Loading...
HomeMy WebLinkAboutSITE PLAN APPROVAL, BUILDING ADDITION p� JI y„� K TOWN OF SOUTH WINDSOR Ar )� PLANNING AND ZONING COMMISSION ivUV ! (, 1987 / j-/l' The Commission will officially bons Application NO . / 'at either S ecial or Re ular m eet nZ�'�RrovS� P o R91 ,W,N044 tded Received Date : �/�� , ff 7 were submitted to the CommB�lUNig �@�s 4� t a r y Action or Public Hearing by : or agent, at least fourteen (14) days prior to the meeting at which they will be officially received. No application officially received at a Special Meeting! Receipt No . ';gyp will be acted upon at that meeting. i APPLICANT : Andre Charbonneau ADDRESS : 125 Edwin Road, South Windsor, CT 06074 TELEPHONE 528-7551 OWNER OF RECORD ON LAND RECORDS : Andre Charbonneau ADDRESS : 125 Edwin Road, South Windsor, CT 06074 COMPLETE LOCATION OF PROPERTY: Northerly side of Sullivan Avenue (see copy of attached map) ZONE I NAME , ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED : William E Grace Escr 479 Buckland Rd So Windsor CT 06074 TELEPHONE 644-1528 THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING) 1 . Zone Change to (public hearing required) 2 . Filing for Subdivision 3 . Filing for Open Space Subdivision (public hearing required) 4 . Filing for Resubdivision (public hearing required) 5 . Special Exception to Article (public hearing required) XXX 6 . Site Plan of Development -- ADDITION to Industrial Building 7 . Removal of Sand , Gravel , Clay or Quarry Stone & Ore (public hearing required) 8 . Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND S BMITTED WITH 6 SETS OF PLANS ( 7 secs if blic hearing is required) AE IT IS RECEIVED BY THE PLANNING & ZOIrI ' COMMISSION .Applicant Owner E CHARBONNEAU ANDRE CHARBONNEAU PLANNING AND ZONING COMMISSION TOWN OF SOUTH WINDSOR Fee Schedule and Policy 1. An application processing fee of $25 per lot ($50 minimum) is required for: Subdivisions,.. resubdivisions, and open space subdivisions. 2. An application processing fee of $50 is required for: Change of Zone, Zoning Amendment, Special Exception, and Earth Removal or Land Filling Operations. 3. An application processing fee of $25 is required for Site Development Plans, except: where new buildings/additions/renovations of 2,000 s. f. or more are proposed, said fee shall be $50; said fee shall be $500 for Site Development Plans in the Designed Commercial Zone; $50 plus $5 per dwelling unit for Adult Housing ($500 minimum) . 4. An application processing fee of $10 per acre ($300 minimum) is required for a Change of Zone/General Plan of Development in the Designed Commercial Zone. 5. An application processing fee of $100 is required for a Change of Zone/ General Plan of Development in the Multi-Family or DA-15 Residential zones; or for a Special Exception/General Plan of Development for Adult Housing. 6. An application processing fee of $50 plus $5 per dwelling unit is required for 'a Special Exception/Site ?lan of Development in the Multi- Family or DA-15 Residential zones ($500.00 minimum). 7. Application processing fees are non-refundable after the application has been officially received by the Commission. Application processing fees may be returned prior to the application' s official reception provided a letter of withdrawal, signed by the applicant, has been submitted to the Commission prior to the meeting at which said applica- tion is scheduled to be officially received. 8. Applications unaccompanied by the required application processing fee are incomplete, and as such may be returned to the applicant and removed from the Commission's agenda. 9. Complete applications and required fees shall be submitted at least fourteen (14) calendar days prior to the Regular or Special Meeting at which it will be received. 10. Fees for a previously denied application shall. not apply to any subsequent application. However, when a subdivision, resubdivision, or open space subdivision application has been denied within the preceding 12 months or approved for fewer lots than requested, and a new application for the subject tract is submitted by the same appli- cant, then the fee for the new application shall be a minimum of $50 plus $25 for each lot above and beyond the number of lots contained in the earlier application. 11. A fee of $5 per sign is required for signs to be posted by the applicant on the subject property. 12. Other Fees: Subdivision Regulations - $3.00; Zoning Regulations - $4.00; Zoning Map $1.00; fees for other documents is as determined by the Commission. 13. All checks shall be made payable to "Town of South Windsor." Adopted: 4/10184 Revised: 12/4/84 . CHECKLIST REQUIRED INFORMATION SITE PLANS This checklist must be signed by plan preparer (P.E. /L.S . ) declaring that all required information is provided . Items 1-7 are required for all applications ; items 8-11 required where appropriate. Check- mark for each item supplies . Y 1 . On each sheet for plans or maps , title block with the following information : ✓ a. Name , address and telephone of applicant . ✓ b . Name , address and telephone number of Land Surveyor or Professional Engineer . C . Name of Development. d . Date when drawings were made. 2 . Key Map : An overall map drawn to a scale of 1 inch equals 200 feet , which can be used as an overlay on Metropolitan District Maps. This map will show the .overall design of the Development and surrounding property within 500 feet . a. Data block which gives needed zoning information such as percentage of lot coverage, acreage of tract , number of apartment units, parking requirements , etc . b . Layout of buildings C. Layout of streets and parking . d . Lines indicating proposed drainage system with direction arrows . e . Lines indicating sanitary sewer system with direction arrows. f . Names of surrounding property owners . g . Proposed open spaces and recreation areas. h. Driveway cuts on surrounding properties . 3 . Architectural Elevations : Plans of the proposed buildings drawn to a scale of 1/8" - 1 ' - 0" showing the elevations of all sides of the proposed buildings in sufficient detail to show architectural styling . JArchitect ' s seal on elevations for buildings in excess of 5000 square feet (per CGS Chapter 390) . Page 2 (Site Plans) ✓ 4 . Plot Plan : A layout map of the proposed site drawn to a scale of 1 inch equals 40 feet on either of the following size sheets: ( 1) 24" X 36" with a 3/4" ruled margin ; ( 2) 18" X 24" with a 1/2" ruled margin , containing the following data: a. Distance and bearings of all boundary lines and acreage of site. Iron pins required at all property angle points and shown on map. ivtA b . Proposed streets and street lines with center line stations , curve data , and parking spaces . C . Building lines in accordance with zoning regulations . ✓ d . Proposed buildings and other structures, including signs , outside lighting , and dumpsters (on concrete pad and screened) e . Easements , noting grantors , grantees , and purpose. ✓ f . Names of abutting property owners . ✓ g . Monuments will be indicated at corners and angles of all streets and at all points of curvature and tangency . In areas accessible to Metropolitan District Commission points , or other coordinated - points , the monumented points within proposed site shall be coordinated . These coordinates shall appear in tabular form on the plot plan. The accessibility of these MDC points shall be / determined by the Town Engineer . IN/A h. All open space or other common or public land uses shall be indicated . ✓ i . A-2 certification ; P . E. /L.S . Seal. 5. Topographic Map : A map drawn to a scale of 1 inch to 40 feet on sheets not exceeding 24 inches by 36 inches , including ruled margins shall in addition to the, requirements of the plot plans show the following: ✓ a. All existing and proposed buildings. ►/" b . Curb lines and pavement width, sidewalks. ✓ C . Existing and proposed sanitary sewers . ✓ d . Existing and proposed water and gas main systems. e . Present wooded area indicated by foliage lines . Any individual trees to be saved should be shown. Page 3 (Site Plans) .eL f . Existing and proposed contours shall be shown in not less than two-foot intervals , but in cases of relatively level land , the contours shall be one-foot intervals and spot elevations . ✓ g . Regulated wetlands and 100-year floodplain or note that none are present . ✓ h. Proposed storm drainage system, showing all catch basins , endwalls , manholes , lengths and sizes of pipes . (Minimum distance between catch basins shall be 300 feet and minimum size of storm drain / lines shall be 15 inches . ) /yf h i . Connections of all springs into proposed storm / drainage system as needed. j . Location and indications of existing brook channels , and 100-year flood limits . V k. A-2 Certification ; P .E. /L. S , Seal . 6 . Landscaping plan . 7 . Drainage calculations - Zero Runoff Increase per attached guidelines . . NIA 8 . Traffic report . _ 9. Plans and Profiles : A plan and profile of the proposed streets drawn on plan/profile paper of scales 1 inch to 40 feet horizontally , and 1 inch to 4 feet vertically on sheets not exceeding 24 inches by 36 inches , including ruled margins and containing the following: a. Layout of streets in sections coordinated by stations with the profile. b . Street plan showing roadways and drainage. C . Sight line at driveway & street intersections. d . Profile of roadway showing existing and finished grades . Roadway profile will show all tangent grade and all vertical curve information. e. Profile will show all catch basins and all drainage lines between catch basins with all invert and top of frame elevations. Drainage lines will be shown and described as to material . f . Where any storm drainage line discharges into an -existing brook sufficient profile of this brook will be shown to determine conditions. g . Metropolitan District Commission datum shall be used on all sites accessible to these controls . The Town Engineer shall , based on standard engineering practices , determine the acc ssibility of these controls. Page 4 (Site Plans) h. Profiles shall show all sanitary sewer lines and manholes , including elevations , sizes, lengths , and slopes of pipes . Top of foundation. elevations for building shall be shown . PA 10. Open Space Site Improvement Plans : For sites which require or include a provision for open spaces , a plan which contains data for site improvement may be required . This map shall be drawn to a scale of 1 inch equals 40 feet . 11 . Sanitary Report: Where individual sanitary sewage disposal systems are proposed , the final plans shall include a Sanitary Report certified by a Professional Engineer . The report shall demonstrate the feasibility of the proposed individual systems; the report should deal with the area as a whole , discussing the following points : a . General nature and development of surrounding area. b . Topography and natural drainage pattern. C . Subsurface conditions as shown by subsurface investigation , including soil absorption characteristics , ground water level conditions, ledge rock , and general nature of soil . d . General description of type of development contemplated . e . Detailed description of proposed sanitary sewage disposal facilities , indicating sizes for various ground conditions, materials to be used , and the general layout pattern to be used , etc. f . Special precautions that may be necessary to provide proper functioning of the proposed .disposal systems . g . Map of general area with locations of all tests shown on proposed layout . h. Flood heights of any nearby streams , brooks, or rivers . i . Test results and engineering evaluation per Section 4 . 13 . 5 . All information required above is included in this application at th time of submission . 00 Z --Z - 88 P ARERU .-E. /L.S . ) DATE Nov mber , 1987 10•M 3'7 7wvn 0 2v s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 2 •CO AREA CODE 203/644-2511 November 24, 1987 Mrs. Elizabeth Warren, Vice Chairman South Windsor Inland Wetlands Agency/ Conservation Commission 1540 Sullivan Avenue South Windsor, CT 06074 RE: 524 Sullivan Avenue Site Plan Review Dear Mrs. Warren: This is a proposed extension of a building that was presented before the Commission in 1985, #338 . It appears that there would not be any encroachment of the wetlands as shown or adverse effect of this expansion. With respect to the conservation plan; by their figures, they expect to disturb .54 acres with the building and parking lot. If the soil erosion and sediment control notes are followed on this flat site, there shouldn't be a problem. If an approval were to be granted, the normal conditions with a $4 , 000 Bond would be appropriate to assure compliance with their erosion control plans. Very truly yours, A. Bowen Davies Deputy Town Engineer ABD/jsv cc: Andre Charbonneau Michael J. Gantick, Director of Public Works Marcia A. Banach, Director of Planning IWA/CC File PLANNING DEPARTMENT IN-HOUSE REFERRAL FORM TO: Karl Reichle, Mike Gantick, Mel Stead, Fred Shaw, Date: Richard J. Sartor, Gary Tyler, Fire Marshal Tanning, John Shemo FROM: Marcia A. Banach, Director of Planning The Planning & Engineering Departments have received plans for the following project:ndcL L)Aay1 od, nra a Subdivision Site Plan Residential Commercial Industrial Location: nc-L41 -5 o" ty /2't Project Description: 1n6b4s1r)aJ s��� /'�`"` , 16,1n'v 5 f Future Town-owned property involved? YES NO (a) new streets ( existing frontage also) (b) new open space/recreation area active passive (c) new detention area Planning Department comments : Please let me know byK7 if you will have comments on this application so that I can follow up with your department when I do a Planning Department report. It Ow M 8 f+< 7-Quin Ole s-oa A ?&U&Iot 1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. 06074 SO -00 AREA CODE 203/644-2511 M E M O R A N D U M December 2 , 1987 TO : Marcia A . Banach , Director of Planning FROM: Michael J . Gantick , Director of Public Works SUBJECT : Engineering Review 524 Sullivan Avenue Please find attached for your information the SEA review of the subject project . Should you have any questions , please contact me . MJG/jsv cc : PZC File Engineering File S E A Consultants Inc. November 24, 1987 NOV Engineers/Architects •i �J r :Cf Principals Arnold B Goldstein, PE Frederick G Aufiero, PE Mr. Michael J. Gantick, P.E. Assoc,ares Director of Public Works Q Stephen H Gerlbo,PE Town of South Windsor Kenneth M Stewart,PE 1 David T Goodemote PE 540 Sullivan Avenue Anthony J Zuena, PE South Windsor, Connecticut 06074 Bruce E Soule, PE Associate in charge o/Architecture Re: 524 Sullivan Avenue Robert M Brandon,A I A Job No. 288-8731 Paul C Ross. PE Task Order No. 9 Dear Mr. Gantick: As requested, S E A Consultants Inc. has reviewed the following for the above referenced project: Sheet No. Title Prepared By Date 1 of 2 Plot Plan & Top- Palmberg & Russo 10-30-87 ographic Map 2 of 2 Soil Erosion & it 10-30-87 Sediment Control Plan 1 of 4 Elevations it 11-2-87 2 of 4 Plan-Schedule it 11-2-87 3 of 4 Sections It 11-2-87 4 of 4 Foundation Plan it 11-2-87 Hydrologic Study it 11-2-87 Section 4.13.21 KEY MAP a. Data block should include minimum lot area requirement for the given zone. f. Abutting property owner of parcel #25 is not listed. Section 4.13.2.3 (g) PLOT PLAN 485 Massachusetts Avenue All monumented points should be listed in tabular form Cambridge,MA 02139-4018 on the plan. (617)497-7800 Citicorp Park West 100 Foden Road South Portland, ME 04106-2319 (207)775-2281 850 Silas Deane Highway Wethersfield,CT 06109-3412 (203)721-7993 Mr. Michael J. Gantick, P.E. s E A Consultants Inc. November 24, 1987 Engineers/Architects Page Two Section 4.13.2.4 (b) TOPOGRAPHIC MAP Proposed curb lines and pavement width should be indicated on plan. Section 8 OFF-STREET PARKING An error has been made in the addition of required parking spaces for the building addition. The correct number of required parking spaces should be 14. GENERAL COMMENTS 1 A construction exit pad should be indicated at the entrance to the proposed parking area on the topographic map. 2. The temporary topsoil stockpile area adjacent to the proposed catch basin in the east corner of the parking area should be relocated. 3. Sullivan Avenue should be labeled on the topographic map. 4. The soil type symbol for Ninigret is incorrect on the topographic map. The correct symbol is "NnA." 5. Soil types and classifications should be listed on the topographic map. 6. Why are the existing catch basin outlet elevations higher than the inlet elevations? Are these "as-built" elevations? 7. The engineer has provided a hydrologic study for existing and proposed conditions for the retention basin. The retention analysis indicates an outflow increase of 0.1 cfs for the 5 and 10 year storms. Maximum water surface elevations have increased between 0.1 and 0.3 feet for the given range of storm frequencies. Pre- development (prior to construction of existing building) peak discharges have not been included and, therefore outflows cannot be properly evaluated. Although outflows determined in this analysis are minor, it is recommended that pre-development flows be provided. Mr. Michael J. Gantick, P.E. S E A Consultants Inc. November 24, 1987 Engineers/Architects Page Three 8. The engineer should indicate the type of outlet structure and method used for determining outflows for the rentention analysis. 9. A table listing temporary and permanent vegetative cover including types, dates and application rates should be provided. 10. The Town requires a minimum cover of two feet over all drainage pipes. The two catch basins located in the proposed parking area should be revised to meet this requirement. If you have any questions, please do not hesitate to call me. Very truly yours, S E A Consultants Inc. dames R. Bancroft, P.E. JRB:emf 40,0 Sfq( -own oP s-oaL4 `lv 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ►osoe•c0N AREA CODE 203/644-2511 December 17 , 1987 Andre Charbonneau CERTIFIED MAIL 125 Edwin Road South Windsor , CT 06074 Dear Mr . Charbonneau : At the December 14 , 1987 meeting , the South Windsor Inland Wetlands Agency/Conservation Commission approved with conditions Application #523 , to construct an addition to an existing building located on the north side of Sullivan Ave. as shown on plans prepared by Palmberg & Russo , dated 10/30/87 , consisting of 2 pages . The following conditions must be adhered to for this permit to be valid : 1 . A bond in the amount of $4 , 000 must be submitted to the Planning and Zoning Commission to ensure the compliance with erosion & sedimentation measures . 2 . This permit is valid for one year and shall expire on December 14 , 1988 . Very Truly Yours , Eli eth Warr"en , Vice-Chairman I and Wetlands Agency/ Conservation Commission Town of South Windsor MRL CC : A. B . Davies , Deputy Town Rngineer Marcia Banach , Director of Planning Michael Gantick , Director of Public Works Thomas D' Auria , Building Official Raymond F. Hallowell , Jr . PZC IWA file �SOwN "44 1 07 e � 70 n- o-P-S-111wt& ?di�� 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 �dSOR•c0C� AREA CODE 203/644-2511 M E M O R A N D U M December 21, 1987 TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works Aw RE: Engineering Review 524 Sullivan Avenue Pursuant to my December 2, 1987 transmittal to you, please find this Departments comments concerning the subject application: 1. Per the SEA comments, existing pipe grades suggest a poor drainage condition from a maintenance and functional point of view. The proposed drainage also implies the install- ation of drainage pipe with as little as one foot of cover. Drainage pipe material may not meet loadings. The water level indicated in the pond would imply a backwater condition which again will present drainage problems on the site. 2. The existing drainage (dry wells) should be (as-builts) shown. 3 . South property corner pin missing. 4 . Drainage to rear of (north) at proposed building does not allow for sufficient room for maintenance. Also pipe slope below minimum 0.5% grade. 5. Grading along eastern portion of proposed driveway/parking not clear. 6. The water level as indicated in the pond and a CB to the southeast of the property would suggest additional design consideration for the building and parking areas including underdrains and additional free draining fill material. MJG/jsv cc: PZC File Engineering File I ;n i 10wM SC4 O S C ` 011 s� mac~ 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 SOR-C-0 AREA CODE 203/644-2511 August 4 , 1988 Mr . Andre Charbonneau 125 Edwin Road South Windsor , CT 06074 Subject : 524 Sullivan Avenue Dear Mr . Charbonneau: On June 28. 1988 I met with your son Kevin and Mr . Ralph Zahner to review the drainage changes we had reviewed the previous week . Prior to leaving the site I observed that some process gravel had already been placed in the area of the new parking lot . I noted to both your son and Mr . Zahner that the subgrade did not appear to be prepared according to the approved plan, i .e . 12 inches of gravel and 4 inches of processed stone. We all reviewed a copy of said plan to confirm the proposed base structure. I stated to your son and Mr . Zahner that I expected the approved base structure to be installed . I also stated that if they felt a change was appropriate, soil testing would be required. I also stated that I expected a request for inspection of the subgrade prior to gravelling and inspection of the gravel prior to paving as per the procedures outlined in the preconstruction meeting held on March 7 , 1988 for this project . On July 15, 1988 I was surprised to find the parking lot was paved. A check with Engineering Division personnel , found that no request for inspection had been made and therefore no Town inspection was made of the parking lot construction. By this letter be advised that prior to the issuance of a certificate of occupancy, proof of materials of construction of the parking lot along with as-builts will be required . Very truly yours, Michael J. G ntick Director of Public Works MJG/jsv cc: John R. Collins, Chief Building Official Marcia A. Banach, Director of Planning PATTERSON, CASEY, HALPERN, GRACE I& ❑OMSROWSKI, •C+• ,)AN 19S$ ATTORNEYS AT LAW 479 BUCKLANO ROAD South Windsor SOUTH WINDSOR,CONNECTICUT 06074 Punning & Zoning Commission [203]644-1528 RICHARD G.RATTERSON 185 SILAS DEANE HIGHWAY JOHN M.CASEY WETHERSFIELD,CT 0610E KENNETH S.HALPERN (2031 563-2834 WILLIAM E.GRACE JOHN W.OOMBROWSKI,JR. WILLIAM K.WASSERMAN ARRIL C.TEVERIS January 21 , 1988 Town of South Windsor Planning & Zoning Commission 1540 Sullivan Avenue South Windsor, CT 06074 Re: Application - Andre Charbonneau - Sullivan Avenue Site Plan - Addition Industrial Building Dear Commissioner: The Applicant hereby grants the Planning and Zoning Commission a 45-day extension in which to act on the above-captioned application. Very truly yours, e4l4iz.. R444pvo William E. Grace WEG: led 10 y r ��CJT S w W O � e � 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ~osoR•co�'� AREA CODE 203/644-2511 Attorney William E. Grace 479 Buckland Road South Windsor, CT 06074 Re: Application #1322, Charbonneau Industrial Addition Dear Attorney Grace: Please be advised that the Planning and Zoning Commission voted on February 16, 1988, to approve the above-referenced site plan of development for an addition to an existing industrial building located on Sullivan Avenue. This approval is based on plans prepared by Palmberg and Russo, dated 10-30-87, revised through 1-27-88, sheets 1-3 of 3, subject to the following: 1 . Prior to commencement of any site work, a meeting must be held with Town Staff . 2 . No building permits will be issued until the final plans have been filed in the Town Clerk's Office. 3 . This approval is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission. 4 . An as-built plan will be required prior to issuance of a Certificate of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations . 5 . A landscape bond in the amount of $2000 is required and must be submitted prior to filing of mylars . 6 . Drainage is subject to Town Engineer' s approval . 7 . Signage for the site must conform to zoning regulations . Black and white transparent mylars of Sheet #1 with this letter and the Inland Wetlands Agency/Conservation Commission approval letter reproduced thereon, together with three blueprint copies of the entire plan, must be submitted to this Commission to be stamped and signed. After signing, the mylars will be returned to you and must be filed in the Town Clerk's Office within 90 days . After filing these plans, a copy of the receipt must be submitted to the Planning Department. Very truly yours, PLANNING AND ZONING COMMISSION David H. Sorenson Vice Chairman cc: M. Gantick, Director of Public Works F. Shaw, Supt. of Pollution Control T. D'Auria, Building Official E. Belleville, Assessor W. Lanning, Fire Marshall M. Banach, Director of Planning Inland Wetlands Agency/Conservation Commission A. Charbonneau t''M16 y ~ Town V/ S-otdA W O � e a s Q 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 Ia�hOSOe,`0 2�v AREA CODE 203/644-2511 November 15, 1988 Andre Charbonneau 125 Edwin Road South Windsor, CT 06074 Re: Application #524 - addition to existing building Dear Sir: At the November 14, 1988 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved a one year extension of Application #524 with all original conditions. In addition to the original conditions you are also required to contact John McCahill, Zoning/Wetlands Enforcement Officer (644- 2511, x229) immediately upon approval notification. This is to reverify the contact person for the site and establish a site visit with that person to verify all erosion and sedimentation control measures are in place according to the plan. The application becomes effective December 14, 1988 and expires December 14, 1989. Very truly yours, A 21and + M. Moran, Jr. , Chairman o Wetlands Agencyl Conservation Commission JXMjr. /pmm cc:John E. McCahill, Zoning/Wetlands Enforcement Officer Marcia A. Banach, Director of Planning Michael Gantick, Director of Public Works John R. Collins, Chief Building Official Raymond Hallowell, Chairman, PZC 4 0•M $f4co -o-wn' O-PSOM44 ?A 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR•C0 AREA CODE 203/644-2511 September 21, 1989 Mr. Raymond Hallowell, Chairman i� V �; Planning & Zoning Commission 1540 Sullivan Avenue SEP 21 1989 South Windsor, CT 06074 Dear Mr. Hallowell: South Windsor Planning & Zoning CG'91T'issiOfi Re: Bonds At the September 18, 1989 meeting of the Inland Wetland Agency/Conservation Commission, it was voted to release the following bonds: Application #421, Charbonneau Industrial Build $3000.00 g1 Application #88-38P, Lot #5, Kyle Woods $3000.00 Application #88-49P, JFI, Lot #17 $4000.00 Very truly yours, lzl mes Lombardi, Acting Chairman Inland Wetland Agency/ Conservation Commission JL/pmm cc: Marcia A. Banach, Director of Planning Jerry Iazzetta, Town Engineer P� CASEY & GRACE L' ATTORNEYS AT LAW 479 BUCKLANO ROAD SOUTH WINOSOR,CONNECTICUT 06074 1 [203)644-1526 JOHN M.CASEY TELECOPIER[2031 644-1520 WILLIAM E.GRACE October 26, 1989 Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Planning & Zoning Commission RE: Appl. #1322 Charbonneau Addition-Sullivan Avenue Dear Commissioners: On behalf of the Owner/Applicant of the above application, we hereby request that the bond in the amount of $2,000.00 be released. I have been advised that the trees have been planted accordingly. It is my understanding the engineering firm of Palmberg and Russo will provide a letter stating all work has been completed and is in compliance with the regulations. Very truly yours, William E. Grace WEG/ls CC: Palmberg & Russo A. Charbonneau LAND SURVEYORS & ENGINEERS 15 BARBER POND ROAD • BLOOMFIELD, CONNECTICUT 06002 • TELEPHONE (203) 242-2775 WILLIAM R. PALMBERG, LAND SURVEYOR JOSEPH R. RUSSO, PROFESSIONAL ENGINEER November 1, 1989 V,' S Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 q 1,4OV Attn: Planning & Zoning Commission Re: Charbonneau Project, addition to 524 Sullivan Avenue Planning & Zor'n? Commwmr' Gentlemen: We have reveiwed the work on the above mentioned site and it is our opinion that the additional plantings, as required by the site plan approval, have been installed. If there are any questions regarding the project, please call our office, Phone number is 242-2775. Very truly yours, 4 Joseph R. Russo, P.E. & L.S. Palmberg & Russo JRR/bah cc: File Attorney William Grace e � 71swm 0-lesoum V&1� .a 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ��tioSaR C0a AREA CODE 203/644-2511 December 14, 1989 Planning & Zoning Commission 1540 Sullivan Avenue South Windsor, CT 06074 Dear Madam/Sir: Re: Bonds At the December 11, 1989 meeting of, the.. 1n1and'Wet1ands:;.: . Agency/Conservation Commission, It.was_voted.-to .release-..-the- following bonds: Application #505, Terl2'_zzi :Lot- #7, Sea -Pave,- Road in the amount of $3000 . 00 Application #88-94W, Mother Goose Nursery (RSK-Kellco) in the amount of $1,000. 00 Application #524, Charbonneau Addition - Sullivan Avenue in the amount of $4,000. 00 Application #341, Lakewood, Phase I & II (RSK-Kellco) in the amount of $25,000.00 Very truly yours, James A. Lombardi, Chairman Inland Wetlands Agency/ -- Conservation Conservation Commission JAL/pmm cc: Marcia A. Banach, Director of Planning L� Jerry Iazzetta, Town Engineer Michele Lipe, Ass't Planner/Analyst <0w" ° 4, �v 1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. 06074 0N AREA CODE 203/644-2511 27 July 1990 Atty. W. E. Grace 479 Buckland Road South Windsor, CT 06074 Dear Atty. Grace: re: Charbonneau Sullivan Ave. Addition $2,000 Landscaping Bond This is to advise that the Planning and Zoning Commission voted on July 24, 1990 to release the $2,000 landscaping bond for the above-referenced project. Please contact the Planning Department office at the South Windsor Town Hall at 644-2511, Ext. 251 to arrange to pick up the bond. Thank you. Very truly yours, PLANNING AND ZONING COMMISSION Louise C. Evans Chairman cc: J. Iazzetta, Town Engineer M. Banach, Director of Planning r/PZC File