Loading...
HomeMy WebLinkAboutSITE PLAN (26) TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING AND ZONING COMMISSION CEP 17 1987 APPLICATION FORM .y� South V;1n0S01` App. No. 13 Plannmg & jnninp o mission Date Received: 7 /5 • IMPORTANT! Action or Public Hearing By: / � �8. Planning and Engineering Department staff require 14 days to determine application Receipt NO. completeness. To ensure receipt of a complete application by PZC, it is strongly recommended that the application be submitted 14 days prior to the Regular Meeting at which it will be received. APPLICANT: METALS TESTING CO. , INC . ADDRESS: 570 SULLIVAN P. O. BOX 213 TELEPHONE: 289-8225 OWNER OF RECORD ON LAND RECORDS: SAME/ C/O BOB DELISLE ADDRESS: COMPLETE LOCATION OF PROPERTY: MYETTE INDUSTRIAL SUBDTVTSTON nN IHF NORI SIDE OF SULLIVAN AVE. 1450 FEET WEST OF WEST RD. ZONE: T NAME, ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: CHRISTOPHER STONE C/O FUSS & O ' NEILL, INC. 210 MAIN ST. , MANCHESTER, CT. 06040 TELEPHONE•646-2469 THIS APPLICATION IS FOR: (Check one of the following) 1. Zone Change to (public hearing required) 2. Subdivision 3. Open Space Subdivision (public hearing required) 4. Resubdivision (public hearing required) 5. Special Exception to Article (public hearing required) XX 6. Site Plan of Development 7. Earth Filling '(Section 10) and/or Earth Removal (Section 9 ) (public hearing required) 8. General Plan of Development 9 . Regulation Amendment: Zoning Subdivision 10. Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED IN TRIPLICAT WITH SIX SETS OF THE MAPS (7 if public hearing is requi END OT R ENTS (see page 2) Applica Owner 1/14/87 (see reverse side) TOWN OF SOUTH WINDSOR, CONNECTICUT PLANNING AND ZONING COMMISSION APPLICATION FORM This application is complete and ready for Planning & Zoning Commission receipt only upon submission of all required documentation, including, but not necessarily limited to, the following items. Not all items are required with every application. See applicable sections of the South WLndsor zoning and subdivision regulations for specific requirements. APPLICATION CHECKLIST X 1. Key Map X 2. Architectural Elevations/Floor Plans X 3. Completed application form (in triplicate) X 4. Required fees X 5. Zone Change, Site Plan, Subdivision, Open Space Improve- ment, and/or General Plan of Development maps, in accordance with regulations. (Six sets - seven if public hearing required) N/A 6. Plans & Profiles/Drainage Calculations X 7. Conservation Plan X 8. Landscaping Plan N/A 9 . Traffic Engineering Report X 10. Narrative Statement N/_A 11. Sanitary Report N/A 12. Copy of agreement to purchase land (if not the owner) 13 . Other ALL PROSPECTIVE APPLICANTS ARE URGED TO CONFER WITH TOWN PLANNING DEPARTMENT AND ENGINEERING BUREAU STAFF PRIOR TO SUBMISSION OF ANY APPLICATION TO THE COMMISSION. CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE. 1/14/87 ffo FUSS8"NEILL 13 November 1987 consulting engineers RECEIVED ' Wv a V 1981 Marcia Banach 304 WINDSOR PLANP4lNG DEPr, Town Planner ` Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Metals TestincJ. Site Plan Application Dear Marcia: As agent for the above referenced applicant I am writing per our conversation of November 13 to confirm with you the status of this application. I understand that due to changes in the application it will not be considered to be officially received until we submit revised plans to you. Only at this point will the 65 day time constraint begin. We foresee submission of these revised plans very shortly. If you have any questions please feel free to contact me. We appreciate your consideration in this matter. Very truly yours, Christopher 0. Stone, P.E. /kt 87-385/Correspondence 1113ACOS. 1 210 MAIN STREET / MANCHESTER, CONN. 06040 / TELEPHONE (203)646-2469 SOLID WASTE MANAGEMENT*WASTE WATER SYSTEMS o EROSION CONTROL o WATER SYSTEMS o HYDROLOGY and DRAINAGE SYSTEMS o SITE PLANNING HIGHWAYS and BRIDGES o SURVEYING•LANDSCAPE ARCHITECTURE o TRANSPORTATION and TRAFFIC 9 PUBLIC WORKS MANAGEMENT 9 HYDROGEOLOGY PREPARED BY: DATE: /L / r�,� FUSS&O•NdL.L I G D IZ J� MANCHESTER. CONNCTICUT SH. NO. OF � E CHECKED BY. DATE: PROJ NO GUTTER FLOW ANALYSIS -1 iN (Sr TOWN _ Al Entering Catch Basin Al By-nassing Inlet Q 61) D Bypassing Inlet Q U i dth of Flow Depth of Flow at gutter Cross Slope of I Shoulder Grade of Gutter I I 9 to Inlet M cn I Rainfall In-tensity Total Al `c Sum of Al I Al r. p O Runoff Coefficient on ,� Area in Acres O p p Time to Inlet A Inlet Number l.t-r':,HtU by. uni t. FUSS&O'NEILL SH- NO. OF 0 12- Z O� YANCNESTEPt. CONNECTICUT CHECKED BY: DATE: DROJ.NO. STORtvI SEWER SYSTEM TOWN DESIGN 'I�77,,�--S `Ta5TI r4 (T 5,ICJ lNL e- M ' No HEADWATER I FULL CAPACITY `J AVERAGE VELOCITY SLOPE 0 O O LENGTH OF PIPE - I - PIPE SIZE 0 1N SYSTEM N M RAINFALL INTE14SI Y-,: SUM OF Al IN � SYSTEM d Al ENTERING CATCH SASIN O ACCUMULATED TIME Til•:E IN PIPE 0 T I t.:E TO INLET LINE SEGMENT i� FUSS&O'NEILL PREPARED DATE CHECKED DATE PROJECT N O consulting engineers BY BY SHEET NO r , /.o�� i - - - -A - 73 _j a s � -J rt - i i y i l REQUIRED INFORMATION SITE PLANS This checklist must be signed by plan preparer (P.E. /L.S . ) declaring that all required information is provided . Items 1-7 are required for all applications ; items 8-11 required where appropriate . Check mark for each item supplies . X1 . On each sheet for plans or maps, title block with the following information : X a. Name , address and telephone of applicant . b . Name, address and telephone number of Land Surveyor or Professional Engineer. C. Name of Development. X d. Date when drawings were made. _ 2. Key Map: An overall map drawn to a scale of 1 inch equals 200 feet , which can be used as an overlay on Metropolitan District Maps. This map will show the overall design of the Development and surrounding property within 500 feet. x a. Data block which gives needed zoning information such as percentage of lot coverage, acreage of tract, number of apartment units, parking requirements, etc. b. Layout of buildings _X C. Layout of streets and parking. X d. Lines indicating proposed drainage system with direction arrows. Xe. Lines indicating sanitary sewer system with direction arrows. X_ f . Names of surrounding property owners. Zg . Proposed open spaces and recreation areas. _X h. Driveway cuts on surrounding properties . X 3. Architectural Elevations: Plans of the proposed buildings drawn to a scale of 1/8" = 1 ' - 0" showing the elevations of all sides of the proposed buildings in sufficient detail to show architectural styling . C Architect ' s seal on elevations for buildings in excess of 5000 square feet ( per CGS Chapter 390) . 2 (Si Le PIJII;; ) 4 . Plot Plan : A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: ( 1 ) 24" X 36" with a 3/4" ruled margin ; ( 2) 18" X 24" with a 1/2" ruled margin , containing the following data: a. Distance and bearings of all boundary lines and acreage of site . Iron pins required at all property angle points and shown on map. _ b . Proposed streets and street lines with center line stations , curve data, and parking spaces . _ C . Building lines in accordance with zoning regulations. d. Proposed buildings and other structures, including signs , outside lighting , and dumpsters (on concrete pad and screened) e. Easements, noting grantors, grantees, and purpose. f . Names of abutting property owners. g . Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency. In areas accessible to Metropolitan District Commission points , or other coordinated points , the monumented points within proposed site shall be coordinated. These coordinates shall appear in tabular form on the plot plan. The accessibility of these MDC points shall be determined by the Town Engineer. h. All open space or other common or public land uses shall be indicated. _ i . A-2 certification; P.E. /L.S. Seal. S. Topographic Map: A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches , including ruled margins shall in addition to the requirements of the plot plans show the following : _ a. All existing and proposed buildings. b . Curb lines and pavement width, sidewalks. C . Existing and proposed sanitary sewers . _ d. Existing and proposed water and gas main systems. e . Present wooded area indicated by foliage lines . Any individual trees to be saved should be shown. f . Existing and proposed contours shall be shown in not less than two-foot intervals , but in cases of relatively level land , the contours shall be one-foot intervals and spot elevations . g . Regulated wetlands and 100-year floodplain or note that none are present . h. Proposed storm drainage system, showing all catch basins , endwalls , manholes , lengths and sizes of pipes. (Minimum distance between catch basins shall be 300 feet and minimum size of storm drain lines shall be 15 inches . ) i. Connections of all springs into proposed storm drainage system as needed. j . Location and indications of existing brook channels, and 100-year flood limits. k. A-2 Certification; P.E. /L.S, Seal . _ 6. Landscaping plan. 7. Drainage calculations - Zero Runoff Increase per attached guidelines. . 8. Traffic report . 9. Plans and Profiles: A plan and profile of the proposed �reviULAs streets drawn on plan/profile paper of scales 1 inch to �PQrcvti` 40 feet horizontally, and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches, including ruled margins and containing the following: a. Layout of streets in sections coordinated by stations with the profile. b. Street plan showing roadways and drainage. C. Sight line at driveway & street intersections. d. Profile of roadway showing existing and finished grades . Roadway profile will show all tangent grade and all vertical curve information. e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations. Drainage lines will be shown and described as to material . f . Where any storm drainage line discharges into an existing brook sufficient profile of this brook will be shown to determine conditions. g . Metropolitan District Commission datum shall be used on all sites accessible to these controls . The Town Engineer shall , based on standard engineering practices , determine the accessibility of these controls . I'i cal i lc:; Ii;il l :J,ow .111 sanitary scwci l j nes and manholes , including elevations , sizes , lengths , and slopes of pipes . Top of foundation elevations for building shall be shown . 10. Open Space Site Improvement Plans: For sites which require or include a provision for open spaces , a plan which contains data for site improvement may be required . This map shall be drawn to a scale of 1 inch equals 40 feet. 11 . Sanitary Report: Where individual sanitary sewage disposal systems are proposed, the final plans shall include a Sanitary Report certified by a Professional Engineer . The report shall demonstrate the feasibility of the proposed individual systems; the report should deal with the area as a whole, discussing the following points : a. General nature and development of surrounding area. b. Topography and natural drainage pattern. C. Subsurface conditions as shown by subsurface investigation, including soil absorption characteristics, ground water level conditions, ledge rock, and general nature of soil. d . General description of type of development contemplated. e. Detailed description of proposed sanitary sewage disposal facilities, indicating sizes for various ground conditions, materials to be used, and the general layout pattern to be used, etc. f . Special precautions that may be necessary to provide proper functioning of the proposed disposal systems. g . Map of general area with locations of all tests shown on proposed layout. h. Flood heights of any nearby streams, brooks, or rivers . i. Test results and engineering evaluation per Section 4. 13 . 5. All information required above is included in this application at the time of submission . PLAN PREPARER (P . E. /L. S . ) DATE November , 1987 PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Karl Fbeichle, Mike Gantidc, Mel Stead, Shaw Date: Richard J. Sar'tor, Gary Tyler, Fire , John Shemo FROM: Marcia A. Banach, Director of Planning Th Planning & Engineering Departments have received plans for the following project: /�' 3 S TT.:�r-�r 1 sc Subdivision Site Plan Residential Commercial Industrial Location: ��� s , c� � S�- ( �� ��~1 ��`� Yij Project Description: -, ��l SZ, s y✓ f Future Town-owned property involved? YES NO (a) new streets ( existing frontage also) (b) new open space/recreation area active passive (c) new detention area Planning Department comments : Please let me know by /�3 i �� if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. �lil✓{� mil e:�.t tH-/ 5 Tito' c/ G�p-�S Gt°"'�I o n [iJ /�-e�w (-2 i T 'P✓�` a``� vc d" a c_e.4S To-wn- Ole S-11au./V7, ?dze2� 1540 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074 SOR-CO AREA CODE 203/644-2511 M E M 0 R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works DATE: January 25 , 1988 RE: ENGINEERING REVIEW METALS TESTING, INC. SULLIVAN AVENUE Please find attached for your information the SEA Engineering Review report. In addition, the following points are noteworthy: 1 . The subject plans note numerous items as "By Others" (B.O. ) which are critical to the development of the proposed site, such 0 as ; drainage system piping, road, sanitary sewer, sanitary sewer t lateral to proposed building, etc. It is unacceptable to this to as presented with 'Pepartment approve the proposed site plan proposed improvements critical to the development of this site noted ,as A.�,"By Others " . 4 _ ,12 . The proposed road would have to be constructed along the ,., , �entire front of Lot 3 with a temporary cul-de-sac. 3 . There is insufficient information provided to fully evaluate the proposed site, specifically; a) topo along Miller and Perra mperties, b) hydraulic data for site, jDc location of roof eaders and underdrains , d typical cross-section of swale with -i,')materials of construction, paved leak off details, 0 pro- tection of vehicles along s�rale, LM sanitary sewer bedding details, [D drain, sewer pipe/system profile plans I dumpste pad, retaining wall de ls , concrete walk,, [N. Catch 0 t , ' basin and manhole details , parking lot entrance radius, n) loading dock drainage detai0s, M road profile data, [M road geometry detail, GQ road material of construction detail, 0 parking lot spot elevations and other associated information . 4 . Soil conditions along the proposed road and propysed site ar I poorly suited for road development . Specia design -is required to address soil and groundwater conditions . �4owM of+<� o Z) c m �v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 Soe•c0 AREA CODE 203/644-2511 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works DATE: January 25, 1988 RE: ENGINEERING REVIEW METALS TESTING, INC. SULLIVAN AVENUE Please find attached for your information the SEA Engineering Review report. In addition, the following points are noteworthy: 1 . The subject plans note numerous items as "By Others" (B.O. ) which are critical to the development of the proposed site, such as; drainage system pipincj, road, sanitary sewer, sanitary sewer lateral to proposed bbuilding, etc. It is unacceptable to this Department to approve the proposed site plan as presented with proposed improvements critical to the development of this site noted as "By Others" . 2 . The proposed road would have to be constructed along the entire front of Lot 3 with a temporary cul-de-sac . 3 . There is insufficient information provided to fully evaluate the proposed site, specifically; a) topo along Miller and Perras properties, b) hydraulic data for site, c) location of roof leaders and underdrains, d) typical cross-section of swale with materials of construction, e) paved leak off details, f ) pro- tection of vehicles along swale, g) sanitary sewer bedding details, h) drain, sewer pipe/system profile plans, i ) dumpster pad, j ) retaining wall details, k) . concrete walk, 1) catch basin and manhole details, m) parking lot entrance radius, n) loading dock drainage details, o) road profile data, p) road geometry detail, q) road material of construction detail, r) parking lot spot elevations and other associated information. 4 . Soil conditions along the proposed road and proposed site are poorly suited for road development. Special design is required to address soil and groundwater conditions . TO: Marcia A. Banach, Director of Planning Page 2 RE: Metals Testing, Inc. 5 . This Department questions the viability of the mote design for drainage. The Town will not accept the drainage swale as a Town drainage easement. 6 . The proposed Canadian Hemlocks (B.O. ) long the Perras property are not to be located within the road R.O.W. . 7 . Plan needed for maintenance of flow during construction of tie-in to sanitary sewer on Sullivan Avenue. Detail of construction needed also. 8 . The certification note on sheet 2 of 3 is not consistent with the State of Connecticut Consumer Protection Board of Professional Engineers certification. 9 . Approval notes regarding construction and grading appear to be unnecessary as part of site plan submittal . Existing and proposed conditions should be noted and detailed. The above noted items and the SEA review report contain the major areas of concern by this Department regarding the proposed project. This Department would recommend that no action be taken by the Planning and Zoning Commission until such time as the noted concerns have been addressed. Should you have any questions regarding the above matters, please contact me. MJG/jsv cc: Engineering Department File P&ZC Correspondence File SEA Consultants Inc. January 8, 1988 Engineers/Architects Principals Arnold B Goldstein,PE Frederick G Auhero,PE Mr. Michael J. Gantick, P.E. -� ✓ Robert M Brandon,A I A Director of Public Works Stephen H Geri bo,PE TOWR of South Windsor David T Goodemote,PE ,, � N Bruce E Soule.PE 1540 Sullivan Avenue Kenneth M Stewart,PE South Windsor, Connecticut 06074 r« Anthony Zuena,PE „, � co Associates Re: Metals Testing, Inc. Steven L Bernstein,PE Job No. 288-8731 Paul F Gabriel,RE Mark Gould,RETask Order No. 13 9 Michael S.Schultz,PE Arthur Spruch,PE Dear Mr. Gantick: Paul C Ross,RE As requested, S E A Consultants Inc. has reviewed the following for the above referenced project: Sheet No. Title Prepared By Date 1 of 3 Plot Plan Fuss & O'Neill, Inc. 8-18-87 2 of 3 Site Plan " 8-18-87 3 of 3 Details " 8-18-87 A-1 Floor Plan Orlando Annulli and Sons, Inc 9-15-87 A-2 Elevations it 9-15-87 - Storm Drainage Fuss & O'Neill, Inc. Calculations 12-2-87 This information was reviewed for compliance with the Town of South Windsor Subdivision and Zoning Regulations dated July 24, 1972 and standard engineering practice. We note the following: Section 4.13.2.1 KEY MAP An individual Key Map has not been provided. However, a Location Map (Scale 111 = 2001) has been included on the Plot Plan. Section 4.13.2.3 PLOT PLAN d) The proposed building including signs and outside lighting should be shown on the plan. 850 Silas Deane Highway Wethersfield,CT 06109-3412 e) Drainage easements should be labeled existing and/or (203)721-7993 proposed, dimensioned and grantor and/or grantee noted. 485 Massachusetts Avenue Cambridge,MA 02139-4018 (617)497-7800 Citicorp Park West 100 Road Sou — --- Southh Port Portland,ME 04106-2319 (207)775-2281 Mr. Michael J. Gantick, P.E. S E A Consultants Inc. January 8, 1988 Engineers/Architects Page Two g) All monumented points within the proposed site shall be coordinated and listed in tabular form on the plan. Section 4.13.2.4 TOPOGRAPHIC MAP b) Curbing (by others) should be labeled along the proposed road. j) The plan should be titled "Topographic Map." Section 4.13.6 CONSERVATION PLAN Although sedimentation and erosion control measures are shown on the site plan, an individual conservation plan of the site has not been provided. GENERAL COMMENTS 1. The data block is shown on the site plan. This information including the zone designation should be indicated on the plot plan. 2. Storm drainage design calculations have not been provided for the 15" R.C.P. (by others) along the north boundary of the site and for the 1511 R.C.P. across the proposed road outletting into the drainage swale. It is recommended that this 1511 R.C.P. be directed into catch basin No. 4. 3. The engineer has not provided design calculations for the proposed drainage Swale. The design should include outlet flows from the future detention basin (by others). Channel velocities should be calculated to determine if riprap protection will be required at the bends of the swale. 4. The Town requires a minimum 1511 diameter for all storm collection pipes. The proposed inlet pipe (12" R.C.P. by others) to catch basin No. 6 should be increased. 5. A cross section of the drainage swale should be provided. Temporary and permanent channel linings should be included. 6. Roof drains for the proposed building should be shown on the plan. Mr. Michael J. Gantick, P.E. January 8, 1988 E E Consultants Inc. Page Three Engineers/Architects 7. The word "course" is misspelled in the typical pavement section of the details sheet. 8. The floor plan indicates an "acid pit" to be located within the facility. What will its purpose be and how will its use impact environmental concerns? If you have any questions, please do not hesitate to call me. Very truly yours, S E A Consultants Inc. James R. Bancroft, P.E. JRB:emf Town 0 y 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 h/hpy.OR co AREA CODE 203/644-2511 January 29, 1988 Chris Stone Fuss & O'Neill, Inc. 210 Main Street Manchester, Ct. 06040 RE: Application #1326, Metals Testing Co. , Inc. Dear Chris: Attached is a copy of comments from the Planning and Engineering Departments regarding the above-referenced application. Please make the necessary revisions to the plans and submit 6 complete sets to the Planning Department. Your application will be scheduled on a Planning and Zoning Commission agenda as soon as possible after we receive revised plans. If you have any questions regarding the comments or the procedure, please contact me. Very truly yours, ��L(%2 C-C-GL lZi2t-rl Marcia A. Banach Director of Planning MAB/pmm VIP �,� 0-ye sow 2v. ti4 �v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ���soe•c0 AREA CODE 203/644-2511 February 10, 1988 Attorney Harold R .Cummings Attorney Michael J. Lanza 1665 Ellington Road South Windsor, CT. 06074 Gentlemen: RE: Application #521 At the February 8, 1988 meeting the South Windsor Inland Wetlands Agency/Conservation Commission approved with conditions Application #521 , for constructing a 2500 sq. ft. addition to and renovation of existing house for professional offices and a 24 space parking lot as shown on plans prepared by AR Lombardi Associates , Inc . dated 10/29/87 , consisting of three pages . The following conditions must be adhered to for this permit to be valid: 1 . Modify the drawings to show the wetland limits . 2 . Change the slope of the parking lot so that it doesn ' t disturb the wetlands and culvert. Grade to drain to the west . 3. Modify the plans to show how the well is to be abandoned , boards, concrete, etc . 4. We recommend a bond in the amount of $2500. 00 be submitted to the Planning and Zoning Commission to ensure compliance with erosion and sediment control measures . 5. Three (3) blueprint copies of the approved map with all modifications must be submitted to the IWA/CC within 65 days for review. ••its ii'.` 7, 6. Construction activities shall be subject to the approval of the Town Engineer. 7 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use . 8. The permit is valid for one year and shall expire on February 8, 1989. Very truly yours, / John M. Moran ,Jr . L/ Chairman Inland/Wetlands Agency Conservation Commission Town of South Windsor JMM,Jr. /pmm cc : A .B.Davies , Deputy Town Engineer Marcia Banach, Director of Planning Michael Gentick, Director of Public Works Thomas D' Auria, Building Official Raymond Hallowell , Chairman PZC AB Lombardi Associates -Own, Ole SIOUM ?A01u:140t _ 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 �osOR•co AREA CODE 203/644-2511 Mr. Christopher Stone Fuss & O'Neill, Inc. 210 Main Street Manchester, CT 06040 Re: Application No. 1326, Metals Testing Site Plan Dear Mr. Stone: Please be advised that the Planning and Zoning Commission voted on February 16, 1988, to deny the above-referenced application for a site plan of development. The reason for denial is that the Commission believes a resubdivision application is necessary to address engineering, road design and drainage concerns created by enlarging Lot 3 beyond the boundaries set in the previous subdivision approval granted by this Commission. Very truly yours, PLANNING AND ZONING COMMISSION David H. Sorenson Vice Chairman cc: Michael Gantick, Public Works Director Marcia Banach, Director of Planning i t O,NN 6f4 O � c ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR.CO�� AREA CODE 203/644-2511 August 24, 1988 Mr. Bob DeLisle Metals Testing P.O. Box 213 South Windsor, CT 06074 RE: Town acceptance of road, Myette Industrial Subdivision, Sullivan Avenue. Dear Mr. Delisle: Per your request, please be advised that the addition of a cul-de-sac turnaround at the northerly termination of the approved road (Phase 1) in the above referenced subdivision will result in a road that will be accepted by the Town of South Windsor, provided that the following conditions are met: 1. The entire road, including the cul-de-sac turn around, receives the necessary approvals . 2 . The entire road, including the cul-de-sac, is constructed to town specifications and 3 . Any and all other subdivision approval conditions and subdivision improvements contained on the approved plans are satisfied. Very truly yours, Marcia A. Banach Director of Planning MAB/pmm