HomeMy WebLinkAboutRESUBDIVISION (38) APPLICATION TO TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
PLANNING AND ZONING COMMISSION ACTION THIS APPLICATION SHALL BE RECEIVED
APPLICATION NO. 1 BY THE PLANNING AND ZONING COMMIS-
SION AT THE REGULARLY SCHEDULED
RECEIVED DATE "a - 73 MEETING ON THE FOURTH TUESDAY OF
PREL. APPROVAL DATE '"" THE MONTH AT TOWN HALL.
FINAL APPROVAL DATE
REJECTED DATE
RECEIPT NO. ADS
APPLICANT SAAVIN BROTHERS. INC
ADDRESS C/o ridwLn .4. Lasomen, !I! Fear! Street, Hartford, Goan. 06103
OWNER SAVIN BROTHERS INC.
ADDRESS
UIV Edwin A. Lawsman, Esq. U! Pearl Street, Rffrtford, Come 103
LOCATION OF PROPERTY S031rh catg1 t �—$Olgh W4 0d OV
ZONE Industrial Park
CHECK ONE OF THE FOLLOWING:
1. Zone Change (Public Hearing)
2. Filing for Subdivision (See "Subdivision Check List")
_3. Filing for Re-Subdivision (Public Hearing)
4. Special Exception
Article 4.1.8 (Public Hearing)
Article 4.2.3 (Public Hearing)
Article 4.7.2.7 (Public Hearing)
Article 4.10.2.4 (Public Hearing)
5. Parking—Article 8.5.16 (Public Hearing)
6. Site Development Plan—Article 4.11
7. Removal of Sand, Gravel, Clay or Quarry Stone & Ore (Public Hearing)
8. Other
STATE CLEARLY AND BRIEFLY THE REASONS FOR APPLICATION
Applicant desires to sell an additional lot.
1. Application and supplements must be filed in triplicate.
2. Application must be typewritten or printed in ink.
3. The applicant or his representative must be present at the Commission Meeting.
4. Application Fee of $25.00 required for filing Items 1, 2, 3, 4, 5, and 7 to defray expenses.
Applications, other than for subdivisions, shall be accompanied with three copies of a map, minimum size 81/2 x
11 inches, drawn to scale showing the land, buildings present and proposed, plot depths and measurements, street
and building lines, also a measured distance to nearest street corner, names of abutting property owners, and a
sufficient portion of surrounding area to make such a map readily intelligible, and the subject property either
shaded or cross-hatched.
If approved, the Zoning Commission reserves the right to request and the applicant hereby consents to furnish,
within sixty days following approval, three maps prepared by a qualified civil engineer or surveyor showing the
items above.
rs �.
SIGNED;•` ,r
APPLICANT
OWNER
"PPLICATi'N CHECK LIST
1. A l'PLICA �'T Ii�;FCR� �.TICN:
N My ��
ADllRESS Cto �-- - A ��SS��lA►J
TELEPH(""INE
2. REC,UE-''ST FOR:
NUMBER CP LOTS
A. Date Roceived
B. Applicat cry No. Receipt No.
C. C.-R.P.A. Notification (Date)
D. Acknowledgement to Applicant
E. Date of Cwri1ssion Dwvle'r+
or
Date of Public Hearing -1-`l 3
F. Legal Noticos Bates (2) l t -go
G. Date of .".ction by Cov- issi o;� �1� ---'-
(65 da.ys)
H, Late of -.t prcvn.l or Denial
I. Ef f'e,,Ctive Date
J. Letter to
L. Linen. :�ecelved
-:. 11,otion made by L ��1.15 ��.►��t<<►
ro,j A k I-F(,,
C�o J L A-Fel I,{e 1Cufla b� 5����1 ��-�i 0 5
e-a . - �
F��.�ut�T�mZ��'�� v .�C; LIST
1. Key lYa p �S
Plot Plan (lin,�!noj cs
3. Map
L, P.-ans and Profiles
5. Open Spac-- S-ite Plan
6.
Sq-nit ar y r-r,Jr t and iN6^.�.',:°�"t�',iZP.�iS�
Of c�
►.�C.�9{tiiJ LJ C ✓
tl11�:-�J ,i 011
7. Sf..o_�. Drainage Assesamten l Fee ...� ,.:
Final Fee
li,lpl os c-n U4i i lJ-3
tin Tryy «,.�^-1�cz
of
Ccl s,:F!n a7 1orl, 1TI,:ICKi
Consv.vat won ''0MO-isd,io;1
MI 5 5 OW.:f 7 Dli 1,di T:L.7 "_�.�or v�_?,f9 t i'�t
Y'1 U:S L U e t v d J 1.. J 1
f l,�J�Y✓mv�",r?j yP rr-,A V t'1J i l�r r oi? o N 5 1 �.�+1.:L!..T."�� +.��.�..
S_'.J• �g .y 1'
7 ►JI ---
ii. FZ'E
1 s4om ?r.1 ,r�� r1o•+ c:
ALI
1LU.r.V Gnr
f
::1U'1f-vli _r1
LAW OFFICES
ROGIN, NASSAU, CAPLAN, LASSMAN & BORDEN
EDWARD S. ROGIN
LOUIS E. NASSAU 111 PEARL STREET
HAROLD BORDEN HARTFORD,CONNECTICUT 06103
JEROME E. CAPLAN
TELEPHONE 278-7480
EDWIN A. LASSMAN
(AREA CODE 203)
ARTHUR M. NASSAU
DAVID M. BORDEN
A.NED ROGIN
ROBERT L. HIRTLE,JR.
STEVEN D. BARTELSTONE
October 31, 1973
Secretary
Planning and Zoning commission
Town Hall
South Windsor,Conn.
Dear Sir:
Enclosed you will find check
in the sum of $25 in connection with the application
of Savin Brothers re sub-division. The application
was left with you last evening.
Very truly yours,
EAL:LM
Enc.
' �!'lye��{'i ��iA 9� 7�,y��•�,•�� ;'l1�II1 !1�����!
' I �i I 11111 Ifj
�i��e.yNiMllily�il��� {axlN��wl�x� IIq�11MM�1+.i
,IC IG� it I��IV IA� Town Hall 1540 Sullivan _venue South Windsor, Connecticut 0G07.1 A,i i
To be published in the L cur nal-Lnq,,.�i_•er Fri-:ay, vecemr ber 7, 1973
1..liC�.L
TU:N OF ,,;INDSOR
C PIA1• T 1`�TT� 1 Ti
During t::e December 4 meeting of the Flannino and Zonird Commission,
it ',ryas voted. to :
1. Aprrvve the ar^lication of Savin Brothers, Lnc. for a resubdivis-Jon
of land as Tot 3D-5, located on the north side of South Satellite
Road in the Sa:-n Industrial Park.
2a�. �ppro�:e tre a^placation of Savin Brothers, Inc., for a site plan of
d 2!valo�.er?t for parcel J D--5, located Gil the north sad:' of Sjou th Satellite
Road in ja Iin 1r Gtast..rial Parik.
3 e I r,-3ve Ca+1On of eTOhn and Helen A. A ia? 5ky, 584 Governor's
c-.,r-,d Lee Ruli'1_iciIC, 57 is and jaull 3n
n11Ce 5OJ COVE.'rnor Is Hia`l;iay Lcr a ?�Cne� cha??fie of land at the
a.bo-re ,GC?'vivi13 from Tr:--'ustr.i.al tc -�O.
Tnv effe::—]- e date cf this 3 ction is 'ece-mber 1C, L973.
Dated -it Jo) :1 CdO: C t iOa., .. s 7�.C1 .:-.f OA �:Pe:.: 1973
-�- J
Secretary
i iJ•lY ai:YV :lit✓ !.I"v1"iJ- -;-
STATE OF CONNECTICUT
PROTECTION
DEPARTMENT OF ENVIRONMENTALO CTION
►,,,N,�,►�"'0 STATE OFFICE BUILDING HARTFORD, CONNECTICUT 06115
December 27 , 1973
APPROVAL OF PLANS AND SPECIFICATIONS
Mr. Richard Reeves
Chairman Sewer Commission
Town Hall
Sullivan Avenue
South Windsor, Connecticut 06074
Re: DEP/WPC-132-S01
Proposed Sanitary Sewer
Parkcentre, South Windsor, Ct.
Savin Brothers, Inc.
Dear Mr. Reeves:
The Town of South Windsor is hereby authorized to install "Parkcentre
Industrial Park Sanitary Sewers" for conveyance of sanitary sewage to the
South Windsor sewage treatment plant in accordance with plans and specifi-
cations prepared by James P. Purcell Associates and filed with this depart-
ment on December 115 1973.
The sewer system shall be installed substantially in accordance with
the plans and specifications as submitted with the understanding that any
modifications to these plans shall be approved by this office prior to
construction.
The Department of Environmental Protection should be formally notified
when the constructed facilities have been installed in accordance with this
approval.
Very truly yours,
�Merwin E. Hupfer
Director of Water Compliance
MEH:JRS:njd
cc: James P. Purcell Associates
`flua papas rune. p4adaevj h&w 4ec fcad pap,e - 6aa daa(ae ad