Loading...
HomeMy WebLinkAboutSITE PLAN (46) TOWN OF SOUTH WINDSOR , CONNECTICUT s � PLANNING AND ZONING COMMISSION APPLICATION FORM S I.0 Du -01 Ap-lication No. : Date Received : Action/ by : ,� - JUL g c88 Receipt No. : -- p ' South Windsor A PPL I CA YT: Guy Burns i .Manning,& Zoning Commisaiow ADDRESS : 121 Connecticut Ave. TELEPHONE: 724-0285 OWNER OF RECORD ON LAND RECORDS : Guy Burns ADDRESS : 1134 Hartford turnpike, Rockvill, Ct. 06086 r COMPLETE LOCATION OF PROPERTY: 121 Connecticut Ave. South Windsor, Ct. 06074 4 --------- ZONE: I .P. NAME, ADDRESS, & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: Guy Burns 121 Connecticut Ave. South Windsor, Ct. 06074 TELEPHONE: 724-0285 THIS APPLICATION IS FOR: ' (Check one of the following) 1 . Zone Change to (Public Hearing required) . e ' 2 . Subdivision . 3. Open Space Subdivision (Public Hearing required) ., 4. Resubdivision (Public Hearing required) . ' 5. Special Exception to Article (Public Hearing Required) . 6. Site Plan of Development. 7. Earth Filling [Section 10) and/or Earth Removal [Section 91 (Public Hearing Required) . 8. General Plan of Development . 9. Regulation Amendment : Zoning $ubdivision • �10. Other (explain in detail) : CONSULT PLANNING DEPARTMENT FOR FEE SCRIDULE. THIS APPLICATION MUST BE SIGNED BY E APPLICANT AND OWNER OF THE PROPE Y OD SUBMITTED IN ]Ap IPL E TH ALL MAPS AND DOCUMENTS RE E sATTACHED ,CHECKLIST. lic nt r t d PLANNT`�fG AND ZONING COMMISSION APPLICATION, CONT' D. TIME FRAMES AND PROCEDURES FOR SUBMITTING APPLICATIONS/PLANS 1 . All prospective applicants are urged to confer with Town Planning Department and Engineering Department staff prior to submission of any application to the Commission . 2 . Plans are officially received only on the fourth Tuesday of each month at the Regular Meeting of the Planning & Zoning Commission (PZC) . 3 . Three ( 3) sets of blueprints are required on the second Tuesday of the month for review by the Town Planning and Engineering Departments . This deadline must be met if you want to ensure that your application is (-fficially received by PZC. These plans must be submitted as complete plans -- which includes application plus all required information contained on checklist. No plans will be accepted at the counter if checklist is incomplete . It' is the applicant ' s responsibility to ensure that all information required on the checklist is submitted in one package at the time of submission -- including landscaping plans , architectural elevations , traffic report , etc . Planning Department staff will not accept checklists with blank spaces , or with "by .others" in any space. 4. Town staff will notify the applicant with any changes required to make the plans in complete compliance with our Zoning/Subdivision Regulations . 5 . All changes requested must be made and new, complete blueprints must be submitted . At this time six sets of plans must be submitted . If a Public Hearing is required ( or optional but likely) then seven sets are required . 6 . Planning Department/Engineering Department staff will review plans only once -- if the resubmissions are not complete/correct , the Town Planner ' s report will reflect that revisions were not made as requested . I CHECKLIST REQUIRED INFORMATION SITE PLANS This checklist must be signed by plan preparer (P.E. /L.S . ) declaring that all required information is provided . Items 1-7 are required for all applications ; items 8-11 required where appropriate. Check mark for each item supplies . X 1 . On each sheet for plans or maps , title block with the following information : X a. Name , address and telephone of applicant . X b . Name , address and telephone number of Land Surveyor or Professional Engineer . X C . Nance of Development X d . Date when drawings were made . X 2 . Key Map : An overall map drawn to a scale of 1 inch equals 200 feet , which can be used as an overlay on Metropolitan District Maps . This map will show the overall design of the Development and surrounding property within 500 feet . X a. Data block which gives needed zoning information such as percentage of lot coverage, acreage of tract ,. number of apartment ,units, parking requirements , etc . X b . Layout of buildings X C. Layout of streets and parking . X d . Lines indicating proposed drainage system with direction arrows . X e. Lines indicating sanitary sewer system with direction arrows. Is f . Names of surrounding property owners . NA g . Proposed open spaces and recreation areas. NA h. Driveway cuts on surrounding properties ., X 3. Architectural Elevations : Plans of' the proposed buildings drawn to a scale of 1/8" 1 ' - 0" showing the elevations of all sides of the proposed buildings in sufficient detail to show architectural styling . X Architect ' s seal on elevations for buildings in excess of 5000 square feet (per CGS Chapter 390) . i , Page 2 (Site Plans) ' ._X 1 4 . Plot Plan : A layout map of the, proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: ( 1) 24" X 36" with a 3/4" ruled margin ; ( 2) 18" X 24" with a 1/2" ruled margin , containing the following data: • X a. Distance and bearings of all boundary lines and acreage of site . Iron pins required at all property angle points and shown- on map. NA b. Proposed streets and street lines with center line stations , curve data , and parking spaces . X C . Building lines in accordance with zoning regulations. d. Proposed buildings and other structures, including signs , outside ligh! _Lug , and dumpsters (on concrete pad and screened) X e. Easements , noting grantors , ' grantees , and purpose. i X f . Names of abutting property owners. X g. Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency . In areas accessible to Metropolitan District Commission points , or other coordinated points , the monumented points within proposed site shall be coordinated . These coordinates shall appear in tabular form on the plot plan . The accessibility of these MDC points shall be determined by the Town Engineer . NA h. All open space or other common or public lan uses shall be indicated . X i. A-2 certification ; P.E. /L. S . Seal . X S. Topographic Map : A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches , including ruled margins shall in addition to the requirements of the plot plans show the following : X a. All existing and proposed buildings. X b. Curb lines and pavement width, sidewalks. X C. Existing and proposed sanitary sewers . i X d. Existing and proposed water .andgas main systems. NA e. Present wooded area indicated by foliage , lin s. Any individual trees to be saved should be shown. R ' Page 3 (Site Plans ) d X - f . Existing and proposed contours shall be sh wn in not less than two-foot intervals , but in c ses of relptively level land , the contours shall e one-foot intervals and spot elevations . X g. Re;;ulated wetlands and 100-year floodplain or note that none are present. X h. Proposed storm drainage system, showing al catch basins , endwalls , manholes , lengths and si es of pipes . (Minimum distance between catch ba ins shall be 300 feet and minimum size of stor drain lines shall be 15 inches . ) NA i. Connections of all springsinto proposed s orm drainage system as needed .. NA j . Location and indications of existing brook channels , and 100-year flood limits . X k. A-2 Certification ; P .E. /L.9, Seal . NA 6, Landscaping plan . X 7 . Drainage calculations - Zero Runoff Increase per attached guidelines . . NA 8. Trafficreport . NA 9, Plans and Profiles : A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally , and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches , including ruled margins and containing the following: NA a, Layout of streets in sections coordinated b stations with the profile . NA b . Street plan showing roadways and drainage. NA C . Sight line at driveway & street intersections. NA d , Profile of roadway showing existing and finished grades . Roadway profile will show all tang nt grade and all vertical curve information . NA e. Profile will show all catch basins and all rainage lines between catch basins with all invert nd top of frame elevations. Drainage lines will b shown and described as to material . , NA f . Where any storm drainage line discharges in o an existing brook sufficient profile of this b ook will be shown to determine conditions. NA g , Metropolitan District Commission datum shal be used on all sites accessible to these controls . The Town Engineer shall , bated on standard engineering practices , determine the accessibility of these controls. Page 4 (Site Plans) NA h. Profiles shall show all sanitary sewer line3 and manhiles , including elevations , sizes , leng hs , and slo1)es of pipes. Top of foundation elevati ns for building shall be shown . NA 10. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces , a plan which contains data for site improvement may be required . This map shall be drawn to a scale of 1 inch equals 40 feet. NA 11 . Sanitary Report: Where individual sanitary sew ge disposal systems are proposed, the final plans hall include a Sanitary Report certified by a Profes ional Engineer . The report shall demonstrate the fea ibility of the proposed individual systems; the report hould deal with the area as a whole , discussing the f llowing points: NA a. General nature and development of surrounds g area. NA b . Topography and natural drainage pattern . NA C . Subsurface conditions as shown by subsurfac investigation , including soil absorption characteristics , ground water level conditions , ledge rock , and general nature of soil . NA d . General description of type ' of development contemplated . NA e. Detailed description of proposed sanitary sewage disposal facilities , indicating sizes for various ground conditions, materials to be used , and the general layout pattern to be used , etc . NA f . Special precautions that may be necessary t provide proper functioning of the proposed disposal systems. NA g . Map of general area with locations of all tests • shown on proposed layout . NA h. Flood heights of any nearby streams, brooks , or rivers . NA i . Test results and engineering evoluation per Section 4. 13. 5. All information required above is included inthis application at the t5NPRIEPARER submission. 741 U P NO ember , 1987 ED LALLY & ASSOCIATES JOB—��lP�ro.�, .E .G 123 Prospect Hill Road SHEET NO. / OF / WINDSOR, CONNECTICUT 06095 _ (203) 688-2413 CALCULATED BY / �. DATE CHECKED BY DA rE_ SCALE .�-*V Toed z� og zo, z91Z I. 0 0 go PP <0)(/Z/, No. 8741 ►',w rf3�IDAli►L��� PAOOUCf2041 K Inc DOW Mass 01471 4 JOB "- "t Cr) ED LALLY & ASSOCIATES SHEET NO. ` OF 111 Prospect Hill Road -- 6 If: WINDSOR, CONNECTICUT 06095 M'/ �♦ CALCULATED BY ``� �-+ DA E (203) 688-2413 CHECKED BY DAI E SCALE #e �)Ojd 11.7 .jr X�.,s I C0--1dt r cam.S _ . 6 . 988.. All th Wind P/annin$,& .. so . . ,�.• a �. 8 Com�lsslp� l ......... . . �. .. ..... .. s... ....... ............. .. � .. .! .a• f .. ..... ....... .... .........>.... ..>.. .................... 40, L..,. 40 *-,-r>.... .... _....... , .... o , ........ ........ . .... ..................... .......................... ............ :. ..................I........,....... .. . ... ......................................,......... , ..... .. ................................................. yC 1 . . . .. . ................ ............................. >....... / v . .... .........................I..................... . . 2� . ........ .... . 4..................,...... ,.................... - 7 .... ....................>......................... ..... PIKM=20St�lnc,W".Mm 01471 To Order PHONE TOLL FREE 14OfH7lb= JOB ED LALLY & ASSOCIATES SHEET NO. OF 111 Prospect Hill Road _/ CALCULATED BY— WINDSOR, CONNECTICUT 06095 —/ � � � OAT � y (203) 688-2413 CHECKED BY DATE- SCALE Fv l . ............. Z 0• .&.. 7. /D 0 7•. 0-0 .. . � ................................ .......... ......e ..... , . .. .. •.,. wM�I`/1r/ , "Y .. .. T. .. .. ...... ....... ...........�................... ........,... .. . , .. s ....... ................... .......e................... � I 8 — — toi-3 ........ . .... ..................�....... i I S e. ..... .. I i .............. ................... .. ..... .... .. .. ,... .. , ... ... I... ... ... ....... a.....................j...................... }.......... ..... . .... .. ... .. , .... > , .. .. .. ..... ....................... ...................r....... ..........j.............. ................e. ......,........,....... ..... ...........................q..........,.........,. .....,.... ... ..., ... .........t.................. ....... ... , ... ........ , .................. ...e ...... ...... ....................... ...... PRODUCT 2011�Nc,(holm,Mw 01471 To OrW PII M TOLL FREE I-WWI 110 _ JOB ED LALLY & ASSOCIATES SHEET NO. OF 111 Prospect Hill Road WINDSOR, CONNECTICUT 06095 CALCULATED BY �" DATE 7 (203) 688-2413 CHECKED BY DATE SCALE C4�11 e C/ i ell �- 2.�4'�O�. z 400:; 'e:�O�d 6)v eq)e,�,k, 'Cel 4- 2y . r� iU 3. 2 y7 a �� fs c '7� 2 . o• 6".... .. ... .. .... 0113 PRODUCT MSa��Inc Groton.Alm oun To Order PRONE TOLL FREE 14t10.245-M , JOB- at2=jo E ED LALLY & ASSOCIATES SHEET NO. OF 111 Prospect Hill Road WINDSOR, CONNECTICUT 06095 CALCULATED BY DATE (203) 688-2413 CHECKED BY DATE SCALE /GT 25?s 291 t17 ........... ........... . .. .. , . ... , . . .. ... . . ' GAG �►2.� , . , ... ........ �. r� 7` e . ✓ n. . . . s. ZO ,.............�..... ........... ..... ............ P.� i t �........ .......... f . . . . . .... .. ............. ...................... ........... . ... ........... ................................ .......... .......... /ffl1./rrea . . . . ..�i.. . Ham.. .. ..... `�F�{•Y 4 �`'.' .. ... ................................. .......... P ` ...................... • .................. o. 8740 PO ..... PRODUCT 20b1�1nc.Groton.Mow 01471 To Order PHONE TOIL FREE 1-OW225-M o .0 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 R-co� AREA CODE 203/644-2511 M E M O RAN D U M August 19, 1988 TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public WorksiaGrit., RE: Capitol Steel of Hartford Engineering Review F1ease find enclosed the SEA engineering review for the subject application. Should you have any questions please contact me. MJG/jsv cc: Engineering Department PZC Correspondence File S E A Consultants Inc. August 15, 1988 Engineers/Architects Principals Mr. Michael J. Gantick, P.E. Arnold B.Goldstein,P.E. Director of Public Works Frederick G.Aufiero,P.E. Robert M.Brandon,A I.A Town of South Windsor Stephen H.Geribo,P.E. 1540 Sullivan Avenue David T Goodemote,P.E. South Windsor Connecticut 06074 Bruce E.Soule,P.E. f Kenneth M.Stewart,P.E. Anthony J.Zuena,PE. Re: Capitol Steel of Hartford Associates Job No. 88126.39 Steven L.Bernstein,P.E. Task Order No. 39 Paul F.Gabriel,PE. Mark Gould,P.E. Joseph A.Murphy,P.E. Dear Mr. Gantick: Michael S.Schultz,P.E. Anna C. spwste PE.E. As requested, S E A Consultants Inc. has reviewed the following for the above referenced project: Paul C.Ross,P.E. Sheet No. Title Prepared By Date 1 of 3 Construction & Erosion Ed Lally & Assoc. 6-17-88 Control Details 2 of 3 Revision to a Site Plan it it 3 of 3 Floor Plan & Elevations it it — Drainage Calculations it It This information was reviewed for compliance with the Town of South Windsor Subdivision and Zoning Regulations dated July 24, 1972, and standard engineering practice. We note the following: Section 4.13.2.2 ARCHITECTURAL ELEVATIONS Architectural elevations should include building material types. GENERAL COMMENTS 1. The engineer has stated that there are regulated wetland areas located on this site. These areas along with soil classifications should be delineated on the Topographic Plan. 850 Silas Deane Highway Wethersfield,CT 06109-3412 0 The shallow swale, referred to in the pre-development hydrologic (203)721-7993 analysis, should be identified on the site plan. 485 Massachusetts Avenue Cambridge,MA 02139-4018 �. The engineer is using a Tc of 24 minutes for post developed conditions, (617)497-7800 compared to a Te of 15 minutes for pre-developed cond ions. .This 1537 Main Street condition appears to be questionable. The flow paths for post & (413)Spring7field,MA 2 01103-1420 pre-developed conditions should be identified. Citicorp Park West 100 Foden Road South Portland,ME 04106-2319 (207)775-2281 1 f S E A Consultants Inc. Engin rs/Architects Mr. Michael J. Gantick, P.E. August 15, 1988 Page Two 4. The proposed use of the processed gravel areas should be indicated. If you should have any questions, please do not hesitate to call me. Very truly yours, S E A Consultants Inc. Y n T. Holland JH:alp r. 1„ go SC4,C G � ` 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 l��soR•co�'� AREA CODE 203/644-2511 September 8, 1988 i Mr. Guy Burns 121 Connecticut Avenue South Windsor, CT 06074 Re: Application #88-70, Capitol Steel Site Plan Dear Mr. Burns: Attached is a copy of comments from the Planning and Engineering Departments regarding the above-referenced application. Please make the necessary revisions to the plans and submit 6 complete sets (including architectural elevations, landscaping plans, etc. ) to the Planning Department. If you have any questions regarding the comments or the procedure, please contact me. Very truly yours, Q Marcia A. Banach Director of Planningr cc: Town Engineer 1' Capitol Ste 1 - Planning Dept. Review Comments Key Map - should show properties within 500 feet of site, b cuts for adjacent sites Plot Plan/Topographic Map * ' - should be labeled as such - show side and rear building lines - add total impervious coverage to data table r f._' CS CAPITOL STEEL OF HARTFORD, INC. 121 CONNECTICUT AVENUE. SOUTH WINDSOR. CT 06074 TELEPHONE 203/724-0265 3 VILLAGE ROW, LYNNFIELD. MA 01 40 TELEPHONE 617/334-5400 DTEN September 23, 1988 1 E SEP 23 10 Marcia A. Banach SCUlth Win ' Director of Planning am"T ummom 1540 Sullivan Avenue South Windsor, Connecticut 06074 Subject; Capitol Site Plan - Application 88-70 Dear Ms. Banach: Your letter of September 8th on the above application, be advised all drawings per comments from Sea Consults letter of August 15th, 1988 is attached for your review. Si sets of following drawings are being resubmitted: (,LJA� Plot Plan and Topograhic Plan Revised 9/14/88 Construction & Erosion Control Revised 9/14/88 . Floor Plan and Elevation Details Revised 9/22/88 Under advice from the Assistant Town Planner, we will request for a time extension of 65 days. Kindly review the above noted documents and plan us in your next hearing. Please call the undersigned in case of any questions. During your field visit we had received indictions about your concerns on outside storage. We shall be removing the material and storing on top of trailers. You are requested to review and advise us of your comments in the forthcoming weeks during your next site inspection. Sincerely, 1 MEMBER M 'ER AN AFFIRMATIVE ACTION EQUAL OPPORTUNITY EMPLOYER Page -2- C�TO�. STEEL OF HARTFORD, INC. 6uy urns Vice President cc: Chairman, Inland Wetland Agency/Conservation Committee Town of South Windsor 2 r toll% a '4 y Q T-a 0-1 � �• O � C 4 w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 %,co AREA CODE 203/644-2511 October 18, 1988 Guy Burns Capitol Steel 121 Connecticut Avenue South Windsor, CT 06074 RE: Applicatio #88-70 - Capitol Steel Gentlemen: At the October 17,1988 meeting, the Inland WeClands Agency/Conservation Commission approved with modifications Application #88-70P - IWA/CC permit for the construction of a addition to an existing industrial building located on the westerly side of 121 Connecticut Avenue, IP zone. The following modifications must be adhered to for this permit to be valid: 1 Three ( 3) blueprint copies of the approved map with all modifications be submitted to the IWA/CC within 65 days for review prior to any construction activity on the site. 2. Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount $2000. to be submitted to the Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures . f 5 . The permit if valid for one year and shall expire October 18, 1989 . 6 . All approvals required must be obtained and submitted prior to any activity on the site. 7 . We recommend to Planning & Zoning that additional planting and screening be provided on the site. Very truly yours, John M. Moran, Jr. , Ch an JMMJr./pmm Enclosure cc: A.B. Davies, Deputy Town Engineer Marcia Banach, Director of Planning John R. Collins, Chief Building Official Michael Gantick, Director of Public Works Raymond Hallowell, Chairman, Planning & Zoning c ap Saa& ?A• Z� C � • w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 Solt-co� AREA CODE 203/644-2511 October 25, 1988 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works RE: CAPITOL STEEL SITE PLAN Please be advised that this Department has again reviewed the subject plans dated September 14, 1988 and offer the following comments: 1 . The proposed roof leaders discharge is directed toward the adjoining property owner and is not acceptable. 2 . Items 2, 3 of the August 15, 1988 SEA review letter have not been addressed. Additionally, the flow (surface drainage) to the outlet structure is not defined, nor are there any contours shown along the western portion of the site. MJG/jsv cc: Project File Capitol Steel Walk Report 11-3-88 M.B. and I walked thru the Capitol Steel Site and determined the following apparent problems on the external portion of the site: 1. Parking spaces ranged from width of 8' to 10 ' wide. Three proposed parking spaces are currently in use. 2. Shrubs shown on current site, other than front side facing Capitol Avenue, have apparently deceased and need re-planting. 3. The drainage ditch needs to be re-worked to the flared-end pipe (indicated by standing water within the rear fenced-in area) . 4. Flat bed trailers are placed in double layers and top trailer is visible from the street and rear-abutting site. 5. Painting and storage is now taking place in fenced-in area. The proposed addition is supposed to accommodate these practices. 6. There is one overhead door at the rear of present building. It appears that parking spaces could be available (after that door) to the location area of the proposed addition. S CAPITOL STEEL OF HARTFORD, INC. 121 CONNECTICUT AVENUE. SOUTH WINDSOR. CT 06074 TELEPHONE 203/724-0285 3 VILLAGE ROW, LYNNFIELD, MA 01940 TELEPHONE 617/334-5400 November 25, 1988 The Town of South Windsor Town Hall Planning and Zoning Commision South Windsor, CT 06074 Attention: Marsha A. Benach Reference: Capitol Steel of Hartford Addition Dear Marsha, Since our Engineer is presently reviewing your Engineer's comments, hence we may not be ready for your next scheduled hearing for our addition. Accordingly you are requested to grant us an extension of 65 days. In the meantime, if we are ready prior to this extension we shall advise you of the same. Sincerely.; CAPITOE' STEF OF HARTFORD, INC. UJI ter.. / + NOV lyon South *-ridsor INLAND WETLA,�Jlz; .-AGtNCY/ CONSERVATION COMMISSION MEMHER I M&ffR AN AFFIRMATIVE ACTION EQUAL OPPORTUNITY EMPLOYER DRAINAGE DESIGN CALCULATIONS PREPARED FOR CAPITOLS STEEL OF HARTFORD 97 SOUTH ST. WEST HARTFORD, CT 06110 TEL.# (203) 724-0285 LOT 27 CONNECTICUT AVE, SOUTH WINDSOR, CT ' //ff11/II♦ // ♦♦ REcpvcrD JAN JL 11 11 fffo JANUARY 11, 1989 JOB ED LALLY & ASSOCIATES SHEET NO. l OF 111 Prospect Hill Road _ WINDSOR, CONNECTICUT 06095, CALCULATED BY M �� DATE (203) 688-2413 CHECKED BY DATE SCALE i Hx-- .....C7� U:/� Yl GC,.� ,.5.1..=+�. ....... < ... .............:.. :.........,.. ....,..... .... .. . Z ........ ................:.................. .I.........i... ... ...e.... ; ... . .... , ............. .. , ... ............ ... > i.. i : .. .. . ..... . ...... . .... .......... ..........i...........i.... ... ..... - ..... ... .. ..... ......... ........ 00r7SI'de k- DI .. �f.. ..Co.n.aer.r�.. ..................... .................... .. ,tD . .. .... , j...........i 1^✓)'1 ...,�C. ✓'Gi..! . . .....ram.... .,.. . 0 ..... '? �.r y!.-....... i ..... ............................................. .......................•;.........,..... ................... ........ ..> .......... , .. .. .... .>............ .. , ... , .. .... .. >. .. ... .... .r..........«................................. , 1 �L`�. ................................ .......................... ...... ................... ....................... . ...,... .. ... .... .......................... ..... f . .,. . ................... ........... ... ............. ��.1''a -�.. ,e....:....... .4 re cam........... o.. .n /.' '. E ..5._ ................ , ....- .......................... ................ .. . ........ ............................... .....:............. ........, ..... ..... .... .............. ...... .................. . . ................... . ..w ............., i i , s ' ............t ......... j ; ins' . ... ..... : ...... . ... ..:.......... i .. i } , .........;..�t'-111.(�Gr'v.D�.�. �1 ! , ... : . .QI. �.�4. ....... . . ... .................................................. « ..... ....................T............... , .............,,.�............... . .......; « ... , . . .................. ... . . . . —,. ,... / • w.....:..> ........ . ... ................:. ... ........... .......:...... . .. :.... . . . .. . .... ........ ......... ....... .... ............ ........�, rt..............Y.................,.....C, �.. ....2... . ... .... ..................._....... , ..... f l�,3 3 . ..... . ....... rt _........ ..}............................ I .......... ....... ............ ..... ............. ............. ..........:..........:.................;.. ......... ... .;. f.�..... e ' s ad ......... �. j ... 11 '..............................: + ,..... ; .. .... .. .................................. 1...........�.._.. 15000 Qr �� .. / .... �.. . .......... .................... ...... , ..................... ,..........:........ ��� ;. ► . / �/... ...... .......... 4.... ... ..�..........>....... .. .... .. ... . 1. .. .......1........ ........}......... ........I................ ..q....... .......... .. , ... .... .. . ..... ... . ....... ... ..�........ ... ..t....... ............................................. ..........I.. ....... ..... ... ... ... ... .. .. w• i ...... ....s...... .> .... ................... ......I.................... ..I ...................711................. ........... ... ........' ............ ...... .. ........ ..... ........i.. F. .. .. .. ... .. , ...................... ... ... ........... ..... ...... ...........' .................................................. ..........R............ ...,.. ...............1............ .... ......> + , , , .. , .. ....s a ....... ... . . .... ........ ......... ` ...... ............. ..... i i i ..:.......... ....................j..........;..........;..........;.......... ..........1.........t.........j....... ...... .........;................. ..4......................;........ j..........;.......:..:...........t..........:..........i..........1..........1 ;.......... �......... ;... ...... . . ....... ............................ ... ...:.... ...........;.......................................>..................... ............ .................................................... .. .. . .. .......... ........ .... s. ;. ... .4 .. . ...... ..... .... ................ .. ... FMM CF W1 W kr-Grabs.Me&OW1.To OMw MM TOLL FREE 14 0=4 0 JOB. C....4+i4eLTE ED LALLY & ASSOCIATES SHEET NO. 2 OF / III Prospect Hill Road WINDSOR, CONNECTICUT 06095 CALCULATED BY DATE l 0 g (203) 688-2413 CHECKED BY DATE SCALE ......... rJ� . �Jam) �f ( .S.W� .. c?. .. ... �.. 7w ..........Of.� -..i.�'Y I ! en7 e , ' rl .......... ...... .�.... .. . .. ..... ............. ... ..... . . .... . .... , ,......... •, ,A • . . .,.� .. .......... , ... ....................... ...................... .......... �a ............ .. ... ' a. l °' vy.,o. ..... e a,05 . ........ ...4r.. _, ..t �� �J. : ..... . ........ «... .... �r !� S ............ . ..... ...... ..... .. ......... ..........:.........................................a.........,...........,........... ........ . ... ....... .. ., .. .. ... .............. �... . . .... ........................ ....� .... , ................ :.. . . �..... ,. � ... . ... ....... .. ....................... ................«. ....., . ... 4 i.........�........:.........�. ......,.......;....... .... i : : ...... F.......... i..................... ;.......... .........:..........r................. '.. i t .............. ..... ..... • ••+•-• iCy. ..L...........:....... !�'S .....;....,....,.............................. ..... �.. Imo? .........................................:................................ .................. ..... i , : 0. ................ ......... .: ..... .. ........,. ....,......... ,. ....... ... .�.... . . . « : .. 7 i _. .. ............................ .......:...... :....... .. �, ...... ........ ..................« ....... ........ «....... , ..... .. .......... ...............«... . .......... .... ....,. .. .�......... :.......... ......�'o...... . ............................... y,. .. . ,.. .« ............ , ,........�........ :... ... ..'.. ... .....................4... ..{................ .................... 1. ' .. .. •. ..r . , ..� .. . .......................... . : ....:.... .y�.:7 «. . to ............................bt­ a : .........w..........w....................... ................ : ................................... .. ... ................ . ,.. . v ...... . ...... . ...... . ..... .........«.................................... ..................:.........:..........Y.......,.............. .....,....... ......... ( ' .� U G �.`4 e .. .... `S Y'�'L C, . a G w.............................. ................. ...... ...................;......... ......... ..........i.... ..� � , ..............E........}.................;..................j,.........E.........1......... ........ ........f........ ...... ....... .,.........t........ ........,.........�.........;.........,..,..... f.........E........t........;..........1......... f....... ...... ...... ............................ ..... .......... .... ,. ,... A.......... ................. ....�...... ........�........ � .......i...........r..........�..........;...........�........... +..........j..........t..........L....... .... ..................................+...........E........... �...........j...........,. ,..........�. r...... i. ,..........,.. FIIOOUCf 1�Mit Omba Mm&OW1.To 0Mw F11 M TOLL FM 14WnS-M JOB �✓ ED LALLY & ASSOCIATES SHEET NO. 3 OF -•111 Prospect Hill Road WINDSOR, CONNECTICUT 06095 CALCULATED BY �T� DATE 9 (203) 688-2413 CHECKED BY DATE SCALE i ! .... . ..... .... . . ... . .................. E ` + : ..........>..........�... ....a....... ..........1 ..... . ... .... .s. ..... ..... ..... ... .. , ... , .. ... a ... .........................................!.......... . . ..........«.. ... . .......... ........... a ... a ...... , .... .. ..... ,.... .... . .......... a.... , .... ! ! . ... . . . ....... ....... ........:...... . r� '�,c��r,.S,........:......;....a.,......:.9.. ...........w.........:. a �..�.... ...,..... .... ..fit.. ... ... ... , . .. , .. .... «.. .. . ... . , ... ........... a........ . ...... : . . . .... ......... ::i..... , ...y........... ... .. .. ... , n� « ............. L. .../.t./.. ............ .......... .... .. . ......... .........«..........a ............................;..........i..........;... ...............:... .. .......... .. . .............. + i « ... a «........., .... !.......... ............ ......... .......a......... ..........�................. t.... .. I i ! .......... ............................... .........j.............I..........>..... ... ........ ;........a .. /. « -... .. .... `.. : i ............... . T...............................J......................{...........;...........,....... +.. a. ... ..a. < ....... ! .........!... .......... (�.. : .....................:....................y.............................,................................ .s. .. a <. .. ..... . a ... , .. .... .... ..........., , - .. .. ' i.......:.' . . . .. .. .... .. .. , .. .. ... .. .. ..... .............. , .. , ...... ..........�..........T.........; ,........... .........:...........i.......�........i ... .,. �.; . i .1 r� � .......... .. . ..... ...... ... ...................y.....................a... .. , ..... Ly `t' 2 CQ•a..,�►-, tom... .:.. .........G �.. . ,. �. . ... '�'�►', � , . . ... . . . . . . .. . ... .......... .... .................a.........« ...... ............ .......................... ............«......... . ..,..... ... . . .. .. ... «...... « ..... , ...... , ...... , Ay f � ....... ........ ........... ,...........:.....C�Y , ........................ ....... . a.. ... ,. . ., :.. .. ............................ ........ ......................,........,. ......,. ... .,... .... ... . .. ...a . a . ..................a....... ..... 2 E — ..........:....... 4 ...... , . ....................�........ .................... .............................. ......................... ....,... .:.. �... . .... , ........ .............I.......................... :...... . . 1.0.......................................................,.. ...... ....... : .. ..... : .. .. .�............. .. �...... I .... . . .�,...... �........... ...................a..........a..........!!.............. .. ............ .......... ..........,........ .. . ...... .....1...................... ...... ...... ..........I........ i........ I........ ..... 1........ j.......... ....... i ... ........... ..�... ....... ......... n 1 -77 ........... -,.........a.......................................a. .... ...... ;..........., ..................;....................« ..... .........Y.......... .......................v........, ,...�. ..... ...,... .. ....t .... ..a..�Ir• ... , .. . .... .......!... ...............a Fl Wjar a&1�YIC,Oio1K MmL 0191.To Or&MM TOLL FREE I-MnS-= 41 PROJECT: C�4P�row STE,�'L DESIGNER. Ur,::;. DATE: HYDROLOGIC AND CHANNEL INFORMATION SKETCH STATION : . EL._� OVIN 10 w/ ��E'.5, AHW= QI = 7'o cl5 TWI = �...� 0 = TW = -S =CD= . TW 2 2 EL7� oon8 - v EL 01 = DESIGN DISCHARGE , SAY 025 MEAN STREAM VELOCITY= 02= CHECK DISCHARGE , SAY 050 OR 0100 MAX. STREAM VELOCITY= CULVERT HEADWATER COMPUTATION i >- DESCRIPTION Q slzE INLET CONT. OUTLET CONTROL HW=H + ho -I-So � _ -3o cost COMMENTS (ENTRANCE TYPE) H W HW H d � TW h LSO HW s ow D ICe C 2 O o . �I /.26' is- 0,5 0.(63 o.7 o.2s 0.75 0.77T 0,26 o.19 to 3 ��. '7 y.0 I i- y.o 2 1,0 1, 5 �� 35 0.9 (003 -- 1.0 3 o.2 j'[. 6 1. 12 (, , 7y.'7'7 5� t,2 1,5 0 .57 D.sS 1 .05' l.os o.Z&p 1 oVo t.5o r-j., '75.c)o SUMMARY & RECOMMENDATIONS: JOB CA PI ro L- SSTcje7'L- ED LALLY & ASSOCIATES SHEET NO. 5 OF' 111 Prospect Hill Road WINDSOR, CONNECTICUT 06095 CALCULATED BY �► DATE (203) N8-2413 CHECKED BY DATE SCALE .:.......... ........ ;.........,............. ..... .... , , ! :C his, ..�.. �. ... ... �-'►' ............ I 4 1 ... , .. .. .... . .. . .. ... ............, ........�....... v .... , .... .. .........�............... ............... ................. .......<.......,..... ... .. .. ........t........ ...... .. ,.. .. ... , J. . .. .... .. ..... ............ 5/ /... . .. :.. ......... .. .... t'��,,. ... .. �.. :,1��t . ... 4 , .................... i 1 ...71 5,.........j...........�..................�......� .. ;. ..l.. �...... G..... t ....d.................. }............ ............................ ..........,..................... .... .......... , ... .... . ...... ........... ! f 320. . 3 ... 7 Co:yQ (o �'. , ......... . . C x... .:.................... :...... y. ; .................... ........... .................... .........:.........,.. . . . � ......... Zg ?. 7... G • !............................ ........,....... ..,...... ............ . ....... ...... .. ....... .. . . ..... . ..... . ..... ....... ..........:.. ...... :........................:........:... . :. 4 ' ... . . ... , . . .... . ..... ..... ...... .. ..... ..... ...... .... , .... ..................... .......q..........,..........:............... ....�... ........... ...1 .......,. ...., ... a ... , .... , .. .... , ! i .........{.......... ........+......................'........... ................. ........«..... . .. Y.. ..; t. ...... ; ' ' .........1 .. ... ............. , i ' ... ................................ ................ . .. . ..... ....... .. ' ------ ..... ........ . .....�!. 1 D.. cS (.... ............:....... ......... ..... .. ... ... . .. .................... ..........:........... ............................. ... . .... ........ ...:.. ...... ....,. ... ,. ... , ..... ....'....... ..........:....... ........ . ....................................,.... .......... . .... . ..... . , ...... : ....... , ...... .. . ! ...................... • ........... ......... i................. ........ ....,... t.........'........T. . : ... .......... ................. 1 ........;..........i....... _.... ................... .....................�..........' ..................,.......... ...... .... ,.. ... , :................................ ....... ....... .. ..... .. :.........:..........:. ..... ... ...... ... .. .. .... ......... . . . . .. . . , .... ..,. .... ... C ........... ..........' ............ ............ ............. ... ,.... .......,. . ...... . ...... ' ...........:.................................r.........,..........,...... ..,.... .............. ..... :..... .. .. .. .... , ... ....... .... .......,... . ... .. . .......................................... ................................ ; ....................... ................................ .........,. ...... ,.. ...... . . ...... . ...... . ...... .......�...... 1......,.. G....... ........�. ...... ...............1..................1........ ........t........�..........�........,.�........ ..... .. .............................1..........1........ ........I.....................�..........�.......... ..........1..........�.. ..�.. ..�.. �.. �.. { ...... ' . ....... ...... : ...... ........................................ ...................... }..........:.....................�...... . : ......,. , .... ............ .y.......... .:.......... .............. ...... .... ..... ..1.. n. . o ... ........... .............. H100==4�YW,&oinMaOW1.TOOHr11101ETOLL FPO 1400•t7-M C� / Y FLOOD ROUTING ------------- CAPITOL STEEL: EXISTING STORM SYSTEM DESIGN STORM: 2 YR. OUTLET CONFIGURATION: 15 IN. RCP TIME OF CONCENTRATION: 22 MIN. PEAK INFLOW: 4.3 GFS • T (MIN. ) INFLOW :CFS) OUTFLOW (CFS) ELEVATION ---------------------------------------------------------------------- 0.0 0.0 0.0 73.SO 2.2 .2 0.0 73.51 4.4 .4 .1 73.53 6.6 .E . 1 73.59 8.8 1 .4 .3 73.68 11 .0 2. 1 .5 73.81 13.2 3.0 .8 74.00 z 15.4 3.8 .8 74.01 17.6 4.1 .9 74.02 19.8 4.3 1 .0 74.04 22.0 4.3 1 .0 74.05 24.2 4.2 1 . 1 74.07 26.4 4.0 1 . 1 ?4.08 28.6 3.7 - 1 .2 74.09 30.8 3.3 1 .2 74. 10 33.0 2.7 1 .3 74. 11 35.2 2.2 1 .3 74. 12 37.4 1 .7 1 .3 74. 12. 39.6 1 .4 1 .3 74. 12 41 .8 1 .2 1 .3 74. 12 44.0 1 .0 1 .3 74.12 46.2 .° 1 .3 74.12 48.4 .8 1 .3 74.11 50.6 .7 1 .3 74. 11 52.8 .? 1 .3 74. 11 55.0 .6 1 .3 74. 11 57.2 .6 1 .2 74. 10 59.4 74. 10 61 .6 .s 1 .2 74. 10 63.8 .5 1 .2 74.09 66.0 .5 1 .2 74.09 68.2 .4 1 .2 74.09 79.4 .4 1 .2 74.09 72.6 .4 1 .2 74.08 74.8 .4 1 . 1 74.08 77.0 .4 1 . 1 74.08 VOLUME STORED _ 4230(CF) FLOOD ROUTING ------ - -7 I Y CAPITOL STEEL: EXISTING STORM SYSTEM a DESIGN STORM: 10 YR. x x OUTLET CONFIGURATION: 15 IN. RCP TIME OF CONCENTRATION: 22 MIN. PEAK INFLOW: 6.9 CFS r T (MIN. ) INFLOW (CFS) OUTFLOW (CFS) ELEVATION ---------------------------------------------------------------------- 0.0 0.0 0.0 73.50 2.2 .3 0.0 73.51 4.4 .7 .1 73.56 6.6 1 .3 .2 73.64 8.8 2.2 .5 73.78 11 .0 3.4 .8 74.00 13.2 4.7 .9 74.01 15.4 6.0 .9 74.03 17.6 6.5 r 1 .0 74.06 19.8 6.8 1 .2 74.08 22.0 6.9 1 .3 74. 11 24.2 6.8 1 .4 74.13 26.4 6.4 1 .4 74.16 28.6 6.0 1 .5 74. 18 4 30.8 5.3 1 .6 74.19 33.0 4.4 1 .7 74.21 35.2 3.5 1 .7 74.22 37.4 2.7 1 .7 74.22 39.6 2.2 1 .8 74.23 41 .8 1 .9 1 .8 74-23 44.0 1 .6 1 .8 74.23 46.2 1 .5 1 .8 74.23 48.4 1 .3 1 .8 74.23 50.6 1 .2 1 .7 74.22 52.8 1 . 1 1 .7 74.22 55.0 . 1 .0 1 .7 74.22 S7.2 .9 1 .7 74.21 59.4 .9 1 .7 74.21 61 .6 .8 - 1 .7 74.21 63.8 :s 1 .7 74.20 66.0 .8 1 .6 74.20 68.2 .7 1 .6 74. 19 70.4 .7 1 .6 74.19 72.6 .? 1 .6 74. 19 74.9 .s 1 .6 74.18 77.0 .6 1 .6 74. 18 VOLUME STORED - 7460(CF) FLOOD-ROUTING----- ------- V l u CAPITOL STEEL: EXISTING STORM SYSTEM DESIGN STORM: 25 YR. OUTLET CONFIGURATION: 15 IN. RCP TIME OF CONCENTRATION: 22 MIN. PEAK INFLOW: 8.6 CFS T (MIN. ) INFLOW (CFS) OUTFLOW (CFS) ELEVATION ---------------------------------------------------------------------- 0.0 0.0 0.0 73.50 2.2 .3 0.0 73.52 4.4 .9 .1 73.S7 6.6 1 .7 .3 73.68 8.8 2.7 .6 73.85 11 .0 4.2 .8 74.01 13.2 5.9 .9 74.02 15.4 7.5 1 .0 74.05 17.6 8. 1 1 .1 74.08 19.8 8.5 1 .3 74. 11 22.0 8.6 1 .4 74. 14 24.2 8.4 1 .5 74. 17 26.4 8.0 1 .7 74.20 28.6 7.4 1 .8 74.23 30.8 6.6 1 .9 74.25 33.0 5.5 1 .9 74.27 35.2 4.3 2.0 74.29 37.4 3.4 2.0 74.29 39.6 2.7 2.0 74.30 41 .8 2.4 2. 1 74.30 • . 44.0 2.0 2.1 74.30 46.2 1 .8 2.1 74.30 48.4 1 .6 2.0 74.30 50.6 1 .5 2.0 74.29 52.8 1 .4 2.0 74.29 55.0 1 .3 2.0 74.29 57.2 1 .2 2.0 74.29 59.4 - 1 . 1 - 2.0 74.28 61 .6 V.0 2.0 74.28 63.8 1 .0 2.0 74.27 66.0, .9 1 .9 74.27 68.2 .9 1 .9 74.27 70.4 .9 1 .9 74.26 72.6 .8 1 .9 74.26 74.8 .8 1 .9 74.25 77.0 .8 1 .8 74.25 VOLUME STORED - 9590(CF) g / FLOOD ROUTING ------------- CAPITOL STEEL: EXISTING STORM SYSTEM DESIGN STORM: 50 YR. OUTLET CONFIGURATION: 15 IN. RCP TIME OF CONCENTRATION: 22 MIN. 1 PEAK INFLOW: 9.4 CFS T (MIN. ) INFLOW (CFS) OUTFLOW :CFS) ELEVATION ---------------------------------------------------------------------- 0.0 0.0 'a.e 73.SO 2.2 .4 0.0 73.52 4.4 .9 .1 73.58 6.6 1 .8 .3 73.69 8.8 3.0 .6 73.89 11 .0 4.6 .8 74.01 13.2 6.5 .9 74.03 15.4 8.2 J 1 .0 74.06 17.6 8.9 1 .2 74.09 19.8 9.3 1 .3 74. 12 22.0 9.4 i .5 74.16 24.2 9.2 1 .6 74.19 26.4 8.7 1 .8 74.23 28.6 8. 1 1 .9 74.26 38.8 7.2 2.0 74.28 33.0 6.0 2.1 74.30 35.2 4.7 2. 1 74.32 37.4 3.7 2.2 74.33 39.6 3.0 74.33 41 .8 2.8 2.2 74.33 44.0 2.2 2.2 74.33 46.2 2.@ 2.2 74.33 48.4 1 .8 2.2 74.33 50.6 1 .6 2.2 74.33 52.8 1 .5 2.2 74.33 55.0 1 .4 2.2 74.32 57.2 1 .3 2.1 74.32 59.4 1 .2 2. 1 74.32 61 .6 1 . 1 2.1 74.31 63.8 1 .1 2. 1 74.31 66.0 1 .0 2.i 74.30 68.2 1 .0 2.0 74.30 70.4 .9 2.0 74.29 72.6 .9 2.0 74.29 74.8 .9 2.0 74.28 77.0 .8 46 74.28 VOLUME STORED 1060@(CF) FLOOD ROUTING ------------- CAPITOL STEEL: EXISTING STORM SYSTEM DESI6N STORM: 100 YR. OUTLET CONFIGURATION: 15 IN. RCP TIME OF CONCENTRATION: 22 MIN. PEAK INFLOW: 10.1 CFS z Y T (MIN. ) INFLOW (CFS) OUTFLOW (CFS) ELEVATION ---------------------------------------------------------------------- x 0.0 0.0 0.0 73.50 b 2.2 .4 0.0 73.52 4.4 1 .0 .1 73.58 ' 6.6 2.0 .3 73.71 i 8.8 - 3.2 .7 73.91 r 11 .0 4.9 .8 74.01 } 13.2 6.9 .9 74.03 15.4 8.8 1 . 1 74.06 17.6 9.5 1 .2 74. 10 A 19.8 10.0 1 .4 74. 14 22.0 10.1 1 .5 74.17 24.2 9.9 1 .7 74.21 26.4 9.4 1 .8 74.25 28.6 8.7 2.0 74.28 30.8 7.8 2.1 74.31 33.0 6.4 2.2 74.33 35.2 5. 1 2.2 74.34 37.4 4.0 2.3 74.35 39.6 3.2 2.3 74.36 41 .8 2.9 2. 44.0 2.4 2.3 74.36 46.2 2. 1 2.3 74.36 e 48.4 1 .9 2.3 74.36 50,6 1 .8 2.3 74.36 52.8 1 .6 2.3 74.36 55.0 1 .5 2.3 74.35 57.2 1 .4 2.3 74.35 59.4 1 .3 A. 74.35 61 .6 1 .2 2.2 74.34 63.8 1 .2 2.2 74.34 66.0 1 . 1 2.2 74.33 68.2 1 .0 2.2 74.33 70.4 1 .0 2.1 74.32 72.6 1 .0 2. 1 74.32 74.8 .9 2. 1 74.31 77.0 .9 2. 1 74.31 VOLUME STORED 11500(CF) JOB ED LALLY & ASSOCIATES SHEET NO. , OF / 111 Prospect Hill Road WINDSOR, CONNECTICUT 06095 CALCULATED BY ' r DATE (203) 688-2413 CHECKED BY DATE SCALE �. .. i.. ........... j .4 If h Sr ..... I ................ .. .... .........; ................. ... ... ..............,. .... .... , ........ ... .,.. .. . . . . . . T . . . . RO.O..f. '��s. f�e? ejZ ;fig 3 . aQ ..................... ......... .......... . .. ............ . .................. ..... .......... .................. ........ ........................... ............ .......... . . ... ......................... ...........;......... .. ..�........ .... ... ...s .. ..q.... .>. i .... .. . ............. ... .................. ,. .. ..` f ;....="..... ,�.. ..� '�! .... .. . .. ... 1 _ .r. / . ... . . i0 .................................t........:......... ....,..........,..........:...................... ......,.. .... , ...........:..........:..... ....... ... :............ ...... .... ...... ... . .. . . . .... . dC,-Fr Co .......................... . ......... .. ....................; ... ....... .... .. ........: . 77'Cw�Z .... . •...........L... . ..c.-f-�. ........... .......I....... a......... .. .... t:.... ,.. . ....... . ... .. ... . .. ........:.........L.... ...i........ ... ,. . .. ... . ..... ........ ��..dr........... r. . ...... .. . . . . ..... . ..... .. ................ ..t.........�............. ... . . ..... . . ;. ,........ c _.. ....... . ....... ....................... .............................;...................i. ............. ... ...... ............................... ........,... .............. �V/. . . .." 3.7� ......:..... ......................... .............. ..... .:...........:... ................�... . .......... .................................................... ........ . .. ... .. ........... ...... , ..... 1-f �' ......: ............................. ................................. ........,........ :............. .... , .......��.... . ... ...... . , .. . . . ............. .. : .... .. . .. ........ ........................... ....................... y7 . ..................*..........L..........1........j.........;....................;.........a.........t..........�.............. . ; . . , ../..............>......... ..........,... ... . ... ,........,....... !........ : 1 .........o..........�...........j..... .F-••• ................. ......p........ ,.�. .........`....M S:.l .,. ... a ...... ..... ................. .... ...... ............ ..... ! ..................a ..... I . FIIO=MJ�Wkv.&dmMm&OUn TeOr&Ff1M TOLL FREE14OGM MD - - JOB GZPI / VL S77_eA!5Z . ED LALLY & ASSOCIATES SHEET NO. /7. OF 111 Prospect Hill Road ., WINDSOR, CONNECTICUT 06095 CALCULATED BY M�G DATE (203) 688-2413 CHECKED BY DATE SCALE : ' s. .. ... .. ... .s... .., .... . - .. .... .. ... .... i .............................. .�-.< YI I 1. - .s .. �.,. ...... ♦. .. ... ., .. .... ........... ... .................................................. :..... ... ... .... .,.. .. ., .. .. .. .. .. > ... a .. < ., ... .s .. s , ..... 0, .... f. . x ..y.. .. .= . , ..�� �? ..> ifs : ................................... ........... ............. ... ........... ... .. ..... . . .. ..... ....... 14. ......... 0.6 -Colo, rbu_.l ...... .. .... .................................�............. �.....� ., ......=.. . ....�.3. .�. - - . •. ,.�.. .............................. ........................ .......... . .. . .. ... ... . ..... ccvr, ....................:.......... ...... ..,........._ ...... .. .s , , - .. ... : , .. .s .s .. ... ... , ......... ... ...............................{.. ........... .:...... .... .. , . <. .. ,. ... , ................. .......1...........t................... ........J....... , ... .... ... ........ , , .. , .. .. ;... ...... ......... ... .... .....................i............. . ....:....... . ..: >.... .................................................................... .... ,. .. .. .: .. ..s.. .,.. ..., .. , ........ ........ .....s......................... ..... i ... ... ... .. ... .... ... , .. .................... ..................... ' ... ..s. ... , . ............. .......................... , s , • i . ......... .. .. . ................a................ ......................l..........«.. ............. .... ..... , .......................... J. ....................... ...... ........,......... ................. ................................. ..........:... ..... ,... ......................... ................................>..............................;... ........................, .. .. .. >. . .. . .......... ............................... ...... ................ «........ i...........:...................... .............................................. .. .......... ........... ,. i ............. ... .. .........i....... . . .....................t..........�..........j........ �..........f........ + ...... ...... .......a....... i ........J........... ......{......... ........1......................1...........F..........:.......... .......... .....................�.......... f �.. �.. r.. �. ,.. �..........t............ ! . .................... . ............ ...« .... # .. .......... Rome M1�M c..GmM Mw OtOl.To Or*MM TOLL FREE 4Oo-7PS M JOB_ 77)1— S! EAiL ED LALLY & ASSOCIATES SHEET NO. /3 OF / 111 Prospect Hill Road — — WINDSOR, CONNECTICUT 06095 CALCULATED BY DATE (203) 688-2413 CHECKED BY DATE SCALE I , A: I ....... .......... ........ / r ...........:.......... _ i Ck- GY!-e...s .. . �. .... L�c/h.o es -v Z. .. �.. . S .., .,,>r.......... . .......... ..................... .........:...........:............................_...................... ......... ... .. . . � . . ... .. u...c�- . .... ...v ... ........ rids a .r. e I ;....a.:................ .S. ........: .. ti. ..... . . . - .................... . i I ........4.......... ......... ..a.....�...............�.11.....�.:••7 � - -. ... , .. .s , I , , .. ... .,- - ... .... ...... � l es s o IJ/-Ve .... ..... ..... C1 . t�C ' ..................... ...... /o ......... .......... .............................:.......... .. ...........:..... .................. .. ..... ..... .. .. .. . ..... . ....................i.. " 0. 'vr� ;�'�c.�. P., . eCO , ...... a ................................. .... ..:........... .... ... .. .., ...... .....................,........ ` D eve��. a..�� �'.. ►�. . Q �r ...... ►'►' 0. ........ I .. ................... : ....................�...........,....... ........... ,.................. ........ .......... : " � I • .....,�e.c..e s.. .rr .... I .. .................. ................................:....................:..........:...... ..... . . .... v .... , .s , a; ...... ...;.. I -- ................> .....A.. .. ... ....:.... ,.. ..,.. .. .,. .... .. ...> - ,c c�............ �. Ir '1. ..+ 1. .. ��//..���!'` +ti... ...`.. .... .. II I i I . ...... ' .................. .. . ...... . ...... . ..... ....... ... t'1100UCf t�lne Gropn Wa OW1.To Oro&MOLE TOLL FREE 1-IOo-MM JOB 7 ED LALLY & ASSOCIATES SHEET NO. L / OF / . 111 Prospect Hill Road WINDSOR, CONNECTICUT 06095 CALCULATED BY �� DATE (203) 688-2413 CHECKED BY DATE SCALE i.........!. .........{ i i i ......... .... ..........���.....�.....�.....j...........i.........t..........y.... ..............;....... ........{......>. .. i .......-.`....> .............. ........ ........ .. ..... ........................... ............... ... 1 j..... f.........{........ ,.........,. ,...........�... , _..�..........:..... .: ......:....... ...... .. .....:....... .... . ......... �: r ec .. . .... ..... . ......... ... ...................: �o� -1`�e/. %. :- .:. .s'f.c PIE. : a` �^ . ....... .........................................:.. ......... ry......... . ...... . . .... . ... .. ....... --�- �'c 'oo o o.. - fs ra- . .....................1....... ... 4.. ... ....... 1........ ......... .p.. t. t .. .. .......... .. .t .. .. .. .... .. ..... 1 ........... .......... PC>S ........:...................................>.........a. ...................................... .. ..... , `................1...• ... '. ....... y..........!... .s I.I. , ........;........... ........ I i , i t .....................�. .. ..........,....... ..j...........y.......i.. .....�... .. .. ., .... , ..... .. .. > , : .. s , ....:........ ...... t i �.J..... O ,Y y ... ...... I I ........:..........:.' .a "..:... . .. ;......l�V.... ...... .......... ........ p I i ................... ..:.......... ................... ........ ,.................. .. ....... . . a ........... .................. ........................ _.......:.....................>............................ ........,...... ......... ,..... .> .. :. ... . .. . ,................. . ....., ... t ... , ...... 3. >........ �..1 ,...... . .. t .�S.S Q,... . . ......................:......................�..........4.........,......... ..... .. �. . .. > . .. ........................... . ..... oft .......... .................... .......---}...... ..;..... ... ... ........ .. . .......... .... .......... .............................. .... :......................y. ... .,... ... .... ... :.... ..........................., ... . ......... , ... i Sc . .............................. ...... ..... o e. ..:.... `f'Q .. . ., . . ...... n.. d... . 1 1 . . .........�............................................................ :. ... .>..... .... ..........,............................. I i i i ^ 1� ...... ...... >.........ram � 1 ...........................~�.01...,........ , ...c�..... .... .2.. �ate, .v ;.. , ...... ............................... .. .....................................................i..................... ......,........ . ... .> . .... 4 .. .. ..{... .. .. . .....................................................:......... :........i................. .... ........... t................... , .................. . ...... :..........:............................................>... ................ ... .,.........,.. . ............ ........... .. ......................:............................. w........,.... ..............,..........i...... ... ..... ..t.... ......... •...........>........................................... ..... �........f.......... .......... ...............................' ...... ...... I ...... .... .... , . ....... .... ....... , .............. ' i t i ........ :........ ! FROOLICI YR&dA mm Owl.To Oft EFIOtE TOLL FREE$4*M-1l0 CS CAPITOL STEEL OF HARTFORD, INC. 121 CONNECTICUT AVENUE, SOUTH WINDSOR. CT 06074 TELEPHONE 203/724-0285 n. r "' F I V E D JA N 1 1 1989 SO. WIjdLN-)'OR PLA."MING DEPTH, January 1 1 , 1989 Town of South Windsor South Windsor Town Hall South Windsor, CT 06074 Attention: Marsha Banach Director of Planning & Zoning Reference: Application #88-70P Capitol Steel Addition Dear Marsha, This letter is in reference to Inland Wetland Commission letter of 10/18/88, Public Works letter of 10/25/88 and our extension request of 11/25/88. We are resubmitting 6 sets of revised drawings for your review for Planning & Zoning Commission meeting for Inland Wetland Commission Records. Kindly review and advise us of the next scheduled Planning & Zoning Commission meeting, date and time. Sincerel , C ITOL TEEL OF HARTFORD, INC. Guy rns . . . AN AFFIRMATIVE ACTION EQUAL OPPORTUNITY EMPLOYER . . . r } o ~ V/ S_aa� ?dzr� c � 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 AREA CODE 203/644-2511 °so!co- si M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works RE: CAPITOL STEEL, SITE PLAN Please be advised that this Department has again reviewed the subject plans dated September 14, 1988 and offer the following comments : l The proposed roof leaders discharge is directed toward the adjoining property owner and is not acceptable. 2 . r�$8'-S Ees�iti�, o r have nat haa-n Addr z-a-@. Additionally, the flow ( surface drainage) to the outlet structure is not defined ner Ye thers any nteurs sw wn-an eng-the Wes aite. C P O 8-/01 UA'oe�� MJG/jsv cc : Project File _ Of SA& ;/�.. .� i Ti PE it L t/IL i.4,u� C� •s-► �t i S0,014 8f,co u T0� 0_P S-Otd4h �v 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 AF.EA CODE 203/644-2511 SOR CO 27 January 1989 Mr. Guy Burns 121 Connecticut Avenue South Windsor, CT 06074 re: Appl. #88-70P Capitol Steel Site Plan Gentlemen: Please be advised that the Planning and Zoning Commission voted on January 24, 1989 to deny the above-referenced application for a site plan of development. The reasons for denial are: 1 . Information submitted suggests poor site drainage, with drainage flowing offsite to the abutting Savin property. Positive drainage to outlets is not well defined, and drainage plan generally is not satisfactorily complete on the plans submitted. Furthermore, easement areas for offsite drainage have not been indicated. Therefore, in each instance indicated above the application does not comply with Section 4. 13 and/or related subsections of our Zoning Regulations . 2 . Drainage comments submitted indicate that the site will experience flooding during storm events -greater than 2-year frequency. This is not in compliance with our regulations. We would be happy to answer any questions you might have regarding the above. Very truly yours, PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. Chairman cc: M. Banach, Dir. of Planning M. Gantick, Dir. of Public Works Y PZC File tO~N st4 r 0 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 `� R,Cp AREA CODE 203/644-2511 'ti'OSOti Fax. # - 203-644-3781 FACSIMILE MESSAGE TRANSMITTAL FORM Date: 127 ,99 PLEASE DELIVER THE FOLLOWING PAGES TO: NAME: �U �N/ti/L — �/�/ ?> ADDRESS: FAX. : MESSAGE FROM: NAME: � � Seg. ADDRESS: �� ® (�LL/)//�•�/ j/C MESSAGE NUMBER OF PAGES TO FOLLOW: / e Tjo�� 0-1'g S-OU� ?d&&46'at 1540 SULLIVAN- AVENUE • SOUTH WINDSOR. CONN. 06074 R•CO AREA CODE 203/644-2511 �SO TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, JAN. 28, 1989 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At its Jan. 24, 1989 meeting, the Planning and Zoning Commission voted to take the following action: 1 . Approve, with modifications, Appl. #88-107P, Alford Associates (Vintage Homes) , for a 2-lot resubdivision of property at 218 Foster Road (easterly side of Foster Road northerly of Ellington Road) , RR Zone. 2 . Approve, with modifications, Appl. #88-108P, Walter T. and Cynthia L. Foster, for a 1-lot resubdivision of property at 90 Foster Street (southeasterly side of Foster Street) , RR Zone. 3 . Deny Appl . # -70P Guy Burns, Capitol Steel Site Plan, 121 Connecticut ve e, IP Zone. 4 . Approve, with modifications, Appl. #88-90P, D. W. Fish Site Plan, 1774 Ellington Road (5-Corners area) , RC Zone. 5 . Deny Appl. #88-98P, Theodore F. Srubas Site Plan, southwest corner Sullivan Avenue & Schweir Road, I Zone. Dated at South Windsor, Connecticut this 25th day of January, 1989 . PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. , Chairman Marshall Montana, Secretary x X P-625 092 353 RECEIPT FOR CERTIFIED MAIL NO INSURANCE COVERAGE OROVIDIC NOT FOR INTERNATIONAL MAIL (See Reverse) #Not Sent to ft CW) Ln Street and No t 6 4: P.O.sty irz P C Postage S Certified Fee Special Delivery Fee --4 Ilk Restricted Delivery Fee Return Receipt showing to whom and Date Delivered C howin 9 to whom Return Re Date. elivery-C T 0(3 s mark or$A, E U. March 7, 1989 TO: All Customers and Vendors of Capitol Steel of Hartford, Inc. RE: Directions to our rebar fabrication facility located at 121 Connecticut Avenue, South Windsor, CT. Take I-91 to exit 35. Go east on 291 across the Bissell Bridge. Turn left (north) on Rte. 5. The fifth traffic light is Governor's Highway. (CBT bank on the left and a G. Fox sign on the right) Turn right onto Governor's Highway. The second right turn is Connecticut Avenue. Turn right onto Connecticut Avenue. The second right turn on Connecticut Avenue is Capitol Steel. Enter the building by the small door just to the left of the large truck door. The office is the first door on the left. Enter that door and proceed to the counter with your paper work. You will be instructed on where you are to be unloaded. If the material you are delivering requires your trailer be turned around before unloading begins, turning should be ac- complished by proceeding along the drive way to the rear of the building. You must turn around in our trailer parking area and then return to the front of the building and backing into our front large truck door. DO NOT attempt to back in from Governor's Highway or to use any area besides our _yard for turn- ing your trailer around. Police will take notice. r ' = a '1( i -T, Z 1:IN S R I I _t;, ..... [WIND75C t• �Y�. Ir��l y � y�j f + . 6 • .r.« s—mil� i1 � ; —�v�� !• •"" � ��. p ''� __ r' o t• T: 7 '•., r a.3. .« �_` . A•er i Q l ! 'Iris: 1;I •`��.y tiy' .� J t 1 r ' -J. ® _ _ a S `,• - _ .iI �'Y•"' �I w !•s_ 1 F417 f 1�.• r.\ VR ii::rr�.a = 291 ....---'• a wa• r' L 1 f,• u JOINS MAP 5: PLANNING DEPARTHENT IN-HOUSE REFERRAL FORK TO: Karl Reichle, Mike Gantick, Mel Stead, Fred Shaw, Richard J.' Sartor, Gary Tyler, Fire Marshall Lanning, Jim Snow FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the following project:# Zone. Acreage 3 Subdivision Site Plan Residential No. of Lots/units Commercial Industrial_ C Location: Project Description: Future Town-owned property involved? Yes No� (a)new streets (existing frontage also) (b)new open space/recreation area active passive (c)new detention area Planning Department comments Please let me know by l '?�,�� if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. S CAPITOL STEEL OF HARTFORD, INC. 121 CONNECTICUT AVENUE. SOUTH WINDSOR, CT 06074 TELEPHONE 203/724-0285 March 82 1989 RECEIVED To: Walsh Brothers, Inc. NEAR James McCormick Sons New Jersey Steel SO. WINDSOR PLANNING DEM Florida Steel Corporation North Star Steel Connecticut Steel Corporation Forbes Steel Wire Corporation George Transfer Inc. Greentree Transportation Co. Ho-Ro Trucking Co. , Inc. Lane Epoxy Coatings Div. Reforce Steel Wire Corp. Thypin Steel Co. , Inc. From: Jim Reid Production Manager RE: Traffic We have received complaints that tractor trailer rigs are using the public streets near our South Windsor facility for a turning area. Attached you will find directions to our shop in South Windsor, CT along with instructions on who to see, how to enter the plant, and how to turn around. A copy of these direc- tions should be given to any driver being dispatched to us. Governor's Highway east of Connecticut Avenue should not be used by large trucks. This is a residential area and the town has asked that we do not send large trucks onto this road. It is imperative that these directions be followed. Jim Reid Production Manager cc: Sgt. Tom Hart, South Windsor Police Marcia Banach, Town of South Windsor Ahsan Haque, Capitol Steel of Hartford 1 M0 . . . AN /AFFIRMATIVE ACTION EQUAL OPPORTUNITY EMPLOYER . S CAPITOL STEEL OF HARTFORD, INC. 121 CONNECTICUT AVENUE. SOUTH WINDSOR. CT 06074 TELEPHONE 203/724.0285 3 VILLAGE ROW, LYNNFIELD. MA 01940 TELEPHONE 617/334-5400 MAR SQutl1 Winclsor- d�a�E� �aino. wissdv March 9, 1989 The Town of South Windsor Planning & Zoning Department South Windsor, CT 06074 Reference: Capitol Steel of Hartford, Inc. , Addition Engineering Review Dear Marcia, As per your _ _ engineering department. review, we are submitting our drawings for your presentation to the board. We have been told that these comments are so minor that these could be handled even after the Planning & Zoning Commission meeting. Since you have confirmed that this resubmission will not affect the hearing date, hence, we are providing final revised drawing for March 14, 1989 hearing. SingeTbly ITOL EEL OF HARTFORD, INC. 0 y B s mamma I � MM AN AFFIRMATIVE ACTION EQUAL OPPORTUNITY EMPLOYER