Loading...
HomeMy WebLinkAboutSUBDIVISION (54) TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION PLANNING AND ZONING COMMISSION ACTION THIS APPLICATION SHA L BE ACCEPTED BY APPLICATION # �a J� THE PLANNING AND ZO NG COMMISSION AT 1 RECEIVED DATE: — YJ THE REGULARLY SCHED D MEETING ON THE APPROVAL DATE: FOURTH TUESDAY OF MONTH. IT SHALL REJECTED DATE: BE SUBMITTED TO THE LANNING AND RECEIPT # �',S�c� ZONING COMMISSION 0 ICE ONE (1) WEEK PRIOR TO THE FOURTH UESDAY. APPLICANT: EVAN' S CROSSING ASSOCIATES ADDRESS: 490 Buckland Road South Windsor, CT TELEPHONE # 644-3231 OWNER OF RECORD ON S.W. LAND RECORDS Same ADDRESS : COMPLETE DESCRIPTION OF LOCATION OF PROPERTY E/S Avery Street opposite Pine Knob Drive ONE RR NAME, ADDRESS & TELEPHONE # OF PERSON TO WHOM CORRESPONDENCE AND INQUIRIES SHOULD BE DIRECTED: Attorney Wayne Gerlt 435 Buckland Road South Windsor, CT TELE on-# 644-2565 . 1-1 lk THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING) 1 Y;T 1 Zone Change to Zone (public hearing �5 2. Filing for Subdivision SAP 2 1984 X 3. Filing for Open Space Subdivision (public hea South Windsor � ng & Zo ing Commission 4. Filing for Resubdivision (public hearing) 5. Special Exception to Article of the Zoning Regulations (public hearing) 6. Site Development Plan 7. Removal of Sand, Gravel, Clay or Quarry Stone & Ore (public hearing) 8. Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE OWNER OF THE PROPERTY AND SUBMITTED ALONG WITH THREE SETS OF PLANS BEFORE IT W LL BE ACCEPTED BY THE PLANNING AND ZONING CO ION APPLICANT OWNER (over) 10*M sf'( O ►+ U 7-0[,[//T ��,SOUM ?&qd4410t 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. C6074 !tiaS�R c�N� AREA CODE 203/644-2511 September 25, 1984 Emil W. Lucek Associates Consulting Engineer 490 Buckland Road South Windsor, Ct. 06074 Dear Mr. Lucek: At a regular meeting of the Water Pollution Control Authority held on September 18, 1984, the Authority voted to approve the sewer line of Evans Crossing as shown on a map designated Evans Crossing by Luc k Engineering Associates, Project ##84-6, with the following conditions: 1 . Within the open space, at least a 20 foot width right-of-way encompass the sanitary sewer. (Condition of Town Engi eer). 2. That a restrictive covenant be placed on the sanitary ewer right-of-way over property N/F Covensky that prohibits large plantings or obstructing structures. The intention being that 'maintenance vehicles and personnel be able to ser ice the sanitary sewer. (Condition of Town Engineer). 3. That Mr. Shaw would specify the type of finishing grav 1 requirements over the sewer line to assure access to his trucks if he has to service the line. �- Very truly rs, Joseph . Carino, Chairman TOWN OF SOUTH WINDSOR Water Pollution Control Authority JJC:pm CC: Peter DeMallie, Director of Planning Robert F. Gilligan, Chairman, Planning Zoning Thomas P. D'Auria, Building Inspector Rick Martel , Town Engineer i oMN st4t� r T-a 0-1s � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �dSOR,C�� AREA CODE 203/644-2511 October 12 , 1984 Wayne C. Gerlt , Esq. 435 Buckland Road South Windsor, Ct. 06074 Dear Sir: ` Re: App . #1025 - Evan' s Crossing Associates Please be advised that the public hearing in flee above matter has been scheduled for October 30, 1984, at 8: 00 P . M. in the Council Chambers of the South Windsor Town Hall . A sign advertising the hearing must be posted on the property where the proposed road will intersect with Avery Street , and remain for 10 consecutive days prior to the hearing . It should be posted by October 19th, and be clearly visible from the road. The sign may be purchased in the Town Hall at a cost of $5. Yours very truly, PLANNING AND ZONING COMMISSION vg By:/&)j 4 obert F. Gil igan, ChaArman Lucek Engineering Associates, Inc. Consulting Engineers & Land Surveyors 490 Buckland Road South Windsor, Connecticut 06074 Emil kk' Lucek. PE, LS Telep one (203) 644-2474 ',1r . Peter DaMallie October 29 , 1984 Director of Planning To,,%"n of South Windsor Re : Evan' s Crossing Dear Peter : I have studied the sight distance conditions of the proposed intersec- : ion of Evan ' s Crossing with Avery Street and have determined that the sight distance substantially exceeds the minimum requiremen s. as recommended ,--)v Conn . DOT and the AASHO. The Conn . DOT Field Survey Sight Distance Test require a minimum sight time span of 8 seconds . The field survey, done betwee 4 :00 and 4 : 30 nm. on a weekday afternoon during commuting hours , resulted in a average time span of 14 . 7 seconds ; with a minimum reading of 12 seconds ; substant- ially more than the required minimum. The AASHO Minimum Sight Distance Table is shown below: 11 TABLE 10, MINIMUM SAFE NONPASSING .SIGHT DISTANCES Braking Braking AASIIO A.L811111ed Design Coeffi• Safe Co- Distance Total Approved Speed Perception cient of efficient on Safe Non- _ plus Reaction Friction Factor of Level, Stopping pawing \1ph. Ft per Skid- of Friction, Ft, Distance, Sight I Sec See Ft ding Safety J V:/30/ Ft Distances 10 14.67 3.5 51 0.68 1.25 0.53 6 57 0 '21) 3 3 23 93 0.65 1.25 0.525 25 120 30 44 3.0 132 0.62 1.25 0.50 60 192 200 1 40 59 2.73 182 0.50 1.25 0.47 113 275 275 . ;n 73 2.50 183 0.58 1.23 0.45 183 368 350 .�i 88 2 23 198 0.53 1.25 0.42 286 484 475 -- 70 1o3 2.0 206 0.50 1.25 0.40 408 614 600 Il' 1 75 203 0.47 1.25 0.375 570 775 • N) 132 1.50 108 0.44 1.25 0.35 771 909 11N) 147 1.25' 18.7 0.41 1.23 0.323 1023 1208 1)"Is for these speeds from AASHO publication, A Policy on SiVAf Disfnnee. Remainder from k"I' a IIi¢h%sy Department standards. The sight distance to the north from the proposed intersection is approximately 800 ' . From the table , this would result in a safe stopping from a vehicle speed of 80 m. p .h . ; considerably higher than would be expected . Sight distance to tF-e south is controlled by a three-way stop at the inter- section of Pine Knob Drive and Avery Street . From the above , I submit that sight distance at the proposed intersec- tion is adequate . Very y o rs , mil W. L ek Hartford County Soil and Water Conservation District Agricultural Center,340 Broad St. -Windsor, CT 06095- Phone (203)688-4946 November 19, 1984 Mr. Richard Martell, Town Engineer Town of South Windsor 1540 Sullivan Avenue South Windsor CT 06074 i Dear Mr. Martell i The Hartford County Soil and Water Conservation District would emphasize the following concerns regarding the proposed "Evan's Crossing Subdivisioa off of Avery Street. Topographic information on the plans should be field verified. There should be no construction of any kind within the area of the emergency spillway for the proposed dam. i The District would strongly suggest that lots 1 and 2, and 3 and 4 be combined to form two lots . Due to the close proximity of embankments, extensive grading needed, and wetland soils, a less intensive building ; scheme for these four lots is recommended. Proposed houses and grading for all lots should be incoropor ted into the final plans . Sediment and erosion control should be addressed in more detail on the plans . 'The suggestions outlined in the accompanying Soil Conservation Service report should be incorporated into final plans. The Connecticut Sediment and Erosion Control Handbook can be used for reference. The District will be available to review revised plans, upon request. Should you have any questions, don't hesitate to call. Sincerely, .�4valll Amy M. Parker District Manager CC: A. Bowen Davies, Deputy Town Engineer - South Windsor Constance Eriksson, Chm, Inland Wetland Commission - South Windsor Emil Lucek, Lucek Engineering Associates, Inc. Vito Covensky J. Polulech, USDA-SCS - Storrs D. Lynch, USDA-SCS - Storrs CONSERVATION — DEVELOPMENT — SELF-GOVERNMENT E`- t United States - Soil Department of Conservation 340 Broad Street Agriculture Service Windsor CT 06095 ` Phone 688-4946 November 19, 1985 TO: Ms. Amy M. Parker, District Manager Hartford County Soil and Water Conservation District FOR: Constance Eriksson, Chairman, Inland Wetland Agency Town of South Windsor RE: Evan's Crossing - Property of Evan's Crossing Associates Avery Street, South Windsor On November 13, 1984, a field review and subsequent plan review was made of the proposed development "Evan's Crossing", Property of Evan's Crossing Associates - Avery Street, South Windsor CT, dated 8/19/84 with revisions. In attendance to the plan review were: A. Bowen Davies, Deputy Engineer, Town of South Windsor; Richard Martell, Town Engineer, Town of South Windsor; Emil Lucek, Lucek Engineering Associates , Inc.; Vito Covensky, owner; Vern Anderson, Soil Conservation Service - Hartford; Amy Parker, Hartford County Soil and Water Conservation District; J. Eric Scherer, Soil Conservation Service - Hartford; Joe Polulech, Soil Conservation Service - Storrs ; Don Lynch, Soil Conservation Service - Storrs. I NZ'E NTORY This parcel of land is approximately 16.1 acres in size. The proposal is to subdivide this land into approximately 15 one-half acre lots, with the remaining land to be deeded to the Town of South Windsor as open space. An east-west road with access from Avery Street is proposed. This road will end in a cul-de-sac with a stub extending north between lots 5 and 6. Current land use on this parcel is woodland. The Hartford County Soil Survey, Sheet No. 27, indicates six soil mapping units within the proposed site. These six units include: Cheshire fine sandy loam (CsB, CsC and CsD2) ; Narragansett silt loam (NaB2); Wapping silt loam (WeB) ; Walpole loam (WcA) . 'Under the definition for prime farmland soils, the CsB, NaB2 and WeB mapping units are listed as prime farmland soils in the bulletin "Important Farmlands of Hartford County, Connecticut". Mapping units CsC and WcA are listed as soils of Statewide Importance. Approximately 45 percent of the soils are Prime Farmland soils while 40 percent are of Statewide Importance. Soil WcA is also classified as a wetland soil under Inland Wetlands regulations. The on-site investigation and a discussion with town officials shows that land directly adjacent to Avery Street and consisting of part of lot 1 and lot 2 is man made. This area consists of fill from previous sewer line construction with some asphalt and other road surface material exposed. A vertical slope of 1:1 presently exists at this site as it borders the brook. o The Soil Conservation Service is an agency of the Department of Agriculture f FOR: Constance Eriksson, Chm page —2— Inland Wetland Commission — South Windsor RE: - Evan's Crossing — Avery Street 11/19/84 EVALUATION A review of the soils located at this proposed site show some limitati ns for development for housing. These limitations include slopes and wetness. To overcome these limitations, houses with basements should be sited 0.5 to 1 foot above established water tables and on stable slopes. i Core borings should be made of the area where sewer construction matey al was placed. The boring should indicate the nature of material and depth. Potential for uneven settling of this material could render it unsuitable for a houselot. It was also indicated that this material might be used for the t culvert crossing fill material. Again tests may show this material to be unsuitable for such a purpose. If this material is found to be unsuitable for A on—site use, it should be removed in order to achieve a stable slope ( :1) . Sheet 3 of 4 indicates a wetland limit boundary. There is no indication as to how this boundary was delineated. A review of the plan and site ind is tes that the eastern boundary may not be accurately shown. Nevertheless, since there is i no proposed filling or building in this area, a more detailed study may not be warranted. Because this proposed development borders a flood prevention project b( ing co—sponsored by the Town of South Windsor, certain considerations will need to be met, and are mentioned in the Recommendation Section. RECOMMENDATION Permanent Flood Easements be established on all IQts at the 2 1.6 foot e This f 1 od easement would) prohibit building and f lling within the 2 t elevation. The developer contact the State of Connecticut Department of Environmental Protection's Land Acquisition Unit. A check of survey line, and topographic elevations should be made to determine the 281.6 foot elevation within the development. The developer should square off lots 14 and 15 for flood easement boundaries. The developer should coordinate with Department of Environmental Protection's Land Aquis it ion Office the designation of flood easement and open space areas so that they do not negatively impact the intended use of the flood pool area. The developer should confirm the location of the proposed sewer easement so as to remain outside the area of the proposed emergency spillway for the flood prevention structure. The developer should check elevations for all sewer manhole covers to ensure that any below the 281.6 foot elevation have been flood proofed. i FOR: Constance Eriksson, Chm page -3- Inland Wetland Commission - South Windsor RE: Evan's Crossing - Avery St 11/19/84 RECOMMENDATION (CONT'D Core borings of the area loc a very Street, comprising lots 1 and 2, are eede This era is of a-q. estioaable nature; consisting of ris from a line installatio Borings would determine t e �anxtent of materials in this fill ea. If this material is determined to be of poor quality it should be used as fill on the site, as intended, for over the proposed culvert. The existing 1:1 slope at the back of lots 1 and 2 should be regraded to a more stable slope of 4:1. This type of slope is easier to stabilize- and maintain. Prior to construction of the storm drain between lots 13 anid 14, a grass or rock rip rap waterway should be constructed as an outlet for stormwater. This waterway should be constructed from the proposed outfall to the stream channel and should be able to handle the desired storm capacity as required by the town. It is questionable whether the hay bale check dam at the upstream side of the proposed culvert will be effective. Hay bale check dams have little effect during high flows over 1 c.f.s. It is recommended that both sides of the channel be protected by silt fences . Hay bale check dams should be installed along all wetland limits where earth moving and/or construction is to take place within 150 feet . This should be done prior to construction start. Also hay bales should be placed at the top and bottom of slope along lots 1 and 2. Overland flow in this area is evident and severe washing could occur otherwise. V j JThe existing stormwater catch basin on Avery Street is clogged. This should be cleaned out as soon as possible. A gravel entrance/-exit pad should be constructed at Avery Street prior to construction at the site. This pad will help to clean wheels of vehicular traffic of sediment as it leaves the site. �b-Silt fences should be installed around all catch basins immediately after pipe installation and prior road surfaceing. A small breached dam presently exists within theT-1. posed site. It is s this b repaired and used as a -tempoDry ediment�asin. A rock faced an -u er 2 inch stone�ould be designed with a per riser to accomplish this . In the event that e Flood Prevention/Structure No 1 is not built, the Town of Sout� Windsor should requ,re the developer to construct a stormwater retent-on structure on the proposed site so as to not increase discharge. from the proposed development . " I f FOk,: -C.Onstanca Eriksson, Chm Inland Wetland Commission - Town of South Windsor page -4+ RE: Evan's Crossing - Avery Street 11/19/44 RECOMMENDATIONS (CONT'D) A more complete erosion and sediment control plan is needed for this site, including such considerations as temporary and permanent seeding, mulching, minimizing areas of disturbance, etc. I hope this information and review is of help to you. Please feel free to contact the field office if you have any questions. Sincerely, J. Eric Scherer Resource Conservationist USDA Soil Conservation Service ATTACHMENT CC: Richard Martell, Town Engineer - Town of South Windsor A. Bowen Davies, Deputy Town Engineer - South Windsor Emil Lucek, Lucek Engineering Associates, Inc. Vito Covensky J. Polulech, USDA-SCS - Storrs D. Lynch, USDA-SCS - Storrs LAW OFFICES OF WAYNE CI-IRI-roPHER GERLT 435 BUCKLAND ROAD P.O.BOX 559 SOUTH WINDSOR.CONN.06074 WAYNE CHRISTOPHER GERLT TELEPHONE DAVID E. COHEN (203)644-2565 December 11, 1984 Robert F. Gilligan Chairman, Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT. 06074 Re: Application Number 1025 Evans Crossing Assoc. Dear Chairman Gilligan: I have been advised that it is very doubtful that the Planning & Zoning Commission will be able to render a decision on the referenced application for approval of a subdivision prior to the expiration of the time limit for action. There- fore, I have obtained approval of the applicants for an exte - sion of 65 days for the rendering of decision by your commis- sion. Please consider this our formal request that the date for action be extended 65 days. Thank you. Very tru o rs, Wayne WCG:lmg cc: Emil Lucek Vito Covensky wln �Ah inB � ton. t0,0 N $�� 1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. 06074 °soa•co� AREA CODE 203/644-2511 December 18, 1984 Ar. Vito Covensky Eva.n's Crossing Associates 490 Buckland Road South Windsor, Connecticut 06074 Certified Mail , Dear Mr. Covensky: At the December 17, 1984 meeting the South Windsor Inland Wetlands Agency acproved with conditions Application No. 294 for the purpose of creating a 15 lot open space single-family residential subdivision; construct roads and util- iti s, for property located on the West Side of Avery Street, opposite Pine Knob Drive. The hermit is based on the plans entitled "Evan's Crossing" p epared for Evan's Crossing Associates/Vito Covensky, 490 Buckland Road, South Windsor, Connecticut, by consulting engineers of Emil W. Lucek Associates. Such plans are dated August 24, 1984, being revised September 209, 1984; sheets 1 through 4of4. The following conditions must be adhered to for this permit to be valid: 1. Lot #2 - Location of house must be moved 30 ft. in a southerly direction. 2. A Conservation Easement is to include all of the wetland careas on lot #3. 3. All trees to be removed uhall be flagged in conjunction With the Town Engineering Department. 4. Conservation Easement on lot #14 and lot #15 should exter4 to the southwest corner of lot #15. 5. A Conservation rlan shall be submitted and approved by the Conser- vation Commission prior to any activity on the property. This plan shall include but not be limited to the following: a. Details of the detention basin. b. Erosion and sedimentation control measures as specified by the November 19, 1984 SCS letter - Page 3-items 2 thri 8. c. Erosion and sedimentation control measures shall be 1i accord- ance with SCS handbook and shall include a sequence of opera- tions. Mr. Vito Covensky Evan's Crossing Associates 490 Buckland Road South Windsor, Connecticut 06074 Letter of Permit - Application No. 294 Page 2 6. This letter of approval shall be reproduced on a mylar to be fled with the Town Clerk's Office. 7. The proposal is subject to the approval of the Town Engineer. S. The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 9. The permit is valid for one year and shall expire December 17 1985, if not initiated and completed within one year from the date of approval. Very truly yours, Constance Eriksson, Chairman INLAND WETLANDS AGENCY TOWN OF SOUTH WINDSOR CE/se attachment - 11/19/84 SCS Letter cc : Emil W. Lucek, Lucek Engineering Associates A.B. Davies, Deputy Town Engineer .Jacqueline J. Smith, Town Clerk Richard J. Sartor, Town Manager Richard Ryan, Deputy Mayor Robert F. Gilligan, Chairman PZC Thomas D'Auria, Building Official Peter DeMallie, Director of Planning John Shemo, EDC r "0,NN SE, G � G. 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 T-a� 0-1ee Soa� AREA CODE 203/644-2511 co t December 19 , 1984 i Wayne C. Gerlt , Es'q . 435 Buckland Road f South Windsor, Ct . 06074 Dear Wayne. , Re: App . #1025 - Evan ' s Crossing Assoc. i Please be advised that the Planning & Zoning Commission voted last night to accept the 65 day extension of time you granted in which to act in this matter . The extension is from January 3 , 1985 to March 9 , 1985 . I Yours very truly, f PLANNING AND ZONING COMMISSION Robert F . Gil'ligan , Chairman J i �,t aC4,( CID 101 T-aWl-2, 0,�4?SOUM ?d&j� C � GJ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 0 074 ���soR•ca�'� AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER MONDAY , FEBRUA Y 18 , 1985 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING & ZONING COMMISSION At the February 13 , 1985 meeting, the Planning and Zoning Commission voted to take the following action: 1 . Approved, with modifications, the application of Evan ' s Crossing Associates, for an open space subdivision in an RR zone , consisting of 15 lots, located on the west side of Avery Street , north of Pine Knob Drive . 2. Approved the application of R. S . K. Contractors, Inc . for a zone change from RR and A-20 to DA-15, and a General Plan of Development , with modifications , for approximately 30 . 8 acres located on the east side of Ellington Road, north of Quarry Brook Drive , and south of the intersection of Ellington and Beldon Roads , to permit 16 two-family and 68 single family dwellings . Dated at South Windsor, Connecticut this 14th day of February , 1985 . PLANNING AND ZONING COMMISSION Robert F. Gilligan , Chairman David H. Sorenson , Secretary • � wNaE, t� O r � n We s 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 �'►'osoR,Cu AREA CODE 203/644-2511 February 20, 1985 Wayne C. Gerlt, Esq. 435 Buckland Road South Windsor, Ct. 06074 Dear Wayne: Re: App. #1025 - Evan' s Crossing Please be advised that the Planning & Zoning Commission voted on February 13, 1985, to approve the above application for an open space subdivision in an RR zone, consisting of 15 lots, 1 cated on the west side of Avery Street, and shown on plans prepared by Lucek Engineering Assoc. , Inc. , dated 8-24-84, revised to 9-20-84, subject to the following modifications : 1. The detention basin should be outlined on Sheet #2 and labeled on Sheet #3. 2. Truck accessibility should be indicated along the sewer line within the open space. 3. The driveway from Lot #2 shall be from Evan' s Crossing, and not Avery Street. 4. Lot #1 shall have a turn around driveway, subject to the approval of the Town Engineer. 5. Concrete sidewalks, built to Town specifications, and in accordance with Section 2. 5. h of the Subdivision Regulations, mu t be installed on both sides of Evan' s Crossing and along the entire frontage of the site on the west side of Avery Street 6. Grading floor elevations on Lot #3 are subject to the approval of the Town Engineer. 7. A right-of-way will be required across Lot #2, and th plans shall be modified to indicate that a 54" pipe will be installed, rather than a 48" pipe, subject to the Town Engineer' approval. 8. Slope rights shall be given to the Town on Lots #5 and #6 for future sidewalk and roadway improvements. 9. Deeds for the open space and roadway; rights-of-way a d slope rights, must be submitted to this Commission prior to filing the final mylars. They must be approved by the Engineering Depart- ment and Town Attorney and be in accordance with the policy for accepting deeds (see attached) . The deeds will be held in escrow until completion of the subdivision, and then teferred to the Town Council for acceptance. Wayne C. Gerlt, Esq. -2- 2/20/85 10. Street lighting shall be installed at intersections and on the cul-de-sac in accordance with the policy established by the Town Manager (see attached) . 11. Quantity estimates must be submitted to the Town Engineer for the purpose of determing subdivision bonding, and all bonds must be submitted to this Commission prior to filing the final plans. In the event the Commission votes to accept a Letter of Credit for a one year term, in lieu of surety bonds, said Letter of Credit must be renewed on a yearly basis until completion of the development. If a new Letter of Credit has not een received within 30 days before the expiration date, the Commi sion may, at its option, call the Letter of Credit it is holdi g. 12. A liability insurance policy shall be submitted to this Commission naming the Town of South Windsor as an insured with a combined single limit for bodily injury and/or property damage in the amount of $1, 000, 000 . 13. A drainage assessment fee in the amount of $750 shall be submitted to this Commission prior to filing the pla s. 14 . If, for any reason, finished grading and other site work is not completed, the Town Engineer shall determine the amount of a cash bond to ensure final grading and site work. his cash bond shall be submitted prior to issuance of a Certificate of Occupancy. 15. Street names and locations of fire hydrants are subject to the approval of the Fire Marshal of the Town of South Wixidsor. Street names and supporting posts shall be installed by the developer in conformance with the standards of the Town of South Windsor and at no expense to the Town. 16 . Drainage for this subdivision is subject to the approval of the Town Engineer. 17 . All lots must be connected to the Town of South Wind or sanitary sewer system and are subject to the approval of the Water Pollution Control Authority. 18 . Water shall be supplied to this subdivision by the Connecticut Water Company. 19 . This approval is subject to the conditions of approval of the Inland Wetlands Agency and Water Pollution Control Authority. 20 . No building permits will be issued until all conditions of approval have been complied with, and the final pland have been Wayne C. Gerlt, Esq. -3- 2/20/85 filed in the Office of the Town Clerk. 21. Prior to commencement of any site work, a meeting must be held with Town Staff. 22. Prior to the building of any structure on a lot, a topographic map, drawn to a scale of 1" = 40 ' , shall be submitted for each lot in the subdivision, showing proposed contours and elevations. No building permits will be issued until the proposed contours and floor elevations have been approved by the Town Engineer. 23. Black and white mylars of sheets #1, #2 and #3, together with three paper prints of all sheets reflecting the above modifications, must be submitted to this Commission within 90 days of the date of approval (by May 21, 1985) . The letter of approval of this Commission, as well as Inland Wetlands Agency, must be reproduced on the mylars. The mylars will then be stamped and signed by the Commission, and filed in t e Town Clerk' s Office. Yours very truly, PLANNING AND ZONING COMMISSION v By: e�ics. obert F. Gi g li an C m air CC: R. Martel, Town Engineer P. DeMallie, Planning Director T. D'Auria, Building Official E. Belleville, Assessor W. Lanning, Fire Marshal Inland Wetlands Agency Water Pollution Control Authority LAW OFFICES OF WAYNE CHRISTOPHER GERLT 435 BUCKLAND ROAD P.O.BOX 559 SOUTH WINDSOR,CONN.06074 WAYNE CHRISTOPHER GERLT TELEPHONE DAVID E.COHEN (203)644-2565 April 25 , 1985 i APR 26 1985 South Wi idsor Planning & Zoning Commission Robert F. Gilligan , Chairman Planning and Zoning Commission South Windsor Town Hall 1540 Sullivan Avenue South Windsor , CT 06074 Re : Application No. 1025- Evans Crossing Dear Chairman Gilligan : On behalf of the applicants in the referenced matter , I hereby request an extension of time for the filing of mylars , delivery of deeds and posting of the bond for 180 days or until November 21 , 1985. Thank you for your attention to this ma e . Very y ours , ayne C erlt WCT :j 1 cc : Mr . Emil Lucek Mr. R. Martel, Town Engineer Mr. T. D'Auria, Building Official Mr. E. Belleville , Assessor Mr. W. Lanning , Fire Marshal Inlands Wetlands Agency Water Pollution Control Authority T-awtl 0 S-OU144, 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 074 e•Co AREA CODE 203/644-2511 May 8, 1985 Wayne C . Gerlt, Esq . P. 0. Box 559 South Windsor , Ct . 06074 Dear Wayne : Re: App . #1025 - Evan ' s Crossing Please be advised that the Planning & Zoning Commission voted to grant two ninety day extensions of time in which to file the final plans in the above matter. The first extension is to August 13th, and the second to November llth . We are not permitted to grant any extensions beyond this . Yours very truly, PLANNING & ZONING COMMISSION vg By : Marshall Montana , Vide-Chairman 'Jim i V I iel G1Tio�� • . 4 �v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06 74 f~�soit-C � AREA CODE 203/644-25n May 21, 1985 Mr. Vito Covensky Evan's Crossing Associates CERTIFIED MAIL 490 BucklandRoad South Windsor, CT 06074 RE: Appliclation No. 294 - Evan's Crossing Dear Mr. Covensky: At the May 20, 1985 meeting, the Work Session of the South Windsor Inland Wetlands Agency discussed your application. Motion was made to temporarily suspend your Inland Wetlands Permit at this time. Discussion will be made to review field conditions. At the South Windsor Conservation Commission meeting on that same da e, discussion of the conservation plan for this project was tabled until the a is reinstatement of the Inland Wetlands Agency Permit. Very truly yours, 6ilora'n. Jr., Ch 'rman INLAND WETLANDS AGENCY CONSERVATION COMMISSION cc: Emil Lucek, Lucek Associates Wayne Gerlt -/Robert F. Gilligan, Chairman PZC A. B. Davies, Deputy Town Engineer 2 �5 MAY Jacqueline J. Smith, Town Clerk Richard J. Sartor, Town Manager South Windsor Richard Ryan, Deputy Mayor Commission Thomas D'Auria, Building Official Planning & Z Wing Peter DeMallie, Director of Planning Kenneth Brill, Chairman EDC y r � �� C�W • e � 4 �v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 018074 ~�soR•co�� AREA CODE 203/644-2511 n . � �i 85 MAY 28 1985 Mr. Vito Covensky South Windsor Evan's Crossing Associates planning & Zoning Commission 490 Buckland Road CERTIFIED MAIL South Windsor, CT 06074 RE: Evan's Crossing - Application No. 294 Dear Mr. Covensky: At the May 20, 1985 meeting 6f the Inland Wetlands Agency Work Session, the Agency voted unanimously to suspend temporarily your IWA Permit (Application No. --294) because of violations of this permit resulting from activities on the site performed beyond certain tree-cutting you were accorded special permission to do, prior to gaining approval of the necessary Conservation Permit. Permission is hereby granted by the Agency for you to perform r medial and corrective measures which must be done to the satisfaction of tovn staff in order for possible reinstatement of your permit to be consi eyed by the Agency. The following conditions must be adhered to: 1. Before commencing with any activities, you will meet with town staff to determine how, and in what progression, remedial and corrective measures will be performed and monitored. 2. No other kinds of activities will be permitted on the site. The following concerns must be addressed: a. All visible blacktop deposited on the site by you for possible use as fill must be removed from the site and disposed of at an agreed upon site. This is unsuitable (recall agency discussions with Emil and SCS letter of Eric Scherer, November 19, 1984, page 2, paragraph 2). Mr. Vito Covensky Evan's Crossing Assoc. 490 Buckland Rd. South Windsor, CT 06074 May 23, 1985 Page 2 Also, all blacktop pieces visible along banks cut and sewer installation roadway itself shall be removed from site as well as all blacktop pieces unearthed when performing any corrective and remedial measures. b. Carefully unclog and clean up brook channel onsite; remove all rubbish, and correct all construction damage caused by equipment. Natural debris (logs, tree limbs, branches, etc.) should also be removed. Such clean-up activity will concentrate on the brook bed and its slopes from the 54" culvert to the area of the earthen dam (Lot 15). Please note that the earthen dam and the sedimentation pool are not addressed on your revised plans as requested at our Conservation meeting, March 18, 1984. c. The sanitary sewer has been cleared and a roadway built for the installation. The slope protection has only been partially done; not as indicated on the drawings. Please correct this situation to prevent damage to the site. d. The concrete pad is not per plan. Please correct this situation. e. The riprap is not per plan in the 54" culvert a ea. Please correct this situation carefully. f. The hay bales are not staked at the critical points. Please correct this situation. g. The temporary PVC to be installed at the brook­crossing for the sewer construction is not in place. They just drive through the brook. Taking the utmost care, p ease correct this situation. h. The drawings should have a current revision date. The contractor was given one of the three sets submitted on 4-15-85, as a guide. Apparently, no one out there has seen them or have followed them. Please take care of this and take whatever steps necessary to instruct K-7.-Vito Covensky Evan's Crossing Assoc. 490 Buckland Rd. South Windsor, CT 06074 May 23, 1985 Page 3 your crew as to the contents of your plans for compliance thereto, and to forestall any further difficulties. i. Other related problems on the site arising from an corrective and remedial measures performed should be addressed as per agreement with town staff. No other activities on the site will be allowed pending: 1. Our Agency's review of an engineering report which shall be submitted to us after you have completed all corrective and remedial measures on the site, and 2. Unless and until the Inland Wetlands Agency formally votes to reinstate your permit based upon demonstrated cooperate n, competence and good faith by the applicant in accomplishing all necessary corrective and remedial measures on the site and 3. Unless and until your revised conservation plan is subsequently approved by formal vote of the Conservation Commission. We realize that our actions on this matter might appear to be harsh at first glance, but, under the circumstances, were deemed necessary by the Agency in order to assist the applicant in achieving compliance with the plans on file and Agency permit conditions. Your cooperation is appreciated. We anticipate an early resolution. Very truly yours, v \ - John Moran, Jr. , Chair n INLAND WETLANDS AGENC cc: Emil W. Lucek, Lucek Engineering Assoc. Wayne C. Gerlt, Attorney A. B. Davies, Deputy Town Engineer Jacqueline J. Smith, Town Clerk Richard J. Sartor, Town Manager Richard Ryan, Deputy Mayor Robert F. Gilligan, Chairman PZC Thomas D'Auria, Building Official Peter DeMallie, Director of Planning John Shemo, EDC EVAN ' S CROSSING ASSOCIATES 490 Buckland Road, South Windsor, CT 06074 4-4) l N D June 6, 1985 Town of South Windsor `SUN J Inlands Wetlands Agency P 30 198 Att: Mr. John Moran, Jr., Chairman ��nnlAg �th Wind South SWindsor, CT UIlivan �106074 Ion�ng Coroft � RE: Evan's Crossing - Application No. 294 Dear Mr. Moran: We have been doing the remedial work necessary to clean up Evan s Crossing since the Commission gave us approval to do so. We have been checking with town staff (Bo Davies) on a daily basi to see that everything we're doing meets with staff and Commission approval. We do not want to be in jeopardy again because of some confusion or lack of understanding on our part. I was born and raised in this town and certainly don't want to see anyone pointing a finger at me and saying I'm trying to destroy or harm it in any way. I'm going to be doing more developing in tow , and I certainly would like the confidence of all the Commission an town staff that we have to deal with. At this point, I would like to ask you and the Commission if it would be possible to reinstate our Wetlands approval, and to grant us Conservation Commission approval at your meeting of June 10, 1985, so that we would not lose any more good construction time weather and be able to turn this project into one the whole town would be proud of. Very truly yours, EVAN CROSSING ASSOCIATES Vito Covensky Owner cc: Emil W. Lucek, Lucek Engineering Wayne C. Gerlt, Attorney Rick Martel, Town Engineer A.B. Davies Deputy T"-own Engineer Jacqueline J. Smith Town Clerk Richard J. Sartor, T own Manager Richard Ryan, Deputy Mayor Robert F. Gilligan Chairman PZC Thomas D'Auria, Building Official Peter Demallie, Director of Planning John Shemo,EDC w N s�44 r o-P ?d&zd4at 4 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 �tipsol.c AREA CODE 203/644-2511 June 18, 1985 Mr. Vito Covensky Evans Crossing Associates 490 Buckland Road South Windsor,CT 06074 RE': Application No. 294 — Evans Crossing Create 15 lot open space single family subdivision, construct roads & utilities Property located west side of Avery Street opposite Pine Knot Drive Dear Mr. Covensky: At the June 17, 1985 Work Session, the South Windsor Inland Wetlands Agency approved the reinstatement of original permit with all conditions prevailing. This approval is also conditioned on the completion of all itemis as stated in letter of May 23, 1985 from Inland Wetlands Agency. Very truly yours, John Moran, Jr., Chairm INLAND WETLANDS AGENCY cc: Emil W. Lucek, Lucek Engineering Assoc. A. B. Davies, Deputy Town Engineer Jacqueline J.Smith, Town Clerk Richard .J. Sartor, Town Manager Richard Ryan, Deputy Mayor u0kobert F. Gilligan, Chairman PZC Thomas D'Auria, Building Official PeterDeMallie, Director -of Planning Kenneth -Brill, Chairman EDC John Shemo, EDC t wN a�4 (� CIO r �� 0 e P 4 w� &&44-at 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 f��soR•co� AREA CODE 203/644-2511 June 18, 1985 Mr Vito Covensky Evans Crossing Association P. 0. Box 511 490 Buckland Road South Windsor, CT 06074 RE: Conservation Plan - Application No. 294 - Evans Crossing Dear Mr. Covensky: At the June 17 meeting, the Conservation Commission reviewed and approved with conditions, your modified conservation plan for property located on the west side of Avery Street. The plan was approved with the stipulation that work will be completed in two phases* The first phase will include installation of ttllities and sewer lines and all rough grading. At that completion, engineering would report either to the Commission or to its chairman . (to the Sommission if work is completed before the July meeting, or tc me if after that) , indicating everything has been done according to plan. At that point, a go ahead will be given for phase two, the final paving This approval also includes the bond of $159000. already submitted by th _,applicant, to ensure that conditions be met. Very truly yours, 65j,"ohn Moran, Jr., C rman Conservation Com ssion i cc; E W. Lucek, Lucek Engineering A. B. Davies, Deputy Town Engineer Jacqueline J. Smith, Town Clerk .)-"ichard Gilligan,. Chairman PZC Coven Construction Company Inc. P.0 BOX 511 SO. WINDSOR, CT 06074• PHONE 644.3231 - 644.9115 - BEEPER 547-8E 67 June 26, 1985 Town of South Windsor Public Works Department 1540 Sullivan Avenue South Windsor, CT 06074 RE: Evan's Crossing - Avery Street, South Windsor Gentlemen: We would like to request reduction in the bond for the above project from the recommended amount of $220,000 to $99,679. Work to be done is listed below according to estimate of Rick Martel. Cut 19600 CY @2.50/CY 4,000.00 Fill 29200 CY @3.25/CY 79150.00 Catch Basins 4 Ea. @1,000/Ea. 4,000.00 18" RCP 150 LF @35/LF 5,250.00 15" RCP 132 LF @30/LF 3,960.00 8" PVC 400 LF @ 10/LF 49000.00 6" PVC Laterals 465 LF @25/LF 11,625.00 Bituminous Concrete Paving: 6" Process Gravel 733 CY @6.50/CY 4,765.00 6" Process Stone 733 CY @5/CY 39665.00 3" Bituminous Concrete 507 Ton @52/ton 26,364.00 Bituminous Concrete Curb 1840 LF @2/LF 3,680.00 Concrete Sidewalks 6,720 SF @2.50/SF 169800.00 Required 2 Trees per Lot @50/Tree 1,500.00 Mow 32 @65/Ea. 29080.00 I.P. 21 @40/Ea. 840.00 999679.00 Yours truly, Vito Covensky Owner ECEIVED LAW OFFICES OF WAYNE CHRISTOPHER GERLT 'J U L' 1 1985 435 BUCKLAND ROAD P. 0.BOX 559 WNW Jj.Pirrt) SOUTH WINDSOR,CONN.06074 WAYNE CHRISTOPHER GERLT TELEPHONE DAVID E.COHEN (203)644-2565 June 26, 1985 Richard M. Rittenband ATTORNEY TOWN OF SOUTH WINDSOR 1734 Ellington Road South Windsor, Connecticut 06074 Re: Deed to Evan's Crossing (Road), Open Space Area within Evan' Crossing Subdivision, Conservation Easement, Storm Sewer Easement and Sanitary Sewer Easement. Dear Dick: Enclosed herewith you will find the referenced easements for Evan s Crossing Subdivision as required by the approval letter from the lanning and Zoning Commission, Inland/Wetlands Agency, Conservation Commi sion and all as shown upon the maps or plans approved by the referenced boards and commissions. If you have any questions concerning the description or legal form of the documents, please don't hesitate to contact me. Thank you. Very truly yours, Wayne Chr' topher Gerlt WCG: lmg Enclosures cc: A. Bowen Davies Virginia Graney Emil W. Lucek Vito Covensky `4 r L //-- � ca 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 r�osoR-CO AREA CODE 203/644-2511 July 10 , 1985 Wayne C. Gerlt, Esq. 435 Buckland Road South Windsor, Ct. 06074 .Dear Wayne: Re: App. #1025 - Evan' s Crossing The Planning & Zoning Commission voted last night to reduce the bonding requirements for the above subdivision from $ 20, 000 to $60 ,000. Building permits will not be issued until the final mylar have been filed in the Town Clerk' s Office. Prior to filing t e mylars the conditions contained in our approval letter dated Feb uary 20, 1985 must be complied with, including posting the bond, or letter of credit, payment of the drainage fee, submission of deeds, and submission of the insurance certificate. Yours very truly, PLANNING AND ZONING COMMISSION vg By: C' Robert F. Gil iga , Ch irman CC: Richard Martel, Town Engineer Thomas D'Auria, Building Official Peter DeMallie, Planning Director Vito Covensky LAW OFFICES OF WAYNE CHRISTOPHER GERLT 435 BUCKLAND ROAD P 0.BOX 559 SOUTH WINDSOR,CONN.06074 WAYNE CHRISTOPHER GERLT / Y (n TELEPHONE DAVID E COHEN (203) 44-2565 LOUIS D.FERRERILk C C71 r August 30, 1985 !! l� Mr. A. Bowen Davies Deputy Engineer TOWN OF SOUTH WINDSOR 1540 Sullivan Avenue South Windsor, CT 06074 Re: Open Space Description - Evan's Crossing Dear .4 r. Davies: Upon your request during a telephone conversation with my secretary today, I have carefully examined the coordination of the map in the referenced matter with the proposed Warranty Deed which I herewith enclose with the one modification to its body. I have proofread the document and find that the bearing S 19 - 06'-37" W was incorrect and has been corrected to N 190-061- 7" E. If you have any other complaints about this open space description, please feel free to contact me. Other than the above referenced modification, I in my experience in these matters can find n other incorrect bearings. Thank you for your cooperation with this matter. Very truly yours, r ,F-t- �I Lo is D. Ferreri LD F:lmg Enclosure T-0 WfT S-o-ttm ?A:a� 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 e-CO AREA CODE 203/644-2511 June 5 , 1986 Mr. Ludis Upenieks , President U & R Construction Co. , Inc. 99 East Center Street Box 248 Manchester, Connecticut 06040 Dear Mr. Upenieks : Per your request , enclosed are certified checks we have been holding on Evan' s Crossing Lots 4, 6 , 7 , 8 , 9, 11, 13 an Paper Chase Lots 40 & 41 . Very truly yours, Joyce Vallez jv enclosures Rec'd above certified checks ��� r 6/5/86 t0,0N E, 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN 06074 �oSOR,co AREA CODE 203/644-2511 August 6, 1986 Mr. Ludis Upenieks U & R Construction Co. , Inc. Box 248 6 99 East Center Street Manchester, Connecticut 06040 nds South W g Commission RE: Final Grading at Lot 7 Evans Crossing plann►ng & Zoe Dear Mr. Upenieks: After inspecting the final grading at 61 Evans Cross ng, I find that the finished work is marginal. My concern are: 1 . That there be sufficient sloping away from the house - especially sensitive on the north side of the house where window-wells have been ilLStalled. 2. That any swales be gradual so as to facilitate use of the property. I would suggest that you contact Mr. Antao and resol a these problems to his satisfaction. Thank you for your anticipated cooperation in this matter. Very truly yours, r , Richard P. Martel Town Engineer RPM/j sv CC: Mrs. Louise Evans, Chairperson, Planning & Zonin3 Commission Mr. & Mrs. John Antao U & R Construction Co., Inc. 99 EAST CENTER STREET BOX 248 MANCHESTER. CONNECTICUT 06040 643-9551 August 27 1986 Mr. Richard P. Martel Town Engineer 1540 Sullivan Avenue South Windsor, Connecticut Re: Lot #7, Evan's Crossing Dear Mr. Martel, Final grading on Lot #7, Evan's Crossing was done before the closing on this house. This matter has been given to John Limberger to work out a solution with Mr. Antao, as he did the work here. 4owpver, because of the contour of the land, the house had to be set as it was. Very Truly Yours, Ludis Upenieks U & R Construction Company, Inc. c.c. : Mrs. Louise Evans, Chairperson, Planning & Zoning Commission Mr. and Mrs. John Antao DT"V1 qI Evan's Crossing South Windsor , CT 0 074 Phone: 644-9745 August 31 , 1986 Mr. Richard P. Martel Town Engineer 1540 Sullivan Ave. South Windsor, CT 06074 Subject : Lot 7, Evan ' s Crossing Dear Mr. Martel This is to follow up on Mr. Upenieks letter of August 7. We would like to point out some discrepancies on that letter : The final grading was done after the closing date, around early April , whereas the closing was on January 24. We met with Mr. Limberger on or about August 13 , who recommended what appeared to be a sastifactory solution, however Mr. Limberger and Mr. Upenieks are now vacilat ' ng. The house was set too low which combined with the f nal grading caused the water to run from lot 8 resulting i substantial water accumulation. We wish to reiterate our position, which we have conve ed to Mr. Upenieks on numerous occasions , we wish this problem corrected while maintaining the backyard functional . Furthermore , since it has been some time w wish to have it corrected as soon as possible. Sincerelly John and Helen Antao cc : Mrs. Louise Evans , Chairperson , Planning and Zonni g Commission U & R Lucek Engineering Associates, Inc. Consulting Engineers & Land Surveyors 490 Buckland .Road South Windsor, Connecticut 06074 Emil W. Lucek, PE, LS Telep one (203) 6 4 4-0 5 5 0 Ms. Louise Evans Chairman Planning and Zoning Commission Town of South Windsor South Windsor, CT 06074 October 27, 198 It)-.r,,� p�j �,S 19a6 Dear Ms. Evans, South �tndsor fission P to Wing & �ons�B Comm Please consider letter as an official request. that the street known as Evan's Crossing be accepted by the Town of South Windsor and that the applicable bonds now being held by the Town be released. 6 Ver my o rs, l0 1 mil W. Lucek cs 11/20/86 COMMISSIONERS: These people want to meet with PZC regarding this petition. Would you like to appoint someone to be liaison and look at this subdivision before it' s an Agenda item? (Evan' s Crossi g, has a request in for a bond release ) . We are holding $60,000 . r Ginny November 17, 1986 �itia D Mrs. Louise Evans Chairperson , Planning & Zoning Committee South Windsor Town Hall NOV 19 1986 1540 Sullivan Avenue South Windsor , Connecticut 06074 $Oath indSOt Dear Mrs. Evans: planning & Zoni g CommiSSioA In speaking to several individuals in both the Planning and Zoning 5nd Engineering DZ!!tn suggested we write to you regarding the "acceptance" g. In our opinion , the following items should be rectified before Evan Crossing is accepted by the Town of South Windsor , and any bonds released. 1 . Raking and Seeding of disturbed areas. Although, the builder provides seeding for the 20-30 feet Burro nding the house , we believe that all disturbed areas be seeded so as LO prevent erosion and pollution to Evans Brook and the surrounding wetlands area. Based on the time of year, we suggest that this be completed in the spring of 1967. 2. That large dead branches of trees located in disturbed areas ha a said branches removed. As you are probably aware , Evans Crossing is graced with many g eat white oak trees which range from 50 to 75 feet tall . Many of t ese have large , dead branches on them which could cause serious ink ry to someone when they fall . It is our common understanding that tie Town of South Windsor mandated that this area would keep as many tre s as possible while developing this area for ecological and aestheti reasons. We ask, that all dead branches for those trees in dist abed ( lawn ) areas be removed. 3. That stumps and similar debris left by both Coven and U & R be removed from back yards , the road cut area , and town property behind the homes (not including lots 13 and 9 ). 4. That both drains on the road cut be corrected 59 as to prevent water build-up around it . We believe this will involve an elevation change for the drain, and/or road and curbing areas around them. l l 1''� Mrs. Louise Evans November 17, 1986 Page 5. That the circle within the cul-de-sac be corrected so as to improve the appearance of the area. Although the road and sidewalk: widths may meet specifications , the grass area between the sidewalk and road ranges between 1 and S feet in width around the cul-de-sac. This is an eye-sore. In comp eting this task , we feel it only fair that if driveway aprons are affected that they be replaced in total so as to prevent a patching affect . 6. That any and all trees in disturbed areas which do not bear leaves in the spring of 1987 be removed in total by U & R. As most of t e neighborh000d will attest , U & R was not very careful in the landscaping around the homes. Most of the home owners were re aired to dig out trees because the nubs were buried too deep. 7. That all of the above items be specifically accepted and adopted by the appropriate town officials to become, part of the building code so as to protect future homeowners in the go-eat town of South Win sor. In addition to the above , we feel that the following two items sho ld be completed. They include: a ) put down the final layer of asphalt cn the road and b ) complete the property surveys. We the undersigned, and residents of Evans Crossing strongly urge ou to refuse acceptance of Evans Crossing and maintain possession of all bonds pertaining thereto until the aforementioned issues are mitigated. Although time did not allow for review of this document by all home owners in Evans Crossing , those reviewing and agreeing to the above are LISTED AS FOLLOWS IN LOT NUMBER ORDER. Lot 3 Lot AN Tomm R. Lot 5 Lot Lot 7 Loot 13 to �� , eta i 00 W,� 1 E E f i Mrs Louise Evans Chairperson South Windsor Planning and Zoning Commission Discrepancies - Evans Crossinq Subdivision On May 5th I met with Mr . Hayden to diSCUss hisineighbors etter of November 17, 1986 to Mrs Louise Evans , Chairperson , Sou h Windsor Planninq and Zoning Commission . I find his letter is accurate in detailing the Uncompleted Poorly constructed items within the subdivision . i -2� sly/� Robert V. Conde f Alternate , Planning and Zonning Commission r °w N E'< GO Tio 01 � C � w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 6074 It CO AREA CODE 203/644-2511 M E M O R A N D U M May 149 1987 TO: Louise Evans , Chairman , Planning & Zoning Commission RE: Inspection of Public Improvements - Evans Crossing The following items are necessary for completion/correction at Evans Crossing before I can recommend that this subdivision be allowed to go to a maintenance bond . 1. "As-Built" drawings must be prepared in accordance witli the present subdivision regulations . The As-Builts will accurately depict the relationship among the street line , sidewalk and curbing in the cul-de-sac. 2 . A letter from the developer ' s surveyor certifying that all iron pins and monuments have been installed . r 3. The finish course of pavement is yet to be applied over the binder course . 4. All catch basins and storm sewer pipes shall be cleaned . ,_ 5 . Throughout the entire length of the existing binder course , tracked vehicles have gouged and defaced the pavement. This must be corrected and repaired before the finish course is applied . 6. Sidewalks on Avery Street must be installed . 7 . Two 2-1/2" caliper trees must be planted at: House #32 , #441) #509 #569 #689 #679 #61 , #15 8 . Stump disposal at the rear of House #44 in the Right of Way reservation . 9. Turf establishment/snowshelf at lot #2 at Evans Crossing -r in front of House #32 in Right of Way reservation iiouise Evans , Chairman , Planning & Zoning Commission 10 . Bituminous Concrete Lip Curbing repair in front of House #67 in front of House #62 (settlement & cracking) in front of House #35 (wheel marks) between House #22 and House #32 11 . Catch Basin repair: repoint around the inlet pipe atICB Station 0+75 1 ft repoint block in catchbasin betw en House #32 and House #44 T/F elevation to be adjusted in ront of House #49 catch basin frame to be re-set j st east of House 49 12 . Trench Settlement/repair : in driveway of House #22 in pavement in front of House #6 in pavement to sidewalk in front of House #61 13 . Re-establishment of rip-rap pad on he northerly side of the 54" flared end . 14 . Removal of silt at the end of the 1 " flared end outl tting by the 54" RCP. 22 15 . A cracked flag of sidewalk east of �he driveway to House # 16 . Removal of silt from the detention basin . 17 . Placingof rip-rap along the exposed wall of the catchbasin in P P g P the detention basin, 18 . Clean up the silt deposits at the Right of Way reservation 19. A gravel base , for the sanitary sewer line in the open space , y be installed . � 20 . All of the sanitary sewer manholes in the open space be uncovered. -- 21 . Clean up and repair the disturbed ateas in the sanitary sewer right- of-way in the open space . 22 . Final pavement repairs at the sanit ry sewer connection in Avery Street . Aw- 1�'ichard P. Mart 1 Town Engineer RPM/jsv CC: Michael Gantick , Marcia Banach , Cov n Construction 27-May-87 Planning & Zoli,� 9 Commission To: Mrs. Louise Evans, Chairperson Planning and Zonning Committee South Windsor Town Hall 1540 Sullivan Avenue South Windsor, CT 06074 Re: Evan 's Crossing - Lot # 7 Dear Mrs. Evans: Following on the Committee meeting of May 191 'e are submiting a noti e of the problems we have encountered, which will be agravated if the development of the land located on the north side of Evan 's Crossing is approved. Furthermore, we understand and agree that there are other arguments against the development of this land, however this letter i to formally put the town on notice, of a specific problem. Lot # 8 and the parcel currently being considered for development, P , drain into lot # 7. It took a sub surface drain and considerable landscapping, to partially correct this problem. If the development f said parcel is allowed it will agravate this problem. Therefore, if the proposed development is approved the town should to e the necessary steps to ensure that water does not drain into the lots on Evan 's Crossing, by maitainning a considerable buffer of undeveloped land between the new development and Evan 's Crossing and by diverting the drainage away from said lots. As a result of the several problems we had, we feel that the town engineers should exercise greater control drrin the development and construction period to ensure that problems suc as ours are not repeated. The drainage into our lot was partia ly caused, and certainly aggravated - in particular the draina a from lot # 8 - by the foundation being laid lower than the natural co tour of the land. In addition, in unrelated matters, but which are also being reviewed ty your Committee, we have four dead trees on the �ront lawn and six dea trees on the back lawn. These dead trees are a direct result of a total disregard by the builder and the lot allo ance should be used t remove and replace these trees. Also the lot b3undaries should be properly marked. _ z _ Other matters that should be finalized worthy Of your consideration are the final surfacing of the street and the proper allignment of the sidewalks around th - e-sac. Thank you for y ur assistance in these matters.' John M. and len Antao 61 Evan's Crossing - Lot # 7 South Windsor, CT 06874 cc: Richard Martel , Town Engineer wM a 44 y r 710 O-P ?d&&Aliat o � C V w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 6074 ftiosoR.CO AREA CODE 203/644-2511 June 12 , 1987 Mr . & Mrs . John Antao 61 Evan ' s Crossing Lot #7 South Windsor , CT 06074 RE: Evan ' s Crossing Dear Mr . & Mrs . Antao: Thank you for your recent letter concerning the drainage pr blems in the Evan ' s Crossing area. We will be sure to look into that issue before deciding about allowing the Zone Change in that area. With respect to the other problems you mentioned , I have recently met with the developer of the Evan ' s Crossing Subdivision and steps are being taken to correct the outstanding problems in the subdivision . Very truly yours , Louise C . Evans Chairman , Planning & Zoning Commission jsg C01VEN CONST�?UCTION COMPANY, INC. RECEIVED i ir, 19 1988 August 17, 1988 SO. WIN11SOR PLANNING DEPT. Town of South Windsor Att: Michael J. Gantick, Director of Public Works 1540 Sullivan Avenue South Windsor, CT 06074 RE: Evan's Crossing Dear Mike: This letter will confirm a meeting at Evan's Crossing on 8/4/88. Present were Les Braddock, myself, Mike Covensky, and Ed Dailey, our laborer. While we were there, we discussed the sewer right of way erosion in the rear of Joe VassalLo's property, and regrading, topsoiling and seeding, also the slope and the accessability of maintenance vehicles were discussed and agreed upon. Then we flushed our sewer line for approximately 1/2 hour from the hydrant on Evan's Crossing and checked the manholes along the right of way and found no obstructio s or blockages. We also mirrored the lines, but saw no problems. This letter is in respect to getting Evan's Crossing accepted by the Town of South Windsor and getting our bonds released or reduced to a maintenance bond. If there are any questions, please call me. Yours truly, eCovensky President cc: A. Bowen Davies, Deputy Town Engineer Lester Braddock, Engineering /Planning & Zoning Inland Wetlands Marcia A. Banach, Town Planner Fred Shaw, Ass't. Director Public Works/Pollution Control Mel Stead, Public Works i P 0. BOX 511 • SOUTH WINDSOR, CONNECICUT 06074 (203)644-3 31 r rIM dE,� Y 7,o o-P s ?d&zd4ot u �� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 0 074 l��soR•cu� AREA CODE 203/644-2511 September 27, 1988 Mr. Vito Covensky, President Coven Construction Company, Inc. P.O. Box 511 South Windsor, CT 06074 RE: Evan's Crossing " Dear Mr. Covensky: Your request for consideration of acceptance and rellease or reduction of bonds is premature at this ,time. As a consequence of activities in (conservation ease mant areas on some house lots this spring by homeowners, discrepancies in boundaries became evident between the filed subdivision maps and plans and amended individual building ' lot plans requirel by the IWA/CC for brook channel re-location necessitated by inaccuracies on the approved subdivision maps and plans. Since the conservation easements granted to the town as well as flood/drainage rights granted to the State of Connecticut via the Department of Environmental Protection appear to be at issue in these areas of discrepancy, the IWA/CC cannot at t is time entertain your request. Once this apparent dilemna is reviewed by the Town and the State, and all concerned parties are satisfied that these apparent discrepancies are resolved or rectified, your request may be re- activated. Your cooperation in resolving this matter is respectfully requested. Sincerely, John M. Moran, Jr. , Chai n ✓. Inland Wetlands Agency/ Conservation Commission JMMJr. /pmm Enclosure: Covensky Letter of August 17, 1988 cc: A.Bowen Davies, Deputy Town Engineer Lester Braddock, Engineering Department Raymond Hallowell, Jr. , Chairman - Planning & Zoning Marcia A. Banach, Director of Planning Fred Shaw, Ass't Director of Public Works Mel Stead, Public Works Ralph Alexander, Town Attorney John E. McCahill, Zoning/Wetlands Enforcement Officer Michael Gantick, Director of Public Works Marla Butts, Connecticut Department of Environmental Protection