Loading...
HomeMy WebLinkAboutOPEN SPACE, SUBDIVISION, 1144, DENIED PLANNING AND ZONING COMMISSION The Commission will officially receive applications Application No . at either Special or Regular meetings provided they Received Date : �3 � 1-7 were submitted to the Commission Chairperson, Secretar Action or Public Hearing by • or agent , at least fourteen (14) days prior to the meeting at which they will be officially received. No application officially received at a Special Meetin (Receipt No . I will be acted upon at that meeting. APPLICANT: Mr. Wayne Gerlt , Esq . ADDRESS : 112 Deming Street , South Windsor , CT TELEPHONE644-2565 OWNER OF RECORD ON LAND RECORDS : T & M Building Company ADDRESS : P.O. Box 86 , Torrington , CT 06790 KC- COMPLETE LOCATION OF PROPERTY : Property located at th southwest corner of the intersection of Avery Street and Dart Hill Road ZONE A-30 NAME , ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED : Mark J . Pronovost , P . E . , A. R. Lombardi Associates , Inc _ , Vernon , CT 06066 TELEPHONE 872-2703 THIS APPLICATION IS FOR : (CHECK ONE OF THE FOLLOWING ) 1 . Zone Change to (public heari dired ) 2 . Filing for Subdivision 3 . Filing for Open Space Subdivision (public hearin.�, TieI�Af, d- J pn;ng � 4 . Filing for Resubdivision (public hearing rA�fi,*gbd y 5 . Special Exception to Article (public hearing require(J ) 6 . Site Plan of Development 7 . Removal of Sand , Gravel , Clay or Quarry Stone & Ore (public hearing required ) 8 . Other (explain in detail ) — ----- THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED WITH 6 SETS OF PLANS ( 7 sets if public hearing is required ) BEFORE IT RE V Y T G & ZONING COMMISSION . T & M BUIT,nTN ANY Applican Owner c SPECIFICATIONS FOR PROPOSED REVISIONS TO THE AVERY STREET DETENTION POND SOUTH WINDSOR, CONNECTICUT DECEMBER, 1985 REVISED MARCH, 1986 A. R. LOMBARDI ASSOCIATES, INC. 25 TERRACE DRIVE VERNON, CONNECTICUT 06066 EARTHWORK Scope a. Furnish all labor, materials, equipment and services necessary for completion of the following: 1) Excavation and backfilling necessary to establish the grades shown on the Subdivision Drawings 2) Excavation and backfilling to install outflow drain pipe 3) Placing topsoil Construction Sequence - Install Erosion Control Measures - Construct new dike section - Construct new low level outlet - Construction new emergency spillway - Remove existing dike - Establish ground cover on all disturbed areas Mass Earth Excavation and Fill a. Mass Earth Excavation and Fill Consists of excavation, filling, compacting and/or disposal of all materials including rock not of definite ledge formation and boulders or portions of boulders less than one cubic yard in volume, necessarily excavated and not otherwise classified under these specifications. b. Make excavation and fill operations to lines and grades shown on the plans and conduct work so as to cause a minimum disturbance to adjacent areas. Do not excavate when earth is frozen or in extremely wet conditions. c. Fill Materials: 1) Excavated Material shall be used as fill if it is free of sod, roots, or other organic material, stones more than 6 inches in diameter or any other material that could prevent the desired degree of compaction and if it meets specified gradations. 2) Borrow shall including furnishing, removing and satisfactory placing additional material, as necessary, to complete fills. 1 3) Impervious Core Material shall be an approved well-graded natural soil which meets the following gradation: Seive Size % Passing By Weight 6 inch 100 No. 4 50 - 95 No. 40 30 - 75 No. 200 15 - 60 and shall have a coefficient of uniformly greater than 20. Samples of impervious material must be submitted and approved by the Town Engineer, prior to placing. 4) Pervious Material shall be free draining material meeting the requirements of Article M.07.06 gradation "B" of Connecticut D.O.T. Standard Specifications, For Roads, Bridges and Incidental Construction, 1985 Form 813. d. Excavation: 1) Remove all roots, topsoil or other organic material, and all silt and clayey material, to a firm bearing subgrade. 2) Provide pumps or other means necessary to prevent subgrade from becoming unstable due to wet conditions. 3) Excavate to impervious material, soil or rock, for impervious core cutoff as shown on the plans. 4) Excavate and grade detention basin so that placement of topsoil will establish finished contours shown on plans. e. Placement: 1) Place fill in layers not to exceed 6 inches after compaction. 2) Do not place fill when either fill or base is in frozen or muddy condition. 3) The embankment shall be crowned or pitched to provide drainage at the close of each day's operation. 4) Maintain drainage to prevent erosion or other damage. 2 f. Compaction: 1) The entire area of each layer shall be thoroughly compacted prior to commencing placement of next layer. 2) The dry density after compaction shall be not less than 95 percent of the dry density for that soil when tested in accordance with AASHO T-180, Method D. 3) Each 1-1/2 foot portion of depth shall be tested separately. Trench Excavation for Outflow Pipe a. Place fill to a level one foot above top of pipe. b. Excavate sidewalls as nearly vertical as possible. c. Maximum width shall be 2 feet greater than inside diameter of pipe. d. Furnish all necessary shoring and bracing. e. Do not excavate to full depth in freezing temperatures unless pipe is installed immediately. f. Backfill and compact in 6 inch layers. g. Compaction - Dry density after impaction shall be not less than 95% of the dry density for that soil when tested in accordance with AASHO T-180 Method D. TOPSOIL AND SEEDING Topsoil shall be tested by a testing laboratory to determine: a. Fertilizing requirements b. Liming requirements After subgrade has been placed and graded topsoil shall be spread to a depth of 6 inches after settlement. No topsoil shall be placed on a muddy or frozen subgrade. Limestone and Fertilizer shall be in accordance with laboratory test. The seed mixture shall have a weed seed content not to exceed 1% by weight and shall conform to requirements of the following table: 3 By Percent Percent by Name Weight by Purity Germination Fylking 0217 Bluegrass 40 85% 80% Pennlawn fescue 50 95% 70% Perennial Ryegrass 10 85% 90% Rates of Application: Materials Per 1,000 Sq. Ft. Limestone as determined by testing Fertilizer as determined by testing Seed 6 pounds Straw or Hay Mulch 70 - 90 pounds Construction Hydraulically or Mechanically a. Harrow or rake the topsoil to a depth of 3 inches b. Remove debris and stones having any dimensions greater than 1 inch c. Hydraulic Seeding: 1) Apply limestone, fertilizer, seed and mulch in one operation by the use of an approved spraying machine. 2) Mix materials with water and keep in an agitated state so that the material is uniformly suspended in the water. 3) Spraying equipment shall be so designed that when the solution is sprayed over an area, the resulting deposits of limestone, fertilizer, seed, and mulch shall be equal in quantity to those specified in above. 4) Before commencing work, submit a certified statement of the quantities of materials per 100 gallons of water, and the area that this quantity can cover. d. Mechanical Seeding 1) Apply limestone at rates determined by testing and thoroughly incorporate into the upper 1 inch of topsoil. 4 2) Apply fertilizer at rates determined by testing and thoroughly incorporate into the upper 1 inch of topsoil. 3) Rake finished surface smooth. 4) Sow grass seed, applying half the quantity at right angles to it. 5) Do not sow seed on a windy day, or when the ground is frozen, wet or otherwise non-tillable. 6) Cover seed with a thin layer of topsoil by raking or dragging. e. Erosion Control: Slopes of 1 foot vertical to 3 foot horizontal or greater, or any areas which will receive concentrated run-off water, should be covered with burlap or jute. Joints in these materials shall overlap no less than one foot, and the material should be secured by pegs. Do not remove material after germination. Let it decompose. f. Maintain a moist seed bed at all times. Water seed bed so that the topsoil is wet to a depth of 2 inches. Apply one complete coverage to the seeded area in an 8 hour period. g. Protect the seed bed with barricades, if necessary, to keep all traffic off the area. h. After the grass has appeared, reseed all areas which have failed to show a uniform stand of grass. OUTFLOW STRUCTURE Materials a. Pipe 1) Reinforced Concrete Pipe shall conform to the requirements of AASHO M-170, Class IV. 2) Toe Drain Pipe shall be perforated or slotted plastic pipe equivalent to ADS corrugated plastic by Advanced Drainage Systems, Inc., and meeting the requirements of AASHO specifications M252. 5 b. Concrete shall conform to Article M.03.01 Class "A" of Form 813. c. Brick, Masonry, Concrete Units, Precast Concrete Tops and Sumps shall conform to Article M.08.02 of form 813. d. Mortar for masonry shall be a 1:3 cement sand mix with hydrated lime. Hydrated lime shall not exceed 10% by weight of cement. e. Stone Riprap shall conform to Article M.12.02 of form 813 except that no stones shall be larger than 24" in size. f. Filter Gravel shall conform to Artile M.02.01 of form 813 for Bank or Crushed gravel. Construction a. Construct to the lines, grades and dimensions shown on the drawings. b. Pipe Bedding: 1) Shape to conform to lower 10% of the pipe 2) Pipes shall have a firm bearing throughout each length. c. All joints in concrete pipe shall be rubber gasket joints. d. Trash Screen: 1) Fabricate and install in accordance with the details. 2) Coat all non-galvinized metal with one coat of metal primer and one coat of exterior black paint. e. Stone Riprap shall be placed on a 12-inch layer of filter gravel in a manner which will prevent segregation. Riprap shall be placed to the lines and grades shown on the drawings with a minimum of pieces projecting above the finished surface. 6 EMERGENCY SPILLWAY Material a. Modified riprap shall conform to Article M.12.02 of the Connecticut D.O.T. Form 813. b. Special riprap shall conform to Article M.12.02 of the Connecticut D.O.T. Form 813. c. Gradation #1 (Filter Blanket) material shall meet the following gradation. Square Mesh % Finer Sieve By Weight 1 1/2 100 3/4 98-100 1/4 90-98 # 4 85-95 # 10 60-90 # 40 5-40 #100 0-15 #200 0-5 7 d. Gradation #2 (Filter Blanket) material shall meet the following gradation. Square Mesh % Finer Size By Weight 5" 100 3" 95-100 1 1/2" 90-97 3/4" 75-95 1/4" 45-80 #4 30-75 # 10 5-45 # 40 0-10 #100 0 Construction The emergency spillway shall be constructed to the lines and grades shown on the plans. All unsuitable material shall be removed and replaced with well drained soil. 8 ,w L CONSERVATION PLAN PARTRIDGE MEADOW OPEN SPACE SUBDIVISION DECEMBER, 1985 A. R. LOMBARDI ASSOCIATES, INC. 25 TERRACE DRIVE VERNON, CT 06066 This Conservation Plan narrative outlines the Erosion and Sedimentation Control Methods to be implemented by the developer during the construction of the Partridge Meadow Subdivision. Reference should be made to the Subdivision Plans, in particular the Conservation Plan and Topographic Map sheets, and detail sheets showing the design and location of proposed Erosion Control Structures. The proposed permanent storm drainage facilities are described in the attached "Drainage Design Statement". GENERAL SITE CONSIDERATIONS The Subdivision consists of approximately 55 acres of land zoned A-30 which is currently used for agriculture. Site soil types are summarized on Sheet 8 of 18 of the Subdivision Plans, and are all in S.C.S. Hydrologic Soils Group "B". Due to the current agricultural land use, no tree stumps to be removed exist on the site in the proposed roadways. Several of the proposed lots have trees on them; however, the extent to which they are removed will depend on each owner's lot plan. The Subdivision will be constructed over two construction seasons, commencing during the Spring of 1986. The first construction season will include lots 1-22 and 59-80, and the second construction season will incude lots 23-58. It is anticipated that construction of the entire project will be completed during Fall, 1987. One period of winter shutdown, during 1986-1987, will be required with measures as specified in this plan. SUBDIVISION SITE EROSION CONTROL MEASURES After initial rough grading, staked haybales and silt fences shall be placed as indicated on the Conservation Plan sheets. Runoff on the site will naturally occur by sheet flow to areas not graded during road construction. Since site soils have been previously disturbed by agriculture, erosion and sedimentation will not be significantly increased in 1 most areas by proposed grading. Roads and lots on steeper slopes will be protected by erosion and sedimentation control measures. Construction during the first year shall be for lots 1-22 and 59-80. Roads in this phase will be paved with the binder course to the dead end between lots 23 and 58. Staked haybales shall be placed behind the dead end, to control erosion in the rough graded portion of the road. The remaining roads and utilities will be constructed during the second year. Materials to be stockpiled during construction of both phases of the Subdivision shall be placed on lots 43, 44 and 47. Staked haybales shall be placed on the downstream side of the stockpile, and the materials shall be seeded with rye grass and hay mulched. Construction of the Subdivision shall be in the following sequence: 1. Roadways and other necessary cuts for the entire subdivision be rough graded, and all erosion control measures put in place. 2. The sanitary sewer construction. 3. The storm drainage construction. 4. The water main construction. 5. Other utilities, including gas, electric and telephone shall be placed. 6. Final grading on the road shall be completed. 7. Pavement binder course installed. 8. During winter shutdown of construction, suffucient erosion control measures shall be in place as specified in this plan. 9. Grading on individual lots will occur according to each owner's schedule, following the construction specifications included in this plan. The above described construction sequence will be repeated during the second construction season. 2 Construction of the Detention Basin Expansion shall be in the following sequence: 1. Staked haybales shall be placed near the location of the outside toe of the proposed dike, and a timber check dam at the pipe spillway outlet, prior to construction. 2. The proposed dike and spillway raising shall be constructed. 3. The apron of the 42 inch inlet pipe shall be riprapped to the inside toe of the dike, as specified on the detail sheets. 4. The existing dike, extending about 280 LF from the pipe spillway to the 42 inch inlet, shall be removed to the finish grades shown. Spoils are to be disposed of in a manner complying with Town requirements. Any stockpiling of material shall have staked haybales placed on the downstream side, with seeding or mulching of the material. 5. The proposed dike shall be seeded, and mulched as per the detention basin specifications. TYPICAL LOT GRADING MEASURES Disturbed areas on each lot shall be the minimum practical for the size and site of the proposed buildings. After the foundation is in place, the area shall be rough graded and seeded for temporary cover. Any drainage flowing to distrubed areas shall be diverted by staked haybales, dikes or ditches to undisturbed areas. Haybale erosion checks shall be placed where necessary. Specified plans for each lot will be varied to suit site conditions. Removed tree stumps shall be disposed of in a manner in compliance with Town regulations. SEEDING Where cut slopes exceed 3 feet in height, or in locations where specified, seeding for permanent cover or heavy mulching in adverse weather conditions shall be applied immediately after excavation. Permanent seeding shall be completed at the earliest possible date. 3 Fill slopes shall be topsoiled and seeded immediately after construction, and protected with hay mulch. Once the pavement binder course is placed, adjacent cuts on fill slopes and disturbed areas shall be topsoiled and seeded to permanent cover as soon as possible. The seed mixture shall be applied at 45 lbs./acre, with 20 lbs. Kentucky Bluegrass, 20 lbs. creeping red fescue, and 5 lbs. perennial ryegrass. Mulching shall be applied at the rate of 1.5-2 tons/acre, or 70-90 lbs./ 1000 feet. WINTER MEASURES Prior to winter shutdown of construction, all staked haybales and silt fences shall be checked. All cut and fill slopes not previously treated shall be hay mulched. All stockpiled materials shall be mulched prior to winter. 4 I i 'JOIN SC4 rA e 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 SO It-co N� AREA CODE 203/644-2511 January 2 , 1986 Wayne C. Gerlt, Esquire �� 112 Deming Street South Windsor CT 06074 RE: (PARTRIDGE MEADOW SUBDIVISION DETENTION BASIN AVERY STREET AND DART HILL ROAD Dear Attorney Gerlt: Enclosed are copies of letters of August 13 , 1985 , September 26 , 1985 and October 29 , 1985 that express a concern about the detention basin. On December 27 , 1985 , plans of Partridge Meadow were submitted with proposed modifications to the detention system. This proposal is just more of the same boiler plate without addressing the problem. When you get serious about this proposal and assuming that we might have to get a consultant to review the plans , it is safe to assume that it would be six to nine months before it would approach any Commission hearings; considering the potential problems downstream, resolving the detention pond difficulties would be first on the agenda. If you have any questions , I can be contacted at 644-2511, extension 244 . Very truly yours , J �C� A. Bowen Davies Deputy Town Engineer ABD:bmr Enclosures cc: R. Arsenault, Director of Public Works R. Martel, Town Engineer A. Christen, D.E.P. P. DeMallie, Director of Planning T & M Homes t OwN Sf7 ° I 0 IT a , VCC 7 Ulu. C� C . U 9 ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 0SOR•C� AREA CODE 203/644-2511 January 8 , 1986 Mr. Ralph McCarroll , Chairman Parks & Recreation Commission 1540 Sullivan Avenue South Windsor, Connecticut 06074 Dear Ralph: RE: Recreation Land Coven Mountain and Partridge Meadow At present, Town staff are evaluating preliminary concept plans for the Coven Mountain and Partridge Meadow single-family subdivisions . After conferring with Jim Snow, Recreation Director, it was determined that input from your Commission might prove in- valuable relative to the size, configuration and location of proposed recreation/open space land. Coven Mountain - Coven Mountain is a proposed 40 lot sub- division situated east of Abbe Road and north of Maskel Road. Under our subdivision regulations (Section 2 . 3) , a conventional subdivision such as this must provide a minimum of one acre (43 , 560 square feet) of public open space land suitable for parks and playgrounds . The Coven Mountain draft concept plan portrays a 1 acre tract to the rear of proposed house lots , with access strips to Abbe Road and a new proposed street. Given that the applicant must provide this land, where does your Commission recommend as a suitable location, what is a suitable configuration, and which if any recreational improvements might be appropriate thereon? Partridge Meadow - Partridge Meadow is a proposed 80 lot sub- division with all ots situated at the southeast corner of Dart Hill Road and Avery Street, and proposed open space land situated diag- onally across the street at the northwest corner of Dart Hill and Lawrence Roads. Under our zoning regulations (Section 5 .3 c) an open space subdivision such as this must provide open space land consistent with a formula. The formula requires a minimum of 10 acres . Under our subdivision regulations (Section 2 .3 b) , the land shall be in a condition to be readily usable for recreation and con- servation. Mr. Ralph McCarroll Page 2 Given that the applicant must provide at least 10 acres of land, does your Commission agree with the proposed location and configuration? What recreational improvements might be appropriate thereon? You should understand that Abe Temkin, representing the former owner, and Wayne Gerlt, the new (or prospective) owner and developer, have met on separate occasions with Richard Sartor and other staff regarding the development of this area, and both agreed in principal to providing a 35-40 acre tract at the northwest corner of Dart Hill and Lawrence Roads for a new Town recreational park. This was to be achieved by aggregating all open space land required under zoning, into this single location. The ten acres of Partridge Meadow would be the initial in- stallment in this park, with additional acreage provided in con- junction with development of land to the west of the park. Jim Snow has a blueprint copy of the Coven Mountain Concept, and a photocopy of the Partridge Meadow concept is attached for your use. A written response would be appreciated at your earliest convenience. Sincerely, Peter R. DeMallie Director of Planning PRD/jsv CC: Richard Sartor, Town Manager James Snow, Recreation Director Rick Martel , Town Engineer Marcia Banach, Assistant Planner �40 •MN at,, 9 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 R, AREA CODE 203/644-2511 ryoSOcoe January 17, 1986 Peter DeMallie, Director of Planning Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Dear Peter: RE: Recreation Land, Coven Mountain and Partridge Meadow At the regularly scheduled meeting of the Park and Recreation Commission on January 16, 1986, the proposed plans of development for the Coven Mountain and Partridge Meadow projects were reviewed. The Commission has unanimously endorsed the Recreation element of the Town Plan (3rd draft, September 1985) , and this played very heavily in the Com- mission's discussion and decisions in the review of subject projects. Coven Mountain - The one acre tract proposed as open space is not accept- able in view of its location within the project, as well as its location in regards to the overall recreational plan of development for the Town. This land does not lend itself to any recreational development and would meet no present need. It is of no value within the Recreation element of the Town Plan. Partridge Meadow - The location of this parcel of land is very suitable and falls within the scope of the Town Plan. It is viewed as the first step toward development of what will eventually be one of four major parks. (Reference: Recreation Element, 3rd draft, Town Plan, September 1985.) The following suggestions are offered. 1 . The configuration as presently offered is unacceptable. Ultimately the total park area will be 30 to 40 acres in size. This entire parcel should be contiguous, and as square or rectangular as feasible to allow development of recreational facilities for varied use, day and evening, with minimal sound and light impact on the neighborhood. Within the 30-40 acres, a flat surface should be included, preferably 15 to 20 acres in size, usable as playing fields for that area of town, including adequate buffering zones. 2. Treed and sloped areas for passive uses should be included, for trails, picnic areas and the like, as well as a possible pool . 3. There should be sufficient frontage along roads away from the inter- sections to allow appropriate access and parking areas. Page 2 Mr. Peter DeMallie January 17, 1986 The Commission would like more knowledge of the 20 to 30 acres to be added to the present acreage, and the level and slope of the land, before it favorably entertains the Partridge Meadow subdivision proposal . Sincerely, RalpK McCarroll , Chairman Park & Recreation Commission I ames Snow, Director of Recreation RM/JS/SB cc: Richard J. Sartor, Town Manager Richard Martel , Town Engineer J Marcia Banach, Assistant Planner Vito Covensky, Coven Construction Co. Wayne Gerlt, Esquire �tC+M 8f,( 9 ., r dq &2 C C d"C!t 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 SOe•cO AREA CODE 203/644-2511 _ March 17 , 1986 Wayne C. Gerlt, Esquire 112 Deming St. South Windsor, Ct 06074 RE : Partridge Meadow Subdivision Review Nov. 1985 Plans . Dear Attorney Gerlt: Staff has working on a proceedure with new subdivisions which in effect asks the subdivider to come in with his engineer prior to too many lines on paper, to discuss their proposal. After a basic plan has been prepared, come on back and we will discuss it further, make suggestions which would be somewhat in keeping with the standards acceptable to the town. With Partirdge Meadow, I thought we went through the last review in January of 1986 . I now feel foolish and embarassed to be asked to review again a set of drawings submitted last week to Planning and Zoning that does not take into consideration the hours of original review and sit down discussion with your Engineer with only minute adjustments to the sub- division drawings. I really do not understand your system, its like you are still on your first subdivision. With a mess on 30 lots, imagine what you can do with 80! It is amateurish, to be blunt. The plans still lack the basics for any further review. I would not recommend the plans for acceptance or approval in this condition. Very truly yours, A. B. Davies Deputy Town Engineer ABD/dlb CC: Richard Martel , Town Engineer Peter DeMallie, Director of Planning ❑RECEIVED Planning & Zoning Commission File Inland Wetlands Agency/Conservation Comm. File MAR . 1( KG DM- 1O.NN Sf4 Z ` 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 �OSOR•c0N AREA CODE 203/644-2511 March 25, 1986 A. R. Lombardi Associates / zU 25 Terrace Drive �+ Vernon, Connecticut 06066 __ ' "I .' `�h Attention: Mr. Richard Lombardi < J ( Dear Mr. Lombardi: At a regular meeting of the Water Pollution Control Authority held on March 18, 1986, the Authority voted to approve the 80 lot subdivision plan of Partridge Meadows, contingent upon the Town Staff giving them a positive report that the Avery, Wet Pump Station has enough reserve capacity and that the developer,na be asked to contribute to the upgrading of the Benedict Drive Station. Very truly yours, C / ..-L''1��j! --� Cif��,•rG�' �;,%?i Joseph J. rino, Chairman / TOWN OF SOUTH WINDSOR Water Pollution Control Authority JJC:pm CC: Mr. Richard Martel, Town Engineer Mr. Thomas P. D'Auria, Building inspector Mr. Peter DeMallie, Director of Planning Mr. Robert Gilligan, Chairman, Planning & Zoning RECEIVED MAR S0, WINDSQA MNNING OEPL tows =E,� L vW -2 oleS01tM ,Qt 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 fc��oSOR.CO AREA CODE 203/644-2511 April 17 , 1986 Mr. Robert Gilligan, Chairman Planning & Zoning Commission Town of South Windsor 1540 Sullivan Ave South Windsor, Ct 06074 RE: The T&M Detention Basin Dam & Spillway located in the Country View Subdivision west of Avery Street. Dear Mr. Chairman: On August 11 , 1986 , the Dart Hill & Avery Street area had a severe storm of a capacity that damaged the spillway at Country View, in the area near the pump station on Avery Street. During the past 8 months we have had correspondence and meetings with T&M Building Company, an apparent developer of the land east of Avery Street and their engineer, discussing the modifications that would be required to the dam and spillway that would bring it up to an acceptable standard of the town and the State of Connecticut DEP Dam Safety Unit. It has been indicated to us that they have submitted the plans to the DEP and are expecting their report momentarily. The proposal includes the installation of a 24" pipe in the dam, the relocation of the spillway from the center of the dam to the south side adjacent to the CL&P row, and the rebuilding of the dike after the existing spillway is removed. During all of the discussions , it has been stressed that the importance of this work is to be done as soon as possible no matter what was to happen to the balance of the upstream watershed, whether it is developed or not, because of the existing potentially hazardous condition of the spillway. This has been complicated by the "Partridge Meadow Subdivision" applicant and his engineer by including the improvements to the dam together with all of the proposed detention basin expansion on sheets 6 & 16 of 18 in the total package for the proposed Partridge Meadow Subdivision. It has been indicated to them, that as soon as they obtain the appropri- ate DEP permit and have met with staff to establish the ground rules , that the work can commence on just the spillway and dam repair only. It has also been indicated to them, that this dam repair in no way gives them a tacit or a back door recommendation for approval for their proposed subdivision_ . In fact, they know the plans are still not ready for sub- mittal for the full review process . To: Robert Gilligan -2- April 17 , 1986 From: A.B. Davies The purpose of this notification to you is so that you are aware of some proposed earth work within an approved subdivision that does not have Planning & Zoning Commission approval . This repair and improve- ment work involves an area about 500 feet long and from 50 to 100 feet wide and is something that has to be done. It is not intended to assume any responsibility for the design or liability for the struc- ture or to relieve T&M Building Company of their current obligations , nor is it my intention to change a good working relationship between staff and the commissions. I would make myself available to show you or discuss the proposal, if you so desire. I can be contacted at 644-2511 Ext. 244 . Very truly yours , A. B. Davies Deputy Town Engineer ABD:dlb CC: Robert Arsenault, Public Works Director Richard Martel , Town Engineer Peter DeMallie , Planning Director✓ Wayne C. Gerlt, Attorney T&M Building Company Planning & Zoning Commission File Inland Wetlands Agency/Conservation Commission File RECEIVED a wiltm MUNN an- 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 AREA CODE 203 644-2511 SOR•CON� TO BE PUBLISHED IN THE JOURNAL INQUIRER THURSDAY, MAY 8 , 1986 THURSDAY, MAY 15 , 1986 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING & ZONING COMMISSION Notice is hereby given that there will be a public hearing of the Planning & Zoning Commission on Tuesday, May 20 , 1986 , at 8 : 00 P. M. in the Council Chambers of the South Windsor Town Hall, 1540 Sullivan Avenue, South Windsor, to consider the following: 1. Application of Alexander Gorski, d/b/a A. G. Builders, Inc . , to modify the Open Space Subdivision known as "Forest Village" , consisting of 40 lots located on the south side of Strong Road, as shown on plans prepared by Kiran Engineering, Inc. , A-40 zone. 2. Application of Wayne Gerlt, for an Open Space Subdivision in an A-30 zone, known as "Partridge Meadows" , consisting of 80 lots located at the southeast corner of the intersection of Avery Street and Dart Hill Road. Copies of these applications and maps more clearly defining the properties are on file in the Office of the Town Clerk of the Town of South Windsor. At this hearing, interested persons may appear and be heard and written recommendations will be received. PLANNING & ZONING COMMISSION Robert F. Gilligan, Chairman David H. Sorenson, Secretary HOLMES & HENRY ASSOCIATES P.O. BOX 238 COVENTRY, CONNECTICUT 06238 (203) 742-0340 May 15, 1986 South Windsor Planning and Zoning Commission c/o Peter DeMallie, Town Planner lV�AY Town Hall South Windsor, Connecticut 06074 South Re: Traffic Report for Partridge Meadow Subdivision Planning & Z,3r...Js cpmmISSIOd Avery Street and Dart Hill Road South Windsor, Connecticut Attorney Wayne Gerlt proposes to divide the 54.7 acre site at the corner of Avery Street and Dart Hill Road into 80 single-family house lots. The lots are to be served by a new subdivision road constructed to Town standards. This new road will have two entrances onto Avery Street and loop through the subdivision. Additional interior access to building lots is obtained by three short cul-de-sacs. The site designer has followed good design practice by proposing both Partridge Meadow Road entrances be directly opposite existing side streets . This minimizes crossing traffic conflicts that occur from off- set intersections . The sight distances from the entrances are the same as those available to the existing Cheshire Drive and Country View Drive. The sight distances to the South from either entrance exceed 600 feet. Sight dis- tance from the North entrance is the entire 500 foot distance to the Dart Hill Road intersection, and the sight distance to the North from the South entrance is 500 feet. Thus , these entrances provide adequate sight distances for the observed 40 mile per hour traffic on Avery Street. The American Association of State Highway Officials requires 275 feet for 40 mph (attached). Conn. D.O.T. attempts to provide 475 feet of sight distance for entry onto State Highways posted for 40 mph. This is far more conservative than the National Standards. Manual traffic counting shows Avery Street at the location of this pro- posed subdivision to be lightly traveled even during peak periods at the present time. For residential roads such as this peak-hour volume accounts for from 12 to 20 percent of the total daily volume of traffic since the road does not serve mid-day shoppers. Mountain View, a 175-lot subdivision under construction on Dart Hill Road, will add an estimated 1750 trips/day to Dart Hill Road. Some of those travelers will choose to go to Ellington Road and then to I-84, but most are likely to use Avery Street. Thus it is conservative to estimate that Avery Street will carry an additional 1 ,000 trips/day due to Mountain View. The 80-lot Partridge Meadow Subdivision is estimated to generate 800 trips per day onto Avery Street with almost all of those vehicles traveling South to 1-84. The table below details current and predicted peak-hour and average daily traffic volumes for Avery Street. Avery Street Traffic Volumes Trips AM Peak Hour (veh. per hour) 190 PM Peak Hour (veh. per hour) 236 ADT present (veh. per day) 1180 ADT generated by Partridge Meadow (veh. per day) 800 ADT generated by Mountain View Subd. (veh. per day) 1000 ADT result (veh. per day) 2980 AM Peak result (veh. per hour) 480 PM Peak result (veh. per hour) 596 Level of Service A Limit (veh. per hour) 400 Level of Service B Limit (veh. per hour) 900 As shown in the table above Level of Service A or free-flow traffic volumes are limited to 400 vehicle per hour. Level of service B, or stable flow, where drivers still have reasonable freedom to select their speeds and which is a suitable design standard for rural roads limits volume to 900 vehi- cles per hour. Therefore , as can be seen from the above data, Avery Street will become more heavily travelled with the addition of these two subdivisions , but still operate well above the Level of Service B limit. In conclusion, the proposed Partridge Meadow Subdivision design provides for safe entry onto Avery Street and the traffic generated by it , in addition to traffic generated by other large development, will still be handled adequately. Sincerely, ---b&--0 OJ4 W. Donald Holmes , P.E. WDH:knh e>>yrcrrrrrv���ej Enc. e� 1 No. 09399 +����uai/rrrrrDr May 20 , 1986 PLANNING DEPARTMENT REPORT PARTRIDGE MEADOW SUBDIVISION 1 ) . The applicant proposes an 80-lot open space subdivision in an A-30 zone. Allowable lot size for such a subdivision is 20 , 000 ft; the average lot size for this subdivision is 25, 800 s. f . In this particular case , there are two very large lots under the power lines (lot 14 & 15) which are in excess of 3 acres each and which favorably skew the average lot size . A more representative average of the remaining 78 lots is about 23 , 000 square feet. The parcel is basically maximized with lots . Some lots do have what appears to be a relatively small building area - generally, these lots are corner lots such as 41 ,46 , 51 and 80 . 2) . The open space for this subdivision is located on a separate site at the request of the Town. The proposed open space is the minimum required under our regulations; however, it is in an extremely useful location and configuration, and has over 600 feet of frontage on each of Dart Hill and Lawrence Road. The Town Plan update indicates that this open space area is desired by the Town for a Town Park of about 40 acres . This is the first installment of that acreage, with more acreage� to be added to the ten acres as development of this vicinity continues.;, ` Both the owner of the site and the applicant had in the past indicated their willingness to provide land for the town park as development proceeds . It should be noted that future land acquisitions for the enlargement of this parcel should continue the pattern of very useable land and config- uration which this parcel has initiated. 3) . The WPCA has approved sewerage for the subdivision, with the contingency that town staff determine that capacity is available in the Benedict Dr. pump station. The Superintendent of Pollution Control has indicated that there is capacity for this subdivision but that the developer may be required to contribute to upgrading the pump station and has been noti- fied to that effect. A,. ,_� , , 4) . There are no,, curb' cuts on either Avery Street or Dart Hill Road. The interior road system has been designed so that there is no offset between Partridge Lane and the opposing Countryview Estate roads , Cheshire Drive and Countryview Drive . Sight lines appear to be adequate . At town staff request, a road stub to the east has been provided between lots 21 and 22 . (Why is this stub not perpendicular to Partridge Lane , as is the opposing Tabetha court?) . Lots on the north side of Dart Hill Road will have rear yards facing Dart Hill Road. 5) . Exterior road improvements are very much needed. The "Y" in Avery Street at its intersection with Dart Hill Road needs to be removed. Lawrence Road needs to be realigned opposite Avery Street , and at present is relatively easy to accomplish as there are no utilities under the road. The Avery/Lawrence intersection improvements would ideally be accomplished during Phase I of this project. Also, improvements to the Avery Street frontage are necessary; and improvements to the Dart Hill Road frontage are desireable. PLANNING DEPARTMENT REPORT -2- May 20 , 1986 PARTRIDGE MEADOW SUBDIVISION 6) . Sidewalks are desireable on both road frontages for the open space - which would be the north side of Dart Hill Road and the west side of Lawrence Road. Sidewalks were not installed on the south side of Dart Hill Road in anticipation of future development of this subject parcel. Sidewalks should be installed along with Avery Road frontage . Interior streets should have sidewalks on at least one side. 7) . There are no regulated wetlands on site . This application was heard by IWA/CC on May 12 for conservation plan approval , and was tabled pending receipt of reports from SCS and DEP (regarding dam permit for modified detention basin) . 8) . With 80 lots , phasing for building permit release purposes is desireable . The project would lend itself to three phases of 25-30 lots per phase . Also, there is a possibility that, with such a totally wide-open site , some sort of security fencing (i.e. ,snow fence) might be necessitated to prevent access at will to this site for both contractors and off- hours 4-wheel-drivers and bikes , etc. 9) . The applicant has met with town staff on many occasions to discuss this subdivision, and the majority of Planning Department requested plan modifications have been made. I do need to have the final plans modified so that side yards are coincident with drainage easements on lots 43 , 73 & 78 . Also, monuments should be indicated for all open space parcel angles, rather than iron pins . 10 Sf, TOW", ap so"M UfVASI-t 9 ~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 �4c tioS 0 AREA CODE 203/644-2511 March 25, 1986 A. R. Lombardi Associates NOR 31 25 Terrace Drive Vernon, Connecticut 06066 IL IL Lczilil:"l A Attention: Mr. Richard Lombardi Dear Mr. Lombardi: At a regular meeting of the Water Pollution Control Authority held on March 18, 1986, the Authority voted to approve the 80 lot subdivision plan of Partridge Meadows, contingent upon the Town Staff giving them a positive report that the Avery Street Pump Station has enough reserve capacity and that the developer may be asked to contribute to the upgrading of the Benedict Drive Pump Station. Very truly yours, i Jose . no, Chairman TCM OF SOUTH WINDSOR Water Pollution Control Authority JJC:pm CC: Mr. Richard Martel, Ton Engineer Mr. Thomas P. D'Auria, Building Inspector Mr. Peter DeMallie, Director of Planning Mr. Robert Gilligan, Chairman, Planning & Zoning tpr'M SC4( 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR-Co AREA CODE 203/644-2511 June 23 , 1986 CERTIFIED MAIL Attorney Wayne C. Gerlt 112 Deming Street South Windsor, Ct 06074 RE: Application #389 - Partridge Meadow Subdivision - Southeast corner of Avery St. and Dart Hill Rd. and Avery St. detention basin. Con- struction of 80 lot open space subdivision and modification of Avery St. detention basin. No wetlands involved. Dear Attorney Gerlt: At the June 16 , 1986 meeting, the South Windsor Inland Wetlands Agency/ Conservation Commission approved with conditions , application #389 . The following conditions must be adhered to for this permit to be valid: 1 . Deputy Town Engineer ' s comments to be incorporated in plans . Copy attached. 2 . Work to be phased as follows : Improvement to Dart Hill and Avery Street dam and detention basin; street and storm sewers in operation, keeping activity in right-of-way. 3 . No lots approved at this time. 4 . Consideration for safety measures for the outlet pipes at the dam spillway. 5 . We recommend a bond in the amount of $25 , 000 be submitted to Planning & Zoning Commission to ensure compliance with Erosion and Sedimentation Control Measures . 6 . Construction activities shall be subject to the approval of the Town Engineer. 7 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. -2- TO: Wayne Gerlt June 23 , 1986 RE: Application #389 - Partridge Meadow 8 . The permit is valid for one year and shall expire June 16 , 1987 . Very truly yours , John M. Moran, Jr. , Chairman Inland Wetlands Agency/ Conservation Commission Town of South Windsor JN1M:dlb CC: A. B. Davies , Deputy Town Engineer Richard Martel , Town Engineer Robert Gilligan, Planning & Zoning Commission Thomas D 'Auria, Building Official Marcia Banach, Acting Director of Planning John Shemo, Economic Development Coordinator �SawM SF,`� c � Town, O-P scrum ?dlnd t a �� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soe•co AREA CODE 203/644-2511 June 25, 1986 Wayne C. Gerlt, Esq. P. 0. Box 559 South Windsor, Ct. 06074 Dear Sir: Re: App. #1144 - Partridge Meadows Please be advised that the Planning & Zoning Commission voted unanimously to deny the above application for an open space subdivision in an A-30 zone, consisting of 80 lots , located at the southeast corner of the intersection of Avery Street and Dart Hill Road. The reason for denial was the extremely high density and street configuration, which coupled with the fact that the open space area and detention basin are off-site, would have created a subdivision which is too crowded and congested. Yours very truly, PLANNING & ZONING COMMISSION vg By : r- Marshall Montana, Vice-Chairman CC: M. Banach, Acting Planning Director R. Martel, Town Engineer Inland Wetlands Agency/Conservation Commission CERTIFIED MAIL RETURN RECEIPT REQUESTED R C 'jUvD SQ WINDS 1940 AtAt Sow N $Fq( 7 a le s0�-ttm &Ua�t y� 4C� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soe•co�'� AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, JUNE 28 , 1986 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING & ZONING COMMISSION At the June 24 , 1986 meeting, the Planning and Zoning Commission voted to take the following action: 1. Approve, with modifications , the application of Mark C. Lavitt, for a subdivision known as "Woodmar II" , consisting of 16 lots located on the South Windsor/Ellington townline, A-30 zone. Lots 5 and 6 of said subdivision are located in South Windsor, and portions of Lots 4 , 7 , 8 , 9 , 10 , 11 and 12 are in South Windsor. 2 . Approve, with modifications, the application of J. F. I. Associates for a resubdivision of property located on Commerce Way (north side of Sullivan Avenue) , as shown on plans prepared by Lucek Engineering Assoc . , Inc. , dated 4/21/86 , I zone. 3. Denied the application of Wayne Gerlt, for an Open Space Subdivision in an A-30 zone, known as "Partridge Meadows" , consisting of 80 lots located at the southeast corner of the intersection of Avery Street and Dart Hill Road. Dated at South Windsor, Connecticut this 25th day of June, 1986 . PLANNING & ZONING COMMISSION Robert F. Gilligan, Chairman David H. Sorenson, Secretary J y. 20, 1987 Planning and Zoning Commission `= ~try 1 Town of South Windsor ","J 1540 Sullivan Ave . So . Windsor, CT o6074 Members of The Commission: I would like to voice my opinion regarding the housing moratorium in So . Windsor, I am particularly concerned, since reading in the paper, about developer Jean Marc Jacques request to build 55 homes at Avery St and Dart Dill Road. I strongly feel that this development should be rejected as we cannot accept the increased traffic that it will generarate on Avery St . We now have too much traffic on our street as it is not only used by residents of South Windsor but also Vernon and Ellington drivers . The street is posted for 30 MPH but to most drivers this a joke . The street is being used by too much heavy equipment ,tractor trailers, equipment hauling trucks , cement trucks and so on. The street is not being monitored for the excessive speed which we have to put up with everyday. Vie do have a stop sign at Benedict Dr. and Orchard Hill Dr . but 850 of drivers ignore this . tine had a 12 year old girl killed at this point four years ago and I am sure that it will happen again with the large amount of traffic that we are confronted with. Until someone realizes the dangers that bicyclists and walkers are in on Avery St . I say, no more building in the area until the excessive speed can can controlled. I invite all you on the commission to spend sometime on Avery St . to see what we have to endure each and everyday especially, between 3: 30 and 6: 30 p.m. . I thank you for any consideration on this matter. Sincerely - J'�I" o s . D. Brennan, J r, . 348 Avery St . So. Windsor, CT 06074 cc: Town Council Police Dept . I L o s a a i "CONSULTING ENVIRONMENTAL ENGINEERS' 25 Terrace Drive ASSOCIATES, I N C Vernon, Connecticut OWN Telephone 1203)872-2703 A.Richard Lombardi,P.E.,President June 9, 1986 Ms. Marsha Banach Town of South Windsor Planning Department 1540 Sullivan Avenue South Windsor, CT 06074 Re: Partridge Meadow Subdivision South Windsor, Conn. Project No. 85-1167 Gentlemen: Attached please find a copy of the D.E.P. Interdepartmental Message dated June 6, 1986 for your records. This memo indicates that the plans and specifications meet the D.E.P. Construction Permit requirements and issuance of the Dam Construction Permit for the above referenced project is now a matter of final processing by the D.E.P. Respectfully, A.R. LOMBARDI ASSOCIATES, INC. Mark J. Pronovost, P.E. MJP:sab Enclosure RECEIVED J U N :"4 lBffi SO. WINDSOR PLANNING DEPT. WASTEWATER•WATER SUPPLY •HAZARDOUS WASTES • WATER RESOURCES• GEOHYDROLOGY SITE PLANNING •DRAINAGE •ENVIRONMENTAL IMPACT ASSESSMENT• SURVEYING �RDEPARTMENTAL STATE OF CONNECTICUT SAGE (S;�'"S"j) Obtain "STATE EMPLOYEE SUGGESTION"forms from, and send your ideas to: Empl yee's Sugg stion Awards Program, 165 Capitol Av nu Hartford, Ct,06106. NAME,TITLE Phil Moreschi, Principal Civil Engineer DAB To AGENCY ADDRESS June 6, 1986 WRU NAME,TITLE From Art Christian, Sr. Civil Engineer TELEPHONE AGENCY,ADDRESS WRU Subied: Avery Street Detention (Partridge Meadow), South Windsor I have reviewed the above referenced plans to determine if a dam construction permit could be issued. -Several items were added to the original plans and submitted to us along with a letter dated May 30, _1986. The items were added as a result of my review. fly review of these plans is now complete and I think a dam con- struction permit should be issued to T & M Builders to reconstruct the existing dam. APC:Ijk - - - - - - I ��J' {i�_.i5 ,�"..`• fE.. _•1 ;!". :: h; li-•,' 5 r'^' ul'•�r_ >'�,�''':.y4.�.�;»'.._�S� �i�' �'�.::i,js,: r �'p'tf ]! �„ /r.«4' .�_if �''�.k it":• k<•�me!µ Cr Cr.,aM1, � _ I,.,r j 'iF a ;,•.� 1' ti s' �..;�_ '�',�,�i:� •♦ "v _'�:y�`_%�i.,'. ;.xer, � w,���-S��:.�i t.,�"�w"�."..y�'-rA'dy .f<+�. .. 40 K.. j N/F r • I l OFTEN SPACE 10 ACR E5 ORA ` r =a �• 1 t PARTRIDGE MEAL I