HomeMy WebLinkAboutRESUBDIVISION (52) TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
PLANNING AND ZONING COMMISSION ACTION THIS APPLICATION SHAL BE ACCEPTED BY
lAPPLICATION # 706, THE PLANNING AND ZONING COMMISSION AT
RECEIVED DATE: j ..25 - THE REGULARLY SCHED D MEETING ON THE
APPROVAL DATE: FOURTH TUESDAY OF THE MONTH. IT SHALL
REJECTED DATE: BE SUBMITTED TO THE P NNING AND
RECEIPT # ZONING COMMISSION OFF CE ONE (1) WEEK
PRIOR TO THE FOURTH TUESDAY.
APPLICANT: T & M Building Com an
ADDRESS• P.O. Box 86 , Torrington , Conn. 06790 TELEPHONE 489-9229
#
OWNER OF RECORD ON S.W. LAND RECORDS T & M Building Com an
ADDRESS : P .O, Box 86 , Torrington, Conn . 06790
COMPLETE DESCRIPTION OF LOCATION OF PROPERTY 15 lots on east end of Kent Lane
and Homestead Drive, plus 2 lots at southeast end of Kent Lane
ZONE A-30
NAME,. ADDRESS & TELEPHONE # OF PERSON TO WHOM CORRESPONDENCE AND INQUIRIES SHOULD BE
,A\-�k• U, 1\e� .
DIRECTED: Abraham Timkin , President , T & M Building Company
P.O. Box 86 , Torrington , Conn . 06790 TELEPHONE # 489-9229
THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING)
1. Zone Change to Zone (public hearing)
2. Filing for Subdivision
3. Filing for Open Space Subdivision (public hearing)
X 4. Filing for Resubdivision (public hearing)
5. Special Exception to Article of the Zoning Regulations (public hearing)
6. Site Development Plan
7. Removal of Sand, Gravel, Clay or Quarry Stone & Ore (public hearing)
8. Other (explain in detail)
THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE OWNER OF THE PROPERTY AND
SUBMITTED ALONG WITH THREE SETS OF PLANS BEFORE IT W LL BE ACCEPTED BY THE PLANNING AND
ZON 0
OmiisION
APPLICANT OWNER
over)
PROCEDURES TO BE FOLLOWED WHEN SUBMITTING THE APPLICATION:
1. Applications must be filed in triplicate. The applications shall be
typed or neatly printed.
2. Maps and plans, as defined in the applicable regulations, shall be
submitted in triplicate with the application forms .
3. An application fee of $25. is required for filing items #1, #5 and V.
4. A subdivision processing fee of $25. per lot ($50. minimum) is required
for filing items #2, #3 and #4.
5. A $20. deposit must be submitted with any item requiring a public
hearing. This deposit is for a sign to be placed on the property by
the applicant advertising the public hearing. The check will be
returned to you when the sign is returned to the Town.
6. Application for Zone Change (item #1) shall comply with Section 11.2.3
of the Zoning Regulations.
7. Application for subdivision and resubdivision (items #2 and #4.) shall comply
with the requirements set forth in the Town of South Windsor Subdivision
Regulations.
8. Application for an open space subdivision (item #3) shall comply with
Section 5.3 of the Zoning Regulations.
9. Application for a site plan of development (item #5) shall comply
with Section 4.11 of the Zoning Regulations.
10. Application for sand and gravel removal shall comply with Section 9.3
of the Zoning Regulations.
IN ACCORDANCE WITH STATE STATUTES, THIS APPLICATION WILL BE ACTED UPON BY
THE PLANNING AND ZONING COMMISSION, OR A PU.3LIC HEARING DATE WILL BE SET
WITHIN 65-DAYS OF THE DATE OF ACCEPTANCE OF THE APPLICATION.
APPLICATION TO TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
PLANNING AND ZONING COMMISSION ACTION THIS APPLICATION SH kLL BE RECEIVED
APPLICATION NO. t1211 BY THE PLANNING AN ZONING COMMIS-
RECEIVED DATE I I-as*-1 J' SION AT THE REGUI ARLY SCHEDULED
MEETING ON THE FOURTH TUESDAY OF
PREL. APPROVAL DATE THE MONTH AT TOWN HALL.
FINAL APPROVAL DATE
REJECTED DATE
RECEIPT NO. Z �d
APPLICANT CQIAP ) t
ADDRESS
OWNER
ADDRESS
LOCATION OF PROPERTY
� ZONE
CHECK ONE OF THE FOLLOWING:
1. Zone Change (Public Hearing)
V" 2. Filing for Subdivision (See "Subdivision Check List")
3. Filing for Re-Subdivision (Public Hearing)
4. Special Exception
Article 4.1.8 (Public Hearing)
Article 4.2.3 (Public Hearing)
Article 4.7.2.7 (Public Hearing)
Article 4.10.2.4 (Public Hearing)
5. Parking—Article 8.5.16 (Public Hearing)
6. Site Development Plan—Article 4.11
7. Removal of Sand, Gravel, Clay or Quarry Stone & Ore (Public Hearing)
8. Other
STATE CLEARLY AND BRIEFLY THE REASONS FOR APPLICATION
1. Application and supplements must be filed in triplicate.
2. Application must be typewritten or printed in ink.
3. The applicant or his representative must be present at the Commission Meeting.
4. Application Fee of $25.00 required for filing Items 1, 2, 3, 4, 5, and 7 to defray expenses.
Applications, other than for subdivisions, shall be accompanied with three copies of a map, minimum size 81/2 x
11 inches, drawn to scale showing the land, buildings present and proposed, plot depths and measurements, street
and building lines, also a measured distance to nearest street corner, names of abutting property owners, and a
sufficient portion of surrounding area to make such a map readily intelligible, and the subject property either
shaded or cross-hatched.
If approved, the Zoning Commission reserves the right to request and the applicant hereby consents to furnish,
within sixty days following approval, three maps prepared by a qualified civil engineer or surveyor showing the
items above.
SIG D^_ `
n A
APPLICANT
OWNER
atOVWN Sf,`
Sou� ?A�2�
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CON . 06074
oe•co�� AREA CODE 203/644-2511
November 1, 1979
T & M Building Company
P.O. Box 86
Torrington, Connecticut 06790
Attention: Mr. Ralph Miller
Gentlemen:
This is to notify you that there will be a public hearing of the Planning
and Zoning Commission on Tuesday, November 20, 1979 at 8:00 p.m. in the
Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue,
South Windsor.
At this time your application for a resubdivision of property into 15
lots on the east end of Kent Lane and Homestead Drive, plus 2 lots at the
southeast end of Kent Lane in an A-30 Zone will be heard. Someone must
be present at the hearing to represent this application.
You are responsible for displaying a sign on the property advert sing the
public hearing, to be visible from a public street, at least 10 continuous
days prior to the public hearing date (by November 9, 1979). The sign is
available in the Planning and Zoning Commission Office of the South Windsor
Town Hall. The $20. deposit submitted by you will be refunded when the
sign is returned.
Very truly yours,
PLANNING AND ZONING CONMISSION
By
Robert F. Gilligan, v37.Fe Chairman
RFG/src
t qqj S f,
° -own o�SIOUIA ?dl��Ot
C �
w` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
soe•co�' AREA CODE 203/644-2511
TO BE PUBLISHED IN THE JOURNAL-INQUIRER SATURDAY, NOVEMBER 10, 1979
TO BE PUBLISHED IN THE JOURNAL-INQUIRER FRIDAY, NOVEMBER 163, 1979
LEGAL NOTICE
TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
Notice is hereby given that there will be a public hearing of the Tanning
and Zoning Commission on Tuesday, November 20, 1979 at 8:00 p.m. ii the
Council Chambers of the South Windsor Town Hall, 1540 Sullivan Ave ue,
South Windsor to consider the following:
1. Application of R. J. Alexander, Inc, for a resubdivision of pr perty
into 15 lots located on Wentworth Drive in an A-20 Zone, known as
Wentworth Estates, Section III.
2. Application of T & M Building Company for a resubdivision of property
into 17 lots located on Kent Lane and Homestead Drive in an A 30 Zone,
known as Timber Knoll, Section IV.
Copies of these applications and maps more clearly defining the properties
are on file in the Office of the Town Clerk of the Town of South Vindsor.
At this hearing, interested persons may appear and be heard and written
recommendations will be received.
PLANNING AND ZONING COMMISSIO
Robert F. Gilligan, Vice Chairman
�l
U
January 16, 1980
Planning & Zoning Commission
South Windsor, Connecticut
Attn: Chairperson
T & M Building Co. , Inc. grants permission to the South Wind or
Planning & Zoning Commission to extend our approval request on
Section IV for Sixty-Five (65) days.
1�1r�
Abraham Temkin
T & M HOMES BOX 86 TORRINGTON, CONNECTICUT 06790 PHO E: 489-9229
OWN !•<<
c �
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 0 074
�4oS0R,cor'� AREA CODE 203/644-2511
January 24, 1980
Mr. Ralph Miller
T & M Building Company
P. 0. Box 86
Torrington, Ct. 06790
Dear Mr. Miller:
Re: Resubdivision - 17 lots on Kent Lane
and Homestead Drive (Timber Knoll, Section IV
Please be advised that the Commission voted to accept the 65 day
extension you granted it at the meeting on January 22nd. The date
by which action must be taken is now March 29, 1980.
We are awaiting receipt of the corrected plans and key map showing
the lots correctly numbered, the square footage, etc. If you have
any question as to what is required, please contact Mr. Page, Town
Engineer. The Commission will be unable to act on this matter until
this is done.
We also understand you have not yet been in touch with the
Sewer Commission and would suggest you do so promptly.
Yours very truly,
PLANNING AND ZONING COMMISSION
By:
Marshall Montana, Chairman
vg
CC: Mr. J. Page, Town Engineer
Sewer Commission - Mr. Pekala, Chairman
4�'wem o from
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR, CONN. 06074
TO Mr. Abraham Temkin DATE February 8, 1980
T & M Building Co.
P. 0. Box 86
Torrington, CT 06790
SUBJECT: DRAINAGE IMPROVEMENT--LOT 62--TIMBER KNOLL
FOLD-
Received from the Town of South Windsor Certified Check #567 8 in the
amount of $10,000 that covered drainage improvement required for Lot 62,
Timber Knoll, So. Windsor.
By
�y S
'towN af,4��
e �
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR-CO AREA CODE 203/644-2511
February 28, 1980
T & M Building Company
P. 0. Box 86
Torrington, Ct. 06790
Gentlemen:
Re: Phase #4 - Timber Knoll
Please be advised that the Planning and Zoning Commission voted at its
February 26, 1980 meeting, to approve Phase #4 of your application for an
open space resubdivision consisting of 17 lots located on Kent Lane and
Homestead Drive, in an A-30 zone, subject to the following conditions:
1. This approval is for lots #55, 56, 63, 64, 65, 66, 67, 68, 69, 70,
71, 729 730 742 752 76 and 77, as shown on subdivision plans prepared by
A. R. Lombardi Associates, Inc. , dated October, 1975 and revised to Febru-
ary, 1980.
2. No Certificates of Occupancy will be issued for Phase #4 of this 71
resubdivision, until the public improvements of Phases #1, 2 and 3 are com-
pleted in accordance with Town of South Windsor Specifications.
3. A surety bond in the amount of $130,000 shall be submitted to insure �•�.
completion of all subdivision improvements.
4. A liability insurance policy shall be submitted in accordance with A
Section 3.2.a.10 of the Subdivision Regulations in the amounts of $250,000
per person; $500,000 per occurrence and $100,000 property damage, naming
the Town of South Windsor as an insured.
5. A Warrantee Deed for the land designated as open space shall be filed
with the Town Attorney to be held in escrow until final approval ol the open
space land in subsequent phases. A Warrantee Deed for the land designated
as the detention basin shall be filed with the Town Attorney to be held in
escrow until all phases of the subdivision are 100 per cent completed. The
Town shall accept the detention basin only after inspection and certification by
the Town Engineering Department that the detention basin has been built according
to the approved plans and is functioning correctly.
6. Plot plans shall be submitted for the land designated as o en space and
de tent ion area.
T & M Building Co. -2- 2/28/80
7. A drainage assessment fee in the amount of $850 shall be submitted.
Additional drainage assessment fees shall be levied on subsequent approvals
of sections of this subdivision.
8. A rip-rap channel, as shown on the plans, leading to the abutting
property owned by U & R Housing Corporation shall be installed before any
Certificates of Occupancy are issued.
9. A gravel road shall be installed wit}iin the open space leading to the
detention area and dam section, subject to approval of theTown Engineer.
10. Drainage for this subdivision shall be subject to approval by the
Town Engineer.
11. This approval is subject to approval by the Town of South Windsor
Inland-Wetlands Agency.
12. Concrete sidewalks shall be installed on both sides of the street frontage,
in accordance with the Town of South Windsor Subdivision Regulations, and
consistent with Public Act 75-295. The sidewalks shall be connected to the
existing sidewalks on Norton Lane.
13. Street lighting shall be installed, subject to approval of the Town
Manager.
14, The placement of fire hydrants in this subdivision shall be subject
to the 1. of the Fire Marshal of the Town of South Windsor.
11 -d lots in this Section shall be connected to the Town of
South ,ry Sewer System, subject to approval by the Town of
South k _lommission and the State of Connecticut Department of
Enviroru: _tion (DEP) .
16. Water shad be supplied to this subdivision by the Connecticut Water
Company.
17. The Street name "Kent Lane" is subject to approval by the Fire Marshal.
All street name signs and supporting posts shall be installed by the developer
in conformance with standards of the Town of South Windsor, at no expense to
the Town.
18. Prior to the building of any structure on a lot, a topographic map,
drawn to a scale of one inch equals 40 feet, shall be submitted for each lot
in the subdivision, showing proposed contours and elevations. No building
permits shall be issued until the proposed contours and floor elevations have
been approved by the Town Engineer.
If for any reason, finished grading and other site work is not completed,
the Town Engineer shall determine the amount of a cash bond to insure final
grading and site work. This cash bond shall be submitted prior to a Certificate
of Occupancy being issued .
T
T & M Building Co. -3- 2/28/8
19. Black and transparent subdivision plans of the plot plans and a black
and transparent key map (1" = 200' ) shall be submitted to the Planning and
Zoning Commission. This letter of approval from the Planning and Z ning
Commission and the letter of approval from the Inland-Wetlands Agenly
y shall be
reproduced on the black and transparent plans as part of the final laps.
In addition, one cloth copy and three paper prints of the subdivisin plans
shall be submitted. After the mylars have been stamped and signed the
Commission, they will be returned to you for filing in the TownCler 's office.
These plans must be filed within 90 days of the date of approval (by May 26th).
Very truly yours,
PLANNING AND ZONING COMMISSION
By:
vg ars all Montana, Chair erson
CC: C. Enes, Acting Town Manager
D. McLaughlin, Building Inspector
B. McNamara, Assessor
J. Page, Town Engineer
W. Lanning, Fire Marshal
J. Woodcock, Esq. , Town Attorney
C. Eriksson, Inland Wetlands Agency
P. DeMallie, Director of Planning
W. Pekala, Sewer Commission
pow" s 4,C
C D
71awn' � ?A• 2�
� U
�v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
soe•co AREA CODE 203/644-2511
TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY MARCH 1 1980
LEGAL NOTICE
PLANNING AND ZONING COMMISSION
TOWN OF SOUTH WINDSOR
At the February 26, 1980 meeting, the Planning and Zoning Commission
voted to take the following action:
1. Approve, with conditions, the application of T & M Building
Company for a resubdivision of property into 17 lots located
on Kent Lane and Homestead Drive in an A-30 Zone, kna n as
Timber Knoll, Section IV.
Dated at South Windsor, Connecticut this 27th day of February, 1980.
PLANNING AND ZONING COMMISSION
Marshall Montana, Chairperson
Raymond F. Hallowell, Jr., Secretary
C
G
GO
O-Ps ?O&U&O-t
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. C6074
���soe•CO�'� AREA CODE 203/644-2511
March 10, 1980
T & M Building Company
P. 0. Box 86
Torrington, Ct. 06790
Gentlemen:
Re: Timber Knoll - Section III
The Planning and Zoning Commission voted on March 4th, 1980, to amend
the bonding requirements as follows:
1. All previously required bonds, except for the bond for the detention
basin, may be cancelled.
2. There shall remain in effect one bond, in the amount of $1 0,000,
to cover all improvements in Section IV and the remaining improvements
in Section III.
3. The existing bond on the detention basin shall remain in force until
all improvements in the subdivision are completed.
Yours very truly,
PLANNING AND ZONING COMMISSION
vg By
Mars all Montana, Chairpe son
CC: J. Page, Town Engineer
c
February 28, 1980
Planning and Zoning Commission
South Windsor, Connecticut
Ladies and Gentlemen:
We respectfully request release of our Bond for Section III and
permission to substitute a maintenance Bond.
Approximately 900' of Sidewalk remains to be done in Section II
and the seeding of the corresponding snow shelf. To simplify o r o,f�
bonding, we would appreciate including this 900' of sidewalk i
our bond requirements for Section IV. This s ewalk wM-be co -
pleted before May 30, 1980.
N "
We also request the acceptance of our retention basin and the t
substitution of a maintenance bond for the present bond. ''nn
1' d
Very y yo
R�a E. Miller
0
T & M HOMES BOX 86 TORRINGTON, CONNECTICUT 06790 PHO E: 489-9229
�c'Vj N S fq(
IV1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
f�osOR-Co� AREA CODE 203/644-2511
May 14, 1980
T & M Homes
Box 86
Torrington, Ct. 06790
Att: Mr. Ralph R. Miller
Dear Mr. Miller:
Re: T imbe rkno l l -- Phase IV
Please be advised that the Planning and Zoning Commission voted a
its May 13th meeting to grant you a 90 day extension of time to file
the final plans in the above matter. The extension is from May 2 th
to August 24, 1.980.
Yours very truly,
PLANNING & ZONING COMMISS ON
By: _
Marshall Montana, Chairperson
vg
U
May 6, 1980
Planning and Zoning Board
Town Hall
South Windsor, Connecticut
Dear Board Members:
We respectfully request a ninety day extension on Timberkno
Subdivision, Phase #4, application so as to allow the Inlan -
Wetland Commission time to study a problem on Lots 63 and 7 .
Very truly yours,
Ralph S. Miller
Superintendent,
Land and Improvement
T & M HOMES BOX 86 TORRINGTON, CONNECTICUT 06790 PHONE: 489-9229
c T-awn, ap S-Otd44, ?din�
a
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 0 074
R-co� AREA CODE 203/644-2511
:.lay 15, 1980
T. & M. Building Company
P. C . Box 86
Torrington, Connecticut 06790 CERTIFIED MAIL
Dear Sirs :
At the May 12, 1980 meeting of the South I i indsor Inland �:+etlands
Agency your Amended Application NO. 005 B, Timber Knoll-P ase IV was
approved with the exception of Lots # 63 and # 77.
Some of the Agency's concerns regarding these lots include:
1. The possibility of soil instability on lot 74 63.
2. The steepness of the slopes on the above mentioned
lots and the possible drainage problem on lot r 77•
3. The necessity for cutting of trees which wotild in-
crease the instability and the erosion of the area,
4. The foil Conservation Service has also raised ques-
tions regarding this area as documented in the en-
closed report.
The permit is based on the plans submitted,entitled ' Topogra-
phic Map Resubdivision Parcel A & C, Timber Knoll, Property of
T. & M. Building Company, South �,%Iindsor, Connecticut, Phabse IV;
drawn by Myron Fienstein Associates, dated October, 1975, revised
May, 1978, October, 19789 January 179 1979, September, 19 9 and
February, 1980 ; and Supplemental lilap entitled "Property Grading
for Lots / 63 and # 77 Timber Knoll, South '1-indsor, Conne ticut
drawn by A. R. Lombardi Associates, Inc. , dated April 149 1980.
This permit for the remainder of Phase IV is subjecto to the
following conditions :
1. The proposal is subject to the approval of the
Town Engineer.
1 . &: livi. -3ui- ding Company
P. 0. Box 86
Torrington, Connecticut. 06?90
Amended Application NO. 005B - Letter of Permit
May 15, 1980
Page 2.
2. This permit is valid for one year and shall expire if
not exercised within that period.
M
3. The applicant shall indemnify and hold harmless the
Town of South ,':indsor against any liability which might
result from the proposed operation or use.
Very t my yours,
a�
Constance Eriksson, Chairman
INLAND WETLANDS AGENCY
TOV:N OF SOUTH WINDSOR
CE:chm
cc: Charles Pelletier, A. R. Lombardi Associates , Inc.
A. Bowen Davies, Deputy Town Engineer
Charles Enes, Town Clerk
Edward Havens, 1117jayor
Richard J. Sartor, Town Manager
v Marshall ;Montana, Chairman PZC
Donald McLaughlin, Building Inspector
Louise Evans , PZC Liaison
Richard Ryan, Town Council Liaison
i
I
f
United States Soil 340 Broad Street
Department of Conservation Windsor CT 0 095
° Agriculture Service Phone 688-49 6
May 8, 1980
TO: Hartford County Soil and Water Conservation District
FOR: Constance Eriksson, Chairman, Inland-Wetland Agency
Town of South Windsor
RE: Timber Knoll Subdivision - Lots 63 and 77
The following comments are a result of a site check for lots 63 and 77 on
May 5, 1980.
Fill material is being added along the road on lot 63. The plan of 4/14-80
shows a maximum 15 feet of fill in the front two thirds of the 1/2 cre lot
The proposed sideslope of the filled area is 2:1.
A maximum 8-foot cut will be made in the front half of lot 77. The sideslope
will be at 2:1. The proposed regrading will allow stormwater runoff from
portions of lots 75 and 76 to be directed to the back and eastern side of the
house.
Both of the lots are presently wooded. Many trees will be lost as a result
of the cuts and fills planned. These vegetative disturbances will add to
the erosion hazard of the two lots during construction.
There is now an erosion problem from water runoff of the new road b ing
constructed east of lots 75 and 76.
Some streambank erosion exists beginning at the 48 inch pipe outlet and con-
tinuing to the existing rock riprap area at the upper limits of the installed
storm water basin.
The soil type of the brook area is WsA - Wilbraham stony silt loans, a poorly
drained soil. The soil type of the banks of lots 63 and 77 is Ches 're
fine sandy loam, a well drained soil.
EVALUATION
If fill material is added to lot 63, there will be a period of soil insta-
bility. If a home and driveway are constructed-during' the period o
instability there may.-likely be cracking of the walls, floors and surface.
areas after construction. ' The fill material for lot 63 is assumed to be .
coming from excavation of soil from lot 77. Stability will be dependent
on the quality of fill used and compaction methods.
P J
FOR: Constance Eriksson, Chairman May 8, 1980
' Inland-Wetland Commission Page -2-
Town of South Windsor
RE: Timber Knoll Subdivision - Lots 63 and 77
1
t
Yard usage beyond the front and back leveled areas will be limited due to
slopes and the possible lot 77 drainage problem in the rear. Slopes with
3:1 sideslopes would allow for safer and easier) maintainance of the sloped
areas.
,
A diversion and/or careful regrading can be used on lot 77 to prevent runoff
from concentrating in the rear and side of the house.
The cutting of trees, the steep 3-sided mound comprising lot 63 and lot 77''s
25-foot rise over some 90 horizontal feet leading up to lots 75 and 76 may
all be contributing factors to an undesirable appearance for others in the
area. The quantity and quality of topsoil applied, the selected grass mixes/
vegetation used, and the methods used during planting will all reflect upon
the area's aesthetics. Gaining the services of a landscape architect would
be beneficial.
Temporary earthen diversions and seeding on the new road being constructed
i east of lots 75 and 76 will help to check soil losses and gullying of the
area until the road is finished.
The brook bank erosion problem just below the 48-inch pipe outlet can be
corrected by rock riprapping the brook bottom and sideslopes from the
outlet and to the riprapped channel of the stormwater basin.
l
If the filled area of lot 63, the excavated area of lot 77, and the new
road are going to be left for a season before development occurs, a temporary
seeding or annual or perennial ryegrass at 60 pounds per acre should be
seeded on all unvegetated areas before June 15 or from August 15 to October 15.
Before seeding apply 300 pounds of 10-10-10 fertilizer per acre. Soil
erosion and sediment loss can then be held to a minimum.
The Connecticut Erosion and Sediment Control Handbook for further details
on conservation measure installation.
U r
Vern Anderson, District Conservationist
Soil Conservation Service - U.S.D.A.
CC: A. Bowen Davies, Deputy Town Engineer, Town of South_ Windsor
l
i
i f
I
P
0
July 24, 1980
Planning and Zoning Board
South Windsor
Connecticut
Gentlemens
We respectfully request the transfer of our Bond from Section III
to cover the remaining improvements in Section IV.
Yours truly,
Ab aham Temkin
0441
T & M HOMES BOX 86 • TORRINGTON, CONNECTICUT 06790 • PHON 489-9229
4
/980
ninzwi�n �D•rl�sr�35io.-�
etc,/ .7 7;177 ze", 00 4:�
.cam �'/
N M e�71/®.� h e 4rc� no
of
�./v . EGG..d ✓����..T
/ 7 el .
d
1�
T & M HOMES BOX 86 TORRINGTON, CONNECTICUT 06790 9 PHONE: 489-9229
MEMORANDUM
TO: Town Treasurer
FROM: Planning and Zoning Commission
SUBJECT: Drainage Assessment Fee - T & M Homes, Phase I
DATE: ' July 29, 1980
Enclosed is a check in the amount of $ 850.00 This is the
drainage assessment fee collected by the Planning and Zoning C mmission
for T & M'Homes, Section IV
w
Please deposit in the proper account. Thank you.
vg
enc.
•I wllclm,ya• r T z C Ccx WNRN AID •ACca`mo
CW-9 F L INO ACCOUNT - - - -f •^ '-
'-- - T & M HOMES, I C. - '.j 6 7 8
SPECIAL-ACCOUNT
i P.O. BOX so �f
_ TORRINGTON. CONN. ' 06790 �/ - ~ . 951-80 i
TOTAL OF INVOICES - - ' 1 v 1` _' --jai ��-•'
LESS %DISCOUNT �
i
LESS ORDER OF
TOTAL DEDUCTIONS J/ - - " I •`
AMOUNT OF CI-IECK �- (Jlr,�lr� / f n DOLLARS
The Colonic k Ban
and Trust Company �� 1
TORRINGTON CENTRAL OFFICE
TORRINGTON.CONNECTICUT 06790
pow
r T-OW112, ale ?din�
C �
R
s v 1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. 05074
OR-CO AREA CODE 203/644-2511
August 1, 1980
T & M Building Company
P. 0. Box 86
Torrington, Ct. 06790
Gentlemen:
Re: Phase IV - Timber Knoll
Please be advised that the Planning and Zoning Commission voted at its
July 29th meeting to grant you a 90 day extension of time in which to file
the final plans in the above matter. The extension is from August 2 th,
to November 221 1980.
Furthermore, the Commission voted -to allow the bonds in effect at th present
time to cover both Sections III and IV. Currently there is a bond 'n the
amount of $130,000 to cover the improvements, and a bond on the dete tion
basin.
Yours very truly,
PLANNING AND ZONING COMMISSION
By:
Marshall Montana, Chairperson J
vg
TH E TI��VELE�ZS
Surety Department
Robert F.Compbtll.Manager ,
August 29, 1980
Town of South Windsor
Town Hall - Contract Section
Sullivan' Avenue
South Windsor, CT
Re: T & M Building Company, Inc.
Bond #209E5657
Bond Asrourt: $100,000.00 Subdivision for
Water Retention Basin in rimber Knoll
Eff. Date: 8/18/77
Dear sir:
In order that we may be informed as to the present status of the above
captioned, we would appreciate your furnishing us with the folloaing
information.
Has the above work been satisfactorily completed?
If so, may the bond be released? ZL Date
If not, in your estimate, what is the value of work left to do ,
Signed
Xk-
Thank you*
Very truly yours,
Robert F. Campbell, Manager CID
Surety Department
RFC:rk
HARTFORD oVFjCV..OV THE TRAVELERS INSURAN"(X)MPANIBa
5o 1'ro%xvt stmet,11artfurd.Conmcticut 06115
A0*N SC4
719,WI-2- oie S-Cwdl Lf2�
r
4 �v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
S.11 OR-CO AREA CODE 203/644-2511
November 12, 1980
T & M Homes
Box 86
Torrington, Ct. 06790
Gentlemen:
Re: Bond Reduction, Phase IV, Timber Knoll
Please be advised that the Planning and Zoning Commission voted at its
October 28th meeting to reduce the bond requirements in the above natter
to a $30,000 bond for subdivision improvements.
Yours very truly,
PLANNING AND ZONING CO SSION
l �7
• A)
Marshall Montana, Cha'rperson
vg
0
October 101, 1980
Planning and Zoning Board
Town of South Windsor
South Windsor, Connecticut
Dear Board Memberss
We have completed the Under Course and all underground work
for Phase IV of our Subdivision at Timber Knoll, South Wind or,
off Norton Lane.
We respectfully request a reduction of our Bond.
Yours truly,
GAb an Temkin
President
T & M BUILDING CO. , INC.
T & M HOMES • BOX 86 a TORRINGTON, CONNECTICUT 06790 PHONE: 489-9229
pow" 44
T ap S ?dzn�
�v 1540 SULLIVAN AVENUE SOUTH WINDSOR, CON . 06074
oR,co� AREA CODE 203/644-2511
May 13, 1981
T & M Homes
Box 86
Torrington, Ct. 06790
Gentlemen:
Re: Timber Knoll, Phase IV
Open Space
The mylar showing the open space in this development has been signed and
approved by the Planning & Zoning Commission and is ready for filing in the
Town Clerk's Office. Would you kindly forward us a check payable to the
Town of South Windsor in the amount of $8 to cover the cost of filing the
mylar so that we can conclude this matter?
Yours very truly,
PLANNING AND ZONING CO SSION
/VX,vg By:
Marshall Montana., Chalrperson
�OVI S f,
Y 7-awn- 074e s �
�v 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074
OR•co AREA CODE 203/644-2511
December 17, 1981
T & M Homes
Box 86
Torrington, Ct. 06790
Attention: Mr. Abraham Temkin
Dear Sir:
Re: Timber Knoll Subdivision
The Planning and Zoning Commission voted to reduce the bonding requirements
for this subdivision to the following amounts:
1. A $13,000 Maintenance Bond '�• 04:�' k4lvJ
2. A $5,000 bond to ensure installation of street lighting
3. A $10,000 bond to ensure grading of the two uncompleted lots
4. A $20,000 bond to ensure completion of the road to the detention
basin.
We have the $13,000 maintenance bond, which we shall retain. We also
have a $130,000 bond which we shall hold until it is reduced to cover the
other $35,000 shown above.
We are returning to you the $100,000 bond for the detention basin which
can now be cancelled.
Please forward us the endorsement reducing the $130,000 bond t $35,000.
Yours very truly,
PLANNING AND ZONING COMMISSION
vg By:
enc. rshall Montana, hairperson /t�
0
November 6, 1981
Planning & Zoning Commission
Town of South Windsor
South Windsor, Connecticut
Ladies and Gentlemen:
We respectfully request town acceptance and bond release o
our road for the final section of our subdivision at Timbe
Knoll, and the retention basin we have constructed for th
entire development.
We shall substitute a maintenance bond for whatever sum your
public works department requests.
ours ruly,
A raham Temkin
T & M HOMES * BOX 86 • TORRINGTON, CONNECTICUT 06790 PHONE: 489-9229
Nathan A.Schatz
(1892-1956)
Louis M Schatz
(1894-1953)
Irving S Ribicoff
�} j � Arthur H Schatz
u�Z&Schat f h S.Michael Schatz
David Kotkin
Attorneys at Law Walter B Schatz
Melvin S.Katz
I.Oscar Levine
Davida S.Edelson
Mark S.Shipman
Michael L.Widland
Stanford N.Goldman,Jr
Lalfeebhai R.Patel
Peter H Levine
Mark Oland
Robert M.Dombroff
Stuart M.Roth
William C.Doran
Samuel J Henderson
Thomas A.Gugliotti
Samuel D Chester
Bruce G Temkin
March 8, 1982 Jack S Lipson
Robert F Schatz
F.Mark Fucci
Donald R.Gustafson
Mark J.Kolovson
Steven M Gold
Mitchell S.Jaffe
Paul A.Rufo
Town Planning & Zoning Commission Gary D.Jones
Town of South Windsor Andrew W.Krevolin
Richard P.Rubin
1540 Sullivan Avenue Paula L.Schiffer
South Windsor, CT 06074 Daniel P Ben-Zvi
Ross G Fingold
Donald S Gershman
Attention: Marshall Montana, Chairperson Gary Klazmer
Re: T & M Timber Knoll Subdivision Phase IV
Dear Marshall:
Enclosed please find a copy of the approval letter for the
above referenced subdivision dated February 28, 1980. The lette
lists eighteen conditions which must be met before final approval.
is given for the subdivision. T & M is planning on mortgaging several
of the unsold lots and the mortgagee requires a status report on the
subdivision. I would appreciate it if your committee could update
the approval letter so that the mortgagee can determine the curr nt
situation and have assurance that the Town of South Windsor is
satisfied with the progress of the subdivision and that all the
subdivision bonds are current.
If you have any questions or if there are any problems, please
call me. 41
Very truly yours,
SCHATZ & SCHATZ, RIBICOFF & KOT IN
lviI Richard P. Rubin
PRP:cf
Enclosure
One Financial Plaza,Hartford,CT 06103 203-522-3234 Cable:Barrister
Stamford Office.Two Landmark Square, 3tamford,CT 06901 203-964-0027
S0%4� f�
w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR•CO� /AREA CODE 203 644-2511
March 23, 1982
Richard P. Rubin, Esq.
1 Financial Plaza
Hartford, Ct. 06103
Dear Sir:
Re : T & M Building Co., Inc., Timber Knoll, Sections 3 and
In response to your letter of March 8, 1982, I would advise you that the
plans for Sections 3 and 4 of the Timber Knoll Subdivision have been
filed in the Town Clerk's office, and work is progressing in a satisfactory
manner.
The Commission recently voted to reduce the bonds in this matter, and
currently we are requiring a $13,000 maintenance bond, plus a $35,000
bond to ensure completion of street lighting, grading on two uncompleted
lots, and completion of the road to the detention basin.
Yours very truly,
PLANNING AND ZONING CONVISSION
vgBy,: &A SL
�
Marshall Montana, Cbairperson
V
July 6, 1982
South Windsor Planning & Zoning
1540 Sullivan Avenue
South Windsor, Connecticut 06074
Attention: Mr. Marshall Montana, Chairperson
Re: Timber Knoll Subdivision
Dear Sir:
All punch list items have been corrected, inspected and approved by
the Engineering Department.
We hereby respectfully request the acceptance on the balance of Kent
Lane and Tall Timber Drive which completes the Timber Knoll subdivision
in South Windsor, and the release of all bonds pertaining heret .
Very truly yours,
A sham Temkin
President
T & M BUILDING CO. , INC.
)12- JA-k�
T& M HOMES BOX 86 TORRINGTON, CONNECTICUT 06790 PHONE 489-9229
SOWN 8f,1
o r
c = 7-awn' O-P sou�
�.
a u
s (d 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
R•co AREA CODE 203/644-2511
September 16 , 1982
T & M Homes
Box 86
Torrington, Ct . 06790
Att : Mr . Abraham Temkin, President
Dear Sir :
Re : Timber Knoll Subdivision
The Planning and Zoning Commission voted at its meeting
on September 14 , 1982 , to release all the oustanding bonds
which it is holding . I am, therefore , returning to you
the $13 , 000 maintenance bond issued by The Travelers , a d
the $130, 000 bond issued by The Travelers which had previously
been reduced to $35, 000 .
I am also returning Aetna insurance policy #07 PC 58967
and several certificates of insurance covering Timber Knoll .
Yours very truly,
PLANNING AND ZONING COMMISSION
vg By;
encs .
Marshall Montana , Chairperso
CC : Mr . B. Davies , Deputy Town Engineer
Mr . P . DeMallie , Planning Director