HomeMy WebLinkAboutSITE PLAN APPROVAL (2) TOWN OF SOUTH WINDSOR, CONNECTICUT
PLANNING AND ZONING
APPLICATION FORM
App. No.
Date ReceivecT.- V A 2 IMPORTANT.
Action or Public Hearing By: Planning and Engineering a Dapt—,pti�_ff
,,F=en
require 14 days to de inegpplic' n
Receipt No. 411fc completeness. To enstwili4c ioillbtlltr�lmi"rlior?
complete application by PZC, it is strongly
recommended that the application be submitted
Addition & Alterations to SNET Manchester/ 14 days prior to the Regular Meeting at which
Wapping Central Office Building it will be received.
PROJECT NAME:
APPLICANT: The Southern New England Telephone Company
ADDRESS : 195 Church St. , 6th floor; New Haven, CT 06510 TELEPHONE: 771-5431
OWNER OF RECORD ON LAND RECORDS: The Southern New England Telephone Company
ADDRESS : same as above
COMPLETE LOCATION OF PROPERTY: 513 Buckland Road
ZONE: RC
NAME, ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE
DIRECTED:
Carol A. Zebb, Real Estate Associate, Southern New England Telephone Company
195 Church Street, 6th floor; New Haven, CT 06510 TELEPHONE: 771-5431
THIS APPLICATION IS FOR: (Check one of the following )
1. Zone Change to (public hearing required)
2. Subdivision
3 . Open Space Subdivision (public hearing required)
4. Resubdivision (public hearing required)
5 . Special Exception to Article (public hearing required)
X 6 . Site Plan of Development
7 . Earth Filling (Section 10 ) and/or Earth Removal (Section 9 )
(public hearing required)
8 . General Plan of Development
9 . Regulation Amendment: Zoning Subdivision
10 . Other (-explain in detail)
THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY
AND SUBMITTED IN TRIPLICATE WITH SIX SETS OF THE MAPS (7 if public hearing
is required) AND OTHER DOCUMENTS (see page 2)
i —Applicant'sowner- AgenV Carol A. ZebU /
1/14/87 (see reverse side)
TOWN OF SOUTH WINDSOR, CONNECTICUT
PLANNING AND ZONING COMMISSION
APPLICATION FORM
This application is complete and ready for Planning & Zoning Commission
receipt only upon submission of all required documentation, including,
but not necessarily limited to, the following items. Not all items are
required with every application. See applicable sections of the South
Windsor zoning and subdivision regulations for specific requirements.
APPLICATION CHECKLIST
X 1. Key Map
X 2. Architectural Elevations/Floor Plans
X 3 . Completed application form (in triplicate)
X 4 . Required fees
X 5. Zone Change, Site Plan, Subdivision, Open Space Improve-
ment, and/or General Plan of Development maps , in accordance
with regulations. (Six sets - seven if public hearing require(
6 . Plans & Profiles/Drainage Calculations
7 . Conservation Plan
X 8 . Landscaping Plan
9 . Traffic Engineering Report
10 . Narrative Statement
11. Sanitary Report
12. Copy of agreement to purchase land (if not the owner)
13 . Other
ALL PROSPECTIVE APPLICANTS ARE URGED TO CONFER WITH TOWN PLANNING
DEPARTMENT AND ENGINEERING BUREAU STAFF PRIOR TO SUBMISSION OF ANY
APPLICATION TO THE COMMISSION.
CONSULT PLANNING DEPARTMENT FOR FEE SCHEDULE.
July 23, 2002
Matthew Galligan
Town Manager
Town of South
Sullivan Avenue
South Windsor, CT 06074
Dear Mr. Galligan:
As you know I own a 12 plus acre parcel of land abutting the Wild Life Sanctuary on
Niederwerfer Road. This site is included in the Rural Preserve Area proposed on the new plan of
development.
Currently we farm this property, growing Christmas Trees; Field-Grown Perennials and we
have a greenhouse range. My family and I would like to continue farming.
I am interested in learning what is involved in selling the development rights to the Town.
Please advise if the Town has an interest in attaching our parcel to the Pudin/Skinner properties.
Very truly urs,
c C ifford W. Slicer
391 Niederwerfer Road
South Windsor, CT 06074
(860) 644-8381
CWS/tc
10MN ar4(
= Town a �soA ?A:
C
a
1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074
f►psoR-CO AREA CODE 203/644-2511
August 14 , 1987
Ms . Carol A . Zebb , Real Estate Associate
Southern New England Telephone
195 Church Street
New Haven , Ct 06510
Dear Carol :
This letter will confirm our telephone conversation of August 13 ,
in which I indicated that the Chairman of the Planning and Zoning
Commission has determined that public utilities cannot be classified
as professional offices , and therefore are not considered as
permitted uses in our Restricted Commercial zone . Thus a variance
must be obtained to expand SNET' s present facility on Buckland Road
in South Windsor .
Please do not hesitate to contact me if I can be of further
assistance .
Very truly yours ,
,.
Marcia A . Banach
Director of Planning
MAB ; dlb
CC : Louise C . Evans , Chairman , Planning g& Zoning Commission/
Southern New England Telephone
195 Church Street
New Hagen,Connecticut 06510
Phone(203)771-5200
SNET
September 17, 1987
Louise C. Evans, Chairman
South Windsor Planning & Zoning Commission
Town Hall
1540 Sullivan Avenue
South Windsor, CT 06074
Dear Chairman Evans:
Southern New England Telephone Company respectfully requests site
plan approval for a rear building addition to its Central Office at
513 Buckland Road.
Expansion of our present building is necessitated by both the
demand for service due to the community's growth and the
technological replacement of telephone switching equipment from
the present electro-mechanical to digital type of equipment.
Because of the importance of telephone service to the community,
SNET would like to start this project before the onset of inclement
weather, if at all possible. We would appreciate your consideration
of this application as soon as possible on your agenda.
Very truly yours,
Carol A. Zebb
Real Estate Associate
279Oh/brh/C AZ/9-17-87
low" 8f�
r � ' OP S W
o �
e
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
�osoR,co�' AREA CODE 203/644-2511
M E M O R A N D U M October 26 , 1987
TO: Marcia Banach, Director of Planning
FROM: Michael J. Gantick, Director of Public Works
SUBJECT: REVIEW OF SITE PLAN
SNET - CENTRAL OFFICE BUILDING
PLANS DATED 9/17/87
Please find attached for your information, a copy of the review
letter from SEA regarding the subject project.
Should you have any questions, please feel free to contact this
office.
MJG:bmr
Attachment
cc: Project File
} If(7I
�• 1 1
October 20, 1987
S E A Consultants Inc.
Engineers/Architects
Principals
Arnold B Goldstein,PE Mr. Michael J. Gantick, P.E.
Frederick G.Aufiero,RE Director of Public Works
Associates Town of South Windsor
Stephen H GerStewart,
P.E. 1540 Sullivan Avenue
Kenneth M Stewart,PE
David T Goodemote,P.E. South Windsor, Connecticut 06074
Anthony J.Zuena,RE
Bruce E Soule, RE Re: SNET
Associate in charge of Architecture Manchester/Wapping
Robert M Brandon,A I A Central Office Building
Paul C. Ross,P.E. Job No. 288-8731, Task Order No 2
Dear Mr. Gantick:
As requested, .S E A Consultants Inc. has reviewed the following:
Sheet No. Title Prepared By Date
LP2.1 .Key Plan Tecton 9-17-87
Property Map Greiner 4-87
LP2.2 Construction/ Tecton 9-17-87
Landscaping/
Topographic/Drainage
Plan
A2.1 Floor Plan Tecton 9-17-87
AM Elevations Tecton 9-17-87
The plans were reviewed for compliance with the Town of South
Windsor Subdivision and Zoning Regulations, dated July 24, 1972
and standard engineering practice.
The plans appear to be in compliance with the regulations with
the exception of a waiver request for the number of parking spaces
to be equal to the number of actual employees and visitors.
If you have any questions, please do not hesitate to call.
Very truly yours,
S E A Consultants Inc.
485 Massachusetts Avenue 6�
Cambridge,MA 02139.4018
(617)497-7800 ames R. Bancroft, P.E.
Citicorp Park West
100 Foden Road JRB:emf
South Portland, ME 04106-2319
(207)775-2281
850 Silas Deane Highway
Wethersfield,CT 06109.3412
(203)721.7993
10'" "4
y r .7o W/ {i olle S__V� 6zd&U&Ot
r_
a
~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
~�SOR•CON AREA CODE 203/644-2511
October 28 , 1987
The Southern New England Telephone Co.
195 Church St . , 6th Fl ,
New Haven , CT 06510
Attn : Ms . Carol Zebb
RE: Applj_c_aL_j-onr_#1.294 , S . N E. T .
Site Plan of Development
Dear Carol ;
Please be advised that the Site Plan of Development prepared by Tecton ,
PC , dated 10-20-87 , was approved subject to the following conditions :
1 . Prior to commencement of any site work , a meeting must be held with
Town Staff .
2 . No building permit will be issued until the final plans have been
filed in the Town Clerk' s Office .
3 . An as—built plan will be required prior to issuance of a Certificate
of Occupancy per Section 4 . 13 . 10 of the Zoning Regulations .
4. A landscaping bond in the amount of $5 , 000 must be submitted to the
Commission .
Black and White transparent mylars of Sheets LP2-1 and LP-2 of the plans ,
with this letter reproduced thereon , together with three blueprint copies
of the entire plan , must be submitted to this Commission to be stamped and
signed .
The Southern New England Tel . Co. - 2 - October 28, 1987
After signing , the mylars will be returned to you and must be filed in the
Town Clerk' s Office within 90 days . After filing these plans , a copy of
the receipt must be submitted to the Planning Department .
Very truly yours ,
PLANNING & ZONING COMMISSION
B y :
Louise C . Evans
Chairman
cc : M. Gantick , Director of Public Works
T . D' Auria , Building Official
F . Shaw, W. P . C . A .
E . Belleville , Assessor
W. Lanning , Fire Marshal
M. Banach , Director of Planning
Inland Wetlands Agency/Conservation Commission
Engineering
<°w" se",
Tom O-Psou;(A ?0&U&01t
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
OR•CON� AREA CODE 203/644-2511
November 23 , 1987
Southern New England Telephone
195 Church St . , 6th Floor
New Haven , Ct 06510
Attn : Carol Zebb
RE: Preconstruction Meeting - SNET building addition
November 10, 1987
IN ATTENDANCE
Name Company Telephone Number
Marcia Banach Town of South Windsor 644-2511
Bo Davies Town of South Windsor 644-2511
George Suydam Construction Services of 583-2000
Bristol
Anthony Mauro Southern New England Tel. 771-8617
David Foster Tecton/Architects 548-0802
Paul Tirrell Tecton/Architects 548-0802
Jack Clark Southern New England Tel . 771-5926
The following is a brief summary of points discussed during the meeting .
Public Works
1 . All erosion and sedimentation control measures are to be
in place prior to earth moving operations in each area
and maintained cleaned out during construction .
2 . Three complete sets of approved/revised plans needed prior
to start of construction .
To: Carol Zebb , SRET Page 2
3 . The Public Works Department is to be notified forty-eight ( 48)
hours prior to the start of major construction work with
inspections and testing per Developers Checklist required for the
following :
a) After road/driveway/parking area is staked out
b) All drainage work
c) Preparation of subgrade , compaction tests as required
by Town
d) Preparation of subbase , six ( 6) inch lifts , each lift
compacted , Town to mark compaction test locations
e) Placement of bituminous concrete , 1 1/2 inch layers .
4 . As built plans are to include horizontal and vertical location of
all road underdrains/footing drains .
S . All topsoil stockpile areas to be protected ( ringed with haybales
or equal ) .
6. All pipe and structures to be backfilled with free draining
material , compacted in maximum one foot lifts with approved
compaction equipment .
7 . During construction of the road/driveway , a crushed stone
tracking pad is to be installed and maintained to minimize
tracking of dirt/gravel onto Buckland Road. Calcium Chloride is
to be used for dust control as required .
8. Any problems and/or questions regarding construction of this
project will be directed to Mr . George Suydam in the field .
9 . Developer/Contractor to submit mark-up print of any buryhole
locations . To be shown on as-builts .
10. Forty-eight ( 48) hours notice needed for Certificate of Occupancy
inspection . Two week review period (10 working days) needed for
all individual site ( lot) plans prior to issuance of building
permit (may be longer if application is incomplete) . Copy of
Building Permit and C .O . Guidelines given to JMJ and Reino Hyyppa
Assoc .
11 . Only approved copies of subdivision plans and lot site plans to
be used . Any proposed changes are to be presented to
Engineering/Planning & Zoning prior to implementation .
Planning Department
1 . A letter with names & phone numbers of persons to contact during
off hours for emergency purposes must be supplied .
To: Carol Zebb , SNET Page 3
2 . The $5 , 000 landscaping bond must be submitted to the Planning
Department prior to filing mylars with the Town Clerk.
3 . As-built drawings will be required prior to the issuance of a
Certificate of Occupancy per Section 4. 13 of the Zoning
Regulations .
Very truly yours ,
Marcia A . Banach
Director of Planning
MAB/dlb
CC : A . Bowen Davies , Engineering
Lester Braddock Engineering
Michael J . Gantick , Public Works
Jack Clark , SNET
George Suydam , Construction Services of Bristol , Inc .
David Foster , Tecton
Southern New England TeleRRhong
195 Church Street — 11
New Haven,Connecticut 06510
Phone(203),r-�299 771-5431
SNET RECEIVED
APR 24 1991
April 23, 1991 80, WINDSOR PLAN
.N�NG pgPT,
Mrs. Michele Lip
Assistant Town Planner
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Release of $5,000 Landscaping Bond
Application #1294 - SNET
Site Plan of Development
513 Buckland Road, South Windsor
Dear Michele:
As discussed with you yesterday, SNET is requesting a bond release on the
above project since all landscaping work associated with that site plan
of development has been completed.
If there are any questions or anything else I need to do, please call me
on 771-5431.
Very truly yours,
Carol A. Zebb
Real Estate Associate
Ce
To 01, �
z 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
� SOR coa�� AREA CODE 203/644-2511
May 8, 1991
Carol A. Zebb
SNET
195 Church Street
New Haven, CT 06510
Dear Ms . Zebb:
re: SNET
$5,000 Landscaping Bond
This is to advise that the Planning and Zoning Commission voted
on May 7 , 1991 to release the $5, 000 . Landscaping Bond.
Advance arrangements should be made to pick up the bond to ensure
that the necessary contact person(s ) will be available. If you
have any further questions contact the Planning Department at
644-2511, Ext. 251 . Thank you.
Very truly yours,
PLANNING & ZONING COMMISSION
��,� c ;il�_r2 I
Louise Evans
Chairman
cc: J. Iazzetta, Town Engineer
M. Banach, Director of Planning
PZC File
LCE/pmm
2 � c
,L � d