Loading...
HomeMy WebLinkAboutSITE PLAN (70) TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION /J The Commission will officiall receive applications pplication NO .( 0�4 at either Special or Regular ikeetings provided they Received Date : were submitted to the Commiss on Chairperson, Secretary Action Or Public Hearin b or agent, at least fourteen ( 4) days prior to the g y � meeting at which they will be officially received. No application officially reci ived at a Special Meeting Receipt NO. will be acted upon at that me ting. i APPLICANT: (�. c� ,!J ADDRESS : 2-4 E —Fo rr//'4z,,ye9l7/y TELEPHONE f�-7� �3 OWNER OF RECORD ON LAND RECORDS : E R CA4, E, t, ADDRESS : 60 Y, q 5 /0 Cz NrV 0 03 COMPLETE LOCATION OF PROPERTY: S'cfedl �t- ZONE NAME, ADDRESS & TELEPHONE NUMBER/ OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: A f/Y hey l ZjT cS�' �75 D TELEPHONE 2- THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING) 1 . Zone Change to (public hearin e 2 . Filing for Subdivision 3 . Filing for Open Space Subdivision (pu'b%licP,�a� lwng required) 4 . Filing for Resubdivision (public hearing reg4jred) 5 . Special Exception to Article (pub.l y. htE"aring required) 6 . Site Plan of Development 7 . Removal of Sand, Gravel , Clay or Quarry Stone & Ore (public hearing required) 8 . Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT &EVE; ICANT AND 0 NER F T OPERTY AND SUBMITTED WITH 6 SETS OF PLANS ( 7 sets if p lic h Jn is req fired) BEFO IT IS RE /BY THE PLANNING & ZONIN Or1 SSIO Applican 0 nee 12 /84 PLANNING AND ZONING COMMISSION TOWN OF SOUTH WINDSOR Fee Schedule and Policy 1. An application processing fee of $25 per lot ($50 minimum) is required for: Subdivisions,. resubdivisions, and open space subdivisions. 2. An application processing fee of $50 is required for: Change of Zone, Zoning Amendment, Special Exception, and Earth Removal or Land Filling Operations. 3. An application processing fee of $25 is required for Site Development Plans, except: where new buildings/additions/renovations of 2,000 s. f. or more are proposed, said fee shall be $50; said fee shall be $500 for Site Development Plans in the Designed Commercial Zone; $50 plus $5 per dwelling unit for Adult Housing ($500 minimum) . 4. An application processing fee of $10 per acre ($300 minimum) is required for a Change of Zone/General Plan of Development in the Designed Commercial Zone. 5. An application processing fee of $100 is required for a Change of Zone/ General Plan of Development in the Multi-Family or DA-15 Residential zones; or for a Special Exception/General Plan of Development for Adult Housing. 6. An application processing fee of $50 plus $5 per dwelling unit is required for a Special Exception/Site Plan of Development in the Multi- Family or DA-15 Residential zones ($500.00 minimum). 7. Application processing fees are non-refundable after the application has been officially received by the Commission. Application processing fees may be returned prior to the application's official reception provided a letter of withdrawal, signed by the applicant , has been submitted to the Commission prior to the meeting at which said applica- tion is scheduled to be officially received. 8. Applications unaccompanied by the required application processing fee are incomplete, and as such may be returned to the applicant and removed from the Commission's agenda. 9. Complete applications and required fees shall be submitted at least fourteen (14) calendar days prior to the Regular or Special Meeting at which it will be received. 10. Fees for a previously denied application shall not apply to any subsequent application. However, when a subdivision, resubdivision, or open space subdivision application has been denied within the preceding 12 months or approved for fewer lots than requested, and a new application for the subject tract is submitted by the same appli- cant, then the fee for the new application shall be a minimum of $50 plus $25 for each lot above and beyond the number of lots contained in the earlier application. 11. A fee of $5 per sign is required for signs to be posted by the applicant on the subject property. 12. Other Fees: Subdivision Regulations - $3.00; Zoning Regulations - $4.00; Zoning Map $1.00; fees for other documents is as determined by the Commission. 13. All checks shall be made payable to "Town of South Windsor. " Adopted: 4/10/84 Revised: 12/4/84 �011% aE+ .4 P T-awn, O-P S_0� ?dbv� wQ 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 f�4soR.00 AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, APRII, 27, 1985 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At the April 23, 1985 meeting, the Planning & Zoning Con=ission voted to take the following action: 1. Approve, with modif ications, the application of Mercu y Oil, for a site plan of development for property located at the corner of South Satellite Road and Nutmeg Road South, as shown on plans prepared by Borghesi Engineering Co. Inc. dated 4-9-85, and Alford Associates, Inc. , dated March 19 , 1985. 2. Approve, with modifications, the application of Rose Zagorski for a subdivision on the west side of Main Street, as shown on a map prepared by Meehan Associates, dated 2-28-85, File 84098 , A-40 and FP zones. Dated at South Windsor, Connecticut this 24th day of April, 1985. PLANNING AND ZONING COMMISSION Marshall Montana, Vice-Chairman David H. Sorenson, Secretary C� O � n serum �v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 0 074 SOR,co� AREA CODE 203/644-2511 April 26, 1985 Mr . Allan R. Borghesi 2155 E. Main St . Torrington, Ct . 06790 Dear Sir: Re : App . #1068 - Mercury Oil Please be advised that the Planning and Zoning Commissior voted to approve the application of Mercury Oil for a site plar of development for property located at the corner of South atellite Road and Nutmeg Road South, as shown on a plan prepared ly Alford Associates , Inc . , dated Mar. 19 , 1985 , and Borghe i Building & Engineering Co . , Inc . , dated 4-9-85 , subject to the following modifications : 1 . The zoning data block should reflect that this is thE IP zone ; 2 . The 50 year flood should be addressed; 3 . The site plan should show hay bales and stockpiling ; 4 . Curbing on the easterly side of the proposed parking area should be shown; 5 . Ownership of the drainage right-of-way in the southerly portion of the lot should be shown ; 6 . The data block should indicate the percent of lot co erage ; 7 . No building permits will be issued until the final plans have been filed in the Town Clerk ' s Office ; 8 . Prior to commencement of site work, a meeting must be held with Town staff . Within ninety (90) days of the date of approval , black and white transparent mylars of the site plan and A-2 survey , with three paper prints, with the letter of approval of this Commission reproduced thereon, must be submitted to the Commission. After signing and stamping, the mylars will be filed in the Town Clerk' s Office . Yours very truly , PLANNING & ZONING COMMISSION v g B y Mar hall Montana, Vice-Chairmai CC : P. DeMallie Planning Director R. Martel , town Engineer T. D 'Auria , Building Official E. Belleville , Assessor