HomeMy WebLinkAboutRESUBDIVISION 3 LOTS o TOWN OF SOUTH WINDSOR , CONNECTICUT '
i PLANNING AND ZONING COMMISSI
APPLICATION FO �*I V, 1'r
Application No. : -G�p JUN 1988
Dat Rec ived : ,�k.
Public Hearing by: .
Receipt No. : South Windsor
Planning & Zoning Commission
APPLICANT: David W. White
ADDRESS : 60 Windsorville Road, South Windsor, CT 06074 528-4788
TELEPHONE:
OWNER OF RECORD ON LAND RECORDS: same
ADDRESS:
COMPLETE LOCATION OF PROPERTY: South of Griffin Road, west of Windsorville Road,
And east of Rye Street. ZONE:
A-20
NAME, ADDRESS , & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE
DIRECTED:
Applicant (or Attorney Harold Cummings, 644-3473; or Design Professionals, Inc. -
Richard Martel or Peter DeMal l ie, tel. 644-4795) . TELEPHONE: 528-4788
THIS APPLICATION IS FOR : (Check one of the following)
1 . Zone Change to (Public Hearing required) .
2 . Subdivision .
3. Open Space Subdivision (Public Hearing required) .
X 4. Resubdivision (Public Hearing required) .
5. Special Exception to Article (Public Hearing Required) .
6. Site Plan of Development.
7. Earth Filling [Section 101 and/or Earth Removal [Section 91
(Public Hearing Required) .
8. General Plan of Development .
9. Regulation Amendment : Zoning Subdivision
10. Other (explain in detail) :
i
CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. THIS APPLICATION MUST BE
SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN
TRIPL CATE_WITH ALL MAPS AND DOCUMENTS REQUI D ON ATTACHED CHECKLIST.
Applicant 0wn r
PLANNING AND ZONING COMMISSION
APPLICATION , CONT' D.
TIME FRAMES AND PROCEDURES FOR SUBMITTING APPLICATIONS/PLANS
1 . All prospective applicants are urged to confer with Town Planning
Department and Engineering Department staff prior to submission of any
application to the Commission .
2. Plans are officially received only on the fourth Tuesday of each month
at the Regular Meeting of the Planning & Zoning Commission (PZC) .
3 . Three ( 3) sets of blueprints are required on the second Tuesday of the
month for review by the Town Planning and Engineering Departments .
This deadline must be met if you want to ensure that your application
is officially received by PZC.
These plans must be submitted as complete plans -- which includes
application plus all required information contained on checklist. No
plans will be accepted at the counter if checklist is incomplete. It
is the applicant ' s responsibility to ensure that all information
required on the checklist is submitted in one package at the time of
submission -- including landscaping plans , architectural elevations,
traffic report , etc . Planning Department staff will not accept
checklists with blank spaces , or with "by others" in any space.
4. Town staff will notify the applicant with any changes required to make
the plans in complete compliance with our Zoning/Subdivision
Regulations .
5 . All changes requested must be made and new, complete blueprints must
be submitted . At this time six sets of plans must be submitted . If a
Public Hearing is required ( or optional but likely) then seven sets
are required .
6. Planning Department/Engineering Department staff will review plans
only once -- if the resubmissions are not complete/correct , the Town
Planner ' s report will reflect that revisions were not made as
requested .
South Windsor CHECKLIST
-r
REQUIRED INFORMATION
SUBDIVISIONS & RESUBDIVISIONS
I
This checklist must be signed by plan preparer (P .E/L.S) declaring
that all required information is provided . Items 1-5 are required
for all applications ; Items 6-9 required where appropriate .
Check mark for each item supplied.
1 . On each sheet for plans or maps, title block with the
following information:
a. Name and address of subdivider.
b . Name and address of Land Surveyor or Professional
Engineer .
C . Name of subdivision.
I
d. Date when drawings were made.
/ North arrows
I
I
2. Key Map - An overall map drawn to a scale of 1 inch
equals 200 feet , which can be used as an overlay on
Metropolitan District Maps . This map will show the
overall design of the subdivision and will include:
a. Layout of streets with names
b . Layout of lots and lot numbers
c. Open space land j
d . Arrows indicating general direction 'of drainage
e. Lines indicating sanitary sewer system flow
i
I
f . Total acreage of subdivision
J g. Total number of lots
I
h. Names of surrounding property-owners , and
properties within 500 feet of the site
3 . Plot Plan : A layout map of the proposed subdivision
drawn to a scale of 1 inch equals 40 feet on either of
the following size sheets - ( 1) 25" X 37" with a 3/4"
ruled margin ; (2) 15" X 24" with a 1/2" ruled margin -
containing the following data:
Page 2 (Subd . & Re-sub. )
a. Distance and bearings of all boundary lines.
i
b . Lot layout numbers , square footage of all lots, and
all lot dimensions . Iron pins to be shown at all
lot angle points. Lots should not be fragmented
onto separate sheets except where size is
prohibitive.
/jA c. Proposed streets and street lines with center line
stations, and curve data.
d . Building lines in accordance with zoning
regulations.
e. Easements , noting grantors, grantees, and purpose.
f . Proposed names of street.
✓ g . Names of abutting property-owners.
_ h. Monuments will be indicated at corners and angles
of all streets and at all points of curvature and
tangency . In areas accessible to Metropolitan
District Commission points , or other coordinated
points, the monumented points within proposed
subdivision shall be coordinated. These
coordinates shall appear in tabular form on the
plot plan. The accessibility of these MDC points
shall be determined by the Town Engineer.
N i. All open space reserved for parks, playgrounds, or
other common or public uses shall be indicated.
J . A-2 Certification; P.E. /L.S. Seal.
N_ k. Traffic control signs and pavement markings
required by Traffic Authority.
4 . Topographic Map: A map drawn to a scale of 1 inch to
40 feet on sheets not exceeding 25 inches by 37 inches
including ruled margins and shall, in addition to the
requirements of the plot plans , show the following:
a. All existing and proposed buildings.
b . Curb lines and pavement width, sidewalks. i* y►�t,aa���5 rrv�c;cl.
c. Existing and proposed sanitary and storm -sewers, if
any. )r k) n o 1 w4u-o.1
d. Existing and proposed water and gas main systems.
e. Present wooded areas indicated by a "foliage dine" .
Any individual trees to be saved should be shown.
f . Existing and proposed contours shall be shown at
not less than two-foot intervals ; but in cases of
relatively level land, the contours shall be
one-foot intervals .
1
Page 3 (Subd . & Resub. )
i
N g . Proposed storm drainage system showing all catch
basins , endwalls , manholes, lengths, and sizes of
pipes. (Minimum distance between catch basins
shall be 300 feet and minimum size of storm drain
lines shall be 15 inches . )
h. Connections of all springs into proposed storm
drainage system as needed.
i . Location and indications of existing brook
channels , and 100 year flood limits. AfTr- m Sire ,
J . A-2 Certification; P.E. /L.S. Seal
k. Regulated wetlands and 100-year flood plain or note
that site contains none.
5. Drainage calculations - Zero Runoff Increase per
attached guidelines. &fo rY-'qf%4 dwhy
6. Plans and Profiles : A plan and profile of the proposed
streets drawn on plan/profile paper of scales 1 inch to
40 feet horizontally and 1 inch to 4 feet vertically on
sheets not exceeding 25 inches by 37 inches including
ruled margins and containing the following:
a. Layout of streets in sections coordinated by
stations with the profile .
b. Street plan showing roadways, drainage and partial
lot lines.
C. Sight line at street intersections .
d . Profile of roadway showing existing and finished
grades . Roadway profile will show all tangent grade
and all vertical curve information.
I
e. Profile will show all catch basins and all. drainage
lines between catch basins with all invert and top
of frame elevations. Drainage lines will be shown
and described as to material .
f . Typical/critical cross-sections where grading is
outside street right-of-way or is at street
right-of-way.
g. Where any storm drainage line discharges into an
existing brook, sufficient profile of this brook
will be shown to determine conditions.
h. Metropolitan District Commission datum shall be
used on all subdivisions accessible to controls. j
The Town Engineer shall , based on standard
engineering practices, determine the accessibility
of these controls.
I
- ---- -------
Page 4 (Subd . & Resub . )
i . Profiles shall show all sanitary sewer lines and
manholes , including elevations , sizes, lengths, and
slopes of pipes . Top of foundation elevations for
houses shall be shown.
_ 7. Traffic Report Nf
A 8. Open Space Site Improvement Plans: For subdivisions
which require a provision for open spaces, a plan which
contains data for site improvement may be required.
This map shall be drawn to a scale of 1 inch equals 20
feet.
N A 9. Sanitary Report: Where individual sanitary sewage
disposal systems are proposed, the final plans shall
include a Sanitary Report certified by a Professional
Engineer . The report shall demonstrate the feasibility
of the proposed individual systems. The report should
deal with the area as a whole, discussing the following
points;
a. General nature and development of surrounding area.
b . Topography and natural drainage pattern.
c. Subsurface conditions as shown by subsurface
investigation, including soil absorption
characteristics, ground water level conditions,
ledge rock, and general nature of soil.
d . General description of type of development
contemplated - noting type of house , number of
bedrooms per unit, etc.
e. Detailed description of proposed sanitary sewage
disposal facilities, indicating sizes for various
ground conditions, materials to be used, and
general layout pattern to be used, etc .
f . Special precautions that may be necessary to
provide proper functioning of the proposed disposal
systems.
g. Map of general area with locations of all tests
shown on proposed lot layouts.
h. Flood heights of any nearby streams, brooks, or
rivers.
i. Test results and engineering evaluation per Section
3. 2.a(6) . F
All information required above is included in - this application at the
time of submission.
6 — z—
PLAN PREPARER P.E. L.S . ) DATE
November, 1987
1
<0'41
ate s �
C �
.1 Gd
1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074
�'►'osoe,co�'� AREA CODE 203/644-2511
David White
P.O. Box 731
South Windsor, CT 06074
RE: Preconstruction Meeting - David White Subdivision
IN ATTENDANCE
Name Company Telephone #
Marcia Banach Town of South Windsor 644-2511
A.B. Davies Town of South Windsor 644-2511
John McCahill Town of South Windsor 644-2511
David White P.O.B. 731
South Windsor, 06074 528-4788
Ralph Winn Winn's Construction 623-6202
Th following is a brief summary of points discussed during the
meeting.
Public Works
1 . All erosion and sedimentation control measures are to be in place
prior-to earth moving operations in each area and
maintained 77 cl--eaned out during construction. Call Zoning/Wetlands
Enforcement Officer for inspection when measures are in place,
prior to commencement of site work.
2. The Public Works Department is to be notified forty-eight
(48) hours prior to the start of major construction work with
inspections and testing per Developers Checklist required for the
following:
a) After site is staked out
b) All drainage work
c) Preparation of subgrade, compaction tests as required by
the Town.
d) Preparation of subbase, six (6) inch lifts
e) Placement of bituminous concrete, 1 1/2 inch layers.
f) Clarification at base materials for driveway needed.
3. No subgrade formation/base in frozen groundisnow. Same for
pipe/structure installation.
4 . As built plans are to include horizontal and vertical location of
all underdrains, footing drains, and sanitary sewers located by a
certified land surveyor.
5. All pipe and structures to be backfilled with free draining
material, compacted in maximum one foot lifts with approved
compaction equipment.
6 . Any problems and/or questions regarding construction of this
project will be directed to Ralph Winn, 623-6202 in the field.
7 . Only approved copies of lot site plans to be used. Any proposed
changes are to be presented to Engineering/Planning & Zoning prior
to implementation on change sheet.
8. No paving after October 15 without written approval from Director
of Public Works.
9 . Any pipe/structure work requires inspection prior to backfilling.
Planning Department:
1 . Drainage Assessment fee $150 prior to mylar filing.
2. $10,000 subdivision bond if work not completed prior to filing of
mylars .
Very truly yours,
Marcia A. Banach
Director of Planning
MAB/pmm
cc: A. Bowen Davies, Deputy Town Engineer
Gerald Lewis, SWPD
Karl Reichle, Public Works
Mel Stead, Public Works
Michael J. Gantick, Director of Public Works
Minh V. Le, SNET
Hal Clisby, CL&P
John R. Collins, Chief Building Official
Fred Shaw, Superintendent of Pollution Control
John E. McCahill, Zoning Enforcement Officer
Ralph Winn, Winn's Construction Company
April 29 , 1988
TOPIC: Subdivision of 616 Rye Street, South Windsor, Connecticut.
Property owned by David W. White
We the adjoining property owners and neighbors of David W. White are
in favor of his subdivision of property known as 616 Rye Street into
three separate parcels of property with houses already on two parcels
and Rye Street Garage Inc. on one parcel .
IL
I
i
ri C��'nc�sorU� l1 Road" So W ,'oclso1—
GU I 30"� L'u )Y, o e 0 , ti
C� ��- � � Scru��l2 ��w41 S�•
` >> Z-
ee
32- Aa� o,4 ci�
3-3 cf,-,,-� JS
Yj
20
923
d 7
30
PLANNING DEPARTMENT
IN-HOUSE REFERRAL FORM
Date: 'AI Aq
TO: Karl Rei chle, Mike Gantick, Mel Stead, Fred Shaw, —
Richard J. Sart�or, Gary Tyler, Fire , John Shemo
FROM: Marcia A. Banach, Director of Planning
The Planning & Engineering Departments have received plans for the
following project: Dad I W • W �
Ar_
Subdivision Site Plan
Residential Commercial
Industrial
Location: o W S�'
s�
5
Project Description. C*-(,A,
3 W
Future Town-owned property involved? YES X NO
(a) new streets ( existing frontage also)
(b) new open space/recreation area
active passive
(C) new detention area
Planning Department comments : 0
4-jv O
4r, us-
-e,k t -V%4 e S I�K -4u 4e4.�
Please let me know by g �1s S if you will have comments on
this application so that I can follow up with your department when I
do a Planning Department report.
S r1M af4(
c ~ 0-1 �•
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
R.CO AREA CODE 203/644-2511
August 23, 1988
Atty. Harold Cummings
Cummings & Lanza
P. 0. Box 667
South Windsor, CT 06074
re: Appl. #88-60P David White Resubdivision
Gentleme:
Please be advised that the public hearing in the above matter has
been scheduled for Tuesday, September 13, 1988 at 8:00 P.M. in the
Council Chambers of the South Windsor Town Hall, 1540 Sullivan
Avenue.
Signs advertising the hearing must be posted for 10 consecutive days
prior to the hearing, and must be clearly visible from the road.
Please have them posted by Friday, September 2, 1988 . One sign
should be placed on the west side of Griffin Road, one on the south
side of Rye Street, and one on the north side of Windsorville Road.
The signs can be purchased in the Town Hall for $5 . 00 each.
Very truly yours,
PLANNING AND ZONING COMMISSION
/4y
�yi '4/ .
7-
-Raymond F. Hallowell, Jr.
Chairman
cc: PZC File
Applicant
&/M. Banach, Dir. of Planning
t°wN aE,�
C ~ `'W •
udA
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
��'►'�s0 CID AREA CODE 203/644-2511
TO BE PUBLISHED IN THE JOURNAL INQUIRER THURSDAY, SEPT. 1, 1988
THURSDAY, SEPT. 8, 1988
LEGAL NOTICE
TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
Notice is hereby given that there will be a public hearing of the
Planning and Zoning Commission on Tuesday, September 13, 1988 at 8:00
P.M. in -.;:e Council Chambers of the South Windsor Town Hall to
consider the following:
1 . ✓Appl. #88-60P, David W. White, for a Resubdivision of
property to create 3 lots west of Griffin Road, north of
Windsorville Road, and south of Rye Street, A-20 Zone.
2. Appl. #88-72P, RSK-KELLCO, Inc. , for a Special Exception to
Article 4 . 1 . 8 c. for property at 1559 Sullivan Avenue, RR
Zone.
Copies of the applications and maps more clearly defining the
properties are on file in the office of the Town Clerk and/or the
Planning Department of the Town of South Windsor.
At this hearing, interested persons may appear and be heard, and
written recommendations will be received.
PLANNING AND ZONING COMMISSION
Raymond F. Hallowell, Jr. , Chairman
Marshall Montana, Secretary
Go
r 7-a 01 �
G
1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074
AREA CODE 203/644-2511
29 September 1988
Atty. Harold Cummings
Cummings & Lanza
P. 0. Box 667
South Windsor, CT 06074
re: Appl. #88-60P, David White Resubdivision
Gentlemen:
We are pleased to advise that the Planning and Zoning Commission
voted at its September 27, 1988 meeting to approve the caption d
application for a 3-lot resubdj&vision in accordance with Drawing
1 of 1 dated Feb. 1988, prepared by Design Professionals, Inc. ,
Project No. 87214 and with the following modifications:
1 . Drainage for this subdivision is subject to the approval of
the Town Engineer.
2. Lot 2 shall be serviced by the Town of South Windsor
sanitary sewer system and is subject to the approval of the
Water Pollution Control Authority.
3 . Water shall be supplied to this subdivision by Connecticut
Water Company.
4 . A drainage assessment fee in the amount of $150 shall be
submitted to this Commission.
5 . Prior to commencement of any site work, a meeting must be
held with Town Staff.
6 . All plans used in the field by the developer must bear the
stamp and authorized signature of the Town of South
Windsor.
7 . No building permits will be issued until all modifications
have been complied with, and the final plans have been
filed in the Town Clerk's Office.
8 . A $10,000 subdivision bond to ensure installation of iron
pins plus other required improvements must be submitted to
the Commission.
Atty. Harold Cummings -2- 29 September 1988
9 . Show sewer connection to Lot 2, and water mains in
Windsorville Road and Rye Street.
10 . All lots are to be served by public water;
OR
Lot 2 may be served by a well. If the water does not test
as potable, public water must be extended to Lot 2.
11 . The curb cut on Lot 2 must be reduced to 100 ft. or less,
subject to Town Staff approval.
12. The corner of Rye Street and Griffin Road must be defined
by removal of lot pavement, loaming and seeding, with
drainage provisions subject to Town Engineer's approval.
13 . Sight line obstructions on the corner of Griffin Road and
Windsorville Road must be removed.
14 . Map should be labeled Resubdivision.
Black and white transparent mylars of Sheet #1 with the above
modifications, together with three blueprint copies of the entire
set of plans, must be submitted to this Commission within 30 days
to be stamped and signed. The letters of approval of this
Commission, as well as the Inland Wetlands Agency/Conservation
Commission, must be reproduced on the mylars .
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within
90 days . After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
Very truly yours,
P NING AND ZONING COMMISSION
R and F. Hallowell, Jr.
Chairman
cc: M. Gantick, Director of Public Works
F. Shaw, Supt. of Pollution Control
J. Collins, Chief Building Official
E. Belleville, Assessor
W. Lanning, Fire Marshal
M. Banach, Planning Director
Registrar of Voters
Inland Wetlands Agency/Conservation Commission
�- PZC File
Architect/Engineer
Applicant
JiN 8
�- 01 �
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
Ol,coe� AREA CODE 203/644-2511
TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, Oct. 1, 1988
LEGAL NOTICE
TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
At its Sept. 27, 1988 meeting, the Planning and Zoning Commission
voted to take the following action:
1 . Approve, with modifications, Appl. #88-60P, David W. White,
for a Resubdivision of property to create 3 lots west of
Griffin Road, north of Windsorville Road, and south of Rye
Street, A-20 Zone.
2. Approve, with modifications, Appl. #88-72P, RSK-KELLCO,
Inc. , for a Special Exception to Article 4 . 1 .8.c. to
operate a day care center at property at 1559 Sullivan
Avenue, RR Zone.
3 . Approve, with modifications, Appl. #88-83P, RSK-KELLCO,
Inc. , for a 1-lot Subdivision of property at 1343 Sullivan
Ave. , RR Zone.
Dated at South Windsor, Connecticut this 28th day of October, 1988.
PLANNING AND ZONING COMMISSION
Raymond F. Hallowell, Jr. , Chairman
Marshall Montana, Secretary
t0'rM f 44
C ~ 7-0 Ole S ?d&"�at
a
1540 SULLIVAN AVENUE . SOUTH WINDSOR. CONN. 06074
��osoR-co�� AREA CODE 203/644-2511
November 22, 1988
Design Professionals
1170 Ellington Road
South Windsor, CT. 06074
Attention: Richard Martel
Dear Mr. Martel:
At a regular meeting of the Water Pollution Control Authority held on
November 1, 1988, the Authority voted to approve the subdivision of
David W. White, South Windsor, CT. on a map dated February 1988, sheet
1 of 1, prepared by Design Professionals - Project #87214 with the
following conditions:
1. That the plans show the sanitary sewer lateral within
the sanitary easement.
2. That the Town gives their technical approval.
3. That the approval letter is affixed to the final set
of mylars and filed with the Town of South Windsor.
4. That the manhole is placed in the center of the
paved right-of-way.
Very truly yours,
P�
Anthon Falzarano Jr. , Chairman
TOWN OF SOUTH WINDSOR
WATER POLLUTION CONTROL AUTHORITY
AFJ:pm
CC: Mr. A. Bowen Davies, Deputy Town Engineer
r,Raymond F. Hallowell Jr. , Chairman, Planning & Zoning
Ms. Marcia Banach, Director of Planning
Mr. John Collins, Chief Building Inspector
r o-Ps ?d&U140t
G �
•
4 �v 1540 SULLIVAN. AVENUE . SOUTH WINDSOR. CONN. 06074
r�oso t-co� AREA CODE 203/644-2511
November 28, 1988
Design Professionals
1170 Ellington Road
South Windsor, CT. 06074
Dear Mr. Martel:
At a regular meeting of the Water Pollution Control Authority held on
November 1, 1988, the Authority voted to approve the subdivision of
David W. White, South Windsor, CT., as presented on a map dated February
1988, sheet 1 of 1, prepared by Design Professionals - Project #87214,
with the following conditions:
1. That the plans show ,the sanitary sewer lateral within the
sanitary easement.
2. That the Town gives their technical approval.
3. That the approval letter is affixed to the final set of
mylars and filed with the Town of South Windsor.
Very truly yours,
Anthony alzarano Jr. Chairman
TOWN OF SOUTH WINDSOR
WATER POLLUTION CONTROL AUTHORITY
AFJ:pm
CC: Mr. A. Bowen Davies, Deputy Town Engineer
Raymond F. Hallowell Jr. , Chairman, Planning & Zoning
Ms. Marcia Banach, Director of Planning
Mr. John Collins, Chief Building Inspector
I
4/Vf emo from
If
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR.CONN.06074
F _
Town Treasurer
TO Town of South Windsor DATE !� v
1540 Sullivan Avenue
South Windsor , Ct . 06074
L_ J
SUBJECT: Drainage Assessment Fees - Planning and Zoning Commission
FOLD-
. •� pC�
Enclosed is a check in the amount of $ A-1A4 �� which is
the drainage assessment fee collected for Application No . �� '� ,
Please deposit it in the proper account . Thank you.
r
z�
PLANNING ZONING COMMI ION
P ,
� j
JEANNETTE K. WHITE 128
P.O. BOX 731
SOUTH WINDSOR, CT 06074 xpt I9 51-7006/211't r
PARDER
Y TO
IL
DD ` �-DOLLARS-
5J` ai ? R' ;.° -y - y •hSs + `
Y'.r�" FIRST'FEDERA�� � : :.V:�,•` � �4�&'
L SAVINGS Z r{ � r_ AND LOAN ASSMATION OF EAST MAMO*D ' e ' '•?+'i�•'f '$ �' � C .''.• i
cc EAST NARTFO D,CONNECTICUT 0610�.,' C'�. p g.*.w,y"`A' P ��a' ' '`• L' 4
~[
MIM
1: 2 L L L ?00 8i: 0 3 40 29 211 0 1 28
F • SCENIC AYf11/CAMA
ANALYTICAL WATER TEST of TOLLAND, INC.
84 WALBRIDGE HILL ROAD
BRENDA A. FALLON TOLLAND, CONNECTICUT 06084
Laboratory Director
(203) 871-2529
Mr. Dave White April 5, 1989
Griffin Road
South Windsor, Connecticut 06074
Dear Mr. White:
The following is a report of the water sample submitted to this
laboratory or, -Arch 31, 1989. from the new well at the above
addressed dwelling.
Sample Number: 03-31-89-01
odor none
Color 0 Std. Units
Turbidity 3 NTU
pH 7.3 Std. M21 t.�,
Iron .15 .mq;0 �eChlo+ides 14 mg/1
Manganese .(�3 igl l Hardness 252 mg/l
Ammonia Nitrogen 1,V51 mg.'I Alkalinity 72 mg/l
f Nitrate Nitrogen t 1.0 mg/l
Coliform Bacteria 0 Organism/100 ml
Based on the above parameters, this water may be classified as
safe for general use and for drinking purposes under existing
conditions. The hardness tested slightly above the State recommend d
limit of 250 mg/l(see enclosure).
Please let us know if there are any questions concerni s
axial ysis.
At your service.,)64,tvt'1.4' n
a s+CdCry
Mrs. Brenda A. Fallon �� l
Laboratory Director
STATE OF CONNECTICUT
PUBLIC HEALTH LABORATORY — PH-0525
i
i
8 w R REALTY
2 Wethersfield Avenue t` ;
Hartford, CT 06114 � MAY 231989
May 1591989
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06040
Attention: Mr. Ego Davies
Re: Nutmeg Rd. South
Project #89-003
Dear Mr. Davies:
We have reviewed the Town plans for the reconstruction
of Nutmeg Road South and offer the following comments for
your consideration.
Lot no.3 (station 9+00 to 12+50) is anticipated to be
developed in the next 12 months. It seems prudent at this
point of time for the Town to extend the service laterals
(water and sewer) to the West curb line rather than
disturbing the permanent pavement in the near future. In
addition, the roof drains for lot no.2, Pol ymetri cs, are
tied-in to the catch basin at station 12+85. This connection
should not present a problem if the catch basin is tied into
the manhole as detailed on your plans.
Please advise us of your decision to extend the lateral
since this appears to be the only lot scheduled for
development on Nutmeg Road South.
Very rul ou s
Vic or L. i sCassi
Pr ject Manager
VLR/m
cc: John Shemo
Director of Economic Development
�� - & �
■
n
esig
Fnofessionals, inc.
■ civil engineers • planners • surveyors
■
May 26, 1989
Mr. David White
P.Q. Bcx 731
South Windsor, Connecticut 06074
Re: Iron Pins set at Job No. 87-214
Zb Whan It May Concern:
This letter is to verify that iron pins were set on or about December 9, 1989
in accordance with the South Windsor Subdivisicn Regulations.
Very truly yours,
DESIGN PFM SSIOiALS, INC.
By:
Richard P. Martel, P.E. eL7.S.
Principal
cc: Marcia Banach✓'
1170 Ellington Road (Route 30), South Windsor, CT 06074 0 (203) 291-8755
Sreesigg
ofessionals, Inc.
. LETTER OF TRANSMITTAL
civil engineers • planners • surveyors
'1 OMarcia Banach, Planning Director DATE: June 6, 1988
Town of South Windsor
1540 Sullivan Ave.
South Windsor, CT 06074
REGARDING: David White Subdivision PROJ. NO. 87-2-1 4
Griffin Road
South Windsor, CT
JUN 6 1988
WE ARE SEND 1 NG YOU: South Windsor
Plannin $ Ioni ymmission
for your use at you r g86s
_X for approval by PZC for your files
for review and comment
THE FOLLOWING: Application form, checklist, fee and two blueprint copies
of the subject application for PZC approval. As discussed last week, no
IWA/ CC application is necessary (structure built,. no development activity,
and the only wetlands nicks a tiny corner of Lot # 3 which ispaved) . __
Kindly review and advise us of any needed revision. Thank you.
%c: David White
Hal Cummings, Esq. Design Pro essionals, Inc .
By: -
Peter R. DeMallie +
Principal
491 buckland road, south windsor, ct 06074 (203) 644-4795