HomeMy WebLinkAboutPERMIT FOR DAM CONSTRUCTION INLAND WETLANDS AND WATER COURSE'S APPLICATION INLAID WETLA203 AGENCY ACTION THIS APPLICATION SILML BE RECEIVED APPLICATION NO. BY THE I NLA D WETLA DS AGENCY AT T. RECEIVED DATE REGULARLY SC=,--DULED MEETI1NNG ON THE PREL. APPROVAL 9ATE SECOND MONDAY OF T MONTH AT TOTh`N PUBLIC HEARING DATE HALL. ; FORMAL REV IE7ri DATE (Completed ADnlication) PLEASE PRINT AND FI E IN TRIPLICATE PF► 41T GRANTED DATE AT THE OFFICE OF TO i CLERK, TOWN OF PEI:LNIIT DE:iiI£D DATE SOUTH WINDSOR y 011E MEEK PRJOR TO THE REGULAR NOTING DATE 1 . • APPLICANTS. T & M Building Company, NO . 489 9229 ., . ADDRESS 110 Brook Street CITY STATE Torrington -Connecticut 2. OWNER T & M -Building Company TEL. ,Np 489 9229 ADDRESS 100 Brook Street CITY & STATE Tozr'ngtont Connecticut 3. LOCATION OF PROPERTY Norton Lane (north end) �.. NAMES OF ADJACENT PROPERTY OWNERS See attached map for location of site and adjacent property owners STATE CLEARLY AND BRIEFLY 5 ' P RPOSZS AND DESCRIPTION OF THE PRO?OSED ACTIVITY, AND r= TIME EL ' yy'1`NT INVO LV'D See attached statement re TIMBER KNOLL SUBDIVISION PHASE I & : PHASE II b. ADDITIQ^ AL IRT ORL%iATION AS MAY BE P.EQUIRED BY THE AGENCY '•� MOTE: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS To BE CONSID�EIED COMPLETE ONLY WIEN ALL INFORMATION & DOG X&ANTS REgUI- BY THE AGENCY. HAVE BEEN SUBMITTED. tr� APPROVAL IrM ALSO EE IIECEEMARY FROM T1-',Z PLAIRIMIG AID Z01 ?Z C0i4; SSIO►I. U.0 7E: IF YOUR PROPOSED ACTIVITL IS FOUND 10 EE A REGULA;Aypp FEE OFSIGNED: 1 i cant) revised 12/10/74 r f e+� EROSION & SEDIMENT CONTROL PLAN FOR TIMBER KNOLL SUBDIVISION PIiASES I & II SOUTH WINDSORy CONNECTICUT Prepared By A. R. LOMBARDI ASSOCIATES , INCORPORATED 25 TERRACE DRIVE VERNON, CONNECTICUT TIMBER KNOLL SUBDIVISION PHASES I & II SOUTH WINDSOR, CONNECTICUT The following is a plan for control of erosion, siltation and surface runoff during development o this subdivision. Reference should be made to the Erosion and Sediment Control Plans which indicate location and details of the proposed facilities. Drainage from the proposed development area passes on to adjoining properties at 3 locations including: 1. at the detention pond site 2. on the southerly edge of lot 42 3. on the southerly edge of lots 10-11 (this drainage re-enters the sub- division in the vicinity of lot 4 and leaves again at lot 42) . Construction of the dam (#2) on the southeasterly part of the site will be started as soon as possible after all necessary permits have been obtained an will be the first item of construction. Two settling basins (#1) will be excavated at the downstream toe of tiie dam, at the site of the stilling basin on the dam plan. Topsoil will be removed f om the dam construction site and stockpiled at the w st side of the pond site. Topsoil stockpiles will b seeded or mulched heavily and a hay bale check dairt will be constructed around the downhill side of the stockpiles to confine any material eroded from the stockpiles. Excavation required for the impervious cutoff will be completed and the material stockpiled adjacent to the site. Equipment will be used to minimize the amount of water to be pumped from the excavation site. Haybales will be placed around the downhill side of these stockpiles to confine runoff from the stockpiles. Stockpiles will also be shaped so as to min- imize the amount of surface runoff from them. Suitable material will be used as pervious fill required in the dam. A well point system will be used to stabilize excavated slopes and control seepage during exca- vation. It is expected that the well point system will reduce to a minimum the amount of water to b pumped from the excavation. Impervious fill will be imported and compacted in the excavation. It will be necessary to dewater the excavation before placing the compacted core. Waters pumped from the excavation will be passed through settli g basin #1. Water from the well point system will not from the pond site. Runoff and erosion of stock- piled material will be controlled as described above. Some of this material will be used in roa construction. Upon completing the excavation, rip rap channels from the pipe and from the existing stream bed will be constructed. The emergency spillway will be c n- structed as the dam embankment is constructed. Topsoil will be replaced and seeded on the dam fill and on the pond site as excavation is completed. Construction of drainage lines L and M will begin at the same time as construction of the dam and will be carried forward as rapidly as practiCiLble. As segments are completed, the backf illed trench will be graded and seeded with quick growing cover and mulched as required. If seeding is not possible , then heavy mulch will be used. Hay bales to intercept surface flow will be placed across the steep parts of the right-of-way of line 14. Line M will be compl ted to inlets 20A and 21A. These inlets will be con- structed with 15 inch inlet pipes on the back side, to be connected to pipe spillways from adjacent settling basins #3A and #3B. Settling basins #3A and #3B will then be constructed. Construction of the drainage line L will be timed to reach lot 10 as the dam and pond are com Assisting Hartford County Soil Water Conservation D�. ict Rt. 5, So, Main St. Mas�tse Point, May 3, 1973 Mr JRmes A. Block Yarwood & Block* Inc. P.O. Boat 533 Simsbury, Conn. Dear Jim: on March 29th I and Leon d M v Civil ftgineer, ftterabod Platxn4.ng ff a Soil Conservation Service, s, not with you and,Mr. Traub of T & M Building Co. to the proposed storm water systea for the pswQpased Norton South windsor, subdivision* The Tom 8bgineering Dep7t. d requested a review of the st water Outlmtt ing into the upper and of the proposed "site 214 flood detention area:. (fe also discussed the roarran-e t of the general layout in saetion to avoid crossing a small stream ftainageway. A few lots also were mentioned as being on rather steep slopes.) In answer to the first r®quest the storm water drainage will not effect the design and operation of the "site 2" flood control struaturse It is, 1967WOvOr, r ceded that erosion and sedimentation measures be i rated into the plan so as to avoid as mach silting as pos i. ble into the retentive area. We would be glad to work with you ©n these measures and would like the opportunity to re vi4w your plans at a later date. f Rrosion and Sedimentation Mon k use is the South Windsor subdivision regulationaecO Sincerely yours, Artbur Be Cross District Cbuservationist Soil Conservation Service ,ABC asa cc. Mr. Suck Page: 1 t i • t ' it r� t {. ' • a .I•. .. r.• / i J D—DartIPer Se,?t=--goer 14, 1973 i•Tr. Earl Nieden­rerfer U_S_D.A. -- Soil Conservation Se'rvj `e Soa L'P_ '-lain S c.reet Warezouse Point, Connecticut Dear -Carl: Here i s a print of T & M' s proposed `holding on and Property in the l�or won Lane area. P hei r T i In pa.:,ti_culara ou - - concerr_s are: _ 1. Will thee i design -of this basin -interfere ��; �� she other z d signs n this area proposed by the Soil Conser Vation Service. for Avery Brook? Can this basin be use in conjunction with the designs d in g - proposed by iE7_S_D..A Soil_ Conservation Service? Is' this design sufficient. to insure R _ - ._ __ • - that the T & .11 project vrill not worse-n the Situation in the Ave� Br o0s' ry .? - 3 v ould like your co-.menta regarding T & t'I' s proposed basin, and any other thoughts you imay have_ if YOU need -,=e information Please fee► free to cal r Very Cruji/ your s TO,,*=; Q1 SO:1'�'L-{ ,DSOP I ' li _L E. Page Engineering nep r.t�ent JEv - �-� - j -01VSULT1NG EiMGllVEERS and SURVEYORS Hayden L. E Griswold,Sr, October 1 8, 1973 Hayden L. Griswold,Jr, P.E. & L.S. _ Walt r S.Fuss P.E. William D. O'Neill Mr. J. E. Page, Planning-Engineer Coordinator P.E.&L..S. • Town of South Windsor Glenn irti P.E.�'L S. Town Hall • South Windsor, Connecticut L onard Jahnke Jr., M.S. William F. Kiobk Dear Mr. Page: Howard M.Weal+r B.S. In accordance with your October 3, 1973 authorization we have reviewed the drainage plans of the T & M Building Co, for a proposed subdivision surrounding the n rtherly continuation of Norton Lane. Before a review of the subdivision can be made, we would like the subdi ider's engineer to provide the following data: 1 . Flow computations should be redone in a manner that will present data in a fashion similar to that on the attached sheet. Indicate design criter a. 2. Total drainage areas should be shown on a small scale map such as a U.S.G.S. 3. Upstream flow into the subdivision (Tumblebr ok) should be computed on the basis of possible flow rather than on the capacity of an existing pip 4. Particular attention should be given to the ab lity of inlets to take design flow. Preliminary in ications are that some single inlets will be far overtaKed. 5. Show the existing structures and piping on Red Fox Lane. 6. Indicate total flow to the proposed pond. GRISWOLD & FUS Is INC . 210 Main Street Manchester, Connecticut 06040 Telephone 203) 646-2469 948 Main Street Willimantic, Connecticut 06226 Telephone 203) 423-1191 r • , Mr. J. E. Page Page 2 October 18, 1973 7. Prepare a flood routing for a 100-year storm for the proposed pond. This routing should include, a) Design criteria b) Elevation discharge curve c) Mass curve d) Elevation storage curve. 8. Provide present flow in the proposed pond outfall. 9. Consider possibility of relocating the 18 inch outlet structure from underneath spillway. 10. Provide dam construction specifications and design data. Include borings and soils report. Has a permit been applied for from the Department of Environmental Protection? 11 . Provide an opinion of a point discharge on the downstrearn drainage area. 12. What is the legality and downstream exposure in transfer ing water from one drainage area to another? When this data is received, we can then proceed to make a review of the proposed drainage and its effects. I believe the subdivider's engineer should be informed as to the Town of South Windsor's drainage criteria for normal subdivision design. Very truly yours, n Walter S. Fuss WSF:w r � i • CiONSULTING ENGINEERS and SURVEYORS January 18, 1974 Hayden L. Griswold,Sr. P.E. L.S. Hayd n L. Griswold,Jr. P.E. & L.S. - Walt r S.Fuss P.E. Mr. Jules E. Page Willi m D. O'NeillEngineering & Planning Coordinator P.E.&L.S. Town of South Windsor Glenn J. Mirtl Town Hall P.E.&L.S. 1540 Sullivan Avenue Leonard Jahnke Jr., M.S. South Windsor, Conn. 06074 William F. Klock Howard M.Wexler RE: Proposed Subdivision - B.S. T & M Building Company - Timber Knoll Dear Mr. Page: In accordance with your request, we have re-reviewed the resubmission of the sub- division plans that were revised essentially in accordance with our October 18, 1973 letter. All of the points outlined in the letter have been addressed. We have some further comments to make on the resubmission, most of which can be considered as minor. The following are our comments: Drainage Calculations 1 . Design criteria is not indicated; Such as design storm and runoff coefficients (I). 2. There are no calculations from catch basins *1 A to #1 and *1 to *2. The calculations start with "off site - 211. s GRISWOLD & FUS a imc . 210 Main Street Manchester, Connecticut 06040 Telephone( 03) 646-2469 948 Main Street Willimantic, Connecticut 06226 Telephone( 03) 423-1191 Mr. Jules E. Page Page 2 January 18, 1974 3. The flow entering catch basin #3 will flood to the centerline of the road. Additional pickup will be required at the cul-de-sac. 4. The pipe from catch basin #3 to catch basin #2A (labeled MH#1 in calculations) is too small. 5. Why is the storm and sanitary right of way from Juniper Lane to Norton Lane being graded? It seems that the fill east of storm MH#2 will block the swale running south from L.ot #9. 6. Catch basin #13A is not included in the calculations. It would appear that a considerable area from land north of the development will enter this catch basin. The storm d ain system on Clearview Drive must be sized to take the qows when Clearview Drive is extended to the north. 7. Plan and Profile Sheets 6 of 7 and 7 of 7 were not in luded in the submission. Therefore, Sheet #2 of the drainage calculations from catch basin #24 to catch basin #33 aid to the outfall cannot be reviewed. 8. There are no calculations for the 18" pipe entering the system from the future road between Lots #4 and #5. 9. Part of the pipe from catch basin #18 to catch basin #19 on Norton Lane has less than 1 .5 feet of cover. 10. The flow entering catch basin #18 is too high for a single grate catch basin. 1 1 . There are no calculations for catch basin #22. The contour map indicates a swale running to this basin. This may require an endwall for a pickup. 12. An explanation of what is proposed at catch basin #23 is required. It appears that there are two outlets from this catch basin with one running south to the existing system in Charing Road and one running east to a swale which eventu- ally runs to the Charing Road system. It appears that the outlet end of the pipe running east is higher than the inlet end. �_ v h Mr. Jules E. Page Page 3 January 18, 1974 13. The capacity of the existing systems in Charing Road should be calculated along with the proposed design flows. The existing system does not appear to be adequate. 14. The pipe from catch basin #1 to catch basin #2 has ess than 1 .0 feet of cover. Detention Basin The inflow mass curve as developed in Table No. 2 is satisfactory. However, the water level in the detention basin should be calculated by routing the design storm through the basin using an Elevation- Discharge curve for the outlet pipe and an Elevation-Storage curve for the basin. A discharge hydrograph should also be p vided. The proposed excavation in the detention basin should be Bhown. If you have any further questions, please do not hesitate to contact me. Very truly yours, Walter S. Fuss WS F/dw s L J T T ST CT 4 PAR-P-A EN T %'D GONNX-L-1-MUT OjTC.Z �UILMNG A 2 Ix,0% 1173 T Building Company M' 110 Brook Street Tor mingtonp CT Res Tl�er Kn011 R*ttr#t'** PCnd Dl* • Smth Winds= Gentlement n for 8-- permit to construct a retention dam IOC&t*d Your application ion of BOelztbub road and Avery Street in feet northwest of the intersect South Windsor has been reviewed by our consultant- From a detailed hydrologic review of the PrOJOCtv it has been determined haL additional freeboard is -requized4b Please submit revised plans ;xoviding a -t minimum of two feet of --freeboard-at design-discharges aw We would also call to your attention that according to COTVWCI:icut l ath of water rights it is illegal to divert water from one watershed to no e r This office does no.t have, the jujisdiction to prohibit this PrOPOsed Howeve,, you, company would be exposing itself to future legal diversion. & --A ty -rom riparian o"neis in the -Aat*jsh*d for diverting from its liabili r natural cc,,U&zse- Very truly yours, -0 J6 ,Victor F. Galgooski Supt. of Dam Maintenance Water & Related Resources VFG%li)g mr'l r, r c., Ott. 6, So. s?.ain Stet, Warehouse Poi-nt, (316308$ r+ 1 rcn 120 1975 r s M Mr. Charles Pelletier A.-R. Associates 25 Terrace Drive Vernon, CT 060,66 � fir--r1r, -Pelletier'. l am enclosing a: copy of the -latter ,fry Whltr-,, in res-nonse to the smnstruetion dp--tzils of the det.exxticn pond. Based on t1he comwents, tha f ollvwing is recomrt 3ded z 1) -I. r air I s ji.?l= or dcw fgn in maser ac fuU C pipe flow (Or c ose to i L} can he riotaited bef c re the y emrgency sail11wav would carry riff r 'i`his i partic-- �.�i uj s Z l ar important s Lnce_the era-erg--e--ncy spi l .way runs along the toe of the dam- With a full flawing rA `w _ gency would not carry water as frequently, 2) Allc4 for ta"s6 'in-mbdLfying the 3" orifac:-_ d ft _ - l1,� ' � �! ' �r',�3 a fin:. tit '_►? rr6bl6n. A larger opening or other 4:ltarnat may be necessary. L i k>di.fy anit-seek co j ,--,4r and pipe j ointa to include flex- ible ible nra_erial that ',will not bLea I�tl g ta] place in -a.-�.� .. }- f'he above r� ..� nda--i ons, �tare_ 1'�I' 1d be f �.,�,.�. pion �Q CY-Lzr t y�.' '�'' .� �.c tc Y "d .. '•r►i-r�r-i t, `Win.. - t ; pay vt1 y-. .�p� 7�• •� +�►�y1 1 _ r• '}..,�- fL.e-+R1 -w ay i 1 L. �a t i i�tii l-a r ♦i1 p a p ��a t.t l d i./.e s � x-IV and p +c ce . ..�� 1 �r ..4 z nisure s abli i Zation 9 i e R SO .'t �t�?�15ar"T1CJ32lst, ��► it e-o P yy � 4 i r "�!s4�=•�a'�?_r���.ir�'e`r�r.�'r_ .•rj5lt��51',.�,.�,,,"Yi .4;.. J�•�.,,�w�.sq•` �� 4 - �h., ",. _. y � ., tr., �de�'r;t«. .y�b�t y;`!:��-- r�,p''`vs7 -.,'➢�'i,���s .+��,.'�'.` t ;i;., "x r _Y;.y.C�t. �.. r � ✓ f}`` ; Y� r Route 5,South Main St. - ',Varehouse Point,Conn.06088 - Telephone: 623 40*607 `r .�-A y - r W � i�w}� .S. �.i+g .yn+� �,� .r Y r -; Dear 'Ir r F!4.any..ol in ' SIZ si%s e onu,- to ins=- ,-a- -siltation stream bazK, y Land tr m r -dreM- is state Gnat Z l � � V � ;;. e0�i � s to cozy out . soil � � ' vea and 6 plan Aram i leZ3 than f5=0 4D2 �;�.� S:meted in t t3 mina, e area i 'o" eaen ra i`$. , � sue.$ -, med it by 4M i.fr.iy t Soil O+r�AdSeV�"L$'i� ati��s elits ' 4 '^� w.-ri t {` ' `� '}s� w S�Wr is 1s ..�..L-i`..i d a�-Li{ 1✓1. S..i #I~ .Y"r+ w. .. w s.,a y�-..r•-,a�r Y 7P-e.-t L r6waiw�`.,�1`.. 2;��'y.`.L► .� ~e�1,e.�. +��-+����.rM aA. 'MST f�-�b� +�i 0.2.1� i�..J6�����i.,LY'�5_".� -i "��t `� J4- •::::a a i z? i�S i�...� LJA �X�•.�i.i vra:�L* L:i call:-�,• t.'*-�J 1i.i SJ'.f�.}r.�r,� �.A _ _ v questions .ham�w t+ 'f�► �Y. +� � r4+'��� •� a - r i y j \ r i, • � SCS Personnel Af1THUk B, CPO:S Sol' Cr_ "'_rv-)tionrst Bea��o�S•,p�rv�sor; ,'� ` E?JAIL. F�_il��l� .1�E,'T'rt,a�.. € 503 Gf,,h3:•t Rd- >.• :.!r-v.f' -1 Rd. f � � �.� � .• _ ^c�nn- �rU-?Ct[;rnr,�, C.�r:rl. G',��. •�'i - D ITA"TiNIENT OF ENVIPONMENTAL PR ZOTEJIO ' SrATF 01FIC-1. BUILDING r W-ATER RE-`",`,,UHCE3 ITL..TIrl" T C C',-.TS T.,TCT FOR 20 Febnaf;-f---- 1976 T 1-1 E .Idinm, Comlpaxw (Rcnewa Peinits issued on. 1-11 -I r',74 PM-d March 179 110 broc�k s-tnaet .5 v r1orringtor., Cl o' TCT.T-kj; `Guth ";irldsor 1975). Lvery hroolc UxMa=ed tribirtary Your application for a permit to (rea d-r (construct) o-"' unnamed tributarm, of Every Trook in the Toim of in accox-d-C-Lne-J.. . with plans priepared by Nscoelate- Inc. dated Decec.ber 1974 (a.1sd- lett&r of Feb nczry Ir-1,-,) has been renoriewed.. The construction, in accordance with those plans, is APPY1.0117D under -Ule- conditions -which follow. I. The Commissioner shall be notified as follows: A. When cona truc-cica ha star tee;. w1l.Len Pr*.jea-c I%.-- I v- c-cir.pI c-Ced zrcac�; for". final inspec on. 116. This permit vrith the plans and specifications must be kapt at the site of the vro3:11c, and made available to the Comnissi.-nex, at any time during the construction. IT 1. 101 any changes are contemplate"d or required, the Cor.mais'sioner C) -MUSICP be notified and supplementary approval o1atained. DI.. If the co.,astruction authorize' by this perm-it is not st.,xted -) yc te of this P=rl-nit and cem- pleted .,rithi n r-j of the dca L,- ,within of da"t"e, this pea=dlC. must be renewed. -iiL;-q resn-c'fe Uni t s, i V. Fi-ndinG of Fish and Water to Se::C'10'Ll 26-1--4 of tiie 1975 Revision o--.' the General Statutes: P fi i.1, !a-.,7a-y is required. Ll L.-allati-on of ac structure does not warrant the ins' f i S11 vray at -Lhio- Sfioul-,-4- c.-ndit-ions cln tftis ter— shed change so that free ride-ration of fish in the watel-.ray is Prevented by the dam, you or the person o-.-.mng th daum at that time m-n-y zh--. -n be to inst-C-11 a fis.--i-ray, o�: remove the barrier. �itab ie :_u to ,,ei r:►it l rce �:ti recL Of shl in t'._Q and V.ater Life Uiiy- 9 De--n--tment of -1-ctecti on, State Office Euilding, ha.r..-ord, Connecticut %:lli be ;lad to assist y u in ply.-n-nin`, a fiy-1.04ay -.-Thiel-,, will Td: et our requires:en-i,s. Vi. kdditior_al reQuiren-.ents 4 Your attention is directed to Section 2j--112 (Public Lct Wo. 571, 1975 Revision of the General Statutes) iihich states, in hart regardin5 this Construction Perr;:ii: "A cop. of the perr.dt shall Le sent -to the tovn clerk'". The enclosed carbcn co•.:)y of this pert-At is the cop; intended for the tovim cler: and it is your obligation -to duly file this copy. four attention is further. directed to Section 25--115 (1975 lie vi ion of the General SlUeU tes): "ITot'ririg in this chapter and no order, approval or adxdce of the Cormnissioner,shall relieve any ovmer or operator of such a structure Prow hig legal duties oblid �t=ens and licbilities resul t it-lg from Such ownership or operation. No action for dar.1a.ges sustained t irough the partial failure of any structure or its maintenance shall be bro "ht or maintained abainst the States the Co*::z is ssioner of aivironmental Protec- tion, or his ei,,vpi ogees or wCl -ents, by reason of supervision of such structure ex-ercised by the ConmLissior_er under this chapter". Vie Con--idssioner c viznot convey or wzi,:e any property* ri`ht in aay lairds of the state, nor is this perfAt to be construed as tiving any property -rights in real estate or r►iaterie.l or airy e.:elusive privileges, nor d es it authorize anj in jury to private property or the invasion of private rights or any infrinbement of federal, state or local lairs or revulations. f� C �cerelyT yours, C1 r ='e='y, ►. Gi11 C _�= ��.osier am..... J::G:1jg E:.c1osure L O X 3 11 B I CONSULTING CIVIL AND SANITARY ENGINEERS ASSOCIATES, INC. LAND SURVEYORS 25 TERRACE DRIVE VERNON CONNECTICUT 06066 TELEPHONE NO. 872-2703 February 24 , 1976 Mr. J. E. Page , Planning-Coordinator Town -of South Windsor 1540 Sullivan Avenue South Windsor, Conn. 06074 Dear Mr. Page : Reference is made to your letter of February 17 , 1976 , concerning inspection of existing retention sites similar to that proposed in the Timber Knoll Subdivision in South Windsor. We are not aware of any development in the area having a similar detention pond. Those which have been constructed in private developments are designed to a lesser standard than those imposed by the Town of South Windsor on this project. The Soil Conservation Service has built 21 retention structures in Connecticut watersheds. These generally control larger drainage areas. They are located as follows : 5 in Canaan-Norfolk area (Blackberry River) 6 in Stafford (Willimantic River and Tributaries 4 in Bloomfield (North Branch Park River) 4 in West Hartford - Farmington (South Branch Pa k River) 1 in Hamden (Farm Brook) and 1 in Ridgefield (Norwalk River) There is enclosed a copy of a pamphlet published by SCS and 2 xerox copies of maps showing the location of severaL of the dams in the Hartford area. Those in Bloomfield would be the most accessible as they are close to well traveled highways and local streets . In particular I would suggest the Cold Spring site which is adjacent to Rt . 185 in the southwesterly part of Bloomfield. Mr. J. E. Page February 24 , 1976 Page 2 In our recent telephone conversation, I mentioned to you a detention pond which is located at the south end of 4he .west Farms Mall Shopping Center. This is the largest priva a evelop- ment of this type in this area. However, it is not comparable to the Timber Knoll Proposal as it has twice the tributary drain- age area, less than 2/3 as much storage and a much larger outlet thereby allowing''a substantially greater discharge. T e outlet may have been modified since I last saw it in 1974 . U also differs from the Timber Knoll Development in that there is no formal dam. If you require further information, please feel free to call on us. Very truly yours , A. R. LOMBARDI ASSOCIATES , INC. ha les J. Pelletier CJP/jp CC : Thom Francoline INLAND WETLANDS APPLICATION FOR TIMBER KNOLL SUBDIVISION SOUTH WINDSOR CONNECTICUT T & M BUILDING COMPANY DEVELOPERS Revised 3-12-76 A. R. LOMBARDI ASSOCIATES, INCORPORATED 25 TERRACE DRIVE VERNON, CONNECTICUT TIMBER KNOLL SUBDIVISION The proposed Timer Knoll Subdivision Phase I a II includes : d Phase (1) Road Construction Red Fox Lane 695 Feet Juniper Lane 1100 Feet . Clearview Drive 343 Feet Norton Lane Kent Lane 1700 Feet � 1938 Feet _ Tall Timbers Drive 350 Feet Total length of road to be constructed. is 6126 Feet. (2) 78 Building Lots. (3) Sanitary sewers to serve all lots. (4) In addition to storm sewers in the streets, off street storm drains will include: Line M which will convey Norton Lane drainage around Charing Road and Line L which will divert storm runoff from about 42 acres of land to a detention pond on the southeast part of the parcel. (5) A dam and storm water detention pond. (6) Substantial areas in the easterly art the site will be devoted to open spacef and recreational activities. A copy of the "Open Space Site Improvement Plan" is attached,' This development is proposed to provide desireabl s for residential construction, ites Project work is planned to begin as soon as al l reire approvals are obtained and extend over a period of abo tutwod years. The wetlands map of the Town of South Windsor shows two areas of wetland which lie in part in the project area (Areas I and II on the attached map) , _ 1 _ Area I includes parts of lots 42 , 43 , 44 , and A5, (there is a demonstration raised ranch-style home existent on lot 424 Most of area II within this ownership is includ d in the open space area mentioned above. Lots 31, 32 , 3 , 34 , 63,. 64 and 78 include small areas of wetland within heir boundaries. Eventual residential construction on th se lots will not involve construction in a wetland. There will also be about 140 feet of road const uction across wetland area II including a culvert to carry nter- mittent drainage flow and roadway fill and paving ma erials. Excavation in wetland area I on lots 39 , 40 and 41 will be required at such time as houses are built. Depen ing on the size and design of the house, excavation will pr bably be in the range of 120 to 180 cubic yards. The mate ial is expected to be sandy gravel. Some additional exc vation may be necessary to grade the lot. Topsoil will be alvaged, however, it may be necessary to import additional to soil. Wetland area I will be essentially eliminated a a "natural" wetland and probably will be converted 100 eecent to residential use including buildings and the usual ssoc- iated paved drive, walk and landscaped lawn. On. the asis of recent field inspections, we feel that area I has ittle value as a wetland. The dam and detention pond are not in an area de ig- nated as wetland soil, however, the site includes a s all excavated pond and segments of intermittent stream be . Construction of the pond and dam includes the excavat on of about 30,000 cubic yards of soil including about 1 000 cubic yards of stripping; 2,000 cubic yards of clay-s lt, and the remainder sandy gravel. Topsoil will be salv ged and replaced. Materials to be imported for construction of th dam include about 5,130 cubic yards of impervious soil t be used in the core; about 950 yards of filter gravel, a ut 600 yards of six-inch rock and about 160 yards of proc ssed filter stone. Remaining fill required for constructio of the dam embankment will be obtained on the pond site a d is included in the total excavation mentioned above. Construction of the dam and pond will reduce the ize of the existing excavated pond and result in modificat on of about 450 feet of intermittent stream channel. Tre s will be removed from the pond site. Subsequent to co - struction, a wetland area will exist in the bottom of he 2 _ r pond site including a small permanent pond area. Tha pond and dam will retain runoff and moderate outflow at tie prop- erty line. Estimated peak flows from the low level Dipe through the dam are less than flows under natural co ditions. Thus, there are compensating benefits from this part of the proposed plan. 3 - STATE OF CONNECTICUT DEPARTMENT OF ENVIRONMENTAL PROTECTION STATE OFFICE BUILDING HARTFORD, CONNECTICUT 06115 " w„ April 28, 1976 Constance Eriksson, Chairman Inland Wetlands Agency Town of South Windsor 1540 Sullivan Avenue South Windsor, Ct. 06074 Dear Mrs. Eriksson: This will serve to answer the questions you raised in your letter of April 15, 1976 relative to the permit issued by this department to T & M Building Company, Torrington, Connecticut. A permit was issued to T & M Building Company dated May 13, 1 74. On March 17, 1975 the permit was renewed in accordance with plans pre ared by A.R. Lombardi Associates, Inc, dated December 1974. The ermit was renewed on February 26, 1976 for a three Year er' . We not plan to haves oPriadic.- inspections during constructi n by members of this department. However, a final inspection will be made upon completion of the project. We are m will b -a� r 1 manner and m structed in accordance with the fans. Inspections of dams are made if in the judgement of the Commissioner a dam would, by breaking away, cause loss of life or property damages. 0 u r pres taj-. �r-,�—. wi=�h-�F�e_u1.t imat��r rship and Lapera ion of the strucutre once-the development is completed. Perhaps local officials can require assurance from the developer that further maintenance will be provided. If I can be of further assistance, please feel free to call upon me. Sincerely, y Edward J. Daly Director Water Resources Unit 566-7220 EJD:ksn -,-�-'' STATE OF C' ONNECTICUT IRONM�ENTAL PROTECTION _�:' • DEPARTMENT OF ENV {,-- 1�% .•' STATE OFFICE BUILDING HARTF ORD, GONNECTIG[:T 06115 WATFD6 RESGL CAS UTTIT C0�1STRTJCTII') FOR DAD/1 20 FebT'aa r: 1976 (Renews pets iaeued on T 8: M 3uildiniz, Cozoany A4ay '1 1974 and Y rch 179 m brook treet 1975) Cl O�T7 0 i'C-111: South varidsor 3 orrington, P,�I1 J,ve ry brook Z?tI-' ARY: 'rinnar aed tributary Your application for a permit to ( t repaj.r) a dam on an construct) unnazed tributary of Avery E'roo t in the Tovm of ::out*'i Windeor in accor ance with plans prepared by v. Lou." %ri .'�ssocl^tes Inc. c' dated December 1`�74 (also latter 0' FeuruP-r;t ?�. 1`� �� has been reviewed. OZ under he The construction, in accordance with those plans, is I�PP? '�'' conditions which follow. I. The Comanissioner shall be notified as follows: A. When construction has starter;. d When prc: ec' iv ecil,ni r ted F-l.d rcad r for fine inspection. II. This permit with the plans and specifications must be ke t at the site of the work and made available to the Commissictier at any time during the construction. Ill. Tf any changes are contemplated or required, the Corailis 'over must be notified and supplementary approval obtained. N. If the construction authorize" -� ..y this permit is not st-rted ;aithz n two y o*r,3 of the dca to of this permit and c nr,-)]_eted within ti:rc� :►'�'"r:: of the date, this per-odt must be renewed. V. Finding of Fish and Water Life Unit, i-Ath respect to Se tion 26-134 of the 1975 Revision o= the General Statutes: Z!7 r?o fish;Js.y is required. The st•:�ucture does not warrant the instal l ati_on o ti a. f i shway f �-� �-�?for water t?ji s ti.me. Should conditions on this s reayn shed change so that free migration of fish in the watenray is prevented by the dam, you or the person ovmzing the dam at that time may then be required to install a fishway, or remove the barrier. aid �JA, pape4 �, y s- t - 2 - k suitable is us' I ,:•--ovIded to i)erudt free i-J ration of fish in the wa:�er-,,ay_ 'IIie Fish and U:ater Life Uni 9 Department of Eivironurentcai Protection, State Office Euilding, Hartford, Connecticut "115., call Ue I ud to assist y u in planning a fishway which will meet our requiremeni,s. VI. kdditional reauirerneizts: 'four attention is directed to Section 25-112 (Public kct No. 5712 1975 Revision of the General Statutes) which, states in psrt regarding this Construction Perr;:it: ".P: cops- of the verrait shall be sent 'to the toI cler0, The enclosed carbcn co..-)y of this penflit is the copy intended for the tovim eler;-: and it is your or libation -to duly file this copy• four attention is furthcr directed to Section 25-115 (1 '?5 lie vision of the General Statutes): i'llothine, in this chapter .rid no order, al roval or advice of the Commissioner,shall relieve my ot:mer or operator of such a structure frow, hid legal duties, otlibationo and liabilities resulting from such oivnershi p or operation. No action for damages sustained Irou£;h the partial failure of any structure or its maintenance shall be br uSI-it or maintained against the State, the Cor.-imissioner of aivironmental rotec- tion, or his employees or agents, by reason of supervision of such structure exercised iy the Coriniissione-r under -this chapter". The Conmiissioner cannot convey or `wive any property right in eny lalids of the state, nor is this per"i-At -co be construed as giving: any prOPE r ty rights in real estate or i►iateriel or a,iy el.cluive privileges, nor &es it authorize any injury to private property or the invasion of private rights or any infringement of federal, state or local lairs or regulations. ncerely ArOLlrs, r � ' sepal % Gill C. i::,�i5siorier J:•,G:ljg Enclosure V O T & M HOMES • BOX 86 • TORRINGTON, CONNECTICUT 06790 PHONE: 489-9229 Novenmber 8, 1973 Mr. William Grace Chairman Planning & Zoning Commission Town Hall Sullivan Avenm South Windsor, cmwecticut R*.: Timber Knoll Subdivision Application Dear Mr, C:ace: We are in receipt of the attached letter from the t of Envirorunantal Protection dated Novefter 2, 1973. The co1111enta in the first two paragraphs have been invo rated into new plans for the dam, which will be submitted to the Engineering Department in the very near future. With regard to the potential diversion of water from ache water- shed to another, our legal counsel and engineer are wozki,ng Ath the state an this matter. Because it may take a number of weeks to resolve this issue, ue, T & M Building Company would consent to a sixty-five (65) day, extension of the time period for review of the final applica on for Phase I of the Timer Knoll subdivision. We appreciate your oomsideratian of this request for an extension, and we are available should the commission have any further questions an our proposal. Very truly you, Anthony J. Francoline, Vice-president AJF:av Enclosure cc: Mark OLwid P ' r i C • STATE OF COS NECTICUT +• - . r NTAL PROTECTION DEPARTMENT OF EN STATE OFFICE BUIL�DZM H o. CoR+NzcnaT 06115 •i 2 WROWW 1973 Ott ft*1tAtx%= XIPJ!'�k'�II�X T L R Building Company llo Brook Street Torrington, CT Res T1001 Knoll Retention PONVI OM South Nindsor Gentlement permit to construct a retention dam loca ed S your application for a p Street n west of the intersection of Beelzebub load and Avery feet north our consultant. South Windsor has been reviewed by review of the pro3ect, it has been determined ing a From a detailed hydrologic plans providing freeboard is required- minimum submit revised p that additional n discharge. ��-- minimum of two feet of freeboard at design to Connect cut law ing We would also call to your attention that acooedwatershed to a other. of water rights it is illegal to divest water from ohibit this pr posed be exposing itself to future legal s jurisdiction o pr This office does not have the Powater from it diversion. However, your comps Y riparian s in the watershed for diverting liability from Pr ian owner a natural course. Very truly yours$ Victor F. Galg ski - Supt• of Dam eedintenance Resources Water d Rlat V FG:1 j g cc: : ,�� ;ta�� g (;hairman STATE OF =CC»TNECTICUT .� DEPARTMENT OF ENVIRONMENTAL PROTECTION Colo STATE OFFICE BUILDING �-� HARTFORD, CONNECTICUT 06115 2 November 1973 T ZM 9uilding Company 0 00-zo,c Street Torrington, CT Res Timber Knoll Retention Pond Dam South Windsor Gentlemen: Your application for a permit to construct a retention dam locatk 215 feet northw St of the intersection of Beelzebub Road and Avery Street in South 'Windsor has been reviewed by our consultant. From a detailed hydrologic review of the project, it has been determined ,,,,.t From freeboard is required. Please submit revised plans providing a minimrn of two feet of freeboard at design discharge, we would also call to your attention that according to Connecticut law of water rights it is illegal to divert water from one watershed to another. This office does not have the Juxisdiction to prohibit this propos divas aion. However, your company would be exposing itself to future legs 'riparian owners in the watershed for diverting water from is r-atur:�z course. Very truly yours, Victor F. Galgowski Suet. of Dam Maintenance Water , Related Resources a� oc; William Grace, Chairman a�oW N SfA O -, U Ole • y � 1540 SULLIVAN AVENUE SOUTH WINDSOR, CON . 06074 soR•c° AREA CODE 203 /644-2511 May 6, 1976 Mrs. Anne R. Marsh 108 Tumblebrook Drive South Windsor, Connecticut 06074 Dear Mrs. Marsh: In accordance with your request, we are notifying you that the following meeting dates have been set up by the Planning and Zoning Commission prior to the May 29, 1976 deadline for taking action on the T & M Subdivision: Special Meeting - Wednesday, May 12, 1976 at 7:30 p.m in the Engineering Department of the South Windsor TawnBall. Public Hearing followed by a special meeting - Tuesday, May 18, 1976 at 8:00 p.m. in the Council Chambers of the South Windsor Town Hall. Regular Meeting - Tuesday, May 253, 1976 at 8:00 p.m. in the Orange Public Commissions Room of the South Windsor Tcwn Hall. At one of these meetings, the Commission will be taking action on this subdivision. If you wish to contact me for further information, please feel free to do so. Very truly yours, TOWN OF SOUTH WINDSOR J. Page, Pla ng-Coordinator JEP/src E. cc: William E. Grace, Chairman Planning and Zoning Commission S0*1 N Strq t -awn o-P sou� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CON . 06074 0R.00 AREA CODE 203/644-2511 May 20, 1976 Mr. Anthony Francoli ne T` &. M. Building Company 110 Brook Street Torrington, Connecticut 06?90 CMTI= MAIL Dear Sir: At the May 17, 1976 meeting of the Inland Wetlands Agency of th Windsor, a p rmit was granted, with conditions, for your Application No, 005 B -- for T. & M. Building Company Subdivision -- Timber Knoll, located on Norton Lane, South Windsor, Connecticut. The permit is' granted for the set of plans entitled Timber Kno2l. South Windsor, Connecticut, dated October, 1975, drawn by Igron Feinstein Associates, and A. R. Lombardi Associates; and for the set of plans entitled Key Map— Timber Knoll property of T..& M. Building Company,, South Windsor, Cormecticut, drawn by A. R. Lombardi Associates, dated April 12, 1976. The following conditions must be adhered to for this permit tobe valid: 1 The work is to be completed as shown on the plans drawn by Iron Feinstein Associates and A. R. Lombardi Associates, dated October, 1975 and the plans drawn by A. R. Lombardi Associates, dated April 12, 1976. 2 This approval is granted for the Timber KnOU Subdivision s shown on the above mention set of plans, excluding Lot No. 63. 3 The issuance of this permit is contingent on the applican si submission to the Agency of a restrictive deed and a plot plan pertaining thereto Said plot plan shall outline the wetlands areas and Lots Xos. 34 32, 33, 34 and 78. This designated wetlands area shall be thvat to which the restrictions will apply. Ir Anthony Francoline May 20, 1976 T. & M. Building Company Application NO 005 B -- Permit Page 2. 4. the applicant shall iridemil)r and hold harmle;s the Town of South Windsor against any liability which might result from the proposed operation or use. Very truly yours., Constance Eriksson, Chairman INLAND SZTLANDS .AGENCY TOWN OF SOUTH WINDSOR CEschm cc: Messrs. Charles Pelletier, P. Be., A. R. Lombardi Associates Charles Enes, Acting Town Manager Jules Page' Planning Coordinator Allan Young, Director of Public Works Ch les Fhes, Town Clerk 6 ..am Grace, Chairman,, PZC Donald McLaughlin, Building Inspector Joseph Walsh, PZC Liaison Ms. Sandra Bender, Mayor ll� �'v�:Lr �r.jl� Zl�-1�? -'__ T `�Z� a: i_ �� �4: v} "� -- OF scu.= �I1�:DSO' o nd 1CS �ency17, 1S76 iee. _rj of tic S�)ut- s ndsor Inl Q ►,erzAt was granted with conditions, to T.. & M. Buildin Co i pony, Timber Knell Suhdivision, loceated a t Norton. Lane, South I ndsor, Connecticut. A copy of the permit is on file in the office of the -mown Clergy: of South Windsor. Dated at South Windsor, Connecticut, this 19 th day of Play, 1976. 9- - -Vaca-%�C /j z - - - - v:'vd Constance Eril�sson, C ka rnan IIZA 'D V?ETL.MMS G3ET:CY TO.'II: OF SOUTH T LIIDSOR MEMORANDUM TO: Mrs. Anne Marsh FROM: J. E. Page, Planning-Coordinator DATE: June 3, 1976 The following are the numbers you asked for on the T & M Subdiv sion located near your property: 1. Method of calculating the density for this subdivision: Total Acres in Subdivision = 67.7 Zone = A-3 0 Minimum lot size for zone = 3 0,000 square feet Minimum lot size for open space in this zone = 17,500 square feet Possible maximum denxity = 88 lots (67.7) (.9) (439560) = 88.47 30,000 Total proposed lots = 78 Total approved lots = 26 2. Method of calculating open space requirement 78 proposed lots average size of proposed lots = 23,300 square feet (30,000 - 23,300 = 6700) (78) = 12 acres of open space required 43,560 Open space to be provided: 10 acres plus 11 acres for storm water control 21 acres gross 10 acres plus one-half of 11 acres 5.5 acres 15.5 net cc: William E. Grace, Chairman Planning and Zoning Commission MEMORANDUM TO: Mayor Bender FROM: J.E. Page., Planning and Zoning Coordinator DATE: June 22, 1976 RE: T & M SUBDIVISION Attached is the information you have requested regarding correspondence between the Town, Soil Conservation Service and the State in reference to T' & M's proposed retention area. attach. r � - 1 � WPRK SESSION WN COUNCIL ' ` OAUCUS ROOM - TOWN HALL MONDAY, SEPTEMBER 27, 1976 SOUTH WINDSOR, CONNECTICUT TINE: 7:30 P.M. 1. T & M - OPEN SPACE SUBDIVISION WITH DAM Buck Page outlined the proposed open space subdivision which has received PZC approval for 26 lgts, contingent upon the Towr%'s wil-lin8ness to accept a water retention area (dam) as part of the open space -land. T & M's proposal is to control the water in the same manner as SCS, my on a smaller scale. The dam would be about 9 acres in area, with the balance of theopen space being 12 acres. It is a 15 foot earthen dam., 400 feet across with a maximum depth of 11 feet of water in a 100-year storm. Design would be by Lombardi, construction by T & M, with the State issuing a permit for construction. The State will inspect the dam after, not during construction. Following extended discussion on concerns, Mr. Page was requ sted to obtain the following additional information and to arrange for anot er meeting with T & M and Council: Town engineering report on design - .analysis of T & M pr posal Proposal for Town inspections during construction and compensation. for same Life expectancy of dam (sediment tion problems) Maintenance costs of dam including replacement equipment Legal ramifications of Town ownership - what is extent oE Town's liability Verify with SCS whether or not T & M dam required if SCS dams are built Check with other towns as to their• acceptancd,I condition , provisions' for-maintenance, etc. of similar retention dams 2. BICENTENNIAL MEMORIAL Stuart Leland reviewed Bicentennial subcommittee proposal for a combined community room/museum per his memo to Council. The building lmder consideration is the "Sullivan House" at Wapping Center to be moved to land donated by Mrs. Williams on Clark and Ellington, at an approximate cost of $34,200 for moving, repairs and site work. The Committee is looking for a dollar commit- ment from the Council. There was general but not unanimous agreement that the proposal should receive consideration, however, concerns were expressed over excessive coats and feasibility of moving the structure Some opposition was expressed over using part of the Community Hall insurance money for such a purpose. It was agreed that before any commitment is given on funding or source of funds, that the following people inspect the building,-with the Town Manager reporting back to Council: Representatives of the PBC Fire Marshal - re suitability for public use Building Inspector - re extent of repairs required,. fea ibiiity of same Turgeon re feasibility of relocating (termite inspection S. Leland and M. Lamenzo - Committee representatives It was suggested to investigate possibility of Federal fundilLg to restore bldg. Leland and Lamenzo are to verify SNETCO and CL&P costs. MEMORANDUM TO: Paul F. Talbot, Town Manager ' FROM: J. E. Page, Planning-Coordinator DATE: October 13, 1976 SUBJECT: T & M Open Space Subdivision with dam I am arranging meetings with T & M, the Soil Conservation Se ice, and surrounding towns to provide you with the information requested by the Town Council. I do not have a timetable yet, but will keep you and Allan Young informed of the progress. When this information is compiled, I will arrange a meeting with you to discuss the various items. . E. Page, Planning-Coordinator JEP/src cc: William E. Grace, Chairman Planning and Zoning Commission Allan S. Young, Director of Public Works 4-,/71emo from TOWN OF SOUTH WINDSOR : . TOWN HALL SOUTH WINDSOR, CONN. 06074 TO Buck Page �-- DATF, 10/ 2/76 Allan Young I.._ J SUBJECT: T & M IOLD- Please give me information on T & M open space sub-divisi n and dam as requested by the Town Council at their meeting on Sept ber 27th. (See attached) Paul F. TaI of B•- WORK SESSION TOWN COUNCIL CAUCUS ROOM - TOWN HALL MONDAY, SEPTEMBER 27, 1976 SOUTH WINDSOR, CONNECTICUT TIME: 7:30 P.M. 1. T & M - OPEN SPACE SUBDIVISION WITH DAM Buck Page outlined the proposed open space subdivision which has received PZC approval for 26 lots, contingent upon the Town's willingness to accept a water retention area (dam) as part of the open space land, T & MIS proposal is to control the water in the same manner as SCS, only on a smaller scale. The dam .would be about 9 acres in area, with the balance of theopen space being 12 acres. It is a 15 foot earthen dam, 400 feet across with a maximum depth of 11 feet of water in a 100-ye r storm. Design would be by Lombardi, construction by T & M, with the State issuing a permit for construction. The State will inspect the dam after, i not during construction. i Following extended discussion on concerns, Mr. Page was requested to obtain the following additional information and to arrange for another meeting e with T & M and Council: Town engineering report on design - .analysis of T & M proposal - n.W,-_) 7#i t;-- Proposal for Town inspections during construction and c mpensation for same wife~expectancy of dam s ( ediment tion problems) Maintenance costs of dam including replacement equipmen �. Legal ramifications of Town ownership - what is extent of Town's liability Verify with SCS whether or not T & M dam required if SCS dams are built Check with other towns as to their• atceptance,t conditio s, provisions' ' for maintenance, etc. of similar retention dams 2. BICENTENNIAL MEMORIAL Stuart Leland reviewed Bicentennial subcommittee proposal for a combined community room/museum per his memo to Council. The building under consideration is the "Sullivan House" at Wapping Center to be moved to land donated by Mrs. Williams on Clark and Ellington, at an approximate cost of $341200 for moving, repairs and site work. The Committee is looking for a dollar commit- ment from the Council. There was general but not unanimous greement that the proposal should receive consideration, however, concerns were expressed over excessive costs and feasibility of moving the structure. Some opposition was expressed over using part of the Community Hall iinsuranca money for such a purpose. It was agreed that before any commitment is given on funding, or source of funds, that the following people inspect the building, with the Town Manager reporting back to Council: Representatives of the PBC Fire Marshal - re suitability for public use Building Inspector - re extent of repairs required, feasibility of same Turgeon - re feasibility of relocating (t rmite inspection S. Leland and M. Lamenzo - Committee representatives It was suggested to investigate .possibility of Federal funding to restore bldg. Leland and Lamenzo are to verify SNETCO and CL&P costs. v t T & M HOMES BOX 86 TORRINGTON, CONNECTICUT 06790 • PHONE: 489-9229 October 15, 1976 Charles Pelletier A.R. Lombardi. Assoc., Inc. 25 71arrace Drive VaTnoa, Ct, 06006 Dear Mr, Pelletiert 7he South Windsor Tom Comcil has requested that we provide s infaasma1 ion on the stoma water retention area, which we have designed for the Timber Knoll subdivision off Norton Lorne. We would appreciate it if you would prepare responses to the following questicins so that we might set up a meeting with Buck Page, and a present- ative of the Soil Cmservatic n Service to review this matter, The questions are: �Pzz 1) What is the life expectancy of the dam? - ^-- '- s'a 2) What are the euactimated maintenance costs of the darn, including periodic replmamnent of equip rent? -0") o I � �-- . 3 1ha TO ars coot p the control of erosion and ae rntiticn 15rior to amoplLetien of site work? When will the major somves of sedimentaticn be cat letaed or removed? 4) What are the regal aspects of Tom ownership? While this bas been referred to the Thm Attorney your amrants based on your eVeriences are appreciated. 5) If the Soil Oonservaticn Service's proposed dam are built will our dam be needed? As soon as you inform me that your oontients have been fo , I will October 150 197 Pace 2 of 2 ac edu s a meeting at South Windsor 7ty4m Hall. Sincerely, Anthony J. Fr line Vice-President cm, Buck Page, Planning Coordinator awn of South Windsor Allan Yam, Town Engineer Town of South Windsor Vbnxn XW&scn, Dist, Cmiservationist Soil Conservation Service " Warehouse Pdint, Ct, Abrahm Zhn*dn, President . T & M Building Co. James Block, Coordinator T & M Building Co. UNITED STATES DEPARTMENT OF AGRICULTURE SOIL CONSERVATION SERVICE Agricultural Service Center, 340 Broad St., Windsor, CT 06095 October 18, 977 Jules Page Town Engineer Town Hall 1540 Sullivan Ave. South Windsor, CT 06074 Dear Buck, This letter is a follow-up to the verbal conversation on the Tim er Knoll subdivision detention pond dam. As per our discussion with Whitney (Spike) Ferguson, the dam con truction is proceeding as per design. Compaction could be improved by using rubber tired vehicles. Altering the path of travel would result in more uniform compaction. The hay bale check dam downstream from the dam is effectively trapping sediment. Removal of sediment may be necessary to prevent overtopping of the hay bales. Establishment of permanent vegetation on the dam, once construct on is completed, will be difficult. Seeding this late in the season usually will not result in a good cover. Consider applying mulch and anchoring the mulch. Seeding could then be done early next spring. Rec enda- tions for seeding can be obtained from our office when the information is needed. If we can be of further assistance, please call. Sincerel i ilip J. Morneault Soil Conservationist v A R LOMBARDI ASSOCIATES, INC. L[EUTEM OF TD RS `'-]OUML 25 Terrace Drive VERNON, CONNECTICUT 06066 DATE / � �� JOB NO. Telephone No. 872-2/03 ATTENTION RE TO �t/G e.00 or Ile,V7F GENTLEMEN: WE ARE SENDING YOU ❑ Attached ❑ Under separate cover via the following items: ❑ Shop drawings ❑ Prints ❑ Plans ❑ Samples Specifications ❑ Copy of letter ❑ Change order ❑ COPIES DATE NO. DESCRIPTION 0&00,4a THESE ARE TRANSMITTED as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit-copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution kiIIIIo�srequested ❑ Returned for corrections ❑ Return-corrected prints ❑ For review and comment ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTEF LOAN TO US REMARKS COPY TO SIGNED: If enclosures are not as noted, kindly notify us t ce. FORM 240-2-Available from nos Townsend,Mesa 01469