Loading...
HomeMy WebLinkAboutWETLANDS PERMIT FOR SITE PLAN (3) cazte, C-Al--� t&j 4ti-g4_76C (,2� TOWN OF SOUTH WINDSOA INLAND WETLANDS AND WATER COUA APPLICATION A, ! 2 j 6b THIS APPLICATION, ONCE INFORMATION IS COMPLETE INLAND WETLANDS AGENCY ACTION (SEE BACK OF THIS FORM ECEIVED AT A REGULARLY SCHEDULED lkL&o&t&EkdblCY AT THE APPLICATION NO. TOWN HALL. RECEIVED DATE THIS APPLICATION MUST BE FILED IN TRIPLIMMISSION CATE AT THE OFFICE OF THE TOWN CLERK OF SOUTH WINDSOR BY PUBLIC HEARING DATE 12 NOON AT LEAST 14 DAYS PRIOR TO THE FIRST (it necessary) REGULAR MONTHLY MEETING DATE. THREE SETS OF MAP' COMPLETED APPLICATION OR PLANS MUST BE SUBMITTED TO THE TOWN ENGINEER PERMIT GRANTED DATE AT LEAST 14 DAYS PRIOR TO THE FIRST REGULAR PERMIT DENIED DATE MONTHLY MEETING DATE. PLEASE PRINT OR TYPE. 1. APPLICANT TEL NO. 2 0.07 cc - Z JF7'9 r7 AOOAES� 4 ��I IN SON Ada• CITY A STATE WEST RA�TFoI-17 . GT 2. OWNER 5^M G TEL NO. - ADDRESS CITY & STATE 3. LOCATION OF PROPERTY N6 GoItNEJt, Of= egoyislemolL's "y./ NUTMS& I'�� N• Il��tes�t NAMES OF AOJACENT PROPERTY OWNERS Allel*EXT � • VNt LLI/�/� YOV NCB ft 15AWATO1-E &Ar-OFALLO._ !e E V 1G Ssa.' ES STATE CLEARLY AMC BRIEFLY 5. PURPOSES AND OESCRIPTION OF THE PROPOSFM ACTIVITY.AND THE TIME ELEMENT INVOLVED: FII.WN67 W61I-AMC 5 Tf AT HAVO IEMN - 10015EVIO 25 r.'f n S'T V Koeq 15Y /KATI . 6K*ATI N& 46W AR.6AS T-44 AT WI VL KEVMT TO W9T1.AH t7S AI!'rER SrA61 L"ZATt01`1 ATTENTION: THE APPLICANT UNDERSTANDS THAT THIS APPLICATION IS TO BE CONSIDERED COMPLETE O ALL INFORMATION & DOCUMENTS REQUIRED BY THE AGENCY.HAVE BEEN SUBMITTED, APPROVAL MAY ALSO 8E NECESSARY FROM THE PLANNING AND ZONING COM- MISSION. AN APPLICATION FEE IS REQUIRED. CONSULT TIIF.JtEGULATIONS (SECTIONS 6.9. 6.9a and 6.9b) . A SIGN IS REQUIRED. CONSULT THE (SECTION 6.3a) . SIGNED: (Ap t) 00, VA VIP A- /?'r-,o&OJ �IM�i - (Ownw) llxr Q"Utl l uA i. APPLIC.UT HAS HAD MPS AND PUIiS CEnTIFIED BY SOIL ` CONSERVATION SERVICE TO VERIFY COMP LZ E COMPLL-%NCE WITH CONHECTICUT GUIDELINES FOR jUIL ER0SION AND S EDDIENT CUN.TROL ( AZ PER F-:.IDBOUK, A6 r'X&MDEDED, AND PUBLIC ACT 83-388, AS Ai�iENDED. DATE OF CERTIFICATICH 7. APPLICAT I CN INF ORMAT I0U COMP LIES WIT.H AGENCY'S REGULATIONS ( SECTIONS 7.I, a through j. 86 REQUIRED FEE HAS BEEN PAID. DATE RECEIVED APPLICANT ( OR DESIGNATED REPRESENTATIVE) ATTESTS THAT A SIGX WILL BE POSED AT THE FOLLOWING LOCATION(S) NUTMa& 90^9 NOICTH i� Gayt�leNyrt.'S Hl&tiWAY ODU N DAKI E�S BY _ DAV I P A. 13le0 W/N _( NAME ) OR OR BEFORE ThE F DATE SIGNATURE 17 ��oA• d44WN THIS AP P LICAT ION IS FOUND TO BE COMP LET E AND NOW QUALIFIES FOR PLACEMENT ON THE AGENCY'S AGENDA: DATE SIGNATURE Town Engineer Agency Sec'y Agency Chairman THIS APPLICATION IS INCOMPLETE BECAUSE OF THE FOLLOWING UUMBERED IT EMS ( FROM ABOVE ) AS CHECKED BELOW: 6 7 8 9 TOM OF S un M INLAND � COt1R , WAT� s CONSSRYATIO CATION ��3 3� MAY 21 199f► �APPLICATIOX �. DATE RECEIVED South Windsor INSTRVCISOUS WETLANDS AGENCY/ 1. The application. ■ap and piaIIet submit ICONSERVAn COMMISSION together forth in the Inland Wetlands. Watercourses and Conservation Regulations To feS ut 'et Windsor. (See Regulations, Section VI). nth 2. The South Windsor Inland Wetlands, Watercourses and Conservation Regulations should b reW"Wed Frith respect to the standards and criteria Toe application evaluation. (Se Regulations, Sections Vill - X). j. The applicant understands that this application is to be considered canpiete only when all inf r atiou and docueents required by the Agency have been subaitted. (See Regulations Section VII). A. APPLICANT'S XA Z David A. Brown AMU-S JW Farmington Avenue West Hartford, CT /p PHONE: t 8 ) (WORK) 2 3 6-2 5 9 5 S. LEGAL ONNSR'S NAM: Same - ADDRISS PHONS: (son) (VORK) (List additional owners, addresses, and phone numbers on back of application). C. IF TSS APPLICANT IS NOT TSS 0(11 OF TSS S=JECT PROPUTY, A LITTER IT TSS PROPERTY OVMM(S) AMMI=IM TIN PRAPOSSD ACTIVITY SIT FORTS IN THS APPLICATION MUST ACCOHPANY TRIS FORM AND WILL SS PART Of TSS APPLICATION. D. PROJECT NAM (if any) Nutmeg Business Park i. Contact Person 5i! further information is needed). David Brown - same as a ove It. THS GIOQRAPS=CAL LOCATION Of TSS PROPIRTY W CS IS TO SS AFFSC?SD ST TSS PROPOgm RDGQZ.ATSD ACTIVITIES INCLUDING A DISCRIPTION OF TU LAND IN SVFFICISNT DETAIL TO ALLOW IDENTIFICATION OF THS PROPIRTY ON TSS INLAND NSTLAND AM WATERCOURSES MAP. 38 acre parcel on the N.E. corner of Governor's Highway and Nutmeg Road. The property fronts Governors Highway for 2,300 feet and Nutmeg Road for approximately 600 feet. PAGE 1 F. NAMES OF ALL ABUTTING PROPERTY OWNERS: (USE SEPARATE SBEET IF NECESSARY) See attached sheet --T G. HAVE YOU UM ALL ABUTTING PROPERTY OWNERS BY CERTIFIED LETTER THAT AN APPLICATION IS P3EDM BZPORE THS AGENCYt. yes _ **(You are required to supply a copy of the letter with the list of the names of the abutters).** H. PURPOSE AND DESCRIPTION OF ALL PRoPOSSD ism MATED ACTMTY(S) MCLMnM AMO NT AND TYPES Of FILL AND THE TIIM ZLEMM nwoLVEDs This is a refiling. Regulated activity has been completed except for building construction. I. A CLASS A-Z MAP Of THE PROPERTY DRAWN TO 1'-40019 SHOWM THE ARIA TO Bs DEVMPZD, E M=T OF THZ WETLANDS AND WATERCOURSES AFFECTED. TOPOGRAM, EXISTING AND PZOIOSM ACTIVITIES AND NABS AND LOCATIONS Of ADJACENT PROPERTY OWNSRS MUST BE SUMT?ED. J. ACRZAQZ OF WETLANDS AND WATERCOURSES TO BS ALTERED: Alteration complete R. ACREAGE OF WETLANDS AND WATZRCOURSZS TO BS CREATMI Creation complete L. LINEAL FEE? OF VZOPOSED STREAM ALTER!?=on N/A M. TOTAL LAND AREA OF PROJECT AND PERCINTAal WSICg IS WETLANDS: 38 acres 50% by soil type only. N. IDENTIFY ALL OTBER PERMITS OR APPROVALS TEAT BAVZ BEEN ISSUED. APPLIED FOR, OR ZEQUIZED NITS RZSPZCT TO THE PROPOSED ACTIVITY SST FORTS IN THIS APPLICATION. (These may inaluds but n t be limited to. local Planniag- i Zoning, Zoning Board of Appeals, D.E.P., F.E.M.A., D.O.T.. The Army Corps of Engineers. and any othss State, Local or Federal Permits.) Town of South Windsor IW WCC permit approved Town of South Windsor Planning & Zoning approval 0. TSE APPLICANT (OIL DESIGNATED REPRnEr'! Y ATTRITS TRAT A SIGN VJ_ML Ss POSTED AT TRZ FOLLOW= LOCATION'IS on the property visible from Governors Highway. by ON OR BEFORZ THE FOLLOWING DATE: June 2 0, 19 9 0 NAM David A. Brown SIGNATURE: THESE SIGNS MUST BE DISPLAYED CONTINUOUSLY FOR AT LEAST FIVZ DAYS PRIOR TO SCHEDULED MEETING. (See Regulations, Section 6.3a). PAGE Z do- TU UNDIUMNED HUZY APPLIES FOR TIM ACTIVITIES LISTED IN P HAPD A INLAND 1i!?I�. W♦?ERCOORSES AND CONSERVATION � Ow?ION PINQ? M ?8s P�OP�?Y DESCRIBED5 M• FOt CONFIM THATsHUM AM • I. HE IS van Tu WNCTIVE-INLAND VULAND, WATERCOURSES OMS INDSOl. AND COIISstY♦?IOt 0r ?a of Soo= W 2. Hs/SMs an M TUT AT ANY TUM DOM Tas REVIEW PERIOD. TNZ AGENCY MAY APPLICANT TO PROMS MU PRO T=ON ASOMT ?Ms AND/OR WATERCOURS=S �Q THE AND/OR ANY POSSD ACTMTY. 3. ALL 3MYONUTION SUM4430 IN THs APPLICATION FOR sEVW SMALL as COUIDEM FACTUAL TU CASs OF AMCZP♦TED ACCTMT1r, D�XNo. ♦ UOUM t♦M= of Tss APPLICANT os ANy O Olt =: RISIM AGENTS TO PROVIDE COSRNC? ON. OR P �CEiDIN4 ?Ms LEVELS Ot 0l ACTIVITY ANTWIP♦?m, SMALL Ds SUMCIRM? GZpU OD Ot A P SQL?t0 Ili? MMIM TWI 4. BY MAE= TM APPLICATION. TMs APPLICANT GIVU P=IRSSIOW ?O TZZ MM W♦ si AM COUIRTA21ON C=M8ION MWERS AM/OIL ITS REPsii�:AM 2 LANDIV PORTI 0 EN ONS os TMs PREMSU UBICM An SULIM OV Tss APPLICATION POOR ?Ni Pass of tHs CcTI AND INVESTIGATION AND OTBE WSs WALVATIM TMs GRITS of Tss APPLsCATIM IM AFTER ♦ rML DNCISION HAS a,=N 1310=. &gnat of Applicant — Date Hec IT" and filed at the office of the Planain� ft dad of pastaest this 19 Signature of Scent Date FEE RECEIVED YES_ NO AMOvfI? VATS INCEIVED by PIMIT GRANTED DA?S PEl1Q? DININD DAIS PAU 3 Y' OPERATION AND MAINTENANCE PLAN b µ �vj APPLICATION 88-33P L �r� DAVID BROWN SITE '�j t r ` S GOVERNOR'S HIGHWAY (,(f S� c� '� SOUTH WINDSOR, CT This plan shall become part of the deed so that subsequent owners follow the established maintenance program and schedule. SWALE AREA 1. Inspect the swale annually by walking the entire length, noting erosion and seepage areas, depressions, and rodent holes. Repair erosion damage and revegetate as called for in the original specifications for permanent seeding. Fill in rodent holes and revegetate. If rodent damage is more than minimal, devise and initiate an eradication plan. Cut all woody vegetation within the swale at ground level and treat to insure that it does not become reestablished. 2. Examine rock riprap and bedding (if visible) and make repairs necessary to meet original requirements. Rock shall be durable and resistant to weathering; shales and siltstone shall not be used. Remove any siltation and regrade to proper pitch to insure proper drainage of the swale. 3. All areas void of vegetation shall be reseeded with the permanent seed mixture as called for in the original specifications. 4. Mow all vegetated areas at least annually. DETENTION AREAS 1. Cut all woody vegetation within 15' of the outlet and inlet channels. Remove dead trees, snags, and debris which may block the functioning of the outlet during a flood event. 2. Inspect any trees and shrubs planted under the construction contract and prune, replace or supplement woody vegetation as necessary. 3. Inspect and clean the culvert under Nutmeg Road North to insure free drainage so that the road does not act as a "dam" during flood events. INLET & OUTLET STRUCTURES 1. Take immediate action to repair spalled or cracked concrete by replacement with a high strength, non-shrink, non-metallic, cement-based grout. 2. Check for erosion or settlement around concrete structures. Fill any settled areas with a properly graded gravel or crushed stone filter material. 3. Riprap and bedding in the channel should be inspected for displaced, dislodged, or deteriorated materials. Properly graded and durable materials shall be used to repair damaged areas. Inspect the channel for growth of woody or other vegetation which restricts flow. Remove if present. Inspect the earth portions of the outlet channel for erosion on the, side slopes and bed. Stabilize eroded areas by regrading to a stable side slope and installing vegetation, jute matting, or riprap as necessary. 87-408 Corres. 0330A89BAK 4 +0�so" ee�ec( f4iSr i ii c y l� C s 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 AREA CODE 203/644-2511 �SOR•GOB TO: Marcia A. Banach, Director of Planning FROM: John E. McCahill, Zoning/Wetlands Enforcement Officer RE: David Brown site: Review and comments on the "Final Plans" for the site. 1 . The IWA/CC does not have plans reflecting the most current changes dated 3/17/89 . Three copies of revised plans should be submitted to IWA/CC prior to construction. 2� Although a consultant with experience in the creation of wetlands has addressed the Commission, the written plan is very general and needs to be clarified to provide details for construction activities. Philip Barske, PhD has provided the "concept of creating a shallow marsh" . In the concept outline there are many site variations which may require modifications to site work. This must be reflected on the plans or we may end up with the plans as shown, whether they work or not, for the site. Who is to decide which is best for the site as it progresses? 3 . There is now some well data indicated on the plans . This, and any other groundwater data available, should be utilized and basin contours further refined on the plans . ./ 4 . Sheet number 7 of 11 "note - refer to plot-plan sheet 3" , should actually reference sheet 4 . do 5 . Details should be provided for the rip-rap of the bends in the swale. .� 6 . Sheet 5 of 11 indicates a snow fence to be placed "when clearing is complete" . I believe the intent of the snow fence is to also act as a limit of clearing. Limits of construction in general need to be physically established on the site. 7 . Area of disturbance is to be limited. There is no phasing or other means of limiting amount of disturbance indicated on the plans . _---_ 8 . Stump deposition was a topic of concern. There is nothing on the plans to indicate the disposal of stumps . 9 . IWA/CC approval condition #12 indicates a concern for effects on the groundwater table up and downstream. This has not been addressed as of yet. 10 . The detention area (which will act as a siltation basin) , proposed swale, and wetlands creation should be given priority on the plans . These areas should be stabilized prior to remaining construction activities taking place. (AA, SOIL SCIENCE SERVICES 104 Elm Street, Cheshire, Connecticut 06410 SOIL REPORT TO: Fuss & O'Neill, Inc . SSS Job No. 87-716-CT-SWI-15 210 Main Street Client Job No. Manchester, Site Inspection Date PROJECT TITLE AND LOCATION Casle Corp. , Governor' s Highway & Nutmeg Road, South Windsor, CT PROJECT DESCRIPTION:Inland wetland identification and classification of soils METHOD FOR IDENTIFICATION OF MAP UNITS Wetlands X� Field marking(flagging) for survey. Field plotting on Property Line Map , scale: 80 contour: 2 f t . Field plotting on aerial photography. Non Wetland Soils 0 High intensity field identification by Soil Scientist. Medium intensity identification from USDA, Soil Conservation Service Soil Maps. METHOD OF SOIL IDENTIFICATION SOIL MOISTURE CONDITION X❑ Spade and Auger Dry ❑X Moist Wet Ej Deep test pits (backhoe) Frost Depth in. Other Snow Depth in. The classification system of the National Cooperative Soil Survey, USDA,Soil Conservation Service and the County Identification Legend were used in this investigation. The investigation was conducted by the undersigned Certified Soil Scientist. All wetland boundary lines established by the undersigned Soil Scientist are subject to change until officially adopted by local, state or federal regulatory agencies. Respectively submitted by Approved b PP J' SOIL SCIENCE SERVICES Soil Scientist Kenneth C. Stevens,Jr Field Investigator Principal Soil Scientis See attached page(s) SOIL REPORT continued PROJECT TITLE: Casle Corp. , Governor's Highway & Nutmeg Road, South Windsor, CT MAPS/PLANS TRANSMITTED TO CLIENT 0 Sketch location of Wetlands and other Soil Types. None NUMBERING SEQUENCE OF WETLAND BOUNDARY LINE MARKERS 1 THRU 7/46 8 THRU 35/111 36 THRU 46/7 36/47 THRU 63 SUMMARY SOIL DESCRIPTIONS WETLAND SOILS Walpole sandy loam (Wd) . This is a poorly drained, moderately coarse over coarse textured, friable over loose glacial fluvial (outwash) soil. NONWETLAND SOILS Windsor loamy fine sand (Wv) . This is an excessively drained, moderately coarse over coarse textured, loose, glacial fluvial (outwash) soil. Sudbury fine sandy loam (Ss) . This is a moderately well drained, moderately coarse over coarse textured, friable over loose glacial fluvial (outwash) soil. For further information about the soils, refer to Soil Survey, Hartford County, Connecticut. SOIL SCIENCE SERVICES 104 ELM STREET•CHESHIRE, CONNECTICUT W410 203-272-7837 KENNETH C.STEVENS,JR.,PRINCIPAL SOIL SCIENTIST THOMAS W.PIETRAS,SENIOR SOIL SCIENTIST VIRGINIA E.BURKHARDT,SENIOR ECOLOGIST December 14, 1987 Christopher Stone Fuss & O'Neill, Inc, 210 Main Street Manchester, CT 06040 Re: Casle Corporation, Governor's Highway and Nutmeg Road, South Windsor, CT S.S.S. Job No. : 87-716-CT-SWI-14 Dear Mr. Stone: At your request I inspected the site for the purpose of identifying wetland soils. The inspections were made on various dates between 11/02/87 and 12/11/87. Several site inspections were neccessary. At my request, other soil scientists reviewed the site with me for consultation. The soils and site conditions are rather complex. Poorly drained soils were identified with the aid of a spade and auger and consequently marked off from the non-wetland soils with consecutively numbered orange survey tapes. The site occurs on a broad outwash plain containing deep sand deposits over glacial lacustrine silts and clays. Hummocky topography with broad flat areas were typical of original conditions. The soils originally formed under forest vegetation with a seasonal high ground water which remained at or just below the surface of the low lying areas. The poorly drained soils found in these lower lying areas are characterized by a deep, very dark gray A horizon over a distinctly mottled sandy loam B horizon. The underlying C horizon has distinct mottles and is light grayish brown to light olive brown sand. The elevated areas contain moderately well drained soil with a dark brown A horizon overlying a bright brown sandy loam B horizon. The lower part of the B horizon is commonly mottled medium brown sandy loam. The separation of poorly drained from moderately well drained soils is readily apparent in the hummocky landscape of the forested area of the site. The broad depressional areas contain thick growths of sweet pepperbush and large red maple trees. The maples show root buttresses which indicated they have grown in long periods of soil saturation and seasonal water ponding. The soils present on the hummocks are non-wetland containing much less undergrowth with a dominance of large upland oak trees. The soils present in the field have been disturbed from past agricultural practices. The original hummocky topography has been changed to a flat to a gently sloping landscape. Both poorly and moderately well drained soils occur in the field. A very hard ironpan layer at 15 inches is present in some soil areas of the field. The ironpan has a dark reddish brown coloration with a thickness varying INLAND WETLANDS IDENTIFICATION ENVIRONMENTAL ASSESSMENTS SOIL CLASSIFICATION AND MAPPING from 2 to 6 inches. The horizon above the ironpan is a very dark topsoil while below is present a light olive brown to light olive gray mottled sand. The ironpan is associated with both poorly and moderately well drained soils on the site. Disturbances from agriculture have resulted in the formation of soil mapping complexes witnin the field. Within areas identified as poorly drained soils, there are small inclusions of moderately well drained soils which, due to the soil complexity cannot be mapped out as a separate unit. Likewise, within the moderately well drained soils there are areas of poorly drained soils which cannot be mapped separate. It was evident throughout the period of my site inspections that the hydrology of the site has changed significantly. Relatively dry to slightly moist conditions were present in the poorly drained soils. The seasonal high ground water table was not present in any of the poorly drained soils. Past drainage work on the site included the construction of ditches and likely tile drains. Drainage work throughout the locality has also likely added to the significant change with the present hydrology. The main ditch which runs from west to east along the edge of the field has a depth of four feet. No water or soil saturation was present in the ditch during the inspection. The permeable nature of these soils make them relatively easy to drain when an outlet is available. It appears that water levels have dropped by two or more feet in these soils. In addition, during the wettest times of the year these soils may become saturated, but likely for much shorter periods than was formerly characteristic. The delineation of the soils having poorly drained features on the site was made in an attempt to identify the existing wetlands. Due to past disturbances to the site, the soils have become drier than under the conditions through which they have formed. The presence of mottled soils throughout the site and the well established wetland vegetation within the forested area indicate that wetland conditions were once associated with extensive areas on the property. The wetland soils delineation which I have made provides the approximate location of the original wetland areas plus some disturbed poorly drained soil areas within the field. At the present time drainage conditions have made the site drier and this should be noted by any regulatory agency making a review of the property. If in the future the present drainage conditions are altered and allowed to revert back to their previous drainage condition, then the delineation of the poorly drained soils would be of greater importance. The poorly drained soils would be characterized by a seasonal high ground water table at or near the surface, be capable of supporting wetland vegetation and be able to provide a variety of wetland functions. Respectfully submitted, SOI SCIENCE SERVICES Thomas W. Pietras Soil Scientist (Certified) SOIL SCIENCE AND ENVIRONMENTAL SERVICES, INC. 104 h&feet . FrUilrei—Ponnect!cut 0641 20 - KENNETH C.STEVENS,JR.,PRINCIPAL SOIL SCIENTIST WO THOMAS W.PIETRAS,SENIOR SOIL SCIENTIST VIRGINIA E.BURKHARDT,SENIOR ECOLOGIST APR ] 1988 February 12, 1988 South Midsor Planning & Zoning Commission Betsy Kaemmerlen Fuss & O'Neill, Inc. 210 Main Street Re: Castle Corp. , _Governor's Highway & Nutmeg Road, South Windsor, CT Dear Ms. Kaemmerlen: At your request I am providing additional information about the wetlands on the site. As has been previously reported, I found poorly drained wetland soils to cover large areas on site in a complex pattern. There is a notable difference between the areas marked as wetland within the open field versus the forested land. Within the forest, the soils are undisturbed and contain distinct soil profiles formed over a long period of time. Poorly drained soils occur in the low flat forested land while better drained soils are located on the raised hummocks. Wetland forest vegetation is closely associated with the poorly drained soils. The upslope better drained soils contain a predominance of upland drier type forest vegetation. In my opinion, the poorly drained soils in the forest would be judged as wetlands under the criteria used by the Army Corps of Engineers. In the open field, the effects of land leveling and plowing over a long period of agricultural use are reflected in the soils. The soils in the field are frequently a transitional mix of wetland and non-wetland characteristics. The vegetation in the field consists mainly of grasses and herbaceous species which commonly grow on both wetland and non-wetland soils. In my opinion the poorly drained soils located in the field do not qualify as wetlands under the criteria utilized by the Army Corps of Engineers. During my inspections which occurred in November and December, 1987 I notably failed to detect a ground water table within the poorly drained soils on the site. There was no ground water table within 36 inches of the soil surface. In combination with on-site ditches and possibly tile drainage in the field, drainage projects throughout the general locality have likely lowered the seasonal ground water table elevations. In order to make a better determination of the recent changes in hydrology on the site, it is recommended that periodic site INLAND WETLANDS IDENTIFICATION ENVIRONMENTAL ASSESSMENTS SOIL CLASSIFICATION AND MAPPING inspections be made throughout the winter and spring months. These inspections would be made to detect surface water ponding or saturated soil conditions within the poorly drained soils. If the results of the inspections show relatively dry soil conditions throughout the site for this period then dramatic drainage changes have likely occurred. If however, a seasonal high ground water table remains at or close to the soil surface in the wetland areas then the poorly drained soils would appear to be accurately reflecting wetland conditions. A better understanding of the actual wetland conditions existing on the site will be essential for the eventual determination of environmental impacts resulting from the proposed site development. Respectfully submitted, SOIL SCIENCE AND ENVIRONMENTAL SERVICES, INC. tSm� r� Thomas W. Pietras Soil Scientist (Certified) C r CIO Tia apS ?d&&46at e � 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 f��soR•co�'` AREA CODE 203/644-2511 May 2, 1988 Mr. John M. Moran, Jr. , Chairman South Windsor Inland Wetlands Agency/Conservation Commission 1540 Sullivan Avenue South Windsor, CT 06074 RE: Application Review - David Brown Associates - #88-33P Dear Mr. Moran: The plan presented indicates an intense activity of about 7 acres around the buildings plus 0.8 acres of swale out of the 38. 6 total for this application. The wetlands have been field located and they have shown the variation from the Town Mapping. The regulated activity would include sections 2.1.i, j & k, 5. 1 and 5 . 2 of the regulations plus our map should be modified per section 3 . 2. It appears that about one half of the building area falls within the wetlands. They also indicate that the constructed swale and detention area shall become wetlands. The initial issue would be whether a permit would be granted for the removal of this wetlands from the inventory and creation of a new area would be adequate. There are no specifics that goes with the creation, it would take more than just a note on the plan. There should be an educated opinion of this proposal on the water if such a permit were granted, the Erosion & Sedimentation control plan would be the next issue before the Commission. There are no dimensions on Sheet 4 of 9, a number of assumptions are made such as slopes shall be no greater than 1' vertical to 4' horizontal, there will be a 15' non disturbance buffer along the boundary to preserve the existing hard wood trees. In the Erosion & Sedimentation control notes #3 "Land Disturbance to be kept to a minimum: restabilization will be scheduled as soon as practical" , is an impractical solution. Individual siltation basins can protect this flat site for storm protection, the major erosion problem could be from the wind. There is a potential of over 7 acres exposed to the wind at one time for no reason . The second item in the construction schedule, haybales and/or silt fencing are to be placed in the bottom of the swales that are being dug in Item 5. A modification in the sequence could include only one building permit at a time and only issued after the detention area and Swale have measurable grass cover. This isn't a solution, but they should show a realistic construction approach. Mr. John J. Moran, Jr. RE: David Brown Associates If an Inland Wetlands permit were granted with conditions, they could include: 1. Modifications to the plans to show maximum 4:1 slopes, stockpile location, limits of construction, buffering of J neighbors, siltation basins, extend anti-tracking apron to existing pavement and resolve the conflict between the construction schedule and the E & S control notes. 2. Item 3 in the E & S control notes to be adjusted to 30 days or as directed. 3 . Significant or specimen trees should be located along NF Albert J. Schneider and methods of their preservation should be shown. 4 . Dust protection should be addressed on the v P plan. 5 . The effect on the ground water table should be addressed. Up and downstream. 6 . The plans are marked "Not Released for Construction" which is correct. Prior to construction the plans as modified shall have to be approved. 7 . A bond would be required to cover the compliance requirement. If on 3 . 86 acres, this should be indicated. Very truly yours, .52 A. Bowen Davies Deputy Town Engineer ABD/jsv cc: David A. Brown Michael J. Gantick, Director of Public Works Marcia A. Banach, Director of Planning John Shemo IWA/CC 0 r10 FUSS8c MBLL consulting engineers MAY 9 1988 May 9, 1988 South Windsor INLAND 'WETLANDS AGEN'CY1 NERVATION OOMIWISSIOP4 Wetlands Commission Town of South Windsor Connecticut RE: David Brown Subject: Wetlands Hearing Dear Mr. Chairman: Due to a sudden illness on our consulting team, we are not able to present our plans to you this evening. Please table it tonight and we will be at your next meeting. Thank you. William D. O'Neill President /PJ g 0509ABAK.2 210 MAIN STREET / MANCHESTER, CONN. 06040 / TELEPHONE (203)646-2469 SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS 9 EROSION CONTROL•WATER SYSTEMS•HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING HIGHWAYS and BRIDGES•SURVEYING•LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC*PUBLIC WORKS MANAGEMENT•HYDROGEOLOGY c w" SE+ co U 7-a oi4c s ?d&zd44'0t 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 l��soe•co AREA CODE 203/644-2511 June 1, 1988 Mr. John M. Moran, Jr. , Chairman South Windsor Inland Wetlands Agency/Conservation Commission 1540 Sullivan Avenue South Windsor, CT 06074 RE: David Brown - Fuss & O'Neill Report of May 23, 1988 Dear Mr. Moran: The supplemental information doesn't change the obligation of the Agency to address the feasible and prudent aspects for development of the wetlands with the issuance of a permit. Their drainage input does require more detailed information, not for the commission action, but overall development of the 95 acre watershed. An expansion of their report could result in 70 acres of impervious coverage discharging down a 3,500 L.F. open channel at a minimum grade to the 24" outlet at Nutmeg Road North. This can be a delicate maneuver where an inch here and there could make it impossible to drain the abutter without an excessive expense. Their proposal for construction from the outlet upstream should be reflected in sufficient and appropriate detail on their plans maintaining drainage from the abutter. Their proposal for a swale along the northerly boundary cannot be covered in a paragraph or so. In keeping with the "Guidelines" , there should be an area of non disturbance around the mature trees in this "buffer area" . The plans should be modified to show the trees in this area and the protection proposed. Perhaps a reduction of the building length could ease the impact. The "creation of a more valuable wetlands environment" does require more detail. A recent site that was over excavated to bring the watertable closer to the surface installed an aeration system to retard the algae growth, resulting in a motorized wetlands . An open water pond isn't what I envision as a wetland enhancement. Mr. John M. Moran, Jr. , Chairman Page 2 Inland Wetlands Agency In summary, the plans are not for construction. Pending a decision on a wetlands permit, the plans should be revised and heard after modification. Very truly yours, A. Bowen Davies Deputy Town Engineer ABD/jsv cc: David Brown Michael J. Gantick, Director of Public Works Marcia A. Banach, Director of Planning John Shemo, EDC IWA/CC File DBA DAMD BROWN ASSOCIATES Building Management June 212 1988 William Young Salvatore Garofalo 584 Governor's Highway South Windsor, Ct. G6074 Gentlemen, I, David A. Brown, an abutter to your property, have sub- mitted to the South Windsor Inland Wetlands Agency, Conservation Commission, an application (#8833P) requesting permission to fill Wetlands that have been previously disturbed by man, and to recreate new areas that will revert to wetlands after stabiliza- tion. This application will be heard before the Inland Wetlands Agency/Conservation Commission of the town of South Windsor, on Monday, June 27, 1988 at 7:30 p.m. Should you wish to review the proposed activity or have any questions concerning this application, please call Phyllis Mann, secretary to the Commission, or or before June 27. Please call her at the South Windsor town offices (644-2511, Ext. 253) between the hours of 8 a.m. and 4 p.m. Sincere o s, a A. Brown DAB:ksl Owner/Applicant cc: Phyllis Mann, Inland Wetlands Agency/Conservation Commission ALSO: Martin & Lee Rulnick 550 Governor's Highway A.S. Associates P 0 Box 684 Mr. Albert J. Schneider 330 Governor's Highway 998 Farmington Ave. 0 West Hartford, CT 06107 0 236-2595 Jim •C, V&U&Ot 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 ~�soR•co� AREA CODE 203/644-2511 June 29, 1988 David A. Brown 994 e t Hartford, CT 061 RE: Application #88-33P - avid A. Brown Site D r Sir: At the June 27, 1988 meeting, Inland Wetlands Agency/Conservation Commission approved with modifications Application #88-33P for the constsruction of an industrial building on the northeast corner of Governor's Highway and Nutmeg Road, I zone as shown on plans prepared by Fuss & O'Neill, Consulting Engineers dated 3/4/88 and revised 4/12/88. The following modifications must be adhered to for this permit to be valid. 1 . Three (3) blueprint copies of the approved map with all modifications be submitted to the IWA/CC within 65 days for review prior to any construction activity on the site. 2 . Construction activities shall be subject to the approval of the Town Engineer. 3 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . We recommend a bond in the amount of $10,000. to be submitted to Planning and Zoning Commission to ensure compliance with the Erosion and Sedimentation Control Measures . 5 . The permit is valid for one year and shall expire on June 27, 1989 . ------- 6 . All approvals required must be obtained and submitted prior to any activity on the site. 7 . A consultant with experience in the creation of wetlands must be contacted to come up with a program for the wetlands creation. A written plan must be submitted with specifics on how they plan to establish the new wetlands. No building permit will be allowed until the plans are submitted to IWA/CC. 8. Modifications to the plans to show maximum 4:1 - slopes, stockpile location, limits of construction, buffering of neighbors, siltation basins, extend anti-tracking apron to existing pavement and resolve the conflict between the construction schedule and the E & S control notes. 9. Item 3 in the E & S control notes to be adjusted to 30 days or as directed. 10. Significant or specimen trees should be located along NF Albert J. Schneider and methods of their preservation should be shown. 11 . Dust protection should be addressed on the plan. 12. The effect on the ground water table should be address d, up and downstream. Very truly yours, John M. Moran, Jr. , Chairman JMMJr. ,/pmm Enclosures cc: A.B. Davies, Deputy Town Engineer Raymond Hallowell, Chairman, Planning & Zoning Comm. John R. Collins, Chief—Building Official Michael Gantick, Director of Public Works Marcia Banach, Director of Planning Fuss & O'Neill, Consulting Engineers The Casle Corporation Avon Park North 200 Fisher Drive Avon, CT 06001 ' (203) 674-9000 FAX (203) 676-9576 December 14, 1988 - Ms. Marsha Banack - Planning Director Town of South Windsor 1540 Sullivan Ave. South Windsor CT 06074 RE: Application # 88-33 , David A. Brown Site Plan - IWC Letter June 29, 1988 - PZC Letter August 9, 1988 Dear Ms . Banack, The Owner/Developer David A. Brown has agreed to abide by the comments concerning his Inland Wetlands Agency/Conservation Commission approval of June 27, 1988 and his Planning and Zoning Commission approval of July 26, 1988. Attached are six (6) copies of the Wetland Creation Plan and narrative concerning its concept/execution prepared by Philip Barske. I reviewed the above with the Commission at there November 19, 1988 meeting and received a positive response. Phil Barske and his associate will be involved in the total process of developing the new wetlands areas. Fuss and O'Neil has submitted the required six (6) copies of the revised site plans to your office, including milars of drawings # 2 and # 4 , on September 81 1988. David Brown is ready to post two (2) letters of credit to cover the $7, 000 Landscape Bond and the $10, 000 Erosion and Sedimentation Bond. The banks of the swale will be seeded with Crownvetch while the swale bottom and two (2) feet up each side will be seeded with a grass mixture of 20% Kentucky Blue Grass, 20% Tall Fescue, 25% Red Fescue, 1500- Perennial Rye Grass and 5% Red Top. Phil Barske feels the above provides the best low maintenance ground cover for the swale. Dave Browns lawyer is investigating how the maintenance of the swale can be incorporated into chain of title for the property. Maintenance of the swale would include the picking up of trash and debris quarterly and the removal of silt deposits when it impedes the design flow of water. The remaining terms on both the IWC approval and the P & Z approval will be complied with and addressed as they are required in the construction process, hence I feel the plans are ready for the Town's final review/sign off. If you have any questions feel free to give me a call . We appreciate both your and Liz's assistance in obtaining IWA/P&Z approvals. Si erel Andrew B. "Srdith --" pc: David A. Brown A0 sf,< ~ V/ so C V 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 SOR-C�a� AREA CODE 203/644-2511 March 15, 1989 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Jerry C. Iazzetta, Town Engineer RE: David Brown Site As a prerequisite to a preconstruction meeting, we have reviewed the "Final Plans" for the David Brown Site and have the following comments: 1 . Planning & Zoning approval letter stated the plans should be modified to show a maximum 4 :1 slope. The details shown on sheet 11 indicate this, however the plans are showing a 2:1 slope at the swale. This should be revised to show the proper impact and limits of gk-a- ing. 4 2 . Planning & Zoning approval letter asked that limits _of construction be shoes drawing. There are none shown. 3 . Planning & Zoning approval letter requested sjltatjon _basins, be shown. This has not been done. 4 . Inland Wetland approval letter asked that the 50' buffer along the east bounc _ �jB.e .be pshown ron the Plot Pam. This is not shown. -t, 0j(c 5 . Inland Wetland approval letter stated "Riprap is needed at- all bends of xale" . Riprap is shown for one side only. 6 . Sheet 5 note number 7 states that riprap is to_be laced at all culver-t discharge areas . This was not shown on drawings . 7 . We request the elimination of the note "Not Released For Congt��on" from all drawings . With this note in place-",the drawings cannot be classified Final Plans . i 8 . Planning & Zonina.. letter asks that a written plan for th_e wet ands �rA�t?�rbe submitted. We do not know if this has been done - we have not seen it. 9 . Planning & Zoning approval letter states that the fect,�n the groundwater table should be *addressed both up and downstream. This has not�been done: JCl/jsv O FVSS&01Y8LL D consulting engineers may APR 1989 South Windsor INLAND VVETLANDS AGENCY/ April 24, 1989 CONSERVATION COMMISSION Town of South Windsor Inland Wetland Agency and Cons. Commission 1540 Sullivan Avenue South Windsor, CT 06074 Attn: Mr. John McCahill RE: Governor's Highway/Nutmeg Road Dear John: Please be aware that since construction has not begun on the David Brown site, we have no update to report on the project controls. Application #88-33P will require an extension of its permit for the period of one year. Thank you for your attention to this matter. Very truly yours, Betsy A. Kaemmerlen, ASLA /Pig cc: Andy Smith David Brown 87-408 Corres. 0424B89BAK 146 HARTFORD ROAD / MANCHESTER, CONN. 06040 / TEL. (203) 646-2469, FAX. EXT. 307 SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS•HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING HIGHWAYS and BRIDGES•SURVEYING•LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC•PUBLIC WORKS MANAGEMENT•HYDROGEOLOGY DBA DAVI D BROWN ASSOCIATES Building Management May 1, 1989 Inland Wetlands Agency/Conservation Commissio Italy Town of South Windsor 1540 Sullivan Ave. South Windsor, Connecticut 06078 MAY 8 1989 Attention: John M. Moran, Jr. South Windsor Re: Application #88-33P INLAND WETLANDS AGENCY1 CONSERVATION COMMISSION, Dear Mr. Moran, Pursuant to your letter of April 10, 1989, we hereby request extension of Application #88-33P, Governor's Highway Nutmeg Road. As requested, our Engineer has issued a letter to the Commission and enclosed is a check for $25.00. We are in the process of beginning the site work in accordance with the instructions set out by the Town of South Windsor and we plan to proceed in strict compliance with conditions set forth by the Commission. We appreciate your consideration in granting an extension to this application. Since vid A. Brown DAB/tab 998 Farmington Ave. 0 West Hartford, CT 06107 0 236-2595 �"toll" Sf� 10 <� C � 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 R•co� AREA CODE 203/644-2511 May 10, 1989 David A. Brown 994 Farmington Avenue West Hartford, CT 06119 Re: Application #88-33P - David Brown Site Dear Mr Brown: At the May 8, 1989 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one year extension of Application #88-33P with all original conditions. In addition to the original conditions you are also required to contact John McCahill, Zoning/Wetlands Enforcement Officer (644- 2511, x229) immediately upon approval notification. This is to re- confirm the contact person for the site and establish a site visit with that person to verify all erosion and sedimentation control measures are in place according to the plan. Application #88-33P becomes effective June 2 7, 1989 and expires on June 27, 1990. Ve truly yours, hn M. Moran, Jr. , Ch man Inland Wetlands Agency Conservation Commission JA KJr. /pmm cc:John E. McCahill, Zoning/Wetlands Enforcement Officer Marcia A. Banach, Director of Planning John R. Collins, Chief Building Official Raymond Hallowell, Chairman, PZC Jerry Iazzetta, Town Engineer Enclosure The Casle Corporation Avon Park North 200 Fisher Drive Avon, CT 06001 (203) 674-9000 FAX (203) 676-9576 a D (7 " V4 ��8g a�{W � Iwo�° 0 11 AUG 14 1989 wit 10401 South Wicidsor 1� INLAND WETLY N09 AGENCY/ CONSERVATION CWAUSSt0W-A IV August 8, 1989 Town of South Windsor Town Hall 1540 Sullivan Avenue South Windsor CT 06074 Attn: John McCahill Re: David Brown Associates $9- 33 Dear Sir: Field conditions have prompted some variations to the original discussions involving how the sitework would be managed. The areas of concern are as follows: Topsoil: The original estimate of topsoil depth was believed to be approximately 611. The actual topsoil depth in some areas is 12" to 24". This variance has caused an increase in the size of the topsoil stockpile. The stockpile will be extended easterly as required. Stumps: The original plan called for stumps to be buried on site. It was decided during meetings with the Town that the stumps would be ground on site. The stockpile for the stump grindings will be on the Northeast corner of the topsoil stockpile. Access: Field conditions have prevented the movement of heavy equipment through the Western end of the swale. This has resulted in a swale excavation that will work both ends towards the middle. A 25' - 30' wide path will be required in the existing field as a temporary area for heavy equipment to move material. This path will run East - West for approximately 3001 . If your have any questions please do not hesitate to contact me. Thank you for your attention. Si ce el William A. Wadsworth WAW/tab PC: David Brown Associates: David Brown Casle: Ron Leathers Spazzarini Construction: Ed Spazzarini The Casle Corporation CIO�• �� of r Tiov� �Sau� 2'30 s 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 4�hoSOR.`o��,� - AREA CODE 203/644-25U Project Name/Location TC�V; CG A - grown Appl•1 SST — 33 P o to t erso owner :(� Wac,Jwy Phone 1 673,1 Address 200 CT 09001 You are hereby notified that problems may exist on the above site concerning 'erosion and sedimentation control measures. Although this is a notification based on a routine sit visit, you are ultimately responsible for inspecting and maintaining the site. You were contacted on 20 'Oc-4 v 1q_and notified of site problems). Thy is a confirmation of that call. You should correct the problem(s) immediately (within 48 hours) and notify, me that situation has been corrected. • _ _ •,..Rf•ems., •.ti.1r•'.•t�•,�t. ^^r r. - - - Erosion and control measures are not^properly installed and/or maintained according--- approved plans. Refer to nnrovpd plans and correct site as needed. Erosion and control measures are needed beyond those shown on the plans, contact me regarding the additional measures."=}jp�"#F Silt fence(s) and/or haybale(s) are not_in place or not properly maintained. Stockpiles are not protected and/or-seeded. Construction entrance not in-according to plan or not functioning adequately. tNed to establish vegetation pe=-plan, either temporary -or -permanent. --- ------ -- '—/rivlc�,� /»ay bt �►�ttSS�rr at74- 1+s1- -Arm c O f �C4r. . Site lacks protection against possible wind erosion. Limits of construction have-not been established on site, or have been exceeded. There is an excessive area-•of disturbance which should be stabilized, limits to are- disturbance may need re-establishment. _. Detention basin or siltation basins have not been maintained and/or vegetation or stabilization is insufficient. Other concerns uTlt� r'U AJe_r j4mc •(�.Qad This will be filed with-your approval/permit for the site. It is your responsibility to maintain the site and repeated violation ems-will be forwarded to appropriate Commissions. - _ �__.._..__.; _�'�_ ;�;�_ _� _�' °..��; -:x- .-w,. _ �_�_ .�� _._-- -• If you have any question regarding this, -contact me at 644-2511. V ry r-u-1v yo re, E. McCahill Zoning/Wetlands Enforcement Officer -ti '''' -. ^'e•x. _• "-mom,._•x•>:.,..... F•ti ,4 �.: ;K.', W.r..•- _ .r-w:n = ':`�.a 7ak=.i�5'�iu n' M s_ .T �; . y -�. - �i+�k 1r ��}} a•-• _.._•r-•-r..-+mow;-..._, .. ;, '+s:�:•_ ..- :.�•k.Srt_ • .�,.N'., 'J!�+L"�':-•o S:Yw• ,.. .rw,'sw�.«-.... _ .-. ..•t.,14w� 'lsssr.....xr..�:•.r.«.rl�ST•t•. "'h+....-. —_.eA err•' - __^wr•wia..fi•e�+.ws`:.rMR+:. . -3 MEMO: #028 DATE: 10-26-89/3 PM @ SITE PROJECT: NUTMEG OFFICE PARK e.L,``1Y f �. PRESENT: JOHN McCAHILL 1 09 ED SPAZZARINI BILL WADSWORTH South WindSor ANDY SMITH INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION PURPOSE: REVIEW 1. Work to be completed. - fill in wash outs in swale bank. - regrade swale sides E of pond. - place rip-rap at E end of swale inlet. - place one (1) row of erosion control bales at outlet under Nutmeg Road. - grade area around W outlet and along Nutmeg Road. - smooth out topsoil stockpiles and seed. - seed all disturbed areas. - drag with anchor fence or hand rake in seeded areas. 2. Seed all areas with a 60/40 mix of annual rye grass/Agway Conservation Mix. 3 . Work to be completed by 11/03/89; weather permitting! 4. Wetlands creation to wait until spring/summer of 1990. ABS:sk PC: Windsor: McCaHill Nutmeg Office Park: Brown Casle: Leathers, Wadsworth Spazzarini: Ed Spazzarini ce = c� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 !~�sot•co�� AREA CODE 203/644-2511 March 6, 1990 David A. Brown 994 Farmington Avenue West Hartford, CT 061009 Dear Mr. Brown: Re: Application 188-33P (David Brown Site), Governor's Highway/Nutmeg Road You re h r by notified that problems may exist on the above site concerning erosion and sedimentation control measures. Although this is a notification based on a routin site visit, you are ultimately responsible for inspecting and maintaining the site. March 2, 1990 I inspected the site. For the most part the erosion and sedimentation control measures seem to be in accordance with the approved plans. My concern is with the amount of sandy barren surface which has been exposed off and on throughout the winter. The area in question is that which is associated with the proposed building locations. With the onset of spring winds I would recommend that this area should be protected against wind erosion if the buildings are not soon scheduled to be built. I would suggest that perhaps a liquid polymer might be appropriate for the site. This will b filed with your approval/permit for the site. It is your responsibility to maintain the site and repeated violations/problems will be forwarded to appropriate Commissions. If you have any question regarding this, contact me at 644-2511. Very truly yours, John E. McCahill, Zoning/Wetlands Enforcement Officer JEM/pmm cc: Bill Wadsworth, 200 Fisher Drive, Avon, CT 06001 Y M E M O R A N D U M t�A1� TO: John McCahi l l dsot FROM: Betsy Kaemmerlen 5dtt� �,NDs AGENT wE'� , 01* DATE: May 21, 1990 1 � ivA60o ��� RE: Erosion Control Measures Application 88-33P Applicant - David A. Brown A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A w A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A A 1. Of primary concern is the reseeding of all disturbed areas A.S.A.P! The sandy soils will be difficult to establish lawn any later in the season. Use mulch to help hold moisture on seed bed. Repair all gullies forming on slopes. 2. Repair double row of silt fence at outlet under Nutmeg Road North. Clean up debris from siltation basin. 3. No check dams were placed in swale, but flatness of grade seems adequate (along with riprap at bends) to preclude significant erosion. The exceptions being: at inlet to wetlands creation area where stream becomes braided; and where debris has fallen across and caused erosion on the banks. 4. No snow fence was installed for tree protection. Barked up trees should be monitored. Remove flagging at clearing limits so as not to cause future bark damage. 5. Topsoil area was relocated to lie parallel with existing ditch. Seed and surround with haybales as directed on plan. 6. Existing ditch is eroding through dike at southeast end of wetlands creation area. The simplest solution would be to place a culvert at outfall, or place filter fabric around the stone to keep the fines from washing away. 7. The five acre building site cannot be left exposed. Though bark mulch would avert wind erosion, spreading topsoil and seeding would be a better solution for the long term. 8. In general, the project looked good, but must be stabilized before problems arise. 87-408 0518A90DMS1 DBA DAM BROWN ASSOCIATES Building Management May 22, 1990 Certified Mail Mr. Albert J. Schneider 330 Governor's Highway South Windsor, CT 06074 Dear Mr. Schneider: I, David A. Brown, an abutter to your property, have submitted to the South Windsor Inland Wetlands Agency, Conservation Commission, an application (#8833P), formerly approved on June 27, 1988, requesting permission to fill Wetlands that have been previously disturbed by man, and to recreate new areas that will revert to wetlands after stabilization. This application is tentatively scheduled to be heard before the Inland Wetlands Agency/Conservation Commission of the town of South Windsor, on Monday, June 11, 1990. Should you wish to review the proposed activity or have any questions concerning this application, please call Phyllis Mann, secretary to th Commission, on or before June 11, 1990. Please call her at the South Windsor town offices (644-2511, Ext. 253) between the hours of 8:00 a.m. and 4:00 p.m. Sincerely, David A. Brown Owner/Applicant DAB:acb cc: Phyllis Mann Inland Wetlands Agency/Conservation Commission 998 Farmington Ave. 0 West Hartford, CT 06107 0 236-2595 DMay JUL 9 1990 MEMORANDUM South Windsor INLAND WETLANDS AGENCY1 PONSERVATION COMMISSION TO: John McCahill FROM: Betsy Kaemmerlen DATE: June 19, 1990 RE: Follow-up on May 21 Memorandum 1. The seeding has been done and has had adequate germinating but fertilization and some mulching in any trouble spots is recommended. 2. Silt fence at outlet still requires repair. 3. The swale is now fairly dry with the only damage arising from bikers. 4. Snow fence WAS installed during construction and then removed upon completion of grading operations. I apologize for any confusion I may have caused by my previous statements. 5. Topsoil shall be respread. 6. The existing ditch seeping through the dike may be handled with a broad swale to allow for future access for maintenance of the north drainage ditch. An alternate suggestion was to fill in the existing ditch since the new ditch replaces its function. 7. Topsoil shall be spread and seeded. 8. As discussed on site, Phil Barske had several recommendations for the wetlands areas. Water levels will be monitored throughout the summer. cc: Andy Smith BAK/dms 0621A90DMS1 JUL s 19W MEMO: #03 0 South Windsor INLAND WETLANDS AGENCY1 DATE: 0 6/19/9 0 - 10:3 0 AM @ SITE CONSERVAPON COMMISSION PROJECT: NUTMEG BUSINESS PARK PRESENT: BETTY ANDY BO BILL JOHN DAVE BETSY IGGI PHI L PURPOSE: REVIEW WETLANDS 1. Front retention/sedimentation basin. - provide a constant pitch/grade from S inlet to W outlet. - mix 3 to 4 inches of top soil into existing sediment. - fertilize with a high nitrogen fertilizer. - seed with a "wet grass" mix. - plants that will grow here Iris and Sweet flag. 2. Drainage swale: - dress barren/sandy bank areas with top soil. - seed with Italian Rye/scratch in. - fertilize with a high nitrogen fertilizer. - hay mulch disturbed areas. - existing grass catch is marginal! 3. Middle Wetlands Area: - area over excavated! - Casle to monitor water depth thru August, at which time Phil will determine at what height the wetlands should be created. - creation will require rotted hay and existing silty topsoil. 4. Building Platform: - spread with 3" to 4" of top soil. - seed with Italian Rye. - fertilize with a high nitrogen fertilizer. 5. Town realizes the creation of the wetland is not a definitive process! ABS:sk PC: Dave Brown Phil Barske Town of South Windsor Casle - Leathers, Wadsworth June 19, 1990 David A. Brown 998 Farmington Avenue West Hartford, CT 06107 Dear Mr. Brown: Re: Application #88-33P At the June 18, 1990 meeting, the Inland Wetlands Agency/Conservation Commission approved with previous and standard conditions Application #88-33P - IWA/CC permit for the construction of office/warehouse buildings on property located on the northeast corner of Governor's Highway and Nutmeg Road North, I zone as shown on plans prepared by Fuss & O'Neill, Inc. , project #87-408 dated July 15, 1988 and revised August 18, 1988, March 17, 1989 and April 7, 1989 . 1 . Two blueprint copies of the entire set of plans and this letter reproduced thereon, must be submitted to this Commission . This must be completed within 65 days of approval prior to any construction activity on the site. 2. Construction activities shall be subject to the approval of the Town Engineer. 3. The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4 . The permit is valid for one year and shall expire on June 18, 1991 . 5. All approvals required must be obtained and submitted prior to any activity on the site. 6 . A contact person shall be identified directly on the plans. 7 . All original approval conditions shall apply to this approval per approval letter dated June 29, 1988. David A. Brown Page Two June 19, 1990 Very truly yours, James A. Lombardi, Chairman Inland Wetlands Agency/Conservation Commission JAL/pmm cc: Jerry C. Iazzetta, Town Engineer Marcia A.Banach, Director of Planning John R. Collins, Chief Building Official Planning & Zoning Commission • SENDER: Complete items 1 and-2 when additional services are desired, and complete It me 3 and 4. . Put your address in the"RETURN TO"Space on the reverse side.Failure to do this will prevent this card from being returned to vou.The return recei fee will orovidg you the name of the Rerson d liv red to and the date of deliverv.For adartionallees the following services are BV8113DIS.Consult postmaster or fees and check box(es)for additional service(s)requested. 1. ❑ Show to whom delivered,,date,and addressee's address. 2. ❑ Restricted Delivery (Fauna charge) (Eztm drarge) 3. Article Addressed to: ;. :-, 4. Article Number P 007 587 066 - J DAVID A BROWN 19Certifled e of Service: Registered ❑Insured 998 FARMINGTON AVENUE ❑ cob iipp WEST HARTFORD CT 06107 El Msit-, ❑for Merchandise Always obtain-sf addressee or agent k D 5. Si nature —,Ad ass 8. Ad dr p"e's Add ��O Y(f re 6. Signature —Agent X 7. Date of Deli ery PS Form 38 1,Mar. 1988 * U.S.M12.0. 1888-212-865 DOMESTIC RETURN RECEIPT DBAD � DM I D BROWN ASSOCIATES MAY J 1991 May 2, 1991 Building Management South Windsor INLAND WETLANDS AGENCY/ CONSERVATION COMA " Ms. Phyllis M. Mann I O J Recording Secretary of South Windsor Town � n 1540 Sullivan Avenue South Windsor, CT 06074 U Dear Phyllis In reference to our phone conversation this morning, I am requesting an extension of my application #88-33P to complete my project located at Governor's Highway, South Windsor. Also, I have enclosed a check in the amount of $25.00 to cover the fee for the extension. If you should have any further questions, please feel free to contact me at our office. Sincerely, *David A. Brown lm Enclosure: Check 998 Farmington Ave. 0 West Hartford, CT 06107 0 236-2595 �A U Tlo �� �• e � 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ,h�SUR cor� AREA CODE 203/644-2511 May 6, 1991 David A. Brown 998 Farmington Avenue West Hartford, CT 06107 Dear Mr. Brown: -- Re: Application #88-33P, Vlutmeg Business Park' In June of last year a meeting was held at the site referenced above (see attached) . The purpose of the meeting was to review the wetlands creation as proposed on the approval plans . (A majority of the excavation had been accomplished but final grades and establishment of wetland vegetation was still needed. ) It was my understanding, based on the meeting, that work was to take place this spring with regard to the wetlands creation. As you are probably aware, the IWA/CC permit granted for this site will soon be scheduled for consideration of an extension to the permit date. Any information you have with regard to this issue would surely be of interest to the Agency. If you have any questions, feel free to call me at 644-2511 . Very truly yours, ohn E. McCahill Zoning/Wetlands Enforcement Officer JEM/pmm cc: Castle Corporation, Attention Andy A. Smith Jerry C. Iazzetta, Town Engineer Elizabeth A. Warren, Chairman, IWA/CC Fuss & O'Niell, Inc. , Attention Betsy Kaemmerlen A DBA MAY 2') 1991 DAVID BROWN ASSOCIATES South Windsor INLAND WETttANDS AGENCY{ Building Management CONSERVATION COMMISSMW May 21, 1991 D r// C Mr. John E. McCahill ay Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Mr. McCahill: I am writing in response to your letter dated May 6, 1991 regarding the enclosed memo reviewing the wetlands. Currently, I have already taken care of Article #2- Drainage Swale by performing: dress barren/snady bank areas with top soil, seeding with Italian Rye/scatch in, fertilizing with a high nitrogen fertilizer, hay mulch to disturbed areas, and having existing grass catch to a marginal amount. Also, the Drainage Swale has been performing as designed and we will continue to routinely inspect and maintain the site which includes cutting the grass. In reference to Article #4- Building Platform, I have already taken care of this as well by spreading 3" to 4" of top soil, seeding with Italian Rye, and fertilizing with a high nitrogen fertilizer. This area has been stabilized with grass and the erosion and sedimentation control measures are in accordance with the approved plan. Due to the current state of the economy and banks unwilling to lend money for raw land, has made it difficult for me to complete Article #1 and Article #2 at this time. I do realize that I have an obligation to complete these two articles and I would like to complete it at a later date. 3 If you should have any additional questions, please feel free to contact me at our office. Sincerely, David A. Brown lm 998 Farmington Ave. 0 West Hartford, CT 06107 0 236-2595 G� x 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 4ftiosoR co AREA CODE 203/644-2511 June 18, 1991 David A. Brown 998 Farmington Avenue West Hartford, CT 06107 Dear Mr. Brown: Re: Applicadm #88 33P - David Brown SkelGoymwe Hgft%W At the June 18, 1991 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a three year extension of Application #88-33P with all original and standard conditions. Application #88-33P becomes effective June 18, 1991 and expires on June 18, 1994. V ry tr y yours, Phyllis,! . Mann, Recording Secretary Inland Wetlands Agency/ Conservation Commission cc: Marcia A. Banach, Director of Planning Planning & Zoning Commission Jerry Iazzetta, Town Engineer Enclosure TOWN OF SOUTH WINDSOR ID :203-644-3751 SEP 12 '95 11 : 13 TRANSMIT OONFIRMRTION REPORT NO . 004 RECEIVER 2362596 TRANSMITTER TOWN OF SOUTH WINDSOR DATE SEP 12 '95 11 : 13 DURATION 04 '33 MODE STD PAGES 04 RESULT OK tOw N SF, C � U s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soR co� AREA CODE 860/644-2511 David A. Brown March 3, 1997 998 Farmington Avenue West Hartford, CT 06107 Dear Mr. Brown: Re: Expiration of Permit #88-33P, Brown Subdivision/Governor's Hwy This is a reminder that the permit with the Inland Wetlands Agency/Conservation Commission, application #88-33P will expire on June 18, 1997. If you plan to extend your project beyond the above expiration date, you must apply for an extension at least sixty-five (65) days prior to the expiration date. There will be a thirty-five dollar ($35) fee required for an extension of the permit. This includes a ten dollar ($10.00) surcharge assessed by the State, to fund the State Environmental Review Team. An application for an extension shall be made in accordance with the following subsection of the IWA/CC Regulations: a. The duration of any amendment or extension shall be for three years unless otherwise specified in the permit. b. The application may incorporate by reference the documentation and record of the original application. C. The application shall state the reason why the authorized activities were not initiated or completed within the time specified in the permit. d. The application shall describe any changes in facts or circumstances involved with or affecting wetlands or watercourses or the property for which the permit was issued. e. In unusual situations the Agency may accept an untimely application to extend the expiration date of a permit if the authorized activity is ongoing and allow the continuation of work beyond the expiration date if in its judgement, the permit is likely to be extended and the public interest or environment will be best served by not interrupting the activity; the application shall describe the extent of work completed at the time of filing and the schedule for completing the activities authorized in the permit. f. The Agency shall evaluate the application pursuant to these regulations and grant the application as filed, grant it with any terms or limitations, or deny it; and shall state upon the record the reason(s) for its decision. In the event that you are requesting an extension, section 8.1.6 of the Zoning Regulations establishes the process for monitoring the approved conservation plan. Per that regulation, a progress report is required from the applicant's engineer verifying that erosion and sedimentation control measures have been installed and maintained in accordance with the approved conservation plan. This verification report shall also be submitted 65 days prior to the expiration date of the permit to allow time for the Commissioners to evaluate your project controls. If work has been finished or will be finished by the expiration date, please send a letter stating work is completed according to the approved plan. If you have any questions call me or Jeffrey H. Folger, Zoning/Wetlands Enforcement Officer at 644-2511, ext 253. e ruly yours, Phyl M. Mann Recording Secretary DBA DAM ID BROWN ASSOCIATES APR 7 South Windsor INLAND WETLANDS AGENCY/ April 4, 1997 SeONSMATION COMMISSION Phyllis M. Mann, Recording Secretary Inland Wetlands Agency Town of South Windsor 1540 Sullivan Avenue South Ta;, clsrir. CT. LJ6 !V. Dear Ms. Mann: RE: Extension of permit #88-33P David Brown Subdivision --------------------------------------- Thank you for your letter of March 3 regarding expiration of my wetlands permit #88-33P on June 18, 1997. Please be advised that I hereby request a three year extension of the above referenced permit, in accordance with the original documents, record, terms and conditions. While most activities have been completed, including relocation of the Swale system to the tract's perimeter to allow for industrial development, we have not constructed any buildings to date due to the downturn in the conomy. We still have every intention of developing the site for industrial purposes as the economy improves. We know of no other changes in facts or circumstances involved with or affecting wetlands or wat rcourses on the subject property. A ch ck in the amount of $35.00 to cover the extension fee, is enclosed. P1 ase call me if further information is required. S ince _c a d Brown Enclosure - Check $ 35.00 998 Farmington Ave. 0 West Hartford, CT 06107 0 860-236-2595 7-J, NO.--4> Q 6 19 RECEIVED FROM LARS Account Total $ TOWN OF SOUTH WINDSOR Amount Paid $ .� � —� 1540 Sullivan Avenue South Windsor, Connecticut 06074 Balance Due $ "THE EFFICIENCYa LINE AN AMPAD PRODUCT-23-121 0 N SEA s 40) 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 °SOR•co�' AREA CODE 860/644-2511 April 23, 1997 David A Brown 998 Farmington Avenue West Hartford, CT 06107 Dear Mr. Brown: Re: Application#88-33P, David Brown Site/Governor's Highway At the April 16, 1997 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a three year extension of application#88-33P with all original and standard conditions. Application#88-33P expires on June 18, 2000. It has been IWA/CC's policy to notify landowner(s)/applicant(s) of expiring wetland permits. However, it is the landowner(s)/applicant(s) responsibility to track expiration dates and notify the Commission of a renewal request at least 65 days prior to expiration. Very truly yours, INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION MAUL 1) Elizabe A. Warren, Chairman EAW/pmm cc: Town Engineer