Loading...
HomeMy WebLinkAboutSITE PLAN (27) O'BRIEN AND HIGGINS ne ATTORNEYS AT LAW OCT P-n 1987 267 MAIN STREET MANCHESTER, CONNECTICUT 06040 SOUtt) -MiidSOr KEVIN M.O'BRIEN Planning & Zonin 03 JAMES M. HIGGINS,JR. g 64649 October 20 , 1987 South Windsor Planning & Zoning Commission 1540 Sullivan Avenue South Windsor , CT 06074 Re : Application of Bruedan Corporation for Site Plan Approval Burnham Street South Windsor , CT 06074 Date of Hearing: October 27 , 1987 Gentlemen : Kindly accept this letter as a withdrawal of the above application for site plan approval which is scheduled for October 27, 1987 . Please be advised that there have been changes made to the proposed s i to plan and we wi 11 resubmit a new application when the same is ready. Thank you for your cooperation in this matter . Very truly yours , Bruedan Corporation / 4 -7,2L By 1L Vl uam s M. Hig i , r . , t Attorney JMH, Jr . : rwm PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM Date: TO: Karl Reichle, Mike Gantick, Mel Stead, Shaw' Richard J. Sa=tor, Gary Tyler, Fire FROM: Marcia A. Banach, Director of Planning Th Planning & Engineering Departments have received plans for the following project: arm f-d CLM cj2gQ Subdivision _ Site Plan Residential Commercial Industrial Location: r iJ r►1. �1 cLt✓t J Project Description: /1 i - - l I ( Al - 4 , v & L 3- h cJ 1 Future Town-owned property involved? YES NO (a) new streets ( existing frontage also) (b) new open space/recreation area active passive (c) new detention area Planning Department comments: Please let me know by if you will have comments on this application so that 11can follow up with your department when I do a /4 PAlannin/g Department report. , L/ 77�/ 14GTKS�i�C G'ct• (GI B N �oc_ ��✓WCi� . �J�f �.): J v L' - e. Cs/'4 --G- -v-V,4 �.L /t���c,✓emu_-� a��..l Cam,�u-�U � ttTV 1. TOWN OF SOUTH WINDSOR, CONNECT ICUT OY-A.gi �' � ` PLANNING AND ZONING COMMISSION ti � z APPLICATION FORM v � App. No. NOV I 1987 Date Received: 777 IMPORTANT! South Windsor Action or Public Hearing y: Planning and EngineeringPll*jitt&eZmi*44,missio require 14 days to determine application Receipt No. -76)'?j completeness. To ensure receipt of a complete application by PZC, it is strongly recommended that the application be submitted 14 days prior to the Regular Meeting at which it will be received. APPLICANT: Weuer'&�) ADDRESS: �� �i.�2 «Tv /1�,� �O9/E TELEPHONE:� 9-Z27 OWNER OF RECORD ON LAND RECORDS: 23,2[APc1A-;✓ e�a lep• ADDRESS : COMPLETE LOCATION OF PROPERTY: �0 _{ec1 ' �a�4 r--_j �r ZONE: 1y4k-� _ NAME, ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: 0 ram/2.. 2 5 /,Je 1 ,�a TELEPHONE: c/ THIS APPLICATION IS FOR: (Check one of the following) 1. Zone Change to (public hearing required) 2. Subdivision 3 . Open Space Subdivision (public hearing required) 4. Resubdivision (public hearing required) 5 . Special Exception to Article (public hearing required) 6 . Site Plan of Development 7 . Earth Filling (Section 10 ) and/or Earth Removal (Section 9 ) . (public hearing required) S . General Plan of Development 9 . Regulation Amendment: Zoning Subdivision 10 . Other (-explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN TRIPLICATE WITH SIB{ SETS OF THE MAPS (7 if public hearing is re fired) AND OTHER DOCUMENTS (see page 2) iz�(�C� App i ncant Owx►e r�,����� y 1 /14/87 _ (see reverse side) TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING AND ZONING COMMISSION APPLICATION FORM This application is complete and ready for Planning & Zoning Commission receipt only upon submission of all required documentation, including, but not necessarily limited to, the following items. Not all items ar required with every application. See applicable sections of the South Windsor zoning and subdivision regulations for specific requirements. APPLICATION CHECKLIST 1. Key Map 2. Architectural Elevations/Floor Plans 3. Completed application form (in triplicate) 4. Required fees 5. Zone Change, Site Plan, Subdivision, Open Space Improve- ment, and/or General Plan of Development maps , in accordance with regulations. (Six sets - seven if public hearing require, 6 . Plans & Profiles/Drainage Calculations 7 . Conservation Plan 8 . Landscaping Plan 9 . Traffic Engineering Report 10 . Narrative Statement 11. Sanitary Report 12. Copy of agreement to purchase land (if not the owner) 13 . Other ALL' PROSPECTIVE APPLICANTS ARE URGED TO CONFER WITH TOWN PLANNING DEPARTMENT AND ENGINEERING BUREAU STAFF PRIOR TO SUBMISSION OF ANY APPLICATION TO THE COMMISSION. CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. /1 n /Q7 f' v d_ r yyM1 •1 rf`qL M ` .j f� That certain piece or parcel of land known as Revised Lot 2 on a certain map entitled "Revised Lot 2, Burnham Street, South Windsor, Connecticut, Owner Pamela B. Johnson, Alford Associates, Inc., Windsor, Connecticut, Civil Engineers, dated February 4, 1987" which map is on file or to be filed at the Town Clerk's Office for the Town of South Windsor. Said Revised Lot No. 2 is more particularly bounded and described as follows: Beginning at a point in the Northerly line of Burnham Street, thence running North 3° 28' 23" West 471.95 feet to a point; thence running South 87° 22' 8" East 264.23 feet to an iron pin; thence running South 690 35' 38" East 119.79 feet to a brownstone; thence running North 170 25' 20" East 37.85 feet to an iron pin; thence running South 87' 21' 28" East 46.53 feet to a point; thence running South 72* 28' 38" East 67.70 feet to a point; thence running South 3* 28' 23" East 401.51 feet to a point on the Northerly line of Burnham Street; thence running South 86' 31' 37" West 495.24 feet to the point and place of b ginning. Being a portion of a certain piece or parcel of land known as Lot No. 2 on a Subdivision Plan entitled "Long Hill Acres, South Windsor, Connecticut Owner/Subdivider entitled Evelyn F. Johnson and Elva Kibbe, Gardner i Peterson Associates, 576 Old Post Road, Tolland, Connecticut, Professional Engineers Land Surveyors, dated January 5, 1984, revisions 2/6/84 and 6/14/841 which plan is on file or to be filed at the Town Clerk's Offic for the Town of South Windsor. a ,e. CHECKLIST REQUIRED INFORMATION SITE PLANS This checklist must be signed by plan preparer (P . E. /L. S . ) declaring that all required information is provided . Items 1-7 are required for all applications ; items 8-11 required where appropriate. Check mark for each item supplies . ✓ 1 . On each sheet for plans or; maps , title block with the following information : ' ✓ a. Name , address and telephone of applicant . b . Name , address and telephone number of Land Surveyor or Professional Engineer .' ✓ C. Name of Development . ✓ d . Date when drawings were made . 2 . Key Map : An overall,-map drawn to a scale of 1 inch equals 200 feet , which can be used as an overlay on Metropolitan District Maps . This map will show the overall design of the Development and surrounding property within 500 feet . a. Data block which gives needed zoning information such as percentage of lot coverage, acreage of tract , number of apartment units , parking requirements , etc. ✓ b . Layout of buildings c . . Layout of streets and parking,. d . Lines indicating proposed drainage system with direction arrows. ✓ e. Lines indicating sanitary sewer system with direction arrows. / f . Names of surrounding property owners . g . Proposed open spaces and recreation areas. h. Driveway cuts on surrounding properties . 3. Architectural Elevations : Plans of the proposed buildings drawn to a scale of 1/8" = 1 ' - 0" showing the elevations of all sides of the proposed buildings in sufficient detail to show -architectural styling . ✓ Architect' s seal on elevations for buildings in excess of 5000 square feet (per CGS Chapter 390) . 1 Page 2 (Site Plans) 4 . Plot Plan: A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: ( 1 ) 24" X 36" with a 3/4" ruled margin ; ( 2) 18" X 24" with a '1/2" ruled margin , containing the following data : V, a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at --all property angle points and shown on map. b . Proposed streets,-and street lines with center line stations , curve data , and parking spaces . ✓ C . Building lines in accordance with zoning regulations . i d . Proposed buildings `and other structures , including signs , outside lighting , and dumpsters (on concrete pad and screened) e. Easements, noting grantors , grantees , and purpose . ✓ f . Names of abutting property owners . ;i g . Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency. In areas accessible to Metropolitan District Commission points , or other coordinated points , the monumented points within proposed site shall be coordinated . These coordinates- shall appear in tabular form on the plot plan . The accessibility of these MDC points shall be determined by the Town Engineer . p/ h. All open space or other common or public land uses shall be indicated. i . A-2 certification ; P . E. /L.S . Seal . ✓ 5 . Topographic Map : A map drawn to a scale of 1 inch to 40 feet-on sheets not exce,edi-ng 24 inches by 36 inches , including ruled margins shall in addition to the requirements of the plot plans show the following : ✓ a. All existing and proposed buildings . ✓ b . Curb lines and pavement width , sidewalks. ✓ C . Existing and proposed sanitary sewers . ✓ d. Existing and proposed water and gas main systems . e. Present wooded area indicated by foliage lines . Any individual tr.e,es to be saved should be shown. I Page 3 (Site Plans) ✓ f . Existing and proposed contours shall be shown in not less than two-foot intervals , but in cases of relatively level land , the contours shall be one-foot intervals and spot elevations . g . Regulated wetlands and 100-year floodplain or note that none are present . e/ h. Proposed storm drainage system, showing all catch basins , endwalls , manholes , lengths and sizes of pipes . (Minimum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches . ) i . Connections of all springs into proposed storm drainage system as needed . j . Location and indications of existing brook channels , and 100-year flood limits . ✓ k. A-2 Certification ; P . E. /L. S , Seal . ✓ 6. Landscaping plan . 7 . Drainage calculations - Zero Runoff Increase per attached guidelines . . A/ 119 8 . Traffic report . 9 . Plans and Profiles : A plan -and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally , and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches , including ruled margins and containing the following : a. Layout of .streets in sections coordinated by stations with the profile . b . Street plan showing roadways and drainage. C . Sight line at driveway & street intersections. d . Profile of' roadway showing existing and finished grades . Roadway profile will show all tangent grade and all vertical curve information , e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevation's. Drainage lines will be shown and described as to material . f . Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions . g . Metropolitan District Commission datum shall be used on all sites accessible to these controls . The Town Engineer shall , based on standard engineering practices , determine the accessibility of these controls. Page 4 (Site Plans) h. Profiles shall show all sanitary sewer lines and manholes , including elevations , sizes , lengths , and slopes of pipes. Top of foundation elevations for building shall be shown. A/1A 10 . Open Space Site Improvement Plans : For sites which — require or include a provision for open spaces , a plan which contains data for site improvement may be required . This map shall be drawn to a scale of 1 inch equals 40 feet . _ 11 . Sanitary Report: Where individual sanitary sewage disposal systems are proposed , the final plans shall include a Sanitary Report certified by a Professional Engineer. The report shall demonstrate the feasibility of the proposed individual' s"yst,ems ; the report should deal with the area as a whole , discussing the following points : a. General nature and development of surrounding area . b . Topography and natural drainage pattern . C . Subsurface conditions as shown by subsurface investigation , including soil absorption characteristics, ground water level conditions , ledge rock , ,and general nature of soil . d . General description of type of development contemplated . e. Detailed description of proposed sanitary sewage disposal facilities , indicating sizes for various ground condi-tions , materials to be used , and the general layout pattern to be used , etc . f . Special precautions that may be necessary to provide proper functioning of the proposed disposal systems . g . Map of general area with locations of all tests shown on proposed layout . h. Flood heights of any nearby streams , brooks, or rivers . i . Test results and engineering evaluation per Section 4. 13 . 5. All information required above is included in this application at the time of su-bmission. DATE PLAN PREPAR L. . 1 E -*jGZ4-- November , 1987 PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM r Date TO: Karl Reichle, Mike Gantick, Mel Stead, Fred Shaw, Richard J. Sartor, Gary Tyler, Fire Marshal Tanning FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the 7 following project: 11 C-oY- Subdivision _ Site Plan Residential Commercial Industrial Location: &e-n It cLty� J f-- r Project Description: /l� i CA Future Town-owned property involved? YES _X_ NO (a) new streets ( existing frontage also) (b) new open space/recreation area active passive (c) new detention area Planning Department comments : Please let me know by if you will have comments on this application so that 11can follow up with your department when I do a Planning Department report. ' PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Karl Re.i.chle, Mike Gantick, Mel Stead, Fred Shaw, Date. Richard J. Sartor �Tyler Fire Marshal Tanning, John Shemo FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the following project: �c X Subdivision _Z( Site Plan Residential Commerc ' �c Industrial I T�r6 Location: f)ot fJ, St , Project Description: Future Town-owned property involved? YES NO (a) new streets ( existing frontage also) (b) new open space/recreation area active passive (c) new detention area �,• REc�Ea DEC Planning Department comments : 2 oPnl�1 ,J Please let me know by /�7 if you will have comments on this application so that I can follow up with your department w en I do a Planning Department report. U"bD dNJIS,-,U7Zy) � �M,C�GL-rUC�� � 'S ���21tiE: �J��t����� (f�il�0 �'z=/��E,l�- - ���,•�FJ � �/,c..t 4(:t.c' /14C),V19 (p� /�. 'J jd/iCE /97/ UILI&I6 l-)?-L'c I h.' Cx/ /L+L flEtf) O,u /"y(�- OC SI'r7 172AOU-_So F11,5;Cul V/.S16Le. zSS,6t6 t0*K Sf4 9 ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �IV ` p AREA CODE 203/644-2511 hOSOR.CN December 11, 1987 Ms. Anne Fornabi Town of East Hatford 740 Main Street East Hartford, CT Dear Ms. Fornabi: I am writing to inform you that there is an application for a Resubdivision and Site plan before the Planning & Zoning Commission for property located on Sea Pave Drive, north side of Burnham Street. This property is within 500 feet of the East Hartford town line. I have enclosed a copy of the applications for your records. The public hearing on the above mentioned matter has tentatively been scheduled for January 19, 1988, at 8:00 PM at the South Windsor Town Hall. Please contact me if you have any further questions. Very Truly Yours, Marcia A. Banach Director of Planning mrl Enc. KASPERASSOCIATES, IBC. Engineers,Surveyors, Planners 375 Hartford Turnpike • Vernon, CT 06066 Tel. (203) 872-0682 Bethel, CT (203) 748-2623 Bridgeport, CT (203) 579-1902 December 16 , 1987 Town of South Windsor Planning and Zoning Commission 1540 Sullivan Avenue South Windsor, CT 06074 ATTN: Marcia Banach, Director of Planning. Dear Marcia, We are hereby requesting a 65 day extension on a pending site plan application for Bruedan Corp. Addi- tional information required and plans will be submitted during the review process for the current re-subdivision application on file. Should you have any questions concerning this matter please feel free to contact me. Very truly our , Ken Such Project Manager 0 An Equal Opportunity Employer _ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOk•c� AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER THURSDAY , JANUARY 7, 1988 THURSDAY , JANUARY 14, 1988 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION Notice is hereby given that there will be a public hearing of the Planning and Zoning Commission on Tuesday , January 19 , 1988 at 8 : 00 P . M. in the Council Chambers of the South Windsor Town Hall to consider the following : 1 . Application of Bruedan Corp , for a Resubdivision of land located on the north side of Burnham Street between Long Hill Road and Clark Street , I Zone. 2 . Application of Capuano Builders and Developers for a Site Plan of Development and Resubdivision of land at the southeast corner of Governors Highway and Connecticut Avenue, to be known as Lot #14 - Governors Square Business Center , IP Zone . Copies of these applications and maps more clearly defining the properties are on file in the office of the Town Clerk and the office of the Planning Department of the Town of South Windsor . At this hearing , interested persons may appear and be heard , and written recommendations will be received . PLANNING & ZONING COMMISSION Raymond F . Hallowell , Jr . , Chairman Marshall Montana , Secretary KRSPER ASSOCIATES, Inc. 765 Fairfield Avenue.P o Box 1963•Bridgeport,Ct 06604 Engineers.Surveyors,Planners Tel (203)579-1902 Project 3�.Gda-n C. <'T Sheet S of I� Computed By �� Checked By Date _ 17- (15t Field Book Ref. Other Refs. Revisions F- x��n� £,o�h.,� p�ud P,0P� -RV Ltd fY��aanc�1 h-i R��`-ZSM., �= R �1 R .tc= 5., ,� q:A-K )o 0 2Q 3 u C> A-• t- 25 Q 3 45 I o�O o7t- 7'I 1;•5+ sv o•2,�7 4 t I S 0. 1 lk- T-1 6.01 1uo �j 2g 4 S 1 2b 0.1k S S 6.43 z- o Z�s S 6 s3 0•76 4 3 20 South V,,Ihidsor a:,nniil 3 L �;;, CCZ iC]iSS1011, KRSPER ASSOCIATES, Inc. 765 Fairfield Avenue•P.O.Box 1963•Bridgeport,Ct 06604 Engineers,Surveyors. Planners Tel.(203)579-1902 Project n nI u e•a a Sheet of _ Computed By Checked By Date 7• Field Book Ref. Other Refs. Revisions Yoi -2si�- �4rO�nr� 0 0 0 0 0 { s 7 6 t9.2-0 1 t FrG4 28•bo O.4°1 z`� z5 0• T 111633► 0 0 2 1�52- 3( •-40 7-703S9Z 2'(' ►44b 4$•Oo 0,{�b g,<6.6� {r �72_4535Z_1) 177-E, S-1•60 0•74 S2'�} 2-016 101.20 0• w 6t•oo 2304 -76'Sv 0.67 77,61 .01 9p c-, �1 C�rI�cS2 � 1J✓aG�. o� O- CA n - FLOOD ROUTING FOR 2 Yr. STORH TlME 1)in1OFS) 2S/T-0 2W [+0 Quut (CFS) 0 0. 00 0. 0M 0' 0N 0. 00 ] 0. 64 0. 54 0. 64 0. 05 3 1 . 92 5. 08 5. 44 0. 18 4 2. 56 9. 06 9' 56 0. 23 5 3. 20 14. 18 14. 82 0. 32 � 6 2. 82 19. 41 20' 19 0. 39 7 2. 43 23' 79 24. 66 0. 44 8 2. 05 27. 32 28. 27 0. 48 9 1 . 67 30. 02 11 . 03 0. 50 10 1 . 28 31 . 93 32. 98 0. 52 11 ' 0. 90 33 05 34 11 0 53 / ^ ^ ^ ' �~�c i`77 12 0. 52 - 33.�39 34 . 47 0. 54 �-- �� 13 0. 13 32. 98 04. 04 0. 53 14 0. 00 32' 06 33. 11 0. 52 15 0. 00 31 . 04 72. 06 0. 51 16 0. 00 30. 03 71 ' 04 0. 50 17 0. 00 29. 04 70. 03 0. 49 18 0. 00 28' 07 M04 0' 48 19 0. 00 27. 12 28. 07 0. 47 20 0. 00 26. 19 27. 12 0. 47 ° � _ . INFLOW 8c OUTFLOW VS TIME 2 Yr. 3.2 3 2.8 2.6 2.4 2.2 � 2 U 1 .8 3 0 1 .6 1 .4 c - 1 .2 _ o 1 0.8 0.6 0.4 0.2 0 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 ATIME {MIN} 4 Q in (CFS) Q out (CFS) tows sf+(� i oP W o � e = 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 l�oSOR-co� AREA CODE 203/644-2511 MEMORANDUM January 19, 1988 TO: Marcia Manach, Director of Planning FROM: Michael J. Gantick, Director of Public Works SUBJECT: REVIEW OF SUBDIVISION BRUEDAN CORPORATION BURNHAM STREET This Department has reviewed the subject plan from a resubdivision perspective and the following points are noteworthy: 1 . Monuments to be set along street line at property lines for new street line not old one as shown. Per previously approved subdivision, cross hatched area was to be deeded to Town. This plan still makes same reference. 2 . The 20 ' permanent easement to be granted to the owner of Lot 2B should be defined by bearings and distances . 3. The Town of East Hartford has called to mention that they may have some concerns with this proposal as it relates to potential impacts to East Hartford and about the proposed R.O.W. . Should you have any questions regarding this matter, please contact me. MJG:bmr cc: Commercial Project File P & Z Corres . File TOWN OF EAST HARTFORD V Departmental Memorandum i ;e TIMM To Town Engineer Date January 26 , 1988 Tim Bockus Proposed Bruedan Corp Butilla From Onerations Engineer Subject: South Windsor Town Line After reviewing the proposed site plan for the possible affects upon the Town of East Hartford , I have the following questions and comments : - A detail should be given for the retention galleries . - The overflow empties into a low area which naturally drains to a 21" C .M. pipe in Burnham Street . What will be the affect on this pipe and will a right to drain be required by the Town of East Hartford? - Details and a schedule are given for implementation of. an E & S system, however , the areas are not shown on the plan. Haybales or silt fence should be installed along the street line and as a protection at the plunge pool. - Who will be the person responsible for maintaining the E & S system? Provide a name and number where this person may be reached. - The anti-tracking apron detail should be- revised to .shbw 50 ' depth into the site and width as directed by the Town Engineer. This construction entrance should also be designated on the plan . - A pavement detail should be shown. - A bond and excavation permit thould be required by the Town of East Iartford for all roadwork and curb cuts . - What type of traffic is anticipated and will be generated z.- -entering,and exiting this .site? - What turning movements are anticipated? - Show the radii at the entrance to the site .,------ spaces for 26 emnloees . Is - There are 13 proposed parking Y this insufficient parking and will this create any street parking? - A Professional Engineer and Land Surveyor ' s stamps should be on the plans . gp HARTFORD Sao )ISTREEF x9 z 911 RXXT-NOI3GRT i.VcNirI,TY TO OF EAST _ MAYOR Fast 4aztfold, eorrzecticut o��oS February 1, 1988 Mr. Michael J. Gantick, P.E. Director of Public Works 1540 Sullivan Avenue South Windsor, Connecticut 06074 Re: Proposed Bruedan Corp. Building Burnham Street South Windsor, Connecticut Dear Mike, Enclosed is a list of concerns and comments generated by this office with regard to the above site plan. As can be noted, drain- age and traffic are major concerns to the Town of East Hartford. It appears the applicant must strengthen that portion of his pro- posal. Please forward our comments to your Pla eined&inZoning Cgmmission and to the applicant. tie woul b rY i th the applicant and further discussing his proposal. Please keep me informed about changes and other developments with regard to this application. Yiz 7 lly � �/ Michael Mancini, P.E. 1� Town Engineer ti 2 1 � MM/ee _�' xc: Michael Dayton, Town Planner '� �' �� o 'FEB: 2' 1988 TG,n tf fr'`'scr pr F. �;k3 8 L �sowM aF,< U To-wt-t O-P O 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 0 -CO� AREA CODE 203/644-2511 M E M O R A N D U M February 2, 1988 TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works RE: Town of East Hartford Engineering Comments BRUDAN CORP. Please find attached for your information a copy of the comments received from the Town of East Hartford. MJG/jsv cc: Project File PZC File Breudan Corp. Site Plan - Planning Dept. Comments 2-22-88 .-'Key Map Correct data block to show total lot area of Lot 2a only `/Plot plan 10 x 20, parking spaces required Landscaping plan More buffer-type plantings along Burnham Street to screen existing residences t OMM SE'�< m ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �'ti'asox•coN AREA CODE 203/644-2511 TO BE PUBLISHED IN THE -JOURNAL INQUIRER SATURDAY, FEB. 13 , 1988 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At the February 2, 1988 meeting, the Planning and Zoning Commission voted to take the following action: 1 . Deny the application of Sowin Associates for an eleven-lot Subdivision known as Birchbriar Estates, located on the south side of Foster Street between Ellington Road and Beelzebub Road, AA-30 Zone. 2 . Approve, with modifications, the application of Vito Covensky for a Site Plan of Development for property - south_ s ' e of Strong Road, I Zone. 3 . Approve, with modifications, the application of Bruedan Corp. for a Resubdivision of land on the orth side of Burn am Street, between Long Hill Road and Clark Street, I Zone. 4 . Approve, with modifications, the application ain Laurel Associates for revisions at proposed Judge Lane in "Mountain Laurel Estates, " located east of Felt Road, south of Birch Hill Drive, west of Andmar Lane and north of Tallwood Drive, AA-30 Zone. In addition, the Commission established an effective date of February 19, 1988 for Zoning Amendments to Buffer Regulations adopted at the January 26 , 1988 PZC meeting. Copies are available in the office of the Planning Department. Dated at South Windsor, Connecticut this 3rd day of February, 1988 . PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. , Chairman Marshall Montana, Secretary 10VON SF'4 Ld7-own, O-P Sot� ?dzo��� e mac` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 '�USOR•CO'C AREA CODE 203/644-2511 February 23, 1988 Mr. Michael J. Gesmundo 496 Greycourt Ave. Chester, N.Y. 10918 Re: Application #1290, Breudan Corp. site plan Dear Mr. Gesmundo: Attached is a copy of comments from the Planning and Engineering Departments regarding the above-referenced application. Please make the necessary revisions to the plans and submit 6 complete sets (including landscaping plans, architectural elevations ) to the Planning Department. Your application will be scheduled on a Planning and Zoning Commission agenda as soon as possible after we receive revised plans . If you have any questions regarding the comments or the procedure, please contact me. Very truly yours, Marcia A. Banach Director of Planning cc: Town Engineer S0WM SAr,( y 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 4�h�SOR•CON�E AREA CODE 203/644-2511 M E M O R A N D U M February 26 , 1988 TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works RE: Engineering Review BRUDAN CORPORATION Please find attached the SEA engineering review letter for the subject project. In addition, please note the comments from the Town of East Hartford Engineering Department transmitted to you previously under separate cover. The following comments are also noteworthy: 1 . The significance and hydraulic capability of the 6 inch PVC pipe from Lot 26 should be demonstrated. Drainage easement needed. 2 . Cross section, profile and materials of construction needed for gallery system. Should you have any questions, please contact me. MJG/jsv cc: Planning & Zoning Crsp. Engineering Department February 2, 1988 S E A Consultants Inc Enameers/ArchrteCSS Gn napa 1s nold s G°'ds'E:n,PE Mr. Michael J. Gantick, P.E. �rederics G Auherc.PE Director of Public Works Robert M Brandon.A I A Stephe^H Geribo.PE Town of South Windsor Dav-d T Goodemote PE 1540 Sullivan Avenue Bruce E Soule PE Kenneth N, Stewart PE South Windsor, Connecticut 06074 Awhonv Zuena,PE Associates Re: Bruedan Corporation ateven L.Bernstein,PE Job No. 288-8731 Paul F Gabriel,PE. Task Order NO. 15 Mark Gould.RE Michael S Schultz,PE Arthur A Spruch,PE. Dear Mr. Gantick: Paul C Ross,RE As requested, S E A Consultants Inc. has reviewed the following for the above referenced project: Sheet No. Title Prepared By Date 1 of 3 Key Map/Plot Plan Kasper & Associates July, 1987 2 of 3 Conservation Plan/ Topographic Map it July, 1987 3 of 3 Landscape Plan if July, 1987 This information was reviewed for compliance with the Town of South Windsor Subdivision and Zoning Regulations dated July 24, 1972 and standard engineering practice. We note the following: Section 4.13.21 KEY MAP a) Data block should include schedule of area, yard and height requirements. Section 4.13.2.2 ARCHITECTURAL ELEVATIONS Architectural elevations and plans of the proposed building have not been submitted and are therefore not part of this review. Section 4.13.2.3 PLOT PLAN d) Although proposed parking lot lighting has been noted on the plan, the location of the lighting should be shown on the proposed building. Signs and dumpsters should also be indicated on the plan. £1,1�0 Si1a,,Deane Highway Wethersfield,CT 06109-3412 (203)721-7993 485 Massachusetts Avenue Cambridge MA 02 1 39-401 8 (617)497-7800 C'mccrp ParE West 100 Foden Road ,r,lith F'-,rl,ml, C '05 1n (207)77-1 2281 Mr. Michael J. Gantick, P.E. s E:A Consultants inc February 2, 1988 EnptneersiA,cnaects Page Two Section 4.13.6 CONSERVATION PLAN Locations of soil erosion and sedimentation control measures should be shown on the Conservation Plan. Soil type boundaries should be delineated on the plan. Soil descrip- tions should also be included. GENERAL COMMENTS 1. The existing and proposed iron pins and monuments do not correlate between the Plot Plan and Topographic Map. 2. The sedimentation structure should be labeled on the Topo- graphic Map. 3. Details of the proposed recharge and detention system should be provided on the Topographic Map. 4. Locations of stockpile areas should be shown on the Conserva- tion Plan/Topographic Map. 5. A hydraulic capacity analysis of the existing 21" C.M.P. across Burnham Street should be provided. 6. The 6" sanitary lateral at the building appears to have less than 3 feet of cover. A minimum cover of 4 feet should be provided. 7. The detention analysis contains proposed outflows for the 10, 25, 50 and 100 year storm frequencies. In addition, an analysis for the 2 year storm frequency should be included. 8. A cross-section pavement detail of the drives and parking areas should be provided. If you have any questions, please do not hesitate to call me. Very truly yours, S E A Consultants Inc. James R. Bancroft, P.E. JRB:emf KRSPER ASSOCIATES, Inc. Engineers.Surveyors. Planners 765 Fairfield Avenue•P.O.Box 1963•Bridgeport.Cl 06604 1 Tel (203) 579-1902 Project i CUD,- �r� Sheet Computed By R�-- Checked By Date '" M Field Book Ref. Other Refs. Revisions �8• o 0 I oo z j2I lot ►02 y ?n, L� _ • / I 180 10,000 CHART 2 168 ' ) 8,000 EXAMPLE (3) 156 0.42 Inches (3.S foot) 6• 6,000 6 144 5,000 0.120 cfs 5. 4,000 11 Is Nw 6. 5. 132 D root 3,000 (1) 2.S 0.e 5. 4• 120 4 2,000 (2) 2.1 7.4 108 (3) 2.2 7.7 4. 3. e0 In feet c 3• 96 1,000 3• 800 84 --� --� 600 500 / W 72 400 �Q = 2. 300 � I to 1.5 1.5 Z rn Z 60 v 200 // W 1.5 H Z W 0 54 _ a a w 4 W 100 g _ > 80 I j Q = /2 N 60 L0 L0 1 50 W J � 40 HD SCALE ENTYPECE a: I.0 w 1— 36 •9 .9 W 30 (1) Square edge with -9 .9 33 headwall 0 Q Q 0 20 (2) Groove end with W 30 headwall = .8 ,8 (3) Groove end •8 27 pro)ogting 10 24 7 8 '7 .T � 6 To use ecaio (2) or (3) project 2 I 5 horizontally to scale (1),then 4 use straight Inclined line through 0 and 0 scales,or reverse as •6 I8 3 illustrated, •6 2 15 .5 5 .5 1.0 I I 12 HEADWATER DEPTH FOR i CONCRETE PIPE CULVERTS IUREAU OF PUBLIC ROADS JAN. 1963 HEADWATER SCALES 2 83 ` REVISED MAY1964 WITH INLET CONTROL . ) 5-22 KRSPER RSSO[IRTES, Inc. 449Silas Deane Highway•Wethersfield,CT 06109 Engineers,Surveyors. Planners Tel. (203) 563-1300 Project 'r�r, e ar. Cova Sheet l of Computed By t/ /g .- Checked By Date -j i7- /988 Field Book Rel. Other Refs. _ Revisions P Y. C- • C. l_o td c'6 ¢o ?a /' 4 1-7s A /Pe b e�, V a l ve ,- a cue dreg ol-) /ot-' ?Z) . The V C IT re //Y 0. 3 C•f S, wh/ch 2 ~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SoR,cO AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, APR. 2, 1988 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At the March 29, 1988 meeting, the Planning and Zoning Commission voted to take the following action: 1 . Approve, with modifications, the application of Bruedan Corp. for a Site Plan of Development on the north side of Burnham St. east-of-Long Hill Road, I Zone. 2 . Approve, with modifications, the application of Highlift, Inc. for a Subdivision of land on the west side of John Fitch Boulevard (Rt. 5) , north of Strong Road, I Zone. 3 . Approve, with modifications, the application of Highlift, Inc. for a Site Plan of Development for property on the west side of John Fitch Boulevard (Rt. 5) , north of Strong Road, I Zone. Dated at South Windsor, Connecticut this 30th day of March, 1988. PLANNING AND ZONING COMMISSION Raymond F. Hallowell, Jr. , Chairman Marshall Montana, Secretary low" st", C r e -a� ap slog ?&UAot � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ~�sUR.00 AREA CODE 203/644-2511 March 30, 1988 Mr. Scott Lowe 25 West Rd. Bolton, CT 06043 re: Appl . #1317 - Bruedan Corp. Site Plan Dear Mr. Lowe: Please be advised that the Planning and Zoning Commission voted on March 29 , 1988 to approve the above-referenced application in accordance with Drawings #1, 2, and 3 of 3 last rev. 3-14-88, prepared by Kasper & Associates, Proj . #V-1180-A, and with the following modifications : 1 . Prior to commencement of any site work, a meeting must be held with Town Staff . 2 . No building permits will be issued until the final plans have been filed in the Town Clerk's Office. 3 . This approval is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4 . An as-built plan will be required prior to issuance of a certificate of occupancy per Section 4 . 13 . 10 of the Zoning Regulations . 5 . A landscape bond of $5, 000 is required. 6 . Revise barking formula to reflect both office and manufacturing uses . 7 . Mode buffer plantings along Burnham Street and provide a variety of evergreen types . 8 . Applicant should meet with the Town of East Hartford Engineering Dept. to address East Hartford' s concerns . 9 . 15" pipe should be used for drainage from I,ot 21 . Mr. Scott Lowe 2 March 30, 1988 10 . Cross section, profile, and materials of construction are needed for gallery system. Soils (SCS) indicate seasonally high groundwater condition. Galley's/detention design to reflect this condition. Plans to be modified accordingly. Detention analysis needed. 11 . A cross-section pavement detail of the driveways and parking areas should be provided. Soil types must be taken into consideration. 12 . Move stockpile out of the treed area. 13 . A hydraulic capacity analysis of the existing 21" C. M. P. should be provided. 14 . Drainage will be subject to approval of the Town Engineer. 15 . Fencing around outside storage areas should be shown on drawings . 16 . Show placement of silt fence around treed area. 17 . A curb cut permit is needed from the Town of East Hartford. Black and white transparent mylars of Sheet #1 with the above modifications, together with three blueprint copies of the entire set of plans, must be submitted to this Commission to be stamped and signed. The letters of approval of this Commission, as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars . After the mylars have been signed by the Commission, they will be returned to you for filing in the Office of the Town Clerk. Very truly yours, PLANNING AND ZONING COMMISSION * Raymond F. Hallowell, Jr. Chairman cc: T. D'Auria, Building Official Engineering Dept. M. Gantick, Director of Public Works F. Shaw, Asst. Dir. of Public Works E. Belleville, Assessor W. Lanning, Fire Marshal M. Banach, Director of Planning IWA/CC PZC File Kasper Associates Bruedan Corp. D N Authorized distributor for 'Y Yamaha Golf Cars &. John Deere Turf Products ' •y So...o1 viindsor Planning & ZQning Camm;ss;ott April 14, 1988 Town of East Hartford 740 Main Street East Hartford, CT. 06108 Attn; Mr. Michael Mancini RE: Traffic Analysis Bruedan Corporation Burnham Street South Windsor, CT. Dear Mr. Mancini, Pursuant to our recent meeting of Thursday, April 14th, please find the following traffic analysis as per our discussion. Just to recap, the Bruedan Corporation is an authorized Yamaha golf car distributor and an authorized John Deere golf and turf equipment distributor. I have enclosed some literature to help in identifying our business. At this new 11,200 square foot facility, we will be assembling, repairing and distributing our products to the golf courses in the entire State of Connecticut and the four western counties of Massa- chusetts. At this time all of our trucking is sub-contracted to common carrier or to Ron's Golf Car Rental, Inc. in Vernon, with most of the trucking being performed in the fall/winter and spring of each year. Main Office: Box 496 Greycourt Avenue Chester, New York 10918 914-469-2275 or 469-2288 Connecticut Branch: 25 West Road Bolton, Connecticut 06040 203-647-1774 Town of East Hartford Page -2- The reason for this schedule is most of our inventory is purchased and delivered to our facility for assembly in October, November, December and January and of course being delivered in the Spring to the various golf courses after assembly. Over the past three years our average new car purchase has been approximately 700 units with 40 units delivered in each container for an average amount of 18 trailer loads each winter and obviously back out to the golf courses each spring. Couple the above with parts deliveries and a few miscellanous other deliveries and that should be the most of our trucking in this facility. The only other traffic will be our twelve employees, salespeople. Mr. Mancini, the only other information that I can add is that the golf and turf business is a very small and unique business and does not warrant a tremendous amount of traffic to the City of East Hartford's Burnham street area. I am sure that the Bruedan Corporation and the City of East Hartford will be good neighbors and I look forward to becoming a part of your community as well as the Town of South Windsor. Thanking you in advance for your support and help regarding our new facility. incerely, o e"-�— Connecticut Branch Manager SOL/j sl Town of East Hartford Page -3- CC: Kasper Associates, Inc. Bruedan Corporation, Chester, N.Y. Town of South Windsor Marcia Banach Michael Gantick KASPERASSOCIATES, InC■ Engineers.Surveyors.Planners 375 Hartford Turnpike • Vernon, CT 06066 Tel. (203) 872-0682 Bethel, CT (203) 748-2623 Bridgeport, CT (203) 579-1902 April 22 , 19 5,\.- 4 Michael Gantik, P.E. a' Director of Public Works , 1540 Sullivan Avenue C�40 South Windsor CT 06074 ••`+� APR 2 5 IM Re : Bruedan Corporation *0aSL KA Job No. V1180/5648 Dear Mr. Gantik: The following comments are offered in response to q U s raised at our meeting of April 14 , 1988 concerning the above project . The question of a possible high water table ' s effect on the storm galley system was raised . In our opinion, the galley system will actually mitigate any such effect . The system is free flowing to its outlet and any infiltration during non-storm periods will simply flow to the outlet . This action will effectively lower the water table. During the periods of storm flow the amount of ground water infiltration will actually be negligible compared to the runoff and will have no effect on the functioning of the system. The matter of proposed landscaping was addressed. We have revised the landscaping plan to reflect the Town ' s thoughts on this subject . You had requested information regarding the capacity of the existing 21" culvert under Burnham Street . This data is included in the storm design calculations previously submitted to you. As noted at the meeting this capacity was calculated on the basis of inlet control utilizing BPR Chart 2 . The maximum capacity was determined to be 20 . 5 cfs with water elevation at 102 giving a head of four feet . We had investigated the function of the existing 6" PVC pipe on the site. We calculate the capacity of this pipe at approximately 0 . 3 cfs and surmise it was installed to function as a high water relief mechanism for the wet area on adjacent property. In keeping with your desire to replace this item with a larger diameter pipe, we will indicate a 15" ACCMP in that location . This pipe will be installed in a near - level manner thus continuing to provide relief; minimizing any effect on site drainage and preserving existing wet lands . An Equal Opportunity Employer KRSPER RSSOCIRTES, Inc. ( 2 Michael Gantik P.E. April 22 , 1988 We welcome any further comments or questions you have concerning these .matters . We trust that this will clear up all outstanding matters regarding this project . Barry J. Berson P.E. er Assoc ' t�s Barry J, n, P.E. Office Manager, Vernon CC: Bruedan REET ROBERMAYO�.��: TOW OF EAST HARTFORD '�(20:1)2•s-TOWN81 East --4a ttfoad, Connrcttcut 061oS MAY 17 1988 May 12, 1988 South Wind;,or mmuiag & Zoniag lra"ia Mr. Scott Lowe Bruedan Corp. 25 West Road Bolton, Conn, 06043 ICE: Access driveway to proposed site Burnham Street Dear Mr. Lowe: The Town of East Hartford has considered your request to construct a driveway from Burnham Street onto your proposed site. Your request is denied for the following reasons: 1. This commercial establishment will not blend well with the residential neighborhood that has been long established. Commercial development along the northern street line of Burnham Street will not prom6te the health, safety, and welfare of the immediate residential neighborhood and the Town of East Hartford. 2. The Town of East Hartford has requested the Conn. Department of Transportation to construct a thirty (301 foot high berm in this area in an effort to hide the proposed route I.-291. The construction of this site may adversely affect our efforts. 3. We have requested the Conn. Dept. of Transportation to relocate the exit ramp from route I--291 entirely within the borders of South Windsor, The construction of this site may also affect our request. In summary, the Town of East Hartford will not grant permission to construct driveways or points of access onto Burnham Street that Mr. Scott Lowe -2- May 12, 1988 will compromise the integrity and quality of the residential neighbor- hoods located within East Hartford. Respectfully, 7 /J Michael Mancini, P,E. Town Engineer gp xc Mayor Robert F. McNulty Michael Dayton, Town Planner Thomas Harris, Director of Development David Griffith, Corporation Counsel William Kennedy, Director of Public Works Michael Gantick, Director of Public Works (South Windsor Marcia Banach, Director of Development (South Windsor) 4.,/7iemo from TOWN OF SOUTH WINDSOR TOWN HALL _SOUTH WINDSOR.CONN. 06074 TO Town Treasurer DA TE Town of South Windsor q� 2 1540 Sullivan Avenue South Windsor, Ct . 06074 L J SUBJECT: Drainage Assessment Fees - Planning and Zoning Commission FOLD- Enclosed is a check in the amount of $ _��i which is the drainage assessment fee collected for Application No . , Please deposit it in the proper account . Thank you . By PLANNING & ZONING COMMISSION S. O. LOWE 9-83 447 J. S. LOWE �. 21 NORTHFIELD RD. ENFIELD, CT 06082 p 19 SY 51-7424/2111 rl-: 21LI71, 21.61: _/ Q ///''' �(/ OU-'� /I�^��)� � /LJ a-Rd -�1411111T_n DOLLARS SUFFIELD SAVINGS DANK[MII[LD CT SOL 027 711u 0447 O BRIEN AND HIGGINS ATTORNEYS AT LAW 267 MAIN STREET SA- WINE( t? AN% wJ Eff, NEVIN M.OMBRIEN MANCHESTER, CONNECTICUT 06040 INLAND WETLAND�,kQJ ... JAMES M. HIGGINS.JR CONSERVATION C0MPq4%411P0 August 5, 1988 CERTIFIED LETTER South Windsor Inlands/Wetlands Agency/Conservation Commission South Windsor Town Hall 1540 Sullivan Avenue South Windsor, CT 06074 Re: Application No. 504/Burnham Street Gentlemen: Pursuant to your letter dated July 15, 1988, kindly accept this letter as a request for a one year extension relative to the above captioned application. I enclose a check payable to the Town of South Windsor in the amount of $25. 00. No work has begun on the sight since getting planning and zoning approval. The reason no work has been done and the reason for this requested extension is that the Town of East Hartford has denied my client a driveway permit (curb cut) rendering the sight unusable. It is my understanding that the towns of South Windsor and East Hartford have been negotiating about this problem during the last two months. If my client is unable to procure a driveway permit then the project will not be feasible. No work will be started without previously contacting your commission. if you have any questions, please feel free to contact me. Very truly yours, James M. Higgins, Jr. JMH,Jr. : rwm cc: Bruedan Corporation South Windsor Town Manager South Windsor Town Planner South Windsor Town Attorney 1 Enclosure O'BRIEN AND HIGGINS ATTORNEYS AT LAW 267 MAIN STREET MANCHESTER, CONNECTICUT 06040 KEVIN M.O'BRIEN AREA CODE 203 JAMES M. HIGGINS,JR. 646-3500 September 14, 1988 RECEIVE ® South Windsor Town Planner Town Hall S c P 18 10 1540 Sullivan Avenue SO. WINDSOR PLANNING DEPT& South Windsor, CT 06074 Dear Sir or Madam: ` I enclose drafts of proposed easements and quitclaim deeds relative to the Bruedan Corporation's site plan on Burnham Street. Would you kindly advise if the Town Attorney approves of these documents. Very truiy yours, e I James M. Higgins, Jr. JMH,Jr.:rwm 2 Enclosures KASPER ASSOCIATES, Inc. Engineers, Surveyors, Planners P.O. Box 2338 • Vernon, CT 06066 Tel. (203) 872-0682 Bethel, CT (203) 748.2623 Bridgeport, CT (203) 579-1902i�` January 12 , 1989 Suet„ r Michael Mancini, P.E. 'Uwing Commission 740 Main Street East Hartford , Connecticut 06108 Re : Bruedan Corporation - Burnham Street KA Job No. V1180/5648 Dear Mr. Mancini: Enclosed is a printout recently provided us by the Connecti- cut Departmentof Transportation . The data provided indicates vehicular activity on Burnham Street east of Long Hill Street . This location is essentially directly in front of the proposed Bruedan site on Burnham Street in South Windsor. The count was conducted in 1987 from 6 : 00 A.M. on Tuesday, November 3rd until 7 : 00 A.M. on Thursday, November 5th. As you can see, Connecticut D.O.T. has rated the road at 1800 ADT. This is obviously based on the first 24 hour count which indicates a total of 1811 trips . Parenthetically, the second 24 hour count noted 2014 trips , a 11 . 2% increase . Please further note that the two busiest periods on both days occurred between 6 : 00 A.M. and 8 :00 A.M. and between 3 : 00 P.M. and 5 : 00 P.M. This activity would logically be anticipated in light of the heavy commerical and industrial activity on Burnham Street . The highest hour, 277 trips , occurred between 6 : 00 A.M. and 7 : 00 A.M. on November 4th. The practical capacity for two lane, uninterrupted traffic flows under ideal conditions is 1500 DHV at 35-40 MPH . Despite a speed limit of 30 MPH we will use the more ,con- servative practical capacity for"'the 35-40 MPH range . 1 . Practical design capacity 1500 vehicles 2 . Pavement width 20 ' : lateral clearance 4 ' both sides from Seelye 12-04 Table A Reduce to 79% . 79x1500 = 1185 vehicles An Equal Opportunity Employer KRSPER RSSOCIRTES,Inc. Mr. Michael Mancini January 12 , 1989 Page 2 3 . Sight distance adjustment Assume 40% Factor From Seelye 12-04 Table B Reduce to 88 . 8% 800/900x1185 = 1053 vehicles 4 . Commerical Vehicle Adjustment 20% ; level terrain from Seelye 12-05 Table A 83% Adjust 1. 25xl7% = 21. 25 100 - 21 . 25 = 78 . 57% . 7875( 1053 ) = 787 vehicles Use 750 DHV for design hour practical capacity. The Bruedan Corporation anticipates a maximum work force of twelve people at this location which would generate twelve trips to and from the site . Additionally they operate three service vehicles and one "gofer" vehicle at this location . Product delivery and shipping accounts for two deliveries per week. Assuming that all of these trips occur during the course of one hour, a total of 18 trips could theoretically be added to a given hour. At the present time , the busiest hour noted above represents 36 . 9% of the practical design capacity ( 277=750 ) . Adding the 18 trips which might occur within that hour, and assuming traffic will grow from 277 per hour to 335 cars per hour in 1989 ( 10% per year 1987-1989 ) , capacity will be at 47 . 1% ( 353=750 ) , or less than half practical capacity all calculated at a very conservative level. YEAR PEAK HR. BRUEDAN TOTAL TOTAL/750 1989 335 18 353 47 . 1% 1990 369 18 387 51 . 6% 1991 406 18 424 56 . 5% 1992 446 18 464 61 . 9% 1993 490 18 508 67 . 7% 1994 540 18 558 74 . 4% 1995 594 18 612 81 . 6% 1996 653 18 671 89 . 5% 1997 718 18 736 98 . 1% KRSPER RSSOCIRTES,Inc. Mr. Michael Mancini January 12 , 1989 Page 3 As you can see from the above chart this conservative approach leads to the conclusion that Burnham Street will be at maximum capacity by 1997 or later. It is assumed that prior to that date the towns of East Hartford , South Windsor and Manchester and/or the State of Connecticut , in conjunction with I-291 , will have made improvements to this street . Naturally, the pace of the future development will be subject to many other factors and complete capacity might not be reached until well beyond the year 2000 . Summing up --- under the worst of existing traffic conditions , Bruedan ' s maximum contribution to the traffic flow in 1989 could not exceed 5 . 4% ( 18-335 ) . That rate can only be reached in the unlikely circumstances that all Bruedan employees arrive during the same hour; all service vehicles leave in that hour and all weekly deliveries arrive in that same hour. Given the impracticality of the above scenario and realizing the conservatism of our approach to Burnham Street capacities , we anticipate the immediate impact of the completed project in the 1 . 5-2 . 5% range . This impact will only decrease as the Burnham Street area continues to develop. Please contact this office if you have any need for further information . Very truly yours , Kasper Associates 1 Barry J. Berson , P .E . Vice President Enclosure CC: Bruedan Corp. Marcia Banach BJB/lt YEA'"' 1987 ETA NO 42 Z117 STATE OF CA ECTICUT I)E'ART1ENT OF TRANSPORTATION ' gLjREAu OF PLANNING AND RESEARCH PLANING INVENTORY ANO DATA : : TRAFFIC RECORDER DATA ; TOWN OF E . HARTFORQ ROUTE DIRECTION 3t�,` d N o LOC 9URNHAM STREET �- EAST OF LONG HILL STREET` DAY SUN MON TUES WED THUR FRI SATE GATE 0 0 1103 1104 1105 a 0.4 .t� Eck{..t• i ir'� TYPE_ HOUR 19.87 AUT 1800 EG MIU U 0 U 3 4 0 0 IA 0 0 0 3. 5. _. U 0 2A 0 0 7 4 1 0 0 3A 0 U 0 3 4 0 0 .. . 44 U 0 U 9 10 0 0 5A 0 0 0 30 32 0 0 6A 0 U _0 119 144 0 0 z 7 ,� 00 237 277 ' 250 0 0 t 8A 0 0 126 140 0 0 0 94 0 0 82 84 0 0 0 10.0 0 0 80 78 0 0 0 11 A 0 0 82 95 0 0 0 12P 0 0 65 111 0 0 0 1P 0 U 66 88 0 0 0 2P 11 0 89 94 0 0 0 3P 0 0 113 128 0 0 0 4? 0 0 168 204 0 0 0 S? 0 0 199 212 0 0 0 _ 62 0 0 106 102 _ 0 0 0 - 7p f] 0 73 65 0 0 0 ts 0 46 43 0 0 0 9P 0 0 40 40 0 0 �] lOP 0 0 27 39 0 0 0 11P 0 U 16 14 0 D 0 ' TOT 0 0 1635 1990 450 0 0 24 HR 1811 G — 4 "SPER ASSOCIATES, Inc. Engineers, Surveyors, Planners LETTER OF TRANSMITTAL P.O. Box 2338 • Vernon, CT 06066 Tel. (203) 872-0682 DATE 01-19-89 JOB NO V11 80 Bridgeport,CT(203)579-1902 • Bethel,CT(203)748-2623 ATTENTION: Scott Lowe TO: Bruedan Co ration RE. Burnham Street West Road Bolton Connecticut 06043 ` r JN GENTLEMEN: S�,u�;, 1�,�It�c,❑ WE ARE SENDING YOU 9 ATTACHED ❑ UNDER SEPARATE COVER VIA piCk-Upt� I�I{p(Yyy39t9�EMS pinning ❑ SHOP DRAWINGS PRINTS ❑ PLANS ❑ SAMPLES ❑ SPECIFICATIONS ❑ COPY OF LETTER ❑ Copies Date or No Description 5 sets Signed and Sealed Plans. Traffic Analysis. THESE ARE TRANSMITTED AS CHECKED BELOW: ❑ FOR APPROVAL ❑ APPROVED AS SUBMITTED ❑ RESUBMIT COPIES FOR APPROVAL (� FOR YOUR USE ❑ APPROVED AS NOTED ❑ SUBMIT COPIES FOR DISTRIBUTION ❑ AS REQUESTED ❑ RETURNED FOR CORRECTIONS ❑ RETURN CORRECTED PRINTS ❑ FOR REVIEW AND COMMENT ❑ ❑ FOR BIDS DUE 19 ❑ PRINTS RETURNED AFTER LOAN TO US REMARKS: COPIES: IF ENCLOSURES ARE NOT AS NOTED,KINDLY NOTIFY US AT ONCE. SIGNED: Ken Such BRADY, WILLARD & ALEXANDER ATTORNEYS AT LAW SUITE 400 330 ROBERTS STREET EAST HARTFORD, CONNECTICUT 06108 GERALD W BRADY AREA CODE 203 RICHARD C WILLARD TELEPHONE 289-5477 RALPH J.ALEXANDER TELECOPIER 291-9282 JOHN F SULLIVAN November 10, 1989 RECEIVED Marcia A. Banach, Town Planner South Windsor Planning Department JAN 18 loQn 1540 Sullivan Avenue South Windsor, Connecticut 06074 SO. WINDSOR PLANNING DEPT. Re: Legal Services Request Planning & Zoning Commission Control #88-32, Breudan Site Plan Dear Marcia: I have reviewed the above matter per your request, and I find the following: 1. The format of the legal description is acceptable. However, the accuracy of the legal description cannot be determined by our office due to the absence of such data including maps, surveys and the like. Therefore, appropriate members of Town staff should review the dimensions of the description as well as the courses and distances, the metes and bounds, together with the map title, in order to insure accuracy. 2. With regard to the title of the property in question, I make the following: A. The submitted certificates of title (2) should eliminate prior mortgage to South Windsor Bank or subordination agreements obtained. B. In any event, appropriate Town staff should examine the status of title from the date of certificate until the date of recording. 3. Easement descriptions (2) should be redrafted to identify starting point by specific reference to map on file. 4. Map should be filed with documents. 5. Corporate resolution authorizing execution of easements is necessary. 6. Memo does not indicate if deed or easement is appropriate, which should be determined by appropriate Town staff. Very truly yours, Ra ph J. Alexander RJA/dr