Loading...
HomeMy WebLinkAboutSITE PLAN (WITHDRAWN) (6) i TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING AND ZONING COMMISSION APPLICATION FORM App. No. �� IMPORTANT!� t• iir': �� r�„�� D�r�'e _Rieceived: A ion Or Publkc Hearing By: Planning and Engineering Department staff require 14 days to determine application Receipt NO. n ✓ completeness. To ensure receipt of a complete application by PZC, it is strongly recommended that the application be submitted 14 days prior to the Regular Meeting at which it will be received. APPLICANT: Gerber Scientific r. ADDRESS: 151 Batson Drive Manchester CT 06040 TELEPHONE: 643-1515 OWNER OF RECORD ON LAND RECORDS: Gerber Scientific Inc . ADDRESS: 83 Gerber Road West , South Windsor , CT 06074 COMPLETE LOCATION OF PROPERTY: Gerber Scientific Products , Inc . , 571 Nutmeg Road North, South Windsor , CT 06074. The property contains 5 .09 acres of land between utme Road North and Rte . S Conrail R.O.W. ZONE: Industrial ( I N North ot Governors Hig way . NAME, ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Richard Boston, Fuss & O'Neill Inc . 146 Hartford Road, Manchester CT 06040 TELEPHONE: 646-2469 THIS APPLICATION IS FOR: (Check one of the following) 1. Zone Change to (public hearing required) 2. Subdivision 3. Open Space Subdivision (public hearing required) 4. Resubdivision (public hearing required) 5. Special Exception to Article (public hearing required) X 6. Site Plan of Development 7 . Earth Filling (Section 10) and/or Earth Removal (Section 9) (public hearing required) 8. General Plan of Development 9 . Regulation Amendment: Zoning Subdivision 10 . Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN TRIPLICATE WITH SIX SETS OF THE MAPS (7 i public hearing is required) AND OTHER DOCUMENTS (see page 2) k V (�(� ^-� �� Owne Owner Sr.Sr. V.P ngin ring-G.S. Inc. 1/14/87 (see reverse side) r, TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING AND ZONING COMMISSION APPLICATION FORM This application is complete and ready for Planning & Zoning Commission receipt only upon submission of all required documentation, including, but not necessarily limited to, the following items. Not all items are required with every application. See applicable sections of the South Windsor zoning and subdivision regulations for specific requirements. I; APPLICATION CHECKLIST X 1. Key Map X 2. Architectural Elevations/Floor Plans X 3. Completed application form (in triplicate) X 4. Required fees X 5. Zone Change, Site Plan, Subdivision, Open Space Improve- ment, and/or General Plan of Development maps, in accordance with regulations. (Six sets - seven if public hearing required) X 6 . Plans- & Profiles/Drainage Calculations N/A 7. Conservation Plan N/A 8. Landscaping Plan N/A 9 . Traffic Engineering Report N/A 10. Narrative Statement N/A 11. Sanitary Report N/A 12. Copy of agreement to purchase land (if not the owner) 13. Other ALL PROSPECTIVE APPLICANTS ARE URGED TO CONFER WITH TOWN PLANNING DEPARTMENT AND ENGINEERING BUREAU STAFF PRIOR TO SUBMISSION OF ANY APPLICATION TO THE COMMISSION. ' CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. 1/14/87 goLETTER OF TRANSMITTAL FUSS&aNEILL Date iNjaq Project No. a- consulting engineers Attention; 146 Hartford Road,Manchester,CT 06040/(203)646.2469 Facsimile: Ext.307 D RE: /� � TO ril t� Of �� W/JUD561Z 1�sN� Suujilw LtXlel tV�Ji7r -, �'• +b�7y Via, :; .�; :: ° �r a"' r We are sending you Attached ❑ Under separate coU�l� �a,0[111" the following items: ❑ Shop Drawings ❑ Prints Plans ❑ Samples ❑ Specifications ❑ Copy of Letter ❑ Change Order ❑ Other Copies Date No. Description ;-17 �=0 R. Nd inin 4d6QAJM 0 /&j These are transmitted as checked below: For approval ❑ Approved as submitted ❑ Resubmit copies for approval ❑ For your use ❑ Approved as noted ❑ Submit copies for distribution C1 As requested ❑ Returned for corrections ❑ Return corrected prints PK For review and comment ❑ For Bids Due 19 ❑Prints returned after loan to us REMARKS Copy to SIGNED: Lb4�� F O-100 STORM DRAINAGE CALCULATIONS ., _ ,] GERBER SCIENT: I i�PRODUCTS, INC. 571 NUTMEG;A0AD NORTH SOUTH WINDSOR, CONNECTICUT annieg & ZfA ,n; APPLICATION: Gerber Scientific Products, Inc. 151 Batson Drive Manchester, CT 06040 OWNER: Gerber Scientific Products, Inc. 83 Gerber Road West South Windsor, CT 06074 CONSULTING ENGINEER: Fuss & O'Neill, Inc. 146 Hartford Road Manchester, CT 06040 1216B88RB STORM WATER CALCULATIONS 1216B88RB 6 • • • C MENEM ■ i MME■■■ ■ NEM ■■E■E■■■■■ ■■ ME■■EE■■NO■■ ■ EMENE MEN MEMO■■■■■■■OMMENEMEMEMEMMEM , ■O■E■O■E■O•• _ - E ._ MOWN ■E■EME■■■■ ■■NEii ■■■■■E■OME E■ E=■■■rEENE ■ NMNNN■O■NONE ■ MEMO WEEME■M �■ ■E■NONE EO■N■ ■EE■■■■■■EM M� MEMEMERMEM ■EEMEOEEM■■EE■EMN moomm■��■M ■■EMEEME■■EEMMMMME ■MMEMEMEMEMEME■MMM■vMMEEE■■■ME■■M } i W — Inlet Station and Offset I I I I I 1 I ! I I 17A 1 IC41 I o i- I Time to Inlet • Area in Acres Runo:f Coefficient I ! I ! 1 ( I I I I I I • ! I ! I I Sum of AI Total AI �ICD I Rainfall Intensity ca N to Inlet •1 R R r � y Grade of Gutter ' o al O. I� Cross Slope of I Z l Shoulder irl �N OeathGutterow . 'o F 1 I H Il' lIH of. I F1 1111111111111111 111Z; ,P I Width of low Q Bypassing inlet I.d 1+ AI Bypassing inlet W a Al Entering Catch Basin � •o�� �aavc ^q ?a�ira40 ']�--3�`QS7�7� 'v.2i I3 -O/y/ ,8,g b'ZI 31.Q4 iq ?aus,saG (VOlSCI d7� � �ca�o:.0 ,g}, z-7g ?=°jec= G regsk �PAV.s I a N Deg=�=-e'' by G-�'/�'1 DATE STREETMijlrjNE-& FTR`^ F Checyed bv_ shetz No. ,TMI., tr� 6� •• ia�a�gaag r. l r t• r 1 is cu I I I I i l I adoTs o e od-W jo R;SIIa'I M O T m d e az;g ocK o, d _ m sum;BAS UT b co ca I � I ITT ,c a /J . 1 N N 7 • R�,�� au�:� ZY 0� 4 � ? (, I � UT a--TW � If 11 11 1 1 I IA I I I ;arzi aT am-:z "'f f IT-� �u>�4og auk .� N1 Ao Q4 �►�� rM STORM WATER CALCULATIONS FOR 100 YEAR FLOOD ELEVATION 1216B88RB 1■■M N ■■N■ME ME■ MOM ■■■■■■■■■ MEN ' • MEM ■■■� ■mom ■■■ mm■■mmN■ ■ ■ �, _ -== ■■ ■■■■■■■ No MOMIN ■� . _ ■ NONE ■ ■■ MEME ■■N■■�■r ■ ME MONSOON MEN CN. ■■■■■MMMMIftdM mom mom EMMIMMEM ■■■ ■mm■■■m■ mmmmm■m■mm■ ■■■■■M■M■■m■ ME■X77 !1 m■■ MENESE■MN MMzs,M 2■ ■NM■MMM■MEMM■M ONE. ■■■■■■■■■■■■■■■■■■ ■■■■�■ Nml ■■■■■■■■■■■_■■■■■■■ ■M■*.13R! ■■■■■■■■■■■■ ■■■■■■■ ■EM■ON ■ ■ ■■■■■■■■■■��■■■■ E■ .. _ ■ - :`■■■■■■■■■■■SOS■■■■ E■■IMEM ■0■■■■■■■■■■■■■■■■■ ■■MN�■oE■Orr■■■MM■.■■■■■■■■■■■■■■ ■■■m■■N= ■■■■■■■■■■■■■■■■■■■ SONS ■■Nmm�M■NM■M■OM■MSE E�MSEE■■■M ■M■MEEMM■■■■■■■■E■■■■■ NMMM■ ■M ■■■M■■■■■■■■ ■EMM■■■ ■ ■■ ■ ■■■■�■■■■OMEN MMMMMMIM■ENEM ■�■■ ■■■■■mom■■■■loom MENNEN ME Ems No ME mom MENNENM ■m■■MMM■■M SOON ■■M■E■■ 0Mom ■EEEMENEM■SMEOEM 40y1N eft y Y ° Gary K. Tyler Chief of Police ^Osoe,cpN Police Services SOUTH WINDSOR POLICE DEPARTMENT CONSTRUCTION REQUIREMENTS 89-14P Project Title: Gerber Sci. Products Date: 6 March 1989 1. Developer is responsible for the purchase and installation of all street and traffic signs. Any signs on or intersecting with a State Highway must be cleared through the Department of Trans- portation. All signs must be in place before a c.o. is issued. AV'2. Developer is responsible for the purchase of all street lighting through Connecticut Light and Power. CL&P will install all lighting once they have received payment from the developer and the locations of the lights has been reviewed by the Police Department. All lighting must be in place before a c.o. is issued. 3. Developer will submit three (3) 82 x 11 or 82 by 14 maps of the proposed project to the Police Department for the purpose of identifying and locating all signs. Completed maps will be distributed to the developer, Town Planner and the Police Department. Any changes in road design will require new maps. Vge 4. Temporary street signs must be in place as soon as possible and maintained throughout the project. LIQ�5. Emergency phone numbers for the duration of the construction must be provided to the Police Department on a company letter- head. If the developer occupies or owns the building/s after construction emergency numbers must be provided to the Police Department. AC? o. All buildings located on property which abutts a public highway must be numbered. Such number/s (address) shall be visible from the street. All numbering shall comply with Town Ordinance 6-800 thru 6-802. Barns, garages and outbuilding which are located on the same premises as a numbered structure are excluded. 151 Sand Hill Rood - South Windsor, Connecticut 06074 - (203) 644-2551 -2- CONSTRUCTION SUGGESTIONS [ 1 . Keep all shrubbery low around doors and windows so as to allow an unrestricted view. (proo"2 . Locate business name , if applicable, on the building . [VOOOO'�3 . Backlight business name and address . (tOOO*-4 . Provide lights over all doors . AVW'5 . Provide ample lighting of parking areas . ZZ;000'6 . Advise the new owner / purchaser to provide the Police Department with emergency numbers . (Business , Commercial and Industrial property only) . i SIGNATURE Sergeant Thomas C. Hart #103 Traffic Services Unit Approved b -Chi T r PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM T0: Karl Reichle, Mike Gantick, Mel Stead, Fred Shaw, Richard J. Sartor, Gary Tyler, Fire Marshall Lanning, Jim Snow FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the following project:#� i Zone_ Acreage Subdivision Site Plan_ Residential_ No. of Lots/units Commercial Industrial_ Location: Project Description: n- 7 `? )O .5� Future Town-owned property involved? Yes No (a)new streets (existing frontage also) (b)new open space/recreation area active passive (c)new detention area Planning Department comments R Please let me know by ,2// if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. G s Tio�� O-P slo� ?&U&ot 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 Solt-coo AREA CODE 203/644-2511 April 18, 1989 CERTIFIED XML Gerber Scientific Products, Inc. 151 Batson Drive Manchester, CT 06074 RE: Application #89-14P - 571 Nutmeg Road North, South Windsor Dear Madam/Sir: At the April 17 , 1989 meeting of the South Windsor Inland Wetlands Agency/Conservation Commission, the Commission voted to deny without prejudice, Application #89-14P. You may re-apply at any time taking into consideration the concerns expressed by the Agency. The concerns expressed by the Agency are: 1 . Building encroaches into both setback and non-disturbance area. 2 . Concern about amount of disturbance and filling on bank of Stoughton Brook. Very truly yours, John M. Moran, Jr. airman Inland Wetlands Agency/ Conservation Commission JMMJr/pmm cc: Marcia A. Banach, Director of Planning Michael J. Gantick, Director of Public Works John R. Collins, Chief Building Official Raymond Hallowell, Chairman, P&ZCommission Jerry Iazzetta, Town Engineer A. Bowen Davies, Deputy Town Engineer Richard Boston, Fuss & O'Neill Engineers 146 Hartford Road, Manchester, CT 06040 o c U .i 9 Tio�� OP Sol� ?&UZ410t 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR Co AREA CODE 203/644-2511 April 13, 1989 Mr. Richard Boston Fuss & O'Neill, Inc. r 146 Hartford Road Manchester, CT 06040 Re: Application #89-14, Site Plan of Development, Gerber Scientific Products, Inc. , Nutmeg Rd. North Dear Mr. Boston: Attached is a copy of comments from the Planning and Engineering Departments regarding the above-referenced application. Please make the necessary revisions to the plans and submit 6 complete sets (including architectural elevations, landscaping plans, etc. ) to the Planning Department. If you have any questions regarding the comments or the procedure, please contact me. Very truly yours, Marcia A. Banach Director of Planning cc: Jerry Iazzetta, Town Engineer GERBER SCIENTIFIC SITE PLAN, NUTMEG ROAD NORTH - PLANNING DEPARTMENT REVIEW COMMENTS Key Map _ - Must show layout of existing and proposed buildings and parking areas - Direction of sanitary sewerage flow should be shown - Driveway cuts on surrounding properties should be shown Plot Plan/Topographic Map - It appears that the sheet labeled site development plan is intended to satisfy the requirements for plot plan and topographic map; should be labeled as such if this is so - A-2 certification required per State statutes and state licensing board - Parking formula should also reflect square footage of office space, if any. - Is there a defined area nor the SNET easement shown on the west side of the property? - Is a dumpster required? �AO%gN af,(� c � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR-Co AREA CODE 203/644-2511 April 11, 1989 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Jerry C. Iazzetta, Town Engineer RE: Gerber Scientific Products - #89-14P The Engineering Department has reviewed the drawings dated December 1988, Sheets SC-1 to SC-7 and the Storm Drainage Calculations and have the following comments: 1 . The Storm Drainage Calculations state that the "Total Area to Stoughton Brook = 2 . 52 AC. " We believe that this is not correct. It appears that over 5 acres of this parcel plus additional areas discharge into Stoughton Brook. This needs to be evaluated further by the design engineer as his entire calculations are based upon this fact. 2 . The releasing of a large part of the storm water from this site directly into the brook needs to be evaluated both from zero increase standpoint and what the impact will be on the abutting Waldo property. 3 . Sheet SC-1 is not an A-2 survey. Dimensions from existing building to property lines are shown + or -. (This could be critical because of the closeness of the proposed building to the building line setback) . 4 . The Fire Marshal should evaluate the 30 foot radius cul-de- sac area of the parking lot. 5 . Sheet SC-4 indicates "Written permission for grading off site (by owner) " on the westerly side of this parcel. The permission should be submitted to the Planning & Zoning Commission before approval and/or should appear on these drawings . 6 . Sheet SC-4 shows grading outside of the "Contract Construction Limit" delineation. This should be corrected. Also slope rights or temporary easement must be obtained from the abutter so that this work can be accomplished. Marcia A. Banach April 11, 1989 Re: Gerber - #89-114P 7 . A spot elevation is needed in the Southwest corner of the new pavement area. 8 . The two concrete pads on the north side of the building are shown with a 2'-2 1/2, drop to grade. 9 . Sheet SC-7 shows detail of storm sewer. Town requires a minimum of 6" of crushed stone under the pipe. 10 . Sheet SC-7 shows detail of pavement section. We require a minimum of 6" compacted processed aggregate for base course. 11 . Please have engineer verify that "modified" riprap is appropriate for velocities that will be encountered. JCl/jsv cc: Michael J. Gantick, Director of Public Works John McCahill, Wetland/Zoning Enforcement Officer fm FVSS&aNEILL consulting engineers April 18, 1989 Ms. Marcia A. Branch, Director of Planning Planning and Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Application #89-14 Site Plan of Development Gerber Scientific Products, Inc. 571 Nutmeg Road North South Windsor, Connecticut Dear Marcia: We regretfully *MdfA our application from review and the tentative hearing scheduled for April 25th. With the Inland Wetlands Agency/Conservation Commission vote of April 17th to deny application without prejudice, we are presently revising the drawings and application to accommodate their wishes. At the same time we will also incorporate staff comments on the Engineering and Planning Department review. It is hoped that the submitted fee will be retained and used for the new application forthcoming. If this is not the case, please inform us of the situation. Sincerely, Richard L. Boston Project Manager F d RLB/bp 4,, f 86-248/Correspondence 0418ARLB. 1 Planning & 146 HARTFORD ROAD / MANCHESTER, CONN. 06040 / TEL. (203) 646-2469, FAX. EXT. 307 SOLID WASTE MANAGEMENT •WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS•HYUROLOGY and DRAINAbE oYSTEMS•SITE PLANNING HIGHWAYS and BRIDGES• SURVEYING •LANDSCAPE ARCHITECTURE •TRANSPORTATION and TRAFFIC 9 POBIIC WORKS MANAGEMENT• HYDRUGEOLOGY