Loading...
HomeMy WebLinkAboutSITE PLAN (44) TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING AND ZONING F COMMISSION FORM brouth Windsor App- IMPORTANT! D R CelVed: Department staff g y: Fre1qu ng and Engineering Dep lication ti n r ublic Hearin B f e 14 days to determine application eteness. To ensure receipt of a ReC 1 Nam• ete application by PZC, it is strongly mended that the application be submitted ys prior to the Regular Meeting at which ll be received. APPLICANT: �,A.v�� � ' •f CT TELEPHONE: �° 2 ADDRESS:1�� FA�WTOP Avg' Nr. �� _ OWNE R OF RECORD ON LAND RECORDS: 5� E ADDRESS: yV COMPLETE LOCATION OF PROPERTY: N 6 Go(�N� a D V��l��5 !� �► J'fv t0 aK-'f S�iGT ZONE Np,LujE, ADDRESS & TELEPHO NE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: 5�►M E TELEPHONE: of the following) THIS APPLICATION IS FOR: (Check one (public hearing required) 1. Zone Change to 2. Subdivision required) 3. Open Space Subdivision (public hearing 4. Resubdivision (public hearing required) 5'. Special Exception to Article (public hearing required) 6. Site Plan of Development (Section 10) and/or Earth Removal (Section 9) 7 . Earth Filling (public hearing required) 8 . General Plan of Development Subdivision 9 . Regulation Amendment: Zoning 10 . Other (explain in detail) SIGNED BY THE APPLICANT AND OWNER OF THE PROPrRTY THIS APPLICATION MUST BE SIG 7 if public ng AND SUBMITTE D IN TRIPLICATE WITH SIX SETS OF TH MAP s requ ired)uired) END OTHER DOCUMENTS (see page 2 --------------- CJ M� 0 er p,pplicant ���j A1/14/87 (see reverse side) TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING AND ZONING COMMISSION APPLICATION FORM This application is complete and ready for Planning & Zoning Commission receipt only upon submission of all required documentation, including, but not necessarily limited to, the following items. Not all items are required with every application. See applicable sections of the South Windsor zoning and subdivision regulations for specific requirements. APPLICATION CHECKLIST 1. Key Map 2. Architectural Elevations/Floor Plans 3. Completed application form (in triplicate) 4. Required fees S. Zone Change, Site Plan, Subdivision, Open Space Improve- ment, and/or General Plan of Development maps, in accordance with regulations. (Six sets - seven if public hearing required) 6 . Plans & Profiles/Drainage Calculations ' X 7. Conservation Plan x 8. Landscaping Plan 9 . Traffic Engineering Report 10. Narrative Statement 11. Sanitary Report 12. Copy of agreement to purchase land (if not the owner) 13 . Other ALL PROSPECTIVE APPLICANTS ARE URGED TO CONFER WITH TOWN PLANNING DEPARTMENT AND ENGINEERING BUREAU STAFF PRIOR TO SUBMISSION OF ANY APPLICATION TO THE COMMISSION. CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. 1/14/87 TOWN OR SOUTH WINDSOR APR INLAND WETLANDS AND WATER COURSES South Windsor APPUCAT10N INLAND WETLANDS AGENCY/' THIS APPLICATION, ONCE INMW D AT A INL AW w AGENCY ACTION (SEE BACK OF THIS FORM)+ SHALL BBIS ME REGULARLYAT =� p REGULARLY SCHEDULED MEETING OF APPLICATION NO. b f TOWN HALL. AT ATE THIS APPLICATION MUST BE ��FIN TRIpLICATESOUTH WINDSOR BY RECEIVED 0 THE OFFICE OF THE TOWN CLERK PUBLIC HEARING OATS 12 NOON AT LEAST 14 DAYS PRIOR TO THE SFIR OF MAPS (if no ssary) REGULAR MONTHLY MEETING DATE. TARES COMPLETED APPLICATION OR PLANS MUST BE SUBMITTED TO THE TOWN ENGINEER PVMIT GRANTED DATE_ AT LEAST 14 DAYS PRIOR TO THE FIRST REGULAR MONTHLY MEETING DATE. PERMIT DENIED DATE PLEASE PMtINT OR TYPE. 1. APPLICA NT DAV 97 TEL NO. AOOA 1N&TO1�1 A46..CITY A STATE Z. OWNER S^,AA G TEL NO. ADDRESS CITY & STATE W NuTM� p. IJ'tE�sf� 3. LOCATION OF PROPERTY or— ohol�s7G � NAMES OF ADJACENT PROPERTY OWNERS ' \NILL ^ 00NCB l 15 A O LIZ AA rQ Ar Ler . V 1G 558G1 ES STATt C ULML.Y AND BRIEFLY S. PURPOSES AND DESCRIPTION OR THE PROPOSED ACTIVITY.AND THE TIME ELEMENT INVOLVED: FjLl•lt4& WETLAMDS V+^T i-'AV15 1:10 N pJcleVlO V5 k%( STVIC 115Y /NAM �Ew AILVA—S ')!AT W11011.0 lcFly z.T TO W9TLAH f7s A�'rER STA61 l.1ZA% fa1`1 ATTLNTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED COMPLETE ONLY VMEN ALLINFORMATION 3 DOCUMENTS REOUIRED BY THE AGE CY.HAVE 13M SUBMITTED. APPROVAL MAY ALSO BE NECESSARY FROM THE PLANNING ANO ZONING COM- MISSION. AN APPLICATION FEE IS REQUIRED. CONSULT TEL ED (SECTIONS 6.9, 6.9a 'and 6.9b) . A SIGN IS REQUIRED. CONSULT THE (SECTION 6.3a) . SIGNED: (Ap t) 10A VIVA. Or-O WN C%AM9 (owner) Revia w 8/12/85 CHECKLIST FOR REQUIRED INF OkMAT I ON 6• _ .q.PPL1C�1�iT HAS HAD NO-PS AND PLw-l.NS CERTIFIED BY SOIL CONSERVAT I ODt SERVICE TO VERIFY Comp LET E COMPLIA.NCE WITH CONNECTICU l GUIDELINES FOR jUIL = OSION AND S ED DMEN T C UN.TR OL ( A.S PER F-ZiND SOUK, .6 AIMEND ED ED, .AND PUBLIC ACT 83..388.. AS AKENDF.D. DATE OF CERT IF ICAT I CDC 70 APPLICATI CDC IN.F ORMAT I Oft COMPLIES WITH AGENCY'S REGULATIONS ( SECTIONS 7.I, a through j. 8. REQUIRED FEE HAS BEEN PAID. DATZ RECEIVED 9. APP LICAM ( OR DESIGNATED REP RESEN.TAT IVE)HEREBY AT`. F=S THAT A SIGN WILL BE POSTED AT THE FOLLOWING LOCATION(S) NUTM6& IZ MCKTH HIl�f1WAY 0D0 J t7A1Kl aS BY VAV i D ON OR BEFORE ThE F DATE SIGNATURE Pt 40P A 090 W" THIS AP P LI CAT I Gib IS FOUND TO BE COMP LET E AND NOW QUALIFIES FOR PLACEMENT Oki THE AGENCY'S AGENDA: DATE SIGNATURE Town Engineer (Agency Sec'y Agency Chairman THIS APPLICATION IS INCOMPLETE BECAUSE OF THE FOLLOWING UUMBERED IT EMS ( FROM ABOVE ) AS CHECKED 8FLOW: 1 2 3 4 5 6 7 8 9 v PS-aa& qdzrl� R CONN. 06074 ° E SOUTH WINDSO e y ` 1540 SULLIVAN AVENUE AREA CODE 203/644-2511 SOR.C TO: Marcia A • A. B anach, Director of Planning Officer Zoning/Wetlands Enforcement v FROM: John E. McCahi 11, �� te: Review and comments on the Final David Brown si RE: for the site. Plans" lane reflecting the most current 1 . The IWA/CC does not have p les of revised plans Three cop' changes dated 3/IWA/CC ' ted to prior to construction. be submit with experience in the creation nfis 2 , Although a consultant wi the written p wetlands has addressed the Commiissiont to provide details for rovided the genera and needs to be Barske, PhD has p very g Philip t outline construction activities . marsh" . In the concept "concept of creating a which may require modifications there are many site variationslane or we may work* This must be reflected on the Work or not, for to site wo lane as shown► whether they end up with the p which is best for the site as it the site. Who is to decide progresses? n the lane. This, and 3 . There is now some well data indicated should be utilized and Y an other groundwater data aedlon the plans . basin contours further re in _ lan sheet 3" , 4 , Sheet number 7 Of 11 "note - refer to plot-plan should actually reference sheet 4 • s in the 5 . Details should be provided for the rip-raP of the bend Swale. laced ,when of 11 indicates a snow fenthetOnteA of the snow fence g , Sheet 5 lete" . I believe . clearing is comp limit of clearing. Limits of construction is to also act ato bephysically established on the in general need phasing or s tO There is 7 . unt no of disturbance indicated on the Area of disturbance i o limited. other means of limiting a plans . topic of concern. There is nothing o 8 . Stump de the plans to inpositiondi at a p ethedisposal of stumps* r 9 . IWA/CC approval condition #12 indicates a concern for effects on the groundwater table up and downstream. This has not been addressed as of yet. 10. The detention area (which will act as a siltation basin) , proposed swale, and wetlands creation should be given priority on the plans. These areas should be stabilized prior to remaining construction activities taking place. -33 O FUSS8c MBLL consulting engineers w M E M O R A N D U M TO: MARCIA A. BANACH, DIRECTOR OF PLANNING FROM: BETSY A. KAEMMERLEN, ASLA RE: DAVID BROWN ASSOCIATES GOVERNOR'S HIGHWAY SITE 1. Maximum 4:1 slopes have been indicated on plans (Sheets 5-7) . Contours were redrafted from originally proposed 3:1 slopes to 4:1 in critical areas. Due to the slope requirement the buildings and roadways were shifted 3' to the north (minimum distance to the property line changes from 105 ' to 1021 ) . 2. Approximate limits of construction are indicated on Sheets 5 & 6. 3. Siltation basin is indicated on Sheets 5 & 7. 4. It is not possible to show the buffer on the "plot plan" since it does not include the east boundary line. The buffer is shown on Sheets 2 & 6. 5. Riprap is indicated on Sheets 6 & 7 as required. 6. Riprap is indicated on Sheet 6 at culvert discharge areas. 7. The work "not" was removed from note on all drawings. 8. A submittal was made and approved. 9. Groundwater was addressed in the wetlands creation plan and discussion with the commission. Groundwater elevations are indicated on sheet 6 in the table of monitor well data. 10. Sanitary laterals were changed from 4" to 6" , as directed by Town Engineer. cc: Jerry Iazzetta David Brown Andy Smith 87-408 Corres. 0317A89BAK 146 HARTFORD ROAD / MANCHESTER, CONN. 06040 / TEL. (203) 646-2469, FAX. EXT. 307 SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS•HYDROLOGY and DRAINAGE SYSTEMS SITE PLANNING HIGHWAYS and BRIDGES•SURVEYING•LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC•PUBLIC WORKS MANAGEMENT 9 HYDROGEOLOGY SOIL SCIENCE SERVICES 104 Elm Street, Cheshire, Connecticut 06410 SOIL REPORT TO: Fuss & O'Neill, Inc e SSS Job No. 87-716-CT-SWI-15 210 Main Street Client Job No. Manc e s e r, CT 06040 Site Inspection Date 12/10/67 PROJECT TITLE AND LOCATION C as le Corp. , Governor' s Highway & Nutmeg Road, South Windsor, CT PROJECT DESCRIPTION:Inland wetland identification and classification of soils METHOD FOR IDENTIFICATION OF MAP UNITS Wetlands X❑ Field marking(flagging) for survey. Q Field plotting on Property Line Map , scale: 80 2 f t contour: ❑ Field plotting on aerial photography. Non Wetland Soils 0 High intensity field identification by Soil Scientist. ❑ Medium intensity identification from USDA, Soil Conservation Service Soil Maps. METHOD OF SOIL IDENTIFICATION SOIL MOISTURE CONDITION XJ Spade and Auger ❑ Dry 0 Moist [] Wet ❑ Deep test pits(backhoe) Frost Depth in. ❑ Other Snow Depth in. The classification system of the National Cooperative Soil Survey, USDA,Soil Conservation Service and the County Identification Legend were used in this investigation. The investigation was conducted by the undersigned Certified Soil Scientist. All wetland boundary lines established by the undersigned Soil Scientist are subject to change until officially adopted by local, state or federal reguiatory agencies. Respectively submitted by Approved by SOIL SCIENCE SERVICES Soil Scientist Kenneth C. Stevens,Jr Field Investigator Principal Soil Scientis See attached page(s) SOIL REPORT continued PROJECT TITLE: Casle Corp. , Governor's Highway & Nutmeg Road, South Windsor, CT MAPS/PLANS TRANSMITTED TO CLIENT Sketch location of Wetlands and other Soil Types. None NUMBERING SEQUENCE OF WETLAND BOUNDARY LINE MARKERS 1 THRU 7/46 8 THRU 35/111 36 THRU 46/7 36/47 THRU 63 SUMMARY SOIL DESCRIPTIONS WETLAND SOILS Walpole sandy loam (Wd) . This is a poorly drained, moderately coarse over coarse textured, friable over loose glacial fluvial (outwash) soil. NONWETLAND SOILS Windsor loamy fine sand (Wv) . This is an excessively drained, moderately coarse over coarse textured, loose, glacial fluvial (outwash) soil. Sudbury fine sandy loam (Ss) . This is a moderately well drained, moderately coarse over coarse textured, friable over loose glacial fluvial (outwash) soil. For further information about the soils, refer to Soil Survey, Hartford County, Connecticut. SOIL SCIENCE SERVICES 104 ELM STREET•CHESHIRE, CONNECTICUT 06410• 203-272-7837 KENNETH C.STEVENS,JR.,PRINCIPAL SOIL SCIENTIST THOMAS W.PIETRAS,SENIOR SOIL SCIENTIST VIRGINIA E.BURKHARDT,SENIOR ECOLOGIST December 14, 1987 Christopher Stone Fuss & O'Neill, Inc. 210 Main Street Manchester, CT 06040 Re: Casle Corporation, Governor's Highway and Nutmeg Road, South Windsor, CT S.S.S. Job No. : 87-716-CT-SWI-14 Dear Mr. Stone: At your request I inspected the site for the purpose of identifying wetland soils. The inspections were made on various dates between 11/02/87 and 12/11/87. Several site inspections were neccessary. At my request, other soil scientists reviewed the site with me for consultation. The soils and site conditions are rather complex. Poorly drained soils were identified with the aid of a spade and auger and consequently marked off from the non-wetland soils with consecutively numbered orange survey tapes. The site occurs .on a broad outwash plain containing deep sand deposits over glacial lacustrine silts and clays. Hummocky topography with broad flat areas were typical of original conditions. The soils originally formed under forest vegetation with a seasonal high ground water which remained at or just below the surface of the low lying areas. The poorly drained soils found in these lower lying areas are characterized by a deep, very dark gray A horizon over a distinctly mottled sandy loam B horizon. The underlying C horizon has distinct mottles and is light grayish brown to light olive brown sand. The elevated areas contain moderately well drained soil with a dark brown A horizon overlying a bright brown sandy loam B horizon. The lower part of the B horizon is commonly mottled medium brown sandy loam. The separation of poorly drained from moderately well drained soils is readily apparent in the hummocky landscape of the forested area of the site. The broad depressional areas contain thick growths of sweet pepperbush and large red maple trees. The maples show root buttresses which indicated they have grown in long periods of soil saturation and seasonal water ponding. The soils present on the hummocks are non-wetland containing much less undergrowth with a dominance of large upland oak trees. The soils present in the field have been disturbed from past agricultural practices. The original hummocky topography has been changed to a flat to a gently sloping landscape. Both poorly and moderately well drained soils occur in the field. A very hard ironpan layer at 15 inches is present in some soil areas of the field. The ironpan has a dark reddish brown coloration with a thickness varying INLAND WETLANDS IDENTIFICATION ENVIRONMENTAL ASSESSMENTS SOIL CLASSIFICATION AND MAPPING from 2 to 6 inches. The horizon above the ironpan is a very dark topsoil while below is present a light olive brown to light olive gray mottled sand. The ironpan is associated with both poorly and moderately well drained soils on the site. Disturbances from agriculture have resulted in the formation of soil mapping complexes witnin the field. Within areas identified as poorly drained soils, there are small inclusions of moderately well drained soils which, due to the soil complexity cannot be mapped out as a separate unit. Likewise, within the moderately well drained soils there are areas of poorly drained soils which cannot be mapped separate. It was evident throughout the period of my site inspections that the hydrology of the site has changed significantly. Relatively dry to slightly moist conditions were present in the poorly drained soils. The seasonal high ground water table was not present in any of the poorly drained soils. Past drainage work on the site included the construction of ditches and likely tile drains. Drainage work throughout the locality has also likely added to the significant change with the present hydrology. The main ditch which runs from west to east along the edge of the field has a depth of four feet. No water or soil saturation was present in the ditch during the inspection. The permeable nature of these soils make them relatively easy to drain when an outlet is available. It appears that water levels have dropped by two or more feet in these soils. In addition, during the wettest times of the year these soils may become saturated, but likely for much shorter periods than was formerly characteristic. The delineation of the soils having poorly drained features on the site was made in an attempt to identify the existing wetlands. Due to past disturbances to the site, the soils have become drier than under the conditions through which they have formed. The presence of mottled soils throughout the site and the well established wetland vegetation within the forested area indicate that wetland conditions were once associated with extensive areas on the property. The wetland soils delineation which I have made provides the approximate location of the original wetland areas plus some disturbed poorly drained soil areas within the field. At the present time drainage conditions have made the site drier and this should be noted by any regulatory agency making a review of the property. If in the future the present drainage conditions are altered and allowed to revert back to their previous drainage condition, then the delineation of the poorly drained soils would be of greater importance. The poorly drained soils would be characterized by a seasonal high ground water table at or near the surface, be capable of supporting wetland vegetation and be able to provide a variety of wetland functions. Respectfully submitted, SOI4 SCIENCE SERVICES fLcui- Thomas W. Pietras Soil Scientist (Certified) FUSS8caN8LL PREPARED DATE CHECKED DATE PROJECT NO O consulting engineers BY 1/1 BY V _-)/IV SHEET NO. SUBJECT: V/c A--c>-T(- Of 77- -4 L� :77� 7_. - `--ram , -; - - :- -- tn-t_ -F . . . . . . . . . . . ��� y� e� .: 41A> FUSS8caNFJLL PREPARED DATE CHECKED DATE PROJECT NO consulting engineers B Y ��/� BY f 0 1 G- g, �.,..,.. SUBJECT: �'�o w N SHEET NO. Z of S , 06 , r 1 , YI i y I i k , , ' Coda wow �_�- 4���-���+'----•-------�--t-�-Fk --', -- ;-- ' , , 1 1 , 1 -- - »-- + - -`-- --- L , I I I mO v _ - -- -- - --�-- ---- a-- -- - - - -+ - - 1- - tI r 4- t -• --- - k 0 G w opt s'41-3 -- --:- - -�- + I I+ FUSS8taNSLL PREPARED DATE CHECKED DATE PROJECT NO consilting engineers BY BY SUBJECT: trz-owp SHEET NO. .� of ZWE-Z- 4 t -4- frollFUSS&(YNSLL PREPARED DATE CHECKED DATE PROJECT NO consLAting engineers. BY BY SHEET NO. SUBJECT: �D W ilT L�' �.�. of 5` R, ---- ---- ------ , ' i ------• --_-------- --- -- TI _ y I j i , o , 3 I �,l i C y - , I , , --�--1----�--i l , -- - tGA� - - -- --,-- --� --j ,-- -- -� -;-�-i t i , 1 � I __� ,y _ __J_. .1 -____ _r-_ -• `K'��( ,vim'/ �-�y � __ _ � i 4 1 ' - ''_- -- _ , , l I I Ze'�.���� --7-_-»- - - �Tf I 1 n 1 e r Jv1 Sza=ion and O-f set ILI IV, hIrIz : L.ne to inlet �-' Area in Acres I I ►4syl I1`11 1�1 _Iy II " rC4 I' Runoff Coer=icient i C' Sum of AI El I i i i rzl 01 1,, r ICI i�.'i" Tota? AI I I lrw IG-- 'n4� +� �a' �°' Rainfall intensity T p to Inlet xt Grade of Gutter o C s O Cross Slope of > Shoulder C Y7 Q Depth o' Flow N n at Gutter �-' Width of Flow Q Bypassing inlet AI By-passing Inlet N �- p� C AI Entering Catch (v Basin •o.� �aavG nq pa->pa4D 11;Prl(7:`5 h Yv'iI? TETI �-q eq Dzuzoisaa Storm Sewer System Design 1 43 P1 u• �, .-0-1 V� vv 3 � i ei U) � - -H ii m E4 VI 1 2 3 8 9 10 1.1 12 13 14 1.5 IS- VN ---_ of is'' �• z, dr o, fi d .10 a 2.t Us � �{,7 !.. 7- LTT ►� J 1 2• COI ` c1 • C7 CA 3 Cr n 0 k PARED DATE CHECKED DATE PROJECT NO- BY FU •NEILL- PRE BY consulting engineers �Z SHEET NO. of 17) +d - --- ' 1 k- : jj 1 a T f — 3 � tl A • t E — 1 PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM Date: ���1a TO: Karl Reichle, Mike Gantick, Mel Stead, Fred Shaw. Ricdzat-d J. sart=, Gary Tyler, Fite John Shemo FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the following project: Subdivision _ Site Plan Residential Commercial Industrial �� Location: , Project Description: Futur Town-owned property involved? _YES = NO (a) new streets (_ existing frontage also) (b) new open space/recreation area active passive (c) new detention area Planning Department comments : �l Please let me know by ��, if you will have comments on �� department when I this application so that I can follow up with your de p do a Planning Department report. aW t2 le, J/7 �/ �,� , <f �n---� r�� C�.Qa, -,t .�s-�1J �.: .`�fir'--���,r��-+Z.,��r w-,, �' ►'e r`��•�?c Mr. John J. Moran, Jr. RE: David Brown Associates If an Inland Wetlands permit were granted with conditions, they could include: 1. Modifications to the plans to show maximum 4:1 slopes, stockpile location, limits of construction, buffering of neighbors, siltation basins, extend anti-tracking apron to existing pavement and resolve the conflict between the construction schedule and the E & S control notes. 2. Item 3 in the E & S control notes to be adjusted to 30 days or as directed. 3. Significant or specimen trees should be located along NF Albert J. Schneider and methods of their preservation should be shown. 4. Dust protection should be addressed on the plan. 5 . The effect on the ground water table should be addressed. Up and downstream. 6 . The plans are marked "Not Released for Construction" which is correct. Prior to construction the plans as modified shall have to be approved. 7 . A bond would be required to cover the compliance requirement. If on 3.86 acres, this should be indicated. Very truly yours, A. Bowen Davies Deputy Town Engineer AHD/jsv cc: David A. Brown Michael J. Gantick, Director of Public works Marcia A. Banach, Director of Planning John Shemo IWA/CC SEA Consultants Inc. May 10, 1988 Engineers/Architects Principals Arnold B.Goldstein,P.E. Frederick G.Aufiero,PE. Mr. Michael J. Gantiek, P.E. Robert M.Brandon,A.I.A. Stephen H.Geribo,P.E. Director of Public Works David T.Goodemote,P.E. Town of South Windsor Bruce E.Soule,PE. 1540 Sullivan Avenue Kenneth M.Stewart,P.E. Anthony J.Zu na,PE. South Windsor, Connecticut 06074 Associates Steven L.Bernstein,P.E. Re: David A. Brown Paul F.Gabriel,PE. Job No. 88126.28 Mark Gould,PE. Task Order No. 28 Michael S.Schultz,P.E. Arthur A.Spruch,P.E. Dear Mr. Gantiek: Paul C.Ross,P.E. As requested, S E A Consultants Inc. has reviewed the following for the above referenced project: Sheet No. Title Prepared By Date 1 of 9 Boundary Survey Fuss & O'Neill Inc. 3-1988 2 of 9 Wetlands Map it 2-1988 3 of 9 Layout Plan it 4-1988 4 of 9 Erosion & Sedimenta- tion Control Plan It 4-1988 5 of 9 Grading do Utilities Plan it 4-1988 6 of 9 Planting Plan it 4-1988 7 of 9 Planting Details it 4-1988 8 of 9 Utility & Paving Details " 4-1988 9 of 9 Erosion & Sedimentation Control Details It 4-1988 - Drainage Calculations it 4-1988 1 Floor Plan Casle Corp. 9-1987 2 Exterior Elevations " 9-1987 850 Silas Deane Highway Wethersfield,CT 06109-3412 (203)721-7993 485 Massachusetts Avenue Cambridge,MA 02139-4018 (617)497-7800 Citicorp Park W st 100 Foden Road South Portland,ME 04106-2319 (207)775-2281 S E A Consultants Inc. Engineers/Architects Mr. Michael J. Gantiek, P.E. May 10, 1988 Page Two This information was reviewed for compliance with the Town of South Windsor Subdivision and Zoning Regulations dated July 24, 1972 and standard engineering practice. We note the following: Section 4.13.2.1 KEY MAP The Key Map should be drawn to a scale of 1-inch equals 200 feet. d, a Proposed drainage and sanitary sewer systems should be label- ed. f. Names of abutting property owners should be shown. Section 4.13.2.3 PLOT PLAN a. Distances and bearings of all boundary lines and acreage of the entire site should be provided. d. Proposed signs and outside lighting should be indicated. Outside lighting for the two buildings has been shown on the Planting Plan. f. Names of abutting property owners should be shown. g. Monumented points within the site should be coordinated and listed in tabular form on the plan. i. The map should be entitled "Plot Plan". Section 4.13.2.4 TOPOGRAPHIC MAP b. Curb lines and pavement widths should be labeled. C. Proposed sanitary sewers and manholes should be shown with top of frame and invert elevations, lengths of pipes, and slopes. Also, existing sanitary sewer manholes along Nutmeg Road North should include top of frame and invert elevations. g. Proposed storm drainage systems should include slopes of pipes. J. The plan should be entitled "Topographic Map". SEA Consultants Inc. Mr. Michael J. Gantiek, P.E. Engineers/Architects May 10, 1988 Page Three Section 8 OFF-STREET PARKING The parking schedule denotes 260 required parking spaces; however, 108 spaces have been provided with an additional 92 in reserve. The engineer has calculated parking requirements for the warehouse based upon floor area. For industrial usages the required parking spaces should be calculated using the following: 1 space per 2 employees. Therefore, the total number of employees that will be employed in the warehouse should be provided. Also, handicap space requirements are calculated based upon 1 space for every 25 parking spaces provided. GENERAL COMMENTS 1. The gutter flow analysis should include depths and widths of flows at proposed catch basin inlets. Gutter flows at the low point locations should not include roof drainage. The "AI" from the roofs should be included in the storm sewer design. 2. The detention computations are incomplete. The engineer should provide hydrograph analyses and demonstrate that there will be zero net increases between pre- and post development conditions for the entire watershed during the 2, 10, 25, 50, and 100-year storm frequencies. Water surface elevations for each frequency and an appropriate outlet structure should be provided. 3. The Town requires a minimum cover of two feet over all drainage pipes. 4. A legend indicating existing and proposed features should be included on the plans. 5. The engineer should demonstrate that the proposed plantings along Nutmeg Road North will not restrict sight line requirements at the site drive intersection. 6. The base and subbase thicknesses of the pavement section appear to be inadequate for the given field conditions. It is recommended that the bases be increased to suitable thicknesses for the subsurface and wheel loading requirements. 7. Item #7 of the erosion and sediment control notes indicates the use of riprap channels at discharge areas. The engineer should include details of the riprap outlets and also investigate the use of riprap protection along the two bends of the proposed swale. . 8. The grassed swale detail should includ typical lawn-sod thicknesses. SEA Consultants Inc. Mr. Michael J. Gantick, P.E. Engin ors/Architects May 10, 1988 Page Four 9. A maintenance schedule of the temporary sedimentation basin should be provided. 10. The detention basin does not include an emergency spillway or any other type of hydraulic structure to pass storms exceeding the 100- year frequency. The maximum allowable discharge of the existing 2411 RCP across Nutmeg Road North is approximately 27 efs. If you have any questions, please do not hesitate to call me. Very truly yours, S E A CONSULTANTS INC. m es R. Bancroft, P.E. JRB:mp M E M O R A N D U M May 18, 1988 TO: , Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works 49 RE: DAVID A. BROWN Engineering Review P1 ase find enclosed the SEA engineering review for the subject application. Pursuant to the comments of the SEA report, the functionability of the proposed drainage system network on a poor soil condition site is of concern. This Department will re-review these plans once the SEA comments have been addressed. Should you have any questions please contact me. MJG/jsv cc: Engineering Department PZC Correspondence File r �AowN sf+c� O w70v"ottl04C S-Oum ?Ozi� C „a u t 4;� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soR,co AREA CODE 203/644-2511 June 1, 1988 Mr. John M. Moran, Jr. , Chairman South Windsor Inland Wetlands Agency/Conservation Commission 1540 Sullivan Avenue + South Windsor, CT 06074 r � RE: David Brown - Fuss & O'Neill Report of May 23, 1988 Dear Mr. Moran: The supplemental information doesn't change the obligation of the Agency to address the feasible and prudent aspects for development of the wetlands with the issuance of a permit. Their drainage input does require more detailed information, not for the commission action, but overall development of the 95 acre watershed. An expansion of their report could result in 70 acres of impervious coverage discharging down a 3,500 L.F. open channel at a minimum grade to the 24" outlet at Nutmeg Road North. This can be a delicate maneuver where an inch here and there could make it impossible to drain the abutter without an excessive expense. Their proposal for construction from the outlet upstream should be reflected in sufficient and appropriate detail on their plans maintaining drainage from the abutter. Their proposal for a swale along the northerly boundary cannot be covered in a paragraph or so. In keeping with the "Guidelines" , there should be an area of non disturbance around the mature trees in this "buffer area" . The plans should be modified to show the trees in this area and the protection proposed. Perhaps a reduction of the building length could ease the impact. The "creation of a more valuable wetlands environment" does require more detail. A recent site that was over excavated to bring the watertable closer to the surface installed an aeration system to retard the algae growth, resulting in a motorized wetlands . An open water pond isn't what I envision as a wetland enhancement. Mr. John M. Moran, Jr. , Chairman Page 2 Inland Wetlands Agency In summary, the plans are not for construction. Pending a decision on a wetlands permit, the plans should be revised and heard after modification. Very truly yours, A. Bowen Davies Deputy Town Engineer ABD/jsv cc: David Brown Michael J. Gantick, Director of Public Works Marcia A. Banach, Director of Planning John Shemo, EDC IWA/CC File J VI 4J, DBA JUN 21 1988 DAVID BROWN A55OCIATES South Windsor Planning A ZooiAg issio�- Building Management June 20, 1988 Town of South Windsor 1540 Sullivan Avenue South Windsor, Conn. 06074 Attn: Michelle Dear Michelle, I am writing for David Brown Associates-,- g-wing the Town of South Windsor an extension of sixty-five days to act upon the application of David Brown Asso- ciates on the thirty-eight acres of land at the corner of Nutmeg Road and Governors Highway. Sinc o D o wn , DAB:ksl David Brown Associates 998 Farmington Ave. ❑ West Hartford, CT 06407 0 236-2595 y Y / ap s �• C � V w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 f'►osoR-co�� AREA CODE 203/644-2511 Y June 22, 1988 David A. Brown 994 Farmington Avenue West Hartford, CT Re: Application #88-033, Site Plan Dear Mr. Brown: Attached is a copy of comments from the Planning and Engineering Departments regarding the above-referenced application. Please make the necessary revisions to the plans and submit 6 complete sets (including architectural elevations, landscaping plans, etc. ) to the Planning Department. If you have any questions regarding the comments or the procedure, please contact me. Very truly yours, Marcia A. Banach Director of Planning cc: Town Engineer B 0,0 y V/ S-aum ?0&U&01t O � M 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 AREA CODE 203/644-2511 June 29, 1988 David A. Brown 994 Farmington Avenue West Hartford, CT 06107 RE: Application #88-33P - David A. Brown Site Dear Sir: At the June 27, 1988 meeting, Inland Wetlands Agency/Conservation Commission approved with modifications Application #88-33P for the constsruction of an industrial building on the northeast corner of Governor's Highway and Nutmeg Road, I zone as shown on plans prepared by Fuss & O'Neill, Consulting Engineers dated 3/4/88 and revised 4/12/88 . The following modifications must be adhered to for this permit to be valid. 1 . Three (3) blueprint copies of the approved map with all modifications be submitted to the IWA/CC within 65 days for review prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount of $10,000. to be submitted to Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures . 5 . The permit is valid for one year and shall expire on Jun 27, 1989 . 6 . All approvals required must be obtained and submitted prior to any activity on the site. 7 . A consultant with experience in the creation of wetlands must be contacted to come up with a program for the wetlands creation. A written plan must be submitted with specifics on how they plan to establish the new wetlands. No building permit will be allowed until the plans are submitted to IWA/CC. 8. Modifications to the plans to show maximum 4:1 slopes, stockpile location, limits of construction, buffering of neighbors, siltation basins, extend anti-tracking apron to existing pavement and resolve the conflict between the construction schedule and the E & S control notes. 9 . Item 3 in the E & S control notes to be adjusted to 30 days or as directed. 10. Significant or specimen trees should be located along NF Albert J. Schneider and methods of their preservation should be shown. 11. Dust protection should be addressed on the plan. 12. The effect on the ground water table should be address d, up and downstream. Very truly yours, John M. Moran, Jr. , Chairman JMMJr. ,/pmm Enclosures cc: A.B. Davies, Deputy Town Engineer Raymond Hallowell, Chairman, Planning & Zoning Comm. ` John R. Collins, Chief Building Official Michael Gantick, Director of Public Works Marcia Banach, Director of Planning / Fuss & O'Neill, Consulting Engineers ��owN at,C y T o-p SOU& ?d&U&Ot G V 4 �v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ,�psoR•c� AREA CODE 203/644-2511 June 29, 1988 David A. Brown 994 Farmington Avenue West Hartford, CT 06107 Gentlemen: Section 4.13. 6 of the Zoning Regulations, Conservation Plan (a copy enclosed) establishes the criteria for such a plan and a method of monitoring its application. A permit for your proposal was granted, with a bond as assurance of compliance with its sedimentation and erosion control measures. To assist in the review process by the Inland Wetlands Agency/Conservation Commission, whether for a permit extension or specific inquiry request, the provisions for verification through progress reports by the developer's/applicant's Engineer demonstrating that each Erosion and Sedimentation control measure has been installed and maintained, in accordance with the approved plan shall be required. It is requested that this verification report be submitted at least two weeks before the regular meeting of the IWA/CC to permit time for the Commissioners to evaluate your project controls . Very truly yours, A. Bowen Davies Deputy Town Engineer ABD/pmm E. TREE PROTECTION (TP) 1. DEFINITION The protection of desirable trees from mechanical and other injury during construction. 2. PURPOSE To ensure the survival of desirable trees where they will be effective for erosion and sediment control , watershed protection, landscape beautification, dust and pollution control , noise reduction, shade and other environmental benefits while the land is being developed. 3. APPLICABILITY To areas with desirable tree growth and subject to land disturbing activities. 4. PLANNING CONSIDERATIONS Development often takes place on tracts of forested land. Building sites are often selected because of the presence of mature trees. Intensive planning and care is necessary to protect desirable trees in the interval between buying the property and completing construction. It takes 20 to 30 years for newly planted trees to provide the benefits of mature trees. Trees may perform the follow- ing functions on a site: a. Stabilize the soil and prevent erosion. b. Decrease storm water runoff through canopy interception and root zone absorption. C. Moderate temperature changes and provide shade. d. Moderate the effects of sun and wind. e. Provide visual buffers and screen out noise. f. Filter pollutants from the air, and produce oxygen. g. Provide habitat for small animals and birds. h. Preserve and increase property values. i. Provide desirable aesthetic values. 5. STRESSES OF CONSTRUCTION Construction activities expose trees to a variety of stresses or conditions which may injure or kill a tree. An understanding of these stresses is helpful in planning for tree protection. 6-39 6. SELECTING TREES TO BE RETAINED a. The proper development of a wooded site requires completion of a plan for tree preservation before clearing and construction begins. Trees should be identified by species, and located on a plan map, either as stands or as individuals, depending on the density and value of the trees. b. Consider trees with a long life span, the oaks, hickories, beech and maples. Trees should be healthy, of good visual form and free of rotted or broken limbs. Younger trees should be given preference over older trees which may be declining in growth. 7. INSTALLATION REQUIREMENTS a. Groups of trees and individual trees selected for retention shall be accurately located on the plan and designated as "tree(s) to be saved." Individual specimens that are not part of a tree group shall also have their species and diameter noted on the plan. b. The limits of *clearing shall be located outside the drip line of any tree to be retained, and in no case closer than five feet to the trunk of such a tree (Figure 6-13). Figure 6-13 - Construction Activities and Tree Protection Drip Line Protective Device 1 I Limits of Clearing and Grading st ...t Proposed Grading Mi n.' 5 . Source: Virginia Soil and Water Conservation Commission 1980, Virginia Erosion and Sediment Control Handbook. 6-41 � r _ Snow FenceW. Drip Line Cord Fence Board Fence— Correct Methods of Tree I ,II I,I IIIJII�L1 .111 II I I � � � I Fencing � l Trunk u I.. Armoring Triangular • • • • • • . . • • Figure 6-16 - Tree Wall 1 I i 1 Drip Line I Original i Grade 1 1 Retaining I .�.,,.. ►, w,� ,: :_• :;; ,,� New i:. , t::°°: Grade Wall Line of Minimum Excavation for Wall Constructio 5' Min. (Drip Line) Topsoil Backfill Gravel Fill if �� Wall is Mor .. ..,.. :,. �;:.: ',,�. :,:.r.:.: •::,_;,:: ., Than 2' Hi g �!S•'r''•'?' 'lit.t:;%•� :r:!t.: ':ii�: .• •:.:. Taper Wall Tile Drain Min. TREE WALL DETAIL Roots Penetrating Beyond the Wall Location Should Be Bridged Source: Virginia Soil and Water Conservation Commission 1980, - Virginia Erosion and Sediment Control Handbook. 6-46 (2) The wall shall be constructed of large stones, brick, building tile, or concrete block or cinder block. Provide for drainage through the wall , if necessary. j, Trenching and Tunnelling (1) To reduce the amount of root area damaged or killed by trenching activities, excavate as far away astpossible from the trunks of trees, preferably outside he crown dripline. (2) The ends of damaged and cut roots shall be cut off smoothly and protected by promptly painting with a tree wound dressing. k. Cleanup Cleanup after a construction project can be a critical �ime for tree damage. Trees protected throughout d development the final operation are often destroyed by carelessness cleanup and landscaping. Fences and barriers shall be removed after everything else is cleaned up and carried away. 8. MAINTENANCE Even with precautions, followed. some damage to protected trees may ocr. In such cases, the following maintenance guidelines should be a. Soil Aeration If the soil has become compacted over the iootzone of in n with tree, the ground shall be aerated by punching holes suitable equipment. b. Repair of Damage 1 An damage to the crown, trunk or root system of any tree ( ) retained on the site shall be repaired immediately. (2) Damaged roots shall immediately be cut off cleanly inside the exposed or damaged area. Cut surfaces shall painted with approved tree paint. Moist peat moss, burlap or topsoil shall be spread over the exposed area. (3) All tree limbs damaged during construction or removed t the any other reason shall be cut off aab vethe co preceding branch junction (Figure )• (4) Care for serious injuries shall be prescribed by a forester or a tree specialist. 6-47 F. VEGETATIVE STREAMBANK STABILIZATION (VP) 1. DEFINITION Stabilizing and protecting banks of streams or excavated channels against scour and erosion. 2. PURPOSE To protect streambanks from erosion. 3. APPLICABILITY This practice applies to natural or excavated channels where streambanks are subject to erosion from the action of water, ice, debris, or to damage from livestock or vehicular traffic. 4. PLANNING CONSIDERATIONS All requirements of state law and permit requirements of local , state, and federal agencies must be met. Good planning normally requires staying away from streams. A primary cause of stream channel erosion is the increased frequency of bank-full flows which often results from upstream development. Most natural stream channels are formed with a bank-full capacity to pass the runoff from a storm with a 1.5 to 2-year recurrence interval . However, in a typical urbanizing watershed, stream channels are subject to a 3 to 5-fold increase in the frequency of bank-full flows. As a result, stream channels that were once parabolic in shape and covered with vegetation are often transformed into wide rectangular channels with barren banks. Many streambanks that need stabilization will require structural measures to make them stable. Vegetation Zones Along Watercourses Streambank vegetation for erosion control and bank stabilization is most important between the mean low water mark (MLW) and mean high water mark (MHW). Above mean high water, native vegetation often volunteers and maintains stable conditions. However, damage from vehicles and animals in this area often requires special plantings to provide adequate protection. Below mean low water vegetation will not grow. 5. DESIGN CRITERIA Since each reach of channel is unique, measures for streambank protection must be installed according to a plan developed for the specific site. Designs shall be developed in accordance with the following principles: a. Protective measures to be applied should be compatible with the planned improvements and site characteristics. b. Streambank protection should start at a stabilized or con- trolled point and end at a stabilized or controlled point on the stream. 6-49 SITE DEVELOPMENT PLAN (cont ' d . ) all 4. 13 . E Conservation Plan: The Conservation Plan Leven- set forth the proposals for Cher soil conservation • tion, sediment control ando treatments to be taken. Conservation Plan shall be submitted bythe the A ro osals applicant for all p and/or activities P _ disturbing an area larger than one-halfot be required except Conservation Plana shall lle family home on for the construction of a subdivision or re- shall lot that is no part. division. Conservation Plans shalasb amended . sub Public Act 83 388 , where required by Conservation Plans may be required under the p C where n se visions of saiesauteiulations , or by other regula- tions of the Town of South Windsor. of Section 4. 13 . 2 . 4 * sha11 be The Topographic Map osed Coassrvati n used to detail and outline lhpfunction as , Place. The Conservation Pan shall reform to , the requirements of an hE"Erosion and co as set fort and Sediment Control dd. The guide for preparation Act 83-388 , as amends the "Connecticut of the Conservation Plan shalndb$edimant Control" Guidelines for $OlCouncilErosion on Soil and Water of the Connecticut1985 , as amended. Conservation, January subdivision or resubdivision, the In a proposedand outline typical Conservation Plan shall portray _ erosion and sediment control treatmentorfresubdivision. sentative lots within the subdbuilding permit application Each plot plan accompanying a typical erosion and shall be consistent acme-utsthe portrayed and- outlined sediment control tre is the conservation plan for said subdivision or resubdivision. ency/Cons rvation The South Windsor Inland -WetlChegConservation Plan, Commission shall not cestwith Public Act 83-388 , tlands until said plan compli d these regulations. The Inland Ccnserva- as amended , an refer said Agency/Conservation Commission ntya re i Water tion Plan to the Hartford Coua report and/or certifica-d/or Conservation District • and all costs incurred for saoilrbpWatern t ion. Any certification from the Sartf bsdbarn:tby the applicant . Conservati n District shall be approval of any application Planning b Z Wing Commission Figure 6-18 - Shrubs for Streambank Protection Years to COMMON NAME How to Provide Mature Fertility Acidity Soil Drought Shad (Botanical Name) Plant Cover Height(ft.) Needs 1/ Needs 2/ Texture 3/ Tolerance 4/ Tolerance5/ 'STREAMCO' Rooted or PURPLEOSIER unrooted WILLOW cuttings 2-4 10-18 M A C,L,S P G (Salix purpurea) SHRUB DOGWOODS Container (Corpus rac mosa) grown or (Corpus amomum) bareroot (Cornus stolon- seedlings if ra) plant 2 ft. 3-5 8-12 M SA C,L,S F F apart AMERICAN CRAN- 2-year old BERRY seedlings (Viburnum plant 4 ft. w trilobum) apart 4-5 6-7 M SA C,L,S P F 'REM RED' AMUR 2-year old HONEYSUCKLE seedlings (Conic ra plant 6 ft. maackii) apart 3-5 8-12 M SA C,L,S F G EVERGREEN GROUND COVER FOR STREAMBANK LILY-TURF Divide clumps (Liriope and plant muscari) 6-12 inches apart 2 1/2-1 L A C,L,S C G HALL'S HONEYSUCKLE Nursery grown (tonic ra plants. Plant hallisiana) 18 inches 2 1/2-1 L A C,L,S G G apart 1/ F rtility Ne ds: M = Moderat and L = Low 4/ Drought Tol ranc P = Poor, F = Fair, and G = Good 2/ Acid Ne ds: A = Acid and SA = Slight Acid 5/ Shad Tol ranc : F = Fair and G = Good 3/ Soil T xture: C = Clay, L = Loam and S = Sand Sourc : U.S. Department of Agricultur , S it Cons rvati n S rvic , Storrs, Conn cticut. Streambank vegetation can be planted in conjunction with riprap or other stone facing by planting clumps, rhizomes or shoots in the crevices and gaps along the line of the average summer water level . Mulch should be used with permanent seedings according to the measure for Temporary Mulching (page 7-1). Sod should be selected and installed according to the Sodding measure (page 6-13). Turf should only be used where the grass will provide adequate protection, necessary maintenance can be provided, and establishment of other streambank vegetation is not practical or possible. b. Establishing Shrub Vegetation Stands of full-grown trees are of little use for protecting streambanks apart from the binding of soil with their roots. Shrubs provide much better protection and riverside stands of willow trees are often replaced naturally by colonies of shrub-like willows. These plants hold the soil with their root systems and reduce water velocities. They also protect tree trunks from damage caused by breaking ice and help to prevent the formation of strong eddies around large trees during flood flows. See Figure 6-18 for species to plant. Shrub vegetation is particularly beneficial along the impact bank of a stream meander, where maximum scouring tends to occur. Infringement of shrub vegetation into the channel tends to reduce the channel width, increasing probability of floods. However, brief flooding offloodplain woods and undeveloped bottomlands does no significant damage, and the silt deposits in these wooded areas are less of a problem than eroded streambanks. Evergreen ground covers are also useful . Plants should be used which are well adapted to the stream and site conditions. Shrub willows, shrub dogwoods and other shrubs can be put into the soil as cuttings, slips or stems. Willows can be planted as 1-year-old nursery-grown rooted cuttings or as fresh hardwood cuttings gathered from local mother-stock plantings. Silky dogwood and the alders should be nursery-grown seedlings 1 or 2 years old. Fresh cuttings should be 3/8- to 1/2-inch thick and 12 to 18 inches long. They should be kept moist. If not used at once, they should be stored in cool moist sand. 6-51 LETTER OF TRANSMITTAL .rG FUSSUME"t� O Date �1,�- Project No. consulting a lglrl@erS Attention: A01 210 Main Street,Manchester,Conn.06040/(203)646-2469 RE: Pw/o �Pvt//VA�;J_ TO Sat)qy (^✓1NayR, 1jW L� f1-AA/A)11(1& We are sending you Attached ❑ Under separate cover via the following items: ❑ Shop Drawings Prints ❑ Plans ❑ Samples ❑ Specifications ❑ Copy of Letter Change Order ❑ Other Copies Date No. Description - G 2 Ui e, V C7 These are transmitted as checked below: ❑ For approval ❑ Approved as submitted ❑ Resubmit copies for approval For your use ❑ Approved as noted ❑ Submit copies for distribution As requested ❑ Returned for corrections ❑ Return corrected prints ❑ For review and comment ❑ For Bids Due 19 ❑Prints returned after loan to us REMARKS LljeP vq_�_ ��C�d� l(.� I r► l dtk too,) V I_ OF 3(vV7 0 CZW47i C-A-A' o � Q.v✓e a c 4.v� � S 41,0'�'YI �+S a- ,J�.O(.� , C o to l� � PY � l� N SIGNED: F O-100 N i Inlet Station and Offset I'l ILI IN; Tire to Inset J iS�- ocl on e,y J L-' Area in nc r e s Runoff CoeT icient iP I� �I C I Sum of AI � ! I 1 I I Ivv Total '.I nj Rainfall Intensity (N fN ( r�j I O p v cr � N v4 j W to Inlet 1 V1 V1 V% 16 rT f o � � rr pO Grade of Gutter � �-' a O O I 4 I Coss Slone of > --r Shoulder Y7 • 0 k Depth o' Flow N� .l�✓. 09 . o(� O� ��� at Gutter to Width o= Plow Bypassing iniet- 46 AI By-passing Inlet I,,� , , J T AI Entering Catch J r V G O Basin i,q ?a--j"a4o �- in ? 7,1 —�-D vn1LnN�Lu—l'T S HIVO C a • 4 Storm Sewer System Design .a 4-) QI U r1 41 [� N ri 3 , E U v FA n W 62 -.i N Qi V)1 I�1 43 9 (, Q t0 N U p� r Ql O r Ql ad 44 0 E� E! u O VA P� qvA 14 a EA E 4 � � a o► 6: .14 f�f• _u; 1 2 3 1► 5 6 7 8 9 10 1.1 12 13 31► ] :rt-J P. ft *00 L �`t C 1°I- %SJr o "T jo o. s` Z 4ot 1— VZ- -+ ., C-,� Q3 ;,4 G Z�� �� . �r� 1a,� 13� 1•`� ,ac ` r USE- 10,0 FUSS&O'NEILL PREPARED DATE CHECKED DATE PROJECT NO. consulting engineers G J 7///�s BY g-�_L,a,�- SHEET NO. of X S L—z'T ,Vo 001 Do p 6C5ej7 Do y Plnas.� �opa 00 S P kci�-X 00<0 0 tf -S-�,e �Sfit d 07 p k a LX Ir (Sa-%M..as do� 007 p►i, -a x P 1-*6s j- LI C Sa,ww.r ,s o04) -e-f-s:7t*c S 1t L,st-I- r �( sue, 44-g- 4-3p ao3� �Se"t ,441444, .ice 3�s des 1Xort 4v ,.:ST 11F .:s 11,.1—�"�';'��';—�}+ 7ia1 i�.J .425 L 75.0 1G.0 ti 76.0 25.5 A.098 7 E\V T i— o :'��?= : vu 1 .053 73.0 ' r` 0 '3 1Li4J� _ 00,11 i a 7rl �6.� �.J L i 6 RUNOFF 1 004 3 .0205 90.0 .33 1 6 ADDSYni 4 004 1 2 4 1 . ADDHYD 4 004 3 4 6 1 1 1 6 RESVOR 2 01 6 7 72.3 1 1 i ENBATA 7 iNCREM 6 0.1 7 COMPUT 7 002 01 0.0 3.2 1.0 2 2 01 02 ENDCMP 1 7 COMPUT 7 002 01 0.0 4.8 1.0 2 2 01 10 ENDCMP 1 7 COMPUT 7 002 Oi 0.0 5.4 1.0 2 2 01 25 ENDCMP 1 7 COMPUT 7 002 O1 0.0 6.2 1.0 2 2 01 -AK E v ENDCMP 1 t COMPUT 7 002 01 0.0 6.9 1.0 2 2 01 99 ENDUP 1 END0B2 � ttt� *� t�ttt �fENB OF 80-80 TR40 XED 07-15-88 14,53 BR G wN ryrtC_= _ 10'B I PASS R V rir 09l83(.2) �A�E E;; C TIVE CON RCS. OPERATION iNCRE§ XC COTIVE CONTROL OPERATION COMPUT ==CM �EC':1�. _ I RECORD iD STARING TIME = .00 RAIN D;-PT-4 _ ".-" ���: -:�':_ _,.:: =;?ir` -AB-_ ._ A\1 1. MO: T. COND= 2 A'TERNATE NO.= 1 STJ^n"w �t.= 2 '° =`k .*z OPERATION RUNOFF CROSS SECTION 2 OUTPUT HYDR06RAPH= 1 AREA= .05 SO MI 'INPUT RUNOF` CURVE= 13. 1'": E3 7LURS INTERNAL HYDROGRAPH TIME INCREMENT= .0922 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEA ELEVATION(FEET) 12.45 1.9.08 FF' RUNOFF VOLUME ABOVE BASEFLOW = .98 WATERSWED INCHES, 33.54 CF5— S, 2.77 ACRE-FEET; BASEFLOM = .00 CFS OPERATION RUNOFF CROSS SE�TION 3 OUTPUT HYDROBRAN: 2 b =X AREA= .08 SO MI INPUT RUNOFF CURVE= 76. TIME 2F CONCEN?Rai.uN= 1.58 HOURS INTERNAL HYDROBRAPH TIME INCREMENT= .0958 HOURS PEAK TIME(HRS) PEAK D:SC��R E;CFLi �_': 13.00 13.62 23.70 1.28* F-RST POINT OF FEAT PEAK RUNOFF VOLUME ABOVE BASEFLOY = :..5 �aT:=SrED Xr=S, v .-7 C='�-�y=, �. >,�_�'=-FEET; AASEFLOi� _ .00 CFS K01iF; ;ROSS SEOTI= ' OUTPUT HYDR06RAPH= 3 AREA= .02 SO M'I :N F,c,:: :%_ TERhF!? H1'DFOLRAPL T'MZ �_aK TIME(HRS) ABOVE BASEF!-014 - _, �.;--__ =- -ICJ==, -=. -- -_-. - -- =_ E= ==_C - .:are CFS ADDHYD CROSS SEGTTPk %. INPUT HYDROGRAPHS= 1,2 1,_�-�`,' .. uaiA:'�.- PEAK TIMEtHRS! uEA� iSC�ARafC=S} E-�T1ONiFcETE r 12.64 32.22 ; "►L} 23.69 2.12 tUii) RUNOFF VOLUME AJOW14SEFLON = 1.08 WATERSHED INCHES, 89.30 CFS—HRS, 7.39 ACRE—FEETt BASEFLOV �:Y ?4 1,J •Ll zj. T 0 AJu:'VD CROSS SECTION 4 INPUT HYDROGRAPHS= 314 OUTPUT HYDROGRAP�= 6 PEAK TIME(HRIS) PEAS` DIE HARSEf7-Tl 12,15 42.59 ---` 23.67 2.59 - - "_'EiHRS) FIRST HYDROGRAPH POINT = .00 HOURS AREA = ,IS SOX. 5.00 DISCHG .00 .00 .00 ,- _ 1v �11 •10. t ;, 6.00 DISCHG .02 .03 .04 .05 ,1::6 .:'� .09 ,10 7.00 DISCHG .11 .12 .13 .13 .14 :`_ ..: "17 ..8 9.00 DISCHG .18 .19 .21 .23 .26 .29 .31 .33 .34 .35 9.00 DISCHG .36 .38 .41 .44 .46 .'*e .1-0 ,53 .56 .59 10.00 DISCHG .61 .63 .67 .71 ,77 .84 .43 1, :4 1.I6 1,29 i1.00 DISCHG 1.44 1.59 1.79 2,00 2.2E 2,6,E 3,u9 6,99 11.1.38 19.84 12.00 DISCHG 32'.57- 42.21 - 42.31 39.74 38.65 39.24 37.69 36.60 35.14 33.63 13.00 DISCHG, 32.07 30.44 28.66 26.92 24.87 22.87 ?0.97 `9,^9 17.80 16.51 f4.00 DISCH6-- 15.36" 14.35 I3.41 12.5b 11.78 i1.06 10,41 9,81 9.26 8.78 15.00 DISCH6 8.36 7.99 7.66 7.38 7.09 6.81 6.56 6.35 6.15 5.98 16.00 DISCH6 . 5.023 5.70 5.59 5.49 5.41 5.34 5.25 5.114 5.02 4.91 17.06 DISCH6 4:73 C 65 4.50 4.52 4,47 4.43 4.39 4.34 4.28 18.00 DISCH6 4.18 4.09 4.01 3.94 3.87 3.81 3.75 3.70 3.65 3.61 19.00 DISCHG 3.57 3.54 3.51 3.49 3,47 3.46 3.44 71.43 3.42 3.37 20.00 DISCH6 3.30 3.23 3.16 3.10 3.111.4 .'E "'' 2='D 2.84 2.80 21.00 DISCH6 2.76 2.73 2.71 2.68 a63 2,62 2.61 22.00 DISCH6 2.60 2.60 2.59 2.58 00 DI5GH6 2.58 2.58 2.58 2.58 -38 �,SS ..vi i,`y 2.58 2.54 L.'a .97 24.00 DISCH6 2.47 2.37 2.'.9 :.9 -a79 .84 73 .63 =� ;� _ - 23 .20 25.00 DISCHG `� . `` .`- 26,00 DTSCHS .16 .14 .��4 _`�_ P BG VE BA5 EL�C� "_ :. ? WATE9SH VOi _J 6 avr� R= T`hl�S'1nSi = '' w•i3.� 1:_,�-C vr` --- - -- -c - 3.5` 21.9` - ,3.73 2,59 'T"�E,�+R51 FiFST HYDR06RApH POikT = ,i1i} �+O�JRS �_ ;-"E;,T = _= a�" .15 SD,"tI. 5.00 D167A .00 .00 .00 , :{; , :0 ,00 .O1 5.00 E_EV 72.30 72.30 72.30 72.30 ,�.3;a 72.30 72.30 7�,'J -2.j0 72.30 6.00 DISCH6 .01 .02 .02 .03 ,04 .05 .06 .07 .07 .08 ri,•12 72.32 72.32 - =--- ■'E .20 .21 ,23 .26 .2B .7: -.?: ,2,33 72.33 72.34 72.34 72.34 72.35 __ -• --__-_ .3b .38 .40 .43 .45 .47 ,2.36 72.36 72.37 72.37 72.37 7S2 ^ , '" �c .b0 .63 .67 ,71 .77 .64 .93 _. .. ._�L. . .. 40 72.41 72.41 72.42 72.43 72.44 ?2,45 �_.f, _..._ ._`u°'G ... :.27 1.41 1.5B 1.77 2.01 2.44 3.46 E.SL h. 72. 9 ?�.51 7�,54 72.56 72.59 72.63 72.71 72.B8 73.06 117 13,98 16,70 19,04 20.15 20.42 20.68 20.94 2..14 _ E;EV 73.74 74.20 74.56 74.87 75.03 75.08 75.12 75.17 75.21 4 :3.10 DISCHG 21.51 21.65 21.77 21.86 21.91 21.94 21.94 21.92 21,87 21,80 .3.'00 Ei-EV 75.27 'r5.30 75.32 75.34 75.35 75.35 75.35 75.35 75.34 7v.33 ;4,00 DISCrG 21.71 21.61 21.50 21.37 21.23 21.09 20.94 20.78 20.61 20.E+4 44.00 ELEV 75.31 75.29 75.27 75.25 75.22 75.20 75.17 75.14 75.11 7'■0E 15.00 DISCHB 20.27 20.09 19.39 18.25 ? 17.19 16.20 15.29` 14.44 13,65 12.92 i5.001 ELEV 75,05 75.02 74.92 74.77 74.62 74.49 74.37 74.26 74.15 74.06 ,6.00 DiSCH6 12.01 10.87 9.91 9.11 8.44 7.88 7.40 7.00 6.65 6,34 16.00 ELEV 73.94 73.80 73.69 73.59 73.51 73.44 73.39 73.34 73.29 73.26 17.00 DISCHG 6.Q7 5.83 5.62 5.44 5.28 5.13 5.01 4.90 4.80 4.71 17.00 ELEV 73.23 73.20 73.17"` 7 .15' 7 :11 ;r 73.1 `�' 73.08 73.07 73.06 18.00 DISCHS 4.62 4.53 4.44 4.36 4.28 4.19 '4.05 3.94 3.85 3.78' '¢,00 __EV 73,E+5 73.0a 73.03 73.02 73.01 73.00 72.98 72.96 '2.9µ 72,^3 :9.M S C H G ',7'_ 3.66 3.62 3.58 3.55 3.52 3.49 3.48 3.46 3.44 _�} 72.92 72.91 72.90 72.90 72.89 72.84 72.8E 72.88 72,Sc - .E- ;:SC iG 3.60 3.36 3.30 3.24 3.18 3.12 3.07 3.01 2.96 ;;! =V 72.81 ?2,E6 72.95 72.84 72.83 72.82 72.81 72.80 ,2.?9 72.r9 2,7� :►iSvHG 2,E7 2.83 2,76 2.73 2.70 2.68 2.66 ?,4v -73 ,; r ' �i,77 72.76 72.75 72.75 72.75 72.74 -- '� � ,b 2 n ' ?.60 '' 60 2.55 2.59 2.59 ,J �.�7 a��- -- .. �'_ L _.h1 a a. 72,"4 747.74 7_.73 72.73 72.73 72a73 72.73 "]r Qr, a.uU iaJ _.JiJ L,J8 L.5E` a5G 2,59 a„_'• _ _ __ -'1.73 c.71 �2.73 72.73 72.73 72.73 72.73 72.73 -; ^.5= ^ v- _a432.17 L,?: 1.84 1 6.5 :.-: 71L r2.69 72.66 '.G•_ 72.61 ta.JJ - -- -- - _=5 _. 45 -- -_ -�,L5 '=mac 72.44 72.4"' _?■40 72.39 r2.37 -- ,14 .12 .LO {.a 14' SL.t 33 7at32 �,L'L �i,31 .03 .03 ,102 .02 ,ti- --, :_ -3. 72.31 72.30 72.30 - Zn, r t -, r�� IV C.r _ , - �� �, 3v 7La3" =��Ali tiOL:a'!E ABOVE FASEF:-OW = :■23 4TLRSHED INCHES, :17.99 CFS-FIRS, 9.75 ACRE-FEET; BASFt_N yy _ — r •.. � � ti-— �J,� —•+1— sf J J��7 � I..I vti.11 V—� JOB I FAH PASE -pry- n r-_- ___• _ _ _ __-� --T _ - �_ -__ - -- RECORD TD START. � _ V V =i . - _ -,E. =. _• i z -� `_ :,, nA'N TABLE NO, 2 ANT. MOIST. CONK= 2 O?ERAT I ON RUNCF �'"�� Zw�C`_'_". c OUTPUT Y� r.nr��L y 1/I vi� a AREA= .05 SO MITINPUT ­lk'OF= L'!,'=c;1== '' _,,E nz CONCENTRATFON= ,83 HOURS t rnn- r -� •r INTERNAL hYOr;;�ukA?� bME '��cEMEKT= ,v i. PEAK TIME(HRS) PERK DISCHAR6c(CFS) PEAK ELEVATION(FEET) 12.42 41.94 (RUNOFF) 23.67 1.52 (RUNOFF) RUNOFF VOLUME ABOVE BASEFLOt� = 2.12 WATERSHED I(+wrc5, 71.52 CFS-HRS, 5,99 ACRE-FEET; BASEFLOW = .00 CFS e OPERATION RUNOFF CROSS SECTION 3 OUTPUT HYDROGRAPH= 2 AREA= • .09 SQ MI INPUT RUNOFF CURVE= 76. TIME OF CONCENTRATION= 1.58 HOURS INTERNAL HYDR06ROH, TIME INCREMENT= .0958 HOURS PEAK TIME(HRS) PEAK DISCHARSE(CFS) PEAK ELEVATION(FEET) 12,95 ��.43 (RUNCUFF) RUNOFF VOLUME ABOVE BASEFLOW = 2,37 'A7ERS'r.Ei: I�lC"i ''t.-?9 CFS-HRS, 9.49 ACRE-FEET; BASEFLOW = .00 CFS 'OPERATION RUNOFF ZFOSS SECT_ "N 4 OUTPUT �YORS3 W.= 3 4.,EA=f1 _fN= ,-L�nS ..�� p;�^:_ �1_ �3 ;��t= v-_= _ _._- n�-= � —��s _.-- -=}::=,, .'� �,v^;�- =--i c�=:rLOW - .O'•.' f.. ,ki r r - -;- +-n `.�__ r.rc PEAK CC i aT'rp{rrL[" 1:,ter; !i. �J (NL'-L) 23,6? 3.78 (NULL) RUNOFF VOLUME ABOVE EASEFLOW = 2.27 WATERSHED INCHES, 187.31 CFS-HRS, 15.48 ACRE-FEET; BASEFLOW _ .00 CFS O MTION ADDHYD CROSS SECTION 4 PEAK PAT TON(FEET) (NULL) _c .5' (NULL) mr,,lRs TIME INCREMENT = .10 HOURS DRAINAGE AREA .02 .G3 .05 .06 .07 .1 .1 .15 .17 .18 .19 6,r, D�uCyG aa^r2 .23 .26 .29 .31 .33 .35 .36 .36 .39 0:sr, .tt, .41 .43 .44 .45 .46 .47 .48 .49 _ ,57 .62 .68 .73 .78 .811 .t4 t 9.00 in,iSl Irl,6 .26 .92 .98 1.05 1.11 1.16 1.23 1.33 1.45 1.66 1.80 1.97 2.15 2.39 2.66 2.97 3.36 3.78 4.25 1:,0. Diq:,HG 4.79 5.35 6.00 6.70 7.53 8.60 11.22 17.42 26.13 42.11 12,G) DiSC±'6 65.52 63.73 86.69 84.56 83.82 83.21 81.56 78.56 74.74 70.93 13,0; DISC ' 67.09 63.13 58.96 54.70 50.31 45.88 41.76 38.13 35.00 32.26 14100 DISCH6 29.85 27.72 25.78 24.01 22.40 20.94 19.63 18.42 17.33 16.37 15.00 DISCH6 15.53 14.78 14.13 13.56 13.00 12.47 11.99 11.56 11.18 10.85 16.00 DISCH6 10.55 1.0.29 10.07 9.86 9.72 9.57 9:41 9.20 8.98 8.76 17.00 DISCHG 8.60 8.43 8.29 8.16 8.05 7.95 7.86 7.79 731 7.59 .6.00 DiSCHG 7.42 7.27 7.13 6.99 6.87 6.75 6:64 6.54 6.46 6.39 19.00 DISCH6 6.31 6.25 6.W,- b 16, :1 �� ' '`°�b.8� .�';.:•w6'40,"-, 6.44- 6.02 5.94 20.00 DISCH6 5.82 5.69 5.57 5.46 5.35 5.25 '5.15 5.06 4.99 4.91 ?1,00 DTSrHG 4,85 4.90 4.75 4.70 4.67 4.64 4.61 4.59 4.58 a,56 <<. D:SV�u 4,55 .54 4.53 4.53 4.52 4.52 4.51 4.51 =3.,r DISCH,G 4.51 ?. �` 4.51 4.51 4.51 4.51 4.51 4.51 u,50 D'SCN5 4.32 4,1L 3.55 3.50 3.17 2.85 2.54 2.24 1.96 2 ^' i1?51�+6 1.49 1,29 1.10 .94 .80 .67 .57 .49 zTrt^J(+ ,3� .�� 18 .15 43 '1 .10 v +J ,�i . a1 .L rk:6 .04 .04 .03 .03 .02 .102 -' f` f•t r t _ ..r_ t`r• _ ��_ _ _ = i___^��n ' n'7 ran r f� r+ E_r-*:T, a)M,l�CSj 1J6."" C-S-+�hS, ,51 A:rR r +f =�t•c _'_ - _-- r _ ") 4u:i � _"_ -,C =YT = .'. } HOURS .v:- L�=,f 72.3:t --,30 72.30 72.30 72.30 72.30 72.31 72.31 71 3'_ 7'.31 =,0'� D.SCG` .0' u9 .10 .11 .13 .14 .15 .16 .? `I,'t ELEV 7z.3' r_32 72.32 72.32 7 ,32 72.32 72.32 72.33 7=-33 72,33 6.0,3 DISCH6 .19 .20 .22 .24 .26 .28 .30 .32 ,34 .35 6.00 ELEV 72.33 72.33 72.34 72.34 72.34 72.35 ?2635 72.35 72.36 72.36 - J',C�!C ,49 .53 _..(:, FzEil ?2.38 7Z,36 ?2,39 �2.3- 72 ': �2. _.-_ -:. r. j,l-c'n L1 ,81 864 •44 .92 rS. _ _ •-- _ei: __+-} _.:;v L,T- --,_;;2,44 72.44 7245E} 45 7..46 ?L. 1.53 1.65 1.79 ;.95 ,� DiSC�'u 1.43 V 72,54 72.56 72.58 72,60 (2 r r,�4 �L 0fl, c3ISC4S 3.73 4.1B 4.46 4.81 5.23 w.J1 7.-� =i 3,?1 ELEV 72.92 73.00 73.03 73.07 73.12 73.1; 73..'8 ?i,4v 73,iG 74,16 DISCH6 17.57 20.47 21.43 22.37 23.29 24._7 �S.C:3 2' S 4 2b.`7 27•-7 Ir tLt 74.68 75.09 75.26 75.43 75.60 75,7b ?5,91 76.06 7b,2t� 76,32 tLi. 113,00 DISCH6 27.89 28.44 28.92 29.33 29.67 29.94 U.i5 30.29 30.39 30.43 13.00 ELEV 76.43 76.53 76.62 76.70 76.76 76.81 76.95 76.87 76.89 76.90 4,00 DI5CH6 30.44 30.42 30.36 30.28 30.i8 30.05 29.71 29.7.r 29.57 29.39 14.E=0 ELEV 76.90 76.89 76.88 76.87 76.85 76.83 76.50 i6,t7 76.74 7b.71 15.00 DISCH6 29.19 28.98 28.77 28.55 26.32 28.09 27,86 27.62 27,38 27.14 15.00 ELEV 76.61 76;63': 76.59 76.55 76.51 76.47 76.43 76.39 76.34 76.30 16.00 DISCHG 26.90 26.-65 26.41 26.17 25.93 25.69 25.45 25.21 24,97 24.74 16.00 ELEV 76.25 76.21 '' 76.17 76.12 76.08 76.03 75.99 75.95 75.90 75.86 11.00 DISCHG 24.50 2426 24.03 23.80 23.57 23.34 23.11 22.88 -22.66 22.44 17.00 ELEV 75.�22� 75.78 75.73 75.69 75.65 75.61 75.57 75.52 75.46 75.44 18.00 DI5CH6 22.2Z ��K� 21.58� 21.35 21.13 20.92 20.71 20.50 20.29 16.00 ELEV 75.40 75.36 75.32 75.28 75.25 75.21 75.17 75.13 75.09 75.05 49.00 D,LSCHG 20.09 19.23 17.98 16.85 15.82 14.88 ?4.03 13,26 12.57 11.42 �0 ELEV 75.02 74.90 74.73 74.58 74.44 74.32 7 4.20 74.11,) 74.Cv,1 73.87 r ,C� ➢ISCHG I0.41 9.55 8.84 8.23 7.71 7,27 6,89 6.56 6.25 b,;'4 ELEV 73.75 73.65 73.56 73.49 73.42 73.37 73.'2 73,29 73.?3 73.22 ,00 D'SCH6 5.83 5,64 5.48 5.34 5.22 5.'2 `.:? 4,95 4,88 4.82 E'EV 73.20 73.17 73.15 73.14 73.12 73.1: ,? 'ra 7?.08 ;3.CS8 4.78 4.74 4.70 4.67 4.64 4,b2 ;,fir; 4•SC 4,w7 4,56 == 73.0? 73.06 73.06 '? Ob 73.05; 73,.= -.,.= ,r 7'_.04 •, 4.55 4.54 4.54 4.53 73.04 ?3.04 73,04 73 ►74 7� ?.: 4 r, , . L,04 ' 4.48 4.44 4.36 4.23 3,�� 67 ;',v3 73.03 73.0� ,3,0C Gr -' -- -- r. J lr 1.88 :- _ ,7,66 72.61 -- 7-7r"38 72.37 '2,?6 72.?5 "2.?4 ,_ - -_.''_ '2,'_' L,72 log - • ---� 7L.32 71. f,31 7G,31 - - :02 .C2 .01. .01 _-= 72.30 72.3C 72,30 72.37 ADv'VE BASEFL Oil = 2.46 WATERSHED INCHES! 236.05 CFS-HRS, I7.Si KIRE-.t BASEFLOir = .:++' XErliiTVt CONTROL OPERATION ENDCMP COMPUTATIONS COMPLETED FOR PASS 2 RECORD ID Zry {��'_?•��� n{y�T�n• rI��'1TTJ'�+ n��-,_`- - �y Y`__--�_ r -- --__ _- __- 1 r--f�-r �TING T' r = .00 DTJ. = C L:. -__` �.*_l----1_ - - , - e- 'i�•- LlR`vT, '.siN�- n ALTERNATE NO.= 1 ST7RM Nu,=215 E'PERAT:ON RUNOFF CROSS SECTION' 2 OUTPUT HYDROBRAPH= i AREA= .05 SO MI 'INPUT RUNOFF nuU VE= INTERNAL HYDROGRAPH T7ME INCRE1w1E"-r= .022 PEAK TIME(HRS) PEAK DISCHARGE(CfS) P LEvAT:uN,;FE='.' 12.41 51.77 (RUNOFF 23.67 1.78 (RUNOFF; RUNOFF VOLUME ABOVE BASEFLOW = 2.59 WATERSHED INCHES, 3E,u? CFS-�YS, " ACR=-:EET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 3' OUTPUT HYDRO6RAPH=. 2 AREA= .08 SO MI. INPUT RUNOFF CURVE= 76. TIME OF CONCENTRATION= 1.58 HOURS INTERNAL HYDROGRAk TIME INCREMENT= .0958 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK E�EVAiiC�v(FEET:) 12.94 51,i`5 (; -' RUNOFF VOLUME ABOVE BASEFLOW = 2.87 WATERSHED %N-'mES, 1jE.tw �;FS-��_, :.,= rC;c-=_E;; BASEF'O4 = .00 CFS OPERATION RUNOFF CROSS SECTION 4 OUTPUT HYDROGRAPH= 3 1N7EyhA_ HYDR0.16RAPH TIME C�tE =�'T= ,,fT :. PEAS: T'ME(HRS) ?_,; 1_"- ABOVE BASEFLOW = 4.27 A-` =r -3-�__ --_--=- - --__---- --- ; -, •1---r-'- TF e, ZROSS SE T k INPUT HYDROGRAPHS= 1,2 U_,r PEAK �- , r_A.: _-:- ) 12.58 135.2•1 23.66 RUNOFF VOLUME ABOVE BASEFLOW = 2.75 WATERSHED INCHES, 227.52 CFS-HRS, 1S.E0 ACRE-FEET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 4 +�L.: �_~ •''-_v RJ �4.v� Rif':.. �x=__ _-, 1` r•,�, ` },j 4n • -,I'r S 7 r l t�ir VL.L71 v 71.YL !if J`' i.'� if_ ri,it 8.00 D:SChS .62 .64 .66 .U9 +L ?8.00 ELEV 72.4E 72,4 72,41 t2.42 �` 7 6_ 172t A ,DjSrpG 1.06 _ 2.r1,,2 - -, ,7 - , 2,649,00 EsEV 72.48 0 `G.GG Di^_CHG 2.18 2.35 2.53 2,72 L �t �, _ -i4 4i:- 4,47 10.00 ELEV 72.66 72,69 72,72 72.75 72,74 71._- ,"__ '2,a4 77 0 73,03 11.00 DISCHG 4.79 5.1E 5.64 6.17 6.70" '2L7 'Gr26 1",95 1`,72 11.00 ELEV 73.07 73.12 73.17 73.24 73.- 1 77. 7 152 -.3t73 74.06 74.43 12.00 DISCHG 20.07 2i.10 22,30 23,SG 24.67 _ .''" 2r, i "^_i,. 4� v,9 n9,"Fi 12.00 ELEV 75.01 75.20 75.42 75.64 75.85 76.U6 76,26 76,44 76.62 76.76 13.00 DISCHG 30.57 31.28 31.91 32.44 32.90 -L0 3y,E5 33.75 33.90 33.99 13.00 ELEV 76.92 77.05 77.16 77.26 77.34 77,41 '7f46 77.50 77.53 77.54 14.00 DISCHG 34.04 34.04 34.01 33.94 33.65 33.72 =3.E_ 33.42 33.24 33.04 14.00 ELEV 77.55 77.55 77.55 77.53 77.52 77.SG 71.47 77.44 77.41 77.37 15.00 DISCH& 32.83 32.61 32.38 32.14 31.90 31.65 31.39 311f1? 30.87 30.61 15.00 ELEV 77.33 77.29 77.25 77.21 77.16 77.12 77.,7 77. -2 76.98 76.93 16.00 DISCHG 30.34 30.07 29.80 29.54 29.27 29.00 28.74 H.40 28.21 27.95 16.00 ELEV 76,88 76.83 76.78 76.73 76.69 76.64 76.59 76.54 76.49 76.45 17.00 DISCHG 21,Q, 27.43 27.17 26.91 26.65 26.39 26.14 25.89 25.64 25.39 17.00 EtfV 16.35 A.34 74.26, 76.21 76,16 76.12 76.07 76.03 75.98 18.00 DISCHG 25.15 24.90 24.66 24.42 24.18 23.94 23.70 23t46 23.23 23.00 18.00 ELEV 75.94 75.89 75.85 75.80 75.76 75,72 75,61 75.63 74.59 75.55 19.00 DISCHG 22.77 22.54 22.31 22.09 21.87 2.,�5 rLt 19.00 ELEV 75.50 75.46 75.42 75.38 75.34 %4.3t 73'.24 5,..i 75,18 75,15 20,00 DISCHG 20.60 20.40 20.19 19.94 18.63 �7.L7 6.37 'E,33 14,42 13.59 21:0.00 ELEV 75.11 75.07 75.04 74,99 74.82 71".66 74.E' f4.3S 74.26 74.14 ^1,G0 DISCHG 12.83 11.80 10.65 9.71 8.9' i,° 7.�E ':3: 5,9= 6.65 2'_.:r�� ELEV 74.04 73t92 73.78 73.b5 73.5� .L9 %'.,L3 7',?, 7?.33 73,29 .."M DISCW6 6.40 6.20 6,03 5,89 -- �. _r-: E-33 J,.3 Si44 ELEV 73 27 73 24 ►3 22 ,3 ,: �� -7- .7 ,� ,_ ,sip f_ ,_ � ! 7'3.t5 .,,r•P��' S �(� c,3fl C.-ZR c 7 = - c - v i� -_ Lr}.i71.a'. t 5. F J a1,j.L Jr J_ _ _ e-_ _.i .J.it J, v 23. E'EV 73.14 73.14 73f 14 73,i4 73,`_: __„ -�,17 '3.'' 7'.:' 73.13 n.ZIFS 5.i22} `,i7 J.Gr! .57 -7 _L`_V 72.32 7�--m l 7 7Y 71 -' 3c) r:s.r m y •+r, r, 1 7 7 f. =,ti^7 G0�'�"'E ABOVE $ASEFL01{ = 2,9b WATERSHED INCHES, 263,8S C=�-R~2 s 2'i 4E ACRE-=Ec'f EABc�'_�;f. _ .00 CF5 1YR24 XEQ 07-15-8E Wy :=— _— JC2 ?ASS EXECUTIVE MI s ROL. S :KQ i --•- wE - RECORD TR^ x=0 ;.'-1;.-55 I d;53 BROWN CASLE- 87 ""_ - R_i� EXECUTIVE ZONTROL OPERATION COMPUT FROG! ASF�T_=` STARTING TIME .00 RAIN DEPTH = 2C� - _ z� _ -- __-= `��,_ -ft-. wiST, COND= 2 ALTERNATE NO.= 1 STORM NO.= 1 MAIN OPERATION RUNOFF CROSS SECTION 2 OUTPUT HYDROSRAPH= 1 AREA= .OS SQ MI INPUT RUNOFF CURVE- 73. 'i"'= JF C� CEk�FATI1 = .S3 "nS INTERNAL HYDROGRAPH TIME INCREMENT= .0922 `UwE PEAK TIME(HRS) PEAK DISCHARSE(CFS) ^EAt: E_EVATT.3N11 F== ) 12.41 65.32 `,NOFF) 23.67 2.12 (RUNOFF) RUNOFF VOLUME ABOVE BASEFLOM = 3.25 NATERSHED INCHES, 111.i1 C=S-HAS, 9,.5 AvuE-FEET; BRSEFLOW = .00 CFS OPERATION.RUNOFF CROSS SECTION 3 OUTPUT HYDROP,RAPH=. 2 )y a„ . AREA= ` :48 SO MI INPUT RUNOFF CURVE= 76. TIME OF CUNCEN'RATTGN= 1.56 HOURS INTERNAL,HYDROMA Tl*'lNCREKN7= .0958 HOURS PEAK TIME(HRS) PEAK DISCHAREE(CFS) PEAK ELEVATT7N(FE=-) 12.93 64.42 (j=4 RUNOFF VOLUME ABOVE BASEFLOW = 3.55 WATERSHED' INCHES, i7' i2 :J=c-�'RS aASE;LOW = .00 CFS OPERATION RUNOFF CROSS SECTION 4 O;ITPUT HYDROGRAPH= 3 AR;A= .02 S9 M1 .N?JT RUN0F 0,J5 =- TERNA '-YDROSRAPH TIME :N RE"=kT= J r1 !✓J.- , _7.57 n �c RUNOFF VOLUME ABOVE BASEFLOW = 3.43 WATERSHED IN-HES, 283.09 lCF^-HRcl 2 ='R A_--_}EET; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS Std-hq , 4 ' TR20 XEO 07-'_5-2 .�_ --F_. LI 1 =: REV ^n .ry9!21 er ! f• r� --+ __ --ram .r._ rr_ r�}�,• r �T PT ? .-'VA TT :1��!(Ftc 23,65 (NULL) TIME(HRS) FIRST �Y2�r;r��: =�;;N- _ ,^^ ~v='" '= = INCREMENT - .10 HOURS DRAINAGE AREA = .15 S&.Ml. 3.00 D:SCHG ,vv C,1 ,=1� ,'r .^: .0? .04 ,05 .0b .OB 4.00 DISCHG .1v =T .:9 ,21 .22 .24 .26 .27 5.00 DISCH6 .29 .31 .32 .ti4 .35 .37 .38 .39 .41 .42 6.00 DISCH6 .43 .46 ,`1 .56 ,59 .62 .64 .66 .69 .69 7.00 DISCH6 .73 .1 .80 .82 .84 .86 8.00 DISCH6 .89 .93 1,v1 1.12 1.23 1.37 1.54 1.61 1.73 1.84 9.00 DISCHG 1.96 2.11 2.30 21,50 2.69 2.87 3.06 3.30 3.55 3.79 10.00 DISCH6 4.01 4.25 4.54 4.85 5.23 5.69 6.19 6.82 7.50 B.27 11.00 DISCH6 9.14 10.06 1i.1(} 12.23 13.55 15.21 19.14 28.20 40.93 63.85 12.00 DISCHG 97,06 123.64 129.24 i27.83 127.47 126.56 123.72 118.72 112.51 106.38 13.00 DISCH6 100.25 93.99 87.46 80.84 74.08 67.33 61.08 55.61 50.91 46.80 14.00 DISCH6 43.19 40.01 37.10 34.48 32.10 29.95 28:01 26.24 24.65 23.24 15.00 DISCH6 22.00 20.91 19.96 19.12 18.32 17.55 16.85 16.24 15.69 :,*15.20 16.00 DISCH6 14.77 14.40 14.08 13.80 13.56 13.35 13.12 12.82 12.11 - .12.22 17.00 DISCH6 11.97 11.73 11,52 111.34 11.18 11.04 10.91 10.80.' 10.69 10.53 18.00 DISCH6 10.30 10.08 9.89 9.70 9'.52 9:35-' �'`:`'9 " '�� 'r: � is'04 19.00 DISCH6 6.74 8.65 8.53 8.52 8.46 8.42 8.38 GAS B.32 8.21 20.00 DISCH6 8.05 7.97 7.71 7.55 7.40 7.25 7.12 6.99 6.88 6.79 21.00 DISCH6 6,70 "42 �, 9 6.44 6,40 6.36 6,34 6.31 6.29 22.00 DISCHG 6.27 6.26 6,2� 6.?4 6.23 E.22 6.22 6.21 6.21 6.21 23.00 DISCHG b,2: 6,21 6,=; 6.211� 6.20 6.20 6.20 6.20 6.19 6.11 24.00 DISCH6 4.39 3.95 3.52 3.10 2.72 2.37 25.00 DTSCHS 2.06 10 .93 .79 .67 .56 .48 26.00 D'SCHG .41' 5 '_.i: .21 .18 .15 .13 .11 .10 27.00 D"SWCH': ;4 .04 ,03 .03 .02 .02 RUNOFF VL� '9E a8 i1* 18.91 ACRE-FEET; BASEFLOW = ,av Crt 78.46 "ME! R:3) FI 7-9tiREMENT = .IO HOURS DRAINAGE AREA = .15 SD. II. 3.00 G1SCHG .;}, ,v, ,. .00 .01 .02 .02 .03 .05 3.00 ELEV '2.'v 72,30 -_,':+ 2.34 72.30 72.30 72.30 72.30 72.31 72.31 4.00 DISCHG .016 .06 ,1,1 .14 116 .18 .20 .21 .23 4.00 ELEV 7?.31 72.31 72.32 72,32 72.32 72.33 72.33 72.33. 724C 72.34 5.00 DISCH6 .25 .27 .28 .30 .31 .33 34 .36:, .39 `R1C XXEQ 07-15-86 i4:5' iZOE REY . 09l8311 ,2) - - - 6 _ i.aCHE ,4' : _ _ 62 6L 6.00 E:.Et' ,2:="' -_ �' -- -_._ -n. 72.»= 72.40 72,4; 7.00 DISCHG .66 .,3 "- r. 6 .78 .90 •$L 7.00 ELEV 72.41 72.41 72.4- ��. �. ,;� '2,�3 72.43 72.43 72.44 8.00 DISto aQ1 .t. . I.' . I `: �,L3 IL 1a45 1.56 8.00 ELEV 72.44 72.4.4 ,2.4 �.4. -2,L? t2.:0 72.52 72.54 72.56 9.00 DISCHG 1.68 1.80 -.51 ­L2 2.91 3.02 3.24 9.00 ELEV 72.58 72.60 '�.62 1 i %2.'1 72.?4 72.77 72.80 72.84 10.00 DISCHG 3.46 3.69 3.93 .'_9 4.5` E.81 5.12 5.49 5.93 10.00 ELEV 72.88 72.91 72.55 '3,�„ ,_. 2 73.��� 73.0 73,11 73.16 73.21 1l.00 DISCHG 6.44 7.102 i.67 F.ti' :'�,1' 11, 5 :3.13 15.19 1$.77 11.00 ELEV 73.27 73.34 73.42 7L,51 .? 6 1 t3.72 73.87 74.06 74.36 74.84 12.00 DISCHG 20.72 22.04 23.58 25.13 26.64 28.12 29,55 30.90 32.15 33.79 12.00 ELEV 75.13 75.37 75.65 75,93 76.2; 76.48 76.74 76.98 77.21 77.42 13.00 DISCHG 34.32 35.25 36.07 36.78 37.3E 37.87 38.26 38.55 38.77 38.92 13.00 ELEV 77.60 77.77 77.92 78.05 ►8.1_6 78.25 78.32 78.37 78.41 78.44 14.00 DISCHG 39.01 39.05 39.04 38.99 38.9! 38.79 38.65 38.48 38.28 38.07 14.00 ELEV 78.46 78.46 78.46 78.45 7B.4L 78.42 7B.39 79.36 79.32 79.29 15.00 DISCHG 37.85 37.60 37.35 37.09 3h,82 36.54 36.25 35.96 35.67 3547 15.00 ELEV 7B.24 7B.20 78,15 78.11 76,06 78.01 77.96 77.90 77.85 77.79 16.00 DISCHG 35.�7 34.77 34.46 34.16 73.86 33.56 33.26 32.96 32.66 31.36 A Pit 0 ELEV 77.74 77.68 77.63 77.57 77.52 77.47 77.41 77.36' '77.30 17.00 DISCHG 32.06 31.76 31.47 31.17 71".8'E 30.59 30.30 30.01 29.73 - 29.45 17.00 ELEV 77.19 77.;4 77.09 77,03 ,6,98 76.92 76.87 76.82 76.77 76:72 18.00 DI5CH6 29.16 29,89 2?.61 28.73 L 1. 27.51 27,23 26.97 26.70 18.00 ELEV 76.67 76,62 76.56 7c,`''_ 76,01 76,36 76.32 76.27 76.22 19.00 DISCHG 26.44 26.17 2:.91 2?,.66 =3, =5,:6 24.9; 24.66 24.42 24.19 19.00 ELEV 76.17 76.12 76.09 76,n3 7=.90 71=,44 75.89 75.85 75.80 75.76 20.00 DI5CH6 23.9r 213.7: 2'_•:48 2?,32 22.10 21.87 20.00 ELEV 75,7E ?5,58 7`.L' 7=,v? �.�ti 'i.=` u,�6 75.42 75.38 75.34 DiSCI6 2:,64 141 2:.2' 2 „= "- 2G,1: 19.64 18.36 21.00 E :V -2 -= -- _ -- -_.. ?4.95 74.78 22.Os? "-:)u 10.04 9.34 22.00 ELEV 74 6? 74,4? ,.6 - - = ?.-_ �3.8; 73.70 73.62 23.00 DiSC►S E:%� 1.'�'. f - _ - - " ' ' =.�1 h.v2 6.71 6.61 23.i," _'_:v ,7 -- -. - -- : 77,32 ?3.30 73.29 4.46 4.03 24.07 .3,')7 73,03 72.97 25.00 DiS CHI c - .94 .80 -.?% �:. - -- -- a_ "._49 72,46 72.43 • �26.00 _• Q _- -- -- - - �nr 72.33 72.33 27.00 D:SGQ .04 .03 27 0_ .. -2, -.n zi � ,- �. - - ,'_: ,2,': 7- If, 7� 3! 72 31 28.00 DISCHG .013 102 . i- 28.00 ELEV :. 'c ��.3C - _. t2, r...•. RUNOFF VOLUME ABOVE BASEFLOW = 3.65 WATERSHED iNCHES, 343.7y 7Z-►RS, 28.9. ACRE-FEET: BASEFLON = .00 CFS TOE i —D F RE�'ORD :.n OR LASS FEY SrrT10N Tr.6i nr,t - F.,_ Rr. O_PTH = 6.90 RAIN DURATION= 1.00 RAIN TABLE Nu.- -. . _:ET. =T= STORM NO.=99 !FAIN TIME INCREMENT = .10 HOURS "1 2 AREA ,05 S2 ML INPUT RUNOFF CURVE= 73. TINE OF CONCENTRATION= .83 HOURS :N'=;'AFL H'Y7ROEAPH TIME INCREMENT= .0922 HOURS �EAK TIME;HRS} PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.40 77.49 (RUNOFF) 23.66 2.43 (RUNOFF) RUN3FF VOLUME ABOVE BASEFLOW = 3.84 WATERSHED INCHES, 131.39 CFS-HRS, 10.86 ACRE-FEET; BASEFLOW = .00 CC` 0?ERATION RUNOFF CROSS SECTION 3- OUTPUT HYDROGRAPH= 2 AREA= .08 SD MI INPUT RUNOFF CUR VE_mj76.- . TIME OF CONCENTRATION= 1.58 HOURS INTERNAL HYDROGRAH TIME,INCREl N w�958 PEAK TIME(NRS) PEAK DISCHARBE(CFS) PEAK ELEVATION(FEET) 12,93 75.74 (RUNOFF) R_h3F: VOLUME ABOVE BASEFLOW = 4.17 WATERSHED INCHES, 201.75 CFS-HRS, 16.67 ACRE-FEET; BASEFLOW = .� � 7S Lr�JJt7. a+C-L4''IS 5R=== r. S, iiPUT RUNOFF CURVE= 91. TiM* OF CONCENTRATI0'�= ,3 ` :NCREMENT= ,0440 HOURS PE9k; D15CHAR5_(CFS) ? AK ELEVATI014(FEE�) - 73.80 (RUNC=�} . - 1,U7 (RUNO�F1 n% �( - -- v r"- _ - - - `," ATER3HED INC FS, ?�,3=� -;; S - - PEAT; TIME(ARS) PEAK DISCHARGE(CFS) PEAK ELEVAsI'ON(FE=T? 12.56 132.48 (NULL) 23.65 5.98 (NULL) RUNOFF VOLUME ABOVE BASEFLOW = 4.03 WATERSHED INCHES, 333.13 CFS-HRS 27.53 ACRE-FEET; BASEFLOW = .00 01, X �7-45-== :4. 3 BROWN LI t S{ 40E rDDL;vD CROSS SECTION 4 :KDU- �YJROGRAPRS= 314 01,27PUT AYDROGRAPH= 6 PEAKTTM-�HRSJ PEAK U1S� !-I C14` % i.•�s 65 7 1 .0 � .._.. rrrs;H?,S) FIRST HYDROGRAPH POINT = .00 HOURS TIME 'NCREMENT = _: PTiPS '•�c N- AREA = ,:5 SC,l�i, 3.00 DISCHS .01 .02 .03 .04 .06 .v, _ ? ,1 .14 4.00 DISCHS .17 .20 .23 .25 .28 .'_r .3L '_ 132 5.00 DISCHG .40 .41 .43 .45 .46 .48 53 .54 6.00 DISCH6 .56 .58 .64 .70 .75 .78 ,8i1 .82 .84 .66 7.00 DISCHG .88 .90 .92 .95 .98 1.01 1.04 09 1,13 1.19 8.00 DISCH6 1.26 1.35 .._ 1.49' 1.65 1.83 2.03 2... 2.36 2.54 2.70 9.00 DISCHG 2.86 3.45 3.29 3.54 3.78 4.00 4.23 4.53 4.8d 5.12 10.00 DISCHB 5.3 ::.;,,` -:'6.41k- , 6.87 7.41 8.01 8.76 9.59 10.51 11.00 DISCHG 11.56 12.66 ; 13.91 15.26 16.84 18.81 23.42 33.94 48.73 75.19 12.00 DISCHS 113.39 144,,15 _ `45f 25- j5k25,- 09 149.00 145.50 139.43 131.96 124.60 13.00 DISCH6 117.28 109.81 102.06 94.21, 86.22 78.26 70.92 64.51- 59.99 54.18 14.00 DISCHG 49.�6 46.23 42.84 39.77 37.00 34.49 32.24 30.18 28.34 26.71 15.00 DISCHS � 25:264. 24:0 ° 22:r�#E `''4'2�.�97-`.,,,-20,99 -20.10 17.29 18.58 17.95 17.39 16.00 DISCHG 16.89 16.46 16.08 15.77 15.49 15.24 14.97 14.63 14.27 13.95 17.00 DISCH6 13.65 13.39 13.14 12.93 12.75 12.58 12.44 12.31 12.19 127.00 1-3.00 DISCHS 11.74 11.49 11.27 11.05 10.85 10. 10.19 10.06 i9.04 DISCHG 9.95 9.85 9.77 9.69 9.63 9.55 9.5. 9.46 9,35 00 DISCHG 9.16 8.96 8.78 8.60 8.42 8.2:5 E.:r 7.96 7.83 7.72 21.00 DISCHG 7.62 7.53 7.45 7.38 7.32 %.28 1.24 7.1?0 =.18 7.15 2240 DISCHS 7.13 7.12 7.10 7.09 7.08 7,'.98 f.1..7 .0-6 7.06 7.06 L'.00 DiSCNG 7.05 7,05 7.05 7.45 7,05 ?..f, '_. 7.V5 ►.�'� :.94 lt.ocll 6 76 6 49 6 5 51 `.Ot 4_, u l]L C..H u �04. .� +� i 2.34 2.42 E.r: 1.48 ♦. J __.� ._, ,�v =�, .,�,J 1� •)• J'1r�r ,46 .40 .,4 .28 _ .0Cj D S;,�i+o .09 .08 .07 =46 ,,;lq _ ,:!' ..ji . ►2 .02 .01 .0. .0' 1c" �.27 WATcRSHtD 1\r�:•�, 4C�6. 3 C`.J--`-. -- _--_- -- ---- :'t - ._ _'S _ nnnr;vDa5SRA,H= 6 O JTPUT ►�:Y;n�033A. r =- n : -.:VATiON= 72.30 PC1f D:SC!+AR6E0ICS) ��[il �_��- •.!'s 14.16 43.56 ;~_ TTVE(HRS) FIRST HYDRO6RAFH POINT = ,00 HOURS TIME INCREMENT = .'101 rDiiRS DRAINAGE ARIA = .15 SD.MI. 3.00 D I'S 33 .00 .00 .01 .02 .03 ,s .06 .07 ,OB .10 3.00 ELEV 72.30 72.34 72.30 72.30 72.31 72.31 72.31 72.31 72.31 72.32 7 IP e 19 t..?3 �".33 7 .34 C_ ./ 0 . .44 .t-.0 ELEV 72.36 72.36 72.36 72.37 72.37 72,37 ��,tV 72._� DISCH6 .52 .54 .56 .60 .64 .68 .7_ , ''`t cV 72.39 72.39 72.39 72.40 72.41 72.41 77.4 2 -.,=� ,�'_• 4- -.w• ;,i5Cri5 .82 .85 .87 .89 .92 .94 .9- _zV,.) ELEV 72.44 72.44 72.44 72.45 72.45 72.46 ,2.46 -_t47 72.47 E.01 DISCH6 1.13 1.19 1.26 1.37 1.49 1.64 -.80 3,00 ELEV 72.49 72.50 72.51 72.53 72.55 72.57 72.60 72.63 '2.6E 9.00 DISCH6 2.46 2.63 2.81 3.02 3.23 3.46 3,68 9.00 ELEV 72.71 72.74 72.77 72.90 72.84 72.88 72,91 7-.' n-1 77. �2 10.00 DISCH6 4.50 4.69 4.91 5.15 5.42 5.74 6.10 �.52 I, J 7.56 10.00 ELEV 73.04 73.06 73:09' 71,,11- 73.15 73.18 73.23 73,28 7-3.3 73,40 11.00 DISCH6 8.20 8.91 9.71 10:61, 11.60 12.63 13.45 14.91 i-.45 20.27 11.00 ELEV 73.48 73.57 73.6b,T 74.02 74.13 74.32 74.66 '�,'!5 12.00 DIS,CQ6 . 6 2,2 94 2 ,_ r� 30.25 31.97 33.60 35._1 36,42 12.00' UT 5�.53 ` ```� ���'' � - 7�:8t �7'�.19 77.47 77.75 78.00 13.00 DISCHS 37.72 38.84 39.83 40.69 4�.42 42.02 42.50 42.88 43.15 43.35 13.00 ELEV 78.22 78.43 78.61� 'l 16'" 70."0 '79.00 79.09 79.16 79.21 79.25 14.00 DISCH6 43.48 43.55 43.56 43.53 43.45•a 43.34 43.19 43.02 42.81 Q.59 14.00 ELEV 79. 77 79.28 79.28.� 79.28 79.26 79.24 79.22 79.19 79.15 79.11 15.00 DISCH6 42 34 42.08 41.81' Y 4 52'y 2; 40.92 40.61 40.29 39.96 39.63 15.00 ELEV 79.06 79.01 78.96 78.91 , 78.86 79.80 78.75 73.69 7E.;63 78.57 16.00 DISCH6 39.30 38.97 38.63 38.30 37.97 37.63 37.30 36.97 36.64 36,30 16.00 ELEV 78.51 78.45 78.39 78.33 78.27 78.21 78.15 7R.JG 17.00 DISCH6 35.97 35.64 35.31 34.98 34.66 34.33 34.01 33.19 3ti:,'7 3't k 17.00 ELEV 77.90 77.84 77.78 77.72 77.66 77.61 77.55 77.41 77,47 77,-"7 _.9.00 DISCH6 32.75 32.44 3Z.13 31.82 31.51 31.Z0 30.70 3".::,6�: 3"-,,` 1Gt<<z 6.00 ELEV 77.32 77.26 77.20 77.15 77.09 77.G4 76.9E ,=3 .t�, 15.E2 DISCHG 29.70 29.4' 29.12 28.94 28.55 28.28 8:0' _". Ni E'EV 76,76 76.7_ 76.66 76.61 76.56 76.5:- 76:4 -ti,-. .;;3 GISCH. 1 -.1 26. 26.40 26.14 25.8E 25t62 2 ,36 -: :1F` 76.26 76.2 76.16 76.12 76.07 76.02 "_ -_ "- ,d.7 Ii:SC'H,6 24.35 2Q.`:' 23.86 23.62 23.38 23.t4 79 75.c0 75.66 75, r7 -- n yT 21..;6 :.1.35 �1. It, - 75.36 'S,28 75.25 75.�1 '=.47 s�_:: _-• �_a:.t'U , F,4- ,31 ;6.32 15.43 _4.J•� �l - - _ E E: 74,95 -.-= 74.64 74.51 74t'9 _-. ,� 6 !3.54 l.1.17 , : , _. 76, L 1 IH T �,'77 r it 3�Dat1 t . 2 .7 .[tom i-."=i ELEV 73.06 7, 72.S9 12,78 72.69 72.663 72.5' 26.00 ELEV 72.43 72.4: 72.39 72.36 72.37 72,36 72.35 72,v ►_,_ -_.'v 27,00 DISCH6 .i5 .'2 .11 .09 .08 .07 .06 .�.` `4 ,13 27.00 ELEV 72.33 72,32 72.32 72.32 72.31 72.31 72.31 72.31 72i3 ?2.3i 28.00 DISCH6 .03 .0_ .02 .02 .01 .01 .01 .Ql .G0 �:4.:•J} XEG JI-1N f1 v. rTn, 4�^�• v ti_ �•i ;}vr v REV PC Q91t17'.2t D ,: 20 nr nit c T.. �r . _ �_ _ __ _. __ _ �h AEB,� _'3� - 4.i f 4 47:7 : 'j EXECUTIVE CONTROL ncrRAT.','JN ENDCMP c"k�i---�� - _ -_� ��= --_= RECORD .n EXECUTIVE CONTROL OPERATION ENDJOB RECORD ID • . 1�?Pr.,i�` 4�e "°�� ru�S�E�'���`^ :7+� ''3"�� �i;,? :,i�Eq,°je,'• r - r , r:A• r..,t 1: •4 Y'r�rY•`k" �S'y >1h. lf. •. - f'1.`d n c . � ti u' r^ =,v t7 ?AGE 21 ,� S- ____ - __ --: _ 'r = ,•" '�___� � ; T=� 4 F_A' TOP HYDROGRAPH SECTION! STANDARD ;� _ 2771 '-- ' PEAK DISCHARGE STRUCTURE CONTRCL JA�N�`vE - �.'_ -: -------- --------------- _NrycF --------------------------------------♦ JI .D O?EkATIO�! "�'A7"k AMOUNT ELEVATION TIME RATE RATE 5p !1:) =_ ~'; '_`, f-'") 11 N) (FT) (HR) (CFS) (Csrl) ALTERNATE 1 STORM2 XSECTION 2 RUNOFF .05 3.210 24.00 .78 --- 12.45 18.06 341.2 XSECTION 3 RUNOFF .08 ? 2 3.2C 24.00 1,15 --- 13.00 14,62 261.6 XSECTION 4 RUNOFF .02 2 .0 3.2.0 24.00 2.17 --- 12.09 29.31 1429.E 2 2 ,r0 3.20 24.00 1.09 --- 12.64 32.22 251.7 XSECTION 4 ADDHYD .13 XSECTION 4 ADDHYD .15 2 a10 .0 3,20 24.00 1,23 --- 12.15 42.59 286.8 STRUCTURE 1 RESVOR .15 2 Z. ,1,. 10 3.20 24.00 1.23 75.35 13.55 21.95 147.8 ALTERNATE 1 STORM 10 XSECTION 2 RUNOFF .05 2 2 .10 .0 4.80 24.00 2.12 --- 12.42 41.94 791.3 .. 1fSEGTIB!!•: 3 RUWF .O� 2 2 .10 .0 4.80 24.00 2.37 12.95 : 42.48 566.4, XSECTION 4 RUNOFF .02 2 2 .10 .0 4.80 24.00 3.69 --- 12.09 48.64 2372.5 XSECTION 4 ADDHYD .13 2 2 .10 .0 4.90 24.00 2.27 --- 12.59 72.63 567.4 XSECTION 4 ADDHYD .15 2 ..` ,v 4.8024a11 2,4E --- 12.21 86.70 583.9 STRUCTURE i RfSUOR .15 4.90 L ,00 2.4E 76,90 13.98 30,44 205.0 ALTERNATE 1 STORM 25 XSECTION 2 RUNOFF .05 9 --- 12.41 51.77 976.' XSECTION 3 RUNOFF 38 --- 12.94 51.75 689.9 XSECTION 4 RUNOFF 132 s _ �.4:, << = �? -_- 12 y c 2,^ XSECTION 4 ADDHYD - _ . . a Ufn a20 596a9 XSECTION 4 ADDHYD 1 • _ '�, �,y� --- ^ 22 , It 1L,-1 14s t,t •Vvea 7` 'i.�� _L,(j63P,04 ~rt a= J TE. Xy£cCTia��N 2 RUNOFF . r. _ �;, --- A I1�rrT13, N J 4`_1rC - _ } �. :2r4t �5.3 2jC X"ECT.7ON 4 RUNQF; _L - -'^ti; _ a_s _S J r --- i. X_ECTATB 4 XSr3 4 ADED - _ . 6. a 5 4u J... i • . n'n . 6.46 1f13 05 2"GETRUCTUR-E i{ G 7Y]R w Ja+i ALTERNATE i STORM 99 XSECTION 2 RUNOFF .05 XSECTION 3 RUNOFF .08 2 ` •0 b,90 24.00 3,84 --- 12.40 77.49 1462.1 a'st- .0 6.90 24.00 4.17 --- 12.93 75.74 1009.9 SU4MAR1` TAB!= ? - ec'_ -E� .._ti`-�� -- cTrNDARD AND EXECUTIVE CONTROL INSTRUCTIONS IN THE ORDER PERFORMED uI CHARGE TIME AND RATE (CFS) VALUES INDICATES A FLA" TOP HYDRu6RAP* HYDR06RAPH WITH PEAK AS LAST POINT.? SECT'.Otil BTAnL'N'1 _� � - 4AiN PRECIPITATION °EAt` D:SCyARF= STRUCTURE Cr, TR01 IN Ik;KBF T`;l r �v7Cr 'r?ME ------------------------- RUNOFF --------------------------- -----------OPERATION "=_A `- "OQ 'RCREM BEGIN AMOUNT DURATION AMOUNT ELEVATION TIME RATE •' tR} SH�t} (IN} (HR} (IN) tFT} tHR} . �- ALTERNATE 1 STORM 93 XSECTION 4 RUNOFF .:.? 2 .10 .0 6.90 24.00 5.73 --- 12.09 73.60 3599. XSECTION 4 ADDHYD .13 2 .10 .0 6.90 Z4.00 4.03 --- 12.56 132.48 1�'c.r.' XSECTION 4 ADDHYD .15 2 2 .10 .0 6.90 24.00 4.27 --- 12.24 151.23 1022.4 STRUCTURE 1 RESVOR .15 2 2 .10 .0 &90 ',k2 : 4.27 79.28 14.18 43.56 293.4 x_ ems: •ey. ;'n y - -_ �1'=== = �' A =:TI;�"�S A�ki STRUCTURES FOR ALL STORMIS AND ALTERNATES L.0._ •.la -7. �J a'r RS.......... AL T ERN8,'E '• Y .;:u 2 i,94 30.44 34.04 43.56 XSECTION '' ALTERNATE 1 65.32 18.08 41.94 51.77 77.49 XSECTION 3 .09 ALTERNATE 1 64.42 19.62 42.48 51.75", 75,74, XSECTION 4 ,15 ALTERNATE i M.55 42.59 86.70 I04.13, 15.1,83 JOB TR_20 _ _, _`f TC 6 RUNOFF 1 00 6 RUNOFF 1 002 6 RUNOFF 1 003 6 ADDHYD 4 003 6 ADDHYD 4 003 6 RUNOFF 1 VAC4 6 RUNOFF 1 0050 6 RUNOFF 1 006 ? 6 ADDHYD 4 006 2 4 6 ADDHYD 4 006 3 4 6 ? 6 RUNOFF 1 001 1 .C�c3 -5,: -- 6 RUNOFF 1 009 2 .0205 6 RUNOFF 1 009 3 ,075 ,0 ., 1 6 ADDHYD 4 009 1 2 4 '. f 6 ADDHYD 4 009 3 4 7 1 ENDATA 7 INCREM 6 .1 7 COMPUT 7 001 009 0.0 5.4 .0 2 2 01 25 ENDCMP 1 7 COMPUT 7 001 009 0.0 6.9 1.0 2 2 01 99 ENDCMP 1 7 COMPUT 7 001 009 0.0 2 2 01 02 ENDCMP 1 7 COMPUT 7 001 ':'09 ENDCMP 1 7 COMPUT 7 00' v09 0.1� ENDCMP 1 ENDIJOP 2 N ' , 'r; "A-N -_'E 73CREN-NT = .10 HOU06 - - TO )SECTION 9 rrrr 0 C=� :,� = 5.M0 RAIN DURATION= 1.00 SRiN TALE NO.= 2 A;)T, ",_ M } - L -�"-Tr -' =-5 MAIN TIME INCREMENT = .10 HOURS -- CZCT"It. "NOFF CURVE= 70. TIME OF CONCENTRATION= .67 HOURS iNTERNP! "Y[jRuiRAF" T_"= INCREMENT- .4893 HOURS PEAS: T.LME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.31 20.50 (RUNOFF) RUNOFF VOLUME ABOVE BASEFLOW = 2.33 WATERSHED INCHES, 30.87 CFS-HRS, 2.55 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 2 OUTPUT HYDR06RAPH= 2 AREA= .05 SO MI INPUT RUNOFF CURVE= 73. TINE OF CONCENTRATION=" .83 HOURS INTERNAL HYDR06RAPH TIME INCREMENT= .0922 HOURS . ; PEAK TIME WS, PEAK DISCHAR6E(CFS) PEAK ELEVATION(FEET) 12.41 51.77 (RUNOFF) ­7.67 1.78 (RUNOFF) ih..'S♦.-T V121UYE A$uvE Br5EF_OW = 2.531 WATERSHED INCHES, 88.68 CFS-HRS, 7.33 ACRE-FEET; BASEFLOW _ X1. C=S cl Zr ,''S N= :,=''�T ` C}= CARVE= 76. TI?!E O= CONCENTRATION= I.`E "OURS -'�--- - n-- ' lL T.V.= - -�;(EP°T= .0958 ;OURS J^ - r'EA� FLEVATION(FEET) ', L -- - --�- -- = - t`'t0 i�'tCHES, 137.L.4 ^--'-4RS, ".17 ACRE-FEES7. 1UTPUT HYDROGRAPH= 4 OiSCNARSE(CFS) PEAS; E.EVATION(FEET) 12,38 71.42 (NULL) 23.67 2.43 (NULL) RUUNOFF VOLUME ABOVE BASEFLOW = 2.52 WATERSHED INCHES,, 119.55 CFS-HRS, 9.86 ACRE-FEET;. BASEFLOW = .00 CFS _ f r AA �� A}n LRsi�k .+�i"+,T,._ tip 4�}i --- -nT-- 1 `A i i 1iJ.3'{tiPH= 5 ; ii'=( 3ISCHARGE(CFS) PEAK ELEVAT'B(FEET) 105.24 (NULL) '.66 5.06 (NULL) HYDROGRAPH POINT = .00 HOURS TIME INCREMENT = .10 HOURS DRAI%S= A;EA 5 HS- .00 .0c .00 .00 .01 .01 .01, .;: - : DISCHB .11 .15 .20 .26 .34 .42 .52 .63 10.? DIS CHI G 1.02 1.18 1.34 1.52 1.72 1.93 2.18 2,47 _ 0 DISCHG 3.65 4.17 4.76 5.44 6.20 7.14 8.60 11.16 16.'7 DISCHG 40.40 59.82 79.50 94.63 102.95 105.23 103.08 98.46 9"E4 S-,L 13.00 DISCHG 82.19 76.87 71.42 65.94 60.36 54.84 49.73 45.30 41,48 35,11. :4.�i0 DISCHG 35.16 32.54 30.18 28.05 26.13 24.41 22.84 21,43 2a.:5 :E,;S 15.00 DISCH6 17.93 17.01 16.20 15.50 14.87 14.30 13.75 13. :4 11L.ii 1 ,35 _6.00 DISCHG 11.99 11.67 11.40 11.17 10.97 10.79 10.62 10.44 10.23 1c.cl 17,^Q DISCHG 9.79 7.57 9.39 9.22 9.00 8.96 B.B5 9.76 5.67 8157 18.00 DISCHG 8.45 8.31 6.14 7.96 7.80 7.64 7.51 7.3y 7.2c i,.9 :9.00 DISCHG 7.10 7.03 6.97 6.92 6.87 6.94 6.81 6.78 20,010 DISC!kG` 6.64 6.53 6.39 6.24 6.09 5.96 5.83 `.7L v.63 -=4 '?ISCHv 5r46 5.40 5.34 5.29 5.24 5.21 5.'_8 �_..1,, DiSCFIG ti J.10 5.09 J.OB `.07 5.07 J.vr u_ 0 DiSuG 5.06 5.06 =.06 5.06 5.06 5.06 5.06 5,` v DISCS 4.96 4.63 4.62 4.31 3.94 3.52 3..1 7: :.30 1.11 .94 .79 ,66 =� _ f n 7 C 1 n?• 7f �1� nc .-J . f� 1y i5 1+ i.a , 1.1 r tz f F -r 7C r, -` •.r. - ,,S'�'_ _� �� - ..;`. �+A .,�-'c: F NC'�:� ,;5.4`1 1�1-' S, -+... JJ95 , �77 .lu4'� .=�_-_.,� _ �,� wi� :`4.�:.i :"1�1."1�3� J�r .L!7y 4.66 .�_-`C-'1 `r-- -- - 0rtn .7!Ok RUNOFF L, DZI .7LL j. J OUTPUT HYDROGRAPH= 2 AREA= .05 SQ MI INPUT RUNOFF CURVE= 90. TIME OF CONCENTRATION= .33 HOURS INTERNAL HYDROGRAPH TIME INCREMENT= .0440 HOURS __ _ = = .= JCE� 1 PASS E9 a'- R,. PA"E .1 Y V`N71 iLy�1 Lei! V. _1,:,• -_^z�' T_}-= J� l+' n�11-R'i. L l IRS PEA)` t } PEAKEEEVATsOMr'EET) t Y' rgL;�W.. RUNOFF VOLV= ABOVE RASE=_ON = 2.61" NATcRSHED :NCHES, 138.81 CFS-HRS, 11.47 ACRE-FEET; AASEFLOY = .00 CFS OPERATION ADDHYD CROSS SECTION INPUT 4YDR06RAPHS= 112 0J,TPUT YDR7SRAPH 4 PEA;! TI�'E(HRS} PEAK ^TSCHARSE(CFS) PEAK ELEVATION(FEET) 12.09 200.26 (NULL) 23.65 2.98 (NULL) RUNOFF VOLVE ABOVE BAS FLOW = 4.27 WATERSH INCHES, 202.37 CFS-HRS, 16.72 ACRE-FEET; BASEFLON = .00 CFS INP"YT 4YDRD6RAP S= F,L ��-�•v� HYDR'u�SriA-+= 6 a E 1'S -L-rr _ . �_ ��r _ . .,_ TT�a. .i'4'r .: =•t - .-, ~_x. v .�1-'-'NAG' 1'��cA 3.j .OIL .03 .06 ,cl i 10 's C= 47 _1 �..31 �.till 111 � .a.t 65: _3.37 ---66 ^? 34 L ,60, 75.19 11C,-.88 f07 7 '•I t 17 •'4 Y� 1, r �I�j ' n _r, n ,8� .14 a.al:69 VV,a r�,Q f 4.Y 13,tt( 3.r_i� _115 ulsc �_,�_ 61,2i 56.88 ��a�+6 •:a9r 40suL'52 a1.,,4 14.00 DISCHE 34,r' '2,J' 3C,43 28.44 26.61 24.91 23.38 21.91 20.60 19.54 15.00 ^�SL�E 18,66 17.91 L7.26 ibfb5 15.45 15a17 14.52 14.03 13.63 13.30 99 11.76 :1❑.33 i0.�,_ .76 i:L�t 9.79 i.s'L Qi.6z - - __ ... aJ.•uf �,10 J,.,a. 13 9.05 y- rs�_ f +••j t •fir --7 6.24 6 t7 6 __ .___ _- _ L._ _ J■ L ve GJ ,.. Jr 6 Q.l 5.72 1r _- �- a.6:5 5.64 `.03 5.63 5.62 5.62 5.,h'_ t:6' 5.61 D. =,i: 5.51 5.61 5.58 =,3 .9 -148 2.27 2.07 1, 3 i =_ _ n .62 ,or, .0 .04 .03 .03 .02 .02 lot loo ;TERSHED INCHES, 341.21 CFS-HRS, 28.20 ACRE-FEET; BASEFLOW .,.+..• it_4 �" !'� CAS=.`_J!� �.�,. r. .. tU:lt�l�~ i rc �7�[+TTON 7 211TPL!T PYDROGRAPH= AREA= .05 SO MI INPUT RUNOFF CURVE= 73. TIME OF CONCENTRATION= .83 HOURS _NTERNA_ 4VDR05RA.PF... TIME INCREMENT= .0922 HOURS PER 7Mc(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 51.77 (RUNOFF) 23,67 1.78 (RUNOFF) R11NO-- V0'_L�wFF &,B!-Vn' AASEFLOW = 2.59 WATERSHED INCHES, 89.69 CFS-HRS, 7.33 ACRE-FEET; BASEFLOW = .{10 G75 Stir µ- = OrF GLRVc= 90. T:"= n: �tJ?►�ENTRAT.N= ,33 HOURS +�C �CJ C;�VATTnl1(�ccT1 INLr,-b 53.«4 r:c_.�RsS 4.66 ACRE-=EET; BAS*r_ 5-A..n,C= r,u r- 7. 1T.�k,= 1 4a riC!!;? Js_- - r((�A�fT71'� 1 _"'� ,_..Y1'�scvii(. i=Tr - CL cj fc 1ry fj���r'y ''-- _':'�� BtiVE ^pc_=_Csi = ".1' �iP-=nSHcD IN''CH--r 1'n,6? ==E--1 5 11.47 ACRE-DEFT; rAwcFLOW = ,='0 GF5 CH-RATION ADDHYD CROSS SECTION 9 15�":i BROWN C;Afi-_r h[q.f D4nt'�/Ih! 2?,ti6' __- .._.. _ •jT'_i'_ �� rW - 3,L:6 WV!RIS'`';� ai4`j�_`.y _'v.•-. _ __ rR SS StCTllu GN 9 YID 6RAP7S= -14 OUTPUT HYD455RAPH= PEAr,� Tr4 v -K. A GE`Cr r 2^_�. � I04.73 • •__-- �'.66 5.24 i �:RST HYDRD6RAPH POINT = .00 HOURS TIDE ' C;E*= - _ ,.. - _=i';=J_ -_` _ „ S-Z I ?r tiv u_SC46 .00 .00 .00 .00 .00 e00 .00 '12 ,yL 4.00 DISCH6 .03 .05 .06 .08 .09 .11 ,12 .It r17 ..30 DISCH6 .19 .20 .21 .22 .23 .2` .26 6.00 DISCH6 .31 .32 .36 .40 .43 .45 .47 .48 .51 (.V0 DiSCH6 .53 .54 .56 .57 .58 .59 .6i .62 .63 .t4 3.00 DISCH6 .65 .69 .73 .79 .86 .94 1,00 1.05 1.09 1.14 9.00 DISCH6 1.19 1.26 1.38 1.51 1.63 1.75 1.88 2,06 2.24 2.42 10.00 DISCH6 2.58 2.76 2.98 3.23 3.52 3.88 4.27 4.76 5.29 5.69 1..00 DISCH6 6.56 7.27 8.09 8.97 10.01 11.32 14.49 21.90 32.32 51.24 12.00 DISCH6 78.8Z 100.69 104.63 102.79 102.21 101.49 99.34 95.51 90.70 85.92 '_3.00 DISCH6 81.12"-" 76.19 `,,11.03 65.78 60.39 54.98 49.96 45.56 41.76 3B.44 1�.00 DISCHS 35.53 32.95 30.60 28.46 26.53 24.79 23.20 21.75 20.45 19.30 r'�1 DiSCH 18.29 17.40 16.62 15.93 15.28 1�.64 1�.07 :3.56 13.11 =2.�1 _-. .. DlvrHS i2.36 12.05 11.79 11.56 11136 1'.19 1'_,fJG '_':,,- ,t� ':0.=5 '.-._ - DjSrHD 10.04 9.85 9.67 9.52 9.39 9.21 �.17 y.0" cr7y S,bS HS 8.66 8.4y7 8},31 8.15 0.00 7,S'6 7.71 7.62 ',:,2 %, 3 :.A. ITV,''^ j �� 7 L� t n� 7.17 7._i 7.'-0 7s 06 fir,? - r.., -0 , ri , .2a_ ,4 D L,.. ',' Ji"� 6.77 6.63 6.49 6.36 6.23 6..` �.`9 '5 5.58 5.52 -j a,4: "_L , 5.29 5.28 5.27 5.26 4,?1 C� 7 5.11t 4.8� 4.�' L.C1F y,h ',�- _•�. - :- 73 1.50 1.28 1.09 ,34 .29 .25 .21 r= yt "�`CW - t,96 WVEARS�':D !VHES �_•�! Z:�_ �~ 1 lr'f 1 = .RJCr t+C7 lPi{ F d 11^Is7 L13MPLF rLl ELF �-v TR20 YEQ 07—'_5-33 15:_.� -J Zt f i'3 ^� `= rpr r v E_XECUTIVE CONTROL OF: r. -� ,^•i_,T --�w ,__-- -- -- --�r-,_. � r—�-, . . ��++Tn T* TrN_ _ _n' P.'. _.—_ _ � — n•— � - n ra qq1 — ppI'! _ h1, e_ �_ .7-A�i:l�!.: _ _ _ l--_ _ - _ -. �.... � ���_ _,l'� .'_�_4 ir.,�."'_' !t4.- a. `l:4T, ',�.v_�1.a', uG��' ► TT2, �-•r'�_ v-r--- OPER ;��N R�,-EFF C�.' ='S D�f �n :ti 7 PUT AREA—` a()i c6 M: I:1_— — .A2,r= *._ Jt ,f�1s F.�T.ON— ,6r +��URS .NTE3IAA_ ',.-a,CS P '-. .- �h_7 .- i r����y F— i 4 °EAR 10-- Z'S) �, _ _ 12.30 ;R3 11F) RUNOFF VOLUME ABOVE BASEF:4iai = 3.53 WA7,"z'S—=: : ��_�� 46.637 =3—A S, 3.86 ACRE—FEET; BASEFLOW — .00 CFI OPERATION RUNOFF CROSS S►CTIOX 2 OUTPUT HYDR06RAPH= 2 AREA= .05 SQ MI INPUT RUNOFF CURVE= 733. T'lE ;;F CONCENTRATION= .83 HOURS INTERNAL HYDR08RAPH TIME INCREMENT= .t:V22 r3JRS PEAS TIME(HRS) DEAD D'.SC^AhSEtCFti) DEAF: ELEVATION(FEET) 12.40 77.49 (RUNOFF) 23.66 2,43 (RUNOFF) RUNOFF VOLUME ABOVE BASEFLOW = 3.84 WATERSHED INCHES, 131.38 CFS—HRS, 10.86 ACRE—FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION OUTPUT HYDROGRAPH= 3 AREA= .08 SO MT. !NDf�T -_N2: 76, _11 C''-'CENTRnT:CN= 1.55 HOURS :N 7 F_RN A L HYDRr.r,fr :vE Tkr+ _"`_`'RU _ is iFFF VJ_J Eti r_ .•n=="_� - = __ - --�-} :a`i' w"(�—�L­1; BASEFAW — .0(.. J _ PUNUF: E ABOVE '_.%3 = =— -- CFE—^FPS, 1�.?" ACRE—FEET; BASEFLOW = ,`0 CDti OPERATICN A:D�;YU CROSS SECT:uN 3 TR20 X 9 07-11-28 15:20 BROWN CASTLE 27 41,,= r, r: �r.•n .y 42 - Lv.6 _.._ ,i•___ !1i1 R�4.1 -'i"T �YDRGGRAP" `i's T - -,�'_ - - -a _'_. _ _ ,--:°+�'�: �`•_ - t jns ,. ti Y 8.0:' DISCH6 .23 .29 ,'� .=: - -�'- .65 .99 '.14 9.00 DISCHS 1..30 ..46 2.67 a91 a..b 10.00 D.yChn 3.4L 3.69 3,77c.4"' 11.00 DISCH6 7.94 8.82 - _,a I.'.L7 28,164 42.55 12.00 DISC65 65.39 94,18 l"<.'b I36.43 127,72 13.00 DISCH6 119.79 i11,62 1J.3 f- 58.99 54.09 14.00 DISCH6 49.79 45.99 42.37 ?0t4 -�. ��,'.= 3'.=4 29,97 28.14 26.47 15.00 DISCH6 24.98 23.66 22.52 18.32 17.65 17.06 16.00 DISCH6 16.55 i6.10 1`.72 .C.-:S `� " '�.85 '4 14,36 14.07 13.76 17.00 DISCH6 13.44 13.14 12.68 12.66 112.46 14 12.01 11.89 11.75 18.00 DISCH6 11.58 11.38 111.I5 10.91 10,67 10,46 10,27 10.11 9.96 9.93 19.00 DISCH6 9.72 9.62 9.53 9.45 9.39 y.34 .3n 9.27 9.23 9.17 20.04 DISCH6 9.07 8.92 8.73 8.52 8.32 6.1- . 6 ►,81 7.68 7.56 21.00 DISCH6 7.45 7.36 7.28 7,21 7.06 7.03 7.00 6.98 22.00 DISCH6 6.96 6.95 6.93 6.92 6.91 6.90 6.90 6.89 6.89 6.89 23.00 DISCH6 6.98 6.88 6.98 6.88 6.38 ME' 6.38 6.88 6.87 6.84 24.00 DISCH6 6.75 6.57 6.28 5.86 5.34 4.78 4,22 3.69 3.20 2.78 25.00 DISCH6 2.40 2.06 1.76 1.49 1.76 1,07 .90 .76 .64 .55 26.00 DISCH6 .4,6 .40 .34 .28 .24 t21 .19 .15 .13 .11 27.00 DISCO' .09' .08 .07 .06 o05 .nt_ .03 .03 .02 .02 28.00 DISCH6 .02 .01 ,ail .01 , RUNOFF VOLUME ABOVE BASEFLOW = 3.96 WATER CL!'== -�. t BASEF43W - .00 "FS > - OPERATION RUNOFF CROSS SECTION e OUTPUT HYDROGRAPH- 1 AREA= .02 SD MI It"Pub r O,7 .rt •�•' fir F•-- jl.. _ lit r_ �t7 �r---_-_ '+ -- -- n: _- - ___.- .•_ _ - - •,f, a � t X 7 7 ': �'Fr'Tifl4 T 1 T !-. �yT�^nuaRAP•, . ME i t.. :,.tki'- I I T-Zih =r JOB l 1H�J av ' 77 PERK ELEVATION(=EET) (R,!OFF) .� IV: - CONCEkT=ATION= 1.59 +,3L',S . 3 _r: �?Zu�,c.�5) PEAT; ELEVATiON(FLLT) (RUNOFF) 2011,75 CH-HRS, 16.67 ACRE-FEET( BASEFIOW = .00 CFS 0PERATION A5 rvirj -__ 110N 6 UT r�nn- �_ ry n, P . 1k�s, v,., : fi J- _,� U i uT HYD�aOSR ,D H= PEAS; i 'c(HR3, FEAK UISCHARGE(CFS) PEAK ELEVATION(FEET) 12.0 264.59 (NULL) 16,45 7.66 (NULL) 17.65 6.39 (NULL) 19,55 5.12 (NULL) 23.65 3.B5 (NOLL) +i1'C ;,;C: E !zC;'7 {� =�^r f = S.7? TESSH.ED T N"WES, 271.77 CFS-HRS, 21.46 ACRE-FEET; BASEFLOW = .00 CFS 'A '- :�fr4G`;=F• - i nr'r _i? uvDRCSRA°P- 6 _ -- _ �A•. U�1L,K .3 PARK ELEVA;.ON(F E,) (NULL) ? y__ < - ,.', ,�< •`_ TIME _ vREilE�iT - .�'. 4U11RJ URAINAH AR!-A - ,l.l Stlic.m_. .:;6 <16 ,'36 .._. .36 .42 =___ _} =S ,": .99 1.:r7 .,_4 1.22 1.2s 1.35 s.66 6t i.vb 5.50 5,214 i. :3 6.2i 6.47 t■9h N1 8,2 3 S. r� [ v d•� va iJt(� 9,Lr 71 =, V . nl (1 11 a.,-,. 1..._ . ..a`� _ _ a_ cs,:.9 Lv -r`t:•} sr 1J l�1 t�V 1?t, 5.54 25.30 31.54 42.05 69.63 104.05 154,6", �r -- - - - ► �� ";, ,, :-' 119.37 112.55 109.76 107.94 105.46 -3U, ,: J,36 136 9 79.86 7..) 66.97 6..26 56.71 5� sib 19.C7 36,49 34.t9 ?i,94 29.89 --- - r „ ' _ - -= �� 5 2'3.32 22:46 21.49 20.42 19,52 i8,84 - - , 16„» :6.46 'b 271 1 C5.9 8 15.66 15.1.t9 01, L SY i�aTi 13.i4 1_e J II.Vi _0.90 10.79 1V.69 i7 11cii _ .17 _V, .77 _ -- ---- - - - �:: -. S1r 7.56 - �,� 'e !.47 7,46 7.45 7.44 7,43 7.42 7,E2 7.41 .40 7.40 7.40 7.40 7,40 7.40 7.40 �_.)A - --_ -. 4.11 5.18 4.27 3.70 3,34 3,05 2.8C .� -� 79 i.5b ..35 i.i6 .99 .B4 .'7_ ,E - -- --- �5 .39 .33 .26 .24 .21 .1B .15 ,1? .08 .07 .06 .05 .04 .03 .03 "B, ,01 .01 .01 .01 .01, .00 "=F'_0W = 4.94 iA'ERSHED :NCQES, 473.53 CFS-HRS, 39.13 ACRE-FEET; ;� =7_C C= RAT:t3� R: �* crrTIGN 7 L7� !'nLjiL JLw. ±jYDRnwGRAPH= 1 AREA= .015 S0 MI INPUT RUNOFF CURVE= 73. TIME OF CONCENTRATION= .83 HOURS INTERNAL wYDROGRAPH TIME INCREMENT= .0922 HOURS PEAS. 'I�=(HRS) PEAK DISCHARGEICFS) PEAK ELEVATION(FEET) 1?.40 77.49 (RUNOFF) L3,66 2.43 (RUNOFF) 3'A'"11. VSL:;AE ABUr= BASEFLOW 3.84 WATERSHED INCHES, 131.38 CFS-HRS, 10.86 ACRE-FEET( BASEFLOW = .00 CF5 ,�� ._ _LrSc; SEC ON 8 �rn4nn. S2 01I RUNOFF CURVE= 90, TIME OF CONCEN'RA'IDN= .33 HOURS , t �41,n_ .0440 HOUR^ -=� --" =E4Y DIS HARBE(CFS) PEAK Eli EWAT14N,F- 7? �1 ^�jfin L.GV •kJ'•�I�- V- 1.0? /r r - - -- ,n�ilN Fr rS >17 T 3 _•11 1, t,Y' Eb. :'iE Cc 'LI. 1- _ - 'iyf� 1L 1L _ , PEAK DISCHARGE(CrS) P K t_E`d AT:UN::`t�' c�yB=F_2W = 4, i WATERSH=i 3CHES, 201.7v CFS-SIRS, `.1A.67 ACR=-f T; BASEFLOW !s ' JOE a� v �•.�'47L'b'�t?'. _- _;L _�-.v? :1 J'\_tom �-- � 23.66 '< - '.r v-JLL'l'A AP4Y -15C h ,31 WTI�ER6 :J i��.., ..�5 ....,_� - - -S -= - - -- --7�'__'t1 ,00 flL u. 3P►RA-iCN ADDHYD :.RGSS ScCFi3h 9 I Nr^G. HYDR3GRAFHS= 3,4 CLiTIPLIT HYDROG cAFm= t PEAK TIME(HR51) PEAT; DISCHARGE(CrS) PEA,," t_E•+ 12.24 151.83 23.65 7.05 TIMEMSI FIRST HYDROGRAPH POINT = .00 HOURS 11ME INCREMENT = .10 AREA = .15 SOX. 3.00 DISCH6 .01 .02 .03 .04 .06 ati}7 .C)9 .10 .12 .14 4.00 DISCHB .17 .20 .23 .25 .25 ,•1�1 „72 .34 .36 .38 5.00 DISCH6 .40 .41 .43 .45 .46 .46 ,til .51 .53 .54 6.00 DISCHB .56 .58 .64 .70 .75 .76 ,Eu 182 .84 .86 7.00 DISCHB .88 .90 .92 .95 .99 1.01 1,04 1.09 1.13 1.19 8.00 DISCHB 1.26 1.35 1.49 1.65 1.83 2.03 2,21 2.38 2.54 2.70 9.00 DISCH6 2.84 3.05 3.29 3.54 3.78 4.00 4.23 4.53 4.84 5.12 10.00 DISCHB 5.34, 5.68 6.03 6.41 6.87 7.41 8.01 8.76 9.59 10.51 11.00 DISCH6 11.56 12.66 13.91 15.26 1_6.84 18.81 23.42 33.94 48.73 75.19 12,00 DI5Gy6 113.39 144,15 151,25 150,25 11510.019 149,M1t, 145,50 139,43 131.96 124.60 :3.t�4{ DISCHG 117.28 149.81 102.06 9}."� 86,?i ;c.- :L_._ 58:9? 11 14,00 DISCH6 49.96 46.23 42.84 39,77 37. l0 28.34 26.71 15,00 DISCHB 25,26 24.00 22.90 21,92 20,9918.5E 17,95 17.39 16.00 DISCH6 16.89 16.46 16,08 15,77 '5,�r- '_�.�- 'i .Q,c? 14.27 13.95 rl() DI5CHG 13,65 13.38 13.14 12.33 12,:9 12,00 F,0�1 DISCPG 11.7a 11.49 11.27 1'.,-15 {i�,o� : ..46 i ,L3 ?b :9.jcc DI5CH5 9,95 9.85 9.77 L-c 1V DTSCWG 9.f 6 C.96 Y. �2.003 DTSC,c :,:3 7.12 7,:,� %,''� ', - _ -. :0 7.;)5 '.06F R'nn�3r L 0, L.JV4J 6 ,4V ,_ aL� ,L" c.__ __ , _ a.._ ,c 1 , L a.a V v • V- _ ,:'.. i Y i L i. 1 __ t o r• n, I_� - -- _ -- .--- ---- ", '•ii-� '�C:� r 4ALFtit= ?�{>:' 3" = 4.27 �iAT`_RCitiED 'N''-=S Ci-7 �J� - w _1 u ~L,�11 '�. t•'i'.1 N ��� _ �w ;7 lt),R . r.p_` 1uECTTON i TO SEC'iC _ _ _ 17'' _ 1•LV RA'N D)RA►a�s= a„ = 'i=�ia .,:_.Z rtw•- ,. �- =- V" 2 MAIN TIM" INCREMENT _ .:3 ��LR5 i �= =_ yC rI TN':' RUNOF= rURVE= 70. TIME OF CONCENT-ENT .5{ �u :S -:,:"::.:5z=,^ ': Ni"nEr NT= .0893 FOURS WEAK D73C IARGE(CFS) FEAR E�E'vAT:ONtFrET? 6.50 (RUNOFF) RsN =F ;?LjME ABOVE BASEFLOW = .83 WATERSHED INCHES, 10.94 CFS-HRS, .90 ACRE-FEET; BASEFLOw OPERA70N RUNOFF CROSS SECTION 2 OU PUT HYDROSRAPH= 2 AREA= .05 SD MI INPUT RUNOFF CURVE= 73. TIME OF CONCENTRATION= .83 HOURS I I ERi�AL HYDR06RAPH TIME INCREMENT= .0922 HOURS `EAR: TIME(HRS) PEAK DISCHARSE(CFS) PEAK ELEVATION(FEET) 12.45 18.08 "r (RUNOFF) RUNOFF VOLUME ABOVE BASEFLIIW .98 WATERSHED INCHES, 33.54 CFS-HRS, 2.77 ACRE-FEET; BASEFLOW = .00 CFS r 1 FT T` l L !1 r+t == ,AS v'' MT INPUT RUNOFF CURVE= 76. TIME OF CONCENTRATION= 1.58 {OURS i�T:. fi:A_ YYD OSRA'F+ ':PEE INCRE)1E!"'= .0958 HOURS PEAS: DISCHARGE(CFS) PEAK ELEVATION(FEcT) 19.62 (RUN 03 Fr) 1rrI .. - 1•LB tRa?iLr�-) --- P Ir ♦�t r n—n nor___ '•— — r�� , _ _,_5 .�IhT_^{t"_D INCHES, 55.76 L`5-'�R�, �. A�H= t-') �A'- -�• - - -- - -�- -- --..- 4,33 1.13 N— �ATER'S�E'D INCHES 44.46 0;S)-HRSj 3.68 ACC%E-FEET I-`-_-__ y -]`yt [s 0 -1 -SL 15;2�1 v`�'r'= ^^ r_= ^� slob 1 PASS 4 y'1 1 n ate_ •1•_! _ .Jui�-_,�-- __ -_ ,_ _ - _ _- : !;J`l•�} Ih ARE A .Lv 30: 1 a j Oil, a 1.00 1;IS It"HG .61. 1.15 2.35 11.04 {? 00r -P,-S :t' t:' 36.93 36.011 34.54 33.01 Ti T n .'S -- - -- - -' - -- nC n { nn 8.66 .94 DISC�13 :4.E' -- :_,_ _ ., ':,�1 7.9` 9.38 8.86 8.38 1v.00 51 HG 1. 3LL ,_: .=- r�L, L.,y3 6ff.:oo00a 5.9}9� 5.79 5.61 16.00 DIWLns =.L':7 vc_a. v.i. _._, . ,:4` 'faO4 't.80 4af2 4.62 17.00 DISCHG 4,5;3 4,22 4.11 4.07 4.03 3.99 18.00 DISGH6 s.94 3,^f t =- _, 'L _<<� '=C7 3.51 3.46 3.41 3.37 19.00 OISCHS 3.3' -,-. =. 5 _.�_ :.�1 3.20 3.19 3.10 3.16 20.00 DI5CH6 3.1' 3.09. '. r_9s 2.Sb 2.v1 -.76 2,71 2.66 2.62 21.00 DISCH6 2.59 2.55 2.53 2.5 t ;8 ^c.4? 2.45 2.44 2.44 2.43 22.00 DISCH6 2.4L L,42 2. 2.41 " 4i �a4J. 2.41 2.41 2.41 2.41 23,00 DISCH6 2.41 2.41 2.41 2.41 4. A 2.41 2.41 2.41 2.41 2.40 24.00 DISCH6 2.37 2.31 L.L. LaU7 �.W :.70 1.50 1.3Z 1.15 1.00 25.00 DISCH6 .86 .74 .63 .54 .45 .38 .32 .27 .23 .20 26.00 DISCHu .16 ..LT ,:L .1C 1.1 .07 .06 .05 .05 .04 27.00 DISCH6 .03 .03 .01.7 .02? .02 .01 .01 .01 .01 .01 28.00 DISCH6 .01 .00 RUNOFF VOLUME ABOVE BASEFLOW = 1.05 WATERS�ED IMCRES, 100.24 CFS-HRS, 8.26 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTIC", 4 OUTPUT HYDROGRAPH= 1 AREA= .02 SO fjl iN;_,, ,,.X.,-r .33 HOURS INTERNAL uYDRCGRAPW; PEAS' TIMEtHRS' c_EJ�iTIO�;=+EE',1 BAH" = 0 �I c .2 ..4 23.55 '. ,=;iNOFF, RUNOFF VOLUME ABOVE BASEFLOW = ?.17 kATER.rED INGiIES, 74.24 CFS-HRS, 6.14 ACRE-FEET; BASEFLOW = .00 CFS +Cant JOB 11 ,''ASS U JN RUNG` CRCSS SEF" 7- 7 'TrC FEA" `�ME(HRS) 00 '"' - nr C —p 273 7 0 -7 k 4 v mjh,;j,;: VOLUME ABOVE BAWI','t,:71-GW I 15; W A Et H T .00 Fs fIT T ON 6 OPERATION ADDHYD CROSS SECTION INPUT HYDROGRAPHS= 112 OUTPUT HYDROGRAF11"= 4 I PEAK TIME(HRS) PEAK DISCHARGE(CIF-S) T:N ::rT) 12.09 105.08 23.65 RUNOFF VOLUME ABOVE BASEFLOW = 2.17 WATERSHED INCHES, :L ACRE-FEF; BASEFLOW = .00 CFS OPERATION ADDHYD CROSS SECTION 6 INPUT HYDROGRAPHS= 314 OUTPUT HYDROGRAPH= 6 PEAK TIMEMRS) - PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.10 108.97 "IN!,LL'i 23.65 i,97 ilk"Mr tHRS) 11 1 4 7'V7 IRA7NAGE AR--A .15 S9.MI. FIRST HYDROSRAP4 POINT .00 HOURS . 5.00 DISCH6 .00 .00 07 b.00 DISCHS .09 111 37 7.00 DISCHS .40 .43 .64 lk� Q,OT DisrHs .66 7 6 .1, DISCYG 1171 -7 6,r DISCHS OG DTS"UC- 56,!` 121 00 DISC146 91.4E '-98.86 ;E9.60 DTS :6,"t L.,CS 67 DISC;- ,7 P- 1.87 D G. DTSN4 1,66 L Disc�G 0 0 DISC-G, 3 63 J.:9 3.16 "j 3 3.010 1 110 D I 5CHG 3.14. i97 DISC HG .9 1.,, 97 .61 -- Tti - zL F_ t .49 c _ ,14 s�. sLi. .02 __ -_-_ !1� _ r r -�_- :� a N ni;rn 1r•ZQ 7' --- _`� 17 t++ - �� 1r�`i'_� _ V.r_ •. v ~�a? __r__ _ _ __. _ __-_ t• r __- 1 1 'A ;•r -r T 11'T RUNOFF t I OFF `RVE 7 t r n�1T '-';ail 7 •+.-•• }_^,— .VL :tls #. a . I. J10��' CJRV�— 1 . t;l F t,� r� ,'�i! =ul- .v•: "_:ru Y 10P,CERAPH TIME INCREMENT= .0922 HOURS ;_r:;: TTWZIL*;Sl PEAK DISCHARGE(CFS) PEAK ELEVATION(FE;T) -4,- .8.08 tR;:NCFr a RU_f}:= vUy:"E AB�JvE BASEFI.09 _ .98 WATERSHED INCHES, 33.54 CFS—HRS, 2.77 ACRE—FEET; BASEFLOW = ,V4 =5 FERATIu R' ,"ILr aROSS SECTION 8 OUTPUT HYDROGRAPH= 2 1}=A= .02 SC Mi INPUT RUNOFF CURVE= 90. TIME OF CONCENTRATION= .33 FOURS :kTERNAL HYDROSRAPH TIME INCREMENT= .0440 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEETI 2.09 29.31 ' "`''' (RUNOFF) B�S_F_OW = ?.I' WATERSHED INCHES, 28.7I CFS—HRS, 2.37 AGRE—FEET; BPS'::' _ .n, �:FS �tiOFF yuRVE= 76. TIME OF CONCENTRATION= .t L8 �CU� .0958 HOURS =EAR; i.:SCHARGE(CFS) PEAS` :_-EVAT70NIFEET; r-; r•r 77 n;.jrn T1 r':C_•�'� h it-r- ---T. -'_-- _ '__ _ - _ -.._ _ : �_�_._•l - e•>.r dt _ �Y J�sa , . v --___--- ;- _ y ORC-.RAPN- G r i 3' 11 _..:�,- ?? '�1n�=RS�'cD INCHES, 62.26 r- —RRS, 5.I5 ACRE—F=ETj P�,E_=_t.? _ CFS _ ,�-- - TL! vt ii - _ ...- q r _ Mom. P.••- 1 " _.. .1_Ju c3=. . t2.59 --- ,.� c- 2.59 --- r.�rt ri +-1c_ka�_ a-:rYD n�J9APH �C, � HOURS no r} 4r+"M1 a l+s� - nt 5C'E n� .G3 04 .G5 --, i, a aV _ <<0 DiZ)u to .18 .19 .21 .23 . -, *S^�►c 36 .38 .41 .44 .16 a4 '?r{ Of, DISG!8 l� ,61 .63 .67 .71 .r _ �:SGi?fi1.44 59 1.79 2.00 2.28 j DISCH6 32,57 42.21 42.31 39.74 38.65 39.24 3 6G 36.= 4 33,63 13,G? DISCH6 3�.07 30.44 28.66 2b,82 24.87 2::.87 2 ,7? :4,LS ,5': .6.51 14,00 DISCH6 15.36 14,35 13.41 12.56 11.78 11,06 1G,41 y.S1 7.16 =?8 ;5.trn DISGH6 8.36 7.99 7.66 7.38 7.09 6,E1 6.56 6.35 16.00 DISCH6 5.83 5.70 5.59 5.49 5.41 5.34 5.25 5,.4 5,G2 4.91 17,00 DISCNfi 4.81 4.73 4.65 4.58 4.52 4.47 4.43 4,31 4.34 4.28 5,0:7 D:SCH6 4.16 4.09 4.01 3.94 3.El ?=5= 3,75 '9.00 DISCH6 3.57 3.54 3.51 3.49 3.47 3.46 3.44 3.43 '.42 3.37 20.00 DISCH6 3.30 3.23 3.16 3.10 3.04 2.98 2.93 2.88 2,84 2.8t� 21aJG DISCH6 2.7� 2.73 2.71 2.68 2.66 2.65 2,b3 2.62 2,62 2.61 22,00 DISCH6 2.60 2.60 2.59' 2.59 2.59 2.59 2,58 2,58 2.58 2.58 DISCHS 2.58 2.58 2.58 2.58 2.58 2.59 2.5 23OD 9 2.59 2.55 2.54 !L r: rg 2.47 2.37 2.19 1.98 1.79 ,51 ',�3 ',26 '.,1± ,97 D:S..r!fi n ,S4 .73 63 .53 a45 .'` _ D?SCHG .16 .14 .12 .09 .•_ ,_ , 4 r• r}a ,03 .02 .02 .02 .03 .�. -- �i5UP6 .01 .00 AnGig= °4SEFi dW = 1.:3 iA'cRSHED iNC4�ES; 1.8.G� u=5--.=�, kwn :+ rtn �t'T/1'lU�C �NI:•t=F=^ ��i ~`ASS -�� �i,jlvMit T i J v t>r-'-L r_vyy-•..-T�•T' 7• Ail YYnT'�TIO15 _V:. J_7-�. .j__ L _. 4v _ _ J_J YLIT Ll MfiVL 1 f� a.J - {/i! _ - RAIN vG.�ttI A K T'Y - a.Tr1 i�?� T11�,� L'f- A'` \A V Jt• I '1 a�_* --�` •�;CC-ar�E:r _ -CURS AR_A_ Y ,� r,=_- -_____ r_ ;�c= 70. TIME OF COhCENTRrA"W .67 HOURS _\ -its �:SCHARSE(ne) PEAK ELEVAT:CNiFEET) (RUNOFF) Ri1�iOFF VOA;i�!E AB'�VE FfiS=F_�i - :,v9 kATtr�=HOD :NCAES, 24.95 CFS-'(IRS, 2.06 ACRE-FEET; bASEFLO _ ,00 rFS OPERATION RUNOFF CROSS Scu;DN 1, OUTPUT HYDRi:GRAP-i= 2 AREA= ,O5 Sg MI ; Pam' RUNOFF CURVE= 73, TIME OF CONCENTRATION= .83 HOURS 1NiERNA►. HYDROGRAPH T!1 E :NCREt,EN-o= .0922 HOURS PEAK ;�ME(,ia5) ycAr; D10UHARSE(CFS) PEAK ELEVATION(FEET) i2.42 41.94 (RUNOFF) 23.67 1.52 (RUNOFF) RUNOFF VOLUME ABOVE BASEF OW = 2.12 WATERSHED INCHES, 72.52 CFS-HRS, 5.99 ACRE.4EET;' BASEFLOM = .00 CFS ny__, n- - .A'1'�ti _i'�iOr- t�� �cO�n �JLITPUT H rR= ,.�^ S �+; =_- -_R��-- CUIRVE= 76. TTM: OF CONCENTRATION= 1.58 HOURS 0958 PEAK E;EVATION(FEET) .n rL•. ' ir,LB (RUNOFF) ^�_': ;'f f� J��-�{AS, 9.49 ACRE 'cET; SE 1 Lr.77 -- 37 J7 uFS-'•HRS, 8.06 ACRE-FEET; 1ASEF:OW B'20 Xc_2' 07-115-83 S t•, _ -- -- - 4_e tt ld 1 �. `%.- �Jn-_ - - •- �r a ' `-R -_CVAi 1CNtFa._T1 7 7 -- - - --+- - -Y ' _ iri y '1-:�* -AC: A--L i'r 6 cia rr� 1 +- __ - i 6 1 f_ .._ C.C S i1. 0 DIS�r; 4.83 5.96 7.11 i__ _' 4_2. .f DiSC": r - -. y_ 85 t.•_C 63,90 r•..�i 7E,±•u .7C 13.00 DISCS y..i' �. , 5t ..' ',.�r 41.39 ? . 5 34.6_ 3.,8` 1,1 L.t r, r\i t4 r-r n: R 14.00 DISC-6 . - _ ,__ �_._t __.,6 0.5 1 .2,. 19.��5 1_6.99 1E.4L r t„ s. �' - .� :. cr - 1•� t t 5 +! '1 if� a 1•+t 15.00 DiS H6 l�. _ 1-_,a. .�.� �.:� ? .6.� -IL 2 .'Je V• IJ 16.00 DISCHG 9.63 9:49 9.32 9.17 9.03 8.88 8.71 8.52 17.00 DIS"H" ^.'i =..5 7'.�y -,85 7.74 7.63 7.54 1.46 7.39 1.31 6.218.00 DISCHG 6.9� . . . 6.13 19.00 DISCHG 6.;:6 5.�� `.95 5.90 5.86 5.83 5.81 5.79 5.77 5.73 20.00 DISCHG 5.67 5.5S 5.46 5.33 5.21 5.09 4.99 4.89 4.81 4.74 21.00 DISCHG t.67 4.51_ 4.55 4.52' 4.48 4.45 4.43 4.41 4.39 4.38 22.00 DISCH6 4.37 4.36 4.35 4.35 4.34 4.34 4.33 4.33 4.33 4.33 23.00 DISCH6 4.33 4.33 4.33 4.33 4.33 4.33 4i33 4.33 4.32 4.30 24.00 DISCH6 4.25 4.14 3.96 3.70 3.37 3.02 2.67 2.34 2.03 1.76 25.00 DISCH6 1.52 :.-3i 1.:2 .95 .80 .67 .57 .48 .41 .35 26.00 DISCH6 .30 .1. .21 .18 .15 .13 .11 .10 .08 .07 27.00 DISCH6 .06 .05 .04 .04 .03 .03 .02 .02 .02 .01 28.00 DISCH6 i .01 .01 .01 .00 RUNOFF VOLUME ABOVE HASEFL5 = 2.21 N4r=RSA7_D XIIHE5, 212.26 CFS-HRS, 17.54 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS i[T'J ntnnr q.4- U. RYL�- •^� ,, �' °' _ j4,n-- a�_ J.V_ 1hT10N- .33 HOURS _- -_ -1; -CA,- EVATIOIINI-T) c�Lc 4.03 ACREE rEET; BAS LOW - ■K vFJ -h- r - -• -_ -..'- ICY i.! RS --n n---. __.-_r -r p FEi. ATI TI - _- iRJNOFF) -L J, '_`-S9 :5ac0 SROW4 CASTLE 67 408 Z. r t - _ -- O'_piL �f-'LCV: SA:c-=O = 3.691 WATERSHED INCHES, 126.10 CFS-�R5, ' .tG� - -_- c'O:F__'� --_= WN'7F CROSS SECTION 6 -• rtn �{t r `U RUNOFF r r.•w.:.� _, T: r n CE STD�++^--• - i __ ^- ,terl�.4T �i.i lR LtrF :.!�ltYt= i6t ia�E O~ �a��'vr�:=l t�..� - _, `� _Z-�A_ `.:ti.,'.-' ;:Yr _N;.n_MENT= .0958 HOURS P_n T E';i�Rv) SEAK DISCHARGE{CFS) PERT ELEVA"iO�i(rE:-) 42.48 = MOVE BASEF:GW = 2 37 WATERSHED INCHES, 114.79 CFS-tfRS, 9,49 A�F--==_-; E; SEFLC - ar:j OO:,A710N ADDHYD CROSS SECTION 6 'INPUT HYDR08RAPHS= 1,2 OUTPUT HYDROGRAPH= 4 PEAK TIME(HRS) PEAK DISCHARBE(CFS) PEAK ELEVATION(FEET) 12.09 174.38 (NULL) 23.65 2.63 (NULL) RUNOFF VOLUME ABOVE BASEFLOM = 3.69 OATERSHED INCHES, 174.87 CFS-HRS, 14.45 ACRE-FEET; BASEFLOW = .00 CF5 OPERATION ADDHYD CROSS SECTION 6 INPUT HYDROGRAPHS< 3,4 OUTPUT HYDRO6RAPH= 6 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATIGN(FEET) 12.10 185.18 (NULL) 23.65 4.99 (NUL-) FIRST HYDROGRRPH POINT = ,00 HOURS TIME INCREMENT = .10 HGdR13 ^ A;`-� 00 sISOHS ,00 .01 .04 .08 .12 .17 2; ,26 5,00 lul ISCHG .39 .43 .47 .51 .55 .59 .53 E� '.00 O.S�'r,5 ,r8 .93 193 1.04 1.12 LIli 7 ','r ..,� DTSCHS 1.44 1,48 1.52 1.57 i.b1 1.65 `. i� _ �.9'_ 06 2.23 2.42 < +77 3,14 3.25 ',45 3.66 3.82 , ,0ry 2 - ":SOS 4.97 -5.16 5.4` 5.78 6.24 c�.C+ "-�i -._.c - . n•�n.�n ra 1^ {+5 a4 C 92 i7,h7 _ ,•1: J:Jv�'_' li lir lc 13, '81 11 6 15. _ n - yn•�r _ C .n .�3a 03 019 �..214f- 7' ri7 r u...�• 60 1-3 57,7L .��:z 5 4:a QC 47.88 27.7: 2S.S3 24,23 22.70 ?:._ - - - �:' 15._y 1'F.�4 14.1,� 13,74 = <.. n_ A 7 ,i,. ♦_t:s J a 8.9, fi.81 S,'? 8.65 7.80 7.5124 7.39 '.29 7,21 :3101.) D.SC;_S b.82 b.77 6.72 6.68 6.64 6.62 n r+, �� wrnn•rn (_t C C _ "TFo C _01t 9 .5 5.5 .. -_ -ff-58 '�-mo BROWN SAS 1 E S7 408 ..� J.12 5.OB 5. �a - - _ 4.94 4.7? 4.92 4.91 4.91 4.6? 4.S9 4.99 4,S �:; -7 n .��! f 9 '-� .. 7.38 ?.�6 y. ;.30 00 .86 .74 .0' _try "Y _L44E ABOVE BASEFLDW = 3.02 WATERSHED INCHES, 289.66 CF5-HRu; 23.?4 A_RE--_E-, r=i=-_= - =r= ;;_.3 077 CROSS SEA ON OUTPUT HYDROGRAPH= I AREA= .05 SO MI INPUT RUNOFF CURVE= 73. TINE OF CONCENTRAT GN= .6-1 z:n_rc •-A'TERNAE. HYDROGRAPH TIME INCREMENT= .0922 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVAI'L (FEET) 12.42 41.94 (RUNOFF) 23.67 1.52 (RUNOFF) RUNOFF VOLUME ABOVE BASEFLOW = 2.12 WATERSHED INCHES, 72.52 CFS-HRS, 5.99 ACRE-FEET; EASEFLG� OPERATION RUNOFF CROSS SECTION 8 OUTPUT HYDROGRAPH= 2 AREA= .02 SO INPUT RUNOFF CURVE= 90. TIME OF CONCENTRATION= .33 HOURS INTERNAL HYDR06RAPH TIME`INCRtNbft='-'.o o lomS - PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.09 48.64 (RUNOFF) VOLUME ABOVE BASEFLOW = 3.69 WATERSHED INCHES, 48.77 CFS-HRS, 4.03 AC-2-FEE- CROSS SECTION 9 4OJTPUT HYDROGRAPH= 3 Azca= .08 S5 Mi IN°i,T RUNOFF CURVE= 76. TTME 0= 0959 HGjRS .`�y 'TYt(!�RS, PEAK DISCHARBE(CzS) �4.48 = as''V `�+.'_"_fib = "AiFR34ED iNCHES, i_�a�7 .Litz OUTPUT YYDROGRAPH= I 12.14 74.29 23.66 2.25 - ►c�v XE 07-`5-68 1.v;2; 1DA i ?ASS 4 Rj`vJ-r 'V-CL'ii+` ,A1atU.V BASEFLN _ 02 AC 'CLT; BASE'7-OW = .;10 US ,_s��t~.nYtry• rn��.�,R .�y�` �..n...r,+. n ��qI T�IIk,•l�F�es ! r•' .�_ _ .. - - --T��i •-'�-t r- :•_,6 T!MENRS) FIRST HYDR RAP LC;°RE HOURS DBANA6E AREA = .15 SQ.MI. 4.00 DISCHB ,oo ��= = �-' .��5 ,06 .07 .OS .10 5.00 DI .11 .12 .,3 .:L ,.7 .18 .19 .20 .21 6.00 DISCH6 .22 73 .35 ,36 ,38 .39 7.00 DISCH6 .40 .41 .43 .44 .41 .46 .47 .48 .49 .50 8.00 DISCH6 .51 .`3 .57 .�2 .6S .77 .78 .81 .84 .86 9.00 DISCHS .88 .92 .98 ..0;. _.11 1.16 1.23 1.33 1.45 1.57 10.00 DISCH6 1.68 1.80 1.97 2.15 2.39 2.66 2.97 3.36 3.78 4.25 11.00 DISCH6 4.79 5.35 6.00 6.70 7.53 5,60 11.22 17.42 26.13 42.11 12.00 DISCH6 65.52 83.93 86.69 84.56 63.82 83.21 81.56 76.56 74.74 70.93 13.00 DISCH6 67.09 63.13 58.96 54.70 50,31 45,88 41.76 38.13 35.00 32.26 14.00 DISCH6 29.85 27.72 25.78 24.01 22.40 20,94 19.63 19.42 17.33 16.37 15.00 DISCH6 15.53 14,78 14.13 13.56 13. ij :2,47 11.99 11.56 11.18 10.85 16.00 DISCH6 10.55 10.29 10.07 9.88 9.72 9.57 9.41 9.20 8.98 8.78 17.00 DISCHS 8.60 8.43 8.29 8.16 8.35 7.95 7.86 7.79 7.71 7.59 18.00 DISCH6 7.4.E 7.27 7.13 6.99 6.67 6.75 6.64 6.54 6.46 6.38 19'.00 DISCHS 6.31 L.25 6.20 6.16 6.12 6.09 6.06 6.04 6.02 5.94 20.00 DISCH6 5.82 5.69 5.57 5.46 5,35 5.2.; 5.15 5.06 4.99 4.91 21.00 DISCHS 4.85 4.80 4,7;; 4,70 ,67 4.64 4.61 4,59 4,58 4.56 22.00 DISCH6 4.55 4.54 4..ti3 4.53 �.52 4,5L 4.51 4.51 4.51 4.51 23.00 DISCH6 4.51 4.E1 4,51, 4.51 4.51 4.50 4.44 24.00 DISCHS 4.32 t,:4 ?.5; '.17 54 2.24 1.96 1.71 25.00 DISCHS 1.19 .1'1�7 `_,.^ 94 =" ,6- .57 .48 .41 ,35 26.00 DISCHn .30 .:5 ,_S ,:? ,:1 .10 .08 .07 27.00 DISCHS , 6 02 .02 .01 28.00 3-cryG Vi: CP�E AECVE BASE L _ �_wc, �''�-. �� : L�_ -,_ _--=_ I-f ACHE-FEE'; BACULOi = .00 C�=S �, X�CtiT:v= ";4' '3'_ D?Efi�'iGti = "'_',�= ,�Y= _--,►� -Y= _ __ ,= SECLSD ID 11A�• _ t! }. � 1L:{.• r' n v r r a.u.+ Y_ .J ..... :l�ri "�•° - __ - _ ..- - RECORD iY *,--"-A L AT -11 - fl t:T ,TLe s-.T,_ •z =' 1:tr._ ,U� ��':�• _ _ _ _ 1_ „_ .,.� �,.- ,67 HOURS °cA-K TI!"E RS, RUNOFF VOLUME ABOVE BASEF3Ow = ?5 A; _=S-FRS, 3.24 ACRE-FEET; BASEFLOW = .00 CFS OPERATION RUNOFF CROSS SECTION 2 OUTPUT HYDROGRAPH= 2 AREA= .05 SO .1I INPUT RUNOFF C�R�'E= 73, ;;?{E OF CONCENTRATION= .83 HOURS INTERNAL HYDROGRAPH TT.ME 'NCREt;=N-= .u9L2 =L1SS PEAK TIME(HRS) PEAT. DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.41 65.32 (RUNOFF) 23.67 2.12 ;RUNOFF) RUNOFF VOLUME ABOVE BASEFLOM = 3.25 WATERSHED INCHES, 111.11 CFS-HRS, 9.18 ACRE-FEET; � BASEFLOY = .00 CFS OPERATION RUNOFF CIROSS SECTION ? OUTPUT HYDROGRAPH= 3 AREA= .()8 Sx MT :N= ' -.v"�G=F G'}�"vt= 7�, :"= z CONCENTRATION= 1.58 HOURS jNT7_Rk`"2_ FYDRC`ERfi .0956 CURS 2.7_ r } �!n _ -- l;-_ --_ rr -_ r { { ,,,J*r_��yr. (�/� -r (}( l'!Iv -�_iK -+�_� a ���. J AvR E: L7h.�.�r,UK - ail lj r� �•h �. ,_ ti - °••-- - ✓iJYC ^.��._vR4 _ _. �+ - �._ii _��:, ..E,:4 _-v-:IRS A11 -�EET; BA `_Q�4 - ■v'} ;J OPERATION AuyHYD CROSS SETT:- TAZ" kt1 8 s5:20 BROWN CASTLE ?ASS 5 v`^ :iNJ+�traaF(A`uv- 1�; L t r -'� . '?3.66 :03 -�1_�•.-� ':rR5 YrCR t BKA-rrH POINT - r1 , ea:•1 -'}:� 'Y n=-1- - - - - -- - j_rf• - _ nn II�� - - jjyy}} n. aJJ . r .04 05 0.00 DISCH6 ,119 .71 au ,97 0 tt. -� to 22 a 2.b6 �+ s sir La _ ?, -�7 4-vo DISCH6 5.84 6.5z5 7.35 8,26 L_ _` u� 22 7-2 34,.27 12,00 DiSCHG 53.44 77.81 102.2C 120.66 13146 :'�.': '��.45 � 3a�; 115,47 :08.83 :3.v D;5Cr6 10t,48 95.26 88.3E 8.,37 7IF J e;.-_ �,,�� ;,;�.5 5�'.77 4b.59 14.00 DISCH6 42.92 39.69 36.76 34.13 31.76 v 2Z.97 15.00 DISCH6 21.68 20.55 19.56 18.70 17.94 :�.2 ha _Sa44 1=v.ti7 14.86 16.00 DiSCHG 14.42 14.03 13.70 13.42 13a17 33 ._L :2.5- 28 17.00 DISCH6 11.74 11.48 11.25 11.05 i0.88 10.74 :0.6: 1I, . 10.?9 10.L7 18.00 DISCH6 10.12 9.94 9.74 9.53 9.33 4,15 5.98 8.u4 8.71 8.60 19.00 DISCH6 8.50 8.41 9.33 8.27 8.22 8.1. a..; 6.06 8.03 20.00 DISCH6 7.94 7.80 7.64 7.46 7.28 7.11 6.97 6.84 6.72 6.62 21.00 DISCH6 6.52 6.44 6.37 6.31 6.26 6.22 6.19 6.16 6.13 6.11 22.00 DISCH6 6.10 6.08 6.07 6.06 6.05 6.05 6.04 6.04 6.04 6.03 23.00 DISCH6 6.03 6.03 6.03 6.03 6.03 6.03 6.03 6.03 6,>,L 5.99 24.00 DISCH6 5.92 5.76 5.51 5.14 4.69 4.19 3.70 3.24 2.81 2.44 25.00 DISCH6 2.11 1.81 1.55 1.31 1.11 .94 .79 .67 .56 .48 26.00 DISCH6 .41; .35_ .30 .25 .21 .18 .15 .13 .11 .10 27,00 DISCHS .09 • .07 .06 .05 .04 .04 .03 .03 .02 .02 28.00 DISCH6 .01 .01 .01 .01 .01 .y0 cf't.,*c Vni►ME ABOVE BASEFLOY = 3.36 WATERSHED INCHES, 322.cg CF_-sRS, �E_b3 �.�►�=-= -; BfiS=r_uw = a0v CAS OPERATION RUNOFF CROSS SECTION 4 'TPUT HYDROGRAPH= 1 AREA= .02 H MI INPUT RUNOFF CJRVE= 90, TM- ryF CCU - --�"_ 7- 4--:Ls 'k-ERIVAL HYDROSRAPH TIME INCREMENT= .0440 HOU=S H AK T:14_(HRS) �'EAK DISCHARGE(CF5) 12.09 65a44 ABOVE A•EFLOW - 5.�14 WA _'t. _1t r. IN.;:ES; 6.b,7 _Lt--- _ -- --=-`== uRCSS SECTION 5 n; T 4YDROGRAPH= 2 _o, i Ml INPUT RUNUF CURVE= 90. :'-rF1�Al HYDROtikpPH TIM- I1VCRcMEN7= ,10440 HOURS PROWk CASTLE 97 408 : -_-. - PEAK DISCHARGE NYS) A. ELEV 16919 - - - -- - -- ter., _ - r •-� ter. �j �� -- cc -- -- - •--- ---- - --- - ^"t;cc SECTION 6 CrTii' T 1 ► }n T !' !� i IT` Tin • - - =,_�= Mi � - i RUNOFF CURVE= 76. Tl�"c OF CONCEN. ,A' -CN= _[f_ . -c -==;'0_ �-Y:-RIBAPH TIME INCREMENT= .0958 HOUR^ PEAK DISCHARGE(CFS) TEAK E EVAT-N(,_=T i-.93 64.42 �S^VE 'ASEFi.OW = 3.55 WATERSHED INCHES, 171.98 CFS-HRS, 14,"1 ADDHYD CROSS SECTION 6 INPUT HYDROGRAPHS= 1,2 OUTPUT HYDR06RAPH= 4 PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.09 234.64 (NULL) 16.45 6.85' (NULL) 17.65 5.71 (NULL) 19.65 4.58, (NULL) 23.65 ' 3.44 (NULL) A OtiE BASEFLOW = 5.04 WATERSHED INCHES, 239.29 CF5-NRS, 1-9.78 ACRE-BEET; OW = no "FS aC^HYO CROSS SECTION 6 - �SY��OtRa°uS= 3,e OUTPUT HYDROGRAPH= 6 y H '+-t o-•�, PEAK DISCHARGE(CrS) PEAK ti�vAT'IMN r 7 252.72 '`O^JJh,A?�y �'O<i�' - [00 NOUK� TIP'; :N'R'jlcNT _ J - _ 4� t� 60 67 - - -- 1-26 tib 1.64 1.91 1.99 2.1? i.66 2[7i 1,76 - 5 3.20 3.�5 3,73 4L.!�5 4. : L. - _ - y'Q J cJ nn t IL -- --_ _f.27 18.10 12C 36 22 05 4 « 26 � r. . � ..i ..�,�± '7-7 ! 252.63 209.40 '57.03 118.92 103.v4 ;,•'_ 74[7' _ - 7167 83,90 75'.40 74,44 69.07 67,4-1 TIF9 07-;5-88 415:20 BRC�N CASTLE 67 409 JOB PASS 5 =, V 'C 9183;.2) r r� DI ilil 42,0- Hai'. � .ui 1341 all ._~=t:� _ s _: _ y.v_7i i•.r7^c' UFi[J�C(!�1 22.�1 74,rLg LO.�y f■9.i DISC'r�.0 iNi r'U a�a\yJ a {-r a. {r F5 '� �} a V 2,2?6 ,.tea Vs 1_s9 4 _- -- -- _ _ -- • 3 =,€}C C.SC'=46 '�J,55 1„�� ua,?G °,EF =,3r 9 ►8 a n' - - - - - '' - - :t09 ._'ra k a•r76r� _16 7.85 i.68 �a�1 ',�~ .00 C_SC431 ?_�?�. 6.S5 6.39 6.il4 , 4.66 ?100 D:5CN6 6.64 6t63 6,61 6,60 =. -- -- :_�v , 7 6t57 73.00 DISCH6 6,57 6.57 6,56 6,`6 t=c` :--- e,44 i,auu 6.53 6.31 24.;1J U.SCH6 5,9 5t41 4.58 3t77 23 2.00 ?`=00 DISCH6 1.79 i.57 :.37 21 00 DISCH6 .40 .34 .29 .25 27.00 DISCH6 .08 .07 .06 .Jj ,U4 28.00 DISCH6 .01 .01 .01 .01 ,'�%, RUhGFF VOLUME ABOVE BASEFLOW 4.29 WATERSHED INCHES, 411.27 v"S-'r S BASEFi_u _ .00 ;FS OPERATION RUNOFF CROSS SECTION 7 OUTPUT HYDR06RAPH= 1 AREA= .05 SO MI INPUT RUNOFF CURVE= 73. TIME OF C.CNCERTRATION= .83 HOURS INTERNAL HYDR06RAPH TIME INCREMENT= .0922 HOURS PEAK TIME(HRS) PEAK DISCHARGE(CFS) PEAK ELEVATION(FEET) 12.41 65.32 (RUNOFF) 23.67 2.12 (RUNOFF) RUNOFF VOLUME ABOVE BASEFLOW = 3.25 WATERSHED INCHES, 111.11 CFS-HRS, 9.18 ACRE-FEET; BASEFLOW = .00 CFS +FZ4ATION RUNOFF CROSS SECTION B OUTPUT HYDR06RAPH= 2 AREA= .02 SO MI INPUT RUNOFF CURVE= 90. TIME _,c L-^NC_NTu rN= _ 3 HOURS INTERNAL HYDR06RAPH TIME INCREMENT= .0440 HOURS PEAK TIME(HRS) PEAK DISCHAR6E(CPS) ,T=O`.(=_=-; 12,09 6515.44 R_ttiO } VOLUME ABODE BASEFLOW = 5.04 WATERSHED INC�ES; 66,7E _ _-tirtS: Sr-Er'1 = 'Go CFS CROSS SECTION 9 C!.TPUT HYDROGRAPq= 3 AREA .08 SO MI INPUT RUNOFF CURVE= 76. :k-= NA- !Y R 6 L{IC E INCREMENT- .0?58 PE! TIME(HRS) PEA)': DISCHARGE(CYS), 12.93 64.42 RUNOFF VOLUME ABOVE BASEFLOW = 3.55 WATERSHED INCHES, 17i.9B CFS-FRS, i GSEFLOW = .00 CFS ,.,r: - T7 srC Jl i PASS r '^2l' �EG n7-15-88 15;20 ��,O�x; _-� �_t : uuP J _„ ._,C t�y,63 4;i l• BOSS INPUT HYuR75RAP=S= A 2 "--P 12,I5 23,66 RUNOFF VOLUME ABOVE BASEFinW = 3.75 WATERSHEr :�:,=��, _-_--=�, ,L, --_E-; iASEr=OW = .00 CH OPERATION ADDHYD CROSS SEC-ION 9 INPUT HYDROSRAPHS= 314 filfiJITIPri HYBaO R`P•,= PEAK TIME(HRS) PEAK DiSCA 11�G�L�J1 ;` `_�yF-F�; ;rEEs 12.23 .29155 23.65 6.21 ;N. TIME(HRS) FIRST HYDROGRAPH POINT = .00 HOURS -i E iNC;;= E°dT = .10 WOURS DRAINHE AREA = .15 SQ.MI. 3.00 DISCH6. .00 .00 .00 .00 .C: 1t12 .04 .05 .06 .08 4.00 DISCH6,, .10 .13 .15 .i7 .19 ,21 .22 .24 .26 .27 5.00 DISCH6 .29 .31 .32 .34 .35 .37 .38 .39 .41 .42 6.00 DISCH6 .43 .46 .51 .56 .%j .62 .64 .66 .68 .69 7.00 DISCOS .71 .73 .74 .76 .77 .78 .80 .82 .84 .86 8.00 DISCH6 .89 .93 1.01 1.12 1.23 1.37 1.50 1.61 1.73 1.84 9.00 DISCH6 1.9# 2.11 2.30 2.50 2.69 2.87 3.06 3.30 3.55 3.79 10.00 DISCH6" ' 4.01' '4.25 4.54 4.85 5.23 5.69 6.19 6.82 7.50 8.27 11.00 DISCH6 9.14 10.06 11..0 12.23 13.55 15.21 19,14 28.20 40.93 63.85 12.00 DISCH6 97.06 123.64 129.24 127.83 j27r47 1"6.56 123.72 118.72 112.51 106.38 13.00 DISCH6 100.25 93.99 87.46 ao.rf jt,'-; 6'.33 6I,09 55.61 50,91 46.80 MOO DISCH6 43.19 40.01 37.10 3�.4° 32.'_t 9,95 28.M 26.24 24.65 23.24 15.00 DISCH6 22.00 20.91 19.96 19.12 :t,': 17.55 16.85 _6.24 15.69 15.20 16.00 DISCH6 14.77 14.40 14.08 !7-190 '.3,56 13.35 13.12 12.82 12.51 12.22 17.00 DISCH6 11.97 11.73 'i.v% `_1.3� -::: C=4 :�).91 1C,80 1��.69 :0.53 18.00 DISCH6 10.30 10.08 918y 9,7: 2 : ,_< 9.35 9: : 9,06 5.94 8.84 99.00 DISCHG 8.74 B,6S C.3S O`Ci U.L` 5,�: E.7a G.3� 3.32 6.21 20.00 DISCH6 8.05 7.87 �, .5= -:ems: ,:5 .L 6.99 6.88 6.79 L1.00 DISCHG 6.7C `'.62 6:34 6.31 G,L9 22.00 DISCHG 6.21 6.26 5,25 ". �`.. „1� ` n _ r, •+R r1+ L 1 bran 6,i 6..La Jrt 13.0//0 DIcS(C�(Hmu S.L. J.�: _ 4- :-_ 6,1 V�/ DialCkG J.9; _.'+ v:"7_ L -� _- -,�_ �z Ci _ ia'L L,:�� DISCHG 27,00 DIS 6 s'!a a+ :-� e`•i 218,00 DISCOS �JNOF VOLUME AB0Jz dA3 17L0 - �r�v ?rR '�' ,�".- _- -- -;,�.. "v- - udw - .{)0 v=E TR" 1 7- BRUN Sf LIE = _ ;S = ��..___ ____--`_.: ,tin�•�^ ��`�- O%S NIPUTED FOR PASS -- -, _ _r i j.,�Wl�.�s •]� .tit !�a5)1�"'x :Y y'e 'yr4y' f•�f'PyyY.�'d-1 .ipp.' ...t_ -�' _ - i.}yy AND EXE::TIVE CONTROL INS?RU7TIGNS IN THE ORDER FERFYr%� D :tisi-;ARSE TIME AND RATE VS) VALUES INDICATES A FLAT Tru =YDi ,?` PEEN. AS 7.r -_--•-, __ }•ter_ _'l _ -- VA-i,; r'ili.�.�aTf.TL _!-}•. - - ___ ------------------------- RUNOFF ---------------------------- :N"CREM SHIN AMOUNT DURATION AM{GllIti? ELr-(V4710N N'4 i Ri 'MR) (IN) ►t3 1 i�N) 1C11 i R i1 = - P L T E RNA T_ YSCCT.n 2 10 .0 5.40 24.00 2.33 --- 12.31C}.5. - u:r .t c �+rr,tt.-i• i n,.•.r� = ecl .Q 5.4Q 24.QQ 2.59 �fL XSEC H L RUNOFF � t ' XSEy [n 'r,N RUN0F� r,, 2 IQ Q 5 40 24.Q4 2.87 41 = ,� _ lu .' nL!i4�: ,yi t --- .aa94 J.,.aJ XS}C-ION 3 ADDNYD ,07 i T .:0 .0 5.40 24.00 2.52 --- !2.-is 70,4: v XSEC _EN 3 AnuLLYD L .1.0 .0 5.40 24.00 2.70 �T t; i'-a XSECTIGN 4 RUNOFF .02 2 2 .10 .0 5.40 24.00 4.27 --- 12.09 55.85 2724a6 XSECTIGN J RUNOFF .05 2 .10 .0 5.40 24.00 4.27 --- 12.09 144.4i XSECTIGN 6 RUNOFF .08 2 2 .10 .0 5.40 24.00 2.87 --- 12.94 51.75 689.' XSECTIGN 6 ADDNYD .07 2 2 .10 .0 5.40 24.00 4.27 --- 12.09 20 .2b 2724.b XSECTIGN 6 ADDNYD .15 2 2 .10 .0 5.40 24.00 3.56 --- 12.10 214.09 1441.7 XSECTIDN 7 RUNOFF .05 2 2 .10 .0 5.40 24.00 2.59 --- 12.41 51.77 97116.7 XSECTIGN 8 RUNOFF .02 2 2 .10 .0 5.40 24.00 4.27 --- 12.09 55.95 2724.6 XSECTIGN 9 RUNOFF ,018 2 2 .10 .0 5.40 24.00 2.87 --- 12.94 51.75 689.9 XSECTIGN' 9 ADDNYD .07 2 2 .10 ,0 5.4� 24.00 ` 3:Ob ___ 12.14 88.36 1202,2 XSECTIGN 9 ADD(�YD 2 2 .i0 .0 5.40 24.00 2.96 --- 12.22 104.73 '; `,? ALTERNATE 1 S-IRM kSECTToN I RUNOFF v2 f 2 .10 .0 6.90 24.00 3.53 --- 12.30 31.'9 �,.�.L,TiJ� 1 rR ''r a ..0 .0 6.90 24.00 3.84 --- 12,40 77.49 E .10 .0 6.90 24.00 4.17 --- 12.93 :;,74 X3EC-: 3 A.;;C Yu 2 = .10 .0 6.90 24.00 3.75 --- :.2.37 cRy _. .10 .0 6.90 24.00 3.96 --- 12.48 157.43 _''t;: ,0 6.90 24.00 5.73 3.81: 7 6.90 IL 24,00 5.73 --- i�,:}= '.-,.?� ?ti.- -_ -. _ --- .0 6.90 24.00 4.17 --- f, w3 7=,7' - _ 6.90 24.00 5.73 --- •� _ -_== -;- _;, _,- - 1 ,•� 6.90 24.00 4.94 - - - - - .0 6,90 24.00 3.84 --- '2.� - _-- 6.9t, 24.00 5.73 --- :2. -:. ... 6.90 24.00 4.17 _-� - = r ,_�.• a,90 24,00 4.37 --- 6.90 24.00 4.27 r: -140 XFQ 07-15-88 15:20 BROWN CASTLE 87 408 JOB 1 SUMMARY REV KC t9f33it2) PAW �L� S.'4M`ARY TABLE 1 - SELECTED RESULTS OF STANDARD AND EXECUTIVE CONTnvi :k5',UC7:? S ti - : _-:_- --;r= "=u (A STAR(*) AFTER THE PEAK DISCHARGE TIME. AND RA-7- A GUESTIC4 MARK 09 INDICATES A HYDRLSRAP. _�,�- I:,_nra4"•i :j;ANllARD .lel-k ANTELm MATT1J� t, :,ri= C0NTRn= DRA'NA6E fABL MIST T114 ------------------------- ti t -------------------------------------- �D 5FERATT•DN AREA 4 COND IN;REM BEE:N trAT" RATE (SQ MI) (SIR) (HR) t'�:: �T?R ;. ) <HR ;CFS) (CSM) ALTERNATE 1 STORM 2 XSECTION 1 RUNOFF .02 2 2 .10 .0 3,2:� 2a, 6,50 317.0 XSECTION 2 RUNOFF .OS 2 2 .10 .0 .2:! 24."0 ,9S --- _2.45 18.09 341.2 3 XSECTION 3 RUNOFF .08 2 2 .10 ,0 3,20 24.V 1.i5 --- '',00 19,62 261.6 XSECTION 3 ADDHYD .07 2 2 .10 .0 3.20 24.0! .94 24.33 331.0 XSECTION 3 ADDHYD .15 2 2 .10 .0 3.2! ��. :� `,�;` --- .2=Ec 37.00 '149.1 XSECTION 4 RUNOFF .02 2 2 .10 ,0 3.20 24.00 2,17 --- 12.09 29.31 1429.6 XSECTION 5 RUNOFF .05 2 2 .10 .0 3.20 24.00 2.17 --- 12.09 75.77 1429,6 XSECTION 6 RUNOFF .08 2 2 .10 .0 3.20 24.00 1,15 --- 13.00 19.62 261.6 XSECTION 6 ADDHYD .07 2 2 .10 .0 3.20 24,00 2.17 --- 12.09 105.08 1429.6 XSECTION 6 ADDHYD .15 2 2 .10 .0 3.20 24.00 1.66 --- 12.10 108.97 733.2 XSECTION 7 RUNOFF .05 2 2 .10 .0 3,20 24.00 .98 --- 12.45 18.08 341,2 XSECTION 8 RUNOFF .02 2 2 .10 .0 3.20 24.00 2.17 --- 12.09 29.31 1429.6 XSECTION 9.•RUNOFF .0k 2 2 .10 .0 3.20 24.00 1.15 --- 13.00' 19.62 261.6 XSECTION 0 dDftD .07 2 i, ' .10 .0 3.20 24.00 1.31 --- 12.13 38.95 528.6 XSECTION 9 ADDHYD .15 2 2 .10 .0 3.20 24.00 1.23 --- 12.15 42.59 286.8 ALTERNATE 1 STORM 10 XSECTION 1 RUNOFF .02 2 2 ,10 .0 4.80 24.00 `.Sy --- 12.32 16.36 798.0 XSECTION 2 RUNOFF .05 2 2 .10 .0 4.90 24.00 2,:? --- 2.42 41.94 791.3 XSECTION 3 RUNOFF .08 2 2 .10 .0 24.00 -7 --- i?,95 42.48 566.4 XSECTION 3 ADDHYD .07 2 2 .10 .0 4,V 2er0" 7,''5 --- _i.:y 57.62 783.9 XSECTION 3 ADDHYD .15 2 2 .10 ,w �.?!: 24,C! 2,': --- :31 65.33 574.6 XSECTION 4 RUNOFL .02 2 ? .10 ,f� c :4 3,-1 --- '=.r; c8.64 2372.5 XSECTION 5 RUNOFF ,05 2 2 ,?!'• ,c! a,F: 7F l.0 4 IL � XSECTION 6 RUNOFF .08 2 2• .10 .0 4 3-n 2t 2 -- --- :.2.9: 47.48 566.4 XSECT:QN 6 ADDHYD 07 2 Z .i0 0 2372.5 XS_^T-C'4 r RUNOFF � 2 0 ,�; a=� �� -• - _,4_ 272,5 X ,:IN c RU.0L = c 22 .:0 _. _ .._ _ _ .. $.64 4- AS=S'; 9 RJNOF- L 2,`: 2 ,10 2k,^: :,_ I3N try-n-. T ., - r. - -- -� �7,n ,j%a ) :�::Dk 9 �i;il��'y,; ? -' �4°`' - - __.,� ,2.7 all .0 2 .i'v �- -- _. 06.7{) 48.�. AA TEri'yATE STO `0 XSECTION 1 RUNOFF ,02 2 2 .10 10 6.20 24.0 2,36 --- :L.31 26.27 1261.6 XSECTION 2 RUNOFF .05 2 2 .10 .0 6.20 24.00 3.25 --- '_=.41 65.32 i232,5 XSECTION 3 RUNOFF .08 2 2 .10 .0 6.20 24.00 3, --- 12.9' 64.42 859.0 XSECTION 3 ADDHYD .07 2 2 .10 .0 6.20 24.00 3.17 --- 12.37 90.50 1231.3 XSECTION I- ADDHYD .15 2 2 .10 .0 6.20 24.00 3.36 --- 12.49 132.72 893.8 4 isC XEQQ 07-1:5`88 i5c20 BROWN CASTLE $7 408 RY ;i 1!A:,Y SELcC'ED RESU?'S uF STANDARD AND EXECUTIVE CONTr=_ (A STAR;*: AFTER THE FEAT. DISCHARGE TIME AND RATS v=�; v _;= _-_:_- = - "- -.�; A :E TTON ?(fl54.(`'l INDICATtS A i'YD►OGRAPa WITH Rc A 'iC MAt}'`- --}l, _ � -_ - - .-_---_------_--.------------- 'i'� a�. i`ii �s�{�0: Lf t ew^}r r �y{t:r to TTur I Il4_ LI.'<<.ailfl�� �AB..t ,1 ay 1 j'f�l�r -'_________________ __- _ _ :D G'E...L �V AREfl # CG D iNCREM BEG:'ti niMG�' _ (SD MI) (MR) ;HR? (.oq! 1-:- ALTERNATE I STORM 50 %SECTION 4 RUNOFF .02 2 2 .10 ,0 b.2v4.:?? i,:� --- � 65.4a 3I�i3,? XSECTION 5 RUNOFF .05 2 2 .10 .0 6.20 24,30 ,9 169,19 if 9-. XSECTION 6 RUNOFF .08 2 2 .10 .0 6.20 24,`10 '.55 --- .2,93 64.42 859.0 XSECTION 6 ADDHYD .07 2 2 .10 .0 6,20 724.00 05. 234.64 ?:=2.3 XSECTION b ADDHYD ,15 2 2 .10 .0 6,20 24,roO211.0 252,'2 XSECTION 7 RUNOFF .05 2 2 .10 .0 6.20 24.00 3,25 --- :2.41 65.32 i232,5 XSECTION 8 RUNOFF .02 2 2 ,10 .0 6.20 24.00 "04 --- 12.09 65.44 3192,3 XSECTION 9 RUNOFF .08 2 2 .10 .0 6.20 24,00 3,55 --- :2.93 64.42 859.0 XSECTION 9 ADDHYD .07 2 2 .10 .0 6.20 24.00 3.75 --- 12.15 ia7.54 i463.I %SECTION 9 ADDHYD .15 2 2 .10 .0 6.20 24.00 3.65 --- 12.223 129.55 672.4 JCL wir - _ _ - - % STRUCTURES FOR ?_ SINSIRMS, AND ALTERNATES X�= -"f ....- 4�•CiS 0.50 6.27 31.47 n�n�ran r AL t �1r • �� , :,74 �..;( G~ 2 77,49 ALTEnN.aTE 25.33 IIiS.2d 132.72 137,L3 XSEL'TION t f►? ALTERNATE 1 29,31 12.64 55,85 65.44 73.80 XSECTIGN 5 ,J5 ALTERNATE 1 t�,77 125.74 144.41 169.19 190.79 XSECTIGN 6 .15 ALTERNATE 1 108=87 185,18 214.09 252.72 286.56 XSECTIGN 7 ,05 ALTERNATE 1 18.08 41.94 51.77 65.32 77.49` ' XSECTIGN S 2 ALTERNATE '29,7: 48.64 55.85 65.44 73.80 XSECTIGN 9 .4 AL'E4NA7E 42,59 86.70 104,73 129.55 151.93 f SEA Consultants Inc. July 22, 1988 Engin ers/Architects Principals Arnold B.Goldstein,P.E. Frederick G.Aufiero,P.E. Robert M.Brandon,A.I.A. Mr. Michael J. Gantick, P.E. Stephen H.Geribo,P.E. Director of Public Works David T.Goodemote,P.E. Bruce E.Soule,P.E. Town of South Windsor Kenneth M.Stewart,P.E. 1540 Sullivan Avenue Anthony J.Zuena,P.E. South Windsor, Connecticut 06074 Associates Steven L.Bernstein,RE. Re: David A. Brown Paul F.Gabri I,P.E. Mark Gould,RE. Job No. 88126.38 Micha I S.Schultz,RE. Task Order No. 38 Arthur A.Spruch,P.E. Paul C.Ross,PE. Dear Mr. Gantick: As requested, S E A Consultants Inc. has reviewed the following for the above referenced project: Sheet No. Title Prepared By Date 1 Key Map Fuss & O'Neill 7-1988 2 Boundary Survey if 3-1988 3 Wetlands Map it 2-1988 4 Plot Plan It 4-1988 5 Erosion & Sedimen- tation Control Plan it tv 6 Wetlands Creation & Drainage Plan ff 6-1988 7 Topographic Map " 4-1988 8 Planting Plan It ft 9 Planting Details if ff 10 Utility & Paving Details " f� 11 Erosion & Sedimenta- tion Control Details " ff 485 Massachusetts Avenue Al Perspective ABS Architects 5-1988 Cambridge,MA 02139-4018 (617)497-7800 A2 Floor Plan it 9-1987 • Citicorp Park West 100 Foden Road A3 Exterior Elevations South Portland,ME 04106-2319 (207)775-2281 850 Silas Deane Highway Wethersfield,CT 06109-3412 (203)721-7993 SEA c nsultants Inc. Mr. Michael J. Gantick, P.E. Engineers/Architects July 22, 1988 Page Two This information was reviewed for conformance with S E A's comments dated May 10, 1988, Planning Department's comments, and your comments dated May 18, 1988. We note the following: The plans appear to be in compliance with the comments contained within the referenced letters and subdivision regulations. If you have any questions, please do not hesitate to call me. Very truly yours, S E A Consultants Inc. z�e� James R. Bancroft, P. . JRB:mp 'S. Appl. #88-33P, D. Brown Site Plan, northeast corner Governors Highway and Nutmeg Road, I Zone (action 9/03) : Andy Smith, Casle Corporation; David Brown; and Betsy Kaemmerlen, Fuss & O'Neill repres nted the applicant. Mr. Smith reviewed topography; site and lot configuration; the building's exterior finishes and configuration; and parking. He said that the proposal was for 2 single-story, multi-tenant buildings, one 21,600 sq. ft. and the other 32,000 sq. feet. Each building, designed for 20% office and 80% warehouse use, would accommodate ten tenants . Ms . Kaemmerlen reviewed landscaping, noting that a substantial buffer would remain along the north frontage at Nutmeg Road, and a natural buffer along the north border. Town Planner Marcia Banach provided the following report: 1. Site size is 38.6 acres, with no subdivision proposed at this time. Two buildings are proposed; one of 21,600 sq. ft and the other, 32,400 sq. feet. Building height is 18' . Before subdivision, impervious coverage is 9% . 2. Proposed entrance is from Nutmeg Road North. It appears that provision is being made for a future access onto Governor's Highway also; it is recommended that as few curb cuts as possible be made onto Governor's Highway as future development of this site occurs . 3 . Drainage and detention are primarily by use of swales . This is a difficult site to drain, similar to Governor's Square. Town staff do not encourage large-scale use of swales for site drainage; these are a maintenance nightmare because of trash collection and filling-in over the years, standing water, and unsightliness . If swales are provid d, an operations and maintenance plan will be required, with deed restrictions requiring future owners to perform necessary maintenance. PLANNING AND ZONING COMMISSION 14 JULY 26, 1988 4 . Proposed parking is 108 spaces; 260 required under our regulations . The Planning Dept. is not comfortable with 108 spaces, but will go along with it provided there is space on reserve. It would be better to have additional parking spaces from the reserve area on the east side of the buildings rather than along Nutmeg Road North if additional parking is ever constructed. 5 . There are regulated wetlands on the site. IWA/CC approval has been granted with the following approval conditions: 1 . Three (3 ) blueprint copies of the approved map with all modifications be submitted to the IWA/CC within 65 days for review prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount of $10, 000. to be submitted to Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures . 5 . The permit is valid for one year and shall expire on June 27, 1989 . 6 . All approvals required .must be obtained and submitted prior to any activity on the site. 7 . A consultant with experience in the creation of wetlands must be contacted to come up with a program for the wetlands creation. A written plan must be submitted with specifics on how they plan to establish the new wetlands . No building permit will be allowed until the plans are submitted to IWA/CC. 8 . Modifications to the plans to show maximum 4 :1 slopes, stockpile location, limits of construction, buffering of neighbors, siltation basins, extend anti-tracking apron to existing pavement and resolve the conflict between the construction schedule and the E & S control. notes. 9 . Item 3 in the E & S control notes to be adjusted to 30 days or as directed. 10. Significant or specimen trees should be located along NF Albert J. Schneider and methods of their preservation should be shown. PLANNING AND ZONING COMMISSION 15 JULY 26, 1988 11 . Dust protection should be addressed on the plan. 12. The effect on the ground water table should be addressed, up and downstream. 6 . Public water and sewer are available. The Superintendent of Pollution Control has indicated that if use of the buildings now or in the future should involve the discharge of industrial process wastewater to sewers or flows of 5000 gal. per day, a DEP discharge permit is required. 7 . A copy of the master concept presented to IWA/CC is available. 8. This area where the building is presently proposed is surrounded by I-zoned land. A buffer will be required along the east property in the future. The applicant would be well-advised to look at the buffer requirements now to do any supplemental planting which might be required along that east boundary -- it's less expensive to plant smaller trees now than larger trees in the future. 9 . The site is partially wooded. The landscaping plan shows a good number of trees to augment the site, plus extensive use of planting beds in front of the buildings . No landscaping is proposed along the east side of the site -- apparently taking into account that future uses in that area are unknown. 10 . Note that loading areas between sites are screened by 8 '-8" walls at both ends of the buildings . 11 . There is one Engineering Department question: why is riprap shown on only one bend of three for the swale? All Planning Dept. and Engineering Dept. modifications requested have been incorporated into the plans . During the ensuing Commission discussions, questions were asked and concerns expressed regarding time of subdivision of the corner lot, phasing, retention of existing buffers, and drainage. Mrs . Evans made a motion to approve the application subject to the following modifications: 1 . Prior to commencement of any site work, a meeting must be held with Town Staff . 2 . No building permits will be issued until the final mylars have been filed in the Town Clerk' s Office. 3 . This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. PLANNING AND ZONING COMMISSION 16 JULY 26, 1988 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations . 5 . A landscape bond in the amount of $ 7,000 is required and must be submitted prior to filing of mylars . 6 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7 . Operation and Maintenance Plan is required as part of deed for upkeep of swale. Copy of Operation and Maintenance Plan must be submitted to the Town Engineer for review. 8 . Riprap is needed at all bends of swale. 9 . Remove reserve parking area along Nutmeg Road North. 10. Plot plan should reflect 50, buffer along east boundary. Black and white transparent mylars of Sheets #2 and 4 with the above modifications, together with three blueprint copies of the entire set of plans, must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. Mr. Castro seconded Mrs . Evans's motion with the above modifications . More discussion followed, during which Mr. Hart observed that the nature of the proposed buildings might make it difficult to control future uses actually requiring DEP discharge permits . Mrs. Rossi questioned the amount of the landscape bond, noting that the size of this project seemed to warrant requiring a larger bond. Mrs . Rossi made a motion to amend Mrs. Evans's motion to reflect a $7000 landscape bond requirement rather than $5000, which was seconded by Mr. Castro and passed unanimously. The Commission then voted on the original motion with the amendment, which carried unanimously. 9 . Set and/or reduce bonds . Mrs. Montana made a motion to set and/or reduce bonds as indicated on Memorandum dated July 26, 1988 (attachment A) . Mrs . Evans seconded, and the motion carried unanimously. O � C U .1 r 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 IsoR.CO AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, JULY 30, 1988 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At its July 26 , 1988 meeting, the Planning and Zoning Commission voted to take the following action: 1 . Approve, with modifications, the application of Thomas Juknis for a farm stand / greenhouse on property on the west side of Sullivan Ave. north of Pierce Road, RR Zone. 2. Approve, with modifications, Appl. #88-62P, Dynamic Controls, for a Site Plan of Development for property on the east side of Nutmeg Road South, I Zone. 3. Approve, with modifications, Appl. #1327P, Irene E. Guay, for a Conventional Subdivision of 17 lots to be known as Cliffwood Estates on 17 .5 acres of land located east of Lawrence Road, north of Cliffwood Drive, A-30 Zone. 4 . Approve, with modifications, Appl. #88-23P, Alexander Terlizzi for a Site Plan of Development for Lot #3 Sea Pave Road, north side of Burnham St. , I Zo 5. Approve, with modifications, App #88-33P, David A. Brown for a Site Plan of Development f r property at t northeast corner of Governor's Hi hway and Nug Road North intersection, I Zone. °"' Dated at South Windsor, Connecticut this 27th day of July, 1988 . PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. , Chairman Marshall Montana, Secretary 0U 3 fob memorandum Y7- v PRO.T. NI�Bx DATE D 19 b PROJECT....... V v '`' ,:^ O W 1JS CLIUM....... PERSONS INVOLVED: TB LEMONE 710R E 5 o C E I V ED L CONPEMCR Ai jr. 12 1988 Q OTHER cn WI N SUBJECT: �, S0� I �,✓ f V? v fGI wr o �. 5"d4 hc4IJ2 1� AJjbvL#-,i "J2!&d 4:;k.- 0 O &ire— WCA S ` /v r cjaj elu bz. 1 11 S vw G.� P v CV& u-v+ a ry 1.7 O r f V► &a-v Qi✓vL,<W S C.,JU s s fj�& e-.1 L'Jy e.,V"" , 1a_..4jA_pk Ili It: 6elob -S � G S)�S 7� is L'j 57, y wr r� ktllr - 07'�_ k,-Prl a S i o�kZ L►��� o r/� �0 a c.+�e_ wa�s� Q,Y,� S,nc�� w �„ ✓ ocv h s �� FUSSMYNDLL e y 0 MANCHESTER, C NNECTICUT /go►_._154 0_ �ow1 f owM 8f,<� ~ 7_0 ap S_ �. c � 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 SOR•co AREA CODE 203/644-2511 August 9, 1988 Mr. David A. Brown 994 Farmington Avenue West Hartford, CT 06107 re: Appl . #88-33P, David A. Brown Site Plan Gentlemen: We are pleased to advise that the Planning and Zoning Commission voted on July 26, 1988 to approve the captioned application for a site plan of development in accordance with Drawings #1 through 11 of 11 prepared by Fuss & O'Neill dated 7-15-88, Project No. 87-408, and with the following modifications : 1 . Prior to commencement of any site work, a meeting must be held with Town Staff . 2 . No building permits will be issued until the final mylars have been filed in the Town Clerk's Office. 3 . This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations . 5 . A landscape bond in the amount of $ 7 , 000 is required and must be submitted prior to filing of mylars . 6 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. 7 . Operation and Maintenance Plan is required as part of deed for upkeep of swale. Copy of Operation and Maintenance Plan must be submitted to the Town Engineer for review. David A. Brown -2- August 9, 1988 8 . Riprap is needed at all bends of swale. 9 . Remove reserve parking area along Nutmeg Road North. 10 . Plot plan should reflect 50 ' buffer along east boundary. Black and white transparent mylars of Sheets #2 and 4 with the above modifications, together with three blueprint copies of the entire set of plans, must be submitted to this Commission within 30 days to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . After the n:ylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. Chairman cc: M. Gantick, Director of Public Works F. Shaw, Supt. of Pollution Control J. Collins, Chief Building Official E. Belleville, Assessor W. Lanning, Fire Marshal M. Banach, Planning Director Registrar of Voters Inland Wetlands Agency/Conservation Commission PZC File Engineer/Arch. Applicant STANDARD APPROVAL MODIFICATIONS FOR SITE PLAN PROJECT: Z ` APPL. NO. _ 3- ARCHITECT/ENGR. /� C� /�/ PROJ. NO. DWG. NOS. , DATES, REV. DATES MYLARS REQUIRED: SHEETS �. Prior to commencement of any site work, a meeting must be held with Town Staff . �2. No building permits will be issued until the final mylars have been filed in the Town Clerk's Office. �. This application is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. �4 . An as-built plan is required prior to issuance of a Certificate of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations . 5 . Footing drains are required if the building has a basement. 7 LA6 . A landscape bond in the amount of $ d-Z)d is required and must be submitted prior to filing of faylars . 7 . All plans used in the field by the developer must bear the stamp and authorized signature of the Town of South Windsor. Black and white transparent mylars of Sheets # Q- , with this letter an the Inland Wetlands Agency/Conservation Commission approval letter reproduced thereon, together with three blueprint copies of the entire plan, must be submitted to this Commission to be stamped and signed. Ater signing, the mylars will be returned to you and must be filed in the Town Clerk' s Office within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. V F CA �, Complete tams 1 and Z when additional wrVIM an daNrad, and oaftWeto tarns 9 and 4. M your adolm In the"APTURN TO"Spew on the raysrea okle. FNhure to do O*web Pravant thb Bard from balm returned to you. � �,�. � . dM of For oWhional Im the ioftwing vembsr are aw pw anfta boX(MO for adeRtloaal m vlo:*W( requMt+ad. Iff show to whamf and adds mme's address. 7. (3 t4owlaW DOOM" t Article Nwnbor >Y,)IA - -P 0-P-5- 12 q qqq F,+pj%-4,00tv�- I'm ow: Ir s ►ciff.d 0000 WC-.0cyr �,e=r na7 C� o(o c o� 0 Ma Alves"obtoln signature of.o1 of m i. s�•a •— S. Ad*mv*'r oWLYIf X •u-rLu.� PoWared eateries I Apftr r . Delivery mn //, 00YAf r Ps Fonts 381 .190 us, AD,ttn f76-zee DOMESTIC RETURN RECEIPT t UNITED STATES POSTAL SERVICE OFFICIAL BUSINESS SENDE9 INSTRUCTIONS Print your name, address, and ZIP Code in the space below. =!S.M Complete items 1, 2, 3, and 4 onm the reverse. '', ~ Attach to front of article if space CP CG �:t permits, otherwise affix to back of article. PENALTY FOR PRIVATE �'� • Endorse article "Return Receipt r 1���' USE,$300 F equested"adjacent to number. RETURN Print Sender's name,address,and ZIP Code in the space below. TO ow (0 • RECEIVED PHILIP BARSKE, PHD 6 .1 fir( EL APPLIED ECOLOGY AND INLAND WETLAND SERVICES f 200 AUOUBON LANE FAIRFIELO. CONNECTICUT 06430 TIM, CAA;i_r=% r oRp. (2031 259-1 447 t RECEIVED Date: 11 November 1988 DF, ' n t�'4Sr To: Andrew Smith Sfl V1iN")10„ PLA��1HING DEPT. David Brown Associates The Casle Corporation Governor's Highway & Nutmeg Road South Windsor, Connecticut From: Philip Barske, PHD, Applied Ecologist Re: Concept of Creating a Shallow Marsh Governor's Highway & Nutmeg Road South Windsor, CT I OBJECTIVE (Refer to accompanying preliminary sketch to visualize projected small marsh) . A. To create a shallow marsh in the defined area. B. To provide for a retention-detention basin for heavy rainfall periods--to maintain a zero-runoff factor. C. To develop the projected basin into a shallow wetland--a marsh with relatively shallow water and an abundance of aquatic plant growth. D. To create an attractive and productive wildlife habitat. E. To remove pollutants from inflow water by vegetation absorption, settling and filtration. F. To provide for near self-regulation of water levels--prevent vandalism, maintenance and questionable , management. II PROCEDURE AND TECHNIQUE A. To create a shallow marsh in the defined area, two ingredients are absolutely essential: 1. A water supply, and 2 . A basin CERTIFIED ENVIRONMENTAL PROFESSIONAL.NATIONAL ASSOCIATION OF ENVIRONMENTAL PROFESSIONALS. CERTIFIED WILDLIFE BIOLOGIST,THE WILDLIFE SOCIETY. CERTIFIED PROFESSIONAL SOIL EROSION AND SEDIMENT CONTROL SPECIALIST,THE SOIL CONSERVATION SOCIETY OF AMERICA. Andrew Smith/David Brown Associates 1 November 1988 Page 2 B. Test wells were dug (8-18-88) and water levels checked 1 day and 7 days apart (the first day inflow provides the most important data) . The water level in the test holes indicates the normal water level in the completed marsh should be the 72 foot contour. C. Contour plans are being developed to create about 1/3 of the area within the zone of expected permanent summer water level (this is the portion of the basin indicated in blue on the sketch) that cab be expected to have a permanent shallow water level of 6 to 8 inches. The rest of the basin will be seasonally and periodically inundated (indicated in green on the sketch) . The higher zone (indicated in yellow on the sketch) will be inundated at high or peak flow periods and this will be of a short duration--a matter of hours. D. The created contours will be designed to maintain a shallow marsh at normal water periods. E. To create the basin, the sandy-loam will be removed to the approximate 71-72 foot contour. To create a semi-natural basin, the contours will be irregular with a degree of perhaps 1/2 to 1 foot variation (this provides a variation in microtopography and also provides zones of permanent water (indicated in blue on the sketch) . F. If the removed earth is found to b,A sand at the lower depths, a slightly deeper, 6" - 811 , excavation may be made and this zone replaced with an equal layer of organic soil--muck and clay. If no soil replacement is deemed necessary; the entire created bottom will be overspread with cow manure and fully disced. Andrew Smith/David Brown Associates 1 November 1988 Page 3 III WATER CONTROL The proposed wetland-marsh will be basically a "dug out" wetland. There will be no control structures (gates, valves, drop inlets, etc. ) for this wetland will flow through when enough water accumulates. The "dug out" wetland basin does away with mechanical controls (breakdown, vandalism and questionable management techniques) and, more important, the self-requlatory inflow and outflow will allow the created wetland to function more naturally with wet and dry periods occuring--similar to nature. IV PLANTING To create a marsh requires non-shrubby (soft) vegetation and two techniques will be employed: A. If time permits, a nurse crop will be planted the year the basin is created and in the next planting season the full complement of aquatic plants will be planted. B. The upper zone (indicated in yellow on the sketch) would be seeded and planted to permanent vegetation as soon as the basin is created and properly shaped (for quick growth to prevent soil loss from the slopes and also because this zone does not require the care that the other two (green and blue) zones do. C. When conditions (base soil and season) are proper, the following plants will be seeded or root-stock planted in the three designated wetland zones: 1. Wet Zone (blue) : Burreed, arrowhead, 3-square, pickerel plant, Japanese millet 2. Moist Zone (green) : River rush, arrowhead, bulrush, smartweed, millet, iris, sweet flag, cattail i Andrew Smith/David Brown Associates 1 November 1988 page 4 3 . Upper Slope (yellow) : A grass mix, wildflowers, shrubs (corners and upper slope--black alder, elderberry, high bush cranberry, etc. ) Aquatic plantings will be from nursery root stock and/or seed. D. Upland Wildlife plantings: The upper slopes of the yellow zone and the entire periphery of the upland (rim) portion of the developed wetland will be planted to niches of wildlife value shrubs and small trees. E. Aquatic plantings may be expected to do well the first few years and then a gradual change can be expected when existing conditions favor and encourage more indigenous plant species to take over. V POSSIBLE PROBLEMS IN CREATED WETLANDS A. Created wetlands cannot be expected to reach maximum visual and biological production for several years--I predict 8-10 years for stability to occur. B. Water level fluctuations may vary from year to year and this will affect plant growth and biological activity. C. Animal damage to the initial plantings may occur; (being an isolated site this may prevent or preclude animal damage) . D. Invasion, in 2-3 years, of noxious or undesirable plants (reed grass, purple loosestriffe, etc. ) will require some initial control work. e Andrew Smith/David Brown Associates 1 November 1988 Page 5 VI SUMMARY The development of a small marsh wetland complex depe nds on many factors and particularly on the two basics of a supply of water and a proper basin. Beyond the absolute basics, some skill and experience is necessary to create a wetland that will, in a period of 5-8 years, become a functioning wetland. 4 The Casle Corporation Avon Park North 200 Fisher Drive Avon, CT 06001 (203) 674-9000 FAX (203) 676-9576 E DEC 1,988 So. Wj 0.1 1111NIING DEPT. December 14, 1988 Ms. Marsha Banack Planning Director Town of South Windsor 1540 Sullivan Ave. South Windsor CT 06074 RE: Application # 88-33, David A. Brown Site Plan - IWC Letter June 29, 1988 - PZC Letter August 9, 1988 Dear Ms. Banack, The Owner/Developer David A. Brown has agreed to abide by the comments concerning his Inland Wetlands Agency/Conservation Commission approval of June 27, 1988 and his Planning and Zoning Commission approval of July 26, 1988. Attached are six (6) copies of the Wetland Creation Plan and narrative concerning its concept/execution prepared by Philip Barske. I reviewed the above with the Commission at there November 19, 1988 meeting and received a positive response. Phil Barske and his associate will be involved in the total process of developing the new wetlands areas. Fuss and O'Neil has submitted the required six (6) copies of the revised site plans to your office, including milars of drawings # 2 and # 4, on September 8, 1988. David Brown is ready to post two (2) letters of credit to cover the $7, 000 Landscape Bond and the $10, 000 Erosion and Sedimentation Bond. The banks of the Swale will be seeded with Crownvetch while the swale bottom and two (2) feet up each side will be seeded with a grass mixture of 20% Kentucky Blue Grass, 20% Tall Fescue, 25% Red Fescue, 15% Perennial Rye Grass and 5% Red Top. Phil Barske feels the above provides the best low maintenance ground cover for the swale. Dave Browns lawyer is investigating how the maintenance of the swale can be incorporated into chain of title for the property. Maintenance of the swale would include the picking up of trash and debris quarterly and the removal of silt deposits when it impedes the design flow of water. The remaining terms on both the IWC approval and the P & Z approval will be complied with and addressed as they are required in the construction process, hence I feel the plans are ready for the Town's final review/sign off. If you have any questions feel free to give me a call. We appreciate both your and Liz's assistance in obtaining IWA/P&Z approvals. S Orel Ani ew B. ith pc: David A. Brown sf4 r -- 01 � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 f��soe•co�'� AREA CODE 203/644-2511 March 15, 1989 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Jerry C. Iazzetta, Town Engineer RE: David Brown Site As a prerequisite to a preconstruction meeting, we have reviewed the "Final Plans" for the David Brown Site and have the following comments: 1 . Planning & Zoning approval letter stated the plans should be modified to show a maximum 4:1 slope. The details shown on sheet 11 indicate this, however the plans are showing a 2:1 slope at the swale. This should be revised to show the proper impact and limits of grading. 2. Planning & Zoning approval letter asked that limits of construction be shown on drawing. There are none shown. 3 . Planning & Zoning approval letter requested siltation basins be shown. This has not been done. 4 . Inland Wetland approval letter asked that the 50' buffer along the east boundary line be shown on the Plot Plan. This is not shown. 5 . Inland Wetland approval letter stated "Riprap is needed at all bends of swale" . Riprap is shown for one side only. 6 . Sheet 5 note number 7 states that riprap is to be placed at all culvert discharge areas. This was not shown on drawings. 7 . We request the elimination of the note "Not Released For Construction" from all drawings. With this note in place the drawings cannot be classified "Final Plans" . 8 . Planning & Zoning approval letter asks that a written plan for the wetlands creation be submitted. We do not know if this has been done - we have not seen it. 9 . Planning & Zoning approval letter states that the effect on the groundwater table should be addressed both up and downstream. This has not been done. JCl/jsv CA S-0� �. C V 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 v 4i~�soa ��w AREA CODE 203/644.2511 co RE: Preconstruction Meeting - David Brown Site Application #88-33P April 13, 1989 IN ATTENDANCE Name Company and Address Telephone Marcia A. Banach Town of South Windsor 644-2511 Bill Wadsworth 200 Fisher Drive Avon, CT 06001 674-9000 David Brown 998 Farmington Avenue 236-2595 Hartford, CT 06107 Fred Shaw Town of South Windsor 644-2511 Betsy Raemmerlen Fuss & O'Neill 146 Hartford Road, Manchester, Ct 06040 646-2469 Andy Smith ABG Architects 200 Fisher Drive Avon, CT 06001 674-9000 Ignatz Horvatt Assistant to Barske 259-5567 Jerry Iazzetta Town of South Windsor 259-2511 P. Barske Fairfield, CT 1447 John E. McCahill Town of South Windsor 644-2511 Lester Braddock Town of South Windsor 644-2511 A.'Bowen Davies Town of South Windsor 644-2511 The following is a brief summary of points discussed during the meeting. Public Works 1 . All erosion and sedimentation control measures are to be in Mace prior to earth moving operations in each area and maintained/cleaned out during construction. Call Zoning Wetlands Enforcement Officer for inspection when measures are in place, prior to commencement of site work. 2 . Four complete sets of most recent approved/revised plans to be provided to Town prior to start of construction. They will be stamped by Planning Department along with plans developer needs . 3 . The Public Works Department is to be notified forty-eight (48) hours prior to the start of major construction work with inspections and testing per Developers Checklist required for the following: a) After driveway/parking areas are staked out b) All drainage work c) Preparation of subgrade, compaction tests as required by the Town. d) Preparation of subbase, six (6 ) inch lifts e) Placement of bituminous concrete, 1 1/2 inch layers. 4 . Certification of gravel used as subbase will be required by an approved testing company. 5 . No subgrade formation/base in frozen ground/snow. Same for pipe/structure installation. 6 . As built plans are to include horizontal and vertical location of all underdrains, footing drains, and sanitary sewers located by a certified land surveyor. Progress sanitary sewer as-builts required prior to gravelling of road. 7 . All topsoil stockpile areas to be protected (ringed with haybales or equal) . 8 . All pipe and structures to be backfilled with free draining material, compacted in maximum one foot lifts with approved compaction equipment. 9 . During construction of the driveway a crushed stone tracking pad is to be installed and maintained to minimize tracking of dirt/gravel onto Nutmeg Road North. Calcium chloride is to be used for dust control as required. 10 . Any problems and/or questions regarding construction of this project will be directed to Bill Wadsworth in the field. 11 . All filling to be done in accordance with Department of Transportation specifications. To be compacted in maximum lifts and tested as necessary. 12 . Weekly job meetings will be held as needed. 13 . Forty-eight (48) hours notice needed for Certificate of Occupancy inspection. Two week review period (10 working days) needed for all individual site (lot) plans prior to issuance of building permit (may be longer if application is incomplete) . See General Guidelines for Certificate of Occupancy. 14 . Only approved copies of lot site plans to be used. Any proposed changes are to be presented to Engineering/Planning & Zoning prior to implementation on change sheet. 15. No paving after October 15 without written approval from Director of Public Works. 16 . Hours of operation 7:00 A.M. - 5:00 P.M. , no work on Sunday. Any pipe/structure work requires inspection prior to backf illing. 17 . Access off of Nutmeg Road North only. 18 . Stump disposal to be off-site. 19 . Reconnect tile drains if encountered during construction. 20 . Waterflow in swale to be maintained at all times, not blocked by construction. Planning Department: 1 . Trees along property boundary should not encroach onto abutter. Wetlands: 1 . Limits of construction to be established physically on-site as shown on plan. 2 . Contact Town Staff prior to cutting trees along northerly property line to verify flagging of limits. 3 . Maintain the Construction Entrance throughout the time of development. 4 . Changes to erosion and sedimentation plan should be submitted in writing to the Planning Department. W.P.C.A. 1 . Letter of approval to be filed with plans . 2 . Sewer connection charge to be paid prior to connection. Permit required. SNET/NU 1 . Contact utilities for coordination of utilities connection. Fire Marshal 1 . Blasting (if required) to be coordinated with the Fire Marshal. Police Department: 1 . Emergency phone numbers for the duration of the construction must be provided to the Police Department on a company letterhead. If the developer occupies or owns the building/s after construction emergency numbers must be provided to the Police Department. 2 . All buildings located on property which abutts a public highway must be numbered. Such number/s (address) shall be visible from the street. All numbering shall comply with Town Ordinance 6-800 thru 6-802. ' 3 . Barns, garages and outbuilding which are located on the same premises as a numbered structure are excluded. 4 . Erect temporary sign on the site during construction identifying the project. 5 . If an alarm is to be installed contact the Police Department. Building Department: 1 . Plan review with Building Official/Fire Marshall required prior to application for building permit. Coordinate with Chief Building Official. Very truly yours, C� Marcia A. Banach Director of Planning ' MAB/pmm cc: Jerry C. Iazzetta, Town Engineer A.B. Davies, Deputy Town Engineer Thomas Hart, SWPD Karl Reichle, Public Works Mel Stead, Public Works Minh V. Le, SNET Hal Clisby, CL&P John R. Collins, Chief Building Official Fred Shaw, Superintendent of Pollution Control John E. McCahill, Zoning Enforcement Officer Bill Wadsworth David Brown Betsy Kaemmerlen Andy Smith Ignatz Horvatt P. Barske y ` ~ Gory K. Tyler - Chief Chief of Police soR-C Police Services SOUTH WINDSOR POLICE DEPARTMENT CONSTRUCTION REQUIREMENTS Project Title: Date: 1. Developer is responsible for the purchase and installation of all street and traffic signs. Any signs on or intersecting with a State Highway must be cleared through the Department of Trans- portation. All signs must be in place before a c.o. is issued. Q 2. Developer is responsible for the purchase of all street lighting through Connecticut Light and Power. CUP will install all lighting once they have received payment from the developer and the locations of the lights has been reviewed by the Police Department. All lighting must be in place before a c.o. is issued. 3. Developer will submit three (3) 81-2- x 11 or 811 by 14 maps of the proposed project to the Police Department for the purpose of identifying and locating all signs. Completed maps will be distributed to the developer, Town Planner and the Police Department. Any changes in road design will require new maps. 4. Temporary street signs must be in place as soon as possible and maintained throughout the project. 5. Emergency phone numbers for the duration of the construction must be provided to the Police Department on a company letter- head. If the developer occupies or owns the building/s after construction emergency numbers must be provided to the Police Department. 6. All buildings located on property which abutts a public highway must be numbered. Such number/s (address) shall be visible from the street. All numbering shall comply with Town Ordinance 6-800 thru 6-802. Barns, garages and outbuilding which are located on the same premises as a numbered structure are excluded. 151 Sand Hill Rood 9 South Windsor, Connecticut 06074 • (203) 644.2551 -2- CONSTRUCTION SUGGESTIONS 1 . Keep all shrubbery low around doors and windows so as to allow an unrestricted view. 2 . Locate business name , if applicable , on the building . �3 . Backlight business name and address . �� 4 . Provide lights over all doors . d5 . Provide ample lighting of parking areas . 6 . Advise the new owner / r e s cha r P u to provide the Police Department with emergency numbers . (Business , Commercial and Industrial property only) . SIGNATURE { Z OPERATION AND MAINTENANCE PLAN APPLICATION 88-33P APR 19 1989 � DAVID BROWN SITE GOVERNOR'S HIGHWAY South W111dSOr SOUTH WINDSOR, CT 'Plaw'g & Zoning Commission This plan shall become part of the deed so that subsequent owners follow the established maintenance program and schedule. SWALE AREA 1. Inspect the swale annually by walking the entire length, noting erosion and seepage areas, depressions, and rodent holes. Repair erosion damage and revegetate as called for in the original specifications for permanent seeding. Fill in rodent holes and revegetate. If rodent damage is more than minimal, devise and initiate an eradication plan. Cut all woody vegetation within the swale at ground level and treat to insure that it does not become reestablished. 2. Examine rock riprap and bedding (if visible) and make repairs necessary to meet original requirements. Rock shall be durable and resistant to weathering; shales and siltstone shall not be used. Remove any siltation and regrade to proper pitch to insure proper drainage of the swale. 3. All areas void of vegetation shall be reseeded with the permanent seed mixture as called for in the original specifications. 4. Mow all vegetated .areas at least annually. DETENTION AREAS 1. Cut all woody vegetation within 15 ' of the outlet and inlet channels. Remove dead trees, snags, and debris which may block the functioning of the outlet during a flood event. 2. Inspect any trees and shrubs planted under the construction contract and prune, replace or supplement woody vegetation as necessary. 3. Inspect and clean the culvert under Nutmeg Road North to insure free drainage so that the road does not act as a "dam" during flood events. INLET & OUTLET STRUCTURES 1. Take immediate action to repair spalled or cracked concrete by replacement with a high strength, non-shrink, non-metallic, cement-based grout. 2. Check for erosion or settlement around concrete structures. Fill any settled areas with a properly graded gravel or crushed stone filter material. 3. Riprap and bedding in the channel should be inspected for displaced, dislodged, or deteriorated materials. Properly graded and durable materials shall be used to repair damaged areas. Inspect the channel for growth of woody or other vegetation which restricts flow. Remove if present. Inspect the earth portions of the outlet channel for erosion on the side slopes and bed. Stabilize eroded areas by regrading to a stable side slope and installing vegetation, jute matting, or riprap as necessary. 87-408 Corres. 0330A89BAK c r 7_aa')v_ _t O-P soaA V• 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 R•co AREA CODE 203/644-2511 _ a May 10, 1989 David A. Brown MAY 1 e1 lgg3 994 Farmington Avenue West Hartford, CT 06119 _ }rt yyY SOU , i4 1.\iJ�il Planning & .airing CommissioTt Re: Application #88-33P — David Brown Site Dear Mr Brown: At the May 8, 1989 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one year extension of Application #88-33P with all original conditions. In addition to the original conditions you are also required to contact John McCahill, Zoning/Wetlands Enforcement Officer (644- 2511, x229) immediately upon approval notification. This is to re- confirm the contact person for the site and establish a site visit with that person to verify all erosion and sedimentation control measures are in place according to the plan. Application #88-33P becomes effective June 27, 1989 and expires on June 27, 1990. Ve truly yours, hn M. Moran, Jr. , Ch man Inland Wetlands Agency Conservation Commission immir. /pmm cc:John E. McCahill, Zoning/Wetlands Enforcement Officer Marcia A. Banach, Director of Planning John R. Collins, Chief Building Official Raymond Hallowell, Chairman, PZC Jerry Iazzetta, Town Engineer Enclosure t C � 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 SOR-co AREA CODE 203/644-2511 22 January 1990 Mr. David A. Brown 994 Farmington Avenue West Hartford, CT 06107 Dear Mr. Brown: re: Expiring Letters of Credit We have not as yet received any renewal of your expiring letters of credit as noted in our previous renewal request. Please be advised that discussion of this matter will be placed on the next agenda of the Planning and Zoning Commission, and calling of the letters of credit will be initiated at that time. Very truly yours, PLANNING AND ZONING COMMISSION r Louise C. Evans Chairman cc:ooPZC File M. Banach, Director of Planning pow M aa, r T-awn aps ?d&U&Gt 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 R-coy' AREA CODE 203/644-2511 31 January 1990 Mr. David A. Brown 994 Farmington Avenue West Hartford, CT 06107 Dear Mr. Brown: re: Expiring Letters of Credit The Planning and Zoning Commission is holding the following Letter(s) of Credit: ProJect(s) Bank Amount Expiration 3 David Brown Site Plan First Bank $10,000 04/12/90 u o of u u 11 71000 04/12/90 In accordance with our policy for accepting Letters of Credit in lieu of surety bonds, we must have an amendment to each expiring Letter of Credit well in advance, extending the term for a one year period from the expiration date. Will you please forward us the amendment promptly. Very truly yours, PLANNING AND ZONING COMMISSION t�J r Louise C. Evans Chairman c: PZC File M. Banach, Director of Planning •t4 a r T-0 0140� �• s v ti 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 AREA CODE 203/644-2511 ► �hOsoR•�ON�� June 19, 1990 David A. Brown 998 Farmington Avenue West Hartford, CT 06107 Dear Mr. Brown: Re: Application #88-33P At the June 18, 1990 meeting, the Inland Wetlands Agency/Conservation Commission approved with previous and standard conditions Application #88-33P - IWA/CC permit for th construction of office/warehouse buildings on property located on the northeast corner of Governor's Highway and Nutmeg Road North, I zone as shown on plans prepared by Fuss & O'Neill, Inc. , project #81-408 dated July 15, 1988 and revised August 18, 1988, March 17, 1989 and April 71 1989 . 1. Two blueprint copies of the entire set of plans and this letter reproduced thereon, must be submitt d to this Commission . This must be completed within 65 days of approval prior to any construction activity on the site. 2. Construction activities shall be subject to th approval of the Town Engineer. 3. The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . The permit is valid for one year and shall expir on June 18, 1991. 5. All approvals required must be obtained and submitted prior to any activity on the site. 6 . A contact person shall be identified directly on the plans. 7 . All original approval conditions shall apply to this approval per approval letter dated June 29, 1988. David A. Brown Page Two June 19, 1990 Very truly yours, James A. Lombardi, Chairman Inland Wetlands Agency/Conservation Commission JAL/pmm cc: Jerry C. Iazzetta, Town Engineer Marcia A.Banach, Director of Planning John R. Collins, Chief Building Official Planning & Zoning Commission Enclosure: copy of approval letter dated June 29, 1988 tgiM8 rA o � G V 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 AREA CODE 203/644-2511 07 February 1991 Mr. David A. Brown 994 Farmington Ave. West Hartford, CT 06107 Dear Mr. Brown: re: Expiring Letters of Credit The Planning and Zoning Commission is holding the following Letter(s) of Credit: Project(s) Bank Amount Expiration David Brown Site First Bank $10,000 4/12/91 David Brown Site First Bank $ 71000 4/12/91 In accordance with our policy for accepting Letters of Credit in lieu of surety bonds, we must have an amendment to each expiring Letter of Credit well in advance, extending the term for a one year period from the expiration date. Will you please forward us the amendment promptly. Very truly yours, PLANNING AND ZONING COMMISSION Louise C. Evans Chairman cc: PZC File M. Banach, Director of Planning �'1 N M +t44 T-o-wn' ates � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 f~�soR-Co� AREA CODE 203/644-2511 4 March 1991 Mr. David A. Brown 994 Farmington Ave. West Hartford, CT 06107 Dear Mr. Brown: re: Expiring Letters of Credit We have not as yet received any renewal of the expiring letter of credit as noted in our previous renewal request of 1/16/91. Please be advised that discussion of this matter will be placed on the 3/26/91 agenda of the Planning and Zoning Commission, and calling of the letter of credit will be initiated at that time. Very truly yours, PLANNING AND ZONING COMMISSION Louise C. Evans OY"t) Chairman cc: PZC File M. Banach, Director of Planning u 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 R.CO AREA CODE 203/644-2511 February 3, 1992 David A. Brown 998 Farmington Avenue West Hartford, Ct 06107 Dear Mr. Brown: re: Expiring Letters of Credit The Planning and Zoning Commission is holding the following Letter(s) of Credit: Project(s) Bank Amount Expiration DAVID BROWN SITE FB OF WH $ 10,000 04/12/92 DAVID BROWN SITE FB OF WH $ 7,000 04/12/92 In accordance with our policy for accepting Letters of Credit in lieu of surety bonds, we must have an amendment to each expiring Letter of Credit well in advance, extending the term for a one year period from the expiration date. Will you please forward us the amendment promptly. Very truly yours, � l Marcia A. Banach Director of Planning MAB/pmm yaw N a�,< s d 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 R•co� AREA CODE 203/644-2511 January 28, 1993 David A. Brown 998 Farmington Avenue West Hartford, Ct 06107 Dear Mr. Brown: re: Expiring Letters of Credit The Planning and Zoning Commission is holding the following Letter(s) of Credit: Project(s) Bank Amount Expiration DAVID BROWN SITE FB OF WH $ 10,000 04/12/93 DAVID BROWN SITE FB OF WH $ 7,000 04/12/93 In accordance with our policy for accepting Letters of Credit in lieu of surety bonds, we must have an amendment to each expiring Letter of Credit well in advance, extending the term for a one year period from the expiration date. Will you please forward us the amendment promptly. Very truly yours, P� - G- &4LJ� Marcia A. Banach Director of- Planning NAB/pmm .�w N Sao•, C-1 4 C V S 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 �f�dsoR co� AREA CODE 203/644-2511 January 26, 1994 David A. Brown 998 Farmington Avenue West Hartford, Ct 06107 Dear Mr. Brown: re: Expiring Letters of Credit The Planning and Zoning Commission is holding the following Letter(s) of Credit: Project(s) Bank Amount Expiration DAVID BROWN SITE FB OF WH $ 10,000 04/12/94 DAVID BROWN SITE FB OF WH $ 71000 04/12/94 In accordance with our policy for accepting Letters of Credit in lieu of surety bonds, we must have an amendment to each expiring Letter of Credit well in advance, extending the term for a one year period from the expiration date. Will you please forward us the amendment promptly. Very truly yours, Marcia A. Banach Director of Planning MAB/pmm Tlawn 014C s � 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 �osox,co� AREA CODE 203/644.2511 March 2, 1994 David A. Brown 998 Farmington Avenue West Hartford, CT 06107 Dear Mr. Brown: Re: EXPIRATION OF PERMIT #88-33P, David Brown Subdiv This is a reminder that the permit with the Inland Wetlands Agency/Conservation Commission, Application #88-33P will expire on June 18, 1994. If you plan to extend your project beyond the above expiration date, you must apply for an extension at least sixty-five (65) days prior to the expiration date. There will be a thirty-five dollar ($35.00) fee required for an extension of the permit. This includes a ten dollar ($10.00) surcharge assessed by the State, to fund the State Environmental Review Team. An application for an extension shall be made in accordance with the following subsection of the IWA/CC Regulations: a. The duration of any amendment or extension shall be for � er years unless otherwise specified in the permit. b. The application may incorporate by reference the documentation and record of the original application. c. The application shall state the reason why the authorized activities were not initiated or completed within the time specified in the permit. d. The application shall describe any changes in facts or circumstances involved with or affecting wetlands or watercourses or the property for which the permit was issued. e. In unusual situations the Agency may accept an untimely application to extend the expiration date of a permit if the authorized activity is ongoing and a 1 l ow the continuation of work beyond the expiration date if in its judgement, the permit is likely to be extended and the public interest or environment will be best served by not interrupting the activity; the application shall describe the extent of work completed at the time of filing and the schedule for completing the activities authorized in the permit. f. The Agency shall evaluate the application pursuant to these regulations and grant the application as filed, grant it with any Mr. David Brown - 2 - March 2, 1994 Application - terms or limitations, or deny it; and shall state upon the record the reason(s) for its decision. In the event that you are requesting an extension, section 8.1.6 of the Zoning Regulations establishes the process for monitoring the approved conservation plan. Per that regulation, a progress report is required from the applicant's engineer verifying that erosion and sedimentation control measures have been installed and maintained in accordance with the approved conservation plan. This verification report shall also be submitted 65 days prior to the expiration date of the permit to allow time for the Commissioners to evaluate your project controls. If work has been finished or will be finished by the expiration date, please . send a letter stating work is completed according to the approved plan. If you have any questions call me or John E. McCahill, Zoning/Wetlands Enforcement Officer at 644-2511, ext. 253. e truly yours, r ' ' 'Phyl l i M. Mann Recording Secretary ■ -60esi g .n rofessiona Is, inc, civil engineers • planners surveyors April 1994 Mr. John McCahill Wetlands Officer 1540 Sullivan Avenue South Windsor, CT 06074 Dear John: Re: David Brown Associates' Industrial Development Governors Highway and Nutmeg Road North Permit Extension Request Project No. 94-738 On behalf of our client, David Brown Associates, we hereby request an extension of the Permit No. 88-33P, as issued by the Inland Wetlands Agency/Conservation Commission. As you are well aware, the initial work has been completed (swale relocation and wetlands/detention area), and is stabilized. Additional industrial development, as approved by the IWA/CC and the PZC is expected to proceed in the future as market conditions improve . Construction of the initial work was consistent with the approved plan, including erosion control measures. Sincerely., Design Prof, sion s, Inc. By: Robe J. enault, E. Principal cc: David A. Brown 441C Governors Highway, South Windsor, CT 06074 (203) 291-8755 FAX: (203) 291-8757 f - DBA RECEIVED DAM D BROWN ASSOCIATES APR 11 1994 �. WINDSOR PLANNING DEPt. Building Management April 8, 1994 Phyllis M. Mann, Recording Secretary Inland Wetlands Agency Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Ms. Mann: RE: Extension of permit #88-33P David Brown Subdivision --------------------------------------- Thank you for your letter of March 2 regarding expiration of my wetlands permit #88-33P on June 18, 1994. Please be advised that I hereby request a five year extension of the above referenced permit, in accordance with the original documents, record, t rms and conditions. While most activities have been completed, including relocation of the Swale system to the tract's perimeter to allow for industrial development, we have not constructed any buildings to date due to the downturn in the economy. We still have every intention of developing the site for industrial purposes as the economy improves. We know of no other changes in facts or circumstances involved with or affecting wetlands or watercourses on the subject property. A progress report from my engineer, Robert J. Arsenault of Design Prof ssionals, Inc., is attached along with a check in the amount of $35.00 to cover the extension fee. Please call me if further information is required. A wn cc Enclosures cc:Design Professionals, Inc. 998 Farmington Ave. 0 West Hartford, CT 06107 0 236-2595 RECEIVED ROM - - -�—. -- - O L LA RS Account Total $ Amount Paid $ 5 TOWN OF SOUTH WINDSOR 1540 Sullivan Avenue , Balance Due $ �---- South Wii7dsor "THE EFFICIENCYO LINE"AN AMPAD PRODUCT-23-121 Connecticut 060?4 yaw N sE� C � U w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 f�dSae•co AREA CODE 203/644-2511 April 28, 1994 David Brown David Brown Associates 998 Farmington Avenue West Hartford, CT 06107 Dear Mr. Brown: Re: Application #88-33P, David Brown Subdivision At the April 27, 1994 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a three year extension of Application #88-33P with all original and standard conditions. Application #88-33P expires on June 18, 1997. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION Elizabeth A. Warren, Chairman Inland Wetlands Agency/ Conservation Commission EAW/pmm cc: Planning & Zoning Commission Town Engineer tow N S f,( s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soR.0 AREA CODE 203/644-2511 February 1, 1995 David Brown David Brown Associates 998 Farmington Avenue West Hartford, CT 06107 Dear Mr. Brown: Re: Expiring Letters of Credit Appl #88-33P, David Brown The Planning and Zoning Commission is holding the following Letter �f Credit: Project Bank Amount Expiration David Brown FB of WH $10,000 04/12/95 David Brown FB of WH $ 7 ,000 04/12/95 In accordance with our policy for accepting Letters of Credit in lieu of surety bonds, we must have an amendment to each expiring Letter of Credit well in advance, extending the term for a one year period from the expiration date. Will you please forward us the amendment promptly. Very truly yours, Marcia A. Banach, AICP Director of Planning MAB/pmm (OWN SE, w � Tio o-ps ?V&U&C�t 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 oe-co�'�� AREA CODE 203/644-2511 February 27 , 1995 David Brown David Brown Associates 998 Farmington Avenue West Hartford, CT 06107 Dear Mr. Brown: Re: Expiring Letters of Credit Application #88-33P, David Brown Subdivision We have not as yet received any renewals of the letters of credit which expire April 12, 1995 as noted in our previous renewal request of February 1, 1995 . Please be advised that discussion of this matter will be placed on the March 28, 1995 agenda of the Planning and Zoning Commission, and calling of the letters of credit will be initiated at that time if we have not received a renewal . Thank you for your attention to this matter. Very truly yours, 6 , &"' 1 Marcia A. Banach, AICP Director of Planning MAB/pmm �OVI N St. ,.q U 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 ���oSOR-CO AREA CODE 860/644-2511 February 9, 1996 David Brown David Brown Associates 998 Farmington Avenue West Hartford, CT 06107 Dear Mr. Brown: Re: Expiring Letters of Credit Appl #88-33P, David Brown The Planning and Zoning Commission is holding the following Letter of Credit: Project Bank Amount Expiration David Brown FB of WH $10,000 04/12/96 David Brown FB of WH $ 7,000 04/12/96 In accordance with our policy for accepting Letters of Credit in lieu of surety bonds, we must have an amendment to each expiring Letter of Credit well in advance, extending the term for a one year period from the expiration date. Will you please forward us the amendment promptly. Very truly yours, Ut 0--, Cf Marcia A. Banach, AICP Director of Planning MAB/pmm