HomeMy WebLinkAboutSUBDIVISION 1 LOT (4) lipC
TOWN OF SOUTH WINDSOR, CONNECTICUT ,
PLANNING AND ZONING COMMISSION APPLICATION FO
Application No. :
Date R c ived:
Action/Public Hearing by: FEB 5 1988
R c ipt No. : 7j?el
South Windsor
APPLICANT:
j o s���r j Pf"WrIg & Zoning Cofnmissio*
ADDRESS : 35`lS CkLiNd:T'ou kf> So , tv141DS"d 2 TELEPHONE: 6yyaoS.S
OWNER OF RECORD ON LAND RECORDS : lelr4 .
ADDRESS: ICY!; E4L/A/C7"v,u kj> 50 07W Gu,,vpsa2
COMPLETE LOCATION OF PROPERTY: o'' y-5' 1./�t•�-Td�✓ Ot t> Sd v?iY tuiAP. -A
ZONE:
N%ME, ADDRESS, & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE
DIRECTED:
�l os fib .l• C/�R��o ,e ys e-L -1,Ua ra,v Rj> 5-d vT , &
Gv �s2.
DG O 7 _ TELEPHONE: GvyadsS
THIS APPLICATION IS FOR: (Check one of the following)
1 . Zone Change to (Public Hearing required) .
2. Subdivision.
3. Open Space Subdivision (Public Hearing required) .
4. Resubdivision (Public Hearing required) .
S. Special Exception to Article (Public Hearing Required) .
6. Site Plan of Development.
7. Earth Filling [Section 101 and/or Earth Removal [Section 91
(Public Hearing Required) .
8. General Plan of Development.
9. Regulation Amendment : Zoning Subdivision
_10. Other (explain in detail) :
f
CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. THIS APPLICATION MUST BE
SIGNED! BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN
TRIPLICATE WITH ALL MAPS AND DOCUMENTS REQUIRED ON ATTACHED CHECKLIST.
a,17-Z
pant ner
1 i
CHECKLIST
REQUIRED INFORMATION
SUBDIVISIONS & RESUBDIVISIONS
This checklist must be signed by plan preparer (P .E/L. S) declaring
that all required information is provided . Items 1-5 are required
for all applications ; Items 6-9 required where appropriate .
Check mark for each item supplied.
1 . On each sheet for plans or maps , title block with the
following information :
a. Name and address of subdivider.
b . Name and address of Land Surveyor or Professional
Engineer .
C . Name of subdivision .
d . Date when drawings were made.
North arrows
V 2. Key Map An overall mar drawn to a scale of 1 inch
equals 200 feet , which can be used as an overlay on
Metropolitan District Maps . This map will show the
overall design of the subdivision and will include:
a. Layout of streets with names
b . Layout of lots and lot numbers
C. Open space land
d . Arrows indicating general direction of drainage
e. Lines indicating sanitary sewer system flow
f . Total acreage of subdivision
g. Total number of lots
h. Names of surrounding property-owners , and
properties within 500 feet of the site
I/
3 . Plot Plan ..
A layout map of the proposed subdivision
drawn to a scale of 1 inch equals 40 feet on either of
the following size sheets - ( 1) 25" X 37" with a 3/4"
ruled margin ; (2) 15" X 24" with a 1/2" ruled margin -
containing the following data:
Page 2 (Subd . & Resub . )
a. Distance and bearings of all boundarylines .
- /
y b . Lot layout numbers square footage of all
Q g lots , and
all lot dimensions . Iron pins to be shown at all
lot angle points. Lots should not be fragmented
onto separate sheets except where size is
prohibitive .
N /4C . Proposed streets and street lines with center line
/ stations , and curve data.
V
d . Building lines in accordance with zoning
regulations.
e. Easements , noting grantors , grantees , and purpose .
f . Proposed names of street .
g . Names of abutting property-owners.
h. Monuments will be indicated at corners and angles
of all streets and at all points of curvature and
tangency . In areas accessible to Metropolitan
District Commission points , or other coordinated
points , the monumented points within proposed
subdivision shall be coordinated. These
coordinates shall appear in tabular form on the
plot plan . The accessibility of these MDC points
shall be determined by the Town Engineer .
N i. All open space reserved for parks, playgrounds, or
/ other common or public uses shall be indicated .
Y
j . A-2 Certification , P .E. /L. S . Seal .
IN /4 k. Traffic control signs and pavement markings
required by Traffic Authority.
4 . Topographic Map :
A map drawn to a scale of 1 inch to
40 feet on sheets not exceeding 25 inches by 37 inches
including ruled margins and shall , in addition to the
requirements of the plot plans , show the following :
!'' A a. All existing and proposed buildings.
AIA b . Curb lines and pavement width, sidewalks.
AIA C. Existing and proposed sanitary and storm sewers, if
any.
A/A d . Existing and proposed water and gas main systems .
e. Present wooded areas indicated by a "foliage line" .
Any individual trees to be saved should be shown.
f . Existing proposed and contours shall be shown at
not less than two-foot intervals ; but in cases of
relatively level land , the contours shall be
one-foot intervals .
Page 3 ( Subd . & Resub . )
A/11 g . Proposed storm drainage system showing all catch
basins , endwalls , manholes , lengths , and sizes of
pipes . (Minimum distance between catch basins
shall be 300 feet and minimum size of storm drain
lines shall be 15 inches . )
N /�} h. Connections of all springs into proposed storm
drainage system as needed .
' i . Location and indications of existing brook
channels , and 100 year flood limits.
V
J A-2 Certification ; P. E. /L.S . Seal
✓ k. Regulated wetlands and 100-year flood plain or note
that site contains none.
Al /A 5 . Drainage calculations - Zero Runoff Increase per
attached guidelines.
A A 6. Plans and Profiles : A plan and profile of the proposed
streets drawn on plan/profile paper of scales 1 inch to
40 feet horizontally and 1 inch to 4 feet vertically on
sheets not exceeding 25 inches by 37 inches including
ruled margins and containing the following:
a. Layout of streets in sections coordinated by
stations with the profile .
b . Street plan showing roadways , drainage and partial
lot lines .
C . Sight line at street intersections .
d . Profile of roadway showing existing and finished
grades . Roadway profile will show all tangent grade
and all vertical curve information .
e. Profile will show all catch basins and all drainage
lines between catch basins with all invert and top
of frame elevations . Drainage lines will be shown
and described as to material .
f . Typical/critical cross-sections where grading is
outside street right-of-way or is at street
right-of-way.
g . Where any storm drainage line discharges into an
existing brook, sufficient profile of this brook
will be shown to determine conditions.
h. Metropolitan District Commission datum shall be
used on all subdivisions accessible to controls.
The Town Engineer shall , based on standard
engineering practices , determine the accessibility
of these controls.
tOw N dE4
C T-0�� siou� ?0&&'61at
w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
l�osoR•Co AREA CODE 203/644-2511
M E M O R A N D U M
December 1 , 1987
TO: Marcia A. Banach, Director of Planning
FROM: Michael J. Gantick, Director of Public Works
SUBJECT: Engineering Review
Carino Resubdivision
Ellington Road
Please be advised that this Department has reviewed the subject plans
dated November 14, 1987 and the following points are noteworthy:
1 . The lots should be pinned at all corners .
2 . The development of the proposed lot will require a DOT Construction
permit prior to the issuance of a building permit by the Town , .
3. Any proposed drainage from the proposed lot onto an adjacent lot will
require the appropriate drainage rights. l �,a -",r ./> I. . �.a ° ��-� ,.. `/kc
d U c+r ✓� ds�2 r c; �f a c i �' .�t'4/ t z )`' eon
r`
� :- Pro�ased--ut-ilP -es__ta--ser ce tine lot---aho-uld- b..e._-so, �nd�ca e
5 . Sanitary waste disposal will require a review by the Town Sanitarian.
If you have any questions regarding the above matter please contact me .
MJG/jsv
cc : PZC File
Engineering Department File
wN SC4
�v 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074
S 11-co AREA CODE 203/644-2511
December 119 1987
Joseph J. & Santina D. Carino
2545 Ellington Road
South Windsor , CT 06074
re : Application #1310
Carino 1-Lot Resubdivision
Dear Mr . & Ms . Carino ;
Please be advised that the Planning and Zoning Commission voted at its
December 8, 1987 meeting to approve the above-referenced application for a
one-lot resubdivision , based on plans prepared by Petersen & Hoffman dated
Oct . 1987 (revised Nov . 1987) consisting of Key Map and Plot Plan , subject
to the following conditions :
1 . A and Easements for conservation
purposes, drainag_e or utilities, that e required in connection
with the approval of this subdivision ; t be submitted to this
Commission prior to filing the mylars and issuance of building
permits . All deeds must be in accordance with the policy for
accepting deeds and easements and must be approved by the Engineering
Department and Town Attorney. T
s-p a c_e--.vi-U__b__ h P 1 rd t �-- nrp e t i o- �--he__ s .b,�; v; �; ,.n_--a n d
tla@n o_. a wn ounce 1--`f nce .
2 . Footing drains will be required for each house . Prior to the building
of any structure on a lot , a topographic map , drawn to a scale of 1" _
40' , shall be submitted for each lot in the subdivision, showing
proposed contours , elevations and the location of the footing drains .
No building permits will be issued until the proposed contours , floor
elevations and location of footing drains have been approved by the
Town Engineer .
3. Drainage for this subdivision is subject to the approval of the Town
Engineer .
4. If , for any reason , finished grading and other site work is not
completed , the Town Engineering Department shall determine the amount
of a cash bond to ensure final grading and site work. This cash bond
must be submitted prior to issuance of a Certificate of Occupancy.
Joseph J . & Santina D. Carino - 2 - December 11 , 1987
5 . Water shall be supplied to this subdivision by Connecticut Water Co.
6. A drainage assessment fee in the amount of $50 shall be submitted to
this Commission.
7. No building permits will be issued until all conditions of approval
have been complied with , and the final plans have been filed in the
Town Clerk ' s Office .
8. Prior to commencement of any site work, a meeting must be held with
Town Staff . Revised plans are required one week prior to scheduling
the pre-construction meeting with Town Staff .
9. A $5, 000 subdivision bond will be required to cover as-builts and
setting of iron pins prior to issuance of Certificate of Occupancy.
10. D.O .T. construction permit is required prior to issuance of a building
permit .
11 . Proposed utilities must be shown on plans .
12 . Septic system approval is required from Town Sanitarian .
13 . A notation that Parcel A is not an approved building lot must be added
to plot plan.
14 . Note must be added that the lot meets the Town ' s 10, 000 sq. ft .
contiguous buildable area requirement .
Black and white transparent mylars of Key Map and Plot Plan with the above
modifications , together with three blueprint copies of the entire set of
plans , must be submitted to this Commission to be stamped and signed. The
letters of approval of this Commission , as well as the Inland Wetlands
Agency/Conservation Commission , must be reproduced on the mylars .
After the mylars have been signed by the Commission, they will be returned
to you for filing in the Office of the Town Clerk within 90 days . After
filing these plans , a copy of the receipt must be submitted to the
Planning Department .
Very truly yours ,
oe
By:
ay and F. Hallowell , Jr . , airman
Planning & Zoning Commission
cc : M. Gantick , Director of Public Works
F. Shaw, W. P . C. A .
T . D' Auria , Building Official
E. Belleville , Assessor
W. Lanning , Fire Marshal
M. Banach , Planning Director
Inland Wetlands Agency/Conservation Commission
Engineering
�ZC File
PLANNING DEPARTMENT
IN-HOUSE REFERRAL FORM
TO: Karl Reichle, mike Gantick, Mel Stead, Fred Shaw,
Date:
Richard J. Sartor, Gary Tyler, Fire Marshal Tanning, John Shemo
FROM: Marcia A. Banach, Director of Planning
The Planning & Engineering Departments have received plans for the
following project:
Subdivision Site Plan
Residential Commercial
Industrial
Location:
Project Description:
Future Town-owned property involved? YES NO
(a) new streets ( existing frontage also)
(b) new open space/recreation area
active passive
(c) new detention area
Planning Department comments : GL.
Please let me know by 3 )S% if you will have comments on
this application so that I can follow up with your department when I
do a Planning Department report.
�A wN sf,t�
y r T_ov� ap ?dzel�
o �
e �
_ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
soR•c0 AREA CODE 203/644-2511
March 24, 1988
11r. John M. Moran, Jr. , Chairman
South Windsor Inland Wetlands Agency/Conservation Commission
1540 Sullivan Avenue
South Windsor, CT 06074
RE: Carino Application Review
Dear Mr. Moran:
This proposal is before the IWA/CC because of the location of
Avery Brook as it crosses the rear of "Parcel B". The permit
would come under Section 5 .2 of the regulations.
If a permit were to be considered, the buffering of the water-
course should be spelled out on the plans. There isn't any
wetlands on the site and requiring the plans to be filed with
the Town Clerk should be sufficient bonding. There is apparently
insufficinet area to be disturbed on this wooded lot to qualify
for Sedimentation and Erosion requirements.
Very truly yours,
A. Bowen Davies
Deputy Town Engineer
ABD/jsv
cc: Joseph Carino, Etal
Michael J. Gantick, Director of Public Woks
Marcia A. Banach, Director of Planning ✓
IWA/CC File
w N aC4
y r eS ?d&"4-at
o D7-0w�
C V
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
R,Cpt
AREA CODE 203/644-2511
April 12, 1988
Joseph J. Carino
2545 Ellington Road
South Windsor, CT 06074
RE: Application #88-010W
Dear Mr. Carino:
ommome
At the April 11, 1988 Meeting, The South Windsor Inland Wetlands
Agency/Conservation Commission approved with conditions,
Application #88-010W.
The following conditions must be adhered to for this permit to be
valid.
1. The plans should show the 40' lines from the
watercourse.
2 . There be no encroachment within the 40, lines .
3 . The house should be shown as moved back 20, from the
original sight.
4 . The application shall indemnify and hold harmless the Town
of South Windsor against any liability which might result from
the proposed operation or use.
5. The permit is valid for one year and shall expire on April
11, 1989 .
Very truly yours,
John M Moran, Jr. Chairman
Inland Wetlands Agency/
Conservation Commission
JAMJr.. /pmm;
cc: A.B. Davies, Deputy Town Engineer
Marcia Banach, Director of Planning
Michael Gantick, Director of Public Works
Building Department
:x;IK&Ymond-ReCUbwoll-, Chairman,, P ZC
��01/N jt,t
C to T-0� �s �•
D
u
_ 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
e•c '��► AREA CODE 203/644-2511
April 22, 1988
Mr. Joseph J. Carino
2545 Ellington Road
South Windsor, CT 06074
re: Appl. #88-10P - Carino 1-Lot Resubdivision
D ar Mr. Carino:
P1 as be advised that the Planning and Zoning Commission voted on
April 19, 1988 to approve the captioned application for a 1-lot
resubdivision in accordance with plot plan and key map prepared by
Petersen and Hoffman dated Oct. 1987, revised through January 1988,
and with the following modifications:
1 . Footing drains are required for each house. Prior to the
building of any structure on a lot, a topographic map,
drawn to a scale of 1" = 4011 , shall be submitted for each
lot in the subdivision, showing proposed contours,
elevations and the location of the footing drains . No
building permits will be issued until the proposed
contours, floor elevations and location of footing drains
have been approved by the Town Engineer.
2. Drainage for this subdivision is subject to the approval of
the Town Engineer.
3 . If, for any reason, finished grading and other site work is
not completed, the Town Engineer shall determine the amount
of a cash bond to ensure final grading and site work. This
cash bond must be submitted prior to issuance of a
Certificate of Occupancy.
4 . Water shall be supplied to this subdivision by Connecticut
Water Co.
Mr. Joseph J. Carino 2 April 22, 1988
5. A drainage assessment fee in the amount of $50 shall be
submitted to this Commission.
6 . This application is subject to the conditions of approval
of the Inland Wetlands Agency/Conservation Commission.
7 . Prior to commencement of any site work, a meeting must be
held with Town Staff.
8 . All plans used in the field by the developer must bear the
stamp and authorized signature of the Town of South
Windsor.
9 . No building permits will be issued until all modifications
have been complied with, and the final plans have been
filed in the Town Clerk's office.
10 . A $5,000 subdivision bond is required to cover as-builts
and setting of iron pins prior to issuance of a Certificate
of Occupancy.
11 . Dept. of Transportation construction permit is required
prior to issuance of a building permit if a new driveway is
constructed.
12 . Septic system approval is required from the Town
Sanitarian.
13 . A note must be added that the lot meets the Town's 10,000
sq. ft. buildable area requirement.
14 . Proposed water line must be shown on the plan.
15 . Cross-travel easements should be shown on the plan for a
shared driveway.
Black and white transparent mylars of Key Map and Plot Plan with the
above modifications, together with three blueprint copies of the
entire set of plans, must be submitted to this Commission to be
stamped and signed. The letters of approval of this Commission, as
well as the Inland Wetlands Agency/Conservation Commission, must be
reproduced on the mylars .
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within 90
days . After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
Mr. Joseph Carino 3 April 22, 1988
Very truly yours,
PLANNING AND ZONING COMMISSION
lGC'GL
Ra and F. Hallowell, Jr.
Chairman
cc: M. Gantick, Director of Public Works
F. Shaw, Supt. of Pollution Control
Building Dept.
E. Belleville, Assessor
W. Lanning, Fire Marshal
M. Banach, Planning Director
Inland Wetlands Agency/Conservation Commission
PZC File
Petersen & Hoffman
Applicant
�4o,MM
C r T-ov� �S ?d&zd46Ot
e P
�v 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
�'►osoR-co AREA CODE 203/644-2511
TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, APR. 23, 1988
LEGAL NOTICE
TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
At the April 19, 1988 meeting, the Planning and Zoning Commission
voted to take the following action:
1 . Approve, with modifications, the application of Southridge
Estates, Inc. for a 6-lot Subdivision to be known as "Linda
Lane Estates" on the east side of Nevers Road, RR Zone.
2 . tpp
r , modifications the application of Joseph J.
rino for a 1-lot Subdiv' on on the east side of
ington Road, e.
3 . Deny the application of Samuel Sisisky for 2-lot
Resubdivision; one lot at the west end of Greenfield Drive
and the other at the west end of Farmstead Drive, A-20
Zone.
Dated at South Windsor, Connecticut this 20th day of April, 1988 .
PLANNING AND ZONING COMMISSION
Raymond F. Hallowell, Jr. , Chairman
Marshall Montana, Secretary
June 2, 1988
Joe Carino
P.O. Box 503
South Windsor, CT 06074
RE: Preconstruction Meeting - 1 lot subdivision on Ellington
Road
IN ATTENDANCE
Name Company Telephone #
M. Banach Town of South Windsor 644-2511
Joe Carino 565-4247
Judy Carino 565-2164
A.B. Davies Town of South Windsor 644-2511
The following is a brief summary of points discussed during the
meeting.
Public Works
1. Three complete sets of approved/revised plans needed prior
to start of construction.
2, Any problems and/or questions regarding construction of
this project will be directed to Judy Carino in the field.
3 . Forty-eight (48) hours notice needed for Certificate of
occupancy inspection. Two week review period (10 working
Days) needed for all individual site (lot) plans prior to
issuance of building permit (may be longer if application
is incomplete) . Copy of Building Permit and C.O.
Guidelines given to Joe Carino.
4 . Only approved copies of subdivision plans and lot sit-
plans to be used. Any proposed changes are to be presented
to Engineering/Planning & Zoning prior to implementation.
Planning Department
1 . Need $50.00 drainage fee; $5000.00 subdivision bond prior
to filing mylars in Town Clerk's Office.
Very truly yours,
Marcia A. Banach
Director of Planning
MAB/pmm
cc: Michael J. Gantick, Director of Public Works
A.B.Davies, Deputy Town Engineer
Mr. Raymond Hallowell, Chairmen
South Windsor Planning & Zoning Cc =ission
Town of South Windsor
1540 Sullivan Avenue
Smith Windsor, Ct. 06074
Dear Mr. Hallowell
My application #88-10P was approved by the Planning and Zoning
to mi
Cssion on April 22, 1988.
Item #10 stated that a $5,000.00 (five thousand) dollar bond was
to be posted to assure the boundry pins were installed and
"as-built" plans were completed and submitted to the Town.
The pins were installed at the four corners of the lot prior to
my application being presented to the Camussion and the
"as-built" plans were submitted to the planning office with this
letter.
Assuming the "as-built" plans meet the requirements as set forth,
I request the release of the bond that was posted for this
application.
V truly yours
Joseph J. Carino
Ellington Road
South Windsor, Ct.
cc: fc
1540 SULLIVAN AVENUE SOUTH WiNDSOR, CONK. 06074
AREA CODE 203/644-2511
'OSOR. '0.
March 2 , 1989
Mr. Joseph Carino
Ellington Road
South Windsor, CT 06074
Dear Mr . Carino:
Re: $5, 000 Subdivision Bond
Please be advised that the above mentioned bond was released by
the Planning & Zoning Commission at their February 28 ,
1989 meeting.
Please contact the Planning Department at 644-2511 to make
arrangements to pick up the bond.
Very Truly Yours ,
Raymond F . Hallowell
Chairman of Planning & Zoning Commission
cc 41*'Z'OC f i I-e
Marcia Banach, Director of Planning
IWA/CC file
STANDARD APPROVAL MODIFICATIONS FOR SUBDIVISIONS
PROJECT 1 4,6 A APPL. # fi--d /y NO. OF LOTS
ARCHITECT ENGR. + a �rz PROJ. NO.
DWG. NOS. , DATES, REV. DATES pC pey, if
1 . All deeds for open space and roadways; and Easements for
conservation purposes, drainage or utilities, that may be
required in connection with the approval of this
subdivision, must be submitted to this Commission prior to
filing the mylars and issuance of building permits . All
deeds must be in accordance with the policy for accepting
deeds and easements and must be approved by the Engineering
Department and Town Attorney. The deeds for the roadw<iys
and open space will be held in escrow until completion of
the subdivision and then referred to the Town Council for
acceptance.
2. Concrete sidewalks, built to Town specifications, shall be
installed on [one] [both] side[s] of all new streets .
(' 3 . Footing drains are required for each house. Prior to the
building of any structure on a lot, a topographic map,
drawn to a scale of 1" = 40" , shall be submitted for each
lot in the subdivision, showing proposed contours,
elevations and the location of the footing drains . No
building permits will be issued until the proposed
contours, floor elevations and location of footing drains
have been approved by the Town Engineer.
4 . Drainage f is subdivision s h o or this is subject to the approval f
the Town Engineer.
L" 5 . If for an reason finished grading and other site work is
• Y , g g
not completed, the Town Engineer shall determine the amount
of a cash bond to ensure final grading and site work. This
cash bond must be submitted prior to issuance of a
Certificate of Occupancy.
6 . All lots shall be serviced by the Town of South Windsor
sanitary sewer system and are subject to the approval of
/ the Water Pollution Control Authority.
7 . Water shall be su plied to this subdivision by
S . Street lighting shall be installed on streets, at
intersections, and on cul-de-sacs in accordance with the
policy established by the Town Manager. Street lighting is
to be coordinated with the Chief of Police.
9 . Street names and locations of fire hydrants are subject to
the approval of the Fire Marshal of the Town of South
Windsor. Street names and supporting posts shall be
installed by the developer in conformance with the
standards of the Town of South Windsor, at no expense to
the Town.
10 . Quantity estimates must be submitted to the Town Engineer
for the purpose of determining subdivision bonding, and all
bonds shall be posted prior to filing the plans .
If the developer chooses to submit a Letter of Credit for a
one year term, in lieu of a surety bond, said Letter of
Credit must be renewed on a yearly basis until completion
of the development. If a new Letter of Credit has not been
received within 30 days before the expiration date, the
Commission may, at its option, call the Letter of Credit it
is holding.
A drainage assessment fee in the amount of [$50 x r lots]
shall be submitted to this Commission.
12 . A liability insurance policy shall be submitted to this
Commission naming the Town of South Windsor as an insured,
with a combined single limit for bodily injury and/or
property damage in the amount of $1,000,000 .
✓ 13 . This application is subject to the conditions of approval
of the Inland Wetlands Agency/Conservation Commission.
✓ 14 . Prior to commencement of any site work, a meeting must be '
held with Town Staff .
15 . All plans used in the field b the developer must bear the
P Y P
stamp and authorized signature of the Town of South
Windsor.
16 . No building permits will be issued until all modifications
have been complied with, and the final plans have been
filed in the Town Clerk' s Office.
Black and white transparent mylars of Sheet(s) # 1
with the above modifications, together
with three blueprint copies of the entire set of plans, must be
submitted to this Commission to be stamped and signed. The letters
of approval of this Commission, as well as the Inland Wetlands
Agency/Conservation Commission, must be reproduced on the mylars .
After the mylars have been signed by the Commission, they will be
returned to you for filing in the Office of the Town Clerk within 90
days . After filing these plans, a copy of the receipt must be
submitted to the Planning Department.
o
h r 7-- ✓
r
(r 4
l ✓u.�N \ ✓ J�,�I y 'C� .1 1 (! 0 .D r!°d1 .l�Yc I '`J C/ ( ��'S•t..�f 41
r.
17 h f