Loading...
HomeMy WebLinkAboutSITE PLAN (55) CONNECTICUT • TOWN OF SOUTH WINDING COMMISSION PLANNING AND ZONoNGFORM APPLICATI • No. -� IMPORTAN'P! App a pepartsaant sta..f Date Receive = BY. E4days and Engineering Lication Action 14 days to determine aP� of a � ness. To ensure receipt application by PZC, it is strongly Receipt No• lication be submitted ded that the appular Meeting at which prior to the Reg be received, ' Qantrols APPLICANT• c TELEPHONE: 528-9971 ADDRESS:: 8 Nutmeg I Dad South OWNER OF RECORD ON LAND RECORDS: Same � ADDRESS: Same Vast i South in sor COMPLETE LOCATION OF PROPERTY: � ����ZCommissioa ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE NAME, DIRECTED: 528-99 p�1 Shaffer 71 8 wad SoUil TELEPHONE: - — (Check one of the following) THIS APPLICATION IS FOR.• (public hearing required) 1. Zone Change to 2. Subdivision ub lic hearing required) 3 • Open Space Subdivision (P ublic hearing required) 4, Resubdivision (P (public hearing required) 5 . Special Exception to Article X 6 • Site Plan of Development e and/or Earth Removal (Section 9 (Section 10 ) 7 . Earth Filling required) (public hearing g, General Plan of Development Zoning Subdivision 9 • Regulation Amendment.• 10 . Other (explain in detail) APPLICANT AN OWNER OF THE PROPERTY THIS APPLICATION MUST BE SIGNED BY THE S OF THE S (7 if public hearing AND SUBMITTED IN TRIPLICATE WITH SIX age 2) • s required) �,ND OTHER DOCUMENTS i Vic=_Qontrols Owne r Applicant r�oo reverse- side) TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING AND ZONING COMMISSION APPLICATION FORM This application is complete and ready for Planning & Zoning o Commissi n receipt only upon submission of all required documentation, includin but not necessarily limited to, the following items. -Not all items are required with every application. See applicable sections of the South Windsor zoning and subdivision regulations for specific requirements. APPLICATION CHECKLIST 1. Key Map 2. Architectural Elevations/Floor Plans - 3. Completed application form (in triplicate) 4. Required fees 5. Zone Change, Site Plan, Subdivision, Open Space Improve- ment, and/or General Plan of Development maps, in accordance with regulations. (Six sets - seven if public hearing require- 6. Plans & Profiles/Drainage Calculations 7. Conservation Plan 8. Landscaping Plan 9 . Traffic Engineering Report 10. Narrative Statement 11. Sanitary Report 12• Copy of agreement to purchase land (if not the owner) 13 . Other ALL PROSPECTIVE APPLICANTS ARE URGED TO CONFER WITH TOWN PLANNING DEPARTMENT AND ENGINEERING BUREAU STAFF PRIOR TO SUBMISSION OF ANY APPLICATION TO THE COMMISSION. CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. 1 /14/87 CHECKLIST _ REQUIRED INFORMATION SITE PLANS I plan eparer (P .E. /L . S . ) declaring This checklist must be signed by rovided . Items 1-7 are required that all required information is p o riate . for all applications ; items 8-11 required where appropriate . Check mark for each item supplies . 1 , On each sheet for plans or maps , title block with the following information : a. Name , address and telephone of applicant . b . Name , address and telephone numbl,;e , or ProfessionalEngineer . C . Name of Development . JUN 14 M8 / d , Date when drawings were made . South Windsor 2 , Key Map : An overall map drawn to AIN,% MonogiGommission feet , which can be used as an overlay on equals 200 Maps . This p will show the Metropolitan Dist Development and surrounding overall design o property within 500 feet . a . Data block which gives needed zoning ainformation h as percentage of lot coverage ,such P parking creage of tract , number of apartment units , p requirements , etc . b . Layout of buildings C . Layout of streets and parking . d . Lines indicating proposed drainage system with direction arrows . e . Lines indicating sanitary sewer system with direction arrows. f . Names of surrounding property owners . g . Proposed open spaces and recreation areas . h . Driveway cuts on surrounding properties . chitec. Ural Elevations : Plans of the proposed 3 , Ar �� � 1 ' - 0 showing buildings drawn to a scale of 1/8" proposed buildings the elevations of all sides in sufficient detail to show architectural styling . rchitect ' s seal on elevations for buildings in excess A er CGS Chapter ) of 5000 square feet ( p Page 2 (Site Plans ) 4 . Plot Plan : A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: ( 1 ) 24" X 36" with a 3/4" ruled margin ; ( 2) 18" X 24" with a 1/2" - ruled margin , containing the following data : a . Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map . b . Proposed streets and street lines with center line stations , curve data , and parking spaces . C . Building lines in accordance with zoning regulations. I d . Proposed buildings and other structures , including signs , outside lighting , and dumpsters (on concrete pad and screened) e . Easements , noting grantors , grantees , and purpose. f . Names of abutting property owners . g . Monuments will be indicated at corners and angles of all streets and at all- points of curvature and tangency . In areas accessible to Metropolitan District Commission points , or other coordinated points , the monumented points within proposed site shall be coordinated . These coordinates shall appear in tabular form on the plot plan . The accessibility of these MDC points shall be determined by the Town Engineer . h . All open space or other common or public land uses shall be indicated . i . A-2 certification ; P . E. /L . S . Seal . 5 . Topographic Map : A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches , including ruled margins shall in addition to the requirements of the plot plans show the following : a . All existing and proposed buildings . • b . Curb lines and pavement width , sidewalks . C . Existing and proposed sanitary sewers . d . Existing and prqposed water and gas main systems . e . Present wooded area indicated by foliage lines . Any individual trees to be saved should be shown. Page 3 (Site Plans ) f . Existing and proposed contours shall be shown in not less than two-foot intervals , but in cases of relatively level land , the contours shall be one-foot intervals and spot elevations . g . Regulated wetlands and 100-y.ear floodplain or note that none are present . h. Proposed storm drainage system , showing all catch basins , endwalls , manholes , lengths and sizes of pipes . (Minimum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches . ) i . Connections of all springs into proposed storm drainage system as needed . j . Location and indications of existing brook channels , and 100-year flood limits . k. A-2 Certification ; P .E. /L . S , Seal . j/T 6. Landscaping plan . T A A-�AP, 7 . Drainage calculations - Zero Runoff Increase per attached guidelines . . 8 . Traffic report . 9 . Plans and Profiles : A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to f 40 feet horizontally , and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches , including ruled margins and containing the following : a . Layout of streets in sections coordinated by stations with the profile . b . Street plan showing roadways and drainage . C . Sight line at driveway & street intersections . d . Profile of roadway showing existing and finished grades . Roadway profile will show all tangent grade and all vertical curve information . e . Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations. Drainage lines will be shown and described as to material . f . Where any storm -,drainage line discharges into an existing brook 'sufficient profile of this brook will be shown to determine conditions . g . Metropolitan District Commission datum shall be used on all sites accessible to these controls . The Town Engineer shall , based on standard engineering practices , determine the accessibility of these controls . Page 4 (Site Plans ) h . Profiles shall show all sanitary sewer lines and manholes , including elevations , sizes , lengths , and slopes of pipes . Top of foundation elevations for building shall be shown . •Y 10. Open Space Site Improvement Plaji-s For sites which require or include a provision for open spaces , a plan which contains data for site improvement may be required . This map shall be drawn to a scale of 1 inch equals 40 feet . 11 . Sanitary Report: Where individual sanitary sewage disposal systems are proposed , the final plans shall include a Sanitary Report certified by a Professional Engineer . The report shall demonstrate the feasibility of the proposed individual systems ; the report should deal with the area a's a whole , discussing the following points: a . General nature and development of surrounding area . b . Topography and natural drainage pattern . C . Subsurface conditions as shown by subsurface investigation , including soil absorption characteristics , ground water level conditions , ledge rock , and general nature of soil . d . General description of type of development contemplated . e . Detailed description of proposed sanitary sewage disposal facilities, indicating sizes for various ground conditions , materials to be used , and the general layout pattern to be used , etc . f . Special precautions that may be necessary to provide proper functioning of the proposed disposal systems . g . Map of general area with locations of all tests shown on proposed layout . h. Flood heights of any nearby streams , brooks , or rivers . i . Test results and engineering evaluation per Section 4 . 13 . 5. All information req ed above is included in this application at the time of submission Id PL PREPARER P . E. November , 1987 wN aC4 y r 01 �• O � C V 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ~osoR•co�' AREA CODE 203/644-2511 May 16 , 1988 �, KF MM 43 1988 Atty. John Woodcock CERTIFIED MAIL South WindsorBuckland Road South Windsor, Ct 06074 &BLAND WETLANDS AGENeYJ CONSERVATION COMMISSIOM Dear Atty. Woodcock: Re: ZBA Ikpplication #1802-88 - Dynamic Control At the meeting of the Zoning Board of Appeals held on May 5 , 1988 , a variance was -granted to Section 8. 3 of the Zoning Regulations to allow 9 X 18 .foot narking spaces in the parking lot on property located at 8 Nutmeg Road South, South Windsor, subject to the approval of said reduction and site plan by the Planning and Zoning Commission. This action is effective Mav 20 , 1988 and upon your filing of the enclosed form in the Town Clerk' s office at your own expense. Very truly, yours, 1nclYrtao ;,,. __ � Thomas Murrin, Vice Chairman Zoning Board of Appeals CC: Marcia Banach, Director of Planning -%ymond Hallowell, Chairman, PZC JUN 14 1988 South Windsor Planning & Zoning Commission DRAINAM CCHPLT=CM DYNA14IC C C TiMLS JUTE 1988 o ' I i r � N Line Segment N Time to Inlet Time in Pipe N -- Accti:z;:lated '"ime k x Al Entering C zt ch `;Q " Bas i n 4v — n, KI Q\ Sum of AI in Syst ea UI LN W O v� 11t �U, vs a1lRainfall Intensity o V3 Ca m Q in System - = N Ca � m �1 tl� U� U' OQ U1 cR Nr �o ?ipe 8.z e a N .J N N p o Lengtb cf Pipe -P v� N Q� Slope o Ave rage Velocity CD L 1 Capacity I ) ► ( ( J i = Headwater o r in, I t U, •on z::ags Xq pa%ioaU 'I Z332iyS '�1y3� 'Pt� �a�I"'C►-�.�a sya� Aq patu5 faaQ uJ 7t w�l► ;DaPo.d . t .f Figure 9-17 - Peak Discharge Worksheet.for Graphical (Tc) Method (Sheet 1 of Project ICC Of-teh+0AJ 9a,S/Al BY 1„� Date G 88 PLEASA41C 'VALt,r 220A S,w, Checked Date St ps P ak Discharge Computation for up;t .3 storms: .. Typ III , Duration 24 hours. 1. Data: Watershed Condition ?=SSL,,�'�" (present or future). Drainage •Area (DA) 19. 6 Beres. Ave. 1atershed Slope'(S)- !a Ponding and Swampy areas (PND) . s� a acres; �p .� of DA Impervious Area (IMP) _ 19.6 acres, Any ' % of DA Total Hydraulic Length (HL) _ a 411t0 feet Hydraulic Length Modified (HLM) Zp a!> feet, 1,06 of HL 2. Rainfall Frequency, (F) Z id ZS 50 LOCO yrs. 3. Rainfall Depth (P) Figure 9-10 �,2. �,r] 5.5 inches 4. Runoff Curve Number (CN) See next page for computation 5. Runoff Depth (0) Use P. CN, and Figure 9-11 ��7 _ 7. 1 ;� inches T 6. Time of Concentration (TO _ -i • hrs. See other side )< Velocity Method for computations Lag-CN Method (check one) (See TR-55) 7. Initial Abstraction/Rainfall (la/p) Use P. CN, and Figure 9-12 L ( I 8. Unit Peak Discharge (q) / Use Tc, I /p, and Fi gure 9-13 y 'S� c�d g66 -0 0 csm/i nch a of 0 9. Drainage Area DA(acres) , 0 3 a 4.. sq. miles 640(ac/sm) 640 *10. Ponding and Swampy Area Peak Factor Only use % PND, Figure 9-14 when PND is spread out in watershed and not related to Tc flow path. 11. Peak Discharge where q = Steps #5 x 8 x 9 x 10 7�['., ' �J ��j cf s of this sheet * If the adjustment is not applicable, enter a Factor of 1.00 9-25 Figure 9-17 - Peak Discharge Worksheet for Graphical (Tc) Method (Sheet 2 of 4. Runoff Curve Number (CN) ' Hydrologic Land use Description CN $ or Area Product Soil Group Include Treatment, Practice & Condition (acres) (3)x(4) Ac. (3) (4) f5) 8.17 3 t.Joa S 1P ee uC�V- S 5 r COV v- P33 Totals = total col. 5 :f CN (weighted) = total col. 4 = use CN 8 6 5. Time of Concentration (TO a. Velocity Method Length ,Velocity Travel Time Reach Description of Flow (ft.) (ft/sec) (s c.) (3) () (3) - (4) I 0TT IF IZ mod 1, 5- Za cv Z P ( VIE -VCa4.tj 1 '7 .5 0 4- y Z 5 Total = 6 2 S sec. Tc - Total Travel Time (sec.) 3,600 (sec./hr.) 0- 1;j7 hrs. b. Lag-CN Method (1) Unadjusted Lag (L) Use HL, S, CN, and Figure 3-3*•. hrs. *(2) Hydraulic Length Modified Lag Factor X Use % HLM, CN, and Figure 3-4*. *(3) Impervious Area Lag Factor X Use % IMP, CN, and Figure 3-5*. X (4) Constant (Tc = 1.67L) 1.67 (5) Time of Concentration (Tc) s hrs. where Te = (1)x(2)x(3)x(4) *Figure numbers refer to figures in TR-55 (2). Sourc U.S. Department of Agriculture, Soil Conservation Service, Storrs, Connecticut. 9-26 Figure 9-17 ' ;Peak-Discharge Wo.rksheetrfor.Craphical.(Tc) Method,:. (Sheet 3 of f Project DO-- Qe_ ...,-�-1�y �D,C�� By Dat-- e Checked Date Steps Pak Oischarg °Computation for. upc qa5 pCnt ;eType III ,,,Dur io� 24 hours, { 1. Data: Watershed Condition,=' y--- r£".,. '(present or 'future). Drainage Area` (DA) acres. Ave.4atershed Slope-"($)'.s'��$. Ponding and Swampy-aireas (PND) : Cn> acres, �, % of DA Impervious Area-'(IMP) � _ = 1 p , 5- acres, of DA Total Hydraulic Length (HL) = Z d 6'4 ' feet Hydraulic Length Modified (HLM) 2-0 0 O feet, /D� � of HL 1st Storm 2nd Storm 3rd Storm 2. Rainfall Frequency (F) Z �O Z�' Sd (OO yrs. 3. Rainfall Depth (P) Figure 9-10 3- Z • 7 �= �•2 �.9 inches 4. Runoff Curve Number (CN) See next page for computation S. Runoff Depth (0). Use P, CN, and,:F,igure 9-11 _2• 3� 7�2 � s,7 inch s 6. Time of Concentrat-ion..(Tc)_=. �.I hraw... See other side. Velocity Method for computations Lag-CN Method (check one) (See TR-55), 10t, 7. Initial Abstraction/Rainfall (la/p) q I Use P, CN, and Figure 9-12 ( • ' 1 I J 8. Unit Peak Di scharQe (q) �6d ��• f�6d �Ay Use Tc, Ia/p, and Figure 9-13 zs�d csm/inch of 0 JJ 1 9. Drainage Area DA(acres) _ _ d 3 4— sq. miles 640(ac/sm) 640 *10. Ponding and Swampy Area Peak Factor Only use $ PND, Figure 9-14r when PND is spread out in watershed,and not related to Tc flow path. 11. Peak Discharge i where q = Steps #5 x 8 x 9 x 10 ,. 1 D.r. �,�_�_ cfs of thisp shoot * If the adjustment is not applicable, enter a Factor of 1:0-:` ' " 9=25 Figure 9-17 - Peak Discharge Worksheet for Graphical (Tc) Method (Sheet 4.of 4. Runoff Curve Number (CN) Hydrologic Land use Description CN or Area Product Soil Group Include Treatment, Practice & Condition (acres) (3)x(4) sic (3) (4) (5) 5 ' 53 yaw - w o a �z Totals = CN (weighted) = total col. 5 = total col. 4 use CN = 1� S. Time of Concentration (Tc) a. Velocity Method Length Velocity Travel Time Reach Description of Flow (ft.) (ft/sec) (sec.) (3) (4) (3) - (4) Total = sec. Total Travel Time (sec.) _ _ —'— Tc = 3,600 (sec./hr.) hrs. b. Lag-CN Method (1) Unadjusted Lag (L) Use HL, S, CN, and Figure 3-3*•. has. X *(2) Hydraulic Length Modified Lac Factor Use % HLM, CN, and Figure 3-4*. X *(3) Impervious Area Lag Factor Use % IMP, CN, and Figure 3-5*. X (4) Constant (Tc = 1.67L) 1.67 (5) Time of Concentration (Tc) where Tc = (1 )x(2)x(3)x(4) hrs. *Figure numbers refer to figures in TR-55 (2). Sourc U.S. Department of Agriculture, Soil Conservation Service, Storrs, Connecticut. 1 9-26 z ^ � Ian aye. 15 133 13o i4� 2 (A, 113 Qr 9 vs Fib , 22 � 6 � � 1� 15 . 20 slzi �G Pc��� 3 Al-ti�,2 - G S Cl Y,h A x S"T'd rLA 6 P- ^C6� S'Tb�� = �, � A c F}: Li AQUA 2Fd)uifZF0 = 12, baa SF lj� cL � Y 4 0)o6 0 }- LU GiZA� �• � v 4 �b,00a i Gt GZ 63 cv64-fri... Suf-66AC� • ti,. .{. l l'ti' +'.. t �y/fir .+ •• s fleet 6 stz1N G 6UT LF 7 Is STd2vl� CYR-) Pou� 2,Z 215 2,� 3 s 1 4-0 -T;-,y 3 - Z4 �) o�e�f'^ c� �D 1-7SA,G to O V\ D o 1 n P o 1 Zo o 1/ Dv- L�- SOIL SCIENCE AND ENVIRONMENTAL SERVICES, INC. 104 Elm Street • Cheshire, Connecticut 06410 • 203-272-7837 SOIL REPORT TO. Lucek En neering Assocs . , Inc. SSS Job No. 88-132-CT-SWI-3 0 Buck and Road Client Job No. South Windsor, CT 0 07 Site Inspection Date 0 PROJECT TITLE AND LOCATION Dynamic Control' s Corp. , Nutmeg Road, South Windsor, PROJECT DESCRIPTION:Inland wetland identification and classification of soils METHOD FOR IDENTIFICATION OF MAP UNITS Wetlands RI Field marking(flagging) for survey. OX Field plotting on Topographic Map , scale: 200 , contour: 2 ft . Field plotting on aerial photography. Non Wetland Soils ® High intensity field identification by Soil Scientist. [-1 Medium intensity identification from USDA, Soil Conservation Service Soil Maps. METHOD OF SOIL IDENTIFICATION SOIL MOISTURE CONDITION X Spade and Auger ❑ Dry XX Moist M Vet Deep test pits(backhoe) Frost Depth in. Other Snow Depth in. The classification system of the National Cooperative Soil Survey, USDA,Soil Conservation Service and the County Identification Legend were used in this investigation. The investigation was conducted by the undersigned Certified Soil Scientist. All wetland boundary lines established by the undersigned Soil Scientist are subject to change until officially adopted by local, state or federal regulatory agencies. Respectively submitted by pproved by SOIL SCIENCE AND ENVIRONMENTAL SERVICES, INC. Soil Scientist Kenneth C. Stevens,J Field Investigator Principal Soil Scientis . See attached page(s) SOIL REPORT continued PROTECT TITLE: Dynamic Controls Corp. , Nutmeg Road, South Windsor, CT MAPS/PLANS TRANSMITTED TO CLIENT Sketch location of Wetlands and other Soil Types. None NUMBERING SEQUENCE OF WETLAND BOUNDARY LINE MARKERS 1 THRU 16 SUMMARY SOIL DESCRIPTIONS WETLAND SOILS Scarboro loam (Se) . This is a very poorly drained, moderately coarse over coarse textured, very friable over loose glacial fluvial (outwash) soil. Walpole sandy loam (Wd) . This is a poorly drained, moderately coarse over coarse textured, friable over loose glacial fluvial (outwash) soil. NONWETLAND SOILS Made land (Ma) . This is a well to moderately well drained, disturbed soil that has had two feet or more of its original soil surface excavated or filled. Windsor loamy fine sand (Wv) . This is an excessively. drained, moderately coarse over coarse textured, loose, glacial fluvial (outwash) soil. For further information about the soils, refer to Soil Survey, Hartford County, Connecticut. v L W (N i Line Segment N Time to Inlet Time in -Pipe W — Acc=:dated Time J, -4 AI Entering Catch Basin S= of AI in Systea J V1 IN U� Vi ,lT, Rainfall Intensity a� o °° Q in System u a �' In \.o IF S:ze s - - m 61 N �v N o Length cf ¢'_pe Lh I N N a Z is Q o p o v, Slope I N �AVerBgcIOCity • �v, ' °' v� w IT all capazity I ( ( J Headwater M ! Lh v, t ON 1;;Qgs OiWWA $8 b 9 3sVa Ma Aq pate5*3aQ -�o�I�.C+►oJ ��w�1ru ;��� TRAFFIC IMPACT STUDY IN CONNECTION WITH A PROPOSED DYNAMIC CONTROLS BUILDING EXPANSION NUTMEG ROAD SOUTH SOUTH WINDSOR, CONNECTICUT PREPARED FOR DYNAMIC CONTROLS CORPORATION ENGINEERS ARCHITECTS SURVEYORS STORCH PLANNERS SOIL SCIENTISTS LANDSCAPE ARCHITECTS ASSOCIATES TRAFFIC IMPACT STUDY for the proposed DYNAMIC CONTROLS BUILDING EXPANSION located off NUTMEG ROAD SOUTH SOUTH WINDSOR, CONNECTICUT Prepared for DYNAMIC CONTROLS CORPORATION r South Windsor, Connecticut Prepared by STORCH ASSOCIATES 161 Main Street Wethersfield, Connecticut 06109 June 28, 1988 STORCH ASSOCIATES TABLE OF CONTENTS PAGE I. INTRODUCTION AND SCOPE --------------------------------- I ---------- ----------- ------------- II TERMS DEFINED ----- --- 2 — III. EXISTING CONDITIONS ------------------------------------ 4 Drawing No. 1 - Area Location Plan Drawing No. 2 - Site Location Drawing No. 3 - Existing Conditions IV. ANALYSIS ------------------------------------------------ 7 . — V. SUMMARY AND CONCLUSIONS -------------------------------- 10 APPENDIX Traffic Counts Capacity Calculations Accident History STORCH ASSOCIATES I. INTRODUCTION AND SCOPE The following is a traffic impact evaluation report which was under- taken in connection with the proposed company building expansion of Dynamic Controls Corporation located off Nutmeg Road South in South Windsor, Connecticut. Drawing No. 1 shows the area location a-nd Drawing No. 2 shows the site location. The scope of the study effort included: 1. Site traffic observations. 2. Review of proposed new developments and roadway improvement projects in the vicinity. 3. Manual peak hour turning movement counts taken at the intersections of John Fitch Boulevard (Route 5)/Pleasant Valley Road, Pleasant Valley Road/Ellington Road (Route 30) , Pleasant Valley Road/Nutmeg Road South and John Fitch Boulevard (Route 5)/South Satellite Road and automatic -- recorder counts along Nutmeg Road South in the vicinity of the site. 4. Assessment of existing traffic operations at the inter- sections of John Fitch Boulevard (Route 5)/Pleasant Valley Road, Pleasant Valley Road/Ellington Road (Route 30), Pleasant Valley Road/Nutmeg Road South and John Fitch Boulevard (Route 5)/South Satellite Road. 5. Estimation of future traffic generation. 6. Performance of capacity analysis. 7. Traffic safety review (accident history) . The following sections of this report present the findings of this work. -1- STORCH ASSOCIATES II. TERMS DEFINED In order to clarify the meaning of certain specialized traffic engineering terms which may be used in this report, the following definitions are offered: Trip is a one-way movement to or from a site. One car entering and leaving a site constitutes two trips. Traffic Generation is the actual number of vehicle movements which may reasonably be expected to be attracted by a specific development. Usually, traffic generation is expressed as a number of trips. Average Daily Traffic (ADT) is the total traffic generation of a development on a typical working weekday. Peak Hour Generation is the maximum traffic generation which may be anticipated during the highest volume hour for the particular development. This analysis parameter may vary as to the time of day, depending on the type of facility proposed. Housing of all sorts normally generates peak volume rates which coincide with the peak volume rates of the surrounding roadway network. Trip Distribution is the process of determining the proportions of the — generated trips that can be expected to originate at any location. Traffic Assignment is the process of assigning the trips which have been distributed from the various points of origin to the roadway system which would provide the most direct route between the points of origin and destination. Capacitor and Level of Service (LOS) are terms utilized to describe the ability of a roadway to handle its traffic assignment. -2- STORCH ASSOCIATES LEVEL OF SERVICE RATINGS Rating Description Traffic A Free Flow Drivers feel no restriction B Stable Flow Drivers feel some restriction C Stable Flow Drivers somewhat restricted but not objectively so. D Approaching Increasing restriction and Unstable Flow congestion E Capacity Substantial restrictions and delays F Forced Flow Jammed conditions, extreme delays Intersection delay criteria have been established by the 1985 Highway Capacity Manual , Special Report 209 in order to measure Level of Service at signalized and unsignalized intersections. The following table outlines the criteria for each condition: LEVEL OF SERVICE CRITERIA - INTERSECTIONS Signalized Unsignalized Stopped Delay Reserve Capacity Per Vehicle (Passenger Cars Rating _ (Sec) Per Hour) A 5.0 or Less 400 or More B 5.1 to 15.0 300 - 399 C 15.1 to 25.0 200 - 299 D 25.1 to 40.0 100 - 199 E 40.1 to 60.0 0 - 99 F Greater than 60.0 0 -3- STORCH ASSOCIATES III. EXISTING CONDITIONS — The site of the proposed company building expansion of Dynamic Controls is situated in the southwest area of the Town of South Windsor, east of State Route 5 and northwest of State Route 30. This is depicted in Drawing No. 1, Area Location Map. The site is located on the east side of Nutmeg Road South, immediately north of Pleasant Valley Road as shown in Drawing No. 2, Site Location Map. The present building has a G.S.F. of 65,000 S.F. with parking facility for — approximately 260 vehicles. Nutmeg Road South is a bidirectional industrial subdivision street, 30 feet in width extending north from Pleasant Valley Road connecting to South Satellite Road and Governors Highway. Pleasant Valley Road is a bidirectional collector road that extends from Main Street, west of John Fitch Boulevard (State Route 5) to points east in the Town of Manchester. This roadway accommodates local residential access to the east of Nutmeg Road South and local industrial access from Nutmeg Road South to John Fitch Boulevard. John Fitch Boulevard (State Route 5) is a 4 lane divided highway that extends into the Town of East Windsor to the north and East Hartford to the south. John Fitch Boulevard connects to I-291 and the Bissell Bridge approximately 1.0 mile south of its intersection with Pleasant Valley Road. The posted speed limit is 50 mph. State of Connecticut Department of Transportation (Conn. DOT) records indicate a 1987 ADT of 24,700 vehicles north of Pleasant Valley Road. -4- Y ff r lourN f.TCIIITC 40,40 f/y4�0M SITE LOCATION r y v t o . CJiMa 7 w TRAFFIC IMPACT REPORT DYNAMIC CONTROLS CORP. SOUTH WINDSOR, CONNECTICUT s • o SITE LOCATION MAP 1� JUNE, 1988 DWG. NO. 2 STORCH ASSOCIATES Ellington Road (Route 30) is a two lane highway that connects to Route 5 to the southwest and extends north and east through the Town of South Windsor before connecting to I-84 in the Town of Manchester. State of Connecticut Department of Transportation (Conn DOT) records indicate a 1987 ADT of 11,700 vehicles immediately north of Pleasant Valley Road. The existing road layout and traffic control in the vicinity of the site is illustrated on Drawing No. 3 - Existing Conditions. To accurately assess the level of traffic at a specific location the traffic flows must be measured. Following a review of the actual traffic flows during peak periods, it was determined that the intersections of Route 5/Pleasant Valley Road, Pleasant Valley Road/Nutmeg Road South, Pleasant Valley Road/Route 30 and Route 5/South Satellite Road represent locations likely to be impacted by the proposed development. A detailed counting program was thus conducted in the area in order to determine present capacity levels. Automatic counts were conducted along Nutmeg Road South immediately north and south of the existing site driveways from Tuesday to Thursday, June 14-16, 1988. Turning movement counts were conducted from 7:00 AM to 9:00 AM and 4:00 to 6:00 PM on June 14 - 16, 1988 at the intersections of Route 5/Pleasant Valley Road, Pleasant Valley Road/Nutmeg Road South, Pleasant Valley Road/Route 30 and Route 5/South Satellite Road. These manual counts confirmed the results of the automatic counts and were utilized to represent design hour conditions at each study inter- section. The counts clearly showed a significant difference between AM and PM peak hour characteristics for traffic entering or exiting Nutmeg Road -5- STORCH ASSOCIATES South at Pleasant Valley Road. This can be generally attributed to exist- ing industrial subdivision traffic destined to work along Nutmeg Road South from Routes 5 and 30 in the morning and the return trip in the late afternoon. The resultant 1988 AM and PM peak hour conditions are illustrated on Figures 1 and 2 respectively. Available accident histories in the vicinity of the site were obtained and reviewed for abnormal incidence of accidents. Our review of the accident history from 1985 to 1987 for the area of the site did not reveal a definable trend which might indicate a geometric deficiency at the study intersections. The records indicate that the majority of the accidents along Pleasant Valley Road involved single vehicles colliding with roadside obstacles or vehicles backing onto the -- roadway from residential driveways. A summary of the accident histories are included in the Appendix of this report. — Field review of the existing and proposed driveway locations along Nutmeg Road South indicate clear sight distance to the north and to the south for vehicles entering or exiting the site. -6- - Y •our t4rcuirt • j A040 ' s"AROM ou.Jt4r t ' l V • 1 4w V t D O a * SIGNALIZED INTERSECTION ' TRAFFIC IMPACT REPORT DYNAMIC CONTROLS CORP. s SOUTH WINDSOR, CONNECTICUT o EXISTING CONDITIONS DUNE, 1988 DWG. NO. 3 — N r� L L 52 y E Y f r{-48 R r ovrm sar�tur� Roao OK � M r NI L 82- 187 ,420 ��aaar Y e a r co m 1 1� 32 N co 2 5 2 7 .:71 �. — 7 —� f--412 5 1 ,owlr-► 9 4—� 3 al 409 r 23 � f 71 Fall- coL v t SCALE 1 ' = 1000 FT. f`~ TRAFFIC IMPACT REPORT DYNAMIC CONTROLS CORP. SOUTH WIN�SOR, CONNECTICUT 1988 A.M. PEAK HOUR TRAFFIC VOLUMES JUNE/ 1988 FIGURE NO. 1 � W �4rr coco ( `.L 12 YY g E . 77 N M OWN !4T(llll( fM4A0A 31—J t—30 3 7 2 o OVA44r of — t t v t 1 r co � N - r r• N co co 2 7 67 V .4 8 _-aw -.-- 38 "J I L* 13—� f-1 19 19 4—J i s 4 3 3 2_,.� �� 12� 43 r co rob- "— N *'CD co N v , t - � O SCALE 1 ' = 1000 FT. TRAFFIC IMPACT REPORT DYNAMIC CONTROLS CORP. SOUTH WINDSOR, CONNECTICUT o • V 1988 P.M. PEAK HOUR TRAFFIC VOLUMES • JUNE, 1988 FIGURE NO. 2 STORCH ASSOCIATES IV. ANALYSIS The prediction of traffic impact involves a process of estimating how much traffic will be created by a new development and assigning this "new" traffic to the existing road network. Analyses can then be performed to assess future traffic conditions and to detect areas which might have less than ideal traffic conditions. The traffic engineer can then propose changes which mitigate these problem areas. The first step in the process is the estimation of the number of "new" vehicle trips which might be expected to be generated by the proposed development. The project is planned to accommodate a total building area — of approximately 126,000 G.S.F. and expanded parking facility to accomodate a total of 446 vehicles as shown on the proposed site plan prepared by Lucek Engineering Associates. To estimate the number of vehicle trips which would be created by this construction, Storch Associates utilized the 1987 Trip Generation Manual of the Institute of Transportation Engineers (ITE) to predict this number. The results of this calculation are depicted in Table I Trip Generation. TABLE I TRIP GENERATION Trip - Rate Proposed Less Exist. "New" (Trips/ Vehicle Trips Vehicle Trips Vehicle Trips 11000 GSF) (1262000 GSF) (65,000 GSF) 619000 GSF Weekday Average Vehicle Trip Ends 5.46 688 355 333 AM Peak Hour Enter 0.94 119 61 58 Exit 0.17 21 11 10 PM Peak Hour Enter 0.40 50 26 24 Exit 0.78 98 50 48 -7- STORCH ASSOCIATES Vehicle trip assignment to the surrounding road network was — undertaken based on employee residence data provided by the personnel division of Dynamic Control Corp. The resultant distribution is illustrated on Figure 3. This distribution was compared to the CRCOG Journey to Work Trip studies for the Town of South Windsor and found to be similar. The subsequent volume analyses are included in the following Figures 4 to 9 which provide data in preparation for performance of capacity calculations. The figures depict the following analysis components: ° Future year projection of current traffic: AM Peak Hour - Figure 4; PM Peak Hour - Figure 5 ° Site generated traffic: AM Peak Hour - Figure 6; PM Peak Hour - Figure 7 ° Final combined projected traffic : AM Peak Hour - Figure 8; PM Peak Hour - Figure 9 It should be noted that the allowance for normal increase in traffic was estimated at 2% yearly and traffic conditions were projected to the year 1990. In addition the future year projection of current traffic includes estimated traffic generated by the 30,500 GSF industrial building presently under construction at the northeast corner of Pleasant Valley Road and Nutmeg Road South. The proposed Dynamic Controls building expansion is anticipated to add 117 daily trips to traffic along the section of Pleasant Valley Road from Nutmeg Road South to Route 5 and 126 daily trips from Nutmeg Road South to Route 30. It is estimated that 90 daily trips will be added to traffic along the section of South Satellite Road from Nutmeg Road South to Route 5. -8- . N V N SOUTH S4T(tUT( - R040 • SM4ROM T . OY11AT 2% _ 3 3 96 ,`! t 18 % t r ' TRAFFIC IMPACT REPORT k DYNAMIC CONTROLS CORP. o SOUTH WINDSOR, CONNECTICUT V PROJECTED TRIP DISTRIBUTION ` DEVELOPMENT TRAFFIC �� JUNE, 1988 1 FIGURE NO. 3 STORCH ASSOCIATES The critical analysis period chosen by review of traffic count data included both the morning and evening peak commuter period. The study intersections were analyzed on the basis of the 1985 Highway Capacity Manual for unsignalized and signalized intersections. Copies of the capacity analyses calculations are contained in the Appendix. The following Table 2 summarizes the Level of Service for the -- projected 1990 conditions. As illustrated, the future levels of service will generally not be affected by the proposed development assuming full-build conditions: TABLE 2 SUMMARY OF TRAFFIC CAPACITY ANALYSIS Critical Projected L.O.S. Projected L.O.S. Intersection Movement No Development With Development Weekday Weekday Peak Hour Peak Hour AM PM AM PM Pleasant Valley/ Left Turns A A B A Nutmeg Rd. South from Pleasant Valley Road All Turns C D C D from Nutmeg Road South Route 5/South Overall B B B B Satellite Road (Signalized) Route 5/Pleasant Overall D B D B Valley Road (Signalized) Route 30/Pleasant Overall D D D D Valley Road (Signalized) -9- O N mow^► � O r� L L 54 - r rJO F � C oVrM 14rcturg soya a — K SN4�OM co V v- N L 85 � � 195 3 11)--. 4 4 7 OV1��r t } rr t � � O N I J 14 y r 1 1—� 34 ago - 2 6 28 7 f--431 54� � 3 wr 1 432 a)co 24 7 4 V co V — SCALE 1 ' = 1000 FT. FUTURE YEAR TRAFFIC IMPACT REPORT 4 BACKGROUND DYNAMIC CONTROLS CORP. ZIA TRAFFIC SOUTH WINDSOR, CONNECTICUT 1990 A.M. PEAK HOUR TRAFFIC VOLUMES JUNE 198 8 FIGURE NO. 4 �. Many CIO 1 L L 131 �t r� 80 � 1 s r = O OUT" sArcturg 4040 Oi O W O co ��_��_ L 32- L 31 4 18 •v•+�r v co cy e W 1 , O r .2 8_j 1 - I{�y 1� w 7 7 a ^ CD . 14--.. �- 4 0 � L.. —i ,F-132 205 j 350— L 153 co co �� 12 � f 45 R �- • N er N m(o L e SCALE 1 ' = 1000 FT. FUTURE YEAR TRAFFIC IMPACT REPORT BACKGROUND DYNAMIC CONTROLS CORP. TRAFFIC SOUTH WINDSOR, CONNECTICUT 1990 P.M. PEAK HOUR TRAFFIC VOLUMES � . JUNE, 1988 FIGURE NO . 5 — Ir `� 3 Y our" ' tar�t��r� 4040 SK,ApM L 23- 19 •wanor 1101 t y\ 1 r L } � co 4 1 cJ 0 " f i SCALE Vv = 1000 FT. SITE GENERATED TRAFFIC IMPACT REPORT TRAFFIC DYNAMIC CONTROLS CORP. t SOUTH WINDSOR, CONNECTICUT A.M. PEAK HOUR TRAFFIC VOLUMES JUNE, 1988 FIGURE NO. 6 -- 1 L 13 �r Y ovrof tare arC ROAD — S$14 CAI r r. 10-1 8 sw`4,+*.sue } V V l , • � Y 78 8 � o SCALE-: 1 ' = 1000 FT. SITE GENERATED TRAFFIC IMPACT REPORT k TRAFFIC DYNAMIC CONTROLS CORP. o SOUTH WINDSOR, CONNECTICUT P.M. PEAK HOUR TRAFFIC VOLUMES JUNEo 1988 FIGURE NO. 7 T "LL57 Y r—F 50 � R • m 0 r m v 1 R040 - sue. R�q N ti N M L 108- 214 139--.- -"•--447 rd E Y 00 y O 0 • N to A co L h 1 1 —•� L-34 a �- -2 7 -*--2 8 j r 7 -� i--4 3 5 6 6 r� 101—•� L"4 N. 4 2 24 � — 74 co to ^� SCALE 1 ' = 1000 FT. FINAL COMBINED TRAFFIC IMPACT REPORT k TRAFFIC DYNAMIC CONTROLS CORP. e o SOUTH WINDSOR, CONNECTICUT A.M. PEAK HOUR ' TRAFFIC VOLUMES UNE, 1988 FIGURE NO. 8 o tee., co a . T L 144 Y 80 ap 1•j J A ovfN f.T(LLIT� R040 oh m b cy) b v-L 42_j 38 416 1--15 •�.'kar a v e v CD �N 28 L-77 to r. r CD 41 14 f-15i 212-j 358—D,. 6 v'o� 13 15 7 co `ram f 45 �-► cy as co t SCALE 1 ' = 1000 FT. FINAL COMBINED TRAFFIC IMPACT REPORT VOLUMES DYNAMIC CONTROLS CORP. SOUTH WINDSOR, CONNECTIEUT V P.M. PEAK HOUR -- TRAFFIC VOLUMES JUN E, 1988 FFIGURE NO. 9 STORCH ASSOCIATES V. SUMMARY AND CONCLUSION -- Storch Associates has conducted a detailed analysis of the proposed Dynamic Controls Corp. building expansion off Nutmeg Road South in South Windsor, Connecticut. Our work has included estimation of probable traffic generation by the project, performance of capacity analyses and review of the safety and operational aspects of the proposed subdivision driveway _ intersections. In general , we have determined that the construction of the proposed development can be accommodated by the existing street network. The findings of our analysis have specifically indicated that the construction of the proposed site expansion will not result in traffic flows that will significantly alter the available Level of Service on the surrounding roadway network. -10- APPENDIX YEAR 1987 STA NO 132 95 •1 YEAR 1987 STA NO 132 95 STATE OF CONNECTICUT _ STATE OF CONNECTICUT DEPARTMENT DF TRANSPORTATION DEPARTMENT OF TRANSPORTATION BUREAU OF- PLANNING AND RESEARCH BUREAU OF PLANNING AND RESEARCH PLANNING INVENTORY' AND DATA PLANNING INVENTORY• AND DATA TRAFFIC RECORDER DATA TRAFFIC RECORDER DATA TOWN OF SO* WINDSOR ROUTE ,US5 DIRECTION N TOWN OF SO. WINDSOR ROUTE US5 DIRECTION S LOC SOUTH OF GOVERNORS HIGHWAY i LOC SOUTH OF GOVERNORS HIGHWAY DA Y SUN' MON' DUES WED THUR FRI SAT DAY SUN MON TUES WED THUR FRI SA T DATE D( 420 421 0 0 C 0 DATE 0 420 421 0 0 0 0 TYPE TYPE HOUR 1987 AUT = 111009Ft?& HOUR 1987 ADT = 11800 BEG �a � �zC�� BEG MID 0 0 135 0 0 0 0 , MID 0 0 63 0 0 0 0 lA 0 0. 43 0 0 0 0 •lA 0 0 28 p p p p 2A 0 0; 32 0 0 0 0 2A 0 U 33 0 0 0 0 3A 0 0, 28 0 0 0 0 i 3A 0 0 43 0 0 0 0 4A 0 0 44 0 0 0 0 4A 0 0 73 0 0 0 0 5A 0 0 172 0 0 0 0 r 5A 0 0 223 0 0 0 0 6A 0 0 529 0 0 0 0 6A 0 0 1100 0 0 0 0 7A 0 0 775 0 0 0 0 ` 7A 0 0 1636 0 0 0 0 8A 0 0 594 0 0 0 0 8A 0 0 989 0 0 0 0 9A 0 494 520 0 0 0 0 9A 0 647 573 0 0 0 0 10A 0 620 0 0 0 0 0 r l0A 0 611 0 0 0 0 0 11A 0 631 0 0 0 0 0 { 11A 0 681 0 0 0 0 0 f 12P 0 780 0 0 0 O 0 12P 0 766 O 0 0 0 0 l P 0 735 a 0 0 0 0 i 1 P 0 669 0 0 0 0 D 2P 0 693 0 0 0 0 0 2P 0 • 713 0 0 0 0 0 3P 0 1025 0 0 Q 0 0 I 3P 0 838 0 0 0 0 U 4P 0 1336 0 0 0 0 0 i 4P 0 827 0 0 0 0 0 5P 0 1110 0 0 0 0 0 5P 0 • 748 0 0 0 0 t? 6P 0 634 0 0 0 O 0 6P 0 500 0 0 0 0 0 7P 0 362 0 0 0 0 0 7P 0 374 0 0 0 0 0 8P 0 251 0 0 0 O 0 i 8P 0 229 0 0 0 0 0 9P 0 215 0 0 0 D 0 9P 0 163 0 0 0 0 01 OP 0 123 0 0 0 0 D 1 OP ' 0 138 0 0 0 0 0 lip 0 103 0 0 0 0 0 ; 11P 0 99 0 0 0 0 0 TOT 0 9112 2872 0 O 0 0 - TOT 0 8003 4761 0 0 0 0 RECORDER 0 24 HR = 11464 G - 4 RECORDER 0 24 HR = 12191 G - 4 _ F A 1132 '13 4 I I 1 I I I I I I I " STATE OF CONNECTICUT YEAR 1987� - STATE OF CONNECTICUTA NO 132 34 . DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION BUREAU OF PLANNING AND RESEARCH PLANNING INVENTORY • AND DATA BUREAU OF PLANNING AND RESEARCH PLANNING INVENTORY' AND DATA TRAFFIC RECORDER DATA TRAFFIC RECORDER DATA TOWN OF SO. WINDSOR ROUTE US5 DIRECTION N TOWN OF S0. WINDS OR ROUTE USS i DIRECTION S LOC NORTH OF PLEASANT VALLEY ROAD LOC NORTH OF PLEASANT VALLEY ROAD DAY SUN MON TUES WED THUR FRI SAT DAY SUN MON TOES WED THUR DATE 0 420 FRI SAT ' 421 0 0 0 0 TYPE - DATE 0 420 421 0 0 0 0 1 HOUR 1987 AUT - 1160124400 m TYPE BEG # ##### ##### ##� 0i► Y1r ) HOUR 1987 ADT = 12 800 BEG MID 0 0 130 0 0 0 0 IA 0 0 44 0 0 0 0 MI A a 0 71 0 0 0 0 2A 0 p 32 D 0 0 0 ` 2A 0 0 37 O 0 0 0 3A 0 D1 33 0 0 0 0 0 0 0 4A 0 b 56 0 0 0 0 4A 0 0 0 D 0 0 87 5A 0 0:' 203 0 0 0 0 I 0 0 0 U 6A D 0 615 0 0 0 0 ; 5A 0 0 212 0 a 0 0 7A 0 0 833 0 0 0 0 � 7A 0 0 1623 a 0 0 0 8 A 0 644 647 0 0 0 0 8 A 0 928 1072 0 0 0 9A 0 580 573 0 0 0 0 9A 0 719 640 0 0 0 l 0 A 0 631 0 0 �1 1 A 0 687 0 0 0 10A 0 664 D 0 0 0 0 0 0 I 11 A 0 741 0 0 0 0 0 12P 0 836 0 0 0 0 0 1P 0 746 0 0 0 0 0 11P 0 762 0 0 0 0 0 2P 0 774 0 D 0 0 0 0 0 0 0 3P 0 1031 0 0 0 0 0 3P O D 92 3 0 0 0 0 0 4P 0 1249 0 0 0 0 0 0 0 0 0 0 5P 0 1077 0 0 0 0 0 ' 4P a 960 0 0 0 0 0 6P Q 650 0 0 0 0 D 0 0 0 0 0 7P 0 371 0 0 0 0 0 7P OD 423 0 0 0 0 0 8P 0 265 0 0 0 0 0 � 0 D 0 9P 0 218 0 0 0 0 0 8P 0 268 0, . 0 0 0 lop 0 131 0 0 0 0 0 ; , 9P 0 182 0 0 0 0 0 11P 0 101 U 0 D 0 lop. 0 161 0 0 0 0 0 0 I• 11P 0 100 0 0 0 D 0 TOT 0 9991 3171 D 0 0 0 � TOT 0 9939 4919 0 ' 0 0 0 RECORDER 0 24 HR = 11937 G - 4 RECORDER 0 . 24 HR = 13146 G '- 4 YEAH 98 r STA NO 132 70 YEA.R 1987 STA NO 132 70 STATE OF CONNECTICUT STATE OF CONNECTICUT DEPARTMENT OF TRANSPORTATION DEPARTMENT OF TRANSPORTATION BUREAU OF PLANNING AND RESEARCH BUREAU OF PLANNING AND RESEARCH PLANNING INVENTORY' AND DATA PLANNING INVENTORY' AND DATA TRAFFIC RECORDER DATA TRAFFIC RECORDER DATA TOWN OF S0, WINDSOR ROUTE USS DIRECTION N TOWN OF SO. WINDSOR ROUTE USS DIRECTION S LOC NORTH OF CHAPEL ROAD i LOC NORTH OF CHAPEL ROAD DAY SUN MON TUES WED THUR FRI SAT DAY SUN MON TUES WED THUR FRI SAT DATE 0 420 ' 421 0 0 0 0 DATE a 420 421 0 0 0 0 TYPE r _ n D ! TYPE HOUR 1967 ADT - 11900 G df- HOUR 1987 ADT _ 12800 BEG BOA lvlle- BEG MID 0 0 119 0 0 0 0 MID 0 Q 79 0 0 0 0 IA 0 0 44 0 0 0 0 ; 1A 0 0 39 0 0 0 r7 2A 0 0 34 0 0 0 0 2A 0 0 39 0 0 0 0 3A 0 0 28 0 0 0 0 3A 0 0 42 0 0 0 0 4A 0 0 52 0 0 0 0 4A 0 0 84 0 0 0 0 5A 0 0 202 0 0 0 0' 5A 0 0 193 0 0 0 0 6A 0 0 638 0 0 0 0 I 6A 0 0 1.154 0 0 0 0 7A 0 0 922 0 0 0 0 I : 7A 0 0 1776 0 0 0 0 8A 0 647 660 0 0 0 0 8A 0 1009 1136 0 0 0 n 9A 0 588 564 0 0 0 0 �. 9A 0 726 670 0 0 0 0 10A 0 615 0 0 0 0 D IDA 0 637 0 0 0 0 0 11A 0 685 0 0 0 0 0 11A 0 672 0 0 0 0 0 j. 12P 0 822 0 D 0 0 0 f 12P 0 745 0 0 0 0 0 1P 0 717 0 0 0 0 D 1P 0 732 U 0 0 0 0 2P O 764 0 0 0 0 0 2P U .805 0 0 0 0 0 3P 0 1064 0 0 0 0 0 3P 0 873 0 0 0 0 0 4P 0 1352 0 0 0 0 0 4P 0 1025 0 0 0 0 0 5P 0 1148 0 0 0 0 0 5P 0 .936 0 0 0 0 0 6P 0 671 0 0 0 0 0 6P 0 541 0 0 0 0 0 7P 0 383 0 0 0 0 0 7P 0 423 0 0 0 0 0 8P 0 277 0 0 0 0 0 8P 0 276 0 0 0 0 0 9P 0 216 0 0 0 0 0 9P 0 166 0 0 . 0 0 0 1❑P O 133 ❑ 0 0 0 0 lop 0 153 0 0 O 0 0 11P 0 113 0 0 0 0 11P 0 103 0 0 0 0 0 TOT 0 10195 3263 0' 0 0 0 TOT 0 9822 5212 0 0 0 0 RECORDER 0 24 HR = 12234 G - 4 RECORDER 0 24 HR = 13228 G - 4 YEAR 1987 S T AI NO 1 S 2 STATE OF CONNECTICUT DEPARTMENT OF TRANSPORTATION BUREAU OF PLANNING AND RESEARCH PLANNING INVENTORY` AND DATA TRAFFIC RECORDER DATA TOWN OF SO* WINDSOR ROUTE 30 DIRECTION B LOC NORTH OF NORTHVIEW DRIVE DAY SUN MON TUES WED THUR FRI SAT DATE 0 0 0 318 319 0 0 TYPE HOUR 1987 ADT = 11700 BEG MID 0 0 0 0 81 0 0 IA 0 0 0 0 39 0 0 2A 0 0 0 0 26 0 0 3A 0 0 0 0 21 0 0 4A 0 0 0 0 35 0 0 SA 0 0 0 0 159 0 0 6A 0 D 0 0 672 0 0 7A 0 0 0 0 1276 0 0 , BA 0 0 0 0 896 • 0 0 9A ❑ 0 0 0 471 0 0 10A 0 0 0 401 ❑ 0 0 11A 0 0 0 484 0 0 0 12 P 0 0 0 577 0 0 0 1 P 0 0 0 529 0 0 0 2P 0 0 0 564 0 ❑ 0 3P 0 0 D 839 0 0 0 4P "0 0 0 1127 0 0 0 5P 0 ❑ 0 1187 0 0 0 6P 0 0 0 710 0 0 0 • 7 P 0 0 0 _ 475 0 0 0 8p 0 0 0 350 0 0 0 9P 0 0 0 324 0 0 0 lop 0 0 0 233• 0 0 0 11P 0 0 0 149 0 0 0 TOT 0 0 0 7949 367.6 0 0 - RECORDER 224 . 24 HR_.=...11625 G . - 4 ' IYE A,K �987 S T A NO 132 2075 STATE OF CONNECTTCUT DEPARTMENT OF TRANSPORTATION BUREAU OF PLANNING AND RESEARCH PLANNING INVENTORY AND DATA TRAFFIC RECORDER DATA ` TOWN OF SO. WINDSOR ROUTE . 30 DIRECTION B LOC N.E. OF CHAPEL ROAD DAY SUN MON TUES WED THUR FRI SAT DATE p p 0 318 319 0 0 TYPE HOUR 1987 AOT = 9400 BEG � � #� MID 0 0 0 0 63 0 0 1A 0 0 0 0. 35 0 0 2A 0 0 0 0 30 0 0 3A 0 0 0 0 22 0 0 4A 0 0 0 0 42 0 0 5A 0 0 0 D 176 p p 6A 0 0 0 0 640 0 0 7A 0 0 0 0 986 p p 8A 0 0 0 611 0 D D. 9 A 0 0 0 385 0 p D 10A 0 0 0 323 p p 0 11A 0 0 0 410 p p 0 1 2P 0 0 0 436 0 p 0 1P p p 0 423 p 0 0 2P D 0 0 460 p p 0 3P 0 0 D 697 0 p 0 4 P 0 0 0 893 p p p 5P 0 0 0 885 p o 0 6P 0 0 0 547 0 p O r • 7P 0 0 0 355 0 0 0 8P 0 0 0 271 0 p 9P 0 0 0 275 0 p 0 lop 0 0 0 184 p p 0 11P 0 0 0 117 0 p 0 TOT 0 D 0 7272 1994 0 p RECORDER 221 24 HR = 9 266 G - 4 C: \>> C: \>> NUTMEG ROAD PLEASANT VALLEY RD NORTHBOUND HOUR ---- QUARTER HOUR ---- HOUR EACH * REPRESENTS 11 VEHICLES OF DA:Y 1st 2nd 3rd 4th TOTAL A DASH MEANS HOUR VOLUME < 6 ------ ----- ----- ----- ----- ------ -------------------------------- 12 AM 1 0 0 0 1 - - 1 AM 0 0 0 0 0 - 2 AM 0 0 0- 0 0 - 3 AM 0 0 0 2 2 - 4 AM 0 3 0 0 3 - 5 AM 1 1 2 4 8 6 AM 8 26 27 51 112 ********** _ 7 AM 64 69 55 115 303 **************************** 8 AM 63 26 16 18 123 *********** 9 AM 15 14 19 20 68 ****** 10 AM 10 21 7 16 54 ***** 11 AM 11 10 25 35 81 ******* 12 PM 45 24 55 50 174 **************** 1 PM 20 13 16 12 61 ****** _ 2 PM 16 17 17 11 61 ****** 3 PM 9 8 13 20 50 ***** 4 PM 18 15 23 17 73 ******* 5 PM 15 4 7 6 32 *** -' 6 PM 3 7 1 3 14 7 PM 2 1 0 3 6 8 PM 1 2 2 6 11 9 PM 2 0 2 0 4 - 10 PM 2 3 2 2 9 11 PM 2 0 0 0 2 - TOTAL VOLUME IS 1 , 252 VEHICLES. PEAK HOURS : MORNING PEAK HOUR VOLUME OF 303 BEGINS AT 7:00 AM ( 24 %K) EVENING PEAK HOUR VOLUME OF 174 BEGINS AT 12 :00 PM ( 14 �) DATA COLLECTION BEGAN AT 10 AM ON WEDNESDAY, JUNE 15 , 1988. NUTMEG ROAD PLEASANT VALLEY RD BIDIRECTIONAL HOUR- ---- QUARTER HOUR ---- HOUR EACH * REPRESENTS 12 VEHICLES OF DAY 1st 2nd 3rd 4th TOTAL A DASH MEANS HOUR VOLUME < 6 ------ ----- ----- ----- ----- ------ ---------- 12 AM 2 0 0 0 2 - 1 AM 3 0 0 0 3 - 2 AM 0 0 0 0 0 - 3 AM 0 0 0 3 3 - 4 AM 2 1 1 0 4 - 5 AM 0 2 4 3 9 _ 6 AM 7 AM 8 AM 115 50 34 30 229 9 AM 20 24 32 33 109 ********* 10 AM 19 21 27 19 86 ******* 11 AM 24 22 26 60 132 *********** 12 PM 108 55 56 75 294 ************************* 1 PM 49 31 28 23 131 *********** 2 PM 20 36 19 32 107 ********* 3 PM 18 18 34 32 102 ********* 4 PM 82 44 58 104 288 ************************ 5 PM 80 40 36 33 189 **************** 6 PM 24 16 9 6 55 ***** 7 PM 6 6 2 5 19 ** 8 PM 11 4 4 4 23 ** 9 PM 10 7 3 13 33 *** 10 PM 0 6 2 5 13 11 PM 3 2 2 - 0 7 TOTAL VOLUME IS 2 , 220 VEHICLES. PEAK HOURS: MORNING PEAK HOUR VOLUME OF 331 BEGINS AT 7 : 15 AM ( 15 %) Or EVENING PEAK HOUR VOLUME OF 294 BEGINS AT 12 :00 PM ( 13 9K) DATA COLLECTION BEGAN AT 10 AM ON WEDNESDAY, JUNE 15, 1988 . -X Y � A HIACHIINE COUNT SUMMARY L0CA T IO N AJO-Iwvlp� �� 5.. 'r• APe R1) ' LOCATION NO, .Dafe 12:15 • 121 NON- Via,. I(2 :��0,. GAM -- 6,15 - l2:15 G PM - 6,1 5 a.b 12 15 1230. _ � 12:15 1230. '6:15 - 6:30 112:30 '-- 12:4 5 G�IS `' G:30� - . G:30 : O'r1,5 12:3 0 I24 5 b:30- - G:11.5 S ` 12•-4 5 -- I CO .. r • I Z 45. -- I CO, q 6:4 5 - ?:00 6 IiOJJRLY TOTAL s;:4� - 7:00 • • ' HOURLY TOTAL HOURLY TOTAL I HOURLY TOTAL 115-1 1:0 0 '- I: '`' : 1�' - 7:00. 7:15 I:0 0 �' I. 1.5 7.00 -- 7:15 0 1: 15 ' _ .1.:30 �':15 �. 'l:30 1 i 15.- -J.:30 `/.. 7:15 -- 7 30 130 - •J:45 7:30 - 7:45 .130 •.J:45 M. 7:10 7:45 1: 45 2.00 - p 5 - 0:40 1, 45 - 2:00 ` = 7:11•5 - 8:00 HOURLY TOTAL _ HOUs;LY `fOTAL HOURLY TOTAL HOURLY `f0't'AL 2-00 - 2:15 -- - 0:00-• 8:15 .2:00 2:15 . . .- 0,00 -- 0_I5 2:15 -- 2:3 0 _ 6:15 - 0:30 2:15 --.. 2:3 0 %I S- 0:15 -- 030 230 -' 2:115• 0:;;fJ -- 0 4 5 200 - 2:45 2 A 5 -: 3:00 : = 8:45 -- S':00 2:4 5 - 3:00 0: 15 - S:00 r HOURLY TOTAL HOURLY TOTAL. HOURLY TOTAL HOURLY TOTAL ; 1 3:00 " 3:I5 =- 9:00 9:1 5 3:00 3:15 9:00 - 9,15 3:15 -' •.33J - 9:15 - 930 3:15 -3.30 9:15 - OJO 3:;0 -- . .34 5 9:30 -- 9:4 5 3:30 - . .3:4 5 9:30 - 9:4 5 7, 3.rr 5 -- 4,00 5 10:00 3:4 5 -- 400. 9:4 5 -- 10:00 Ll HOURL)L TOTAL HOURLY TOTAL. HOVELY TOTAL HOURLY `fOlAL 1 .400 4:13 'I0:00 -~ 10: 15 400 - 4:15 q0.- 10:00 -- 10: 15 '> 4:1 5 - 430 10:15 - 10:30: 4:15 4:30 ;� ! 10: 15 - iO:30 43 0 -- 4:4 5 10;5 0" - 10:45 1 43 0 -- 44 5 I W 0 -- 10:45 4:1t 5 -- 500 10:4 5 - 11 :CO 4�4 5 - .°i00 I 1 10:4:i -- I I :CO HOURLY TOTAU HOURLY TOTAL HOURLY TOTI LO, HOURLY TOTAL w 5:00 - '':15 11:00 1 1:15 5:00 - 05 11:00 -- 1 1:15 IS" 5:15 - 510 11:1 5 - 11.30 5:15 - 5:30 2"f 5 • - 11:30 ,� • . o u. 5:30 "' 545 :30 _ 11-45 5:30 - 545 :30 _ 11 :45 0 5:4 5 GOO 11:4 5 -1214 00?d 5:45 - 61C O _1?_M I u, p 'OPAL HOURLY TOTAL r; " MIOURLY 1 OTAL I HIGH Fla HOURLY TOTAL HOURLY l - �r.��D -rnTA G �Kth •rnzA,L �� GRAND TOTA __ (;I��;ND TOTAL 1 24 HRJOTA 'IV1AC1-IINE COUNT SUMMARY .. LOCATION �:��y,, ,> r"� .5 t 1.� ' `� LOCATION N0. ' � �����r e c o�• .D�te •� .I S f f�� • 2 I0`-- I2:I5 1 .GAIA -• G=I5 �, 12NC*N 12:15 G pM -- G:I5 I215 - 1no. _ 12:15 -- 1230. _ 'G:15 - G:30 245 6. G:IS 6:30t 12:30 I . 0:3 0 12:3 0 IN 5 b:3 0_ _ G:JI•5 12.4 J - 1 CO 64 J - 7:00 1a45. 100 G:4 5 - 7:00 MRLY TOTAL 5 NOUR'LY TOTAL H(YJRLY_TOTAL HOURLY TOTAL 1:00 7:OQ. 7:i 5 - 1:00 ``- 1:1.5 _ 7:00 •- 7:I 5 .1:34 E.. f;i 5 : `/:30 1� 15.:- .1.�.,0 �.:.• • . ' ?: 130 - .1:�'�S 7;30 - 7:45 .130 J 45 'I:30 7:45 ' I: 4 5 2:00 7.45 _ 8:00 I: 4 5 2:00 7: 5 -- 8:0 p HOURLY T01-AL F;ourLY 'fd'Ii\L �� �`{ HOURLY TOTAL 140URLY T0TAL ?'00 - 2:15 - .- 0:00 - O:Ici �a 2:00 2:15 _ 0=00 -' a:l;i 2:15 - 2:30 ...�?. 0:I5 - 0:30_ 2:15 -r . 2:30 0:I 0:3U ;r1r" -;�";• J (- 2:300 --0 -' 2:45 .... �3D 0:er 5 �0 2 ..0 O:�D 0 2 4 5 -- 3:00 10. 0:,15 - c,•:00 -� - 2:4 5 -_ 3:00 0:45 - S:00 HOURLY TOTAL HOURLY TOTAL �, HOURLY TOTAL .. HOURLY '1*0TAL 1 3:00 - 3:15 .t>:_ 9.00 9=1 5 ,3:00 3:1, 9:00 - 9115 3:15 " .-3'3 0 .i--) 9:15 -- 930 3:15 -"_-.3.O _ 9:15 - 9 i 0 3:3 0 -' 3<?5 A. 9:30 -- 9.45: 3:30 - 3 t15 9:30 - 9:4 5 3:er 5 400 9`4 5 --- 10.00' 3:4 5 -- 4 00. S•4 J -- 10:00 iOLu R I.Y -OPAL HOURLY. TO-rAL 4_QR_LyTOTAL HOW Y TOTA L 400 -- 4:13 4): '10:00 -~ 10: 15L 00 4:1 :5 - 10:00 - 10: 15 er:1 J -- 4Z'0 .J 10:15 - I0:30. 4:15 4•o 10: I5 -- IO:JO `w 0 - �-•r I W O -- 10:45 - 10J 0 I O•:�� 4�;5 -- %If 10:4�5 --• I I :CO, 4:4 5 -- 500 10:4 5) -- 11 :CO . IOURLY TOTAL L- . HOURLY TOTAL HOURLY TO TAL HOURLY TOTAL 5:00 '':I J 1 11:00 11:15 -- �'1 5:00 :15 11:00 - 1 1:I 5 I:I 5 - 11:30 5:15 - 530 5:30 - 5.45 :70 " II:CIS 5:30 5*45 5: J�J -- GCO I I:�;5 ...I? }•ill), Na ,, ,5 � G�J Ih45 '--I?_IJd0?J }i GH� -IOURU' TOTI�L 1.10URLY 'I'ol'•'�L HOURLY TOTAL� �10URLY _1"OY►�L Y Y�i •�n t 'tOT''.i�l l� F?MI D 701'A GR u h •'n'�s,L I 1 214 HR.TO�AI 1 I � So Windsor MACHINE COUNT SUMMARY •' L 0 C A T 1014 - 0,ga LOCATION AT I O N Ofi . I I 5 .Dote 611qj87 12 ;Ip -- 12:15 12NIM4- 12:15 - 1 �6A�� G:I 5 � GPM 6:15 i 12:1 5 1230. _ 112715 -- 1230. . 7_ 6:15 6:30� •6.15 - 6..30 � 112:30 -- IN _ • 12:30 1245 /7 _ b:30- '- G:45 . 3 12.4 5 -- 100 G:30 G',I•Fu r _ 12�4 5. -- I�0 6�4 5 - 7:00 3 I{4JrRl_Y TOTaI. 6:4� 7:U0 • � • HOUiiI.Y TOTAL I{OURLY TOTAL -�: HOURLY 1'UTaL f' 1:00 - I=15 _ 1: 1:1.5 � - _. 7:00. �- 7:15 00 ``- 7:00 7:15 I.. 15 _ .1:30 .15 7:30 15 - 7 30 !•45 7:30 - 7:45 .13 0 .1:45 -`r 7-ZO 7:45 y ' I: 45 2:00 r 4.5 8:00 I: 45 - 2:00 _ .: 7.4.5 - b:00 �t HOURLY TOTAL HOURLY 'rOTAL HOURLY TOTAL 2._. HOURLY YOTAL ,>-00 - 20-15 -- - 0:00-• 8:15 -2:00 - 2:15 .ate._ 0:00 - 2:15 -- 2:30 _ 0:15 - O:�U 2:15 -- . 2:30 ...FS.. 0:(5 -- 0.30 ) . 230 2:115. 0: a 0,45 230 -- Z:45 - :' d:2n - 0""15. 245 `= 3:00 S:00 . 2:4 5 -_ 3:00 A* 0:-15 - •00 ;?,J' HOURLY TOTAL HOURLY TOTAL HOURLY TOTAL 3.0 . HOURLY TOTAL, y � 3;00 - 3:15 9.00 9:1 5 3:00 -' 3:15 :7 5:00 - 9:1 5 J:15 ..3.",,.0 9:15 -- 93 0 3:15 `-._.3.O -�' 9:15 - OW O 3:30 - . 3:45 9:30 - 9:45: 3:30 - . 3:45 , 9:30 - 9:45 1), 3:e.5 - 4,0 0 9:1;5 10:00� 3:4 5 --• 400. J.4 5:4 5 -- 10:00 2- CU R LAY JOTAL 'rMU LY ` 07AL 80vRLY TOTAL HOURLY TOTAL 6 �, - 4:13 IJ:OQ -- 10: 15 400 4:15 1- - 10:00 -- 10: 15 4:1 5 4430 10:15 - I0::50' 4:15 *30. 15- ., 10: 15 - 10:30 1 .1 4:3 U - 4:4 5 y �L3 0 -- 4�r 5 -- IG5O -- 10:45 11 {U'�0 IU:=�S 1 4:4 5 -- �00 10:4 5 - 11 :COI 44 5 -- 10:4 J -- 1 i --co .. HOURLY YOYl' HOURLY TOTAL HOURLY TOTE 5,� , HOURLY TOTAL L r: I �•: 11:00 — 1 1:15 5:00 I� II:00 I1.1 55 =00 -- i� 5:15 - 530 11:1 5 - 11:30 5:15 - 5:30 11:I 5 . -- 11:30 • . o ;;�30 -' S-45 :30 _ II:45. 5:30 - 5%45 'Y` :30 " II :45 y 5:er 5 G:00 11:4 5 -•121400?4 - 5.45 - 6CO 11:4 5 --1?_H I O. 0 AV '1'O1AL HOURLY TOTAL r HOURLY HIGH. Na HOURLY TOTAL ItOURLY LPLr 7 -r^-rA ►it1 '� Thf 1 I 1 �iRAN TOTA 1. 'rn j,t,(� (�7 1241-1R.TOTA I I ._._.1 _._....1 - -•-IT —1 � ILIACHINE COUNT SU?ANIARY LOCA T 10 i�l „ ,, r',-� `��, - �, LOCATION NO 12 ,10 - 12:15 3 6 A 1A G•15 12NOON- 12:15 G r M - G:15 12 15 1230. O_. 12:15 -- 1230. _ •6:13 - 6:30 Fl2:30 IN 5 � . 6;15 6 30 . 12:30 •-. Iz4 5 6:30_ •- I 0.30 G•11•0 �l� 4 12�4 S --� :'� 1 f 124 5.-- 100 .. G 5 ?:00 GA 5 - 7:00 I IiOJRLY TOTAL 3� I�OUiiLY Tt�TaL 9 HOURLY TOTAL ..- : HOURLY TOTAL 7.00 � 7:15 -� I:00 -� (:1.5 � 1:00 -- 7:15 I� 15 .I�30 �• f 15 ! 7:30 "�� 1: 15 ':I5 - 'r30 . 13 0 7:30 - 7:45 .i 3 0 J:45 7:30 .- 7.45 is 45 - 2:00 -.01. 7:45 8:00 I: 45 - 2:00 _ _ 7:45 - 8:00 HOURLY TOTAL :I._. HOURLY ' OTAL =? HOURLY TOTAL HOURLY TOTAL 2-00 - 2,15 .fa- 0:00- 0:15 t .2:00 2:15 - 0,00 - ICS 2:15 - 2:3 0 .. 0:15 - 0:3U 2:15 --- 2:3 0 8:15 -- 0`J0 230 -' 2--45. 230 - 2:45 W."30 -- O:er:, 245 '- 3:00 ici. 5 -- 5:00 I I . 245 -:. 3:00 5 - 0:00 HOURLY TOTAL . HOURLY TOTAL ,LI HOURLY TOTAL •. . .. . HOURLY TOTAL ! 3:00 - 3:1.5 - 9:U0 9-1 5 3:00 . . 3:)Z :_ 5:00 - J:I 5 3:15 `"...330 0:15 -- 9:30 3:15 -`..-3ZO _ 9'15 - 90:i0 3:30 9,30 -- 9:45: 3:30 - 3�45 9:30 - 0:45 3:<<5 -- 4-00 5 w 10:00 3:45 -- 4-00. 5:45 - 10:00 QUR_l.Y �'OTAL HDURL�' TOTAL 41F�LY TOTAL •.. HOW Y 'F0TAAL -fr 00 -- 4:13 '10,0 0 10: 15 400 - 4:I 5 - 10,0 0 - IO: 15 . 4:I 5 - '�` '�- 10:15 - I0:30, 4:I5 - 4W 10: 15 -- 10:30 -Q 0 -- 4:4 5 _ 4Z 0 -- 44 5 _ - 4--et 5 500 > 10:4 5 - 11 :Co; 4A 5 --- 500 10:4 5 -- 11 :CO .. HOURLY T 0 TAL HOURLY TOTAL HOURLY T0TI HOURLY TOTAL -- 11:00 -- 1 1''15 5:00 -- '':I.ri I I:00 �•- I I:I 5, 5:40 �':15 � 5:I 5 - 5:43;0 11:I 5 -- 11:30 5:15 -- 530 I I:I 5 . - 1 I:SO • . � V 5:30 - 545 Tj :30 `" I 1 t115 :5:30 - 545 1..-or 0 545 -' GO) I I:4 5 -1214 OO?J f � 5 A 5 - 6100 { I:4 5 "17_H,10, g A HOURLY TOTAL ]HOURLY_TOT►�L FI GHQ HR HOURLY TOTAL N�OURLY 101 L . � � � GRA � TOTdt r �1 1.24 HRTOTA G t► -r^-r� �t) _ . .!, . � -IT I I I -----I --I ---1 l l 00 MACHINE COUNT SUMMARY .. =! I�v�i�e .S'' 0��034enf LOCATION NOLOCAi10i � . , IV Q � - { •Date (o•f�Y`4� `�� o v {2�•�iD,` I2:I5 .6AIA _ 6-16 121 NON- 12:15 3g 6 rM -' 6,15 c 1 1221 .5 '- 1230. _ ' 12:15 -- 1230• .2 _ •6:15 - 6:3 0, 10 C 1245 _ :I� 630 715 • 12:30 ••-. I2-45 0 - 6:30- - G:,1.5 � 12'-4 S I CO6.30 G-•1 J - Gt4 5 - 7:UO 12 5.-- I�0 J.2, 0:4 5 - 7:00 Qs- 1{OJRLY TOTAL I10UiiLY TOTAL HOURLY TOTAL g7: HOURLY 1'UT.aL 1:00 — . I=I5 _ 1:00 1.1.5 8— 7:00. 7:I5 "1:00 — 7:15 - : 1: 15 .1:30 _:8. - f, f•15 - �•30 .. �•15 730 I• �. 13 O _ •- 13 0 .1:45 .'/. f:W . -- 7:45 7:30 7:4 5 I: 4 5 2:00 •- 7:4 5 -- 6:OU I: 45 2:00 1. = 7:45 - 8:00C- HOURLY TOTAL HOURLY 'rO-I��L HOURLY TOTAL (�. HOURLY TOTAL "I 2:00 — 2:15 - - �:00.-. 0:15 .2:00 — 2:15 - .- 0:00 — 8:10 c� . 2:15 -- 2:3 0 2:15 -- . 2:3 0 ./. :I S -- 0_30 2..30 _ 2-1i5• 0:;;f.� — 0 4— 0 5 230 — Z:45 Q.: �!:�fJ — 0:4 5 Ir 245 3:00 _ _ g:al _ c 2:4 5 -' 3:00 r '}3 - :00 Q .,•UO HOURLY TOTAL HOURLY TOTAL,. HOURLY TUTAL ; o. HOURLY TOTAL � 300 " 3:15 9:U0 �- 9:1 3 3:00 3:1' 9:00 - J:I 5 �• `J J:I .r! ... ..3UO - :I 5 9�0 :15 "...3..,J -C� ' 9:I 5 - S V 3�I 5 9:30 - S:4 5, 3.30 -- 3.4 5 .11? 9:30 - :4 5 O J 3:<<5 -. 4-00 9:-i5 1000' 3,45 -- 4100. .1. ..• 5:45 - 10:00 LY TOTAL HOURLY.. TOTAL: TOTAL .` H0uRLY 'f01'AL 00 - 4.15 '10,00 -- 10: 15 400 -- 4:15 7�._ 10:00 10, 15 4:I 5 -- 4-W 10:15 - 10"30. 4:15 -- 4:0 1 10: 15 - i0:30 SW U -- 4:4 5 10z 0'' - I 0: 4Z 0 -- Vt 5 3 _ I Uz O -- 10:-1'� � vt 5 -- 500 10:4 5 - 11 W i 4 5 -- 5w W '. 10:4 5 -- I I :CO HOURLY TOTAL z HOURLY TOM HOURLY TOTAL HOURLY TOT1' w 11.00 1 1:I 5 , 5:00 -- :15 '' 11:oU - 1 1:15 w 5.00 •IJ--- � J•I 'S -- J k0 11.1 5 I I.30 5.15 -~ 5-30 I I•I 5 • 11.30 ' . p O ;;:30 -' 5.45 :30 - 11 :�15 5 30 " 5%45 J ,5 J' GtYJ I i:4.ri •~I?_IJ 00?J f g 4 5 - 6'CA ? 11:4 5 -I?_'r'i��), C� NaA HOURLY TOTAL 6 1'10URLY TOTAL F1 G v� N• HR HOURLY TOTAL 1IOURLY 101 L - G 0 ��Yd ,' •t �-�_ r,RAt{ TOT I G� �..1I� I •rn TAL �1 I �4 HR•;crrA I I ILIACHINE COUNT SUMMARY LOCA i IO?"l �, ►,��ri ��{�, `��� ��.irJlL �c_ �,�, LOCATION NO. v -- 12:15 �. (2tMN- 12:15 PM ••,• r 15 ' 1230. 6 ,� ' I2: 15 - 1230. G - G 1 6:15 0:30 - t.�ref 12:30 IN Q. � 12:30 -- 1245 �- 12•-4 S --- 1 CO ,�• 6:30 G�'1•J :� - - b:30_ G:�1.5 12 5. (�0 .. Gtt5 - 7:00 IIOJRLY TOTAL `�r F,�1� - 7:U0 � �` I10UiiLY TOTAL HOURLY TOTAL HOURLY 'iTOTAL v 1:00 - r 1� I.00 ., 1• 1•J r 7:00. 7.1 1 t:00 7 I 115 _ .1:30 .. f:15 :-- /:30 �:15 -- �W 1• 7:30 - 7:4 5 1 -k3O '.1.4 5 7::0 7:4 5 '�. 0 1: 45 2:00 7:-ET 5 G:OU '_''G 1. 45 2.00 7:4.5 -- 8:00 HOURLY TOTAL ..1... IMURLY '(0TAL HOURLY TOTAL "_ HOURLY TOTAL 2-00 - 2:15 0:15 a, -2:00 2:1 5 _ J 0.0 0 _." fl_I� =� r 2:15 -- 2:3 0 0:15 - 0:1"30 �- 2:.I 5 `• 2:3 0 _ _ G:15 -- 0,30 Q ivlJ OBI}5 y? Z:45 U;vIJ 0' r.1 -! 2 A 5 3:00 .L 0:115 - S':oo 2 4 5 - 3:00 0:115 - 6:00 HOURLY TOTAL C). HOURLY TOTAL I HOURLY TOTAL ,. HOURLY TOTAL � 300 - 3:1.5 •�• '- 900 J:I 5 _3:00 3:15 5:00 -- 9.1 5 v41 J.I.r1 ...3UO -L (�:I J J 0 :I S ~.-„� �:I S '_' vJ0 F _3:30 -' 3:115 .�:. g:30 -- 5:45: 3:30 .345 / �:`0 -- 9:45 3:4 5 -- 4-00 C. 9:4 5 =-- 10:00 3!4 5 -- 4-00. _... S'4 5 -• 10:00 CURLY i'OTAL .1 HOURLY. TOTAL Q TOTAL1(OUii LY 'TOTAL r; oo -- 4:13 '10:0 0 --• 10: 15 �r a0 -- 4:1 :5 - 10:0 0 -- 10: 16 5 — 4Q1,0 i 10:15 — 10:30. 4:15 - 4ZO 10:15 -- 10:30 1:S U -- 4 5 D I G�0� - I 0:�1� ' 4:S 0 4:Ar 5 1 U 5 0 -- 104,5) 4:4 5 -- 5,00 10:4 5 -- I 1 :CO i 4: 15 -- 500 10:4 J -- 11 :CO .. 1oURLY TOM HOURLY TOTAL HOURLY TO TAL HOURLY TOTAL 5::00 -- 5:I5 11:00 1 1:15 , 5�00 - 05 I1:00 - I 1:15 5:15 - 5:",;0 I 11:I 5 - 11.30 5:15 - 5!30 11:1 5 . -- 11:30 o 0 I I !ZI5 5:30 5145 50 11 :- 5 J:30 _ 545 5 4 5 GCO I 1 is 4 5 •--12 W 00?J - � 5�5 - GCA_ I I:�;5 --12 j�11►1, • i {`- L 'I.O1'►'�L FIo�Rur TOTAL FIOURLY •_7�OTAL FI AV Na ioURLY TOTAL , HOUR Y �R T *CUT PA)-?p `I•f1TA GR�:.�r� •rn T 4.L I C_`i I ?�4 HR-TOT" 1 1 l SIA U16E : OWjOr U. : Jew P11Ln it-'46 plircr at. kimb6wf wLuy Mmu Manor timY nov*wwxso. venicies Tim f rcm wt(I imm ust i-roes stir, hd!2-i veA!%:,bw *In Mi JhKU Li it) ihiU Ll NJ I rb(U L A ;iilu f-i 6:ju y v b 4 104 eld H ruiAL 1 b.fti Lis b Ivj; it 4w 1 J 7:00 PA i y r C 110 Li I Ifia V 4 113 la i1i 14C j c lab 4w Lv 549 a4 Le tl 75 sb 192 PA TWAL 19 15yj fiy 32 ALP. 114i 641 f i It 247 Lj Iz h L I+j I e3i is it f Z� I,,: lee 14 y 34 ab 144 b L2 14 1jo4 vva: MR i* 8?15 33 :?d v 17s of 3.%j. 14 16 �;j I'L 18TkL 4D 31As I" lilt bw Cal ital lie, w ii wi" Nib PLXIOU W*osls tlx Im PcJouif: M-4 y:vv wh WRi.011s, ifwi I kk W VLILLft:; FKLIM kW tvAA'4 thow kignt mru Len Jam k1iriv jrru ur� ------------- Norm h-W Mh v.Y 19 I by ID16 1 4 East 6::Pj Am 4& soun b.-4� An 0.b3 107 Ebb i &k la on 1 wait I m I b ;k le 6u 0 34 em Ent ire irmersed ion 1:06 m 9d 19 Ib3f) 0 Ifila East 0.85 k 0 41e 4./1 Sou-cn 0.06 1 L'I 611 1 ?91 6 U4 Iciest 0.di I Ln I I 4S l0 1ti 4f, STWO hStWAlES T"FIL 01415ION SITE WLt s 2 PAjor St. AM MW fiLVO Mirlar tit. I $WTH SAT"ITC, 10) Primary W.-vewats.- vmicl*s itla Winn Frw r.&ST 1:row wpwu, ry,00 W" if WW 0 KI 'f HKU L I hire, L I trlhtl u sit IM 14 Vv v 4u- u 14 1C J •- 7:W NR v 36:i l9b 1V 0 is e.3 I.-A; V V v v Jw 14 IV Cu liv u u u 4: 1/Z v 7t4t lb S4 1,14 V 0 v v hk TOTAL 48 101 6j,:1 V v Aj 0.0 V u fj 143 7 4 v 5 Il 16 u v V v AR f0fk 0 936 63 0 4i 6,1 3% li 0 v v 1141 break bAv I AL U S4 140 u 141 clu 1:k!p IV v v DIAE01uh ib;mi KW hk VUANrL%i :j HdA FVA r"x ihLiUx mignt inrg WC IOC41 iorg Let: bd v li** -6 hn U.7S 3S V jw v W Soutn 1:4-4 WR V. 61Q ji !Ws 14 01 li West l3 30 w 0.w u ti (0 u 0 v 0 E*xrt Intersection MOM East 0.71 0 4b 10() SOUSA 0.di 301 Q9 0 A0 W"t 0.00 0 0 0 0 0 0 Q - v .3it1NU1 H6!•1MItb •Iftwrli. LnvA:)!u l ylIt Lilt i 1 Major 5`. I JUNN rl ILH Ie VU 113,wr bt. : D!.lrwwf vwiLEf INHu 11lather' s �IJsWY Primary Nov*wnts: YiIIt cies 'wrrrr rwr rr••r••nw__..+r..rrw.....•_-....rrr..wrrrw�••r__rrw•rw.•..._...._..rr...w._.rw�_..�rr..r r�.+•�_-r.«._✓rrr•..-........-...._.. .... .. r__ .. " 'firt ime hest mm wrtr, rrcm East rrom 40446 solicit ,;:��gjri kl jHIdJ Li AT T11kU LI ill i!'HU LI �..,Y S.�wwrwwr.w_rr-Mw_wr_ r_..wr.w•�_.�rr-_rrrw__r_rrrww rrwr__•.rrr.rrrrr-wwww��+r�r..wwrrw_wrrrr.w•r.�rr�_rr... ••r..•.......Y..� . 3:W f+fl '3 s .s the lb 19 1 1� lb I�fl j 3:15 1 !a 111 �'ti w �t-., i ti 14 D Ec6 G3 1� b �l 49 Cb1 lU siJJ 3:45 G 7 b 9 etni , lb !9 1V do boo `Wk To& lu 41 U7 61 lU 1W1 :&;14 AsUO m f`} 1, z 4if Gtl lid b Ald mot/ o 4S1J eu by .+n 'J LPoo ' ♦:9] 1 1=1 b 0 t'.k +44 HR YWAL !'1 :,4 C/ 1/ O:r! 1vv /t C/ 1J4 :ul 13�u ;rt ►:��a 4 1 a v b Gbd 4u A.1 3 r lbl Ckl ! i/ 16.6 eu _64 b :i u 1 Wp I u 13 ! i t Ov riot, ' 3:y:i :i 1�1 l .7 !�'y 1'♦ `: 13 i.0 •t;► cs`� r •�c►:, HR 7ulrtL ly 41 Lb 1! l:+l a DAB( Ttffk �v 14C !V �s C;il:i cl� 16:, 1!1 sVa bl.i ,34br r ray PERK Pfk1UD ftLYSIS FOR IML ftklW.-' OLNEf:f!EN S f AR1 l;W MR ........ � tuiks ........ .... punt-m b ... r'RiIM PEAK do FAL70k Kisht lnru Lerti Total &ignt Inru Lest rrrrrrN+rwww_____r rrrr.�rwwr__r w..r-rwrw_+____rr..r.wrrrrw_wwr____rr_-.wr•wrrw________-rr Nest 4:60 W! 0.65 1i 54 27 ii� l av L ;;;�;Y:-� Nor•tn �:1:, aol G.w to `.Jl�i !le lVsl c a/ ll East Ai:3U NM (/.8� 61 5U l::% tD lei :IJ . . SGUM 4:16 t+19 V.5.3 SV`! 1St s JJ !/su 1�► tlti .: URIC 4.1 v I+M V.`J.: 13 4i3 G r ik'i in XI J. Ntfr�h U.tl•11 16 yt?l lie- 1V•il G W 11 East 0.6u nl Jib 11j Lc4 av 11 j.a • �-�:. �Giltn V.73 ,iUl s.wts � 11.w lti tic, c r . S''y st fE uxi 2 pAjor St. 8 JCM FITCH ALVD Nimr it. : WAN SwELLITL W weatner : SUWY Primq mov"Was: vencles Tim Fro worth from East 1-ma kuln rrcA i�"T Vk(,ICli fie2ir ftl FWW L f ftl YHW Lf ki 'IMW UIfI I hitJ L i I cp C iu 32ov k 0 4 u 4 cl Iz (i evil Q uV V 4:So (p al it W v d.3 ly abi 0 M f14L 0 Ma 41G 44 IU14 v au v u 1S 14 3Ib V v v 4:Su 0 i:o I Ss D U.1 v v 'i IV v u Hk luj'siL U nss .A) Nj IXk V y v V teal SWU pm ins 4) :Pj b sI%J 0 u u Q 166 lu to v le 4 e.14 v v v irr 11:03 6 1V 0 IQ 15 .9)4 v V 9 u 146 4 is 0 13 Iu 04 u V U V OR MAL V bS 2. Lai Q V v e.Lil DAY 10TAL 0 190 106 A6 u U V v ob:lat -OV ph - c):ou A P" PERIEW A*LYSIS FOR YHE PERIEW: 3. tldJM kw HULM Migra inru Lent 1OW elan? WU Ldrft Nortn J!its A4 V.cyj v ts51 Z E"c 'j.65 1*1 U tsi edb X 4:o PA wOu U V V V V V V EAST. U.61 lib v jb Best O.W V G u4 SITE UJL* M&jCr tit. i ELLUbfUh WAW Nether PrImAry wiva"rits: Yfiniclas Prcs �outrs tarp *&i ifi 16 6 Time from WO rce cast Win its M10i LF 9 f IMU U kf DW Ll its I'MHU L I yea 4.s 14U v U 66 lj 4 1y 4 J41 UffAL 17a 2io 6 54 to d Jt lb 1414 7:00 An 5d ib 0 411S 7 YJ 37 18t 0 hnb bQ 164 0 L AW 16 d4 HA TUTHL lib 144 1 W I it h qv ism, i3 1Vb v HR TtY(k. 04 50-6 4 d 1 sjo gl LA At 4i I 4a L%:-v DAY TUIRL 147a 5 6 lad 06 4w jo bd i:V.3 il%; kp;:i PEPA PERIOD w"YSIS FOR INk PtRi(lb- 6@3fj MA - y:W AN DIRECTILm iiihkl PEAK H9 4464&084 WLUME khw H& t"A FM iUA hignt lbrU Lett total Right Inru Lett —--------- Mom bw wo 0.95 W 1 6& ki 6 0 East 7:00 Ah 0.91 40 A 48.s 1 1�5 South 7:30 An U.t$6 ko 164 is 51 160 14 5t, .5v West 7. Wirt Intersmiors North L lu buj I dbAl. v /I wli C171 AD ta6v south 0. 111 Is LJ I of 4v WEST t `° � biiva:n k��lt:iillta Iki+�rli. vir1S1CK� SIYt txlllt 3 r.wt t 11iJGr ��. 2 tLLINbIl�i 14�W i•i�i: �1ti�i-..r '�. •�M>tr+ar St. : W.rf�Sfwi vwrl.tY kt�11t Iieatrwr s Str:Mr i+ im" hove ms: venlclas ill i:ai aav �% �..M�r�.►I��rr�••�.•�r•M•�r�yrr�wr•�r�.M�rb�WN..�rrr•..r..•...W)�rlrrrrrrrr..• ,.••.wyrrr....rr Yw..NY 1•I•..Nr r..rw r.•• r... .. r.r•.r wr.. •... t111e rrce NGrCA t rcm I:aas xaucr& i rvji 6,im Viiiitic v bQQlrl k1 fnku 4.1 KI MW Lf 10 1rdku L1 10 11gui L� ivt3a ,r•a� �+ �r�r..r+Mrr•rw�wr•rr wrM•r r•r�..r.ww.r.r•rr�r•rr•r..w rrrrr�wrr.•�.•r+-��•....rr.•rr•�rr....rr..�-r...w.�...........w .....—..w.... Lv !A w 1 1:4 1 14 1V 'j Ss 11 4v 1 L•� b 1b 1:v to r .�:, �;► �:,� ' ?.. NN OIL jSV ell 1:3 11 1: cav o~�� . .r 4100 i+!( 6 ,0 1 S 17 a 16 i7j 4 1 a4 413 .st,ci ?- 4:1:; 10 4a 0 1 Gr 1;sV - 1 tab 4o xac 43 30 19 41 s 0 4+1 10 2C Ito :+ bi 4b w1 4:46 31 1 C 39 1V us lb.i 4 s vb t w HR 70TAL ;A 167 5 tl ic4 3� tS1 bl'j ib y �s 1y4 six►y 5.01) PH 11 40 4 1 21 167 it yp 44 jfsj aS l3 12 36 1 :S S2 11 1 L' 144 / .] 14 4:i .• rY MM.+r�.....Yr rr�••� r r�r rrr.w•.. r�r M'N•r•Ir.1.•.r�rrrr•�•Ar�Ar r�•r� N�r�h.���rrr�.wrrrr�r�rrr�wr..rw..•.�... iN• .•—r...—. .. 1' l:aU 1171 44 4.i J.M 44;# Woo ! NtXIOU wocysl5 fum I'm FLRI 1: .S:.w ►a!a DIKLTION bikkl 1fkm MR Kw voile tALWK kigne •inru Larc Iocu ,na•u Sri �rrr r..w�rwr•rrr�.•rrrr•�r.+�rr�..��r rrrr••�...��rrr�r..rrrr•r r r..rrrr�r.....•'•••r r•�...r......... •.•..•or•�� 'i. _ P1orCr. d:JV lria V.6 Sa 105 At ir.4b :� ILI tit 4..SiJ >JA t1.�1 to l�:i 4ji i�4 J /:► 4: elirl 4:1:r N11 V.`Jt yG a1S 1b West 4:.O ;A Ulm 1�1 Entire Intersection Norm 4:30 NM 0.52 43 itid y du L�U, 16 4.u Cast ra de - Suutn 0.5G 75 SO 6 71b Hest 0.6b lc 3u 6,4 J6 . x Y-y • • 'E � 1 tilL lt1 i&WlAlib YMFhlt; DlVISILW y..; SITE ad* : 4 r +Htrc PILL: 46ii-ITH it. kEASWf WiLLU OW Nirsor St. : NuTNEb id" •�,= Meatt�er s5lkwr wrir�ry rwv:�r�s: verticitS �+ir: ��;�•�•• rrrrrrww•rrwwwr�rwwwwwrr.•rrwr r.�rrrwrr�..r«r..r rrrwrwrrr«r..Trrrrrr rw rrrr.T..rrrr rwr«rw«rr.rrrrr.•+•rw� r•r... .«......«r"ra.•rr.• .•• ... fire •-7 broil Mrtn front East rror Loan rrc* 6esc reaiQla • ..etegin Ri irfu U KI• lrival za Hi Iraq! Ll ;cj funs i-1 ►-..%.•�rwrirrwrrr rwr....a.rwr«rrwrwr«rrrr rrrrrr�rrrrrrr rrr+rrrr�.r«T«rr...rr+...r««rrrr..... rr+..�..r r.-rr...•... -. •.....r_.......... •.: _ 6s:K► u U ! ew '99 V u u V v ,1 1W ti: ► ' b:43 G 1.SS V V u v v i 1 =s s4l 'tit fulwL V V V V v � .Sv .,rt Am u V V u 7:30 4 u Cl 40 111 v v v v v TV -W _... ?;�� NS t UAL A G !b 10 4;r1 0 U V U v li4 i�.i ► B:OU AA :i V `1 44 99 0 U V G u ce.1 Gl �s3V 4 U 1V !.S 54 V b:4S "I U 4 IU s/ G V U v u i:: 4 . NR T WAL c3 U 3v iz ebb V 0 V u V its 1� :3.1 ``wrrw�rr�«wr+wrw.«rr«r rrrrrrrr...r.�«rrrrrrrwrr�rrr..wrrrrw+wTw�r..rrr rrrrrrr rrrrw...w�rTr�•r..r.rr.•r•......«r«.....�. .. Oi1Y YWFK. 4i G 4$ 3UG S V u U u u d" i0a ,t;r k" Pkkiut} A*LYSti Hm ihL vtKILO: b:.iv w - `y:Vu mn $l*. Ihn SlA f PEAK HX• eee.eds, Vtyi-1 tt; dadedd„ dealt 1"WO.4mc:i ..• 1`fttie+ Fthit c u�i 1 Icsrris Yrru port i"&I utsmay ArW1. 1 Arr. ' rrrrr rrr�rrrrr w.rwwwrrrr....r• ..y r�rw�rrrrrrwr•nrrw. rrr�.wr,..�MT1...1•Trrr••r•.rr r.1• rw`T rr•.r�r...r -.• ,�=: Nw°th b:i� hn G.9a �a N su :�s i� t1 �� y ti5i b:4J H9 0.4h Ize 4`jb u b9b CL !J u Soutfl 6:4JI v v �. Best hl5 wl Veal u l;se Oe. e.14 36 • '' �J'1t i i"� l At 8t5ECL 1 Grp Nortn 7:it Am Ge 7! 17 V �3 4V 43 V 5is East V. ' la/ 420 u tit:! al by v .. �•.• XitttA U.ZKJ V U G V V U V ,_ West G.b5 G Ise i! e14 U t1` .SA 11�Vr J • y �ftlid.'�! iA'�tlCtafcS b*FiL uivtStiW S1IE Wtit : 4 r►1tit: i hajor St. 1 f4,Etr!! *.LEY MAW r i,u: 46i t-w+ WeatMW : 9jWY Primary ibvewerts: venlcies w.�rrww�rr�Nrwwr—r,rrrrr-rrrrr—r—w..—rwr—r.w-rwrrr•r�w.rww��w�w��w�rr.�rr rr�rrr..r�.rw�wrww r..r.r.r.r..�rw.......w...w�ww•deed.. deed... Tire Fro hortn From East from Soutn rroe WesT, veulctc e`begin kT fMW Li K! TMU k•f Kt lMitlt LI i!I IMu Li local :...-."wr�rr-+rr.rrr���rr�wM�.w��r �r��rM�����rww���.rrrr�r������w�r.r�����w�wrw�wr•�r�W��.� rr�rrrr..rr•M/��••i�.—rrr�y.�.�r ter... V v U v •;u: u 114 =_ 3:4!; !w a �;v<► Hk fO i+L. .is U e5 lb In 4:00 Pm .60 0 ita G ,SV v V V v V . 4:1j 4:.3t1 2t� V :n 11 4� V V V V V W a .c+a v :� �r t► !w u:� • H e Tulw. ik$ V 1s4 Gt3 1d'i u u u V i� .�:� �, ,,.► taxi r�4 0 u kv 14 4.i v V u V v lvl w� 13 9/ V i4 • _ rArMYM..���---wren---------rw— r�wrr�.M•�r�A��•�r� ••w`•rMw�r��.w• �rr.rr.1_.r r.•Y.w•I.�rr�rr rr ee•..•�.deed _ .. KW DE I(W wrF+tYSTS FOR !!it PERIOD: 4.ZW fir! jv Pm UIkEI;(ION STAk! PEAK HN .......a VOLlINEy ........ dead NEla:r•H!5 @ a- - F" P" HWR FACW Rignt bru Left fatal kignt inrU Larc - wrw��w�.�rrrrrrr w��wrrwr.*—rrr��rrr�w�w�.w.w�r� w..rwrrwrwwwrww .►�rrr wr.•r�wr rww•w •'.-�" Nbrtfl 4:t)f) N 0.60 88 0 13 221 4u u bV East 4.-SO NR V.da iGrs i& V lb/ lei n/ u South 4:30 IJR O.W v 0 U V V v v +� krocire irstersecticrii Worth �:1� f+N V.�l !% V 1S'1 G11 ti �.�► east W T/ au 14d v 1tt: 1/ dJ V u.uu u u V v j u ~r�;', West Q*%x V J/4 .51 +Vj err. _ _- 11,7P8� H[U: �3TG�1 i"iLI /TFnSECTi01K6 ***� **x*x**** **�*�+* .":« x�**�****�*« ***is**4;-9*****************��**+ IDENrTF` [r|G l^unnPMor['An _ ....` ... �� �VEP�GE �uw�/I�G 9pEE�> , wAJOIQ STREEr, . , . . . . . . . . ' . . TO _ FEM :! :'/�MM/. . ' , ' , . . . . ' . . ' , ' , ' , , . . . - ' , , . . . ' G3 F'Qr',/E5 �P'rREYE 1 ' . ' - . , - ' ' ' ' . pi Ha5/`hT '.'''`iLE/ �9 'stil} '��` �TPEET, , . , NAME GF -1 i*7 Nm^)L� c. ' . , ' , . - . . . . . . . ' . . . . ' . ' , . . . ' ' r�� [ _ D"�TE OF TME Aw(V'Y5TS (w»/dd' yv} , , . . . . . . . . , ' . , . . . . rTMF PEP Un^} PI&/ � AM' . . . . ' . ' . . , . ' , . . . . ' ' . . . . ' 1903 A'/ Hk _ [wlFPFETIF T p (11n) C'1;1 f It f1i -- - ----'-- '' -- ' — - - - --- --' -- -- --- - '- '--- - - - ---- -' -- --' - — I�4TFR/�FCTT�� TYPE: | EpSEf-r7`}N _ MAxr}p STFT E GT D\nROT [ON, E'\); r mEST CnNFPa T /PE Sfo/ T 7J; Sr/}p 7�N _ Fn 13 WE; Nn 5B — LEFr 87 0 -- 23 THRU 132 420 -- 0 _ RIGHT 0 187 _ N�/MnE� OF LANc�G — Fn bit"! mn 5P _ _ 17 F f O-T ` • P a RT RtHT T; J T 1 J P.:` T T T C P'I T F T! I'Al T 1"1.n'R I F Ez I T. 1 'T%f f7 C7. C!1', tit W I FAA I.1: 1:E 11 Q F CF TR Q3 E 17 f 31 f I N 15-3 Paqw-1. *-Y. .;_ %.*- --,: !.-.- -".4,*-0 4,.. -*,+- r.-*:-t-**4--,,i--it i:-4. -V. -X- N. -),i=-3x-p--X-X ."X--f� it: fr M. t Will'1 to 1 NO z fIFFATHIA T T W.-I (A'-)E_F�i";1-3 E 1"Uhuq 1 Its .?I- E IH 13 J i7i 1:� �3 T F.,E E I i q PEAK F'S A 1 fA A r!T, . . . . . . . . . . . . . . M.� sho IF r N 11 CIF-O jUAT r 01. . . . I . 1 - - _ , . 1 1 1 1 . . - I . I . 1r . . 1 tic) Q >j,jy7 rg ry p .. ,1 ! y P.E ; . , . , . . . . - - . . . 1 . FA,Q%710. 17 A: kT Y FR F, ju: 1-p w;w v;v i 4 1 i 1! i 1 i vy mp7 c a i 1 m7i: ryw) Z3q j ri D"."i f T I A 1 f)t 5 T to C d 01 r I In K, r,;;i j np tit b 7,11) u 9 1 1 1 1 1 ev i TFIN 177 15 1% rr, s F-i Ff I GHT 77 _ _ mDJi|STMwNr rnforUiit, F�ne-2 WTI AMID PI7'Qx [/ TOW CUR OR R/Q f/ B /+ t ) A/JAFLERnTlOU L/4'|x FOR RlFIH / rn/pN� -- --- -'- ----- - --------- '--- -- - - -- -' ---- -- EnSf8(:o«0 (). »`' _ 0ER t 70`IND NvrHBOUv(D - - - - - ' ' - 5O |TI/ /1 j 11 0. � ' _ �E/4l��iF _ % SU TR|1r!kS it COM8 [NATlON �J S MJ1[/P[JCiES ---------`— --------' - - - ------------ - - E(1S1POUND WETS TO](full) 2 1 � _ WAR T| |8CUN0 -' - --' -- _ SOMHnPUW0 — CRIT] CA/ - -'--' ---- - --- --' --' - -- -- --' ' - -' --'- --- '----------'---- -- '—' -- rABUL /x1 'All 1 ATE (C14 J TEF� Tist 1T 0113' . FZmAL y0L1WE A TyJ/ 1 TFT0/E| T P. TTT / �/)P ' '—' - -------- -------- ---'-- ----- - ---- '-----' MINOR RlGHTS — SB 5j 5, 50 MAJOR LEFTS — ER 5' 00 5. 00 0' 00 F5, 00 MINOR LEFT5 _ SR _ _ _ _ _ _ _ CAP�CITY AND �'E,.'ri -OF-SFP« ��E Pagc -3 _ POTEN - ACTU'\L Fu]W' TlAL. OvEME \T SHf;FIE,/) RE5FPVE RATE CA ""',lT," CAPArTIQ,' CApAC[ T ACITY (ncp}`> c (pcph> c /pcp 0y p _ wINOf RE Er Sr, > FF r _ RI chi r 01) 5 Q ey > r — MAJOR S7R[El ED FTFT _ _ _ _ _ _ _ _ _ _ _ _ _ — 1995 HCM: |]uST SHOAL T .7F11 I1/1,BRnE�TIni�� Fos gm-1 ****�+�*** -A *+***x******* -it**�'*********��� _ IDENr [F INr� I| lFO ;|iArIOI-I AVERAGF R//NMING 110EE1) STREEI ' ' . . . . . . , - . . ' 3� _ POo}f 1lN A P'.Clv/!'. . - ' , . , ' . ' ' ' ' . . . ' . . . ' , . ' , , , �5 p`}PULor [/]H, . ' . ' - . . . . . . . . . , , . , . . . . , . . . . . 15C0t)`) r}r �*� 1017 94r 73 7F' in AS'')N 1 Y ` R0 -- p4^`(qE CF 'm iFE y/lFTi 3'jUr/i STR . . . . - . , . . ' . , . . . /En fl Q,4 Q QC`1 Tw MP-.: OF T| (� _ DATE OF THE AmOLvSIS ('p/:/dd . . , . . , . . . , ' ' , . , . . . 6 l/8H TIMjo pqR!n:) ANALS TRU. (' W1 - NO TE 14r . INTERSE`�T [Ow � 'rrE AwT-.1 l Nit FR54rrION r pE T-TtJrER FT? i [O!'I _ MAJDP ST E nE�.TTrri. FoST ES'i CON rl`T TYpET 5O1rHBOUuD v: [Or, SIGj ( _ T 'VM�6 E13 WB pill 13 P _ LEFT O5 « -- 24 'n IRU 139 447 -- 0 _ RIGHT n 195 -- 1R _ NUmBER OF LANDS — EP I G rF,-! LANEr�.' _ _ _ _ _ _ Aon /S'ram, F cTORS P'�gc-2 pEPCENT RIGHT TUR04 CURB RA/)l1K! (+ t> «CCELERArTO'1 LoNE — nRADE Am6( F. FnP RlGHT TURNS FOR MIGHT TANS ------- ---------- '' -------- ---- `--EAS PALAU to. 0C, 90 20 N _ WFF5T7PO//|'/D _ I'll OPTH le 111-.11N1) _ YE�<l[�-E COwpOSlT [ON - ' ' ---- - -' ------- '------------- --- ------- ' -----' '- ' ------------ _ is 5ij TRUCKS 00 COMB iNATITm �*�D RY '5 VE/<lC� ES t mO [O�CycLE� — EAn'11UUt 1D 1112,ESrP l7i/)M0 2 l 0 _ _ SOUTHBOUND 2 1 « — CRITICAL GAPS — TABULAR VALUES ADJUSrED SI04T DlST. FINAL (Table 3(>-2> VALUE ADJUSTMFNT CRITICAL GAP MINOR RI8HTS — SB 5. 50 5. 505. 50 MAJOR LEFT8 — EB 5. 00 5. 00 0, 00 5. 00 MINOR LEFTS 0. 00 6. 50 _ _ _ _ T [7- T P- f­1 1.) T 0 F-, I"T T * r il- I C C: t i r 77. cz, CZ- Pi _ _ 19O5 \ |�M: UNJIG�@'l7�� lNTER3E�TlO��5 Pagu-\ +* «******«************** ***»*** IDEi.11 TFYl��O lwFnFM4r [�: _ ER E RU;NIN 11,EE17, , EE�. . , . . . , , , . . . . . 3') _ PE�« 8-s U] 15�0»0 Ti T+/S'���T'` �TnE�r. . . ' . ' ' . , ' , . . . . . . . ��/ m�/EG RJAD SCi'7,} / OF TH ALvS7 . _ TI m/��_ //��. ` , ' ' . , ' . , ` ` , ' , , , ' , . ` ' , ` , ` ' ' ' _ rOu -- ---- ---------- - - -- ----- - ' --'- - - --- - - -- --'--- '---- ----'-- - -- INTER��ECTl�N TYPE T-IUTER6E,��7�N _ S � REE T1nU: COt--iTR0- TYPF S0UTw5011111"ID: S�OF �TGw _ TR*F�I� vn�'Lm�S E� �9 N8 S8 — LEFT THRU 416 15Z -- 0 _ RI8HT _ NUMBER OF LANES — Fr _ _ _ _ _ — �nJ| /STMENr F/�7��S Paqe-2 pFRrFNr R711/ \T TWpN FA RR RAT)T/ |S (++ > orK| FPArTfit! ( AHE _ Gp 1)E RACLF R RrG| T 1-UR1A13 FUn nI[» NS ---- - -- -` --- - -- - `-- - `--` -` --- --------- ' -- - EATTBOUN ) «. 0// _ WEGrBi»ND -- NOFTT14BOUNn - - - - -_- q�'` _ VNlCLY Cq1PO5T-z rO'1 -------- ---------'----------------- ---- ---------------' -------------- _ % S/} TRUCKS 11 /11113TNA1-Tfow AND PQ ' S VP d{1 lk E 5 l bit)TUR(NO-ES -- ----'--- '---- - -- -- -- -----------' _ WE5rBpinD _ NOryTHBGUND --- --- --- _ S THBOUhD — CRTTICA1 g/�pS — rABULAR VAL| 0q AD'7U5TED SlGHT ( TST /*D S | ME:.H' CF.",TTI��� ------------'- -----' — ----------- ---------- '- _ ��INOR RI'GHTS SB 5. 50 5C_', ». n3 El. 5» MAJOR LEFTS — EB 5. 00 , ;» MIy|OR LEFTS _ _ _ _ _ _ LFoE� -OF '3FP»TC[ P�go-3 '----'--------' --'-- -- ' --' — --- --- '-------- ------- ------ -------- Ij- RATE CAFACI TY CAPr"ClT`/ CAp�rTTv CAP��l Tv '------ -- --- -- --------- --- --------- ---- -------- --- _ mlN�P S�REFT -- 4�� RIGF�T � o4 �93 893 _ MAJnR STREET _ _ _ _ -- _ _ _ _ _ _ _ _ U43IGUAL17ED lunERSECTIOi 1S Paqe-1 **+*************************** » **************** ******�* lDFNTl�YIwG l,!F]�MATIUN _ PNW HO/ 17 ; } JF . . , ' ' . , ' ' - ' . ' ' . . , . ' . , , ' . , ' , ' 85 ARE/` . . . . ' . . . . ' . . . . . . . ' . . . . , 117 01'4110' _ NY& /'.F r|k' QW; r 1110 WT | , ' ' ' . ' ' , ' . ' . ' ' 7i 11. S,"iir o l i,K FRn -- 11(IwF /110 ry/F 01117 1'1i , J3111,| i gTRlzEf . . . ' ' . ' . . ' ' . ' . ' . . r�i|ri, r Fn/�') N0wE fj 17 [PIF ;)N;;LVSr, , . . . . ' . ' ' . , . ' ' ' . . . , . , . . , , _ DATE OF THE AuN VSlS /dd.'yy> . , , . . . . , . . ` . . . . , , . 6/27/88 TIOUR PER}i0[> A | `7E�. . , ' , . ' ' . . , ' . . . ' . , ' , ' ' , . . - _ INTER�ECrTO�| TYFE A�D ��MrR�| IFT ENT SECTTON TvPE: 1--INTErl5Ei-TION — w�Jr}P STpEE� DIPECTTO�: Eu�T/�E9T CONTROL TYPE OP SIGN _ TyN-FIC oOL//mpqS _ ED WB N8 �O — LEFT 108 0 -- 27 T[AFT U 139 447 -- Cl _ RIGHT 0 2.14 — NUMBER OF LANES ----------------------------` --------------- ----`- `----` --------`-- -' — Fn wn NB SB LAKES 1 1 -- 1 _ _ _ _ — �DJ/ |s EHF FAllOR6 pag";-? PFnCFNl R [Gwl ' 1/ 1PIN ['Uitn n(1/)l| \S ArCET! El all TAN / (1,IF _ [�RA 1LE FOR RUCHr T/AMS G� TU��� EA5T8OUND 0' �») _ WHO POU11)) �'. ^»} �(` 2'/ N _ ur3rT|iDCUNri ' '- -- --' -- ;I pl [CLE CO4 it:OS1 r T O� -------'---------- --------'---'------------'------- - ---------- ----- _ % SU TR/ACkS % CCMBl�ATTO« - ' ' —'-' --- ------------ - -------- - -- -- _ NOR 1/ORm /|fD - — -- ' --- _ SO/]THDgUN0 � � 0 — OFT ITlC/)L G/`PS -------------------------------------'-- ---- ----------- ---------- ---- A J I Io*T DT��. k TA,} e 1 Q-2) VALU E 41I1J to S TMEP 4 1 cip r-rTn0/ 6n - nlNOR RIGHT5 _ SP 5. 50 5. 50 0. MA'JOR LEFTS — EB 5. to 00 5. 0» MINOR LFFTS _ SB 6, 50 6. 50 _ _ _ _ C-1, R A F T Y k.) NN E kll-r T F., V..L F;7 _ _ j9py I H[H: UNyllnNA.IZED lHrEPaEc: [rO»S Paqe' I. *** �**�*****IN.L:.*«,+*******x*« x'.* X ** ****«**************** ****** ITATArTFYING [uFORM«TIOH AVERA5E RUNmING _ PEA| HJ/]p r/>RTOR, . . ' ' ' , . ' , ' . , . , . . - ' . ' . . . . ' , , . . , . . .85 AREu POF JLr;TION . . ' ' ' . , , , . . , ' , ' ' , . . . , , . , . , . . . . . . . , 4` _ Ne;'^F OF r ; P Oh Fj; SrF'p sEA . , . ' , ' . ' ' , . ' . ' . . . . . - p/'E 191.Oo ON AT + � p0i,10 5 f- NAME OF . . , , , . . . . ' . . . . . . . . . . ' , . . . ER _ Di2iTE OF THE AHALYSIS . . - . , . . . . . . , , . . . . , Tlin pEn '[`v no /V 7 For)' , , . ' . . ' . . . ' . , . . ' . . . ' . ' ' . , - 1pcso 4 Exp' _ INTERSECl'rON TvPF: T-7NT 7l[}�1 — MAOfOR SrRFRT PIPEQTIEll I: E/,Sl uE5i CONTROL TYpE SOUTHBOUND: STOP SIGn -- TR i:'F I(; :OLUMES _ EA} WG ND 3S — LEFT 42 THRU 416 152 -- 0 _ RIGHT 0 — N|}MBER OF \'ANES ------- ---'--'— --'--- - ------- _ _ _ _ _ _ _ 9 (�0 ^0 S1J B 1 �ONIW 0o ^0 0M ^'� 8S _ - SlH3l8 8ONJW ------------ ----------- -------- ----- --------- I1I M W�S[.�D\� lJNlA ~lSlO 1HSJS 'O E:-DOl�/` u�-QP 1-4� — S�Y8 �\rJIlI83 — 0 l � �N�/UOHlOOS — _ uA/ |'.*!; 2. �J� _ ----- -------- -- ---------- -- --- -'--- HOI 1l {)S � _ r�[�J� IS�6uO] ��3lH�A CT {/U81S�M _ UNOO8lSkl)-] �m�iu lH�l8 UO� I.J. l/��}8 f/ �OIU\'� 8UO3 /8�� ----------'-- -------- ------------------------------------------------ C-abe� S8O�3�� �.!lEF;11r.Od — _ _ _ CAPACTTY 0ND LE SERvTCE Pogo-3 — POl8( AC11]m, � 'If`| nU' 'EMEU | S| K��[� R0lE C/W1711A CAPAClTY C/\PACI'V' CAPACTTN -- mo' 'cwFmr c /Inc n/ c /nrpool 1 p _ �|INCR SrRE�T S} r -- ` 440 PIGHT 12O 889 888 760 ) A — MAJOR STREET EB |'EFT _ _ _ _ _ _ _ _ _ _ _ _ _ -- z"nn'AFT, ncrvr ' _ -- SAME in!1 � ���� Iu� } ��� ` /�n� | I�w -_ ^H 01 ` ''polo 12. _ it 111.1 _ _ -- 5n } 0« 3 W m � 0 0 q0 0 V 8 1 3 -_ P. ' . . . ' . Ph ~ P11 . ' PH ^ . ' . 2 r . . `� . . EB LT y NP LT Y 7H Y rH � Rr X RT X — PD PW WB TH x TH v > -- Rr X nT X 'X pn pc GREEN 9. 0 0. « 0. 0 0. 0 GREEN 9. 0 _ YE:iALOH . 0 0. 0 LLOm ^). 0 7. � «. 0 | EVEL OF SERVICE LANE GRP, V/C G/C DELAY LOS APP. DELAr APp. L. ' — WB L. ». 2('9 0. 157 1C?. 6 C 1R. 2 C R 0. 266 0. 157 16, 1? C NB T 0. 334 0. 629 4. 0 A 4. 7 0 — R 0. 095 0. 786 1 . 1 A SB L 0, r05 0. 0R6 32. 7 T 0. 6413 — lNrERSECT [OM: Dela C 583 _ _ _ _ — �unp1m*Y wEpuw / -- ' - ' 17 vs 12 _ _ i.,kj . .� ' . N irf.' _ -- Pr ' '' `- 2 M,-.` r ,n , . EB LT » No LY X TH TH � RT X FT X PD PCC- !, uD � X 138 iT X TH X X P0 PD GREEN 9. � 0. 0 0 . 0 0. 0 GREEN 6. 0 43. 0 0. 0 — YELLOW to. 0. 0 0, 0 0. 0 vELLOW />. 0 /. 0 0, ') iEVEL OF SERVICE LANE GRP. V/C G/C DELf",v LOS APP. DELAY APP. L — WB L 0. 335 0. 157 2v. 2 C 2: .» C R 0. 645 0. 157 21 . 5 C NB 7 6 0. 671 5. 1 �. R29 0. 7 A T 0. 387 0, 75� i . 9 w _ ImTERSECTIUN: Del �y = 5. | / yah / _ _ _ _ — SU| M . P R . . . . .^ .. _ _ Nz' � . �'/ 3, M ---- -' '--- ----`---- —` --- `- ---`— ----- — -- --` -- --`` ----``- -- SCGNAL SETrlMG5 C`/CLE LENGTH = -- put ] FH-7 |1P4 F'H- F'H '3 EB iT � t 8 i T x 7u x T� � X FA X PD FD W8 LT GB LT X r* � x x -- Rr Y RT PD PD 8REENGREEN LO 7. LEVEL OF SERVICE _ LANE GRP, V/C G/C DELAY LOS ApF . DB.xY APP. L WB L 0, 218 0. 157 19' 6 C 18. 2 C R 0.277 0. 157 16. q C NB T 0. 349 0. 62p — R 0.099 0. 78� SB L 0. /311 0. 086 31 . 6 T 0. 678 0. lNTEPS�CTI M: Del�� = 4. 8 (scc/ �nh � V/C = 0. O0'� LOS = A _ _ _ _ _ 10u :/E4 r31E 1 +0 /nu1 |1// v u 1 !Ljl J" / x+/��� | /n -- - '- - -' -- ` _ -- ----- ------- ' ---- --------------------- ------ —' --- - ---'--' --' —' ---' _ 01) 3 J ) _ . ` put P wi, EB X N� LT X 7H � T/' 'Al FIT X WB LT X S!? i7 � Ti! Y T.,I X { '- RT v RT X X PD p; GREEN W 0 0. 0 0' 0 0. 0 GPEE� _ YELLO Eii8yj 0. 0 Y, 0 v. 0 --------------------- --------------------------------'' ------- ------ --- iEVEL rJF SERVlCE LANE GRp. V/C G/C DELAY LOS ApP. DEL APP. L ' 0. 3*8 0. 15J 21 . 5 C R 0. 671 0. 157 22. 2 C ND T 0' 727 0 7 i 5 P, 0, 7 A SB L o. �16 0. 043 2r . 6 D is. « /i T 0. 40� 0. 757 2. � A — lNTERSECTI[ipi T:'j _ _ _ _r Fz ry vs a v-i M l A -X-k ii. �t--h ,'-•i-•i�- Z.-X-�k X-;i- h. i.:-x-,n--X*- -H--X. it. :i 4; ;4 yi- 9, 0 E . . . . . . . I wo i vg1j;1 1 1 i5w id f-rm Eym,jyjyj ci>,, I—T_ I R Y F.IA c"U'llf G FT 1)A F_ FIV A()11 FIR K W i 1FT3 F:1!17 1)13 FO E 1). E31 1 c ARK. 70) It Ft K! 1 jin j Tj B W) 71 CDC) F: C. 71i "14" T k-I x R T PT7,,' R T. CJ F i If Er L.1 0 W 5 0 LAVER. GF- SERVICIE L t-.,'E L rl 17 to FF L 0 2 E. 0■ 15 1 2 S f? U B to E) Q E3 6, 11) 43 17 3 WNM F f 1 E K 0, f f NIS., -)F R R F I IX-hA -I. i..-X'-71. - F" -cX of 1 1 of X."T i'- E -Y. ."4. X- AllEMSETO T 1:ON 3CO BAf IH i 1 T D A - 7)(.,..T -3 F70141V FIll.. . . . . . PF f I C'T Er) j QL?C) Q:Iipjf)j r y F114 M: I H FEW"ANT!'[Fit I Wil AFFIT. 0 E-0 M E-r rj Fy g j, I. C; T 1. C� r R f 72 112 FT A F EF ld y ATY F?1 G 111 jS ET F; F!1: V QI bun t N j CA) N M to 0 Q Z X. 41 IA C-1 7 C 2 :1 PH .1 ph 6- t PH.-Is FAIV I pp-, E 0 T loj r,� X ro I L T'i x x F" V E L.1.(M C5 n Q Q C) Y E L.i.0 W 1-E�IEI- OF E,E 1 C E LAINE G F!P V c 03 DELAY LOS APP. iAY f,^lF,P L-F I-Ij Fl. 11 S Q. 1 1 5 12C)n 77. C. 52 75- 24 9 C:7:7.7 0 157 1 -9 2 C)- 7 A L 0 6 0 11 0 _1 1111 HAVIEC F 1 CAA a 01.6 sew lveh j 41/1 1:_', _ _ _ | �* * DRI r ^ . 0 ^ " it _ Ar / ��CiE 1 S 5 m FH-1 pH-2 PH 3 pl-I � p I � _ E� LT X r,P 7 � . +1 , RT '- pD ' TH : / '' � FD �u GREEN 25. 0 0. 0 n1 E[� YEL! AW 5. 0 EEL.LUw \ EVEL OF SER /TrE LANE G�P. V/c ELA` I ou r r ue A ' ' LuS — E 1.3 WB L 1 . 00� 0. 3\8 56 r � ot 2 TR L 0. 048 O. 09-1 *58 11432 R », 1[ 70 8� 3 n 93R IF1 2 ` 'A, ^ / TO [W�F�R5ECT I(� : O'��ay = 25' 1 ' �ew1h VA: 0. '+% L.u13 CO _ _ 251 1011000 PET OR f IITIEF13TECI r C CM PLANOW f YALL W/ R TO F! t 1= T V I*-:.F f:) I*! 1,F C NIH W f DY F&I Fill:W 11010 py; L r S7 j I R'T :7 C') L 3 ("r''. ".'I: Y N sun T poll Q) A 0 0 54 1) (-; 1) 13 Fiji Q. 00 to 0 Q z 13 P t A L 71 I ONAL 3E F T 14 G S; 1 W R IV T F"D G E I-E!,,1 9 11 C G FR E:!-.-.N 0 303 0 Q CAY L fill APP D FT 1 R, 0 'i 57 E. 7 B (1-1 . P.13 C-1 ON 1 4 5,27 7, 7 F3 P 9 C,`i I HIM 1 93 V R F?I n(A V a 1; is if -H- R S EE UF 1 CM 1311 JApygE r 1: 1 r�Fj t..j L- 1UH. . . . . . . . . . wK0 (Nil MOW HOW,! F1 SO i 5 23. q Otis 12 f? 9 1)1 F"h:13 To!jF3F:S PEFF a A r. j!FQQ j I(; n FF B WIS 03 1 YJAL. SE7 1 C y 'X R i- P V, X R i- P I- X PIC, P 1c, Y E:I.L.0 W q YF.0-OW 15. 1,F:YFF L fill 13FRI)T 111E E: G FR F 1)EEL.01 Y LAS 01 P F"n 0 F L.A V APF" US 1 2 F3 17h. 2 jD L- (-)7---,7 C) 1.8 4 F 65.0, F 4:� 0 1-6 1 4 B 191 t B -B 5 1. 172 1; 0 34 E9 T i I I R E C*'I"I f V-1 1) 1 Stec Web s T) T f it 41 A A--'k X--X- il". -X--X. it -N.4. I S)T 7 14 GE D'y I"Irf 1--*E.,,--;-. . . . . . . . SYL A W, F,Y: 1 T cy j: f-0111) 1 1 1 73 y L T 1193 3 71, 1 -oil FR 1 r� T. A L .2 011.1 RPM 13 1) 10, Q V/bi W T y/w min 7_1 5 till Q of cy) W 0 0 00 0 PHI.- t PH 2 r':4_1 _71 H L T' X NIT-31 114 Y T FR 1 P, X p T) P Yj 11 C, ELAMW 1, ED 7) C) FT Fn F? I C-F Lit"iN IF GI�I'--'• V 1171. OAF,F? .7 /f,-1 DELAY Pz 1" L 03 E 13 L.T FR 54 Q 157, 8. 1 i FR. i W !.:1---'7 '2.6 6 S 2 1\1 1-1-H V*-, 'J P-I a f 117 of-11 (':j _ _ _ _ _ -- go 'T OPQ fill" -- I foci MY PH' ( FKi '2 FH 3 pH F Wk I PH 2 Pn 7 F TV 9 EB i T v n� _ r; i ^ r u� : PT v1 : pD 'u -- WB ir x / | x r! t T 1/ « RT GREEM 4) ». » n.n O 0 CREW �ELLOu 5. () 0, » «. o Isl i u6 LANE GRP. V/C G/C DELn L.013 mpp uEn L./Vy 1ApF" | u�R ET El LTR 0, 107 0. 318 13 2 B 15 � w — W8 L 1 . 06p 0. 318 77' 1 F T . 1 », 31g 1 �. 1. TR MB L 0. 0118 0. 094 n _ T 4 76 R 0.224 0. 482 31 m o T 1 . «�9 0. 482 35. 0 D INrEPSECTION: De1ay 7 /sec/ h� _ _ _ -i F V,-, AT 151.0.1 FOR,i AN T, -k 4;. -X--X.--X. -K-X- k it 'i 4.'--h. -,i-i`-i% !—.rR, 1- L.t.E't T 1441. . . . . . . . . . 11 K 0 V FON PRAN 110 M.' F"F?F!j E C:T E Ti 1 `3 FICI t-�'T) J 1 I'Dti-4 W I P.7. P v C1 1�s 1%fill sy-1 R V EV to V;EB I 1 77'1 T t 41 1.1 4 11 07 7 100. CD J L i'3 F H.E I'J IF F-A C T F1 ANT ED K G Q OES NIF NOW E 11 L111 J"T,. j n T chi Q CAM IT LENS 1 H 1.T 'T H TO RT FT T, x PT FS x Ell 'i x Y 1 X x rs Q CO E Y Ell. !,(I W 0 C; 0 7r 0 I-EVEL 0 E L A F 1. C 1 -.1 E C'31R,(*�` Cz./C i)ELAY Lf V%i T R 0 w 5-14 5',;' ,-j C N11 q7.t 4 7 S 9 Ell 6 7 7, 5 1 .......... T 1\1 T Fl..:3,F,C''T 10 V-4, ,.on 7.7 5113"01 17EI RE17" Ir' X.+.iE �e:-A-it:. 1 4? —'k-k--.'i —h 4-.-'K I 1KY"FIERSIECT 1 CIN 1PL1F(-)SAPT1_ VAULPH f-;Tj "RC"t iTE 14 FT E 1) T- P F 0 F ANALAST T) 3: T I ME, Oill c ri 1%'11 i I"PE i 14 IF 1 fS I'I I(-1 1 i C;T T 0', Ey D e qI 9 f? E 0 k i Al R 0 DE oil; A&I Fob fj Ul 1306 F"I JFV P i= 3 F; E D 11 U F n to FT R T V: i T i 00 0 9k) e -p % WICLA L.E 14 G to '71.1 PH 1 P"i PH P i I; FN K I P H 2 M W 05 P H IT 11 Y. T H' X 11-3 L. A T L! R T' RT x P 0 FO D GREEN 20. 1) (D (I GREEN 40. 0 C) 0 C), 0) Y E L.L.0 W 0 0, 0 0 FE L.L.0 W LAVER. f3F1 S E Ff V X C EE E Ej, I _F R. C)n B 0 B C) TS 1 C? 2 C? 15 L.T R 0 32-7 0 T5 C? 71 r7j 6 LTR L 0C) 0 59 3,'�_'_! 2 4 1 11-E:R-S T T C i -1 317 .1 rp c -v r� V H.- 13 Li ON AW Y FR EE P Q R T 41+ to 4,41 it is A.*.;L-, li .-.' X f;.. -X.-?i- N. -,1-4:• i. x.$:,-,i-ii.f4 i!-7:-ti- T i .:f-X, X: N. K -'X is 4,-X­-X-K--k- I t+T'IHMi0-_-T 1 ON PLET143§11IT' V(ALLE't RE) S071 L!"IT-E F- T 1 MEE. . . . . . . . . .hit.MY ITY PEAK HOUR V 01.1141 EK�Til 114 r A E T-i �D U CST TTj TV?21 1 Z1 j Is 117.1 01 Of j G T ill I c it To,j r,w:Fo En i5 F7 vi K it F?E7 E)9 F7 1) t;l 11 1.1 7 0 5 t CM) (MA E3 is 0 41 0 0 L3 1 1_3 IV-4 I S I G 7 F1 F_I PIP 11 ITO 44- F3 P H--.3 E B X T TH x ►H PT R."r x �3 F11 L x T H X R X r;­r G FT En EE M (7)n 0 INVEFL. OF7 MARWECE".: I—W-4E (3314P G lic 1XI L We L.0 13 mw now re 5 0:11 Vil T-3 L T fR 751 i:) ;-3 C, E3 ED LT 1-.;, 171 1:5 17 N T IF 1? IH F:"T:10 1 t 1.'a-v, 29 1 mrs:1 mill 0 1."1,777 j W,1 i no 1 r d jol K�Z P r, T f T vwx vew ( fomm?v is T is h f K is !.--i.--X.--, r...S':f t:••zti:--,. 'S?• ,. .,-'k.*:-.`. -,- -,,: -'i, ;.-.i�: -.z A -X-* -X. T t,1 r IF IR T Cl I Pj,fEj1,3(A1WF kif);j 1;11 91T) "F05(JITE7 750 0 T f)Wi 1 DRT T- .. . . . . . . . . . r;[7 0 114 1: p. . . . . . . Fn p"(1,1 Ej f F7 1) 1 TWO 1,-T QI LQ 1 f AW T FE X PCs IS f Obi WA i RAP STOPIT: f FIN' Q I ED Y3 1r,71 T 7 Too 14FROIS I Ivj ealM FAM Ell ISFUT FOWT 10 F!T)S F"j_D B I T y1p p"F-, 40 C) 11:3 S it ON A L 13 E TT 15 15 13 G Y ME L.G till 141 z- 7 0!. 0 py 1 P FA 11 F H -:1 oo 1+—Of 1A i 1-31 T i3 X, D 0 0 (17 SERVICEE LAM, GIRP. U C G C 111)11H 11—Ay L CO3 AFF—,F---. 112 L.1,17VY, APP. L,rj�15 E- �.-j 37. L 7,F*11 i-) -r,-,L 4 C., 7 r.3 r.. a q 13 El LUT 4) 91,1i,55 0 5,";,7 I T IH C-,E C, I h 0 t 9 E3 L.0 () .1.1 X 4. -h.:;-N,-*,-,.-'k: -�i--X if: ,.-.' 1114 T Fn FR 13 1H C T 1:P M P 1 FF Al A 13 T (%L F"e" 0 NNI,A L . . . . . . . . . . Elf 101MY T. w . I E'7, 7,U. I TO 11 i i 14 V,T T I ij A 1 W I f H I 11- Y,i'7'(- i---.'-F3 I A A WHOWIS FW ul to 41 E! F? TH q t .2. 12. S R A 15 EE 1)U I F"K G T.3 j i-: F WIF FT 1111 S f'.'; y Y; h! to j n 1 J. C) ........... P 1 Fi-I H 5 F"T Q TIVII x. 4311 1. r y 3 IR F-i 2 6 L EYAL. OF SIFIRV E 07F LANEE GFIF" /C 113 0 E L.PI'"' L 0 S 14 F P 1D CE L.AY APF" L 0 CS-) F:13 1:1 R I 1:1 0). E3 9 F F W 13 L,TFR 0 573 1 0 0 1. 5 c c 391 0 7. c 3 7 , 0 5 N TEP*3-[-:*.0 T 1:O"N y so(0 cc h c? 01 _ E�����rr'}/�� SU�!�/\PY PEpJPT _ ************ ***** I�TERSECTlO�. .PLE�SAHT oALLF/ R�. /ROUTE 3 } Air pE. . . . , O7HER TI"PH. ' . . . , . . . mED` tip! PEAK HUUR . pROJFCr�D l990 CCh� [ rIO� WlTH E F'\NSlON EO uR mC Sn -- T| ) iQ 1 Z ^ FG 71 _ U-:ST�Ey! [ F�CTOR� GR��DF �o Oslo J pKy B/ /5FS p10 pp 1D vp pED' RU7 , AMR, T FF v//1 An M� 94 — will 0. /)e 5B 0, `'`/ 3, 0D SISuA/- SFTr [uO iE LE i�TH Px-1 PH-11 P!4-3 P; 4 F* -1 PH-7 E8 Lr x NB LT y -- [ TH X RT k RT X p� pD pr � Rr X __ FD F1/ GPEEw 2`/. 01 40 `` — L [�E LANE GpP, V/C G/C DELAY APP. 1)EL0 LOS EB LTR 1 . 018 0. 3i9 72. 4 F 7�. '� F -- WB LTR 0. 98� 0. 319 44. 2 E 40. 6 E ND LT� 0. 356 0. 597 5� LlP 1 . 009 4 — lmTER5ECTIU ay _ _ _ _ _ 1rip ?|/.>}^ yj I (qM/)L 9U/1MARv RE QPT �����."i. ������� _ INrERSECTION. , FLE�S/�N� VALLE� RO' /ROVTE 30 ARE/) [YF iER ANALYST' . . . , . . DRI -- ' . . . . , ' ' , . n/�2/8H COMMENl . . . . . , ' p�UJECTED /��(� CO/ |DTTlpN uI �* EX�AN5IOu «O| O�ES : GEOmE Rv EP uR ^�n 138 I F RP o ) 2. 0 12. C1 12' » 12. o _ �O`TUSTw�Ml FA�TO�S Gn/\6L | y'' (10'1 PvG B/ /S179 ;11.)S FE7 f). *UT. APn. 7 Ali,E OHG 00 3. 00 SlGM0/. 5ErT 11 5 f7YCLE ENG 9' » rip pHV2 pH-3 Pis I FW ) pH-? pH '3 FH-4 EB Lr x -- [/( X TH x Rr x FiT X PD F� — W8 LT x S8 LT X TH � T* X GR�EN �REEN 4�}. � 0. () 0. � �. 0 vEY'( clod � » L/ nW 6. 0 — LFV�i nF SER»ICE LANE GRP. V/C G/C DELAY LOS APP. DEL/\Y APP. LOS EB LTR 1 . 152 0. 38// 110. 8 F 110, 8 F — WB LTR 0. 550 0. 380 15. 8 C 21 , 5 C NB LTR 0. 8�1 44 2o. 2 C 15. 9 C SB LTR15, 3 � -- INTERSECT [UN� Delay = 39. 2 (sec/ noh/ V/C = 0. 99T LOS = 0 _ _ _ _ f. Y 010, 140 X X ---- O 'T4 wAr a M • L sourM , i4TCLLITC 4040 si4440M t - L Ou4R4r 1 at 3 srca! z �y 6 1 it v _ mT n ® G f oT -T ' l • O l e ! • o v Z d L _ I ► v ! C►t4a� 7 MARI• TRAFFIC IMPACT RE PO R-r / DYNAM IL GONT?, oLY CORP. ' < odTli wit40301. 1CLlT pF dcc Ivy I��� -�r �•.p':• •• .r r QOVERJMDRi r :• J�,-Jet•y..� .i• #\ _. --•_. r � liko Y X X -O R T IITM ; tArELLIrc O ROAD SMgRON ouaRitr •- 1 i : 1 SYCA I r O u I _T m i f -T QT - r ! o v_ a 1 1 c►tArq � <' A r►Rt TRAFFIC IMPACT RE PO RT OYNAri IC GOr/Tt20t Y CORP. f OJ1t, w1N0301. � ., ,•EclJC �7� flly �a► 1 ���/ �o � � - .,L 1�� 7,���^^ `,.orclNtm >~Ilr�pS SD!_ — � s d 2f o 7 S l 0-6-L lio-3 v (3 LId odI'd 1-D vdwI 'D t i a"Or � O 1 . s / i i 1 ' w 14 ® to � j J �YY►np MOyV►�s 10 p.olf to 71l11)1�! k4AOf • M xil 1 Y 40* Ir 1 err .• ,' , .',�.' — �owN 0 t� y U Tio� saam V&U&Ot o (.t7 �(d 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 it-CO ` AREA CODE 203/644-2511 July 1, 1988 Mr. John M. Moran, Jr. , Chairman South Windsor Inland Wetlands Agency/Conservation Commission 1540 Sullivan Avenue South Windsor, CT 06074 RE: Application Review - Dynamic Controls Corporation �� Dear Mr. Moran: This proposal is for an expansion of the existing building and parking lot on Nutmeg Road South. The building is in the existing paved area and wetland soils are not involved. The new parking and detention area shall impact about 1 1/2 acres of wetlands . The source of the wetlands limits has not been designated, it appears to come from the Town Mapping. A permit under Section 5. 2 of the regulations to permit the construction in the wetlands, including excavation for the detention pond, the associated drainage and proposed parking, shall be required. If a permit were granted for this activity, there are some items that should be clarified. I am presuming that it is intended that the detention pond is to be a dry one. Verification of the elevations down stream to assure proper flow should be part of the final plans . Documentation assuring a continued right to drain across lands of others by Dynamic Controls and the Town should be submitted prior to any work on the site. Considering the amount of impervious coverage and the nature of the soils in the detention area, I would suggest a paved pilot trench or gutter arrangement to take the flows through the pond. Also, assuming an approval soon, the timing of the excavationn of the pond should be such to permit vegetative cover to be established per the guidelines . The building construction and the parking lot construction are two separate phases . They can operate independently. The applicant should justify two anti-tracking pads . I see no reason to contaminate the existing parking area. There appears to be construction within feet of the neighbors . Construction limits should be established to avoid any accidental encroachment. Mr. John M. Moran, Jr RE: Dymanic Controls Review 1. Submit documentation providing continued rights to drain from Nutmeg Road South. 2. Verify the elevations sufficiently down stream from the detention pond to assure proper drainage. 3. Modify the detention pond bottom; i.e. , the watercourse to avoid erosion within the pond. Riprap the inlet and outlet areas . 4 . Modify the plans to include the dam or berm specifications . 5. Adjust the schedule to provide vegetative coverage of the exposed areas promptly. 6 . Locate construction limits to not adversely affect the abutters . Very truly yours, Lv A. Bowen Davies Deputy Town Engineer ABD/jsv cc: Al Shaffer, c/o Dynamic Controls Michael J. Gantick, Director of Public Works Marcia A. Banach, Director of Planning John Shemo IWA/CC PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Karl Reichle, Mike Gantick, Mel Stead, Fred Shaw. Date: 7 I' Richard J. Sartcr, Gary Tyler, Fire John Shemo FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the following project: Cz^—" S Subdivision _� Site Plan Residential Commercial _y Industrial Location: �- S At d� N1'+M!J W • S6`�`N''Gals � I W Project Description: co Future Town-owned property involved? YES NO (a) new streets ( existing frontage also) (b) new open space/recreation area active passive (c) new detention area Planning Department comments: Please let me know by if you will have comments on this application so that I can follow up with your department when I do a Plannin Department report. �� �r2.•.e..' U•,'`/i hvd/v-c., aG-o C16 PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM Date. 71, I TO: Karl Reichle, Mike Gantick, Mel Stead, Fred Shaw, Ridard J. Sart0r, Gary Tyler, Fire Marshal Tanning, John Shemo FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the following project: bSjn, L,,4,, S Subdivision �_ Site Plan Residential Commercial _- Industrial Location: Q �- Sld.t 4� Project Description: Co&l s4T'' � r CX 5f6 el) Future Town-owned property involved? YES - )< NO (a) new streets ( existing frontage also) (b) new open space/recreation area active passive (c) new detention area Planning Department comments : Please let me know by I I J' 3 if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. 04C &5X/f/7V6 bul4dzV4 7 OE A&) c. UCTU z SC7,-S)YPO-r RNv F106b. &j) 1(L7yls 7b WiD, hb4 or N&) 6o1Q1,u( 7-tee-w(. kot b6�i l",- /,,g 2A,16 J*' iFr 3R? �N-/Fi� �1(/J-rLs 0 to m i4u �1u��P�ieS �� �►roc C� 1'T SdE or , card - 9�F.O/�ac� l�� ,! fmA- it. SHAU". Or A)101"6- gy ft ov A74.4 8 NUTMEG ROAD SOUTH POST OFFI 0 BOX 73 SOUTH WINDSOR, CONNECTI1 LO6Pi41988 DYNAMIC CONTROLS CORPORATION 203 528-9971 TWX. 710 425-1994 South Windsor Planning & Zoning Commission South Windsor Planning July 6, 1988 & Zoning Commission Letter No: JAS-88-07-003 South Windsor Town Hall 1540 Sullivan Avenue South Windsor, CT 06074 Attention: Raymond F. Hallowell Jr., Chairman Subject: Planning and Zoning Request For Extension of Time Limit for DCC Site Plan Filed 6/28/88 Reference: Telecon, Planning and Zoning Office to J.A. Shaffer on 7/1/88 Dear Ray, Dynamic Controls Corporation (DCC) was requested via the reference telecon to grant the P&ZC a 65 day extension beyond the normal 65 days permitted for action by the Zoning Regulations on our site plan application submitted on 6/28/88. I understand the problems facing P&ZC because of your already busy schedule for the month of July and the fact that the Commission does not meet during the month of August. DCC is somewhat reluctant to agree at this point in time to a full 65 day extension however. Our company has been involved in a United States Air Force sponsored program to modernize our existing facilities. We are under contract to the Air Force thru General Dynamics Corporation in Fort Worth, Texas to accomplish this modernization. Included under this contract is a project to rearrange our manufacturing facilities including consolidation of existing offsite facilities on Edwin Road and Nutmeg Road North. Unfortunately we cannot complete this project and close out our Air Force contract which is currently delinquent until we obtain site plan approval. Most of the delay in our program was caused by delay in acquiring additional land for expansion. We have purchased two acres of land from M.G. Realty immediately to the north of our existing property. The acquisition of this property was delayed while M.G. Realty obtained subdivision approval and negotiations were completed. 8 NUTMEG ROAD SOUTH - POST OFFICE BOX 73 SOUTH WINDSOR, CONNECTICUT 06074 OVNAMIC CONTROLS CORPORATION 203 528-9971 TWX• 710 425-1994 DCC is being pressured to complete our Air Force Contract. In addition we are bursting at the seams in our present 8 Nutmeg Road facility and need additional space to handle our present and projected business. This situation would exist whether we had the Air Force contract or not. We would solicit whatever support the P&ZC can provide in obtaining early action on our site plan application. We will work with the Commission in any way necessary to assure action on our application. We would request that P&ZC consider a DCC offer for a 30 day extension at the present time. If circumstances make it impossible to meet the original or extended dates we will certainly work with you and the Commission to accommodate your needs. We would just like to make you aware of the pressure DCC is under to obtain site plan approval. cc: S. Sceery Very truly yours, BCC: J.J. Woodcock, III PC DYNAMIC CONTROLS CORPORATION 9.a. Ae-t'v J.A. Shaffer Modernization Program Manager pow N sE,44 �Id 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ftios0R_co�� AREA CODE 203/644-2511 July 12, 1988 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works RE: Engineering Review - Dynamic Control Please find enclosed the SEA review letter for the subject application. Should you have any questions, please feel free to contact me. MJG/jsv cc: Project File P & Z Correspondence Y - Y arm July 12, 1988 • S E A Consultants Inc. Engineers/Archit cts Principals Mr. Michael J. Gantick, P.E. Arnold B.Goldstein,P.E. Director of Public Works Fred rick G.Aufi ro,P.E. Town of South Windsor Robert M.Brandon,A.I.A. 1540 Sullivan Avenue St ph n H.Geribo,P.E. David T.Goodemote,PE. South Windsor, Connecticut 06074 Bruce E.Soule,P.E. Kenn th M.Stewart,P.E. Re: Dynamic Controls Anthony J.zu na,PE. Job NO. 88126.33 Associates Task Order No. 33 Steven L.Bernstein,P.E. Paul F.Gabriel,P.E. Mark Gould,P.E. Dear Mr. Gantick: Michael S.Schultz,P.E. Arthur A.Spruch,PE. As requested, S E A Consultants Inc. has reviewed the following Paul C.Ross,P.E. for the above referenced project: Sheet No. Title Prepared By Date 1 of 8 Title Sheet Lucek Engineering 3-1987 2 of 8 Plot Plan It 3-1988 3 of 8 Topographic Plan it 3-1988 4 of 8 Site Plan " 3-1988 6 of 8 Conservation Details " 6-1988 S-1 Roadway and Storm " 1-1979 Drainage Details S-2 Sanitary Sewer Standards " 1-1979 Storm Sewer Catchment " 3-1988 Areas - Drainage Computations " 6/1988 This information was reviewed for compliance with the Town of South Windsor Subdivision and Zoning Regulations dated July 24, 1972, and standard engineering practice. We note the following: Section 4.13.2.2 ARCHITECTURAL ELEVATIONS Architectural elevations and plans of the proposed building addition were not submitted and were therefore not part of 850 Silas Deane Highway this review. Wethersfield,CT 06109-3412 (203)721-7993 485 Massachusetts Avenue Cambridg ,MA 02139-4018 (617)497-7800 Citicorp Park West 100 Foden Road South Portland,ME 04106-2319 (207)775-2281 Mr. Michael J. Gantick, P.E. SEA C nsultants Inc. July 12, 1988 Engine rs/Architects Page Two Section 4.13.2.3 PLOT PLAN C. The rear building line should be indicated on the plan. g. The existing monument should be coordinated and indicated on the plan. Section 4.13.2.4 TOPOGRAPHIC MAP b. Pavement widths for proposed entrances/exits should be shown on the map. Section 4.13.6 CONSERVATION PLAN Soil classification symbols have been shown on the Site Plan. The drainage calculations include soil descriptions. However, the soil boundaries should be delineated and soil types defined on the plan. The source from which the wetland limits were obtained should be indicated. All sedimentation and erosion control measures should be indicated and labeled on the plan. Section 5 AREA, YARD AND HEIGHT REQUIREMENTS 5.2 The minimum lot area for an industrial zoned parcel V/' is 20,000 s.f., not 40,000 s.f. as indicated in the zoning data block of the Title Sheet. Section 8 OFF STREET PARKING 8.4 The total office area should be provided in order to compute the required number of parking spaces. The plot plan indicates a total of three handicap parking spaces. However, based upon the parking requirements of 1 handicap parking space per 25 spaces provided, a total of 15 spaces should be provided. GENERAL COMMENTS 1. The Landscaping Plan has not been included in the set of plans submitted and is therefore not part of the review. 2. A detailed cross-section of the proposed concrete retaining wall should be included in the plans. 3. The top-of-frame elevation of the outlet structure detail on sheet 6 does not correlate with the elevation shown on the topographic map. Mr. Michael J. Gantick, P.E. July 12, 1988 S E A C nsultants Inc. page 2 Engineers/Architects 4. Storm sewer system design calculations indicate a minimum Tc of 5 minutes. However, the engineer is using inlet times less than 5 minutes in his calculations. The rainfall intensities should be revised to reflect the minimum Tc.6efomern-acem I te' mv4ew---cair-be-eempleted. 5. Storm sewer design calculations for drainage line segment #13, - #14 have not been provided. 6. Peak dicharge rates for pre- and post-development conditions should be recalculated based upon the following observation. It appears that the engineer has used the runoff depth (Q) in place of the rainfall depth (P) in determining Ia/p. Therefore, the unit peak discharges (q) are incorrect and the detention basin calculations should be revised based upon the corrected rates. If you should have any questions, please do not hesitate to call me. Very truly yours, S E A CONSULTANTS INC. < 43=.- da mes R. Bancroft, P.E. JRB:mp 710w� Oles �. 9 � 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 k�~osoR-co��� AREA CODE 203/644-2511 July 13, 1988 Dynamic Controls Corporation 8 Nutmeg Road South South Windsor, CT 06074 Re: Application #88-62P - Dynamic Controls Gentlemen: At the July 111 1988 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved with modifications Application #88-62P for the construction of an industrial building located on the east side of Nutmeg Road south, north side of Pleasant Valley Road, I zone as shown n 317187 h plans ans prepared by Lucek Engineering Assoc. ,Inc. datedrevised 3115188. The following modifications must be adhered to for this permit to be valid: 1 . Three (3) blueprint copies of the approved map with all modifications be submitted to the IWA/CC within 65 days for review prior to any construction activity on the site. 2. Construction activities shall be subject to the approval of the Town Engineer. 7 7 .-..... J..L... M- - ,3. The application Small indemnify and hold harmless .11C LW n of South Windsor against any liability which might result from the proposed operation or use. (J4 We recommend a bond in the amount of $8000. to be submitted to Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures. 5. The permit is valid for one year and shall expire on July 11, 1989. 6. All approvals required must be obtained and submitted prior to any activity on the site. 7. Submit documentation providing continued rights to drain from Nutmeg Road South. 8. verify the elevations sufficiently down stream from the detention pond to assure proper drainage. 9. Modify the detention pond bottom; i.e. , the watercourse to avoid erosion within the pond. Riprap the inlet and outlet areas. 10. Modify the plans to include the dam or berm specifications. 11 . Adjust the schedule to provide vegetative coverage of the exposed areas promptly. 12. Locate construction limits to not adversely affect the abutters. 13. Grease trap should be located in the catch basin. Very truly yours, John M. Moran, . , Chairman JXMJr. /pmm Enclosures cc: A.B. Davies, Deputy Town Engineer Marcia A. Banach, Director of Planning John R. Collins, Chief Building Official Raymond Hallowell, Chairman, Planning & Zoning Michael Gantick, Director of Public Works Lucek Engineering Assoc-, Inc. �N s f,< y r _0�� 0-le S_0 ?d&&41at O � G V 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ��osoR•co�'� AREA CODE 203/644-2511 July 13, 1988 Dynamic Controls Corporation 8 Nutmeg Road South, South Windsor, CT 06074 RE: Application #88-62P Gentlemen: Section 4. 13. 6 of the Zoning Regulations, Conservation Plan (a copy enclosed) establishes the criteria for such a plan and a method of monitoring its application. A permit for your proposal was granted, with a bond as assurance of compliance with its sedimentation and erosion control measures. To assist in the review process by the Inland Wetlands Agency/Conservation Commission, whether for a permit extension or specific inquiry request, the provisions for verification through progress reports by the developer' s/applicant' s Engineer demonstrating that each Erosion and Sedimentation control measure has been installed and maintained, in accordance with the approved plan shall be required. It is requested that this verification report be submitted at least two weeks before the regular meeting of the IWA/CC to permit time for the Commissioners to evaluate your project controls. Very truly yours, A. Bowen Davies Deputy/ own Engineer ABD/pmm O C _ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR-CO AREA CODE 203/644-2511 July 13, 1988 Mr. Al Shaffer 8 Nutmeg Road South South Windsor, CT 06074 Re: Application #88-062, Dynamic Controls Corporation Site Plan Dear Mr. Shaffer: Attached is a copy of comments from the Planning and Engineering Departments regarding the above-referenced application. Please make the necessary revisions to the plans and submit 6 complete sets (including architectural elevations, landscaping plans, etc. ) to the Planning Department. If you have any questions regarding the comments or the procedure, please contact me. Very truly yours, Marcia A. Banach Director of Planning cc: Town Engineer 13 DYNAMIC CONTROLS - PLANNING DEPT. REVIEW COMMENTS Topographic Map - Dumpster to be on concrete pad & screened LANDSCAPING PLAN NEEDED STORCH 161 MAIN STREET CONNECTICUT 06109 ASSOCIATES 1-203-529-7727 July 15, 1988 HE, -r iED Mr. William Stoeckert JUL Executive Director State of Connecticut VATE TRAFFIC C4MMiSSION Department of Transportation r3jZ-ftSv7 -a j State Traffic Commission 24 Wolcott Hill Road Wethersfield, Connecticut 06109 Re: Determination of Certification Requirements Dynamic Controls Building Expansion Nutmeg Road South South Windsor, Connecticut Dear Mr. Stoeckert: Enclosed please find four (4) sets of plans for the company building expansion of Dynamic Controls located-,on the east side of Nutmeg Road South, immediately north of Pleasant Valley Road. The existing building has a G.S. F. of 65,000 S. F. with parking facility for approximately 260 vehicles. The project is planned to accommodate a total building area of approximately 126,000 G.S. F. and expanded parking facility to accommodate a total of 446 vehicles as shown on the proposed site plan prepared by Lucek Engineering Associates. It should be noted that this proposed building expansion is a consolidation *of company operations that presently utilize 3 other buildings in the area. Signalized intersections in the vicinity of the site are the following: - ° John Fitch Boulevard (Route 5)/Pleasant Valley Road ° John Fitch Boulevard (Route 5)/South Satellite Road ° Pleasant Valley Road/Ellington Road (Route 30) We are also enclosing plans indicating a distribution of site generated traffic to the area roadways for both AM and PM peak hour traffic. These volumes are based on the Institute of Transportation Engineers (ITE) rates and have been assigned in accordance with employee residence data provided by the personnel division of Dynamic Control Corporation. This distribution was compared to the CRCOG Journey to Work Trip Studies for the Town of South Windsor and found to be similar. MASSACHUSETTS NEW JERSEY NEW HAMPSHIRE RHODE ISLAND NEW YORK • Mr. William Stoeckert STORCH July 15, 1988 Page 2 ASSOCIATES As a result of our analysis, it is estimated that 650 of the site generated traffic would use John Fitch Boulevard (Route 5); 27% to the north via South Satellite Road and 38% to the south via Pleasant Valley Road and 33% would use Pleasant Valley Road east to Ellington Road (Route 30) . We request that this material be reviewed and that we be advised if formal certification under Section 14-311 of the Connecticut General Statutes will be required. ,Very truly yours, STORCH ASS C A a ' i James W. Ford, P.E. Associate JWF/DRI/laf Enclosure 4877 I STATE OF CONNECTICUT MEMBERS TRAFFIC COMMISSION Commissioner of Transportation Department of Transportation Commissioner of Public Safety Commissioner of Motor Vehicles 24 Wolcott Hill Road • P.O. Drawer A �'"""'' Wethersfield, Connecticut 06109 Phone: 566-5228 July 25,- 1988 Mr. James W. Ford Storch Associates 161 Main Street Wethersfield Ct 06109 Re: STC# 132-8807-01 Dear Mr. Ford: rt Y Subject': Dynamic Controls Building Expansions Nutmeg Road South Town of- South Windsor As a result of your July 15 submission, we are asking the Bureau of Planning and the Bureau of Highways' Division of- Traffic to review the data to determine if the- site generated traffic will substantially affect state highway traffic. This office will advise you of the conclusion of the study and if a Certificate will be required pursuant to Section 14-311 of the General Statutes of Connecticut, as revised. Very truly yours, AJA. /�— William W. Stoeckert Executive Director cc: Chief Gary K. Tyler Mr. Thomas D'Auria An Equal Opportunity Employer PLANNING AND ZONING COMMISSION 2 JULY 26, 1988 2. Appl. #88-62P Dynamic Controls Site Plan east side Nutmeg Road South, I Zone (action 10 03) . Mr. Castro disqualified himself from participation in this matter. Al Shaffer represented the applicant. He reviewed the company's history and expansion projects in the Town, commenting that this 62,000 sq. ft. addition was part of a much needed expansion program. Town Planner Marcia Banach read her report: 1 . The proposed 2-story addition of 61,420 sq. ft. has a 30,710 sq. ft. footprint added onto a 65,000 sq. ft. existing building. Building height is 25'-6" . Impervious coverage 74%; 75% allowed. The site is completely surrounded by I-Zoned and I-used property. To the east is the Fishman property for which a site. plan has been approved; - to the north is a recently-approved I lot in Nutmeg Commercial Center; to the west is the newly- reconstructed Fishman site; and to the south across Pleasant Valley is Jeffrey Drive with its industrial buildings . 2. Just under 450 parking spaces have been provided; these are required by Dynamic Controls for its employees . ZBA has granted a variance to the size of parking spaces, reducing them from the required 10 x 20 to 9 x 18. There are currently 5 curb cuts onto Nutmeg Road; this proposal includes a reduction in the number of curb cuts to 4 total on Nutmeg Road. There is an existing truck bay on P1 asant Valley Road which will remain; however, the bulk of the loading will be transferred to a new loading dock at the northeast corner of the building. The majority of the pavement in front of the building on Pleasant Valley Road will be removed and replaced with landscaping. 3 . Public water and sewer are available. The Superintendent of Pollution Control has noted that if the addition will involve discharge of industrial process water or total flow greater than 5000 gal. per day, a DEP discharge permit is required. The Fire Marshal requests sprinklering. 4 . An STC permit may be required for this site. A request for determination has been submitted to STC. 5 . There are regulated wetlands on the site. IWA/CC approval has been obtained with the following conditions: 1 . Three (3) blueprint copies of the approved map with all modifications be submitted to the IWA/CC within 65 days for review prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. PLANNING AND ZONING COMMISSION 3 JULY 26, 1988 3. The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount of $8000 . to be submitted to Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures. 5 . The permit is valid for one year and shall expire on July 11, 1989 . 6 . All approvals required must be obtained and submitted prior to any activity on the site. 7 . Submit documentation providing continued rights to drain from Nutmeg Road South. 8. Verify the elevations sufficiently down stream from the detention pond to assure proper drainage. 9 . Modify the detention pond bottom; i .e. , the watercourse to avoid erosion within the pond. Riprap the inlet and outlet areas . 10. Modify the plans to include the dam or berm specifications. 11 . Adjust the schedule to provide vegetative coverage of the exposed areas promptly. 12. Locate construction limits to not adversely affect the abutters. 13 . Grease trap should be located in the catch basin. 6 . Landscaping is a bit difficult, given the large amount of parking which Dynamic Controls requires . There will be new landscaping along Pleasant Valley Road where there is existing pavement. Unfortunately, the Public Works Director has indicated that the proposed plantings in the Town right-of-way along Nutmeg Road will have to be relocated within Dynamic Controls' property lines . It would also be nice to see some more variety in the shrubs -- the bulk are juniper of various types . 7 . Dynamic Controls is the Town's third largest employer. This project will generate new employment in addition to the consolidation. The applicant's ability to annex land and reduce impervious coverage, given that the abuttors are industrial developers themselves, appears to be severely PLANNING AND ZONING COMMISSION 4 JULY 26, 1988 limited. Dynamic Controls is a valuable asset to South Windsor, and the Town would like to retain the company's business . It is recommended that positive action be taken on this application. B . Comments from the SWPD are: a. Dynamic Controls is requested to transfer lighting from rear of existing building to rear of new structure and to add lights to the west side of the new building. b. Provide parking lot lighting if second and/or third shift exists. c. Eliminate the Junipers along the roadway on the west side of the building and replace them with shorter shrubbery for a better view of the building by police on patrol. If approved, the Planning Department would like the following modifications: - Note on the site plan that dumpster is to be on concrete pad and screened. Ms . Banach reviewed the Engineering Department notes: 1 . Right to drain from Nutmeg Road through the property at the existing 24" pipe is requested from the applicant. 2. Pipe must be sized to accommodate flows from Nutmeg Road. 3 . All drainage will be subject to the approval of the Town Engineer. 4. Minimum lot area for an industrial zoned parcel is 20,000 sq. ft. , not 40,000 sq. ft. as indicated in the zoning data block of the Title Sheet. 5 . The plot plan indicates a total of three handicap parking spaces . However, based upon the parking requirements of 1 handicap parking space per 25 spaces provided, a total of 15 spaces should be provided. 6 . A detailed cross-section of the proposed concrete retaining wall should be included in the plans. 7 . The top-of-frame elevation of the outlet structure detail on sheet 6 does not correlate with the elevation shown on the topographic map. PLANNING AND ZONING COMMISSION 5 JULY 26, 1988 8. Storm sewer system design calculations indicate a minimum Tc of 5 minutes. However, the engineer is using inlet times less than 5 minutes in his calculations . The rainfall intensities should be revised to reflect the minimum Tc. 9 . Storm sewer design calculations for drainage line segment #13 - #14 have not been provided. 10. Peak discharge rates for pre- and post-development conditions should be recalculated based upon the following observation. It appears that the engineer has used the runoff depth (Q) in place of the rainfall depth (P) in determining Ia/p. Therefore, the unit peak discharges (q) are incorrect and the detention basin calculations should be revised based upon the corrected rates . Commission members discussed the application, with concerns expressed regarding drainage, additional plantings, tree preservation, appearance of the building's exterior, and parking. Mrs . Montana made a motion to approve the application subject to the following modifications: 1 . Prior to commencement of any site work, a meeting must be held with Town Staff. 2 . No building permits will be issued until the final mylars have been filed in the Town Clerk's Office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations . 5 . A landscape bond in the amount of $ 10,000 is required and must be submitted prior to filing of mylars . 6 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7 . Note that dumpster is on concrete pad and screened. 8 . We request that the applicant provide right-to-drain from Nutmeg Road South into the existing 24" RCP, and that pipe be sized to accommodate flows from Nutmeg Road. 9 • Change minimum lot size in data table from 40,000 sq. ft. to 20,000 sq. feet. PLANNING AND ZONING COMMISSION 6 JULY 26, 1988 10 . Detailed cross-section of proposed concrete retaining wall is needed. 11 . Top of frame elevation of outlet structure detail on Sheet 6 must be correlated with the elevation shown on the topographic map. 12 . Revise rainfall intensities in drainage calculations to reflect minimum time of concentration of 5 minutes . 13 . Detention basin to be sized to handle Nutmeg Road drainage, per Town Standards . Drainage is subject to approval of the Town Engineer. 14 . Provide parking lot lighting if second/third shift exists . Transfer lighting from rear of existing building to rear of new building and add lights to west side of new building. 15 . Shrubbery along west side of building should be very low, for better view of building by police on patrol . 16 . Building to be sprinklered. 17 . Revise parking along west side of building to be one-way angle parking, and provide landscaped strip along Nutmeg Road. A tree in each island in the parking lot is also required (check streetscape for Parkcentre for tree types) . 18 . Extend walkway through entire parking lot to building entrance. 19 . Flag large trees in detention basin for preservation. Black and white transparent mylars of Sheet #2 with the above modifications, together with three blueprint copies of the entire set of plans, must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. Mrs . Rossi seconded Mrs . Montana's motion with the above modifications, and the motion carried 5-0. lk 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ~°soR-co AREA CODE 203/644-2511 July 28, 1988 Dynamic Controls Corp. 8 Nutmeg Road South South Windsor, CT 06074 Attn: Al Schaffer re: Appl. #88-62P, Dynamic Controls Corp. Site Plan Gentlemen: We are pleased to advise that the Planning and Zoning Commission voted at its July 26, 1988 meeting to approve the captioned application for a site plan of development in accordance with Drawings #1 through 8 of 8 prepared by Lucek Engineering Associates dated 3-15-88, Project No. 88-15 and with the following modifications: 1 . Prior to commencement of any site work, a meeting must be held with Town Staff . 2. No building permits will be issued until the final mylars have been filed in the Town Clerk's Office. 3. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations. 5 . A landscape bond in the amount of $ 10,000 is required and must be submitted prior to filing of mylars . 6 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. Dynamic Controls Corp. -2- July 28, 1988 7 . Note that dumpster is on concrete pad and screened. 8 . We request that the applicant provide right-to-drain from Nutmeg Road South into the existing 24" RCP, and that pipe be sized to accommodate flows from Nutmeg Road. 9 . Change minimum lot size in data table from 40,000 sq. ft. to 20,000 sq. feet. 10 . Detailed cross-section of proposed concrete retaining wall is needed. 11 . Top of frame elevation of outlet structure detail on Sheet 6 must be correlated with the elevation shown on the topographic map. 12 . Revise rainfall intensities in drainage calculations to reflect minimum time of concentration of 5 minutes . 13 . Detention basin to be sized to handle Nutmeg Road drainage, per Town Standards . Drainage is subject to approval of the Town Engineer. 14 . Provide parking lot lighting if second/third shift exists . Transfer lighting from rear of -existing building to rear of new building and add lights to west side of new building. 15 . Shrubbery along west side of building should be very low, for better view of building by police on patrol. 16 . Building to be sprinklered. 17 . Revise parking along west side of building to be one-way angle parking, and provide landscaped strip along Nutmeg Road. A tree in each island in the parking lot is also required (check streetscape for Parkcentre for tree types) . 18 . Extend walkway through entire parking lot to building entrance. 19 . Flag large trees in detention basin for preservation. Black and white transparent mylars of Sheet #2 with the above modifications, together with three blueprint copies of the entire set of plans, must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . rZ Dynamic Controls Corp. -3- July 28, 1988 After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, P ING AND ZONING COMMISSION yiGd'•.c Ra and F. Hallowell, J . Chairman cc: M. Gantick, Director of Public Works F. Shaw, Supt. of Pollution Control J. Collins, Chief Building Official E. Belleville, Assessor W. Lanning, Fire Marshal M. Banach, Planning Director Registrar of Voters Inland Wetlands Agency/Conservation Commission PZC File Arch. /Engineer Applicant y r Tio 0-1 � �• o � 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 �'►osoR,co�'� AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, JULY 30, 1988 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At its July 26, 1988 meeting, the Planning and Zoning Commission voted to take the following action: 1 . Approve, with modifications, the application of Thomas Juknis for a farm stand / greenhouse on property on the west side of Sullivan Ave. north of Pierce Road, RR Zone. 2. Approve, with modifications, Appl. #88-62P, Dynamic Controls, for a Site Plan of Development for property on the east side of Nutmeg Road South, I Zone. 3. Approve, with modifications, Appl. #1327P, Irene E. Guay, for a Conventional Subdivision of 17 lots to be known as Cliffwood Estates on 17 .5 acres of land located east of Lawrence Road, north of Cliffwood Drive, A-30 Zone. = 4 . Approve, with modifications, Appl. #88-23P, Alexander Terlizzi for a Site Plan of Development for Lot #3 Sea Pave Road, north side of Burnham St. , I Zone. 5 . Approve, with modifications, Appl. #88-33P, David A. Brown for a Site Plan of Development for property at the northeast corner of Governor's Highway and Nutmeg Road North intersection, I Zone. Dated at South Windsor, Connecticut this 27th day of July, 1988 . PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. , Chairman Marshall Montana, Secretary �, -i.Mk. t'TR:y%w;".'�_f b� i�..1.•ti Nr.4" - -' .+'ne_ i "�"lt S '_ a:'q-^, -' _ ••.. _. "_-, ., -" , t,, - Y� �+: .+:;p aG.,'� j��_�, :±"�* - �'°`,w.a i„.f-•':t.,µ'th:X::i.'4;'i'y - - -a, - . ,,f. -. „r f. ;ant +7 i3.y.2y'b; �" N`l9avte'•l t_h"Y µ1 ✓. �`{yq}S,D"� +•'_ ' -�,J,'�: �-.r`y4_"' �`� t r ,7, ✓'fY.'•-rJ t - . _ Y ' TRH.eA. ' a'� ;��"�"Y^4,d y_Y...,..Yu`iit_ " r - - .- _- .„ ,• _ .At O STRCH • STREET • v WETHERSFIELD, CONNECTICUT 06109 1-203-529-7727 ASSOCIATES August 24, 1988 Mr. ,William Stoeckert Executive Director State .Traffic- Commission yState"oUConnecticut _:,Department "of .Transportati on '`24 Wolcott Hill '-Road ,',.Wethersfield,'Connecti cut -06109 RECEIM Subject: .Dynamic Controls Expansion • ,, �,n� ----1 Town of South Windsor �' Determination Request 3. STATE CCIMS ION ac Dear Mr:Y;Stoeckert: µ Enclosed are four. (4) sets of the additional information requested by Mr. Patrick Bush from the Division of Traffic in our telephone conversation on August 199 1988. Mr. Bush requested the number of -employees by shift for the existing and proposed Dynamic Controls facility on Nutmeg Road in South Windsor. In addition, trip generation data based on the number of employees was requested. The employee,data is presented in Table 1. Table 1 Emp oyee Data Shift Existin Proposed 7:30 am to 4:00 pm- 77 155 8:00 am to 5:00 pm 268 290 3:30 pm to Midnight 23 29 11:30 pm to 8:00 am 5 6 In determining the peak hour generation rates, the data from the first two- shifts was used. The trip generation volumes based on the 1987 I.T.E. Trip Generation book is shown in the attached summary sheets. These calculations indicate an increase in daily traffic of 302 trips. The a.m. peak increase was 45 trips with 37 entering and 8 exiting trips. The p.m. peak hour increase was 43 trips with 10 entering and 33 exiting. STORCH ASSOCIATES Mr. William Stoeckert - August 24, 1988 Page Two Based on 100 new employees, we concluded that the 'I.T.E. average rates were low for the a.m. entering and p.m. exiting volumes. �We expect a ,vehicle occupancy rate of 1.25 persons per vehicle. This results -in a trip generation rate of 0.8 trips per employee. Thus, we would expect 80 entering trips during the morning peak and 80 exiting trips during the afternoon peak. The exiting a.m. peak rates and the entering p.m. peak rates were determined to be reasonable. Therefore, the following peak hour volumes can be expected based on employee data: A.M. -Peak: P.M. Peak: Enter: 80 Enter: "'JO j Exit: 8 Exit: � 80 Total 88 :>: ' Total: ""90 .. . .We are also enclosing .four (4) -copies of..,the South Windsor Planning & Zoning Commission site plan -approval .- --The approval -required minor modifications of the site plan to include angle.parking -in front and a walkway which passes through three rows of parking. ; This results in a loss of about 10 parking spaces. Four (4) copies of the revised site plan are enclosed. If you need any additional information.to-complete your.determination of ° a: . a certification requirements,' pl ease-contact our-office. Very truly yours, STORCH ASSOCIATES 4� V- --; James W. Ford Partner David L. Spear Traffic Engineer Enclosures cc: Mr. J. Alvin Shaffer, Dynamic Controls Corporation 4877 DLSWSI IV �- STATE OF CONNECTICUT MEMBERS TRAFFIC COMMISSION Commissioner of Transportation Department of Transportation Commissioner of Public Safety Commissioner of Motor Vehicles 24 Wolcott Hill Road • P.O. Drawer A Wethersfield, Connecticut 06109 Phone: 566-5228 August 26, 1988 Mr. James W. Ford Storch Associates 161 Main Street Wethersfield CT 06109 Re: STC# 132-8807-01 Dear Mr. Ford: Subject: Dynamic Controls Building Expansion Nutmeg Road South Town of South Windsor The Bureau of Highways' Division of Traffic Engineering has indicated that additional data is required in order for the review of the subject development to be continued. The enclosed comments detail the data required. Four (4) copies of the data should be forwarded to this office. Should you have any questions with regard to this requested data, please contact Mr. William A. Peace (Telephone 566-5120) . Very truly yours, L li'a William W. Stoeckert Executive Director cc: Chief Gary K. Tyler Mr. Thomas D'Auria An Equal Opportunity Employer A discrepancy exists between the amount of additional site -- traffic due to the 61 ,000 square foot expansion and the amount of ad- ditional parking proposed. The submitted trip generation is cons istent---� 15(0 with I.T.E. values for light industrial use; however, the addition of` 168 , ' parking spaces for the addition of 68 vehicle trips in the am peak an8­72 in the pm peak is inconsistent. To clarify this matter, the following data should be submitted: 1 . Existing number of employees at the facility. 2. Proposed number of employees at the facility. 3. Working Hours of the facility (Number of shifts and the hours of each) . 4. Trip generation based on the Number of Employees. 0�- 1 � )- 8 NUTMEG ROAD SOUTH • POST OFFICE BOX 73 SOUTH WINDSOR, CONNECTICUT 06074 DYNAMIC CONTROLS CORPORATION 203 528-9971 TWX: 710 425-1994 August 30, 1988 RKS-88-281 Town of South Windsor 1540 Sullivan Avenue South Windsor, CT. 06074 Attention: Marcia A. Banach, Director of Planning Subject: Right-to-Drain From Nutmeg Road South Into Existing 24" RCP on Dynamic Controls Property References: (1) Letter Town of South Windsor to Dynamic Controls Corporation dated July 13, 1988, re: Inland Wetlands/ Conservation Commission Approval with Modifications of Dynamic Controls Application #88-62P (2) Letter Town of South Windsor to Dynamic Controls Corp. dated July 28, 1988 re: Planning and Zoning Commission Approval with Modifications of Dynamic Controls Application #88-62P Dear Ms. Banach: Item 7 of Reference (1) letter and Item 8 of Reference (2) letter both request Dynamic Controls Corporation (DCC) to provide to the Town of South Windsor a right-to-drain from the storm sewer system for Nutmeg Road South into an existing 24" RCP which crosses DCC property and empties into a stream flowing Easterly into the Podunk River opposite Veterans Memorial Park. DCC agrees to grant the Town of South Windsor a right-to-drain from Nutmeg Road South through the above described 24" RCP, which right-to-drain has previously existed. The Town of South Windsor will have access across DCC property for maintenance and/or repair of the 24" RCP line crossing DCC property upon request to and approval by DCC. Such approval will not be withheld without just cause. After any maintenance, repair, replacement, or other activity on said 24" RCP line, the Town of South Windsor will return any DCC property disturbed during such activities to its original condition in an expedited manner in order to avoid unnecessary inconvenience to DCC. Very truly yo r , DY M C TROLS CORPORATION R. K. Sceery Secretary cc: John J. Woodcock III STATE OF CONNECTICUT MEMBERS TRAFFIC COMMISSION Commissioner of Transportation DeP ✓ Transportation artment of Commissioner of Public Safety Commissioner of Motor Vehicles 24 Wolcott Hill Road • P.O. Drawer A Wethersfield, Connecticut 06109 Phone : 566-5228 September 2, 1988 Mr. James W. Ford Storch Associates 161 Main Street Wethersfield, CT 06109 Re: STC# 132-8807-01 Dear Mr. Ford: Subject: Dynamic Controls Building Expansion Nutmeg Road South Town of South Windsor This is to confirm receipt of your letter dated August 24, 1988. The letter and data will be forwarded to the Bureau of Highways' Division of Traffic Engineering for their review. Very trul yours, 000f illiam W. Stoeckert Executive Director cc: Chief Gary K. Tyler Mr. Thomas D'Auria An Equal Opportunity Employer STATE OF CONNECTICUT MEMBERS TRAFFIC COMMISSION Commissioner of Transportation Dep ✓ Transportation artment of Commissioner of Public Safety Commissioner of Motor Vehicles 24 Wolcott Hill Road • P.O. Drawer A ' ""�• Wethersfield, Connecticut 06109 ow Phone : 566-5228 September 19, 1988 Mr. James W. Ford Storch Associates 161 Main Street Wethersfield CT 06109 Re: STC# 132-8807-01 Dear Mr. Ford: Subject: Dynamic Controls Building Expansion Nutmeg Road South Town of South Windsor This office has been advised by the Division of Traffic Engineering that the expansion of the Dynamic Controls Building will not substantially affect state highway traffic at the following intersections; Ruote 5 at Pleasant Valley Road, Route 5 at South Satellite Road, and Route 30 at Pleasant Valley Road. Therefore, a certificate will not be required pursuant to Section 14-311 of the General Statutes. Very truly yours, P"r William W. Stoeckert Executive Director cc: Chief Gary K. Tyler/ Mr. Thomas D'Auria An Equal Opportunity Employer g r Ole Saa& qd&uaot u s 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 4�hosol.c1 AREA CODE 203/644-2511 Mr. Al Schaffer Dynamic Controls Corp. 8 Nutmeg Road South South Windsor, CT 06074 RE: Preconstruction Meeting - Dynamic Controls Application #88-62P September 23, 1988 2:30 P.M. IN A�'TENDANCE Name Company Telephone # Marcia Banach Town of South Windsor 644-2511 Fred Shaw Town of South Windsor 644-2511 Michael Gan ti ck Town of South Windsor 64 4-2511 John McCahi l l Town of South Windsor 64 4-2511 A.B. Davies Town of South Windsor 528-7551 Emil Lucek Lucek Engineering Assoc. 644-0550 J.A. Shaffer Dynamic Controls 528-9971 x 651 The following is a brief summary of points discussed during the meeting. Public Works 1 . All erosion and sedimentation control measures are to be in place rior to earth moving operations in each area and maintained cleaned out durinq onstruction. Call Zoning Wetlands Enforcement Officer for inspection when measures are in place. 2. Four complete sets of approved/revised plans to be provided to Town prior to start of construction. They will be stamped by Planning Department along with plans developer needs. 3. The Public Works Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist required for the following: a) After site is staked out b) All drainage work c) Preparation of subgrade, compaction tests as required by the Town. d) Preparation of subbase, six (6) inch lifts e) Placement of bituminous concrete, 1 112 inch layers. 4. Certification of gravel used as subbase will be required by an approved testing company. 5. No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 6. As built plans are to include horizontal and vertical location of all underdrains, footing drains and sanitary sewers located by a certified land surveyor. 7. All topsoil stockpile areas to be protected (ringed with haybales or equal) . 8. All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment. 9. During construction a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel onto Sandra Drive. Calcium chloride is to be used for dust control as required. 10. Any problems and/or questions regarding construction of this project will be directed to Al Shaffer. 11 . Road is to be paved with base course prior to issuance of Certifiate of Occupancy. 12. Developer/Con tra ct cor to submit mark-up print of any buryh o1 e locations. To be shown on as-builts. 13. All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 14. Weekly job meetings will be held as required. 15. Forty-eight (48) hours notice needed for Certificate of Occupancy inspection. Two week review period (10 working days) needed for all individual site (lot) plans prior to issuance of building permit (may be longer if application is incomplete) . See General Guidelines for Certificate of Occupancy. 16. Only approved copies of lot site plans to be used. Any proposed changes are to be presented to Engineering/Plannng & Zoning prior to implementation. 17. Draining items (SEA) to be addressed. 18. Town to notify developer regarding pipe size. 19. Town to forward comments on right-to-drain. 20. No paving after October 15 without written approval from the Director of Public Works. 21 . Hours of opera ti on 7:00 A.M. - 5:00 P.M. , no work on Sunday. Planning Department: 1. Landscaping Bond to include removal of temporary sidewalk. Use map rather than narrative for silt fencing. W.P.C.A. 1 . Drain Layers Permit needed prior to connection to sanitary severs. 2. DEP discharge permit (modification) may be needed. SNET/NU 1. Contact utilities for coordination of utilities connection. Fire Marshal 1 . Blasting (if required) to be coordinated with the Fire Marshal. Police Department 1 . Emergency phone numbers for the duration of the construction must be provided to the Police Department on a company letterhead. If the developer occupies or owns the building(s) after construction emergency numbers must be provided to the Police Department. 2. All buildings located on property which abuts a public highway must be numbered. Such number (address) shall be visible from the street. All numbering shall comply with Town Ordinance 6-800 thru 6-802. Barns, garages and outbuilding which are located on the same premises as a numbered structure are excluded. Very truly yours, �2� -v zt, 64tx� Marcia A. Banach Director of Planning MAB/pmm cc: A. Bowen Davies, Deputy Town Engineer Gerald Lewis, SWPD Karl Reich1e, Public Works Mel Stead, Public Works Michael J. Gan ti ck, Director of Public Works Minh V. Le, SNET Hal Clisby, CL&P ' John R. Collins, Chief Building Official Fred Shaw, Superintendent of Pollution Control John E. McCahill, Zoning Enforcement Officer Michael Gantick, Director of Public Works Emil Lucek, Lucek Engineering 8 NUTMEG ROAD SOUTH • POST OFFICE BOX 73 SOUTH WINDSOR, CONNECTICUT 06074 DYNAMIC CONTROLS CORPORATION 203 528-9971 TWX. 710 425-1994 Town of South Windsor September 26, 1988 1540 Sullivan Avenue Letter No: JAS-88-09-006 South Windsor, Ct. 06074 Attention: Marcia A. Banach, Director of Planning Subject: State of Connecticut Traffic Commission Advisory Relative to Section 14-311 o Genera Statutes Reference: DCC Site Plan Application # 88- 662 Attachment Letter dated 19 September 1988, W.W. Stoeckert, State Traffic Commission, to Storch Associates Dear Marcia, Attached please find a copy of the letter from the State Traffic Commission advising that we do not require a certificate pursuant to Section 14-311 of the General Statutes. Very truly yours, DYNAMIC CONTROLS CORPORATION Q."Aw .A. Shaffer Program Manager ZC M OF SOM WINDSOR STAFF SITE CHANCE FOR SITE & SUBDIVISION GENERAL: , Site Name D)j v� c k�� P & Z ID Nunber - 62 P Date 10 z0 8 1 Owner Contractor CHANGE: (Describe location and nature of change. Include plan/profile of change) . 46 + n 7-4'' ke P . o SJ` e a --fau g e- eje Ac 4 har xld. Reason for Change: (Why is change required) r APPROVALS: (As Required) Date Town Engineer Date: Design Engineer Date: brt' Dir. Public Works Date: Dir. Planning pate: Owner Date: Other STAFF CONS: OC: Deputy Town Engineer Zoning Enforcement Chief Building Official IpoII CO TM li����S LoO� �' V �`1 I YV �_� PO BUX 155G8 SPRINGFIFL1),MA 01115 8 NUTIANG R AD SOUTH P.0 BOX Ir 11 P.O. U,PX 7� C� ST LOU IS,M01 631 50 874 1 ��" SOUTH 'VIPJ: SOR, CONNECTICUT 06074 '�� �� P.O BOX 73 r SO.WINDSOR,CT.06074 r A 5 INVOICE No. 66913 I �, �rmn of Sa Sso.W�dstt Q Palle*'Am SHIP TO L ' D �. Y o TOWN OF SOUTH WINDSOR PUBLIC 14ORKS DEPARTMENT SOUTH WINDSOR, CONNECTICUT 06074 ATTN: M. GANTICK, DIR. OF PUBLIC WORKS GOVT CONTRACT NO. JOB NO YOUR ORDER NO.&REQ VIA SALESMAN INVOICE DATE TERMS NET 30 DAYS SHIPMENT NO. 04 89 F.O B.OUR PLANT BILLING FOR: 280 X ft. of i5" Reinforced Concrete Pipe 2,50( .( NOTE: For inst-aliation in parallel with existing 24" R P extending from Nutmet Road to outfal 1 at brook on East side of DCC'S new parking lot. ORIGINAL 'SELLER REPRESENTS THAT WITH RESPECT TO THE PRODUCTION OF THE ARTICLES AND/OR THE PERFORMANCE OF THE SERVICES COVERED BY THIS INVOICE,IT HAS FULLY COMPLIED WITH THE FAIR LABOR STANDARDS ACT OF 1938,AS AMENDED IN ITS ENTIRETY.' CORRESPONDENCE / REPORTS To�-na Plc-iiinor Marcia Eanach raised a question regarding the recently approved Dynamic Controls application. One of the approval modif ications was that the applicant grant the 7o;,rn a right--to-drain for street drainage across the drai-nage pipe crossing Dynamic Controls ' property. The pipe was subsequently found to be inadequate for drainage, and the Engineers v�anted to substitute larger pipe for it . A request was made to release $2, 500 from the Downstream Drainage Fund to replace the pipe. s Mrs . Montana made a motion to release $2,500 from the Downstream Drainage Fund for this work, Mrs . Rossi seconded, and the motion. carried 0--•0 . 24Is . Danach asked how the Commission interpreted Section 3 . 1.1 . 2 of the Zoning Regulations with regard to accessory buildings . She said -two recent appl cations fror;i residents with interior lots having frontage on taro str_oets --- corner lots -- had resulted in their_ being told thcC,y eoulc? not erect s}l ads where, they had planned . The Cocrmiission responac( thc,,t the regulat~i on was meant to cover unusual situations such as L-.heaped lot, or i_TIte_rior lots fronting on one street- but wi-th rear a Cji f ent st not: ord tv COTi�f„' 1 Lucek Engineering Associates, Inc. Consulting Engineers & Land Surveyors 490 Buckland Road South Windsor, Connecticut 06074 Emil W. Lucek, PE, LS Telephone (203) 644-2474 July 5, 1989 D JUL ' 1989 NIr. Joan PSoran, Chairman South Windsor south Windsor Inland Wetland Agency INLAND WETLANDS AGENCY/ CONSERVATION CQMMISSIQ.N Re: Dvnamic Controls Corp. F-ngineer Report Dear t�jr.. Moran: Please be advised that all construction activities within the regulated �4etlands of the subject project have been completed. The detention basin and the parking lot construction is completed; all disturbed areas have been stabilized and permanently seeded and are grer�aing nicely. ,lne erosion and sedimentation controls are still in place and will be removed in the fall when thev are no longer necessary. Ve truly yo leFMi 1 Lacelc cnan Project no. 88-15 8 NUTMEG ROAD SOUTH - POST OFFICE BOX 73 SOUTH WINDSOR, CONNECTICUT 06074 DYNAMIC CONTROLS CORPORATION 203 528-9971 TWX. 710 425-1994 Town of South Windsor July 7 , 1989 1540 Sullivan Ave. Letter No: JAS-89-07-001 South Windsor, CT 06074 Attention : Mr. John M. Moran, Jr. Chairman Inland Wetlands Agency/Conservation Commission Subject : Request For Return of Bond Application #88-62P - Dynamic Controls Corporation Reference: 1) Application #88-62P Inland Wetlands Agency 2) Letter Inland Wetlands Agency to Dynamic Controls Corporation dated July 13 , 1988 Attachment: Letter Emil W. Lucek of Lucek Engineering Associates to Mr. John Moran dated July 5 , 1989 Dear Mr. Moran: As noted in the attached letter, DCC has completed work in the wetlands area covered by the reference 1) application as approved by the reference 2) letter. The one item remaining to be completed is the stabilization of the bottom of the detention pond with grass . We have been unable to do this because of standing water in the detention basin caused by sedimentation downstream in the small stream which drains the pond. It is our understanding that Nutmeg Commercial Center is to dredge this stream as a condition of the recent approval for development of this area. Dynamic Controls will stabilize the floor of the detention pond as soon as the water level is lowered by dredging downstream, but we obviously have no control over when this will be accomplished. In the meantime we would respectfully request that our bond for completion of work in the wetlands area in the amount of $8 ,000 be returned . Thank you for the cooperation which has been displayed by your agency and all other concerned Town of South Windsor departments in our company's expansion project . D Sincerely yours , DYNAMIC CONTROLS CORPORATION �.a. AL 1999 J.A . Shdtfer South Windsor Project Manager INLAND WETLANDS AGENCYI CONSERVATION COMMISSION Tc -M or SC(T11I WIM FOR STAFF SITE C:I VV X,I� FOft SPI E & SUBDIVISION Q=�I,; Site Name DYNAMIC CONTROLS CORPORATION P & Z ID Nuarber 88-62P Date 7/12/89 Owner DYNAMIC CONTROLS CORPORATION Contractor INCO INC. C UU,K;L': (Describe lucation and natutc cL ctwliye. Include elan/pluiile (A elianye) . PLEASE SEE ATTACHED - Reason for Change: (Why is change required) PLEASE SER ATTACHED APPROVIUS: 0AcjZLx.,LiL,' od 'i�Crwn Frig ii ice I�..i tc:7 l$ Design Eng in DatoDir. Public Da to: Dir. Plannin Uatc:I� Owner _ a to Date: Other STAFF CONIME9rS: Lit �✓'� d rn -Lj CC: Deputy Town Engineer Zoning Enforcarent Chief Building Of f icial CHANGE : (Describe location and nature of change . Include plan/profile of change) . 1) Qhange loading dock from a one door bay to a two door bay. 2) Add an 8' x 61 ' 6" one story addition on the East side of the new building for storage of chemicals such as solvent as well as paints . 3) Add six personnel access doors to the new building. 4) Add three additional parking spaces at the NW corner of the' parking lot next to Nutmeg Road. 5) Change the grade between the new and existing buildings and Nutmeg Road from elevation 68 to elevation 70 and adjust the elevation of the catch basin in the same area. 6) Add the locations for the sanitary sewer, water and gas connections from or Nutmeg Road to the new addition. 7) Widen the planter area in front of the new addition and part of the existing building on the West side facing Nutmeg Road to 5 ' . 8) Add two crushed stone access ways from Pleasant Valley Road to the two Northeast Utility transformers located on the South side of the building. 9) Remove the Northeast Utility transformer currently shown on the West side of the existing building and add a new transformer located on the West side of the new building. (SEE ATTACHED MARKED UP SITE PLAN DRAWING) REASON FOR CHANGE: (Why is change required) 1) One bay with a 14' x 14' door will be used primarily for truck/trailer units which are not used as frequently for pick up/delivery at DCC. Units will back 6 ' into the building to a dock lift. The second bay with a 10' x 10' door will be the primary pick up/delivery bay and will enable a UPS type delivery van to back into the building far enough to close the door. It was not felt the one loading dock would allow us to handle the two sizes of vehicle in an efficient manner. One parking space will be lost . 2) The addition for chemical storage would replace a similar smaller structure currently located on the East side of our existing building. The existing structure is too small and will be inconveniently located for access from within the plant and by trucks from outside the plant. A portion of the existing structure will also be taken to provide outside access to a new interior stairwell . The new location will also be much more accessible to emergency vehicles if ever required. Four parking spaces will be lost . 3) The six added personnel access doors are being added as a result of completion of the internal building layout. One door will provide access to the loading dock area for use by truck drivers . One 6 ' double door on the SE side of the building will provide access for moving large equipment into our printed circuit board assembly area. The remaining four doors are emergency exit doors which will not normally be used. 4) Added parking spaces will partly compensate for those lost as a result of the change to the loading dock and the addition of the chemical storage addition. 5) The area between the new and existing buildings and Nutmeg Road is currently lower than Nutmeg Road and the parking area North of the new building and South of the existing lobby entrance. This problem is accentuated by the regrading of Nutmeg Road being done as a result of the current reconstruction of Nutmeg Road. The change will also conceal the foundation wall of the new addition and part of the existing building and will greatly enhance the aesthetics of the building. 6) Information added to show utility connections as made . 7) The planter area as currently shown in front of the new addition and part of the existing building narrows from 5 ' at the South end to approximately 3' 9" at the North end . A uniform 5 ' planter area will permit a much more attractive landscaping of the front of the building. The 3' 9" planter area is not wide enough to permit setting plantings back far enough to prevent damage from vehicles parking in front of the building. 8) Northeast Utility has informed us that we must provide an access way to each transformer to permit their trucks to gain access to the transformers for servicing or replacement . These access ways will be contructed of crushed stone and will be used only for access to the transformers . They can be blocked off at Nutmeg Road with chains of removeable fencing to preclude their use for vehicle parking. A change will be required to the landscape plan to accommodate the access ways . They will not be paved so that we can utilize the area as pervious surface and blend it into the landscaping. 9) Discussions with Northeast Utility have led to their recommendation to replace the existing transformer with a new larger unit which will supply both the new addition and the existing buildings fed from the existing transformer. TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: Site Name D�//�a m �� � »frc l S Cert� P&Z No._ 8 8_ (.2 p Owner Dv.�orr�tc. Cnr�f�D�s Co�-�. Phone No. ,fa8- 997/ Contractor Signature of Owner Date: gf23/d 9 Signature of Design Engr. Date: CHANGE: (Describe location and nature of change. Include plan/profile of Change) . CAanoG si ;Lc o70 RCP td Ca�KCA Be sin o 7` A/W corms A.- o 7 new a ,�, �!„ �a� • ue rewire . Reason for Change: (Why is change required) APPROVALS: (As Required) Dir. Of Planning Date: Town Engineer Date: Dir. of Public Works Date: Other: Date: STAFF COMMENTS;,) cc: Deputy Town Engineer Zoning Enforcement Officer Chief Building Official c ., IVED f i0 E ').4 1989 LETTER 'U r- NANSM ITTAL ,0.014 ,f4< O r PLANNING DEPARTMENT TOWN OF SOUTH WINDSOR 1540 SULLIVAN AVE. °SOR.coN?�` SOUTH WINDSOR, CT 06074 �li� (203) 644-2511 Date / TO: I. WE ARE SENDING YOU: �S S► 0 P&Z initial plans Q Drainage comps E-1 P&Z final plans = Bond estimate requests O Inland Wetlands plans 0 Bond reduction requests CM Final plans for filing al. Change order form E:3 Other O Correspondence Copies App. No. Project '(o THESE ARE TRANSMITTED as checked below: 1' For review and comment 0 For your file 0 For your use 0 Returned with revisions C-1 As requested 0 Other PLEASE. RETURN/COMMENT BY: 4514P COMMENTS: Copy to: From: (old-W, dae J4y5PJA4n»er r TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: Site Name_ Dga CMArds rdtA . P&Z No.d8-G 2 P Owner Damieml G C&"fnd15 Co Phone No. 9271 �Q 1 Contractor Signature of Owner 0 rc Date: �g Signature of Design ngr. Date: CHANGE: (Describe location and nature of change. Include plan/profile of Change) . r A&ANZA& dylyr Ly v Al &2 Alfj c6twme tAr 0,04%b yiow/� 4601 &Ak ez&� &*2vAa& W;A 0 24 x If g�Pt/�. Dr/r_ fc ffc �s'` VeAd " "t fa �dhnrcf � C8 fe &Ca" re ~r ZI 4rr.;1'` Reason for Change: (Why is change required) XJ56aZ -f-e-,& w; 22fi2 Mu rlp" Arxw; APPROVALS: (As Required Dir.. Of Planning r1�1�1ny Date: Town Engineer Date: — (PIC? J^ Dir. of Public Wo ks Date: Other: Date: STAFF COMMENTS: cc: Deputy Town Engineer Zoning Enforcement Officer Chief Building Official RECEIVED SEP 5 1�RQ SO. WINDSOR PLANNING DEPT. �owN sfro U T�0�� 0�-P S-OU& ?d&U146-0t f''< o s 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 r� OR co AREA CODE 203 644-2511• September 27, 1989 Mr. J. A. Shaffer-- Dynamic Controls Corporation 8 Nutmeg Road P.O. Box 73 South Windsor, CT 06074 Dear Mr. Shaffer: Re: Application #88-62P9 Dynamic Controls Conservation Bond At the September 18, 1989 meeting of the Inland Wetlands Agency/Conservation Commission, your request for release of the $8,000.00 conservation bond was tabled. The Engineering Department, Town of South Windsor, has indicated a concern with the stability of the detention basin and the level of water maintained in the basin. At such time that the issue is resolved, you should re-request your release of the bond. Sincerely, ames Lombardi Acting Chairman In1andzWet1and9 :Agency/ Conservation Commission JL/pmm cc: Jerry Iazzetta, Town Engineer TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON J,,}, Stie#r/► Phone No.S2 g-9197/ Site Name �v�e��� �,,fjy/s Cerro. P&Z No. �� L 2 P Owner Phone No. Contractor Signature of Owner Date: //l90 Signature of Design ngr. Date: CHANGE: (Describe location and nature of change. Include plan/profile of Change) . L?46// & /y4_j g � . cl mmeed . r 9 . dande zat" e"shw bo r.r 49,1%r fr r re)l Aoiand oz 6 YC Me. tr#;Ier 9&7*1?0 Idy'd tlrn' of JA&0� mted. Avrtml' &Z&d is Reason for Change: (Why is change required) , gw &4&aif fie getv' . NCO= l .i APPROVALS: (As Requir d) Dir. Of Planning Date: Town Engineer Date: 2 z/ Dir. of Public W rk ` Date: Other: Date STAFF COMMENTS: cc: Deputy Town Engineer Zoning Enforcement Officer Chief Building Official TOWN OF SOUTH WINDSOR STAFF SITE CHANGE a,/ `� f;l e . FOR SITE & SUBDIVISION n Q� GENERAL: Jl CHANGE ORDER CONTACT PERSON J,f}, 5ha jq�'rr Phone No 8- ?97/ Site Name_Tawit 72 ,s OW, P&Z No. AR-G 21* Owner Phone No. fL7 , -9971 Contractor I/VCO Ir�c. Signature of Owner _ Date: Signature of Design Zngr. Date: CHANGE: (Describe location and nature of change. Include plan/profile of Change) . f r ,S Sa7zre4ro lm&4ral r 17 Al G bod I r .P-a rd for tt %r ern _ t .e k-A &A e Y-64 av/;// f M Reason for Change: (Why is - change required) ,Sh,-Ah,e 0-P C V Am ! f APPROVALS: (As Required) Dir. Of PlanningL Date: f d Town Engineer � Date: Dir.. of Public Works 01-%S Date: Other: \ Date: STAFF COMMENTS: /P?c 70 -t 5.0 S0G44Qi/1 cc: Deputy Town Engineer Zoning Enforcement Officer Chief Building Official E 8 NUTMEG ROAD SOUTH • POST OFFICE BOX 73 SOUTH WINDSOR, CONNECTICUT 06074 DYNAMIC CONTROLS CORPORATION 203 5 2 8-9 9 71 T W X: 710 4 2 5-1 9 9 4 December 19, 1990 Town of South Windsor Seth VV. 1540 Sullivan Avenue Planning & Zonin dsor South Windsor, Ct. 06074 g Comcnissioll Attention: Chairman, Planning and Zoning Commission Subject: Request for Return of Landscape Bond Reference: Planning and Zoning Commission Letter to Dynamic Controls dated July 28, 19889 RE: Application #88-62P Dear Sir: Dynamic Controls Corporation has completed all landscaping called for on the site plans for Project #88-62P covering an addition to our plant at 8 Nutmeg Road South. We therefore request the return of our $10,000 landscape bond requested by the above referenced letter and paid via certified check #24218 dated August 31 , 1988. If there are any questions please contact the undersigned. Very truly yours, DYNAMIC CONTROLS CORPORATION .a J.A. Sha fer cc: R.K. Sceery JAS/jpm 8 NUTMEG ROAD SOUTH • POST OFFICE BOX 73 SOUTH WINDSOR, CONNECTICUT 06074 DrYNAMIC CONTROLS CORPORATION 203 5 2 8-9 9 71 T W X. 710 4 2 5-19 9 4 February 7, 1991 FED law Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 ATTN: Ms. M. Banach Planning Director SUBJECT: Detention Basin for Dynamic Controls Corporation Expansion Project Application #88-62P Dear Ms. Banach: It is our understanding that a Certificate of Occupancy for Dynamic Controls' new 62,000 square foot addition on Nutmeg Road is currently held up pending resolution of the situation where our detention basin is acting as a retention basin. This has been an ongoing problem. The elevation of our detention pond was dictated by the elevation of the Nutmeg Road storm sewer system and the discharge. pipe leading from Nutmeg Road to the stream draining East to the Podunk River just North of Veterans Park. It would appear that over the years this stream has silted in from the sand and other solid material discharging from the storm sewer system. We did remove all of the fallen trees from the stream in 1989 downstream of our detention pond, which lowered the pond level perhaps six inches. Any further lowering of the level of water in the detention pond must await dredging of the stream to the East of our pond. This stream is not on DCC property and we have no control over it. February 7, 1991 Town of South Windsor Page 2 DCC respectfully requests that our detention pond be permitted to act as a retention pond, until such time as the stream draining the pond is dredged to an elevation which will permit our pond to drain. At that time, we would be in compliance with the original site plan drawings. Sincerely, DYNAMIC CONTROLS CORPORATION .a. Z/ J. A. Shaffer Modernization Program Manager JAS/nls cc: John Collins Town of South Windsor R. K. Sceery DCC February 14, 1991 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Steven Groves, Project Engineer RE: Dynamic Controls - Detention Basin We have reviewed Mr. J. A. Shaffer's letter of February 7, 1991 concerning the existing detention basin at Dynamic Controls. As he indicated in its present state, the detention pond acts as a retention pond. The bottom elevation of the pond is below the groundwater table, therefore the pond will hold water throughout the year. When it rains the water elevation of the detention pond and the ditch rises simultaneously, acting as one large retention area. The approved plan indicates this pond would be a detention pond. The only way for this to be accomplished is by dredging the ditch so that the pond can be drained. However, as Mr. Shaffer indicated, this ditch is not on Dynamic Control property. In addition, we feel this may adversely effect the site as it is presently stable with vegetation. Losing the retention in the ditch may also cause erosion and flooding downstream. The Engineering Department concurs with Mr. ShafferIs request that the pond remain -as is and recommends that the Planning and Zoning Commission approve this modification to the approved plan. yz�C SG/jsv cc: Michael J. Gantick, Director of Public Works Jerry C. Iazzetta, Town Engineer re r ap s ?d&U&Ot C � 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 f��SOR•co� AREA CODE 203/644-2511 i March 12, 1991 Planning & Zoning Commission 1540 Sullivan Avenue South Windsor, CT 06074 Dear Madam/Sir: Re: Bonds At the March 11, 1991 meeting of the Inland Wetlands Agency/ Conservation Commission, it was voted to release the following bonds: Application #88-62P, Dynamic Controls Corporation in the amount of $8,000.00 Application #89-06P, Charbonneau Industrial Building in the amount of $5,000.00 Very truly yours, Elizabeth A. Warren Chairman EAW/pmm cc: Marcia A. Banach, Director of Planning Jerry C. Iazzetta, Town Engineer Michele R. Lipe, Assistant Planner/Analyst 'to'M" sty �s ?d&&Aat C � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ��osoR.CO � AREA CODE 203/644-2511 19 March 1991 J. A. Shaffer 8 Nutmeg Road South P.O. Box 73 South Windsor, CT 06074 Dear Mr. Shaffer: re: Appl. #88-62P Dynamic Controls $8000 IWA/CC Bond This is to advise that the Planning and Zoning Commission voted on March 12, 1991 to release the above-referenced bond. Advance arrangements should be made to pick up the bond to ensure that the necessary contact person(s) will be available. Please call or write the Planning Department office at the South Windsor Town Hall ( [203] 644-2511, Ext. 251) to make these arrangements . Thank you. Very truly yours, PLANNING AND ZONING COMMISSION Louise C. Evans Chairman cc: J. Iazzetta, Town Engineer M. Banach, Director of Planning PZC File TOWN OF SOUTH WINDSOR STAFF SITE CHANGE FOR SITE & SUBDIVISION GENERAL: CHANGE ORDER CONTACT PERSON Phone No. Address ,F " /sir /e1 Site Name �-,e�/� Ci,�� P&Z No. Owner Phone No. -!5-2?• QQ� Contractor Signature of Owner Date: Signature of Design Engr. Date: CHANGE: (Describe location and nature of change. Include three (3) copies of plan/profile of Change. ) Reason for Change: (Why is change required) /ems v T.�c� ,6 T"w�, �/� �i.. �i•� APPROVALS: (As Required) Dir. Of Planning Date: 3� Town Engineer Date: Dir. of Public Works Date: Other: Date: STAFF COMMENTS: White - Town Engineer Pink - Director of Planning Yellow - Applicant tDAn .E7 _ ce 4 �v 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 '~�soR•c� AREA CODE 203/644-2511 31 July 1991 R. K. Sceeny Dynamic Controls 8 Nutmeg Road South P.O. Box 73 South Windsor, CT 06074 Dear Sr. Sceeny: Re: Appl . #88-62P Dynamic Controls $8,000 Landscaping Bond This is to advise that the Planning and Zoning Commission voted on July 30, 1991 to reduce the above-referenced bond from $8,000 to $1, 000 . Upon site inspection it was noted there were a couple dead bushes in the parking lot area. Once these plantings have been replaced, please notify the Planning Department at 644-2511, ext. 252 to arrange another inspection. Very truly yours, PLANNING AND ZONING COMMISSION Louise C. Evans Chairman cc: Town Engineer Director of Planning M E M O R A N D U M October 22, 1991 TO: PLANNING & ZONING COMMISSION FROM: Marcia A. Banach, Director of Planning RE: BOND REDUCTIONS/RELEASES - Below please find recommended bond reductions and releases . LANDSCAPING BOND PRESENT BOND RECOMMENDED REMAINING p SITE AMOUNT BOND REDUCTION BOND BALANCE Carter Rice 31000 31000 0 Dynamic Controls 21000 21000 -0- ml cc: Planning Department Engineering-Project File JiM atCIO t� x w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 It.00 AREA CODE 203/644-2511 October 31, 1991 J. A. Shaffer 8 Nutmeg Road South P.O. Box 73 South Windsor, CT 06074 Dear Mr. Shaffer: Re: Application #88-62P, Dynamic Controls This is to advise you that the Planning and Zoning Commission voted on October 22, 1991 to release the $3, 000 landscaping bond. Advance arrangements should be made to pick up the bond to ensure that the necessary contact person(s ) will be available. If you have any further questions contact the Planning Department at 644-2511, Ext. 253 . Thank you. Very truly yours, Louise C. Evans, Chairman Planning & Zoning Commission LCE/PMM cc: Town Engineer Director of Planning