Loading...
HomeMy WebLinkAboutAVERY BROOK RETAINING WALLS APPLICATION TO TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION PLANNING AND ZONING COMMISSION ACTION THIS APPLICATION HALL BE RECEIVED APPLICATION NO. BY THE PLANNING AND ZONING COMMIS- SION AT THE REGULARLY SCHEDULED RECEIVED DATE /1. 2 s- 7 S MEETING ON THE F URTH TUESDAY OF PREL. APPROVAL DATE THE MONTH AT TOWN HALL. FINAL APPROVAL DATE7S- REJECTED DATE RECEIPT NO. APPLICANT TOWN OF SOUTH WINDSOR ADDRESS 1540 Sullivan Avenue. South Windsor. t. OWNER 10 Property-owners - See attached list ADDRESS LOCATION OF PROPERTY Along Avery Brook - From west of Benedi t Drive to East of Manor Lane ZONE CHECK ONE OF THE FOLLOWING: 1. Zone Change (Public Hearing) 2. Filing for Subdivision (See "Subdivision Check List") 3. Filing for Re-Subdivision (Public Hearing) 4. Special Exception Article 4.1.8 (Public Hearing) Article 4.2.3 (Public Hearing) Article 4.7.2.7 (Public Hearing) Article 4.10.2.4 (Public Hearing) 5. Parking—Article 8.5.16 (Public Hearing) X 6. Site Development Plan—Article 4.11 7. Removal of Sand, Gravel, Clay or Quarry Stone & Ore (Public Hearing) 8. Other STATE CLEARLY AND BRIEFLY THE REASONS FOR APPLICATION To construct concrete and stone retaining walls along a pDrtion of Avery Rrook to retain soil now beingeroded from z .. the followina r 'd nts' ro ert . Chalk Kidd May., Amoroso,, Be e , Gallo. adar Deloreto Ber ren and Gilmore. 1. Application and supplements must be filed in triplicate. 2. Application must be typewritten or printed in ink. 3. The applicant or his representative must be present at the Commission Meeting. 4. Application Fee of $25.00 required for filing Items 1, 2, 3, 4, 5, and 7 to defray expenses. Applications, other than for subdivisions, shall be accompanied with three copies of a map, minimum size 81/2 x 11 inches, drawn to scale showing the land, buildings present and proposed, plot depths and measurements, street and building lines, also a measured distance to nearest street corner, names of abutting property owners, and a sufficient portion of surrounding area to make such a map readily intelligible, and the subject property either shaded or cross-hatched. If approved, the Zoning Commission reserves the right to request and the applicant hereby consents to furnish, within sixty days following approval, three maps prepared by a qualified civil engineer or surveyor showing the items above. SIGNED -APPLICANT ` OWNER I�ZLfi T7 WETLANDS 4`i� WATZ'R COuRS�S �L� APPLIC z - / J J - _"+r `TD •'�E'iL^.' 3 AG�TCY ACTION r . {�t �t V . THIS APP.�I ATIM S �'ILL E ^-ter.—, —, �_ ,��, R;r --.-.-, T f _(�7 '1� CB1_�T�R}».c ._:.Q�r.D R J.H_i ./r D DATE +J� �'�•.i, +?�.L:-.Z�'T..,J j• 1 Ij f� '�� AG y..fCIr T - II ,«yz EL. IPPPO�AL v_-T-,,- SC�y 0-,'T TzESECCD i•10NDAY ;H?U3L?U �LIC DATE T H 'T0�' � 1 T TOT R2�LL ''' -: r rYi� FORi4A." R�IIEW DATE • Co:-a-0Ie-.ed Applica�v^on) .,� PER •;, GRA`II'L.D DATE PLEASE PR�'TT �tiiD FI E IN TR i PL �,� A T T:-i 0 r �' P ._ 'ir-I�` DE-1TI'D D T� -� " I��, O mo Y� cL '-ls ~T 0,,P -� S0T7�.r.' �i f iTDSOR 3 0?'F P'�IO� 0r s R .�OT'rE A PPLIC ;' TOWN OF SOUTH WINDSOR RLs;�L."t� _•y ,r_,....�r0 D}L. .-JJ�}Z _ `.T`EL. ITO. 44-2511 ADDRESS 1540 Sullivan Avenue C7T-ir STrAr'F, S6ut1j Windsor Ct 2. OWNER (10 propertyowners - See List) EL. 111 0 Benedict Drive and ADD_=~SS Manor- Lane CIl�..rrr STATE So. indsor t. 3• LOC-ATIOti OF PROPERTZ - Along Avery Brook - from West of Eenedi ct Dr, to L. ITT Al--fES OF ADjACMTT PROPERTY 9,.TIT:w:R. S East of Manor Lane. Chalk, Kidd, May, Amoroso,- Begey, Gallo; Spadaro, Del or or to, Ber ren and Gilmore. " STA` CI,E,aRLY !`0 BRIE-, L 5. �}R�O��;� AN D DESCR?PTI{;�T OF TnE PRO:JSED a, •-�r, ,T � - Z_1 v I-VED _ e__��TY, C tD = TI'�,;.E ;-?+.�?Tn T re ain soil now being eroded from the above-named properties. Concrete and stone walls are being proposed for this �purpo e. It will- be permanent. 6. IAD- I`I'I��;:!�, i"U�fATIO'T AS M`'Y BE R,►Q:U i RED B-f t •-� AG E'TC� -= _ . -- - A concrete- lined channel was proposed in Griswold & Fuss ' Report - F1 d Control Study, Avery Brook Watershed. (See attachdd. ) - - NOTE;_ _ l��l��r T APPL Z C,jt'TT 21,TD_:;2STA:sDS THAT r T.ci rt - TC'��.E�.1..0 1S � 1 CC�riPL- O.TLY y; ,_ ALL r iFOP.N- --I Z D0" ^Y`-'''^ _. t.C, J.�r �D 3�E�'i SUE �•--.k11� REQ Nr r �j% G ,- Y __.4?"1 TED, _._l�s -� IP V0-3 PROPGSEED A Cl 1`1 1 T;is F0 L r � 'r, rr r-- • S IG:r D :2—. Eit/yJ►3:, ;ri�e3 12/10',/74 The following is a list of propertyowners affected by the proposed Avery Brook Construction Project. Easements 'have been sent to all and they are being returned:to the To ' s Attorney for execution: Stanley C. & Linda Yvonne Chalk - 185 Benedict Drive Dale E. & Miriam Kidd - 187 Benedict Drive Phyllis W. May - 178 Benedict Drive Alfred J. and Regina A. Amoroso - 190 Benedict Drive Joyce A. Gallo - 43 Manor Lane Henry F. and Rose C. Begey - 53 Manor Lane Salvatore Jr. and Dolores P. Spadaro - 44 Manor Lane Edward and Margo Deloreto - 54 Manor Lane Steven R. and Barbara S. Bergren - 250 Benedict Drive Gilmore A. and Jean C. Dow - 258 Benedict Drive I 0V1N SEq� * T_au V/ SOM& ?d&&,6ot O � s 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN 06074 0s co'��w AREA CODE 203/644-2511 Public Works November 1 , 1975 Atty. William E. Grace, Chairman Planning and Zoning Commission 9 Sunnyside Drive South Windsor, Connecticut Dear Atty. Grace: Re: Attached Application for the "Construction 'of Concrete and Stone Retaining Walls - Avery Brook" In March of 1974, the Engineering Firm of Griswold & Fus , Inc. submitted a report on the Flood Control Study - Avery Brook. This study was made at the direction of the Town Manager to investigate the feasibility and/or alternatives to the F ood Control Project as outlined by the Soil Conservation Ser ice, United States Department of Agriculture. They engaged t e assistance of Mr. DeElden Philbrook and Martin Drobney of the Soil Conservation Service to conceive a sufficiently detailed report on the affect of flood control measures in this watershed. I have elected to quote from this document the following to allow you to make your decision on the best information available at this time. Chapter IV, Page 11 116. Channel improvement from Kelly Road to Benedict rive was studied. The existing channel is an earth channel that winds through the heavily developed area th t "is presently subjected to flooding. The channel receives little or no maintenance, and obviously has insufficient capacity to carry existing flows from storm freq encies of relatively low recurrence intervals. By wide ing the channel and lining it with concrete, the capacity could be increased to carry present and future flows. A detailed analysis, with required field work, was not made of the capacity of the existing channel. However, from information available it is indicated that he existing channel has insufficient capacity to ca ry flows from Areas 4A and 4B without flooding. Si ce these areas cannot be controlled due to heavy de elop- ment, any plan that will eliminate flooding must include the improving of the existing channel." i Atty. William E. Grace, Chairman Planning & Zoning Commission Page -2 November 17, 1975 The report goes on to say that advantages of the channel improve- ments will be that erosion in this area would be eliminated, and that flooding would be non-existant. It should be pointed out, however, that the basis for these conclusions is the anticipated construction of the flood control detention basins. Until these basins are constructed, the concrete walls (as designed) will . . . .only retard erosion along that area where the walls are proposed to be installed. Disadvantages are also mentioned. The major one being that of destruction of aquatic life. The Soil Conservation Service reports that the section of Brook from Avery Street to Route I-86 is "generally urbanized, and has a pond below Benedict D ive. This stream reach supports minnows but the pond will provide habitat for brown bullheads, minnows, and sunfish." The complete destruction of aquatic life would come about with a wholly-lined concrete channel. It is hopeful that by building only retaining walls, and leaving an earth bottom, the p esent level of aquatic activity can be retained. The other two major disadvantages were cited as being di ruption of individual homeowners yards and the opposition of landowners bordering the channel. We have overcome the opposition of landowners by designing an aesthetically pleasing stone—faced wall, and by holding informational meetings with the ten property- owners involved. Easements are now being signed and returned to the Town. I feel that this represents a step in the right direction toward a long-awaited course of action to solving existing problems of taxpayers in the Avery Brook area. It will, when constructed, serve the purpose for which it is intended--that is, retention of banks, and prevention of erosion. In addition to thi , it will also serve as one portion of a recommended plan of action for flood control in the lower reaches of the Avery Brook watershed. Thank you in advance for your early consideration of thi application. Very truly yours, TOWN OF SOUTH WINDSOR MCS:prb Melvin C. Stead, Jr. Acting Director of Publ'c Works Encls. (4) ` T o7,e SotdA V 1540 SULLIVAN AVENUE SOUTH WINDSOR, CO N. 06074 OR•co�,w AREA CODE 203/644-251 Public Works November -17, 1975 Mrs. Connie Eriksson, Chairman _ Inland/Wetland Commission 18 Birch Hill Drive South Windsor, Connecticut 06074 Dear Mrs. Eriksson: Re: Attached Application for the "Construction of Concrete and Stone Retaining Walls - Avery Brook" In March of 1974, the Engineering Firm of Griswold & Fuss, Inc. submitted a report on the Flood Control Study - Avery Brook. This study was made at the direction of the Town Manager, to investigate the feasibility and/or alternatives to the Flood Control Project as outlined by the Soil Conservation Service, United States Department of Agriculture. They engaged the assistance of Mr. DeElden Philbrook and Martin Drobney 3f the Soil Conservation Service to conceive a sufficiently de ailed report on the affect of flood control measures in this aatershed. I have elected to quote from this document the followin , to allow you to make your decision on the best information available at this time. Chapter IV, Page 11 116. Channel improvement from Kelly Road to Benedict Drive was studied. The existing channel is an earth channel that winds through the heavily developed area that -is presently subjected to flooding. The channel receives little or no maintenance, and obviously has insufficient capacity to carry existing flows from storm freiluencies of relatively low recurrence intervals. By widening the channel and lining it with concrete, the capacity could be increased to carry present and future flows. A detailed analysis, with required field work, was not made of the capacity of the existing channel. However, from information available it is indicated that the existing channel has insufficient capacity to carry flows from Areas 4A and 4B without flooding. Since these areas cannot be controlled due to heavy develop- ment, any plan that will eliminate flooding must include the improving of the existing channel." Mrs. Connie Eriksson, Chairman Inland/Wetland Commission Page 2 November 17, 1975 The report goes on to say that advantages of the channel improve- ments will be that erosion in this area would be eliminated, and that flooding would be non-existant. It should be pointed out, however, that the basis for these conclusions is the anticipated construction of the flood control detention basins. Until these basins are constructed, the concrete walls (as designed) will only retard erosion along that area where the walls are proposed . - . to be installed. Disadvantages are also mentioned. The major one being that of destruction of aquatic life. The Soil Conservation Service reports that the section of Brook from Avery Street to Route I-86 is "generally urbanized, and has a pond below Benedict Drive. This stream reach supports minnows but the pond will provide habitat for brown bullheads, minnows, and sunfish." The complete destruction of aquatic life would come about with a wholly-lined concrete channel. It is hopeful that by building only retaining walls, and leaving an earth bottom, the present level of aquatic activity can be retained. The other two major disadvantages were cited as being disruption of individual homeowners yards and the opposition of landowners bordering the channel. We have overcome the opposition of landowners by designing an aesthetically pleasing stone-faced wall, and by holding informational meetings with the ten property- owners involved. Easements are now being signed and returned to the Town. I feel that this represents a step in the right direction toward a long-awaited course of action to solving existing problems of taxpayers in the Avery Brook area. It will, when constructed, serve the purpose for which it is intended--that is, retention of banks, and prevention of erosion. In addition to this, it will also serve as one portion of a recommended plan of action for flood control in the lower reaches of the Avery Brook watershed. Thank you in advance for your early consideration of this application. Very truly yours, TOWN OF SOUTH WINDSOR MCS :prb Melvin C. Stead, Jr. Acting Director of Public Works Encls. (4) The following is a list of propertyowners affected by the proposed Avery Brook Construction Project. Easements have been sent to all and they are being returned• to the own' s Attorney for execution: Stanley C. & Linda Yvonne Chalk - 185 Benedict Drive Dale E. & Miriam Kidd - 187 Benedict Drive Phyllis W. May - 178 Bene ict Drive Alfred J. and Regina A. Amoroso - 190 Benedict- Drive Joyce A. Gallo - 43 Manoc Lane Henry F. and Rose C. Begey - 53 Manor Lane Salvatore Jr. and Dolores P. Spadaro - 44 Manor Lane Edward and Margo Deloreto - 54 Manor Lane Steven R. and Barbara S. Bergren - 250 Benedict Drive Gilmore A. and Jean C. Dow - 258 Benedict Drive MEMORANDUM TO: Melvin Stead, .Acting Director of Public Works FROM: William E. Grace, Chairman Planning and Zoning Commission SUBJECT: Avery Brook Erosion Control Retaining Walls DATE: December 23, 1975 This is to notify you that the Planning and Zoning Commission voted to approve the plans for the Avery Brook Erosion Control Retaining Walls as submitted, with the following exception: A four-foot high chain link fence, anchored in concrete, be installed, rather than the fence shown on the plans. The Commission feels this stipulation is necessary from a safety standpoint, recognizing that there will be times when the channel will be full of water. Also, the Commission feels the chain link-type of fence will be more durable and easier for the Town to maintain. PLANNING AND ZONING C M[aSSION By William E. Grace, Chairman WEG/src cc: Mayor Sandra Bender T. V. Sprenkle, Town Manager CID ° Tio O-P S ?d&&40t e � s '� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CON . 06074 ` AREA CODE 203 644-2511 R•Co , December 16, 1975 Mr Melvin Stead., Jr. Acting Director of Public Works T Town of South Windsor Town Hall South Windsor., Connecticut 06074 RE: Application Vo. 019 Avery Brooks Benedict DrManor Ln Dear Mel., After discussing your Application No. 019,p for the concrete channel along Av ry Brook., on Benedict Drive and Manor Lane, South Windsor., the AgDnay feels additional information is needed to make a determination on your proposal. The following are some of the concerns and questions the Agency has regarding this proposal: 1. Additional information regarding the possible creation of erosion problems downstream,v that now exist where the concrete channel is proposed. 2 The land owners downstream should be contacted regarding their feelings about lining this channel.9 as they may receive increased erosion problems due to the channeling. 3 Plans for avioding erosion downstream. 4 The full report from Griswold and Foss regarding this proposal* 5• A statement with regard to proposed soil erosion prevention sediment control and other soil conservation treatments to be taken showing any proposed sediment basins.9 diversion dikes indicating the timing of strip- ping of topsoil.0 when topsoil shall be stri.pped.9 where topsoil shall be stored and for how long., and what method of stabilization shall be used 6. Specific information on the end of the channel where the silo decreases from 16 ft. to 10 ft. Mr Melvin Stead, Jr. r Acting Director of Public Works Town of South Windsor RE; Application No. 019 Request for additional information Page 2. 7. Projected changes in velocity, volumm or course of water Elow, or in the water table, and their effects; and also the flow in cfs efore and after channelization. Very truly yours, onstance Eriksson, Chairmm INLAND Tr1ETLANDS AGENCY TOWN OF SOUTH WINDSOR CE:chm cc.V`illiam Grace, Chairman, PZC Charles Enes, Town Clerk Jules Page, Planning Coordinator Terry Sprenkel, Town Manager Donald McLaughlin, Building Inspector Josph Walsh, PZC UNITED STATES DEPARTMENT OF AGRICULTURE SOIL CONSERVATION SERVICE assisting the LI SOIL & WATER CONSERVATION DISTRICT A10W1 ��ARTFORD COUNTY' VeA 123 So Main St9y Warehouse Point CT 06088 To: the Hartford County Soil & Water Conservation Distr ct For: South Windsor Wetlands Agency Re: Avery Brook stream channeling Benedict Drive and Manor Lane area By; Karl M. Niederwerfer, Soil Conservationist Dat : 1/8/76 FINDINGS: The plans for channeling have been reviewed by our water ed plan- ning staff at Storrs. A copy of the letter from Martin Drobney to Mr LaVerne Anderson is included. In addition to tho a comments it was found the stone and concrete channel would have sec nd and ate strength. Maximum velocities will not exceed 3' p ar as immediately downstream should not be affected, whether the flood control structures are installed or not. In addition to the bare channel bottom helping preserve f its ish fd hab- itat the angular stone facing may help with insect an production. Perhaps the primary concern would be the sediment produc ion-dur- ing construction. This will be very difficult to or control a will due to th necessary activity in the channel. Pumping g probably be necessary since the wall and footing e llilla o about 21 below the channel bottom. Construction techniqu s es should be spelled out concerning this and other items such as how to exclude the stream from the area being worked on. it would also help if the time of project constructioisl Basting the low flow month of July when heavy erosive runoff likely. This would also fit in with timing for vegetati a estab- • lishment in the fall. The Hartford County Soil & Water Conservation District is vthaabl to assist the town in developing _a procedure and techniques would keep erosion and resultant sediment of the project to a minimum. l UNITED STATES DEPARTMENT OF AGRICULTURE SOIL CONSERVATION SERVICE Mansfield Professional Park, Storrs, Connecticut 06268 SUBJECT: PL-566, Avery Brook DATE: Janua 5, 1976 Rat-Aining Walls Proposal TO: Laverne S. Anderson District Conservationist Soil Conservation Service Routa 5, South Main Street Warehouse Point, Connecticut 06088 W have reviewed-the proposal for the installation of retaining wells from Benedict Drive to Manor lane. The installation of these walls will not adversely affect the areas downstrem or the proposed PL-566 plan. We are returning the material you sent to us on Decesber 29, 1975. Martin Drobney Hydraulic Engineer Enclosures 04 0 6Wj 1 . �0,0 S At. Y O-P S-0� O _ � rl • � 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN 06074 O -CO AREA CODE 203 644-2511�SR ��� Public Works January 19, 1976 Mrs. Connie Eriksson, Chairman Inland/Wetland Agency 18 Birch. Hill Drive South Windsor, Connecticut Dear Connie: Re: Application No. 019 - Avery Brook - Benedict Drive/Manor Lane This letter is in response to your query about the above. It is reassuring to see that your Commission takes such an active interest in the future development of our Town. The erosion problems that exist at present are most severe where the brook makes sharp changes in direction. Additional erosion has also occurred between Raymond Road and Man r Lane because of the gravel material in the channel. It is apparent that this land was filled when the original subdivisior was built, and the brook relocated into this fill material. Erosion due to these conditions will not be transmitted downst eam beyond the presently proposed construction. Erosion that has occurred downstream of this project in the past, will continue to occur until preventative measures, such as continuation of the retaining walls, are implemented. Funds have been appropriated for this work, but no plans have., been drawn up as yet. There have been no plans for avoiding erosion downstreELM, other than to rip-rap the outlet at the rear of the Spadaro property. The reason for this is that calculations indicate little or no increase in velocity resulting from this construction, and the anticipation of continuing the wall construction through Phase II, which is the remaining stretch from Phase I to the bridge on Benedict Drive near the Avery Heights Water Association pumphouse. Mrs. Connie Eriksson Page 2 Zanuary 19, 1976 The full report from Griswold and Fuss referred to by m in my application is enclosed with this letter. As -I indicat d earlier, the report concerns a project much larger in scope than the channel improvement requested at this time. I feel that it is important that the total report be considered before final action is taken by your commission. Impl entation of all recommendations is necessary to eliminate the f ooding in this area. I assume that this item is in reference to the constru tion process. It should be apparent that all construction ill be confined to an area within, and immediately adjacent t , the existing channel. This means that a majority of the c nstruction will be undertaken in a wet condition. There is no ch nce to install diversion dykes, as this area is completely su rounded by private residences. The slope of the channel is so flat that the sedimentation control check dams will cause b ck-up conditions that would put the construction completely nder water. If construction were started at the downstream end E of the first phase, the newly constructed portion of t e walls and channel could be used as a sedimentation basin. It would start out as a small relatively ineffective basin, but would be increased in size and effectiveness as the project pro ressed. Topsoil will be stripped on a daily basis, and will no leave the site. It will be windrowed along the easement li a and would not be spread until the threat of equipment tra fic was over. When the construction is complete, the topsoil ill be spread and graded so that it will pitch to the top of the walls. The methods of stabilization will be seeding, and wil not be done until early Spring 1976. If construction is del yed and does not commence until Spring, seeding will be done ediately following construction. A sketch of the proposed outlet end of Phase I propos 1 is enclosed. From your request, it appears that you are under the mpression that we are attempting to direct a 16-foot wide chann 1 into a 10-foot wide channel. This is not the case. The 10-- oot wide channel is being constructed in a tributary branch, a d the flow is from the 10-foot channel into the 16-foot wid channel. •Mrs. Connie Eriksson Page 3 January 19, 1916 However, the downstream brook channel is not undergoing any improvement during the first phase of construction. This portion of the channel varies from seven (7) feet to twelve (1 ) feet wide, but the defined bank on the west side is only ab ut three (3) feet to three and a half (3'-) feet high. The water here will, as it has in the past, continue to overflow the bank on the west side during storms of a magnitude higher than 10-year frequency. I pointed out earlier that the walls will not, by themselves, contain the present flow in the Phase I area, and will not contain the flow in the Phase II area either. Further informa- tion about the actual intersection of the 16-foot wide channel , and the 10-foot wide channel is as follows. Flooding has been experienced upstream from the proposed 16-foot wide channel. This flooding has been on the pavement of Benedict Drive and has been caused by the backwater condition that use to occur before the Avery Pond Spillway was lowered and reconstructed. Since that time, this area has not been a particular problem. Increasing the size of this channel at the intersection of the 16-foot wide channel will improvethe -flow capabilities at that point. The flow of value to be considered in any analysis is the projected peak flow of 750 cfs. The peak flow is for full development under present zoning with the installation of the retention dams. Without the retention dams, the projected peak flow is 1240 cfs. (See Plate 1 and figures following Page 5 of Griswold and Fuss ' Report. ) The area of the culverts at Benedict Drive and Manor Lane is 90 square feet each. This area is insufficient to allow the projected peak flow of 750 cfs to pass. Therefore, the controlling factor for flow downstream is the size of the culverts, which are not being changed. The existing velocity, under normal conditions that is, in fair weather, has not been measured. Calculations based on the average slope of the channel indicate the velocity to be approximately 5-6 fps. The design velocity is 6. 1 fps There is no appreciable increase in the velocity and, therefore, no increase in its affect downstream. Mrs. Connie Eriksson -Page' 4 January 19, 1976 The water table will not be affected. We are not channeling below the existing channel, other than to smooth it out; and, therefore, cannot lower the water table. The greatest affect on the water table has been the sewer construction, which has lowerel the water table somewhat. I hope that this information will assist you in your fi al evaluation of our application. If additional informati n is needed, please feel free to contact me. Very truly yours, TOWN OF SOUTH WINDSOR Melvin C. Stead, Jr. Acting Director of Public Works MCS:prb .E-ncs. -- cc: Terry V. Sprenkel j O•N N S CA r 4 <� ,. 1540 SULLIVAN AVENUE SOUTH WtNDSOR, CONN. 06074 AREA CODE 203/644-2511 SOR• February 20, 1976 Mrs. Constance Eriksson, Chairman Inland/'Wetland Agency Town of South Windsor - South Windsor, Connecticut Dear Connie: In response to your letter of February 18, 1976s I submit the . following comments: To Item #1 - Yes! The construction process will cause an appreciable amount of sediment during the installation phase, and again immediately following the construction, until the newly-excavated bottom can stabalize itself. This is the reason for my initial comment on starting construction at the lower, or eastern, end of the project. In this way, the: newly formed channel can be used to a limited extent as asedimentation basin, which would become more effective as successive sections are completed. Also, beyond Pine Tree Lane, opposite he sewage pumping station, a log and hay bale check dam could be installed to form an additional sedimentation basin which could be cleaned and removed after construction. The disadvantage of these methods is that during astoo u of dismantled even slight magnitude, the dams would have to be to prevent flooding of yards and basements in the area T his would have the affect of carrying away the sediment pr viousl y stored in the above-mentioned basins. -� Items :�2 and #3 - I have spoken with Karl Niederwerfer of the Soil Conservation Service, and have discussed some sediment control methods with him. It appears that we can control sedimentation during the greatest portion of the construction work. The contractor will be required to approach installation in this fashion: 1. The channel will remain undistrubed and within the, conffines of its low water banks while trenching is done on eit side. Mrs. Constance Eriksson Page ,2 February 20, 1976 2. Pumping from the trenches will be of ground water and, therefore, a minimum amount of soil will be introduced to the stream bed as sediment. 3. Discharge from the pumps will be into the brook charnel, but shall outlet to a solid material having the aff ct of diffusion, thereby reducing the turbulent affect on the stream bed. 4. The wall sections will be placed, and the area betty en these excavated to the proper grade. This is the point where maximum erosion will occur. It is unavoidabl , but should be of short duration. This step can be implemented at two different periods during construction. It can be left to the end of the project, just prior to clean-up, loaming, and seeding. Or it can be done in stages at the end of each day' construction. It is my feeling--and_ I think Karl will concur--that the grading of "the channel should be done at the end of each construction day. In this way, the least amount of area will be disturbed at one time, and it will give us a chance to observe the extent and duration of the sedimentation. 5. There will be areas where we are straightening the channel that will require rechanneling of the existing stream-bed to facilitate construction. This, in most cases, will be done with existing material in the channel; but in 3ome cases, will have to be done with sandbags or pipe. The reason for this is the attempt by the Town to center the channel on the existing property lines and rece tly acquired easements. I feel it appropriate to point out that the long-time continued erosion along the Avery Brook channel has continually silted in the lower stream-bed and the pond. This project, and its anticipated extension to the south, will reduce this continual Mrs. Constance Eriksson Page 3 February 20, 1976 sedimentation. The sediment generated during the constr ction, although of great concern, is, I feel, the lesser of two evils and will be controlled sufficiently during construction ' f the aforementioned five conditions are followed. Very truly yours, TOWN OF SOUTH WINDSOR Melvin C. Stead, Jr. Acting Director of Public Works MCS:prb cc: Terry V. Sprenkel J. E. Page Karl Niederwerfer ap s_aa& _ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 'U R-Co���• AREA CODE 203/644-2511 February 25, 1976 Mr. Mlelvi.n Stead, Jr. `I I,J l Acting Director of Public' Works J l� �,k Toim of South Windsor 1540 Sullivan Avenue �74 b` Al South Windsor, Connecticut 06074 � C O t Dear 11r. Stead: At the February 24, 1976 meeting, the Inland Wetlands Agency graited a permit, Frith cor_ditions, to the Town of South 1,,1indsor, for Application �To. 019, to construct retaining walls along Avery Brook between Benedict Drive and Manor Lane. The permit is granted for the set of plans dra.Tn by the Engineer ng Division, South ?Tindsor Department of Public �rlorks, South TJTindsor, Connecticut, dated November, 1975, Sheets 1, 2, and 3, of 14. The follow-Ln-condi:,ions must be adhered to for this permit to be valid. 1. The maps as prepared by the Enc;Lneerino Division, South T,,Tind or Department of Public Works, South Tr:indsor, Connecticut, date 11/75, Sheets 1, 2, and 3, of 14, shall be followed. 2. The discr ntio n of the work nro^osed and the necessary implet en ration methods that are set forth in the letters by Melvin C. Stead Jr., dated January 19, 1970" and February 20, 1970, shall be adhcy d to. 3. Particular emphasis should be placed on the f ollo ring: a. Log and hay bales should be placed at the outlet to the and for sediment control. b. T:Then rechanneling of existi nc- streambed is necessary, sandbags and/or piping shall be used if necessary. c. Pit-rap shall be placed at the outlet of the project. d. 17hen the wall sections are placed, it Trill be necessary to exca- vate �­e .V-een them bo t?,.e Orooe'r ~rade; the grading of th channel :elvin Stead, Jr. Ao_ irit; D13'eC tot^ of Public Works Tom of So'-th �rlridsOr Let;er of Permit - riy�;lication 'To. 019 Hebnaary 27, 1976 as-e f. sli -u .d be done at the end of each construction day in order to at the least anaunt of area will be disturbed at one time. Very truly yours,, Constance Er ►.sson, Chairman_ LA\TD- T 1N =:VTD.S AGE';(,Y TCT.rnT OF t1'I'H TAT?: J_fl CT:chm Enclo e 2 cc: Z�Tilli=m Grace, Chairman, PjC Jules PaI,7e, Pl rming Coordinator Charles �e s, Clerk '2ems- ,. i,e,��:el, "'opt T,?an.a;er D/o�ned .:cT �rr�� T1n,T - l1ldyi�r , Inspector V:J ii �1r TTC'1 S'1 ^ ZJ L,a.1 s,}n + To be published in the Joarnal Inquirer on Tuesday, _!arch 2, 1976 LEGAL NOTICE DMAND •V..TL ''DS AM.CTT TOWN OF SOUT111 ?.'INDSC'_� At the February 24, 1976 meeting.. the Inland Wetlands Agency of Sou h �,Tindsor granted a pern t with condi tions yto the Toiin of South Windsor, to c nstruct retaining t•Jalls along Avery Brook betu-een Benedict Drive and Manor Ianet South .•,indsor, Connecticut. A copy: of the perrLit is on file in the office of the Town Clerk of outh Windsor. Dated at South .-Tindsor, Connecticut, this 2- th day of February, 197 Constance Eriksson, Chairman I I 7L*,TD Z�jSTLMDS AGE!?CY 'I`E.-,M1 OF 'SOUTH "TIT•iDSOR