Loading...
HomeMy WebLinkAboutRESUBDIVISION (27) APPLICATION TO TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION PLANNING AND ZONING COMMISSION ACTION THIS APPLICATION SHALL BE RECEIVED APPLICATION NO. UU 7 BY THE PLANNING AND ZONING COMMIS. RECEIVED DATE S - - a SION AT THE REGULARLY SCHEDULED MEETING ON THE FOURTH TUESDAY OF PREL. APPROVAL DATE THE MONTH AT TOWN HALL. FINAL APPROVAL DATE REJECTED DATE RECEIPT NO. APPLICANT James M i 1 ki e ADDRESS 160 Newberry Road, South Windsor, CT OWNER Thomas Burgess etal ADDRESS 828 Sullivan Avenue, South Windsor, CT LOCATION OF PROPERTY As shown on map ZONE A-40 CHECK ONE OF THE FOLLOWING: 1. Zone Change (Public Hearing) 2. Filing for Subdivision (See "Subdivision Check List") X_3. Filing for Re-Subdivision (Public Hearing) 4. Special Exception Article 4.1.8 (Public Hearing) Article 4.2.3 (Public Hearing) Article 4.7.2.7 (Public Hearing) Article 4.10.2.4 (Public Hearing) 5. Parking—Article 8.5.16 (Public Hearing) 6. Site Development Plan—Article 4.11 7. Removal of Sand, Gravel, Clay or Quarry Stone & Ore (Public Hearing) 8. Other STATE CLEARLY AND BRIEFLY THE REASONS FOR APPLICATION Zoning regulations require filing for a Re-subdivision 1. Application and supplements must be filed in triplicate. 2. Application must be typewritten or printed in ink. 3. The applicant or his representative must be present at the Commission Meeting. 4. Application Fee of $25.00 required for filing Items 1, 2, 3, 4, 5, and 7 to defray expenses. Applications, other than for subdivisions, shall be accompanied with three copies of a map, minimum size 81/2 x 11 inches, drawn to scale showing the land, buildings present and proposed, plot depths and measurements, street and building lines, also a measured distance to nearest street corner, names of abutting property owners, and a sufficient portion of surrounding area to make such a map readily intelligible, and the subject property either shaded or cross-hatched. If approved, the Zoning Commission reserves the right to request and the applicant hereby consents to furnish, within sixty days following approval, three maps prepared by a qualified civil engineer or surveyor showing the items above. SIGNE APPLICANT OWNER D UD WETL NDS AND WATLR C©UiZ' SES �,,• APPLICAl_O�T IlM-421D WETLANDS AGENCY ACTION THIS APPLICATION SH:Akl- ;• BZ RFC:e:•rTIRD Ar''nLs.CA�tIOsT�IiO. _�?�?'� ,_..._._..., B. THE 11IL•A?iD i1-1'I' G?'iD� �,.Gr`�C .P`f' i L Y PRF.L. 4sv iP0�TAL DATE RTGUL=.. Y S C .D`JLED ] 'E^1 i�F:- ON THE SECOND 1:.0�TDAY C�' T} i�rOvi� r'�T TOjn}I P JBLIC iiEI RRIG DAB' HALL. FORMAL REVIEW DATE (Co:a-03eted Apnli cation) PEMMI-) GRATTrb DA'T PLEASE PRINT A: D FILE IN TRIPLICATE E PE :� IT DENIED DATjE AT THEE OFFICE OF TO?PLf. CLERXv TURT O r SOUTr: WINDSOR, 0"r j1�T�: PP�IOR TO TAE t REGUj-AR, 'M� I D�TE- .1 . APPLICANT . . NO. _ ADDRESS C ITY STATE - 2. O:ti NER .-� `t,.� TEL 130. _ ADMES S CITY & STATE %!� a 3.- L0tiATIL0X OP PROPERTY - 4 0, N n-t'-2S OF ADJACENT PROPERTY VVITMS ST A`_E CLEARLY = -D •BRT'ELY f �. PO-"'"S .'AND DESCRIPTION OF THE. PR ?. �� �_ - 0_ D ACTIVITY.,TY A`�D Tom' E r .-% �� J�� r III TIs•,'�. E •y"c_1? 6. ADDIT►YY:'.�:,, I�:Fu;2-fATT0lT AS MAY BE BY 55M, AGENCI► - 1%r THE APPLTC_42,T MNDERSTA fD3 THAT VETS AP-PLIC-4 TI02. IS TO BE; CO% '`T T .r ' J f E ) C014PLE;� O" LY W��T ALL .1- lU I T �. D��-� -� �, - .._..�..� --t--� O 1 t 7.��..V:i r •J 4a� if T►Z �",��1 j'�'� i� 'n•.-�si' -i "�� !� HAVE BEEN SUD" 41ITIrrm"D V M;E• A?r?OVAL L!Y ALSO M N JSS r r"� r LS,vFROI ^�- rL- r I • a` t ZG:ir;rc -miO.T. :OTs- IF YOU, PROPOS O AC^! I6 FOMID ifl 4 R EsuL c O C�1 !it Tim 4 r 0? 15. SIG�t' D: k—� r ✓i�e3 12/1 3/74 �0,0 f�< O � ap Soa& ?dzn� d 1540 SULLIVAN AVENUE -• SOUTH WINDSOR, CONN. 06074 OR-CO AREA CODE 203/644-2511 March 18, 1976 CERTIFIED P,.AIL Mr. JameSKMilk' 160 Newber oad South Windsor, Conn . 06074 Dear Sir: At the March 15 meeting of the Inland Wetland Agency, a permit was granted, with conditions, for your Application No. 025 for a 3—lot subdivision located on Newberry Road, South Windsor, Connecticut. This permit is granted for the set of plans drawn by Hayden L. Griswold, Jr. , dated February, 1976, Set 1 of 1, Scale 1" = 40 feet. The following conditions must be adhered to for this permit to be valid: 1. There shall be a conservation easement on Lot 8. This easement shall be acceptable to the Town Attorney and shall be submitted to the Inland Wetlands Agency for approval. 2. The area covered by the conservation easement is shown on the map and shall be specifically described in the written easement. 3. If any future changes are proposed on Lot 8 that differ from exactly what is shown on the map by Griswold and Fuss, approval for these changes will be necessary from the Inland Wetlands Agency. 4. The applicant ' shall indemnify and hold harmless the Town of South '�iindsor against any liability which Might arise from the proposed operation and use. Very truly yours, Constance Eriksson , Chairman Inland Wetlands Agency CE:bck cc: Thomas Burgess James Sommers, Griswold & Fuss Terry Sprenkel William Grace Joseph Walsh Jules Page Sandra Bender Charles Enes 1Dcn 1 r .'_cLau="a�in j-BLIC 014 S DEPA R Tvf T pC? T11O'l C:O."ITT,,10L DIV ST_TI M Frank J. Sv i a- Pollu:-ion. Control Supe�.;.nter-den.t F'P;.4 : Melvin. Edwards, Jr. _ Sanita J ynspector DATE : 07 'May, I W6 s7,r. 111LUE,S ',aU: �� ROAD SUB—DrJ71SION I have review ad the plans for the subject which you gave np earlier• tTjjs weep, and have found everything to be in accordance with State impartment of Health requirementsw herpere rate for each lot (V in 5 minates) is well within limits and dictates a field size of 125 squatre feet per bedroom, with a minimum mum allowable held of 375 square feet R. ctfully submitted by, } Melvin Edwards, Jr.. Sanitary Inspector cc file L �0 C-� ..v tZj MCn H H En H O tLi K O a d Planning and Zoning Commission Town of South Windsor,Conn.,a60T4 Mr. William E. Grace May 22, 1976 Dear Sir: This concerns a water line proposed to be constructed on Newberry Road in South Windsor by the Metropolitan District.. A hearing was held recently on this_ propos-alp but we were not notified of any decision. We however observed stakes which appear to indicate that construction of this line is, planned along the north side of Newberry Rd. We presently are served by our own water line which runs along the north side of New- berry Rd,. We have no objection to a new line being constructed on the south side of Newberry Road to provide service to area not now, supplied , but we do object to construction on the north side of Newberry Road where it could and probably would inter - fere with our present water line. Respect.-fully submitted: Prope*ty Owner Address J Memorandum June 3, 1976 To: Buck Page � From: Mel Stead Re: Milkie Subdivision - Newberry Rd. near Rt. 5 A preliminary review of the proposed subdivision indicates three basic problem areas. 1. The present street line in this area is 33 feet. The final plans should indicate that a new street line 25 ' from / the center of the existing pavement will be provided. 2. Although a drainage easement to the Town of South Windsor has been provided, a right to drain to the existing brook channel must also be obtained. 3 . Storm water drainage in this area is not adequate and the use of driveways in this area and the change in ground cover and grade will increase the drainage problems already experi- enced in this area. Planning and zoning should consider obtaining down stream storm drainage improvement funds to help remedy this situa- tion. one final comment for consideration is the close proximity of existing sanitary sewers in Rt. 5. The active sewer is approxi- mately 750 feet east of Lot 6. cc: Al Young, Bill Grace ` O'N N S E4 O-P Sou� `J�N • 1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. 06074 soe cor'� AREA CODE 203/644-2511 June 24, 1976 Mr. James Milkie 160 Newberry Road South Windsor, Connecticut 06074 Dear Mr. Milkie: This is to notify you that the Planning arld Zoning Commission voted to approve your application for a three-lot resubdivision of property, located on Newberry Road, subject to the following conditions: 1. Water shall be provided by the Metropolitan District Commission through a water line which shall be extended from Route #5 along the southerly edge of Newberry Road. 2. Sewage disposal shall be approved by the Town of South Windsor Pollution Control Department. 3. A drainage assessment fee in the amount of $150. shall be submitted. 4. Prior to issuance of any building permits, house foundation elevations and proposed contours for each lot shall be approved by the Town Engineer. Each lot shall be designed to provide zero increase in storm water drainage run-off, subject to the approval of the Town Engineer, prior to issuance of any building permits. 5. A conservation easement shall be submitted to the Town of South Windsor Inland-Wetlands Agency on lot #8, as outlined in their letter dated March 18, 1976, granting a permit. 6. Erosion control measures during construction, as noted on the plans, shall be complied with. 7. The plans shall be modified to show a 25-foot right-of-way from the center line of the pavement on Newberry Road. 8. Location of fire hydrants shall be subject to approval by the Fire Marshal of the Town of South Windsor. 9. A liability insurance policy shall be submitted, satisfactory to the Town Attorney, in limits of not less than $250,000 per person; $500,000 per occurrence bodily injury, and $100,000 property damage, naming the Town of South Windsor as an insured. Mr. James Milkie -2- June 24, 1976 10. Before issuance of any Certificates of Occupancy, each lot shall be inspected and approved by the Town Engineer for compliance with the plans and proposed contours and elevations. 11. A 24" x 36" black and transparent plot plan, printed on polyester film, shall be submitted to the Planning and Zoning Commission to be stamped and signed and filed, at your expense, in the Office of the Town Clerk of the Town of South Windsor. This letter of approval from the Planning and Zoning Commission, and the letter of approval from the Inland-Wetlands Agency, dated March 18, 1976, shall be reproduced on these plans to become part of the final plans. Also, three paper prints of the complete plans shall be submitted. Very truly yours, PLANNING AND ZONING COMMISSION By ' obert F. Gilligan, Act' g Chairman RFG/src cc: D. McLaughlin, Building Inspector and Zoning Enforcement Officer A. Young, Town Engineer and Director of Public Works B. McNamara, Assessor M'. Stead, Project Engineer F. Smith, Superintendent of Pollution Control W. Lanning, Fire Marshal J � MEMORANDUM TO: Allan Young, Town Engineer and Director of Public Works FROM: J. E. Page, Planning-Coordinator DATE: June 24, 1976 SUBJECT: James Milkie three-lot resubdivision, Newberry Road Attached is a copy of the Planning and Zoning Commission's approval letter for the Milkie Resubdivision located on Newberry Road. The Commission received several letters from residents on Newberry Road requesting that the water main be installed on the south side of Newberry Road. A water line made of plastic was installed years ago on the north side of Newberry Road to service the existing homes. The residents' concern is that any construction activity on the north side would damage the existing plastic main. The Planning and Zoning Commission requested that the Engineering Bureau insure that the new water main is installed on the south side of Newberry Road, as shown on the plans. J. E. Page, Planning-Coordinator JEP/src cc: M. Stead, Project Engineer W. Grace, Chairman - Planning and Zoning Commission �0,0 r TSot� ?A;ez� O 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soR•co� AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL-INQUIRER SATURDAY, JUNE 269 1976 LEGAL NOTICE PLANNING AND ZONING COMMISSION TOWN OF SOUTH WINDSOR At the June 222 1976 meeting, the Planning and Zoning Commission voted to approve the application of James Milkie for a three-lot resubdivision of property, owned by D. J. Henry Trustee, located on the south side of Newberry Road, near the intersection of John Fitch Boulevard, in an A-40 Zone. Dated at South Windsor, Connecticut this 23rd day of June, 1976. PLANNING AND ZONING COMMISSION William E. Grace, Esquire, Chairman Albert C. Aniiello, Secretary ° Burgess Sheridan Co. , Inc. GENERAL INSURANCE • REAL ESTATE • FINANCIAL PLANNING P.O. Drawer P T lephone 828 Sullivan Av nu (2M) 6"_24M South Windsor, Connecticut 06074 T.M. BURGESS R.J. SHERIDAN V. PRESTILEO N. NICHOLSON September l. b Town of South Windsor Torn Hall 1540 Su11.iYan Ave. South Windsorf Como 06074 Attentions fir. William Grace, Chairsan zoning Hoard Dear Hr• Grace: The Sub-Division on Dewberry Road of choose Hilkie has been ap"p sabJect to condition. We would I' an extension of clays to meet your req ;Lrewmte. Yours +�vlys s K. Biug®s8 TMBsnen KEY MAP JAMES MILKIE SUBDIVISION SCALE:1" 200' cd�o co s � NEW?ERRy IATS4G'/.4 TES O 07 O - R l TOTAL AREA OF T,,TAC-r /7Z,Z93 SQ.FT IGRISWOLD 81 FUSS,INC.