HomeMy WebLinkAboutSUBDIVISION PHASES II III TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
li
PLANNING AND ZONING CO SSION ACTION THIS APPLICATION SHALL BE ACCEPTED BY
APPLICATION # THE PLANNING AND ZONING COMMISSION AT
RECEIVED DATE: -/ -Vs THE REGULARLY SCHEDULED MEETING ON THE
APPROVAL DATE: FOURTH TUESDAY OF THE MONTH. IT SHALL
REJECTED DATE: J BE SUBMITTED TO THE PLANNING AND
RECEIPT # ZONING COMMISSION OFFICE ONE (1) WEEK
11 PRIOR TO THE FOURTH TUESDAY.
APPLICANT: DART HILL REAL , INC.
ADDRESS : 658 Ellington �oad, South Windsor, CT TELEPHONE # 282-0628
OWNER OF RECORD ON S.W. LA RECORDS DART HILL REALTY,INC.
ADDRESS : SANE AS ABOVE
COMPLETE DESCRIPTION OF LO TION OF PROPERTY North Side of Dart Hill Road, South
Windsor, Connecticut Secion II-32 Lots and Section III-33 Lots (See attached maps)
ZONE A-30
NAME, ADDRESS & TELEPHONE OF PERSON TO WHOM CORRESPONDENCE AND INQUIRIES SHOULD BE
DIRECTED: Attorney Raymo d G. LeFoll
2307 Silas Deane Highway, Rocky Hill, CT 06067 TELEPHONE # 563-2355
THIS APPLICATION IS FOR: (C CK ONE OF THE FOLLOWING) r
1. Zone Change to' Zone (public hearing) � j
V
2. Filing for Sub ivision SEP 20 1985
X 3. Filing for Ope Space Subdivision (public hearing) South
Planning Windsor
4. Filing for Res bdivision (public hearing) g & Zoning Commission
5. Special Except on to Article of the Zoning Regulations (public hearing)
6. Site Developme Plan
II�
7. Removal of Sand1l' Gravel, Clay or Quarry Stone & Ore (public hearing)
8. Other (explain n detail)
THIS APPLICATION MUST BE SIG D BY THE APPLICANT AND THE OWNER OF THE PROPERTY AND
SUBMITTED ALONG WITH THREE SE S OF PLANS BEFORE IT WILL BE ACCEPTED BY THE PLANNING AND
ZONING CODIMISSION
DART HIL TY,INC. DART H REALTY,&IN
By By
ICANT R
G. LeFoll, Attorney) G. LeFoll, Attorney
(over)
PROCEDURES TO BE FOLLOWED WHEN SUBMITTING THE APPLICATION :
1. Applications must be filed in triplicate. The applications shall be
typed or neatly printed.
2. Maps and plans, as defined in the applicable regulations, shall be
submitted in triplicate with the application forms .
3. An application fee of $25. is required for filing items #1, #5 and #7.
4. A subdivision processing fee of $25. per lot ($50. minimum) is required
for filing items #2, #3 and A.
5. A $20. deposit must be submitted with any item requiring a public
hearing. This deposit is for a sign to be placed on the property by
the applicant advertising the public hearing. The check will be
returned to you when the sign is returned to the Town.
6. Application for Zone Change (item #1) shall comply with Section 11.2.3
of the Zoning Regulations.
7. Application for subdivision and resubdivision (items #2 and #4) shall comply
with the requirements set forth in the Town of South Windsor Subdivision
Regulations.
8. Application for an open space subdivision (item #3) shall comply with
Section 5.3 of the Zoning Regulations.
9. Application for a site plan of development (item #5) shall comply
with Section 4.1.1 of the Zoning Regulations.
10. Application for sand and gravel removal shall comply with Section 9.3
of the Zoning Regulations.
IN ACCORDANCE WITH STATE STATUTES, THIS APPLICATION WILL BE ACTED UPON BY
THE PLANNING AND ZONING COMMISSION, OR A PU.3LIC HEARING DATE WILL BE SET
WITHIN 65-DAYS OF THE DATE OF ACCEPTANCE OF THE APPLICATION.
.10L REOIOry
C,
C PITOL REGION COUNCIL OF GOVERNMENTS
I
214 MAIN STREET — HARTFORD, CONN. 06106
cO
Tel. 203 522-2217
LfRti MEN TS • DANA S HANSON
I
TOWN PLANNING AND ZONING COM ISSION REPORT ON SUBDIVISION REFERRAL #85/59
TOWN OF SOUTH WINDSOR May 23 , 1985
Commissioners:
1
Receipt is acknowledged of t e above-numbered referral . Notice of this proposal was
transmitted to the Planning ivision of the Capitol Region Council of Governments
under the provisions of Sect on 8-26(b) of the Connecticut General Statutes, as
amended.
The referral involves a prop sed subdivision (Mountain View) of 146.7 acres being
subdivided into 175 lots. S bdivision abuts Ellington on the northwest corner and
Vernon on the east. Develop rs are requesting approval of an open space subdivision
concept and permission to pr teed with Phase 1 (28 lots) in the south/southeast
section.
Comments:
The staff of the Regional P1 nning Commission of the Capitol Region Council of Govern-
ments has reviewed this refe ral and finds no apparent conflict with regional plans
and policies or the concerns of neighboring towns.
Questions concerning this ref rral should be directed to Mary Barnes.
In accordance with our proce ures this letter will constitute final CRCOG action on
this referral . The public h aring date is scheduled for 6/4/85.
I
DISTRIBUTION: Respectfully Submitted ,
Frank Dzurenda , Chairman
TPZC: S. Windsor, Elling Dn Barbara Surwilo, Vice-Chairman
Planner: S. Windsor, Vernon Regional Planning Commission
Clearinghouse Representative
A111
4
LI
i
A VOLUNTARY COUNC{�L OF GOVERNMENTS FORMED TO INITIATE AND IMPLEMENT
REGIONAL PRO RAMS OF BENEFIT TO THE TOWNS AND THE REGION
i
LEFOLL E6 ROGGI
ATTORNEYS AT LAW
2307 SILAS DEANE HIGHWAY
ROCKY HILL, CONNECTICUT 06067
RAYMOND G.LEFOLL TELEPHONE
CURTIS H.ROGGI (203)563-2355
September 18, 1985 1985
m
pla outh Windsor
nning & ZorinS Commt;t;v
South Windsor Planning and Zoning Commission
South Windsor Town Hal
South Windsor, CT 06 74
Re: Mountainview Estates - Section II (32 Lots) and Section III (33 Lots)
Dear Commissioners:
i
Please be advised that this office represents Dart Hill Realty, Inc. ,
owner and developer of Mountainview Estates. Enclosed herewith you will
please find an applica ion for Sections II and III of this subdivision. A
request is herein bei made to hold the public hearing for both Sections
II and III at the same time. It is our understanding that we would develop
Section II initially aid seek building permits for Section II only, and
then return to the com ission to seek permission for the issuance of
building permits for S ction III.
If you have any q estions concerning this matter please do not
hesitate to write or c 11.
Very truly yours,
i
L Fo 1
RGL/gy
Enc.
I
I
I
<OwN 9fA
_. _...
Cn
e 4;� 40 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
SOR•CO AREA CODE 203/644-2511
October 1 , 1985
Mr . William G. Wel ver III , P . E .
Town Engineer
14 Park Place
Vernon, Ct . 06066!
Dear Bill : � 4 {
Re: Dart Hill Roi d - Mountainview Subdivi6ion Sanitary Sewers
This letter is td confirm our telephone conversation which
took place recently. The contractor installing the sani-
tary sewers on Dart Hill Road at the Mountainview subdivision
completed his tesjting of the lines yesterday . An air test
was performed , with a result that the lines held 3 . 5 lbs .
for a five minute period .
I will try to keo you informed as to the development
progress in this !area of Town .
Very truly yours ,
I �
a. ' Lc Y
ichard P . Martel , P . E. & L . S .
Town Engineer
RPM/ml
cc : fir. F. Shaw, Superintendent of Pollution Control
peter R. De allie , Director of Planning
Mountainvie File
RECH v L
OCT ; ,
i
j Nasu flukhNIQ Din,
,I,
o • w� 11540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
��OSoe•coN� AREA CODE 203/644-2511
October 10 , 1985
Richard M. Rittenban�, Esquire
Town Attorney
1734 Ellington Road
South Windsor, CT 06074 1
RE: ABANDONMENT OF PORTION OF NEWMARKER ROAD
Dear Dick:
The purpose of this etter is to confirm our meeting of October 3rd,
during which we set he process of abandoning that portion of
Newmarker Road relat ve to the Mountainview Estates Subdivision,
Sections II and III . ,
I�
Those procedures areal
1. Upon the appro al of Sections II and III, the Planning and
Zoning Commiss on make the approval conditional upon the
abandonment of the appropriate portion of Newmarker Road
by the Town Co ncil.
• 2 . The Town Council then put this item on their agenda and
table it. On he same agenda, the Town Council request
a report on th abandonment from the Planning and Zoning
Commission as er State Statute 8-24.
3 . The Town Council send a copy of the resolution for said
abandonment tolthe Planning and Zoning Commission. The
pivitol point eing that abandonment be effective with the
posting of the bonds for public improvements for Section II
and III .
4. The Planning a4Ld Zoning Commission make another report to the
Town Council i cluding the motion and vote of the Planning
and Zoning Coiroiission.
5. The Town Counc l then takes its appropriate action.
Very truly yours,
ichard P. Mart
Town Engineer
cc: R. Arsenault, Director of Public Works
R. Gilligan, Ch irman, Planning and Zoning Commission
P. DeMallie, Director of Planning
Attorney Raymon LeFoll
i
v
10wN SE� 70�vn' 0,/?S-CwtA� ^dz-pz�
o/
O �
G U
a
y, i1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR•co AREA CODE 203/644-2511
October 10 , 1985
Richard M. Rittenband, Esquire
Town Attorney ECT IV ED
1734 Ellington Road
South Windsor, CT 06074 XT is iw�
RE: ABANDONMENT OF A PORTION OF NEWMARKER ROAD
So. WINDSOR PLANNING DEPT,
Dear Dick:
The purpose of this better is to confirm our meeting of October 3rd,
during which we set process of abandoning that portion of
Newmarker Road relative to the Mountainview Estates Subdivision,
Sections II and III.
Those procedures are:
1. Upon the approval of Sections II and III , the Planning and
Zoning Commissilbn make the approval conditional upon the
abandonment of 'the appropriate portion of Newmarker Road
by the Town Council.
• 2 . The Town Council then put this item on their agenda and
table it. On the same agenda, the Town Council request
a report on the{ abandonment from the Planning and Zoning
Commission as per State Statute 8-24.
3. The Town Council send a copy of the resolution for said
abandonment tolthe Planning and Zoning Commission. The
pivitol point being that abandonment be effective with the
posting of thelbonds for public improvements for Section II
and III.
4. The Planning apd Zoning Commission make another report to the
Town Council including the motion and vote of the Planning
and Zoning Commission.
5 . The Town Council then takes its appropriate action.
Very truly yours,
ichard P. Mart
Town Engineer
cc: R. Arsenault, Director of Public Works
Gilligan, Chairman, Planning and Zoning Commission
. DeMallie, Director of Planning
Attorney Raymond LeFoll
�So•MM 8F,`
c �
.a
w� IP40 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
lN�soR.00 AREA CODE 203/644-2511
October 31, 1985
Raymond G. LeFoll, E q.
2307 Silas Deane Highway
Rocky Hill, Ct. 06061
Dear Ray:
Re: App. #1111 - Phases II and III
MountainView Estates
Please be advised that the public hearing in the above matter
has been scheduled for November 19 , 1985, at 8 :00 P. M. in the
Council Chambers of the South Windsor Town Hall.
Signs advertising the hearing should be placed on Dart Hill
Road and at the end of Debbie Drive, and should remain for
10 days prior to the hearing. Please put them up on November 8th,
and be sure they are clearly visible.
The signs may be purchased in the Town Hall at a cost of $5 each.
Yours very truly,
PLANNING & ZONING COMMISSION
vg By
Robert F. Gilligan, ghairmq&
CC: Mr. Jean Marc Jacques
10wN 8t'q `®
e �
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
SOR•CO AREA CODE 203/644-2511
TO BE PUBLISHED IN THE JOURNAL INQUIRER THURSDAY, NOVEMBER 7 , 1985
THURSDAY, NOVEMBER 14 , 1985
LEGAL NOTICE
TOWN OF SOUTH WINDSOR
PUNNING AND ZONING COMMISSION
Notice is hereby given that there will be a public hearing of the
Planning and Zoning Commission on Tuesday, November 19 , 1985, at
8 :00 P. M. in the CouAcil Chambers of the South Windsor Town Hall ,
1540 Sullivan Avenue, ' South Windsor, to consider the following:
1. Application of Beatrice M. Thrall, for a 4 lot subdivision
on 2. 927 acres, located between Avery Street and Concord Road,
north of the Sout4 Windsor/Manchester town line, as shown on
a plan prepared by Megson & Heagle, dated 9/9/85 , Map No. 26-85-1,
A-20 zone.
2. Application of Dart Hill Realty, Inc. for Phase II of Mountain-
view Estates, consisting of 32 lots, and Phase III consisting of
33 lots, located on. the north side of Dart Hill Road, west of
Newmarker Road and the South Windsor/Vernon town line, A-30 zone.
Copies of these applications and maps more clearly defining the
properties are on file in the Office of the Town Clerk of the Town
of South Windsor. At' this hearing interested persons may appear
and be heard and written recommendations will be received.
PLANNING AND ZONING COMMISSION
Robert F. Gilligan, Chairman
David H. Sorenson, Secretary
Planning & Zoning Commission -3- 11/19/85
Mrs. Carolyn Berzins said she was representing her mother, Beatrice
Thrall. With her wa Andrew Tupper, of Megson & Heagle, Civil
Engineers and Land S rveyors, who had prepared the subdivision map.
Mrs . Berzins explained that they wished to subdivide almost 3 acres
into 4 lots, in an At20 zone. Two new lots would front on Concord
Road, and one of the ''lots fronting on Avery already has a house on it.
That lot is designated lot #1, and consists of about 12 acres. In
May of 1985 they went to the Zoning Board of Appeals for a 5 ' variance
on the frontage of o e of the lots on Concord Road, and it was denied
because of substantial opposition. The reason for denial is that
it was not in keepin� with the character of the neighborhood.
Mrs. Berzins said sh is not requesting a variance now. Each of the
lots will have 100 ' f width at the building line in accordance
with Section 1. 2 f o the Zoning Regulations. No Wetlands approval
is required, and the have applied for Conservation approval. The lots
will be serviced by ewers and water.
Referring to the opposition at the ZBA meeting, she produced a map
showing a number of ots in the area with less than 100 ' frontage.
Mrs. Berzins said he husband has been in the building business
for over 20 years, a 'd the homes they build would detract from the
neighborhood.
Mrs . Berzins conclud d that this property has never been previously
subdivided, and the uilding line is being established on one lot in
accordance with Section 1. 2 f. The lots can all be serviced by sewers
and water, and are not out of character with other lots in the neigh-
borhood.
Town Engineer, Richa 'd Martel, said he had no comments. Mr. DeMallie,
Planning Director, s , id the Planning Department recommended the public
hearing in view of t ,e denial of a variance by the ZBA. This appli-
cation does not requ re a variance. The building line on Lot #4 is
95 feet. Notation 4 ' should read that Lot #2, rather than #1, is
serviced by South Wi�dsor sewer. Lot #4 still contains a sufficiently
large area for a house. Mr. DeMallie said he recommends a turn-around
driveway on Lot #2.
No one in the audienle spoke in favor of the application. Speaking in
opposition was Richa 'd Roback, of 116 Concord Road. He said he feels
that if approved, th s subdivision will change the character of the
neighborhood due to the placement of the houses. The neighborhood
consists of custom b ilt homes from the 1950 ' s and 1960 ' . Properties
immediately surrounding the proposed subdivision have lot widths of
at least 134 ' , and a;eas close to 3/4 of an acre. The front
building lines are b6tween 40 and 50 feet from the road. The
ZBA denied this beca se one of the lots did not meet the minimum
requirements. Mr. R 'back said he submitted a petition at that time
asking the variance �o be rejected. By careful manipulation of the
lot lines, they have, come up with this plan. This plan only makes
the matter worse reg4rding the effect on the neighborhood. He said
that he and his neighbor offered Mrs. Thrall an option: A single
Planning & Zoning Commission -4- 11/19/85
house lot, with the land on each side purchased by himself and
his neighbor, and they have had little success in negotiating.
Mr. Roback then submitted a petition which he said was signed by
16 residents representing 7 properities in close proximity.
Mrs. Berzins said she would like to mention that the Commissioners
should see the neighborhood and they would see what is planned is
not out of character with the neighborhood. She noted there is a
thick hedgerow between Lot #4 and the Conyers property, and setting
the house back would not be unatractive. Insofar as the offer is
concerned, Mrs. Berzins said Mr. Conyers never made an offer - they
just talked to him. Mr. Roback offered $35,000 for the entire
parcel fronting on Concord Road, which is improved property with
water and sewers or an alternative offer of $1, 000 an acre for
the excess property. She said she doesn' t know where he got that
figure, but the property is certainly worth more and that' s why
her mother didn' t seriously consider the offer.
Commissioner Klenke asked if the lots were wooded, and Mrs . Berzins
said all three lots are basically very open, with
the Conyers property, and also some on her mother' s property.
Mr. Asplund asked Mrs. Berzins to restate the lot sizes on Concord
Road. Mrs. Berzins said the abutting properties are 38 ' frontage
on the Roback property, but he has 138 ' on the building line; the
Carman Road properties are 93 ' , 971 , 97 ' and 821 ; across the street
from the proposed lots there are two lots with 102 ' and 81 ' .
Mr. Asplund asked the square footage of the lots. Mr. Tupper said
the three lots on the east side of Carman Road are 180 ' deep, and
are a little less than 20, 000 s. f. The lot on the left are two
lots combined. which had . 47 and . 33 acres for a total of . 8 acres.
The lot to the east - the one with the 38 ' frontage - is . 7.
Mr. Roback reiterated that the lots they are speaking of were put
together in 1938, long before the present zoning regulations. He
said there are other lots in the area with more frontage. The
newest lot in the area on Avery Street has 134 ' frontage and is
close to an acre. The Pasquilini property on Avery has 134 '
and is about 3/4 acre. The Conyers property, which abuts the property
in question, has well over an acre. Another property to the south
of the Thrall property has about 200 ' . The other houses on Concord
Road do have smaller frontages, but they were part of a subdivision
in Manchester approved in 1938.
2. Application of Dart Hill Realty, Inc . for Phase II of Mountainview
Estates, consisting of 32 lots, and Phase III consisting of
33 lots, located on the north side of Dart Hill Road, west of
Newmarker Road and the South Windsor Vernon town line, A-30 zone.
Present on behalf of the applicant were Attorney Curtis Roggi of
the firm of LeFoll & Roggi, and Bill Clock, of Reino Hyyppa & Asso-
ciates. Mr. Roggi submitted sets of plans which he said were revised
i
Planning & Zoning Commission -5- 11/19/85
in accordance with c mments from the Planning Department. They
are asking for approlal of both Phases II and III, consisting of
32 and 33 lots. Thel,only substantial change between the plan
the Commission is re.iewing tonight and the one they saw with Phase I,
is that the phasing has been changed. Half of the homes in Phase I
have been built, and 'the others are under contract. The WPCA
approved the sanitary sewers for all six phases. IWA/CC heard this
matter the other night, but adjourned before taking it up due to
the late hour. Mr. Ftoggi said he does not foresee any problem with
IWA/CC.
i
Mr. Clock said the phasing has been changed in order to accommodate
development to the north which will be called "Windmar" . Mountainview
will service their drainage and sanitary sewer needs. A detention
basin is proposed tolthe west of Lots 42 and 41.
i
Mr. DeMallie said th4, Planning Department recommends that building
permits be authorized: only for Phase II. The difference between
the plans submitted this evening (revised to 10/15) and the plans
submitted with the a0plication originally are as follows: An overall
c-ncept plan showing the new phasing has been attached; they have furn-
ished area calculations for detention basins; temporary stockpile
site have been provided; pavement widths are shown on the topographic
maps; and, the hedgetlow and barn in the area of Lots 37 and 38 are
clarified. Mr. DeMallie concluded by stating the plans are now
complete and no furtH6 r changes are required.
Town Engineer, Rick Martel, reported that the revised plans corrected
the following items : i Sheet #11 now shows a piece of drainage pipe
that was missing; a latch basin was added to the northwest corner
of lot #43. Mr. Martel said the grade shown on the plans is greater
than the 3% requirediby the subdivision regulations at the intersection
of Debbie/Newmarker. I That will be addressed with Phase VI. He said
he recommends that tl�e Fire Marshal approved the configuration of the
phasing. Phase III requires the abandonment of a portion of Newmarker
Road, and he referred to a letter written to Attorney Rittenband which
gives the procedure for the abandonment, and the maps have been prepared
by the applicant. The sanitary sewer which is supposed to extend from
Phase III of this subdivision to the north to the Lavitt subdivision,
is somewhat in question is somewhat in question. It is not a major
problem, and Mr. Markel said he thinks it can be worked out. The
drainage that is beiniig proposed for Sections II and III will also handle
drainage from Mr. Lav'itt' s subdivision. The original detention
basin which had been planned for the Lavitt subdivision was in a heavily
wooded area, and it plow looks like this area will be saved.
Mr. Martel noted that further to the north in Ellington the watershed
that will be coming down to these detention basins covers approximately
40 to 60 acre more. He contacted Lombardi Associates who acts as
consultants for Ellington, and they do not have a policy regarding
drainage and how it relates to development. He said he would like
to ask the Commission to write to the PZC in Ellington to determine
their policy of further development in this watershed area. Development
of this area could have a significant impact downstream and it does
drain just about due south.
Planning & Zoning Commission -6- 11/19/85
Mr. Martel said the Engineering Department has been in contact
with Vernon regarding the realignment of Newmarker, and the only
comment they had was that the pavement that is to be replaced be
replaced up to the manhole which had been excavated. Mr. Martel
said he has bond estimates ready to submit at the work session on
this application.
Mr. Gilligan asked if anyone in the audience wished to speak in
favor of the application, and no one did. Mr. Roger Hildebrand
said he is concerned with the safety problem at the intersection
of Debbie and Dart Hill Road. He said he lives near this development
and it is impossible to see anything to the left coming out of
Debbie onto Dart Hill. He said relocating the trailer might help.
Mr. Gilligan asked Mr. Martel if it is permitted to park construction
trailers. Mr. Martel said yes, but he will check to see if it is
blocking the sightline, and report back to the Commission next week.
Mr. Roggi explained that the applicant intends to move the trailer
in a couple of weeks. Mr. Gilligan said it sounds like it is a
hazard and Commissioners Klenke and Sorenson suggested that tomorrow
might be a good day to move it.
Commissioner Rossi asked if there was any way the 3% grade on
Newmarker could be done prior to Phase VI. Mr. Clock replied that
the existing condition is only temporary, until Phase VI is
constructed. At that time Newmarker Road will be reconstructed
and the grade will be lowered 18" or so. When that grade is dropped
the 3% will be achieved. Mrs. Rossi asked if they objected to doing
the work at this time. Mr. Clock said they would have to extend the
limits of construction beyond a few hundred feet quite a ways.
Mrs. Montana asked if Debbie Drive would be coming onto Newmarker
with the next phase. Mr. Clock said it will come onto to Newmarker
with Phase II. Mrs. Montana said the Commission is concerned with
Newmarker Road and has refused to accept it as a Town road, and
people will be exiting onto Dart Hill from Newmarker, and eventually
people will come from the subdivision in Ellington onto Grant and then
to Newmarker. She said she is disturbed with the timing. Mr. Clock
said he spoke to Mr. Jacques just a minute ago, and if the Commission
prefers they won' t connect to Newmarker and will just put in a
temporary cul-de-sac. He noted that they are proposing a temporary
cul-de-sac at the end of Lisa Drive where it will eventually connect to
Grant Road.
Mr. Sorenson asked how far along they are on Phase I. Mr. Clock
replied that there are 14 under construction, and other lots have
been sold. They are about 50% along in the construction of houses,
and 75% sold. Mr. Sorenson asked how many houses are actually
completed, and Mr. Jacques said 10.
Chairman Gilligan confirmed that the applicant does not intend to
connect to Grant Road, and that Lisa Drive will be cul-de-sacced.
Debbie Drive will not be connected to Newmarker Road, and the paving
of Debbie will end at Lot 55. Mr. Clock said that is correct.
�4"M M "44
-TO WI-L 0./-? Saudi vt�ld�
1�
G �
� u
6 1�40 SULLIVAN AVENUE - SOUTH WINDSOR. CONN. 06074
SOR-cO��,� AREA CODE 203/644-2511
December 6 , 1985
yl
Mr. Edwin Lavitt, Chairman
Planning & Zoning Coltimlission
Town of Ellington ;
26 Upper Butcher Road
Rockville, Ct. 06066
Dear Mr. Lavitt:
Recently a considerable amount of development has been proposed
in the northern section of South Windsor, along the South Windsor/
Ellington town-line. The Mountainview Estates subdivision in
South Windsor will eventually contain about 175 homes , and
another subdivision is proposed for the Lavitt property off
Grant Road, in both South Windsor and Ellington. In addition,
there is more land in Ellington which is part of the same
watershed.
Our Town Engineer has requested that we contact you in order to
determine your policy regarding any increase in run-off due to
development in this watershed. Our policy has been to ensure
a zero increase in run-off. We would like to continue to preserve
the health, safety and general welfare of residents in this area.
We look forward to hearing from you regarding your Town' s policy.
Yours very truly,
PLANNING & ZONING COMMISSION
vg By:
Robert F. Gilligan, Ch irman
CC: Richard Martel , ,Town Engineer
P. DeMallie, Planning Director .,
SOUTH 'VWINDSOR INLAND WEl'LANDS'AGENCY/CONSERVATION COMMISSION �
f`
Monday, December 9, 1985 MINUTES - Regular Meeting Meeting R B'I
Meeting Called To Order at 7:30 p.m.
1. Roll Call - Members Present: J. Flynn (alternate) , J. O'Sullivran, B. Warren, 710
K. Rennie, J. Goodwin (alternate)', J. Moran, 14,17 r/er.�,
D. Lanza, S. Moynihan.
Also Present:' A.B. Davies, Deputy Town Engineer; M. Banach,
Asst. Planner; see also presentations.
2. Public Participation - None.
3. Acceptance of Minutes: .on by B. Warren to accept minutes of October 21, 1985
presented. Seconded by Flynn, unanimously carried.
tion by B. Warren to accept minutes of November 18, 1985,
presented. Seconded by Rennie, unanimously carried.
4. Correspondence and Communications:
1. Letter dated December 3, 1985 from Town Council appointing Jane Goodwin
as an alternate - tern to expire December 1, 1987.
2. Three letters fram,,Calvin Lane:
a. Letter date December 9, 1985, enclosing a check for $53.56,
the balance of the Wildlife Sanctuary account - check to be
forwardedto Frank Neiderwerfer.
b. Letter dated December 9, 1985, submitting resignation from
IWA/CC effective January 9, 1986 or when new member is appointed.
c. Letter date December 9, 1985, declining Town Council's reappoint-
ment to Co River Assembly.
3. Letter dated Dec;;r 3, 1985 from Ucello & Ireland requesting extension
of Permit #306 - B idlewood Estates.
5. South Ridge Estates - Pl! ¢E Ridge Condos.
Atty. John Casey; Chri Stone & Stephanie Fuss of Fuss & O'Neill were present.
Atty. Casey and Chris Stoie presented a grading plan for the CL&P right of way
slope and told the Commis ion about stabilization which has been done on the
slopes and on border are . Atty. Casey indicated that he thinks the site is
presentable. Chris Stonelsaid that CL&P has approved their grading plan, and
that some 733 juniper bus es have been planted.
Mr. Moran noted that e CUP slope has been improved but type rest of the site
remains ravaged - the sit
fence is partly down, there is still water flow and
erosion, same hay bales a missing, etc. These conditions have existed since
summer, and there hasn't been any improvement except for the CL&P slope. Mr. Davies
said that the developer hLs not done loaming & seeding as required in the approved
plans, and has also disturbed large areas of earth rather than following excavation
plan prepared by Fuss & O'Neill in the summer. Mr. Davies asked for a copy of the
CL&P approval for the modified excavation plan. He also noted that no improvements
have been made to the t 's detention basin, which was supposed to be the first
thing done. There is a $ 0,000 bond posted to ensure compliance.
6. Discussion of Pending lications
I
SOUM WINDSOR INLAND WEIZANDS AGENCY/CONSERVATION COMMI SS ION
Monday, December 9, 1985
Page 2.
a. Application #343 - A Terlizzi
Motion by Lanza to deny without prejudice Application #343 because of the
large amount of wetlands affected and unanswered drainage questions. Seconded
by Mr. Moynihan, carried unanimously.
b. Application #362 - Alexandra Development Corp.
Mr. Frank Mercede, MJM Realty, represented new owners of the property. The
conservation easement is in place, and previously required conservation measures
have been done. Mr. Davies indicated he is satisifed with the proposal, and
asked Mr. Mercede for correspondence identifying the realty company and the new
owner. Motion to approve with a $5000 bond and same conditions as original
approval was made by Mr. Lanza, seconded by Mrs. Warren, and carried unanimously.
c. Application #329 - Morgan Farms
Mr. Moran has letters from SCS and fram Mr. Davies regarding this site. The
developers would like to put all roadways in simultaneously but said he would not
object to 3 phases of about 20 lots per phase. Mr. Davies commented that the
developer has not produced any documentation showing rights or ownership for the
adjoining property to the north where he plans to build a cul-de-sac. Mr. Moran
indicated that the applicant had been asked to produce such documentation. Motion
made by Mr. Lanza to deny without prejudice Application #329 because applicant
hasn't shown title or rights to all land required for requested improvements (cul-
de-sac) . Seconded by Mr. Rennie. Voting in favor: O'Sullivan, Warren, Rennie,
Goodwin, Moran, Lanza, Moynihan. Opposed: Flynn. Motion carried.
d. Application #353 - East Hartford Welding
Chris Stone of Fuss & O'Neill was present. Applicant has made a few changes to
the plan - the driveway will now be a town mad and built to town road specifications;
and sore drainage will be slightly rearranged to provide greater separating distance
from the septic system. Mr. Stone said that East Hartford has agreed to accept
drainage of the southern portion of the site onto Burnham Street. Mr. Davies re-
quested correspondence to confirm from the East Hartford town engineer and a note on
the plans. Mr. Davies also noted that a drainage channel to the rear of the site
must be regraded as needed to the west. The plans should have a stump dump addressed
on then, plus a note addressing site stabilization outside prime seeding dates.
Mr. Rennie made a motion to approve Application #353 with conditions that (1) all
above modifications be noted on final plans, and (2) a bond of $5,000 be posted.
Seconded by Mr. Lanza, carried unanimously.
e. Application #356, #357 - Dart Hill Realty - Mountainview Estates Sections II, III
Mr. Davies said that applicant has done a good job on Section I. Motion made by
Mr. Moynihan to approve Section II in its entirety and to approve Section III road
network and detention basin, with a $25,000 bond and with the conditions that (1)
they pay careful attention to erosion and sediment control for the oncoming winter,
(2) construction limit of 60 feet for roads and (3) same conditions as approval of
Section I. Seconded by Mrs. Warren, and carried unanimously.
Planning & Zoning Commission -3- 1/21/86
I
They have been disrupted, and are not maintained.
Mr. Wentzel said he would like to mention that this area is
wet, even during the airy season and even building on a slab will
create problems without a great deal of filling. He pointed out
that traffic is also very heavy during rush hours , and this is a
direct route from Route 5 to Route 30 .
Mr. Lucek said they c�uld not afford to develop this ]little piece
of property if they h d to put in 2, 000 feet of pipe. When the
land to the west is d' veloped the Town Engineer will request
drainage pipes and until then this system will work.
2. Application of Cla k Realty, Inc. for approval of 12 lots in
Section 1 of Pleas nt Valley Homes II, an Open Space Resubdivision
in an A-20 zone, b ing lots 9 , 10, 12, 13, 19 , 20 , '21, 22, 23,
24 , 25, and 26, to ated on Stanley and Sally drives, west of
Clark Street.
Attorney Raymond G. L�Foll, of Rocky Hill,was present on behalf of
the applicant. He ex lained that this was previously 'approved, but
the plans were not fi ed within the 90 day period required by law.
He is asking for the ame approval, except for Lot 11 which was not
approved by the Inlan� Wetlands Agency/Conservation Commission.
He asked the Commission to take notice of all prior information
and testimony. }
Mr. DeMallie said all1his previous comments still apply and he has
no further comments e cept to note that the plans should indicate
57 lots will be in th s subdivision, rather than 58 . Mr. Martel
said he has nothing t add.
Commissioner Hallowel questioned whether everything in the original
approvals has been co plied with, and Mr. LeFoll said yes, to the
best of his knowledgeland belief.
Mrs. Klenke noted that Lot #11, which was not approved by IWA/CC, is
supposed to be part o the area of the conservation easement, and
asked if this is show on the plans, and whether the conservation
easement has been sub fitted. Mr. LeFoll said that once they give
up on Lot 11 that is the end of it for all times if they give the
Town the Conservation ' easement. He said he doesn' t think IWA/CC had
the right to require an easement, and they should have just denied
the lot. Mr. Sorenson said that Mr. LeFoll is saying that they
will not comply with a condition of approval..
There being no furthe� comments the public hearing was closed.
I
. I
I
Planning & Zoning Commission -4- 1/21/86
SPECIAL MEETING
Call to Order
New Business
1. Pleasant Valley Homes II, Section 1
After a lengthy discussion concerning the submitting of the
Conservation Easement for the area of Lot 11, the Commissioners
concurred that it must be submitted since it is a condition of approval,
even if Mr. LeFoll hoped to return to IWA/CC at some future date to
try to secure approval of Lot 11.
Arrangements were made for the signing of the mylars so that they
could be filed immediately in order to permit closings, which had
been held up for a few weeks, to be held.
Mr. Hallowell made a motion to approve Lots 9 , 10, 12, 13, 19 , 20 , 21,
22, 23, 24, 25 and 26 in Section I of Pleasant Valley Homes II, as
shown on plans prepared by Reino E. Hyyppa & Associates, dated
6-3-85, revised to 12-10-85, Map No. 43-80-1H, subject to the
following modifications :
1. All the conditions of approval contained in the approval
letter dated June 25, 1985 are made a part of this approval,
and will remain in full force and effect.
4
2 . The key map shall be corrected to indicate 57 lots, rather
than 58 lots.
Within 90 days, black and white transparent mylars of Sheets
#1, #2, #3 and #4, together with three paper prints, with all
the letters of approval of this Commission as well as the
Inland Wetlands Agency/Conservation Commission reproduced thereon,
must be submitted to this Commission to be stamped and signed.
Mrs. Rossi - tic""onded the mQtio and it was unanimously voted in favor
and,-s"o or'd- ered.
2. App. #1111 - Dart Hill R It , Inc. , Mountainview Estates,
Sections 2 and 3
e Commissioners.r- called that the question of road improvements was
brou -uF��' the public hearing. Mr. DeMallie suggested a phasing
sequence for road improvements, and Mrs. Montana said there would
still be a gap in time and people would be occupying the homes before
the roads were improved. Mrs. Klenke asked which was most critical -
Newmarker or Dart Hill Road. Mr. Sorenson said his personal feeling
is that Newmarker is more important. Mr. Hallowell said the real
problem is Dart Hill because of the traffic. This development will
compound a problem which exists.
Mr. Hallowell asked the Town Engineer if drainage will be improved
and Mr. Martel said yes, they are also working on this in connecti�•
with Partridge Meadow. Mrs. Klenke recalled that the Commission
Planning & Zoning Commission -5- 1/21/86
contacted Ellington re�arding drainage, and Mr. Martel said yes,
he had received a call from them. They will use the name policy
that South Windsor is sing - zero run-off. Referring to Newmarker Road,
Mr. Martel said the To n Council will have to vote to abandon it.
After further discussi n, Mrs. Rossi made a motion to approve
the above application or Section 2, as shown on plans prepared by
Reino E. Hyyppa & Associates , dated 8-1-85 , revised to 10-16-85 ,
consisting of 14 pages; and Section 3, as shown on plans prepared by
Reino E. Hyyppa & Asso sates, dated 8-23-85, consisting of 8 pages,
subject to the followi g modifications :
1. This approval is f�r Lots 29 through and including Lot 60
in Section 2; and or Lots 61 through and including 93 in
Section 3.
No building permit will be issued for Section 3 until at
least two-thirds ( /3) of the building permits for Section 2
have been issued.
2. As part of Section 2, the intersection of Dart Hill Road and
Newmarker Road mus be reconstructed and realigned, subject to
the Town Engineer' approval.
As part of Section�, 3, the portion of Dart Hill Road abutting
the subdivision mint be reconstructed and improved, subject to
the Town Engineer' o approval.
The above road improvements must be completed prior to receiving
an approval from tIis Commission for S�ction 4, or by September
30 , 1986 , whicheve date is first.
3. The Planning & Zon ng Commission recommends that the Town
Council abandon or' discontinue a portion of Newmarker Road,
as shown on a map prepared by Reino E. Hyyppa & Associates , dated
7-19-85, Map No. 1P0-83-6.
The mylars for Sec ion 3 will not be filed, and no building permits
will be issued, un�il the Town Council has taken action to
abandon and/or dispontinue that portion of Newmarker Road.
4 . All deeds for the roads, open space and easements, must be
submitted to this -"mission prior to filing the final plans. —
They must be in acllordance with this Commission' s policy
for accepting deed (attached) , and must be approved by the
Town' s Engineering ,Department and Town Attorney. The deeds
for the roads and Zdivision
n space will be held in escrow', until
completion of the and then referred to the Town
Council for acceptance.
5 . Concrete sidewalks, built to Town specifications, $hall be
installed on both ides of the interior streets.
6 . Water shall be supplied to this subdivision by the Connecti-
cut Water Company. ;
Planning & Zoning Commission -6- 1/21/86
7. All lots must be connected to the sanitary sewer system,
and are subject to the approval of the Water Pollution Control
Authority.
8. Street lighting shall be installed in accordance with the policy
established by the Town Manager (see attached) .
I
9. Street names and locations of fire hydrants are subject to the
approval of the Fire Marshal of the Tpwn of South Windsor.
Street names and supporting posts shall be installed by the
developer in conformance with the standards of the Town of
South Windsor, at no expense to the Town.
10 . A liability insurance policy shall be submitted to this Commis-
sion naming the Town of South Windsor as an insured, with a
combined single limit for bodily injury and/or property damage
in the amount of $1, 000 , 000.
11. A drainage assessment fee in the amount of $1, 600 for Section 2,
and $1, 650 for Section 3 , shall be submitted to this Commission.
12. The following bonds must be submitted prior to filing the final
plans :
Section 2 - $460, 000 to ensure completion of subdivision improvements;
$40 , 000 to ensure completion of improvements to the
intersection of Dart Hill and Newmarker Roads
Section 3 - Quantity estimates must bi submitted to the Town
Engineer for the purpose of determing bonding for
the subdivision improvements and road improvements
The Commission voted to accept a Letter of Credit, subject to
the approval of the Town Attorney, for a one year term, in lieu
of a surety bond. Said Letter of Credit must be renewed on a
yearly basis until completion of the development. If a new
Letter of Credit has not been received within 30 days before
the expiration date, the Commission may, at its option, call the
Letter of Credit it is holding.
13. This approval is subject to the conditions of approval of the
Inland Wetlands Agency/Conservation Commission.
14. If, for any reason, finished grading and other site work is not
completed, the Town Engineer shall determine the amount of a cash
bond to ensure final grading and site work. This cash bond
must be submitted prior to issuance of a Certificate of Occupancy.
15. Footing drains will be required for each house. Prior to the
building of any structure on a lot, a topographic map, drawn
to a scale of 1" = 401 , shall be submitted for each lot in the
subdivision, showing proposed contours, elevations and the
location of the footing drains. No building permits will be
issued until the proposed contours, floor elevations and location
of footing drains have been approved by the Town Engineer.
Planning & Zoning Commission -7- 1/21/86
16 . Drainage for this subdivision is subject to the approval of the
Town Engineer.
17 . Prior to commencement of site work, a meeting must be held with
Town Staff.
18. No building perm�ts will be issued until all the conditions of
approval have bean complied with, and the final plans have
been filed in the Office of the Town Clerk.
Within 90 days (by Ap*il 21, 1986) black and white transparent mylars I
of Sheets 1 through 4for Section 2; and Sheets 1 through 5 for
Section 3, must be smitted to this Commission to be stamped and signed.
Three blueprint copie$ of the entire set of plans mush also be sub-
mitted. The letters 4f approval of this Commission, as well as the
Inland Wetlands Agency/Conservation Commission, must be reproduced
on the mylars . After ! signing, the mylars will be filed in the Town
Clerk ' s Office.
Mrs. Klenke seconded the motion and it was unanimously voted in
favor and so ordered.
3. App. #1047 - Bridle Wood Estates
Mr. Paul Uccello was resent to request permission to proceed
with roads in Phase I�. Mrs . Montana asked how thing's were going
and Mr. Martel said h has had no problems with Phase I . THe
residents have not cop lained and the drai'n`age pipe has been extended
to the rear. He noted the subdivision hr gone along smoothly.
Mr. DeMallie said he has not received any complaints .'
Mr. Hallowell asked a�out the clogged pipe that was Mentioned at the
public hearing and Mi. Martel said everything has been corrected.
Mr. Uccello said he has done all the filling that was required
with the exception of, some filling on lots. He noted, that these
homes are being custom built - in the $200 , 000 or higher range -
and they estimate this will be a 2h year project. People are coming
to him with their plans, and he builds to their specifications.
Mrs. Klenke made, a motion to permit Uccello & Ireland' to proceed i
with road work in Phase II of Bridle Wood. Mrs. Rossi seconded the
motion and it was unanimously voted in favor and so ordered.
4. App ' #1103 - B1ue� Spruce Estates (Creative Development Corp. )
Mr. Schick of Creativ Development was present, and referred to
a letter from Chief R;an concerning the sightline. Mrs. Montana
noted that the letter said in part " . . . . the entire proposal does
not meet all the idealistic engineering standards that would eliminate
any questions , but the area from a standpoint of public safety
is acceptable. As the Town' s traffic authority, I would required
the proper posting of warning signs in both directions to advise
motorists on Mill Road of the intersection, as well as double line
the roadway through the intersection, for the prescribed measurement
to create a no passing zone. "
Planning & Zoning Commission -8- 1/21/86
r
Mr. Martel reported that looking west from the subdivision it is
about 4801 , and minimum requirements call for 4101 . To the east
sightline is 600 to 700 ' and again the requirement is 4001 . Mr. Martel
said originally staff was standing in the wrong place, but the land
has now been surveyed and it is okay. The Commissioners concurred
that item #2 of the approval letter requiring the applicant to
return to the Commission and address the sightline has been complied
with.
5. App. #1126 - Arne Dalene - Resubdivision
The Commissioners reviewed the resubdivision plan which had been
presented at the public hearing. It was noted that drainage will
be addressed by McDonald' s when the site plan application is submitted.
Mr. Sorenson made a motion to approve the above application for
a resubdivision of property located on the west side of John Fitch
Boulevard, south of Mascolo Road, as shown on a plan prepared by
Mervyn F. Strauss, L. S. , dated Nov. 12 , 1985 , in a GC zone, subject
to the following modifications :
1. The abutters on Lots #2 and #3 should be indicated.
2. A front yard must be shown along the south side of the lot
along the future street, and side yards must be indicated.
3 . The existing utility pole and small building must be shown on
the plans. `
4 . Prior to submission of a resubidilision application for addi-
tional building lots , a conceptual plan indicating streets ,
drainage and lot configurations , must be submitted to this
Commission.
5. Iron pins must be shown on all corners.
6 . The direction of sanitary and storm water flow should be indi-
cated on the key map.
7. The mylar must be signed by both surveyors prior to filing
same in the Town Clerk' s Office.
8. A drainage assessment fee in the amount of $50 must be sub-
mitted to this Commission.
Within 90 days of the date of approval (by April 21st) , a black and
white mylar, with the letter of approval reproduced thereon, together
with three paper prints, must be submitted to this Commission. After
signing and stamping same, the mylar will be filed in the Town Clerk' s
Office.
Mrs. Klenke seconded the motion and it was unanimously voted in favor
and so ordered.
Mr. Hallowell moved the meeting be adjourned at 10 : 45 P . M. , seconded
by Mr. Sorenson and unanimously voted in favor.
APPROVED: Res ctfully submaittedi
Virgin a S
Recording Secretary
�4�wN Sf+`
r "
,a U
� , 0 �
1540 SULLIVAN AVENUE . SOUTH WINDSOR. CONN. 06074
soR•c0� AREA CODE 203/644-2511
TO BE PUBLISHED IN TSE JOURNAL INQUIRER SATURDAY, JANUARY 25, 1986
LEGAL NOTICE
TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
At the January 21, 1986 meeting, the Planning and Zoning Commission
voted to take the following action:
1. Approve, with modifications, the application of Clark Realty,
Inc. , for 12 lots in Section I of Pleasant Valley Homes II ,
an Open Space Resubdivision in an A-20 zone, being Lots 9 , 10 ,
12, 13, 19 , 20, 32 , 22, 23, 24 , 25 and 26 , located on
Stanley and Sally Drives, west of Clark Street.
2 . Approve, with modifications, the application of Dart Hill
Realty, Inc. for Phase II of Mountainview Estates, consisting of
32 lots, and Phase III consisting of 33 lots, located on the
north side of Dart Hill Road, west of Newmarker Road and the
South Windsor/Vernon town line, A-30 zone.
3. Approve, with modifications, the application of Arne Dalene
for a resubdivision of 13. 46 acres into one lot and Parcel A,
for property located on the west side of John Fitch Boulevard,
south of Mascolo Road, as shown on a plan prepared by
Mervyn F. Strauss, L. S. , dated Nov. 12 , 1985 , in a GC zone.
Dated at South Windsor, Connecticut this 22nd day of January, 1986 .
PLANNING & ZONING COMMISSION
Marshall Montana, Vice-Chairman
David H. Sorenson, Secretary
�40MM at,`�
CO)
7-aw n 0-ie slcw
m ` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, COiNN. 06074
►oSOR,co AREA CODE 203/644-2511
January 27, 1986
Mr. Richard J. Sartor, Town Manager
Town of South Windsor
South Windsor, Ct. 06074
Dear Sir:
J
Re: Abandonment or Discontinuance of
Portion oft/Newmarker Road ,0/,f',
Please be advised that the Planning and Zoning Commission voted
on January 21st to recommend to the Town Council that a portion
of Newmarker Road, as shown on a map prepared by Reino E. Hyyppa &
Associates, dated 7-19-85, Map No. 180-83-6, be abandoned or
discontinued. This was done in connection with the approval of
Phase III of Mountainview Estates . Before the developer will be
permitted to file the mylars and secure building permits for
Phase III, the Town Council must act on this matter.
Would you please take whatever steps are required to secure
Council action?
Yours very truly,
PLANNING & ZONING COMMISSION
vg By. /(uz ;L
enc. .Marshall Montana, Vice-Chairma
CC: Richard M. Rittenband, Esq.
Richard Martel, Town Engineer
Raymond LeFoll, Esq.
Peter DeMallie, Planning Director
LEFOLL G ROGGI
ATTORNEYS AT LAW
2307 SILAS DEANE HIGHWAY
ROCKY HILL, CONNECTICUT 06067
MMOND G. LEFOLL TELEPHONE
CURTIS H.ROGGI (203)563-2355
January 27, 1986
South Windsor Planning & Zoning Commission
South Windsor Town Hall
South Windsor, CT
Re: Bond Reduction - Mountainview Estates - Sections I, II and III
Dear Commissioners:
Please be advised that this office represents Dart Hill Realty, Inc. ,
owner and developer of Mountainview Estates. The developer has completed a
substantial number of improvements within this subdivision including roads,
sewers and drainage. Please consider this to be a formal request for a
substantial bond reduction within this subdivision.
If you are in need of any further information please do not hesitate
to write or call.
Very T ly Yours,
r
R o
RGL/gy
A
40JIM se"
Wn Ole S-a� ?dbll�
s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
mac,
SOR-CO AREA CODE 203/644-2511
January 28 , 1986
Dart Hill Realty, Inc.
658 Ellington Road
South Windsor, Ct. 06074
Dear Sir:
At its December 9 , 1985 meeting, the Inland Wetlands Agency/
Conservation Commission approved with conditions your Application
No. 356 and 357 , for Mbuntainview Estates Phases II and III . The
permit is based on the plans prepared by Reino Hyyppa & Assoc . ,
dated August 23 , 1985, revised October 16, 1985 , sheets 1-14 of
14 , entitled "Mountainyiew Estates Section 2" and "Motrltainview
Estates Section 3 . "
The following conditions must be adhered to for this permit to be
valid:
1. Construction activities shall be subject to the
approval of the Town Engineer.
2 . The application shall indemnify and hold harmless the
Town of South Windsor.
3 . The permit is valid for one year and shall expire 1/27/87 .
4 . Special attention must be paid to wintertime erosion and
sediment control.
5. Construction limit of 60 feet for roads .
6. All conditions of approval for Phase I are incorporated
as conditions of approval for Phases II and III by
reference to the approval letter for Phase I dated 6/17/85 .
Very truly yours ,
JON M. Moran, Jr. , Chair�nian
In d Wetlands Agency/
Cons vation Commission
JMM/j v
CC: A. B. Davies, Deputy Town Engineer
M. Burger, Town Clerk
} Sartor, Town Manager
,/R. Gilligan, Chairman, PZC
I
C � ��//}may J��.(/� /y.�/� /�
C / V Q.[// L V/ S_V� W
4 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CoNN. 06074
~�soR•CO AREA CODE 203/644-2511
January 28 , 1986
Raymond G. LeFoll, Esq.
2307 Silas Deane Highway
Rocky Hill, Ct. 06067
Dear Sir:
Re: App. #1111 - Dart Hill Realty, Inc.
Mountainview Estates, Sections 2 and 3
Please be advised that the Planning & Zoning Commission voted to
approve the above application for Section 2, as shown on plans
prepared by Reino E. Hyyppa & Associates , dated 8-1-85, revised
to 10-16-85, consisting of 14 pages; and Section 3 , as shown on
plans prepared by Reino E. Hyyppa & Associates, dated 8-23-85,
consisting of 8 pages, subject to the following modifications:
1. This approval is for Lots 29 through and including Lot 60
in Section 2; and for Lots 61 through and including 93 in
Section 3.
No building permits will be issued for Section 3 until at
least two-thirds (2/3) of the building permits for Section 2
have been issued.
2. As part of Section 2, the intersection of Dart Hill Road and
Newmarker Road must be reconstructed and realigned, subject to
the Town Engineer' s approval.
As part of Section 3, the portion of Dart Hill Road abutting
the subdivision must be reconstructed and improved, subject to
the Town Engineer' s approval.
The above road improvements must be completed prior to receiving
an approval from this Commission for Section 4, or by September
30, 1986, whichever date is first.
3. The •Planning .& Zoning Commission recommends that the Town
Council abandon or discontinue a portion of Newmarker Road,
as shown on a map prepared by Reino E. Hyyppa & Associates, dated
7-19-85, Map No. 180-83-6.
The mylars for Section 3 will not be -filed, and no building permits
will be issued, until the Town Council has taken action to
abandon and/or discontinue that portion of Newmarker Road.
4 . All deeds for the roads, open space and easements, must be
submitted to this Commission prior to filing the final plans.
Raymond G. LeFoll, Esq. -2- 1/28/86
They must be in accordance with this Commission' s policy
for accepting deeds (attached) , and must be approved by the
Town' s Engineering Department and Town Attorney. The deeds
for the roads and open space will be held in escrow until
completion of the subdivision and then referred to the Town
Council for acceptance.
5. Concrete sidewalks, built to Town specifications, shall be
installed on both sides of the interior streets.
6 . Water shall be supplied to this subdivision by the Connecti-
cut Water Company.
7. All lots must be connected to the sanitary sewer system,
and are subject to the approval of the Water Pollution Control
Authority.
8. Street lighting shall be installed in accordance with the policy
established by the Town Manager (see attached) .
9. Street names and locations of fire hydrants are subject to the
approval of the Fire Marshal of the Town of South Windsor.
Street names and supporting posts shall be installed by the
developer in conformance with the standards of the Town of
South Windsor, at no expense to the Town.
10. A liability insurance policy shall be submitted to this Commis-
sion naming the Town of South Windsor as an insured, with a
combined single limit for bodily injury and/or property damage
in the amount of $1, 000, 000.
11. A drainage assessment fee in the amount of $1, 600 for Section 2,
and $1,650 for Section 3, shall be submitted to this Commission.
12. The following bonds must be submitted prior to filing the final
plans :
Section 2 - $460,000 to ensure completion of subdivision improvements;
$40,000 to ensure completion of improvements to the
intersection of Dart Hill and Newmarker Roads
Section 3 - Quantity estimates must be submitted to the Town
Engineer for the purpose of determing bonding for
the subdivision improvements and road improvements
The Commission voted to accept a Letter of Credit, subject to
the approval of the Town Attorney, for a one year term, in lieu
of a surety bond. Said Letter of Credit must be renewed on a
yearly basis until completion of the development. If a new
Letter of Credit has not been received within 30 days before
the expiration date, the Commission may, at its option, call the
Letter of Credit it is holding.
0075I °
SCHEDULE A
Resolution to Discontinue a Portion of Newmarker Road
BE IT RESOLVED that the South Windsor Town Council hereby
discontinues the following portion of Newmarker Road within the
Town of South Windsor :
That portion of Newmarker Road shown with hatch marks and
extending northerly to the South Windsor/ Ellington Town Line on a
map entitled : "DISCONTINUANCE OF A PORTION OF NEWMARYER ROAD , SOUTH
WINDSOR , CONY . REINO E . HYYPPA & ASSOCIATES CIVIL ENGINEERS & LAND
SURVEYORS , GLASTONBURY , CONN . SCALE 1 " = 100 ' DATE 7-19-85 MAP NO .
180-83-6 REV . 2-4-86" to be filed in the South Windsor Town Clerk ' s
Office .
Discontinuance shall take effect upon the posting of the bonds
for public improvements as required in the approval of Phase III of
Kountainview Estates subdivision by the Planning and Zoning
Commission on January 1-7 , 1986 .
1
Raymond G. LeFoll, Esq. -3- 1/28/86
13. This approval is subject to the conditions of approval of the
Inland Wetlands Agency/Conservation Commission.
14. If, for any reason, finished grading and other site work is not
completed, the Town Engineer shall determine the amount of a cash
bond to ensure final grading and site work. This cash bond
must be submitted prior to issuance of a Certificate of Occupancy.
15. Footing drains will be required for each house. Prior to the
building of any structure on a lot, a topographic map, drawn
to a scale of 1" = 401 , shall be submitted for each lot in the
subdivision, showing proposed contours, elevations and the
location of the footing drains . No building permits will be
issued until the proposed contours, floor elevations and location
of footing drains have been approved by the Town Engineer.
16. Drainage for this subdivision is subject to the approval of the
Town Engineer.
17. Prior to commencement of site work, a meeting mast be held with
Town Staff.
18. No building permits will be issued until all the conditions of
approval have been complied with, and the final plans have
been filed in the Office of the Town Clerk.
Within 90 days (by April 21, 1986) black and white transparent mylars
of Sheets 1 through 9 for Section 2; and Sheets 1 through 5 for
Section 3, must be submitted to this Commission to be stamped and signed.
Three blueprint copies of the entire set of plans must also be sub-
mitted. The letters of approval of this Commission, as well as the
Inland Wetlands Agency/Conservation Commission, must be reproduced
on the mylars. After signing, the mylars will be filed in the Town
Clerk's Office.
Yours very truly,
PLANNING AND ZONING COMMISSION
vg By-
enc. Marshall Montana, Vice-Chairma
CC: Richard J. Sartor, Town Manager
Richard Rittenband, Town Attorney
Richard Martel, Town Engineer
Thomas D'Auria, Building Official
Edward Belleville, Assessor
Peter DeMallie, Planning Director
Inland Wetlands Agency/Conservation Commission
Water Pollution Control Authority
Reino Hyyppa & Associates
10W N Sf4
y D ��n- C-/ sicw� 7&1�
O 9 (1 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
4•
SOR•Co AREA CODE 203/644-2511
February 11 , 1986
Mr . Robert Gilligan, Chairman
Planning and Zoning Commission
Town of South Windsor
South Windsor, Connecticut
Dear Mr . Gilligan :
At a Special Meeting of the South Windsor Town Council , held
February 10, 1986, the following Resolution was approved :
BE IT RESOLVED that the South Windsor Town Council hereby
refers to the South Windsor Planning and Zoning Commission,
for a report , under Sec . 8-24 of the General Statutes , the
proposal to discontinue a portion of Newmarker Road
contained in a Resolution shown on Schedule A attached
hereto .
Sincerely,
Ja
Patricia R. Brown 1��0
Acting Clerk of the Council
prb Planning & Zoniii �Gniilli$SIOf►
cc : Richard J. Sartor, Town Manager
Robert Arsenault, Public Works Director
TOWN OF SOUTH WINDSOR
TOWN HALL
f"
SOUTH WINDSOR.CONN.06074
i
i
i
Town Treasurer
TO Town of South Windsor DATE 2/14/86
1540 Sullivan Avenue
i
South Windsor , Ct . 06074
L -I
SUBJECT: Drainage Assessment Fees - Planning and Zoning Commission
)LD-
Enclosed is a check in the amount of $ 1600. which is
the drainage assessment fee collected for Application No . 11ll ,
Mountainview, Phase II
Please deposit it in the proper account . Thank you.
By Virginia Gr ' ne
MISSION
-44
1 { EM THIS CHECK WHEN PAID IS ACCEPTED _ .' 4,•1
•,�I�!• .•ifl - I 9•1 I I, .I BY ENDDMSEM -,
AS FULL PAYMEM OF THE FOLLOWING
TIDN AMouNT I I q
TRUC DATE �-F
:J.M.J:`� CONS I. i
CO. INC:
658 ELLINGTON ROAD ,. S�GT��, ,zz: 5 !
SOUTH,WINDSOR, CONNC, 06074
OLLARS _
CHECK NO.'
ACCTS.PAYABLE DISCOUNT CHECK AMOUNT
TO THE ORDER OF
ATE
1 M.J.CO TRUCTION CO.,INC-
II I,
�_.'AUTHORIZ D SIGNATURE
CON ECTICUT NATIONAL BANK
r. ii+
746�II■ ;, 1:0 L L90044�5 . i tI'-
10W N Sf4
7-01wn' 0-le Sou� 7&1�
�I
9 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
SOR•c0N AREA CODE 203/644-2511
February 25, 1986
Mr. Robert Gilligan, Chairman
Planning 4 Zoning Commission
South Windsor Town Hall
1540 Sullivan Avenue
South Windsor, CT 06074
Dear Mr. Gilligan:
At a Special Meeting of the South Windsor Town Council held February 10, 1986
the following Resolution was approved:
BE IT RESOLVED that the South Windsor Town Council hereby
refers to the South Windsor Planning and Zoning Commission
for a report under Sec. 8-24, of the General Statutes,
the proposal to discontinue a portion of Newmarker Road
contained in a Resolution shown on Schedule A attached
hereto.
Sincerely,
Eileen G. Jalet
Clerk of the Council
egj
r T-Omn O-PSlott& �
e
U
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
'►oSOg,CON`' AREA CODE 203/644-2511
February 26, 1986
Mr. Richard J. Sartor, Town Manager
Town of South Windsor
1540 Sullivan Avenue
South Windsor, Ct. 06074
Dear Sir:
Re: Referral under Section 8-24
Abandonment of portion of Newmarker Road
Please be advised that the Planning & Zoning Commission voted
on February 25, 1986, to recommend to the Town Council that the
portion of Newmarker Road, described on Schedule A attached
hereto, be abandoned or discontinued.
Yours very truly,
PLANNING & ZONING COMMISSION
vg By:
enc. Marshall Montana, Vice-Chairman
CC: Richard M. Riittenband, Esq.
Richard Martel, Town Engineer
Peter DeMallie, Planning Director
Raymond G. LeFoll, Esq.
I t
..M44,...W'.,.- ��'wwi
l
SCHEDULE A
Resolution to Discontinue a Portion of Newmarker, Road
BE IT RESOLVED that the South Windsor Town Council hereby
discontinues the following portion of Newmarker Road within the
Town of South Windsor :
That portion of Newmarker Road shown with hatch marks and
extending northerly to the South Windsor/Ellington To*n Line on a
map entitled : "DISCONTINUANCE OF A PORTION OF NEWMARK�ER ROAD , SOUTH
WINDSOR , CONN . REINO E . HYYPPA & ASSOCIATES CIVIL ENGINEERS & LAND
SURVEYORS , GLASTONBURY , CONN . SCALE 1 " = 100 ' DATE 7-19-85 MAP NO .
180-83-6 REV , 2-4-86" to be filed in the South Windsor Town Clerk ' s
Office .
Discontinuance shall take effect upon the posting of the bonds
for public impr-oveme,nts as required in the approval of Phase III of
Mountainview Estates subdivision by the Planning and Zoning
Commission on January 27 , 1986 .
I .
I�
�I
`4,
- �"l� '��'��F °'�'-*;' ;fir.,.: °°s:,.,, _ .�''1 ,_ `•;> .c'-`,.
LEFOLL F1 ROGGI
ATTORNEYS AT LAW
2307 SILAS DEANE HIGHWAY
ROCKY HILL, CONNECTICUT 06067
RAYMOND G. LEFOLL TELEPHONE
CURTIS H.ROGGI (203)563-2355
March 18, 1986
Robert Gilligan, Chairman
South Windsor Planning & Zoning Commission
South Windsor Town Hall
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Mountainview Estates Section III
Dear Mr. Gilligan:
Please be advised that this office represents Dart Hill Realty, Inc. , owner
and developer of Mountainview Estates. We are hereby requesting an extension
of time, for the period of ninety (90) days, for filing the ,final mylars for
Section III of the above referenced subdivision. We feel it is necessary for
us to have the ninety (90) day extension so as to meet all the requirements
and conditions of the Planning and Zoning approval of Section III.
If you are in need of any further information, please do not hesitate to
write or call. Thank you for your anticipated cooperation.
Very truly yours,
Curtis FR6
gci`
CHR/jas
01C
run o1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
AREA CODE 203/644-2511
March 31, 1986
Raymond G. LeFoll, Esq.
2307 Silas Deane Highway
Rocky Hill, Ct. 06067
Dear Ray:
Re: Mountainview Estates - Section 3
Please be advised that the Planning & Zoning Commission voted
to set the bond amount for the improvements to Dart Hill Road
at $20 , 000 . This bond, as well as the subdivision bond in the
amount of $275, 000, must be submitted to the Commission prior to
filing the mylars and issuance of building permits.
Yours very truly,
PLANT & ZONING COMMISSION
vg By: tc'/ ec, (rC-r
Robert F. 'Gilligan, C airman
CC: Mr. Jean Marc Jacques
THE CONNECTICUT BANK INTERNATIONAL DIVISION ONE CONSTITUTION PLAZA
C BT
AND TRUST COMPANY L/C DEPARTMENT HARTFORD,CONNECTICUT 06115
CABLE ADDRESS:CONNBANK
IRREVOCABLE LETTER OF CREDIT NO. 007490
TOWN OF SOUTH WINDSOR JUNE 16, 1986
SULLIVAN AVENUE
SOUTH WINDSOR, CT 06074
GENTLEMEN: j
C) WE HEREBY ESTABLISH OUR IRREVOCABLE LETTER OF CREDIT IN YOUR FAVOR FOR THE ACCOUNT OF
DART HILL REALTY, INC., 658 ELLINGTON ROAD, SOUTH WINDSOR, CT 06074 FOR AN AGGREGATE
AMOUNT OF TWO HUNDRED NINETY-FIVE THOUSAND U.S. DOLLARS CUS$295,000.00) AVAILABLE AT
SIGHT BY YOUR DRAFTS DRAWN ON THE CONNECTICUT BANK AND TRUST COMPANY, ACCOMPANIED BY
''Cs THE FOLLOWING DOCUMENTS:
O
O 1. ORIGINAL LETTER OF CREDIT.
2. BENEFICIARY'S STATEMENT PURPORTEDLY SIGNED BY AN AUTHORIZED OFFICIAL:
"DRAINAGE AND GRADING, SANITARY SEWERS, ROADS, PLANTINGS, HYDROSEEDING,
LOAMING AND IMPROVEMENTS TO DART HILL ROAD AND/OR ANY OTHER SUBDIVISION
IMPROVEMENTS OF SECTION III MOUNTAIN VIEW ESTATES AS DESCRIBED �,IN TOWN
OF SOUTH WINDSOR PLANNING-AND ZONING COMMISSION APPROVAL LETTER] DATED iy, r
JANUARY 28, 1986 HAVE NOT';BEEN COMPLETED". (STATEMENT TO CONTAIN ONLY
yam• THOSE CONDITIONS APPLICABLE. = r
f EACH DRAFT DRAWN- HEREUNDER MUST BEAR THE FOLLOWING CLAUSE "DRAWN UNDER THE CONNECTICUT
BANK AND TRUST COMPANY, IRREVOCABLE LETTER OF CREDIT NO. 007490 DATED JUNE 16, 1986".
WE ENGAGE WITH YOU THAT ALL DRAFTS DRAWN UNDER AND IN COMPLIANCE WITH THE TERMS OF THIS ;
LETTER OF CREDIT WILL BE DULY,HONORED UPON PRESENTATION TO US AT THE INTERNATIONAL, L/C
DEPT. A07Z, HARTFORD, CT 06115 ON OR,BEFORE JUNE 12, 1987 ON WHICH DATE THIS LETTER OF
CREDIT EXPIRES. .
EXCEPT SO FAR AS OTHERWISE EXPRESSLY STATED, THIS LETTER OF CREDIT IS SUBJECT TO THE
UNIFORM CUSTOMS (1983 REVISION, INTERNATIONAL CHAMBER OF COMMERCE PUBLICATION NO. 400. .
j. .,H
VERY TRULY YOURS,
AUTHORIZED IS GN RE
FORM NO.9-0244-10/80
Alemo from
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR. CONN. 06074
F
TO Richard M. Rittenband, Esq. DATE 6/30/86
1734 Ellington Road
So. Windsor, Ct. 06074
L
SUBJECT: Mountainview Estates, Section III
FOLD-
Attached is a Letter of Credit, drawn on CBT, in the amount of $295,000, which
was required by PZC in connection with the approval of Section III. Also
attached is a copy of the approval letter dated 1/28/86 and the letter
establishing the bond amount dated 3/31/86.
Please advise me if this Letter is in satisfactory form.
attach.
BY
Virginia Gran Sec.
PLANNING & ZO G COMMISSION
•
TOWN OF SOUTH WINDSOR
TOWN HALL
SOUTH WINDSOR. CONN. 06074
TO Town Treasurer DATE
Town of South Windsor 6/30/86
1540 Sullivan Avenue
South Windsor, Ct . 06074
L
SUBJECT: Drainage Assessment Fees - Planning and Zoning Commission
FOLD-
Enclosed is a check in the amount of $ 1,650.00 which is
the drainage assessment fee collected for Application No . 1111
Momtainview Estates, Section III
Please deposit it in the proper account . Thank you .
By Virginia Graney , Sec .
n r d>,t u T iur_"t_ __•,-- �M M I S S I O N
• _ m lT/0011SETAENT THIS CHECK WHEN PAID IS ACCEPTED 5 -57
AS FULL PAYMENT OF THE FOLLOWMG ACCOUNT 119
DATE MOUNT D
DART HILL REALTY,; INC'. 4 4 7
658 ELLINGTON ROAD
SOUTH WINDSOR, CT 06074
UMI650; Crs
,O,; DOLLARS
PAY
ATE TO THE ORDER OF _ CHECK NO. ACCTS.PAYABLE D1$COUNT CHECK AMOUNT
i
D T HILL REA Y, INC.
THE CONNECTICUT BANK AND TRUST COMPANY,N.A. 36 ALIT RIZED SIGNATURE
ELLINGTON ROAD HARTI ORD, CONNECTICUT
110000044 7 p- 1:0 L L900 5 L 7689 7110
Lam// v �pt v
O �
G
mac` ?dt��
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
r�asOR-Co�� AREA CODE 203/644-2511
JAIL 1986
South Windsor
Planning & Zoning Comm,.
TO: Planning and Zoning Commission
I hereby approve the attached Letter of Credit drawn on
Connecticut Bank & Trust Co.
in the amount of $ 295,000. dated June 16, 1986
concerning Mountainview Estates, Section III
Date: / J
7/7/
Ri rd M. Rittemband,
Town Attorney
LEFOLL S ROGGI
ATTORNEYS AT LAW
2307 SILAS DEANE HIGHWAY
ROCKY HILL, CONNECTICUT 06067 TELEPHONE
RAYMOND G.LEFOLL (203)563-2355
CURTIS H.ROGGI
October 22, 1986 T07,
J eJ
Ms. Louise Evans
Chairperson UI'I
South Windsor Planning & Zoning Commission
South Windsor Town Hall
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Bond Reduction for Mountainview Estates Subdivision
Dear Ms. Evans:
Please be advised that this office represents Dart Hill Realty, Inc.
owner and developer of Mountainview Estates Subdivision. Presently the
Town of South Windsor is holding a bond in the form of a Letter of Credit
for improvements within Sections 1 and 2 in the amount of $310,000.00 and
another Letter of Credit for improvements within Section 3 in the amount of
$295,000.00. Substantial improvements have been made within all of these
sections of Mountainview Estates including but not limited to roadways,
sidewalks, sewers, water, electric, gas and landscaping.
A request is herein being made to reduce the bond in Sections 1 and 2
to $50,000.00 and a further request to reduce the bond in Section 3 to
$95,000.00.
Thank you for your anticipated cooperation.
rVer my yours,
I
Raymond G. LeFoll
RGL/j as
SO'NU sE+
y r
� n olleslcwm ?v1zdj'at
6 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
sos•cole, AREA CODE 203/644-2511
December 2, 1986
Raymond G. LeFoll, Esq.
2307 Silas Deane Highway
Rocky Hill, Ct. 06067
Dear Ray:
Re: Mountafinview Estates
Please be advised that the Planning & Zoning Commission voted
on November 25th to reduce the bonding in the above subdivision
as follows:
Phase I - Reduced from $50 , 000 to $40 , 000
Phase II - Reduced from $310 , 000 to $130 , 000
Phase III - Reduced from $295, 000 to $75 ,000
We are holding Letters of Credit from the Connecticut Bank &
Trust Company. Would you please forward us amendments decreasing
the amounts as stated above? Also, the Letter for Phase II
expires on February 7, 1987, and the term should be extended for
a one year period.
Yours very truly,
PLANNING & ZONING COMMISSION
vg By: 1
Louise C. Evans, Chairman
CC: Mr. Jean Marc Jacques
1 lJ t
J�
to+" ate
y r 7_(WVn 071e SOUJA ?&f-jdj4-0t
ci
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
~�SOR•GON AREA CODE 203/644-2511
December 15, 1986
Attorney Raymond LeFoll CERTIFIED MAIL
2307 Silas Deane Highway
Rocky Hill, Ct 06067
RE: Application #356 & 357 - Mountainview Estates II & III -
Permit Extension
Dear Attorney LeFoll:
At the December 8, 1986 meeting, the South Windsor Inland Wetlands
Agency/Conservation Commission approved a one-year extension for the
above mentioned applications.
The extension becomes effective December 9, 1986 with an expiration
date of December 9, 1987 . All original conditions of this permit
apply.
Very truly yours,
/ John M. Moran, Jr. , Chifil man
Inland Wetlands Age C
Conservation Commission
Town of South Windsor
JMM:dlb
CC: A. B. Davies, Deputy Town Engineer
Richard Martel, Town Engineer /
Marcia Banach, Director of Planning V
Michael Gantick, Director of Public Works
Thomas D'Auria, Building Official
JMJ Construction Company
� C
q"0N se4
� u
n 0 2v
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
sOR-CO AREA CODE 203/644-2511
April 3 , 1987
Raymond G . LeFoll , Esq .
2307 Silas Deane Highway
Rocky Hill , CT 06076
Dear Sir :
RE: Mountain View III
The Planning and Zoning Commission is holding a Letter of Credit drawn on
the Connecticut Bank & Trust in connection with the above matter . The
Letter of Credit is in the amount of $75 , 000 and will expire on June 12 ,
1987 .
In accordance with our policy for accepting Letters of Credit in lieu of
surety bond , we must have an amendment to the Letter extending the term
for a one year period well in advance of the expiration date . Will you
please forward us the amendment promptly .
Very truly yours ,
PLANNING & ZONING COMMISSION
1-t-6 :t`ZL-A, 1
By : Louise C . Evans , Chairman
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
towN °F�
.a
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 "
SOR•c0�� AREA CODE 203/644-2511
July 6 , 1987
Raymond G . LeFoll , Esq .
2307 Silas Deane Highway
Rocky Hill , Ct 06067
Dear Sir :
RE:Mountain View I
Mountain View II
Mountain View III
Mountain View IV
Please be advised that the Planning & Zoning Commission voted on June
16 , 1987 to reduce the bond for Section II from $ 130, 000 . to
$70 , 000 . , to reduce the bond for Section III from $75 , 000. to
$50, 000, , and to reduce Section IV from $380, 000 . to $120 , 000. We
are holding Letters of Credit from the Connecticut National Bank for
all of these Sections which expire on 2/7/88 , 6/12/88 , and 10/27/88
respectively . Kindly forward us an amendment reducing the Letters of
Credit to the appropriate amounts .
The Commission further voted to leave the bond covering Section I at
$40 , 000.
Your prompt attention is appreciated .
Yours very truly ,
PLANNING & ZONING COMMISSION
By :
Louise C . Evans , Chairman
CC : Mr . Jean Marc Jacques
Y J
y t- 7-0�� 01/?S-0� ?&U&C)'t
o
c `
o w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
l��SOR•C�rc AREA CODE 203/644-2511
August 26, 1987 AMENDED - AUGUST 26, 1987
Raymond G. LeFoll, Esq.
2307 Silas Deane Highway
Rocky Hill, CT 06067
Dear Sir:
RE: Mountain View I
Mountain View 11
Mountain View III
Mountain View IV
Please be advised that the Planning & Zoning Commission voted on June
16, 1987 to reduce the bond for Section II from $130,000 to $70,000. ,
to reduce the bond for Section III from $75,000. to $50,000. , and to
reduce Section IV from $380,000. to $120,000. We are holding Letters of
Credit from the Connecticut Bank & Trust for all of these Sections which
expire on 2/7/88, 6/12/87, and 10/27/87 respectively. Kindly forward us
an amendment reducing the Letters of Credit to the appropriate amounts.
The Commission further voted to leave the bond covering Section I at
$40,000.
Your prompt attention is appreciated.
Yours very truly,
PLANNING & ZONING COMMISSION
By:
Louise C. Evans, Chairman
LCE:cbs
cc: Mr. Jean Marc Jacques
Dart Hill Realty, Inc.
CONSTRUCTION SPECIALISTS
658 ELLINGTON ROAD SOUTH WINDSOR, CT 06074
(203) 282-0628 OR 644-8136
Januaryl9, 1988
Town of South Windsor -
Planning & Zoning Commission
1540 Sullivan Ave.
South Windsor, Ct 06074
Dear Michele:
I am writing concerning the Bond ( Letter of Credit) for Section II Mountain
View Estates. It is currently $ 70,000.00. I would like to have it reduced
because I feel that much work has been done at Section II since the time that
the bond was posted. If you have any questions regarding this matter please
feel free to contact me. Can you please put this on the agenda for your
next meeting.
Thank-yoo,u'I
can-Marc r ues
I
esident
let
Dart Hill Realty, Inc.
CONSTRUCTION SPECIALISTS
658 ELLINGTON ROAD SOUTH WINDSOR, CT 06074
(203) 282-0628 OR 644-8136
February 15 , 1988
Town of South Windsor
1540 Sullivan Ave .
South Windsor , Ct . 06074
Attn: Raymond J . Hallowell , Jr .
Re : Mountain View Estates Sections 1 , 2 , 3 , and 4
Bond Reduction
Dear Sir :
The road work on sections 1 , 2 , 3 , and 4 at Mountain
View Estates has been completed . Therefore I would
appreciate it if you could reduce the Bond on said
project to $25 , 000 each .
If there is any problem with this please feel free
to call me at 282-0628 .
Very Truly Yours ,
Jean-Marc Jacques
Pres dent 7
cc : Marcia Bafivach , Director of Planning
Town Engineer
JMJ : jp
F
Windsor
`� Zoning Co"issim
LOW
J . M . J. CONSTRUCTION CO. INC.
658 ELLINGTON ROAD-SOUTH WINDSOR, CONNECTICUT 06074- (203) 528-6054
February 17 , 1988
Raymond F. Hallowell JR
Town of South Windsor
So . Windsor, CT 06074
RE: Letters of Credit & Surety Bonds
Dear Raymond :
Sir : In reference to all of the SURETY BONDS & LETTERS OF CREDITS
that we have posted with the town of So . Windsor, we strongely
feel that all of the work has been completed in a very satisfactory
manner specially in SECTION II MOUNTAIN VIEW ESTATES, PLEASANT
VALLEY HOMES SECTION 6 , 7 , 8, CHAPEL HILL CONDOS, AND PLEASANT HILL
CONDOS. ,
We would like to request of you that cur bonds be returned and
the amount on the letters of credits greatly reduced . We would
be very greatful and your cooperation and consideration in the
above request will be very arpreciated .
Please call our Mountain View Estates office at 644-5611 if you
have any questions .
Sincerely ,
JEANNE HUPPE
�?OU4NTAIN VIEW ESTATES
CC . Jean - Marc Jacques �j' ;`
FCC
South Viindsor
Planning & ZQning COmmiss104
tOW M 9f7
�I 1
ap �
m 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
(v
SORTON� AREA CODE 203/644-2511
April 29 , 1988
Jean Marc Jacques
Dart Hill Realty
658 Ellington Road
South Windsor, CT 06074
Dear Sir:
Please be advised that the Planning and Zoning Commission voted
on April 19 , 1988, to reduce the subdivision bonds for Mountain
View Estates as follows :
current amount new amount
Phase I $ 40,000 $ 40, 000
Phase II 70 , 000 60, 000
Phase III 50, 000 36 , 000
Will you please forward us an amendment reducing the Letters of
Credit we are currently holding.
Very truly yours,
PLANNING ':"ZONING COMMISSION
Raymond F. Hallowell, Jr.
Chairman
ml
cc: Michael Gantick, Director of Public Works
Marcia Banach, Director of Planning
10'M� $FI
y r Ta� Ole Sot W
O �
G
9 c~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
�'►osOR.CO N�v AREA CODE 203/644-2511
September 23, 1988
Mr. Jean Marc Jacques
626 Ellington Road
South Windsor, CT 06074
Dear Sir:
RE: Letters of Credit- Mountain View
Section III$ 36 , 000 exp. 10/6/88
Section IV $120, 000 exp. 10/27/88
Section IV $ 20, 000 exp. 10/27/88
The Planning and Zoning Commission is holding fiveLetters of
Credit drawn on Connecticut Bank & Trust in connection with the
above matter . The Letters of Credit are in the amounts listed
above with the expiration dates shown.
In accordance with our policy for accepting Letters of Credit in
leiu of a surety bond, we must have an amendment to the Letter of
Credit extending the term for a one year period well in advance
of the expiration date. Will you please forward us the amendment
promptly.
Very Truly Yours,
Raymond J. Hallowell, Jr.
Chairman, Planning and Zoning
ml
CC: ✓PZC File
Marcia Banach, Director of Planning
l0w" 8f,(
C
Tiov� of
e sicwm V&U&O't
y 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
��'►'pSOR CON�(v AREA CODE 203/644-2511
December 15, 1988
Mr. Jean Marc Jacques
626 Ellington Road
South Windsor, CT 06074
Dear Sir:
RE: Letters of Credit- Mountain View Section II
The Planning and Zoning Commission is holding a Letter of Credit.
drawn on Connecticut Bank & Trust in connection with the above
matter. The Letter of Credit is for $ 60, 000 and will expire on
2/07/89 .
In accordance with our policy for accepting Letters of Credit in
leiu of a surety bond, we must have an amendment to the Letter of
Credit extending the term for a one year period well in advance
of the expiration date. Will you please forward us the amendment
promptly.
Very Truly Yours,
Raymond J. Hallowell, Jr.
Chairman, Planning and Zoning
ml
CC: PZC File
Marcia Banach, Director of Planning
i
I
O
c
9 ` 1540 SULLIVAN AVENUE . SOUTH WINDSOR. CONN. 06074
�oSOe Co AREA CODE 203/644-2511
January 3 , 1989
Jean Marc Jacques
J.M.J. Construction Co.
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques :
Re: Mountain View Estates Section III - $ 36 , 000
Please be advised that at the December 20, 1988 meeting of the
Planning & Zoning Commission they voted not to release the
performance bond being held on the above mentioned. The
engineering department felt that a maintenance bond for this
section is premature at this time.
As soon as the winter months are over, a letter should be sent
requesting another inspection.
Very Trul/y/ Yours ,
17
Raymond F . Hallowell
Chairman of Planning & Zoning Commission
cc: Marcia A. Banach, Director of Planning
PZC file
Engineering Department
ml
S OwN Stq,
s 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
soe•c0N AREA CODE 203/644-2511
April 21, 1989
M E M O R A N D U M
TO: Marcia A. Banach, Director of Plan 'n
FROM: Jerry C. Iazzetta, Town Engineer
RE: Mountain View Estates - Bond Redu ion
The Engineering Department has reviewed the bond amount for the
various phases of the Mountain View Estates Subdivision and
recommends that we do not reduce the amounts at this time.
JCl/jsv
<0"M 9E4(
710v� 071C S-aa� V&U&ot
G U
a
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
�'YOS�R,C0 AREA CODE 203 1644-2 511
April 27 , 1989
Jean Marc Jacques
J.M.J. Construction Co.
658 Ellington Road
South Windsor, CT 06074
Re: Bond reductions for Mountain View Estates Section II, III,
IV, and V
Dear Mr. Jacques :
Please be advised that at the April 25, 1989 meeting of the
Planning & Zoning Commission they voted not to reduce any of the
the bonds being held on the above referenced subdivision. Please
contact the Engineering Department for outstanding items that
have not yet been completed in the subdivision. Once these items
have been addressed, contact the Planning & Zoning Commission by
writing and we will arrange for another inspection of the
subdivision.
Very Truly Yours,
Raymond F. Hallowell, Chairman
Planning & Zoning Commission
cc: LMA'rcia A. Banach, Director of Planning
PZC file
Engineering Department
ml
t°•M aft(
�I
C
9 C, 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
soR.00 AREA CODE 203/644-2511
September 5, 1989
Mr. Jean Marc Jacques
JMJ Construction Co.
626 Ellington Road
South Windsor, CT 06074
Dear Sir:
re: Expiring Letters of Credit
The Planning and Zoning Commission is holding the following Letter(s) of
Credit:
Project(s) Bank Amount Expiration
MountainView III CBT $ 36,000 10/06/89
MountainView IV CBT $120,000 10/27/89
MountainView IV CBT $ 20,000 10/27/89
In accordance with our policy for accepting Letters of Credit in lieu of
surety bonds, we must have an amendment to each expiring Letter of Credit
well in advance, extending the term for a one year period from the expiration
date. Will you please forward us the amendment promptly.
Very truly yours,
PLANNING AND ZONING COMMISSION
c�xGC /ell ,
Ra nd F. HalloJr. +
Chairman _
cc: PZC File
M. Banach, Director of Planning
September 21, 1989
Mr. Jean Marc Jacques
JMJ Construction Co.
626 Ellington Road
South Windsor, CT 06074
Dear Sir:
re: Expiring Letters of Credit
We have not as yet received any renewal of the expiring MountainView III
letter of credit as listed in our renewal request dated Sept. 5, 1989.
Please be advised that discussion of this matter will be placed on the Sept.
26, 1989 agenda of the Planning and Zoning Commission, and calling of the
letter of credit will be initiated at that time.
Very truly yours,
PLANNING AND ZONING COMMISSION
Raymond F. Hallowell , Jr.
Chairman
cc: PZC File
M. Banach, Director of Planning
` SEP 2 1989
Dart Hill Realty, Inc.
CONSTRUCTION SPECIALISTS ^ldnnin} L`vr.4` C?^ifrri;,.;r;ri
658 ELLINGTON ROAD SOUTH WINDSOR, CT 06074
(203) 282-0628 OR 644-8136
September 26, 1989
Town of South Windsor
1540 Sullivan Ave
South Windsor, Ct. 06074
Planning & Zoning Commission
Attention: Mr. Hallowell
Dear Mr. Hallowell:
Please be advised that work at Mountain View Estates Sections I,
II,III,IV and V have been completed and we feel tha our borfd should be
returned at this time. Most of the work is completed in section 6 with
the exception of some finished pavement and sidewalks, therefore we are
requesting a bond reduction at this time. If you have any further
questions regarding this matter please feel free to contact me at the
above number.
Respectfully,
R
Jean arc Jacqu
President
JMJ/krb
to
ZV
A• 8a 198 Red`ictyon5 Se�tyons Z
MayCi eY 20 � $otld ntaynvyew
RtO sts o
q,lests esie onds °� Mo and bill.
e"1 EStat that ime b ergy,eeted
yn d t e d
°'rota tecou adat tY'y5 needs t° tot ces°1Ve lved,
It f be sedgy ti°� Z ' da eis Qr°blevl n°t puylt ad riot yes°
11 SeC W alk5 s V
1• ZZ ydew F a�
on som SeCtl e �,atsyskY
2• SeCtyon V oplem on
3 • D�aynage 4�
4 .
n �j.
7�0�� �saw "( ///
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
S CpN AREA CODE 203 644-2511
OR.
November 9 , 1989
Mr. Jean Marc Jacques
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
RE•
ge states
Pleasant Valley Homes Sec. II
Please be advised that at their October 24, 1989 meeting the
Planning and Zoning Commission denied your request to reduce the
bonds for the above referenced subdivisions .
Please find enclosed a memo from Jerry Iazzetta regarding the
outstanding issues in these subdivisions . Once these items have
been addressed, contact the Planning Department and we will
arrange for another inspection to be done.
Very Truly Yours,
t.
Marcia A. Banach
Director of Planning
cc: IWA/CC file
o
G U
a
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
SOR•co� AREA CODE 203/644-2511
1 December 1989
Mr. Jean Marc Jacques
JMJ Construction
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
re: Expiring Letters of Credit
The Planning and Zoning Commission is holding the following Letter(s) of
Credit:
Project(s) Bank Amount Expiration
MountainView II CBT $60,000 02/07/90
In accordance with our policy for accepting Letters of Credit in lieu of
surety bonds, we must have an amendment to each expiring Letter of Credit
well in advance, extending the term for a one year period from the expiration
date. Will you please forward us the amendment promptly.
Very truly yours,
PLANNING AND ZONING COMMISSION
4/'U'C:e-C l�
Louise C. Evans
Chairman
cc: PZC File
M. Banach, Director of Planning
10 aF�
e U
Tia� afesa� vt:olz�
.a
4,C, 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR•C0 AREA CODE 203/644-2511
January 11, 1990
Mr. Jean Marc Jacques
JMJ Construction Co.
626 Ellington Road
South Windsor, CT 06074
Dear Sir:
re: EXPIRING LETTERS OF CREDIT
We have not as yet received any renewal of the expirin"ountainview II�
letter of credit as noted in our previous renewal request. --PI-e-d-se--be -advised
that discussion of this matter will be placed on the next agenda of the
Planning and Zoning Commission, and calling of the letter of credit will be
initiated at that time.
Very truly yours,
PLANNING AND ZONING COMMISSION
e
Louise C. Evans
Chairman
cc:t,-frZC File
M. Banach, Director of Planning
t OwN JET
y r /�li�(.�// [ V/ �'I�.���.•i.I l W�I�I:.l_[.t7L/G
o �
m ~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
'YOgOR.CpN
AREA CODE 203/644-2511
t
ORIGINAL HAND DELIVERED i
April 4, 1990
Mr. Jean Marc Jacques , President
JMJ Construction Company
658 Ellington Road
South Windsor, CT 06074 ;
RE: Pavement Failure
Lisa Drive
Mt. View Estates, Section 3
Dear Mr. Jacques :
During a recent street maintenance activity, our vehicle broke
through the pavement on Lisa Drive.- "A visual inspection this
date revealed additional settlement of the driveway and sidewalk
to #111 Lisa Drive. This settlement or pavement failure should
be investigated by an excavation process, removing the material
to sufficient depth to determine the extent and the corrective
action to be employed. This is to be accomplished with a Town
inspector present.
We would appreciate your completing this repair by May 1, 1990 .
If you have any questions, I can be contacted at 644-2511.
Very truly yours, .
�v
A. Bowen Davies
Deputy Town Engineer
ABD/jsv
cc: Michael J. Gantick, Director of Public Works
Jerry C. Iazzetta, Town`Eirgsrie�r��-
• Melvin Stead, Jar. , Supt. of Street Services
Project File V
Public Works File
PZC File
e �
.a
1540 SULLIVAN•AVENUE • SOUTH WINDSOR. CONN. 06074
~os0R.0 '{ AREA CODE 203/644-2511
June 7 , 1990
M E M O R A N D U M
TO: Marcia A. Banach, Director of Planning
FROM: Jerry C. Iazzetta, Town Engineer
RE: Mountainview Estates Section III
There have been pavement settlements along Lisa Drive in the area
between #111 and #141 that, as of this date, has not been
repaired. A request for corrective work was sent to the
developer on April 4, 1990 with a requested completion date of
May 1, 1990 . To date this work has not been started. Several
verbal requests, prior to our letter, have also failed to achieve
any resolution. We feel that it may be appropriate to utilize
some of the subdivision bond monies to correct this condition
before it gets worse and becomes a safety hazard. Your input in
this would be greatly appreciated.
MJG/jsv
cc: Michael J. Gantick, Director of Public Works
A. Bowen Davies, Deputy Town Engineer
t
Wi ddf�tl
�b
Dart Dill Realty, Inc.
CONSTRUCTION SPECIALISTS
658 ELLINGTON ROAD SOUTH WINDSOR. CT 06074
(203) 282-0628 OR 644-8136
October 15, 1990
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Attention: Louise C. Evans, Chairman
Planning and Zoning Commission
Dear Ms. Evans:
RE: ✓Mountainview Estates and
Partridge Meadows
I hereby request reductions in the bonds for Mountain View Estates and
Partridge Meadows. All the sidewalks are now complete at Partridge Meadows.
I look forward to hearing from you in the near future regarding these
reduction requests.
Thank 'you.
Very truly yours,
J
Jean-Marc Jacqu s, Pre dent
JMJ:cg
�40,NM ae,`�
o
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
4'h�SOR�o�a AREA CODE 203/644-2511
25 October 1990
Mr. Jean-Marc Jacques
Dart Hill Realty, Inc.
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
Re: Mountainview Estates Subdivision Bonds
This is to advise that the Planning and Zoning Commission voted
on October 23, 1990 to reduce the subdivision bonds for the
above-referenced project as follows:
1 . Section I, from $40,000 to $35,000.
2. Section II, from $60,000 to $50,000 .
3 . Section III, from $36,000 to 29,500 .
4 . Section IV, from $120,000 to $38,500 .
5. Section VI, from .$176,000 to $17, 600 .
These represent maintenance levels and will expire October 23,
1991 .
Please forward an amendment showing these revisions as soon as
possible. Thank you.
Very truly yours,
P ING AND ZONING COMMISSION
Louise C. Evans
Chairman
cc: M. Banach, Director of Planning
*W-
to.
Dart Hill Realty, Inc.
CONSTRUCTION SPECIALISTS �,; Vr W)
658 ELLINGTON ROAD SOUTH WINDSOR, CT 06074 w5
(203) 282-0628 OR 644-8136
ULL YVvL
December 03 , 1990 SOU',!1 Windsor
Mr. Jerry C . Iazzetta
Town Engineer
Town of South Windsor
1540 Sullivan Avenue
South Windsor. , CT RE : MOUNTAIN VIEW ESTATES I - V
Dear Jerry :
The Planning and Zoning Commission is holding
bonds in different amounts for the above referenced
subdivision ( See letter dated october 25 TH ) . Since the
unfinished items ( See letter dated october 5 TH per Mr. Davies )
have been completed we would like for you to consider
acceptance of Sections I , II , III , IV &' III , and to please
release our bonds .
Your cooperation is greatly appreciated . ,
Very truly yours ,
n (�
JEAN-MARC JACQUE PR DENT
JMJ/jh
cc : Marcia A . Banach, Director of Planning
HAND-DELIVERED
O �
e
s v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR•C� AREA CODE 203/644-2511
06 December 1990
Mr. Jean Marc Jacques
JMJ Construction
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
re: Expiring Letters of Credit
The Planning and Zoning Commission is holding the following Letter(s) of
Credit:
Project(s) Bank Amount Expiration
Mountainview Estates CBT $ 50,000 02/07/91
Section II
The $50,000 maintenance bond for this section will expire on 10/23/91.
In accordance with our policy for accepting Letters of Credit in lieu of
surety bonds, we must have an amendment to each expiring Letter of Credit
well in advance, extending the term for a one year period from the expiration
date. Will you please forward us the amendment promptly.
Very truly yours,
PLANNING AND ZONING COMMISSION
Louise C. Evans
Chairman
cc: PZC File
�1�1. Banach, Director of Planning
SO•N a
9 ~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
~osoe•co�' AREA CODE 203/644-2511
16 January 1991
Mr. Michael Jacques
626 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
re: Expiring Letters of Credit
We have not as yet received any renewal of the expiring Mountainview Section
II letter of credit as noted in our renewal request dated December 5, 1990.
Please be advised that discussion of this matter will be placed on the
January 22, 1991 agenda of the Planning and Zoning Commission, and calling of
the letter of credit will be initiated at that time.
Very truly yours,
PLANNING AND ZONING COMMISSION
Louise C. Evans
Chairman
cc: PZC File
�( Banach, Director of Planning
r _
January 25, 1991
M E M O R A N D U M
TO: Marcia A. Banach, Director of P an ing
FROM: Jerry C. Iazzetta, Town Enginee
RE: Bond Reduction Requests
We have reviewed the bond reduction requests transmitted to us on
January 23, 1991 by Ms . Michele Lipe and have the following
comments :
1 . The bond reduction requests for Mountainview Estates
and Partridge Meadows is dated October 15, 1990. We
have responded to these in our memo dated November 7,
1990 and Mr. Ganticks memo dated October 19, 1990.
In addition, Mr. Bo Davies wrote to JMJ Construction
on January 9, 1991 indicating that the drainage
problem on Natsisky Farm Road needs to be corrected
before any bond reductions can be considered for
Mountainview Estates .
2 . The January 22, 1991 request for reduction of the
bond for Cambridge Estates asks for a reduction from
$136 ,000 to $46,000 . On November 7, 1990 we
recommended a reduction of this bond to $80,000 . We
feel that this $80,000 figure is still appropriate.
JCl/jsv
cc: Michael J. Gantick, Director of Public Works
""ON a44
e P
.a
9 ~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN_ 06074
~�soe•co`' AREA CODE 203/644-2511
06 February 1991
Mr. Jean-Marc Jacques
Dart Hill Realty, Inc.
658 Ellington Road
South Windsor, CT 06074
Dear Mr. Jacques:
Re: Partridge Meadows Subdivision
Mountainview Estates Subdivision
Cambridge Estates Subdivision
Dart Hill Estates Subdivision
This is to advise that the Planning and Zoning Commission voted
on February 5, 1991 not to reduce the subdivision bonds for the
above-referenced projects . Enclosed is a copy of the memorandum
from Town Engineer, Jerry C. Iazzetta, outlining the outstanding
items in Partridge Meadow, Cambridge Estates and Mountainview
Estates . Quantity estimates, as requested by staff, were never
received for Dart Hill Estates so no evaluation could be made.
Once these items have been addressed and quantity estimates are
submitted for Dart Hill Estates, notify the Planning Department
by letter and we will arrange for another inspection.
Very truly yours,
PLANNING AND ZONING COMMISSION
�c�-tC _�__ C'. 9 ,tJ�_)
Louise C. Evans car,4u)
Chairman
cc: M. Banach, Director of Planning
J. Iazzetta, Town Engineer
t 0wN 8f�
OSaa� W&Uaot
c =.a
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
~oSOR•coN AREA CODE 203/644-2511
June 7 , 1991
Mr. Arthur P. Christian II
Principal Civil Engineer
Water Resources Unit, DEP
State of Connecticut
165 Capitol Avenue
Hartford, CT 06106
RE: #DS-89-082
Mountainview Estates
Farm Pond Dam
II
Dear Mr. Christian:
i
A member of the Engineering Staff recently made a cursory examination
of the above noted site which has led to a number of concerns that
will have to be addressed before the Town accepts this structure.
There appears to be a breach in the dam, permitting more water
exiting the pond along the side of the pipes than through them. From
our limited exposure, I don't believe this was what was intended.
This particular structure is within a 27 acre open space parcel being
given to the Town. The Town intends for this area to remain open to
passive recreation activities . The outlet structure is not visible
from the street and in an emergency situation, there isn't a safe
access to this structure. The gate operating device should also have
locking capabilities . In addition, the attempts to provide a
permanent vegetative cover are not consistent with the "Connecticut
Guideline Standards " .
We are concerned about this project and if any remedial work is
required, that it be done in a timely manner. Please advise as to
your schedule for inspection and acceptance of this work. If you
have any questions, please call me on 644-2511, Ext . 240 .
Very truly yours,
ii3��4�
A. Bowen Davies
Deputy Town Engineer
ABD/jsv
cc: James A. Thompson, Buck & Buck Engineers
Dart Hill Realty
Jerry C . Iazzetta, Town Engineer
Michael J. Gantick, Director of Public Works
Marcia A. Banach, Director of Planning
r,
1EMORANDUM October 23, 19Q1
TC: Jerry lazzo . 1a, 'can Engimeer-
=ROM: Carl qeiLmle, Superinterden : of Parrs I Toand::-
RE: Dam at mountsim View EEtalm--
19, ! Zvi 1 lVe .00 ji � np wLcn PFOUV
tLp of m- a zem to tto n- jcVwrY no some2ms .=�Ic walv 0-t amn worl
W o 3&lim�e Wat too pzmd ohuuld be xj 1 : ad to its prsvious 3evel.