Loading...
HomeMy WebLinkAbout2 LOT SUBDIVISION, NEVER FINALIZED TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMriIS S ION PLANNING AND ZONING COM ISSION ACTION THIS APPLICATION SHALL BE ACCEPTEI BY THE PLANNING AND ZONING APPLICATION O 'COMMISSION AT THE REGULARLY RECEIVED DATE: as I h 5 SCHEDULED MEETING OF THE FOURTH APPROVAL DATE: TUESDAY OF THE MONTH. IT SHALL BI REJECTED DATE: SUBMITTED TO THE PLANNING AMID RECEIPT ZONING COMMISSION OFFICE ONE (1) WEEK PRIOR TO THE FOURTH TUESDAY. APPLICANT: aiwas ADDRESS: y OWNER OF RECORD ON S.W. LAND RECORDS_ /� y�° SWILL ADDREss 29/ Z-zKAe r COMPLETE DESCRIPTION OF LOCATION OF PROPERTY e �` �e ZONE _/>P THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING) 1. Zone Change to - - - - _ Zone (public hearing) c/ 2. Filing for Subdivision 3. Filing for Resubdivision (Public Hearing) 4. Special Exception to Article of the Zoning Regulations (Public Hearir S. Site Development Plan 6. Removal of Sand, Gravel,. Clay or Quarry Stone .& Ore (Public Hearing) 7. Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE OWNER OF THE PROPERTY AND SUBMITTED ALONG WITH THREE SETS OF PLANS BEFORE IT WILL BE ACCEPTED BY THE PLANNING AND ZONING COTIMISS ION. SIGNED: MAY 2 2 1979 APP I OWNER PROCEDURES TO BE FOLLOWED WHEN SUMMING THE APPLICATION: 1. Applications must be filed in triplicate. The applications shall be t or neatlytyped printed. 2. Maps and plans, as defined in the applicable regulations, shall be submitted in triplicate with the application forms. 3. An application fee of $25. is required for filing items #1, #4 and #'6. 4. A subdivision fee of $25. per lot ($50. minimum) is required for filing items 1#2 and #3. 5. A $20. deposit must be submitted with any item requiring a public hearin This deposit is for a sign to be placed on the p g� property by the applicant advertising the public hearing. The check will be returned to you when the sign is returned to the Town. 6. Application for Zone Change (item shall comply with Section 11.2.3 of the Zoning Regulations. 7. Application for subdivision and resubdivision (items #2 and #3) shall comply . with the requirements set forth in the Town of South Windsor Subdivision Regulations. 8. Application for site plan of development (item #5) shall comply with Section 4.11 of the Zoning Regulations. 9. Application for sand and gravel removal'shall comply with Section 9.3 of the Zoning Regulations. f IN ACCORDANCE WITH STATE STATUTES, THIS APPLICATION WILL BE ACTED UPON BY THE PLANNING AND ZONING CON24ISSION, OR A PUBLIC HEAPING DATE WILL BE SET, WITHIN 65-DAYS OF THE DATE OF ACCEPTANCE OF THE APPLICATION. i . �oW N Et< O I F' 7_au� V 1 Sou� • a 1540 SULLIVAN AVENUE . SOUTH WINDSOR. CONN. 06074 OR-co AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL-INQUIRER TUESDAY, MAY 292 1979 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At the May 24, 1979 Special Meeting, the Planning and Zoning Commission • voted to take the following action: 1. Accepted the withdrawal of the application of Samuel D. Evans for a subdivision of a large tract of land located on the corner of Ellington Road and Ne iderwerfer Road in a RR Z one. 2. Approved, with conditions, the application of Thomas G. Dennis for a two lot subdivision of property owned by Mildred B. Smith located on the easterly side of Foster Street back to the end of Clinton Drive in a RR Zone. Dated at South Windsor, Connecticut this 25th day of May, 1979. PLANNING AND ZONING COMMISSION William E. Grace, Esquire, Chairman Marshall Montana, Secretary ��o•NN SF,<� C 0V 7'0�� o-P SC� . 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 �� sOe co ,w AREA CODE 203/644-2511 May 30, 1979 Thomas G. Dennis, Esquire 1708 Ellington Road South Windsor, Connecticut 06074 Dear Attorney Dennis: This is to notify you that the Planning and Zoning Commission voted to approve your application for a two-lot subdivision of property owned by Mildred B. Smith located on the easterly side of Foster Street back to the end of Clinton Drive in a RR Zone, subject to the following conditions: 1. Prior to any work being done on the lot (grading, drainage, sewers, etc.), the applicant is responsible for notifying adjoining property owners of this subdivision and advising the Planning and Zoning Commission in writing that this has been done. 2. Prior to any work being done on the lot (grading, drainage, sewers, etc.), the Planning and Zoning Commission shall approve the location of the house and driveway. 3. The dwelling on lot #2 shall be connected to the Town of South Windsor Sanitary Sewer System, subject to approval by the Town of South Windsor Sewer COTaniSSion. 4. Water shall be supplied to the dwelling on lot #2 by The Connecticut Water Company. 5. A drainage assessment fee in the amount of $50. shall be submitted. 6. A surety bond in the amount of $2,000 shall be submitted to insure repairs to the street. 7. Prior to the building of any structure on lot #2, a topographic map, drawn to a scale of 1 inch equals 40 feet showing proposed contours and elevations shall be provided. No building permit .will be issued until the proposed contours and floor elevations have been approved by the Town Engineer. No Certificates of Occupancy will be issued until grading plans have been complied with and accepted by the Town Engineer. If for any reason, finished grading and other site work is not completed, the Town Engineer shall determine the amount of a cash bond to insure final grading and site work. This cash bond shall be submitted prior to the issuance of a Certificate of Occupancy. Thomas G. Dennis, Esquire -2- May 30, 1979 8. A 24" x 36" black and transparent map, printed on polyester film, shall be submitted to the Planning and Zoning Commission to be stamped and signed. This letter of approval from the Planning and Zoning Commission shall be reproduced on and made a part of the final plans. A filing fee in the amount of $18. for the first sheet and $8. for any additional sheets shall be submitted prior to this subdivision map being filed in the Office of the Town Clerk of the Town of South Windsor. In addition, three paper prints of the subdivision plans shall be submitted. Very truly yours, PLANNING AND ZONING COMMISSION William E. Grace, Chairman WEG/src cc: D. McLaughlin, Building Inspector J. Page, Town Engineer B. McNamara, Assessor LAW OFFICES OF THOMAS G. DENNIS ; 170 ELLINGTON ROAD SOUTH WIND OR,C.ONNECTICUT 06074 F AREA CODE 20 644-Ib48 May 31, 1979 i The South Windsor Planning and Zoning Commission, at its May 24, 1979 , meeting approved, with conditions , my appli- cation for subdivision of property owned by Mrs. Mildred Smith, 296 Foster Street, South Windsor. The reason for the subdivision was to create a building lot, 2.42 acres in area at the end of Clinton Drive. The Planning and Zoning Commission has asked me to advise you, as an abutting land owner, of this approval and that I will be starting construction of a single family dwelling on the lot in the near future. If you have any questions concerning this matter, would you please give me a call and I would be pleased to discuss them with you. Very truly yours , E Thomas G. Dennis TGD/pj LAW OFFICES OF THOMAS G. DENNIS 1708 ELLINGTON ROAD SOUTH WINDSOR,CONNECTICUT 06074 AREA CODE 203 644-1548 May 31 , 1979 Planning & Zoning Commission South Windsor Town Hall 1540 Sullivan Avenue South Windsor, Connecticut Re : 2-Lot Subdivision - end of Clinton Drive South Windsor, Conn. Gentlemen: The enclosed letter has been sent to the following individuals , being all the owners of property abutting the above referenced 2-lot subdivision: Mr. & Mrs . Donald R. Sherman 187 Clinton Drive Mr. & Mrs. Ernest Reichle 27 Mountain Drive Mr. & Mrs . Paul R. Carey 290 Foster Street Mr. & Mrs. Mark F. Pietraszewski 264 Foster Street Mr. & Mrs. William L. Williams 258 Foster Street Mr. & Mrs . Edwin D. Barber 306 Foster Street Mr. & Mrs . Walter J. Cox 23 Broadleaf Drive Mr. & Mrs , Wilbur Mann 37 Fountain Drive ,,Very my Thomas Denni TGD/'pj enc. Ow N SL►4 O / S-0� • C r1 ' � T-G�� V s 1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. 06074 soR•c AREA CODE 203/644-2511 June 4, 1979 Thomas G. Dennis, Esquire 1708 Ellington Road South Windsor, Connecticut 06074 Dear Attorney Dennis: This is to notify you that the Planning and Zoning Commission voted to approve the application of 50-Acres Ltd. for an open space subdivision known as Wood Ponds, Section I, consisting of 20 lots on property located 1400 feet north of Miller Road, between Nevers Road and Abby Road, South Windsor, subject to the following conditions: 1. This approval is for lots #13, #14, #15, #16, #17, #18, #19, #20, #21, #22, #232 #242 #259 #263, #27, #283, #292 #62 #7, and #8, as shown on plans prepared and submitted by Luchs and Beckerman. The remainder of the land shall be designated as follows: The land shown as open space on the plans shall be so designated; the land shown for the detention pond shall be so designated; the remainder of the land shall be designated parcel "A". 2. The storm water drainage flow from this subdivision shall be directed through the abutting Balf property (as shown on sheet #1 of 1, titled "Detention System on Balf Property".) From the Balf property, at the storm water outlet structure, the storm water shall be directed to a swale (or other drainage system as agreed upon by the abutting property owners, the Town of South Windsor Engineering Bureau and the Planning and Zoning Commission.) The swale shall be in place from the outlet structure to the Podunk River on property of Russo Brothers and the subdivision known as South Ridge Estates. Easements to the Town of South Windsor from the properties of Balf, Russo Brothers and the subdivision known as South Ridge Estates shall be provided for the construction of a storm drainage system. The complete drainage plan as designed by the Town of South Windsor Engineering Bureau, (or other drainage system as agreed upon by the abutting property owners, the Town of South Windsor Engineering Bureau and the Planning and Zoning Commission) shall be operable prior to work commencing on this subdivision. 3. A surety bond in the amount of $225,000 shall be submitted to secure completion of all subdivision improvements in Section I. A surety bond in the amount of $35,000 shall be submitted to secure completion of the detention basin and all downstream improvements on the Balf property. Thomas G. Dennis, Esquire -2- June 4, 1979 4. The detention basin shall be owned by the applicant until all phases of the subdivision are 100 percent completed. The Town shall accept the detention basin only after inspection and certification by the Town Engineering Bureau that the detention basin has been built according to the approved plans and is functioning correctly. The plans for approval of Section I shall not be filed until the Town Council has given preliminary approval to accept the open space land and the detention basin, in accordance with criteria established by the Council on 3-28-77. A warrantee deed for the land containing the detention basin and all the land designated open space shall be submitted to the Town Attorney to be held in escrow by the Town of South Windsor. 5. All improvements to the existing detention basin and all downstream improvements to the Balf property shall be approved by the Town Engineering Bureau, and all details shall be shown on the plans. All drainage pipes and outlet structures shall be reinforced concrete. No Certificates of Occupancy shall be issued until all improvements to the detention basin and the Balf property are completed to the satisfaction of the Town Engineering Bureau. 6. A drainage assessment fee in the amount of $1,000 shall be submitted. 7. A liability insurance policy shall be submitted in accordance with Section 3.2.a.10 of the Subdivision Regulations in the amounts of $2503,000 per person; $500,000 per occurrence; and $100,000 property damage, naming the Town of South Windsor as an insured. 8. A subdivision processing fee of in the amount of $450. shall be submitted ($25. per lot x 20 lots = $500. minus $50. submitted = $450.) in accordance with State Statutes. 9. All utility easements shall be provided to the Town of South Windsor. These easements shall be subject to the approval of the Town Attorney and shall be filed, at your expense, in the Office of the Town Clerk of the Town of South Windsor. 10. The street designated as Wood Pond Road on the plans shall be built from Nevers Road to the intersection of the street designated as Rustic Lane on the plans. As subsequent phases of this subdivision are approved, Wood Pond Road shall continue through to Abby Road. Woad Pond Road shall have a 50-foot right-of-way and a 30-foot paved width. The cul-de-sac streets designated on the plans as Rustic Lane and Fox Hill Road shall be built from the intersection of Wood Pond Road. These two streets shall have a 50-foot right-of-way and a 26-foot paved width. 11. Concrete sidewalks, built to Town Specifications, shall be installed on both sides of all streets in this subdivision, with the exception of the open space area on the south side of Wood Pond Road. The sidewalks shall be consistent with Section 2.5.8 of the Subdivision Regulations providing adequate and reasonable access for the safe and convenient movement of physically handicapped persons. Thomas G. Dennis, Esquire -3- June 4, 1979 12. All lots in Section I shall be connected to the Town of South Windsor Sanitary Sewer System, subject to approval. of the Town of South Windsor Sewer Commission. f 13. A "Sequence of Construction Events" and a Conservation Plan, as outlined in Section 3.2.a.11 of the Town of South Windsor Subdivision Regulations shall be incorporated in the plans. 14. If needed, the yard drains on lots #22 and #29 shall be approved by the Town Engineering Bureau on the individual plot plans, in accordance with Section 2.6.b of the Subdivision Regulations. 15. Under drains for control of ground water shall be installed in all areas, as directed by the Town Engineer. 16. Street names and location of fire hydrants shall be subject to the approval of the Fire Marshal of the Town of South Windsor. The location of all fire hydrants shall be indicated on the plans. All street name signs and supporting posts shall be installed by the developer, in conformance with standards of the Town of South Windsor, at no expense to the Town. 17. Street lighting shall be installed, at the developer's expense, subject to approval by the Town Manager. 18. Water shall be supplied to all lots in Section I by The Connecticut Water Company. 19. Improvements on the land designated open space shall not include foot paths, and shall be limited to drainage improvements. 20. Prior to approval of subsequent phases of this subdivision, the Commission reserves the right to require the following: (a) Additional open space land, in accordance with Section 2.3.c of the Subdivision Regulations; (b) Improvements to the land designated as open space; (c) Additional drainage improvements to the land designated open space and detention basin. 21. This approval is subject to all conditions of approval by the Town of South Windsor Inland-Wetlands Agency. 22. Prior to the building of any structure on a lot, the subdivider shall provide a topographic map, drawn to a scale of 1 inch equals 40 feet, for each lot in the subdivision, showing proposed contours and either basement floor or slab floor elevation. No building permits shall be issued until the proposed contours and floor elevations have been approved by the Town Engineer. No Certificates of Occupancy shall be issued until lot contours and house foundation elevations have been completed according to the Town Engineer's requirements. If for any reason, finished grading and other site work is not completed, the Town Engineer shall determine the amount of a cash bond to insure final grading and site work. This cash bond shall be submitted prior to issuance of a Certificate of Occupancy. Thomas G. Dennis, Esquire -4- June 4, 1979 23. Black and transparent subdivision;-plans of the plot plans (24" x 36", printed on polyester film) shall be submitted to the Planning and Zoning Commission to be stamped and signed. This letter of approval from the Planning and Zoning Commission, the letter from the Planning and Zoning Commission approving the open space concept for this property and the letter of approval from the Inland Wetlands Agency shall be reproduced on and made a part of the final plans. A black and transparent key map, printed on polyester film, and a black and transparent set of subdivision plans, printed on polyester film, and drawn to a scale of 1" = 100' , shall also be submitted. A filing fee to be determined shall be submitted prior to the final plans being filed in the Office of the Town Clerk of the Town of South Windsor. In addition, three paper prints of the complete subdivision plans shall be submitted. Very truly yours, PLANNING AND ZONING COMMISSION ByI -I C>6� -I -- Robert F. Gilligan, cti g-Chairman RFG/src cc: A. Young, Town Manager D. McLaughlin, Building Inspector R. Shattuck, Director of Public Works J. Page, Town Engineer B. McNamara, Assessor W. Lanning, Fire Marshal R, Rittenband, Town Attorney J. Pitts, Chairman - Sewer Commission C. E riksson, Chairman - Inland-Wetlands Agency OwN Sf,'`� a Taw� O-P s ?dlt� y v 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 AREA CODE 203 644-2511 OR-Co / f June 81, 1979 Thomas G. Dennis, Esquire 1708 Ellington Road South Windsor, Connecticut 06074 Dear Attorney Dennis: This is to notify you that item #16 in the approval letter dated June 4, 1979 of 50-Acres Ltd. for an open space subdivision known as Wood Ponds, Section I, consisting of 20 lots on property located 1400 feet north of Miller Road, between Nevers Road and Abby Road, South Windsor is deleted and replaced with the following: 16. Street names and location of fire hydrants shall be subject to the approval of the Fire Marshal of the Town of South Windsor. The location of all fire hydrants shall be indicated on the plans. All street name signs and supporting posts shall be installed by the developer, in conformance with standards of the Town of South Windsor at no expense to the Town. Prior to the issuance of the first Certificate of Occupancy in this subdivision, street name signs shall be installed by the developer at the developer's expense. Very truly yours, PLANNING AND ZONING COMMISSION By Robert F. Gilligan-Actin -Chairman RFG/src cc: D. McLaughlin, Building Inspector J. Page, Town Engineer W. Lanning, Fire Marshal