HomeMy WebLinkAboutSITE PLAN 1196 TOWN OF SUIIT11 W I NUSOR
PLANNING AND ZONING COMMISSION
The Commission will officially receive applications
Application NO . �r°�!_4� at either Special or Regular meetings provided they
Received Date : f - L 3 were submitted to the Commission Chairperson, Secretar_
Ction or Public Hearing by : or agent , at least fourteen (14) days prior to the
meeting at which they will be officially received.
No application officially received at a Special MeetinE
receipt No . will be acted upon at that meeting.
APPLICANT: Elio Capuano
ADDRESS : 1208 Cromwell Avenue, Rocky Hill , CT 06067 TELEPHONE 203-721-8220
OWNER OF RECORD ON LAND RECORDS : Elio Capuano
ADDRESS : 1208 Cromwell Avenue, Rocky Hill , CT 06067
COMPLETE LOCATION OF PROPERTY: Nutmeg Road South (formerly Savin Drive)
ZONE 1P
NAMF , ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE
DIRECTED : Paul Capuano, 1208 Cromwell Avenue, Rocky Hill , CT 06067
_ TEL HONE 230-721-8220
THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING) 0,)?
1 . Zone Change to (public hearing required)
S J11
FP 1 �
2 . Filing for Subdivision � ]orb,
3 . Filing for Open Space Subdivision (publ�liq n�Jt���quired)
KK "on oa�n �
4 . Filing for Resubdivision (public hearing required
5 . Special Exception to Article (public hearing required )
XX 6 . Site Plan of Development
7 . Removal of Sand , Gravel , Clay or Quarry Stone & Ore (public
hearing required)
8 . Other (explain in detail )
THIS��APP IC�T ION MUST BE SIGNED BY THE APPLICANT' AND OWNER OF THE PROPERTY
AN]) l/54UB1 TT Eq WITH 6 SETS OF PLANS ( 7 sets if p 1 is k ar ' ng is required )
BEhOr�E I IS `RECEIVED BY THE PLANNING & ZONING MMISPI�O
App rant cO n e r
� / ►i4
PLANNING AND ZONING COMMISSION
TOWN OF SOUTH WINDSOR
Fee Schedule and Policy
1. An application processing fee of $25 per lot ($50 minimum) is required
for: Subdivisions., resubdivisions, and open space subdivisions.
2. An application processing fee of $50 is required for : Change of Zone,
Zoning Amendment, Special Exception, anc Earth Removal of Land Filling
Operations.
3. An application processing fee of $25 is required for Site Development
Plans, except: where new buildings/additions/renovations of 2,000 s. f.
or more are proposed, said fee shall be S50; said fee shall be $500
for Site Development Plans in the Designed Commercial Zone; $5!' plus
$5 per dwelling uric fo: Adult Housing ($500 minimum) .
4. An application processing fee of $10 per acre ($300 minimum) is required
for a Change of Zone/General Plan of Development in the Designed
Commercial Zone.
5. An application processing fee of $100 1s required for a Change of Zone/
General Plan of Development in the Multi-Family or DA-15 Residential zones; or
for a Special Exception/General Plan of Development for Adult Housing.
6. An application processing fee of $50 plus $5 per dwelling unit is
required for a Special Exception/Site Plan of Development in the Multi-
Family or DA-15 Residential zones ($500.00 minimum).
7. Application processing fees are non-refundable after the application
has been officially received by the Commission. Application processing
fees may be returned prior to the application' s official reception
provided a letter of withdrawal , signed by the applicant , has been
submitted to the Commission prior to the meeting at which said applica-
tion is scheduled to be officially received.
5. Applications unaccompanied by the required application processing fee
are incomplete, and as such may be returned to the applicant and
removed from the Commission's agenda.
9. Complete applications and required fees shall be submitted at least
fourteen (14) calendar days prior to the Regular or Special Meeting
at which it will be received.
10. Fees for a previously denied application shall not apply to any
subsequent application. However , when a subdivision, resubdivision,
or open space subdivision application has been denied wittisn
prscewing 12 months 3r approves for fewer lots than requested, and a
new application for the subject tract is submitted by the same appli-
cant, then the fee for the new application shall be a minimum of $50
plus $25 for each lot above and beyond the number of lots contained in
the earlier application.
11. A fee of $5 per sign is required for signs to be posted by the
applicant on the subject property.
12. Other Fees: Subdivision Regulations - $3.00; Zoning Regularions - 54 . 00;
Zoning Map $1.00; fees for other documents is as determined by the
Commission.
13, All checks shall be made paygble to "Town of South Windsor. "
Adopted: 4/10184
Revised: 12/4184
�'i0l" SC4,
G �
.1
9 Q 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
soR•co AREA CODE 203/644-2511
October 8 , 1986
Mr. John M. Moran, Jr.
Chairman, IWA/CC
1540 Sullivan Ave.
South Windsor, Ct 06074
RE: Governors Square Business Center - #Application #418 Review
Dear Jack:
There is insufficient information on or in the set of plans submitted
September 29 , 1986 to make a review or evaluate their proposals .
Considering the number of meetings already held with staff , it would
appear when ever they become serious about their proposal , the plans
will be more appropriately modified to be presented.
Very truly yours ,
(1a
A. B. Davies
Deputy Town Engineer
ABD:dlb
CC: Michael Gantick, Director of Public Works
Richard Martel , Town Engineer
Marcia Banach, Director of Planning
Elio Capuano
IWA/CC File
SOW M seq
� /O LUf Z OI�,�OLC�f'L LIIL�ZCI.�d'L
mac` 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
soe•co AREA CODE 2103/644-2511
November 10 , 1986
Mr. John M. Moran, Jr. , Chairman
Inland Wetlands Agency/Conservation Commission
1540 Sullivan Avenue
South Windsor, CT 06074
RE: Application # 425
Governors Square Business Center Review
Dear Jack:
In accordance with the standard review practice, enclosed are
the comments as they relate to the above pro osal.
In essence, this is part of the Park Centre Site, 50± acres with
substantial wetlands, as shown, throughout. Sheet 11, is a fair
representation of the flat site, with the exception of the exist-
ing berm along the Pleasant Valley Estates line.
In our preliminary discussions with the deve oper, a realistic
workable drainage proposal was required for the total site. This
has been addressed on both the sequence and Dn sheet 11, in that
the new swale is the first order of construction.
Some of my concerns include:
1. Limit of development lines needs some thought.
The swale construction is outside the limits.
2 . The location of little topsoil piles will be
difficult for both them and us . Keep it simple
in one spot, it will be less to maintain.
3 . The location of the proposed swale along a possible
extension of Connecticut Avenue could become a
problem.
4 . Assuming a winter construction, show appropriate
E & S controls .
5 . A note should be on the plans to ma ntain the
existing drainage from the Pleasant Valley Estates .
Mr. John M. Moran, Jr. Page 2 .
RE: Application #425
Governors Square Business Center
Page 2 .
approval were consider resented 6 . If an app d as �e , a
sedimentation and erosion control bond of $40 , 000
should be in place prior to any wok on the site
to assure compliance with their pl ns .
If the site work is to be done in phases , then certainly a lesser
amount could be considered.
Very truly yours ,
A. Bowen avies
Deputy Town Eingineer
ABD/jsv
CC: Design Professionals
Michael J. Gantick, Director of Public Works
Richard P. Martel , Town Engineer
Marcia Banach, Director of Planning
IWA/CC File
wn o-lespuM 2vt;qd6'Ot
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
Solt-co`'2 AREA CODE 203/644-2511
November 21 , 1986
Mr . Paul Capuano
1208 Cromwell Avenue
Rocky Hill , Ct . 06067
Re: App . #1196 - Governor ' s Square - Site Plan of Development
Please be advised that the Planning & Zoning Commission voted on
October 28 , 1986 , to approve the above application for a site plan
of development for property located on Nutmeg Road South , as shown
on plans prepared by Design Professionals , Inc . , dated 10-20-86 ,
and Alford Associates , dated August 29 , 1986 , TP zone , subject to
the following :
1 . The following modifications must be made to the plans :
a. The key map shall indicate the general direction of the
sanitary sewer and storm sewer flow and both Class D
certifications should be shown .
b . Sheet #3 shall indicate iron pins at ,all angle points
along abutting properties and at the street ; MDC or CGS
datum base coordinates should be given ; the front
building offset for building #1 must be given ; the status
of curbing should be indicated ; and Wetlands must be
shown on the topographic map .
C . Sheet #7 should show iron pins at all angle points along
abutting properties and at the street, ; the name of the
abutting property owners ; an A-2 certification ; and the
wetlands should be shown .
d . The dumpsters should be shown on the landscaping plan and
shall be adequately screened .
2 . The landscape plan for this site shall be �coordinated with the
streetscape/ landscape plan for Parkcentre�
3 . Any further development of this site sha address buffering
of the adjacent residential areas and an overall drainage
plan .
4 . A bond in an amount to be determined by t e Town Engineer
shall be submitted to this Commission to nsure completion of �'
drainage and landscaping .
5 . Approval must be obtained from the Fire Marshal .
6 . This approval is subject to the conditions of approval of the
Inland Wetlands Agency/Conservation Commission .
Mr . Paul Capuano -2- 11/21 /86
7 . No building permits will be issued until the final mylars have
been filed in the Office of the Town Clerk .
8 . Prior to commencement of any site work , a meeting must be held
with Town Staff .
Black and white transparent mylars of Sheets 1 , 2 and 3 , together
with two blueprint copies of the entire set of plans with the above
modifications , shall be submitted to this Commission to be stamped
and signed . The letters of approval of this Commission , as well as
the Inland Wetlands Agency/Conservation Commission , shall be
reproduced on the mylars . After the mylars have beens signed by
the Commission they will be returned to you and must be filed in
the Town Clerk ' s Office within 90 days.
Yours very truly ,
PLANNING & ZONING COMMISSION
vg By :
Louise C . Evans , Chairman
CC : R . Martel , Town Engineer
M. Banach , Planning Director
E . Belleville , Assessor
T . D ' Auria , Building Official
W. Lanning , Fire Marshal
Inland Wetlands Agency/Conservation Commission
wf? Ol�, ��LL tfZ UlU Z Ll d a'L
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
SOe•CO AREA CODE 203/644-2511
December 4 , 1986
Mr. John M. Moran, Jr. , Chairman
Inland Wetlands Agency/Conservation Commission
1540 Sullivan Avenue
South Windsor, Connecticut 06074
RE: Application No. 425
Governors Square Business Center Review
Dear Jack:
The revised plans of November 24 , 1986 appear to be modified
sufficiently to cover most of my concerns .
Primarily the swales shall be completed prior to any other
site work. Winter protection has been addressed. The location
of the stockpiles was to assist in the working of the sites ,
they have no material effect on their proposal .
The plans , as modified, could be approved with an appropriate
bond and conditions .
Very truly yours ,
A. Bowen Davies
Deputy Town Engineer
ABD/jsv
CC: Elio Capuano
Design Professionals
Michael J. Gantick, Director of Public Works
Marcia A. Banach, Director of Planning ✓
IWA/CC File
to+M •C4
y 7-1w-zlotlO-Psouzh ?& zc
C �
a
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
AREA CODE 203/644-2511
December 15, 1986
Mr. Paul Capuano CERTIFIED MAIL
1208 Cromwell Avenue
Rocky Hill, Ct 06067
RE: Application # 425 - Governor' s Square
Dear Mr. Capuano:
At the December 8, 1986 meeting, the South Windsor Inland Wetlands
Agency/Conservation Commission approved with conditions application
#425 for a planned industrial development to be located on Nutmeg
Road South.
The following conditions must be adhered to for this permit to be
valid:
1. Construction activities shall be subject to the approval of
the Town Engineer.
2. The application shall indemnify and hold harmless the Town
of South Windsor against any liability which might result
from the proposed operation or use.
3 . We recommend a bond in the amount of $10,000 be submitted to
Planning & Zoning Commission to ensure compliance with
Erosion & Sediment Control Measures.
4. The permit is valid for one year and shall expire on
December 8, 1987 .
Very truly yours,
John M. Moran, Jr. ,/-ClyaIrrfian
�. Inland Wetlands A4n /
Conservation Commission
Town of South Windsor
JMM:dlb
CC: A. B. Davies, Deputy Town Engineer
Richard Martel, Town Engineer. /
Marcia Banach, Director of Planning
Michael Gantick, Director of Public Works
Thomas D'Auria, Building Official
Design Professionals
Louise Evans, Chairman, Planning & Zoning Commission
70WfT ale SGZtlm LUCi2d�4
y 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
�osoe•co� AREA CODE 203/644-2511
February 9 , 1987
Mr. Paul Capuano
1208 Cromwell Avenue
Rocky Hill, Ct. 06067
Dear Sir:
Re: App. #1196 - Governor ' s Square, Site Plan of Development
Please be advised that the Commission voted on January 20th, 1987 to
require the following bonds in connection with the above application:
$10 , 000 to ensure compliance with the conservation plan
and soil erosion and sedimentation control;
$30, 000 to ensure compliance with the planting plan;
$50, 000 for excavation and drainage.
The Commission voted to accept a letter of credit for a one year
term, in lieu of a surety bond. Said letter of credit must be
renewed on a yearly basis until completion of the development. If
a new letter of credit has not been received within 30 days before
the expiration date, the Commission may, at its option, call the
letter of credit it is holding.
Yours very truly,
PLANNING & ZONING COMMISSION
B y:
Louise C. Evans, Chairman
vg
South Windsor Chamber of Commerce
' a 1750 Ellington Road, South Windsor, Connecticut 06074 Tel. 203-644-9442
J
TO LIVE,WoR�.
April 27 , 1987
Mrs . Louise Evans , Chairman
South Windsor Planning $ Zoning Commission
South Windsor Town Hall
1540 Sullivan Avenue
South Windsor, Ct . 06074
Dear Mrs . Evans :
The Board of Directors of the South Windsor Chamber of Commerce
would like to inform you and the other members of your com-
mission that it has approved the concept plan for Governor' s
Square on Nutmeg Road South proposed by Paul Capuano of Capuano
Builders & Developers .
The Capuano proposal was approved at the Board' s regular meeting
April 21 after a detailed presentation by Mr. Capuano and
Mr. Peter DeMallie of Design Professionals , Inc. Discussion
following the presentation centered on the development ' s "incu-
bator" concept--the encouragement of small business start-ups
long favored by the South Windsor officials , and visible in
varying forms throughout the industrial zone.
In addition, it was felt that the project and its close to half
a million square feet of individual buildings is a most appropri-
ate use of the area, which has been zoned industrial or industrial
park since the late 19501s .
It is further felt that the project, as described to the Board,
will not unfavorably impact the abutting residential zone. We
urge your favorable consideration of the proposal when it is pre-
sented at your up-coming meeting.
Sin rely,
rely, _
d`oseph Rapt"aa ese , . , President
South Windsor Chamber of Commerce
JR/dpt
Capuano Realty Management
November 30, 1987 �;.
Sargent Lewis
Traffic Control Authority � -
South Windsor Police Dept .
South Windsor, CT 06074
RE : Installation of Street Lights iVl < ��' CC
Dear Sargent Lewis : � e4
As per our conversation last week, it is understood and
agreed that in an effort to expedite the installation of
street lights along Nutmeg Road South, between Carter Rice
Paper Company and Standard Printers, we, Capuano Builders
and Developers, will share the cost of installation,
(approx . $4, 000) 50/50, with the Town of South Windsor.
As you indicated, the Town of South Windsor is responsible
for street lighting , but money would not be appropriated for
until next year ' s budget , at which time Capuano Builders and
Developers would be reimbursed its 50% share.
If this is in agreement, please sign below and return a copy
to my office .
r
Pau apuano Sargent Lewis
South Windsor Police Dept .
cc : Public Works Director
Planning Dept ' (Marsha Banick)
South Windsor 'Town Manager
Hal Clisby, CL,'&P
1208 Cromwell Avenue
Rocky Hill, CT 06067
203-721-8220
<0,0 N S f,<
y 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
���asoe•co�'�� AREA CODE 203/644-2511
s
CERTIFIED MAIL
December 22, 1987
Mr. Paul Capuanl
1208 Cromwell A enue
Rocky Hill, ' CT 6067
�I
Re: Permit Extension - Application #425 , 250 & 310 Nutmeg Road
South
Dear Mr. Capuano�:
At the December 4, 1987 meeting, the South Windsor Inland Wetland
Conservation Commission approved a one-year extension for the above
mentioned application.
The extension became effective November 17, 1987 with an expiration
date of November 17 , 1988.
Very truly yours,
Kevin Rennie, Chairman
Inland Wetlands Agency/
Conservation Commission
Town of South Windsor
JER
cc: A.B. Davies Deputy Town Engineer
Richard Mar el, Town Engineer
Planning & oning Commission
I—`Marcia Bana h, Director of Planning
John Shemo, Economic Development Coordinator
Thomas D'Au ia, Building Official
Paul Capuano
Builder/Developer , v I,
1 � C
J 1� v'0m�`SS`p1
January 15, 1988
U
Raymond F. Hallowell, Jr.
Chairman
Planning and Zonin Commission
Town of South Wind or
1540 Sullivan Aven16074
e
South Windsor, CT
Dear Mr. Hallowell
Thank you very much for your letter of January 11, 1988.
I would like to re�uest that my letter of credit be re-
newed with a reduc d amount.
The original amounts of bonding are as follows:
$10,000 Erosion and Sedimentation Control
$50,000 Drainage
$30,000 Landscaping
for a total of $90� 000.
I would like to request that erosion and sedimentation be
reduced by $5, 000 4s site two is completed. I am request-
ing landscaping be, reduced by $10, 000, as site two has
been two-thirds completed, and that drainage be reduced by
$45, 000, as only minor work remains on site seven.
The balance on the letter of credit would then be reduced
to $30, 000 with a $6, 000 maintenance bond, for a total of
$36, 000, with the maintenance bond lasting for a period
of one year.
If you have any questions or concerns please feel free to
contact me.
very tul yours,
Paul tapuano
cc: Bradford Wainman,
Connecticut National Bank
PC/dmg
1208 Cromwell Avenue
Rocky Hill, CT 06067
203-721-8220
Building Contractors, Inc.
rA-6
JUL 1 1 198R
July 8, 1988 South Windsor
Planning & Z' ring COMMItAn
Raymond F. Hallowell , Jr.
Chairman
Planning and Zoning Commission
Town of South Windsor 1�
1540 Sullivan Avenue
South Windsor, Ct 06074
Re : Governor ' s Square Business Center
Dear Mr. Hallowell ;
I would like to request that the performance bond posted
in the form of a letter of credit from Connecticut National
Bank, for the Governor ' s Square Business Center drainage and
landscaping, be released and/or reduced to a maintenance
level .
If you have any questions , please feel free to contact me .
Ver)k.,truly yours,
PAA-
Pad-1 Capuan
cc: Bradford Wai=ional
n,
Connecticut Bank
1208 Cromwell Avenue
Rocky Hill, CT 06067
203-721-8220
4�wN aF�(
�I ro
�� sly �&
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
'��SOR•CDa� AREA CODE 203/644-2511
November 28, 1988
Governor' s Square
Paul Capuano
1208 Cromwell Avenue
Rocky Hill, Ct 06067
Re: Application #425 - Governor' s Square
Dear Sir:
At the November 21, 1988 meeting, the South Windsor Inland
Wetlands Agencyl Conservation Commission approved a one year
extension of Application #425 with all original conditions.
In addition to the original conditions you are also required to
contact John McCahill, Zoning/Wetlands Enforcement Officer (644-
2511, x229) immediate. y upon approval notification. This is to
reverify the contact person for the site and establish a site visit
with that person to verify all erosion and sedimentation control
measures are in place according to the plan.
The application becomes effective December 8, 1988 and expires
December 8, 1989.
Very truly yours,
i
John M. Moran, Jr. , Ch rman
Inland Wetlands Agency/
Conservation Commission
JMMJr. /pmm
cc:John E. McCabi.11, Zoning/Wetlands Enforcement Officer
Marcia A. Banach, D. rector of Planning
Michael Gantick, Director of Public Works
John R. Collins, Chlef Building Official
Raymond Hallowell, Chairman, PZC
4 0,11M SE,(
Ticnvtl olle s-Cov vzn�
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
Soe•c0N� AREA CODE 203/644-2511
February 16 , 1989
M E M O R A N D U M
TO: Michele Lip , Assistant Planner
FROM: A. Bowen Davies, Deputy Town Engineer
RE: Governor Sgoare Bond Release
Consistent with the policy of "zero increase in runoff" , and
their presentation that the downstream detention pond lacked the
capacity for the development of this site, and the impervious
area proposed, the open swales were proposed, approved, and built
to conduct the sto mwater runoff and to act as the on site
detention. In the Povember 21, 1986 approval letter from PZC,
#4, the bond can be released when we receive some verification of
completion as propsed. The as built drawings would be the
appropriate plan.
The as built plan would also show the iron pins and street line
points as indicated n sheet 2 .
At present, we do not have the as built drawings as per 4 .13 .10
of the regulaltions .
ABD/jsv
. u
,pesigo
ofessionols, i0c.
civil engineers • planners • sur{Leyors SG. I� .. , t LETTER OF TRANSMITTAL
TO: Ms• Marcia Banach DATE: 2/17/89
Planning birector
TOWN OF SOUTH WIND OR
1540 Sullivan Aven�e
South W' sor CT 06074
REGARDING: Governor's Square PROJ. NO. 86-142
prai nage ssd�1 e System
WE ARE SENDING YOU:
for your useX at your request
for approval for your files
for review and comment
THE FOLLOWING: C a: Per your request, I have reviewed the existing
drainage swale System atliGovernor's Square. A field check of topography shows
that the swales were conotructed in conformance to our design plan entitled
Topographic Map dated 10113/86, revised to 8/7/87, sheet 7 of 7. If you have
i
any questions, please hesitate to ask.
Design Professionals, Inc.
cc: Paul Capuano
By:
Ro rt enault, P.E., #11963
Principal
1170 Ellington Road (Route 30), South Windsor, CT 06074 0 (203) 291-8755
�C
1208 Cr.or..J,ti-ell Avo .
Rocky Kil'i , CT0600
Doar Mr . CapuaQ-
I
Please to c"tdViS* Lha T, the c:bO:rE'- m'`n 0Onod hO,1C'. was f"elF?c;t::E.C'. by
The Planning S Zlln] ng Commission at their }''LbrunrY 2R , 1989
`meeting . Iie Ccnmission is nun bolding a loner of urediL for-
$5 , 000 for tic WpInAon of the WAscalipp .
Raymond F . Hall Wel l
Anirn an of Pith Ingi 0 Zoning Commission
cc PZC Pilo
Marcie Anna h , Diract or of PIaIlIlih,,
- Q
tow" Stq
° oye sou. V&&,4-at
C U 7-C MAI-2,a
�� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
sof co AREA CODE 203/644-2511
September 19, 190
Mr. Paul Capuano
1208 Cromwell Avenue
Rocky Hill, CT 06067
Dear Sir:
re: Governor's Square
This is to advist that the Planning and Zoning Commission voted
on September 12, 11989 to release the landscaping bond for
Governor' s Squar ' .
Please contact tle Planning Department office at the South
Windsor Town Hal at 644-2511, Ext. 251 to arrange to pick up the
bond. Thank you
Very truly yours '
PLANNING AND ZONING COMMISS ON /D0
X' Raymo d F. Hallo ell, Jr.
Chairman
cc: N3: Gantick, i Director of Public Works
✓ ,
� Banach, irector of Planning
PZC File
Jo
�4
�40
,MN SE,`�
540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074
SORco��,� AREA CODE 203/644-2511
TO BE PUBLISHED IN THEiJOURNAL INQUIRER SATURDAY NOVEMBER 1 1986
Q ,
LEGAL NOTICE
TOWN OF SOUTH WINDSOR
P ANNING & ZONING COMMISSION
i
At the October 28 , 19% meeting, the Planning & Zoning Commission
voted to take the foll wing action:
I
1 . Approve, with modifications , the application of Hartford
Jewish Federation/ avin Brothers , Inc . , for a resubdivision of
land located on t east side of John Fitch Boulevard, north
of South Satellit Road, in Parkcentre, as shown on plans
prepared by Palmbe g & Russo , dated 8/7/86 , No. A-85202 , IP zone .
2 . Approve, with modifications , the application of LaCava Construction
Co. , for an open s ace subdivision in an A-20 zone, consisting of
32 lots located atithe end of Quarry Brook Drive, west of Clark
Street and south of Stanley Drive, known as Section II of
Beechwood Farms.
3. Approve, with modifications , the application of Arthur Roe,
for a subdivision bf land located on the west side of Main
Street, as shown I a plan prepared by Petersen & Hoffman, L. S.
dated May, 1985, vised Sept. , 1986 , A-40 zone.
4 . Approve, with mod' ications, the application of Elio Capuano
for a site plan o rdevelopment for property located on Nutmeg
Road South, as sh n on plans prepared by Design Professionals,
Inc. , dated 10-20-�86 , and Alford Associates, dated August 29 ,
1986 , IP zone.
5 . Approve , with modifications, the application of Peter L. Fishman,
for a site plan o idevelopment for property located on the
north side of PleaIsant Valley Road, east of Nutmeg Road, I zone.
Dated at South Windso Connecticut this 29th day of October, 1986 .
PLANNING & ZONING COMMISSION
Louise C. Evans Chairman
Items 1 2 and 5 were app pved by David H. Sorenson, Secretary
unanimous vote of the Co=jission
with Commissioners Evans, IHallowell,
Montana, Klenke, Rossi , C jstro and
Hart voting in favor.
Item 3 was approved by a E to 1
vote with Commissioners Hallowell,
Montana, Klenke, Rossi , CE stro and
Hart voting in favor, and ,Mrs . Evans
opoosed.
Item 4 was approved by a 41' to 3
vote with Commissioners E ans ,
Montana, Klenke and Hart In favor,
and Commissioners Rossi , . allowell
and Castro opposed.
Virginia S. Graney, Recor ing Sec.