Loading...
HomeMy WebLinkAboutSITE PLAN 1222 TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING AND ZONING COMMISSION APPLICATION FORM App. No- IMPORTANT! Date Received: -7— Action or P blic Hearing By: planning and Engineering Department staff -L- require 14 days to determine application ReCel.pt NO. completeness. To ensure receipt of a complete application by PZC, it is strongly recommended that the application be submitted 14 days prior to the Regular Meeting at which it will be received. APPLICANT: Edward and Bonnie Cebry TELEPHONE: 875-9088 ADDRESS: 7 Timber Lane, OWNER OF RECORD ON LAND RECORDS: William Oleksinski ADDRESS: 444 Center Street Manchester COMPLETE LOCATION OF PROPERTY: 912 Sullivan Avenue, South Windsor c'T ZONE: NAME, ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: � ��'�'`` `� f Emil W. Lucek T 490 Buckland Road South Windsor TELEPHONE:644-0550 THIS APPLICATION IS FOR: (Check one of the following) 1. Zone Change to (public hearing required) 2. Subdivision 3. Open Spaice Subdivision (public hearing required) 4. Resubdivision (public hearing required) 5. Special Exception to Article (public hearing required) 6. Site Plan of Development 7 . Earth Filling (Section 10) and/or Earth Removal (Section 9) (public hearing required) S. General Plan of Development Subdivision 9 . Regulation Amendment: Zoning 10 . Other (explain in detail) THIS APPLIC ATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PRO PROPERTY AND SUBMITTED IN TRIPLICATE WITH SIX SETS OF THE MAPS (7 1 public is required) AND OTHER DOCUMENTS (see page ) rs .� Owner Applican 1/14/87 (see reverse side) a�,`� y r T-0 O-PS-o-u� qd&uaot O a C V �f ci 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 e-coy' AREA CODE 203/644-2511 Gentlemen: The Town of South Windsor, Bureau of Pollution Control, requests your cooperation in arriving at an equitable sewer use charge. In order to calculate such a charge, we shall require, each year, a statement from the Connecticut Water Service as to your water usage for the period January 1 through, December 31. The Connecticut Water Service will provide this information to the Town with your permission. Please indicate your approval at the bottom of this letter and return it by to the Bureau of Pollution Control, c/o Town Hall, 1540 Sullivan Avenue, South Windsor, Connecticut 06074. This request is in accordance with the South Windsor Water Pollution Control Regulations prescribing sewer use charges: (a) "Require the owner to submit a sworn statement of water use or discharge into the sewer system from January 1 through December 31, such a statement to be supported by any available records or evidence of water use or discharge to which applicable rates shall be applied; or (b) In the case of disagreements, require the owner to install and maintain, at his own expense, a meter measuring sewage outflow, such measurements to be used in arriving at sewer use charge. Said meter to be installed in a place easily accessible to the Authority of its'duly authorized agent for recording purposes." If there are any questions in regard to the above, please feel free to contact this office at 644-2511, extension 257. Very truly yours, Cll,. . v�Lr C. F. Shaw, Superintendent Bureau of Pollution Control Please circle appropriate response: The Connecticut Water Service may/may not provide water consumption information to the Town of South Windsor Date: Signed: Title: pow" se,4 C •, r ran. a sollik 9 ' 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 o • soR•'CO�'� AREA CODE 203/644-2511 February 18 , 1987 Mr. Kevin F. Rennie, Chairman South Windsor Inland Wetlands Agency/Conservation Commission 1540 Sullivan Avenue South Windsor, Connecticut 06074 RE: Ed & Bonnie Cebry Application Dear Kevin: In accordance with the reviewing practice, enclosed are the comments as they relate to this application. This is a small site, 25 ,077 sq. ft. With a fairly intense earth movement to make it work, some of the normal items shall get lost in the process. Modifications to the drawing could, or should, inlcude: 1. No apparent wetlands on the site. 2. Topo should extend 501 ± North and West to include items such as buildings, driveways, plantings and or walls . 3. Show the stockpile and to modify seeding for less than six months. 4. Extend the storm sewer into the parking lot with a real pipe. 5. Item 4 in the narrative indicates improvements to detention area. Where is this on the drawing? If an approval were to be granted, the plans should be modified and a bond of $2 ,500 should be submitted to assure compliance. Very truly yours, A. Bowen Davies Deputy Town Engineer ABD/jsv - CC: Ed & Bonnie Cebray Michael J. Gantick, Director of Public Works Richard P. Martel, Town Engineer Marcia A. Banach, Director of Planning IWA/CC March 31, 1987 Ms. Louise Evans, Chairperson Planning and Zoning Commission Town Hall 1540 Sullivan Avenue South Windsor, CT 06074 Dear Ms. Evans: This letter will serve as my request for an extension of time for my application for site plan approval. The extension is effective April 2, 1987 through April 9, 1987. I understand my application will be discussed at a work session on April 7, 1987. Edward Cebry 0 CV1 C� 4 r� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ♦,�,� .Co��' AREA CODE 203/644-25U March 30, 1987 Mr . Edward Cebry CERTIFIED MAIL 7 Timber Lane Ellington , Ct 06029 Dear Mr . Cebry: RE: Application #448 - Cebry Corner At the March 23, 1987 meeting , the South Windsor Inland Wetlands Agency/Conservation Commission approved with conditions Application #448, to construct an office building with required parking on property located at 912 Sullivan Avenue , as shown on plans prepared by Lucek Engineering Associates , Inc . , dated 12/1/86 as revised 2/5/87 , consisting of 3 pages . The following conditions must be adhered to for this permit to be valid: 1 . We recommend a bond in the amount of $2 , 500 be submitted to the Planning and Zoning Commission to ensure compliance with the erosion & sediment control measures . 2 . Construction activities shall be subject to the approval of the Town Engineer . 3. The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4. The permit is valid for one year and shall expire March 23, 1988. Very truly yours , f L/ Eliza eth Warren , Vice-Chairman Inl d Wetlands Agency/ Conservation Commission Town of South Windsor EW: dlb CC: A. B. Davies , Deputy Town Engineer Richard Martel, Town Engineer Marcia Banach , Director of Planning Michael Gantick, Director of Public Works Thomas D' Auria , Building Official Louise Evans, Chairman , PZC Lucek Engineer Associates , Inc . �oM,M aE,'( ca 0-les � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 0R•c0 AREA CODE 203/644-2511 07 April 9 , 1987 ►j t �. Edward and Bonnie Cebry 7 Timber Lane Ellington , CT Dear Mr . and Mrs . Cebry : RE: Application #1222 , Site Plan Please be advised that the Planning and Zoning Commission voted to approve your application for a site plan of development for property located at 912 Sullivan Avenue , as shown on plans prepared by Lucek Engineering Associates , dated 12-1-86 , revised through 2-5-87 , subject to the following : 1 . Hillside Drive will be widened 3 feet on the west side to facilitate 3 11-foot traffic lanes which will be appropriately marked and signed . The 3 lanes will consist of 2 south and 1 northbound lane , with exclusive right turn and left turn lanes on the southbound approach . Widening shall occur from the site driveway to Sullivan Avenue . r2 . The site shall have 19 parking spaces rather than the 25 parking spaces proposed on the plan , with the 7 spaces located closest to Hillside Drive eliminated to facilitate the Hillside Drive widening . Also , the portion of the proposed island which is oriented north-south will be eliminated and replaced with pave- ment to facilitate through traffic movement . 3 . The area where the 7 parking spaces were eliminated shall be landscaped . 4. The water connection should be to Hillside Drive rather than Sullivan Avenue if possible . 5 . The driveway must be raised so that there is a positive slope of greater than 1% at its intersection with Hillside Drive , to improve the sight line to the north . 6 . The landscape plan should show the sizes of plantings . 7 . A note should be added to the plans that there are no regulated inland wetlands nor flood hazard zones on the site . 8. A bond in the amount of $5 ,000 shall be submitted to this Commission to ensure compliance with the landscape plan . 9 . Directional arrows on bearings should be corrected . Edward and Bonnie Cebry 4/9/87 RE: Application #1222 , Site Plan 10 . Prior to commencement of any site work, a meeting must be held with Town Staff . 11 . No building permits will be issued until the final plans have been filed in the Town Clerk ' s Office . 12 . This approval is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission . 13 . An as-built plan will be required prior to issuance of a certificate of occupancy per Section 4 . 13 . 10 of the Zoning Regulations . Black and white transparent mylars of Sheets 1 and 2 of the plans , with this letter and the Inland Wetlands Agency/Conservation Commission approval letter reproduced thereon , together with two blueprint copies of the entire plan , must be submitted to this Commission to be signed . After signing , the mylars will be returned to you and must be filed in the Town Clerk ' s office within 90 days . Very truly yours , PLANNING & ZONING COMMISSION Louise C . Evans , Chairman LCE/jsv CC: Richard P . Martel , Town Engineer Marcia A . Banach , Director of Planning E . Belleville , Assessor Thomas D' Auria , Building Official IWA/CC w N +e APR 8 "i987 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074 tiosoR.coe AREA CODE 203/644-2511 TO BE PUBLISHED SATURDAY, APRIL 11, 1987 LEGAL NOTICE At the April 7, 1987 meeting, the Planning & Zoning Commission voted to take the following action: 1. Approve modifications, the application of Edward and Bonni CebrZe�s�t a site plan of development for land located on the corner of Hillside Drive and Sullivan Avenue, as shown on a plan prepared by Lucek Engineering, dated 12-1-86 , revised through 2-5-87 . 2 . Deny the application of Jean Marc Jacques for a zone change from RR to A-30 on 109 acres located on the northwest corner of Dart Hill and Lawrence Roads. Dated at South Windsor, Connecticut this 8th day of April , 1987 . PLANNING & ZONING COMMISSION Louise C. Evans, Chairman David Sorenson, Secretary Item No. 1, approved unanimously Item No. 2 , denied by a 6 to 1 vote, with Rossi, Castro, Montana, Evans, Sorenson and Klenke in favor and Hallowell opposed. By: Marcia Banach, Acting Recording Secretary 'tow N sF4 Ca H T-Own O-P S ?A�1� C � U 4 wG 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 f��SOR-CO AREA CODE 203/644-2511 M E M O R A N D U M December 29, 1987 TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works RE: Property of Ed and Bonnie Cebry Hillside Drive Pursuant to our previous conversations, this Department has reviewed the as-builts by Lucek Engineering Associates, Inc. dated 12/22/87 and find the following items of concern regarding the on-going devel- opment of the subject site: 1. Parking lot plan does not reflect original approval plan dated 4/20/87 . 2 . Building floor elevation on as-built 3.1 feet higher than approved plan; impacts elevation of driveway/parking lot area. 3 . Parking lot area approximately 2 to 3 feet higher than originally proposed. Has resulted in steep side slopes to detention swale. 4. Using original detention swale volume sizing and assuming a maximum 2:1 side slope, detention swale will encroach into state R.O.W. 5. Existing side slopes are not stable, material not compacted, slopes in some areas at 1:1. Existing drop from top of curb to bottom of detention swale 5 to 6 feet. 6. As-built spot grades needed along detention swale, top of parking lot area at corners/sides, at driveway, near build- ing, for existing drainage pipes, detention swale. 7. Many notes on as-builts still reflect proposed conditions i.e. things to be done. 8. As-built plans do not reflect conditions of Section 4.13.10 of the Zoning Regulations. 9. Existing pavement showing signs of poor mix and compaction. Marcia A. Banach December 29, 1987 Re: Property of Ed and Bonnie Cebry Page 2. Hillside Drive Three scenerios exist regarding the deviation from the original plan and specifically how this deviation has impacted the parking lot and associated elevations: 1. Stabilize side slopes and reconstruct detention swale based on existing grades; include vehicle protection/guide railing along edges of parking lot. Stabilization of side slopes to include, compaction, regrading to maximum 2 :1, stabilization of slopes via approved aethestically acceptable manner. Con- struction of detention swale within State R.O.W. would require State permission. 2. Remove section of parking area and reconstruct side slopes and detention swale within property line. 3 . Reconstruct parking site to reflect original approved grades. Since the nature of the grade changes have significantly altered the site conditions, I would recommend remedial measures to insure the safety and aethestics of the site. MGJ/jsv cc: A. Bowen Davies, Deputy Town Engineer Engineering Department r i V s��oaoI•co��� Lucek Engineering Associates, Inc. Consulting Engineers & Land Surveyors 490 Buckland Road South Windsor, Connecticut 06074 Emil W. Lucek, PE, LS Telephone (203) 644-0550 Mr. Mike Gantic February 1, 1988 Director of Public Works Ton of South Windsor Re: Cebry Corner Sullivan Ave. Dear Mike, Attached please find plans, quantity estimates, and a proposed sequence for yet another proposal for remedial and finish work at the subject site: Basically this proposal suggests expanding the existing detention pond to almost twice its design capacity, filling with a 2" uniform-sized stone, and allowing the void space of the bed to provide the required detention volume. The bed is surrounded with a filter cloth envelope to insure continuing capacity. This proposal has advantages to both the 'Down and the Owner. By filling the existing swale, the hazardous condition at the edges of the parking area is elimin- ated, the esthetics are improved greatly and the need for expensive,unsightly guard r. � railing is eliminated.Further, the problem of trying to stabilize steep slopes along the detention pond is bypassed and no work within the State Right of Way is necessary. I estimate that this remedial work and the remaining finish work at this site yJU D is valued at $12,600.00 not including landscaping, which is much less then the cost ash of expensive guard railing and slope stabilization and provides a far more attract- ` �tid ive solution. Mr. Cebry will be contacting you with regard to a schedule for this work as soon as he has conferred with his contractor. Please call if you have any questions. � �cJ< � ( t t_ � J , 5 f Very Truly Yours, °b 19 '1 W. Lucek 9 cs cc Mr. Edward Cebry Lucek Engineering Associates, Inc. Consulting Engineers & Land Surveyors 490 Buckland Road South Windsor, Connecticut 06074 Emil W. Lucek, PE, LS Telephone (203) 644-0550 CEBW CDRNER Wbrk Sequence and Quantity Estimate 1 . Saw cut edges of pavement reconstruction and removal. 145 LF 2 . Remove existing pavement and stone base. 160 CY 3 . Regrade subbase (reconstruct area) . 357 SY 4, . Grade subbase (3 new parking spaces) . 67 SY 5 . Excavate for detention bed (stockpile) . 313 CY 6 . Install 6" PVC with elbows in bed. 125 LF 7 . Install 6" PVC laterals to parking area. 24 LF 8 . Construct catch basins. 2 ea. 9 . Place filter envelope at base and walls of bed. 1120 SF 10. Place 2" stone bed. 196 CY 11. Place filter envelope at top of bed. 2100 SF 12. Fill over bed area grade to property line. ill CY 13. Fill southwest swale to be abandoned. 135 CY 14. Place 8" processed stone pavement base-grade and roll. 282 CY 15. Pave 2" bit conc base course (1151b/inch/SY) . 50 Zion 16. Pave 1" bit conc surface course overall(1060SY) . 60 Ton 17. Place 6" bit conc curb. 210 LF 18. Topsoil and seed. 100 CY 19. Landscape per plan. $5,000 bond in effect 1 MM fit, t� � ~ � Cam/ � C�;(! • 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ~osoR.co�'� AREA CODE 203/644-2511 February 4, 1988 Mr. Edward Cebry 7 Timber Lane Ellington, CT 06029 re: Cebry Corner Hillside Dr. & Sullivan Ave. D ar Mr. Cebry: The Planning and Zoning Commission accepts the plan for the reconstruction of the parking lot and detention area for the above-referenced site, prepared by Lucek Engineering Associates Inc. , dated 1-27-88, Project No. 86-207, Sheet No. 1 of 1, and will release the Certificate of Occupancy upon satisfactory completion of the following conditions: 1 . A cash bond in the amount of $20,000 must be posted with the Planning Department. 2 . A barrier must be erected across the parking lot to prevent vehicles from encroaching upon the existing detention basin. The barrier must be approved by the Public Works Director prior to installation. 3. A landscaping/stabilization plan must be submitted for the embankment. The plan should include shallow-rooted shrubs as appropriate. 4 . The reconstruction must be completed no later than June 1, 1988 . 5 . There will be no parking on Hillside Drive. If you have any questions regarding the above conditions, please contact Marcia Banach, Director of Planning. Very truly yours, PLANNING AND ZONING COMMISSION 41 Raymond F. Hallowell, Jr. Chairman cc: M. Banach, Director of Planning M. Gantick, Director of Public Works Lucek Engineering Proposal Pr posal N . FROM oh RaL4 C ah S IPA"4e- Sh et N . q(, A RP/ Date C AvVe&i �r , c7' 06 .239 I Proposal Submitted To Work To Be Performed At Name �o wh a�' S e. 1S�� �• i Street 7 /�' s �� 20h/ v-r Street City -So- u/ih s•" __ State T City Date of Plans Stat _ Architect Tel phone Number We h reby propose to furnish aalll the materials and perform/all the labor necessary for the completion of y-c as/I-t = ,`�IS r /N L IV q h .S t C�i✓o�. A q h .l War 9 f e Y" �4 I'1 /rf�Y bar `I% t�.s.R 3 t r f. V✓i L C .c s,r,rq�s► T.4 N h . 4. T--sac )O -r s �s lft,&e-p tV,_ Ar All mat rial is guaranteed to be as specified, and the above work to be performed in accordance with the drawings and specifications submitted for above work and completed in a substantial workmanlike manner for the sum of Dollars ($ ). with payments to be made as follows: Any alteration or deviation from above specifications involving extra costs, will be executed only upon written orders, and will become an extra charge over and above the estimate. All agreements contingent upon strikes, accidents or delays b yond our control. Owner-to carry fire, tornado and other necessary insurance upon above work. Workmen's Compensation and Public Liability Insurance on above work to be taken out by Respectfully submitted A—e. Ate.. Per Note—This proposal may be withdrawn by us if not accepted within days ACCEPTANCE OF PROPOSAL The above prices, specifications and conditions are satisfactory and are hereby accepted. You are authorized to do th work as specified. Paym nt will be made as outlined above. Acc pied Signature Date Signature TOPS FORM 3450 LITHO IN U. S. A. V � wN sf, t o C V a � �� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ���soR•co�'� AREA CODE 203/644-2511 February 24, 1988 Edward & Bonnie Cebry 7 Timber Lane Ellington, CT 06029 RE: Application #448 - Cebry Corner Dear Mr. and Mrs. Cebry: At the February 22 , 1988 meeting , The South Windsor Inland Wetlands Agency/Conservation Commission approved a one-year extension for the above mentioned application. The extension becomes effective 3/23/88 with an expiration date of 3/23/89. All original conditions of this permit apply. Very truly yours, G John M. Moran , Jr Chairman Inland Wetlands Agency/ Conservation Commission JMMJr/pmm cc : A.B. Davies, Deputy Town Engineer Marcia Banach, Director of Planning Michael Gantick, Director of Public Works Thomas D' Auria, Building Official Raymond Hallowell, Chairman, PZC IUN 01' 1988 South Windsor Planning & Zoning Commissiod Cebtty Cotulen 7 H.cMide Dtc,i.ve So. fVin6otc, CT 06074-1301 (203) 644-3466 Town o j South w.uids on P.ea.ming and Zoning Comm,izzion Ge.n temen: The teco z Unction of the pahk tng .dot at 7 H c.Q.Pz ide D i.ve waz ecmpteted " pen pt t6 zubmitted and appnoved. I am thenejou kequeating &eteaae o� the $20,000 you ane hold in.g as a' pa6w mance bond. Thank you. S.ineercety; May 31, 1989 EDC/ehm • �4 MN jt,t� y r apS `�• 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 'ti'OgOR,Cps AREA CODE 203/644-2511 August 2 , 1988 Mr. Edward Cebry 7 Timber Lane South Windsor , CT 06074 Dear Mr . Cebry: RE: Cebry Corner $5 ,000 Landscaping Bond Please be advised that the above mentioned bond was released by the Planning & Zoning Commission at their July 26 , 1988 meeting. Please contact the Planning Department to make arrangements to pick up the bond. VeryTruly Yours, l( � Raymond F. Hallowell Chairman of Planning & Zoning Commission cc: IWA/CC file Marcia Banach, Director of Planning CIO C r T-0 O-P s ?d&&4at • 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ��osoe•co�'� AREA CODE 203/644-2511 October 31, 19B8 Mr. Edward D. Cebry 7 Hillside Drive South Windsor, CT 06074 Dear Mr. Cebry: RE: Cebry Corner IWA/CC Bond - $ 21500 Please be advised that the above mentioned bond was released by the Planning &' Zoning Commission at their October 25, 1988 meeting. Please contact the Planning Department at 644-2511 to make arrangements to pick up the bond. Very Truly Yours, fl Raymond F. Hallowell Chairman of Planning & Zoning Commission cc: IWA/CC file PZC file Marcia Ban4ch, Director of Planning