HomeMy WebLinkAboutCLAY EXCAVATION TOWN OF SOUTH -WINDSOR
PLANNING AND ZONING COMMISSION
The Commission will of icially receive applications
Application No . at either Special or RI gular meetings provided they
Received Date : were submitted to the ommission Chairperson, Secretary
Action or Public Hearing by: or agent, at least fou teen (14) days prior to the
meeting at which they ill be officially receiv d.
No application officia ly received at a Special Meeting
Receipt No. will be acted upon at that meeting.
i
APPLICANT: AMVAS CORPORATION, c/o William E. Grace, E .
ADDRESS : 25 Oakland Road, South Windsor CT 06074 Tj7,LEPHONE 644-1528
OWNER OF RECORD ON LAND RECORDS : John Schweir Sons, I c.
ADDRESS : 89 Sullivan Avenue, South Windsor CT 06074
COMPLETE LOCATION OF PROPERTY: Sullivan Avenue, South Windsor CT
(See copy of Attached Map)
ONE I
OF PERSON TO WHO
NAME, ADDRESS & TELEPHONE NUMBERM INQUIRIES SHOULD BE
Windsor DIRECTED . William E. Grace, Esq. , 25 Oakland Road, , Sou h W in CT 06074
TELEPHONE 644-1528
THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING)
1 . Zone Change to (public hearing required)
2 . Filing for Subdivision
3 . Filing for Open Space Subdivision (publ'Iic hearing required)
. 4. Filing for Resubdivision (public hearini required) x
X 5 . Special Exception to Article 4 .7.'. 2.8 �P) 1 V! r'T ed)
X 6 . Site Plan of Developmentwx
X 7 . Removal of RFD: XXN�, Clay o x OER�� xx E;zo
u ire d �`�N)
hearing required) 53,,E• , 010
8 . Other (explain in detail)
4�
THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY
AND SUBMITTED WITH 6 SETS OF PLANS (7 sets if publicl',hearing is required)
BEFORE IT IS RECEIVED BY THE PLANNING & ZONING CO*MI81SION.
V CORP02PIOT0
By: lVeA� - EW
Applicant Owner William E. Grace John Schwe r Sons, Inc .
Its Attorney By: William E. Grace
12/84
PLANNING AND ZONING COMMISSION
TOWN OF SOUTH WINDSOR
Fee Schedule and Policv
1. An application processing fee of $25 per lot ($50 minimum) is required
for: Subdivisions,. resubdivisions, and open space subdivisions.
2. An application processing fee of $50 is required for: Change of Zone,
Zoning Amendment, Special Exception, and Earth Removal or Land Filling
Operations.
3. An application processing fee of $25 is required for Site Development
Plans, except: where new buildings/additions/renovations of 2,000 s. f.
or more are proposed, said fee shall be $50; said fee shall be $500
for Site Development Plans in the Designed Commercial Zone; $50 plus
$5 per dwelling unit for Adult Housing ($500 minimum) .
4. An application processing fee of $10 per acre ($300 minimum) is required
for a Change of Zone/General Plan of Development in the Designed
Commercial Zone.
5. An application processing fee of $100 is required for a Change of Zone/
General Plan of Development in the Multi-Family or DA-15 Residential zones; or
for a Special Exception/General Plan of Development for Adult Housing. ,
6. An application processing fee of $50 plus $5 per dwelling unit is
required for a Special Exception/Site Plan of Development in the Multi-
Family or DA-15 Residential zones ($500.00 minimum).
7. Application processing fees are non-refundable after the application
has been officially received by the Commission. Application processing
fees may be returned prior to the application' s official reception
provided a letter of withdrawal, signed by the applicant, has been
submitted to the Commission prior to the meeting at which said applica-
tion is scheduled to be officially received.
8. Applications unaccompanied by the required application processing fee
are incomplete, and as such may be returned to the applicant and
removed from the Commission's agenda.
9. Complete applications and required fees shall be submitted at least
fourteen (14) calendar days prior to the Regular or Special Meeting
at which it will be re(zeived.
10. Fees for a previously denied application shall not apply to any
subsequent application. However, when a subdivision, resubdivision,
or open space subdivision application has been denied within the
preceding 12 months or approved for fewer lots than requested, and a
new application for the subject tract is submitted by the same appli-
cant, then the fee for the new application shall be a minimum of $50
plus $25 for each lot above and beyond the number of lots contained in
the earlier application.
11. A fee of $5 per sign is required for signs to be posted by the
applicant on the subject property.
12. Other Fees: Subdivision Regulations - $3.00; Zoning Regulations - $4.00;
Zoning Map $1.00; fees for other documents is as determined by the
Commission.
13. All checks shall be made payable to "Town of South Windsor."
Adopted: 4/10/84
Revised: 12/4/84 o �y
PATTERSON, CASEY, HALPERN, GRACE & DOMSR J SKI, P.C.
ATTORNEYS AT LAW
25 OAKLANO ROAD
SOUTH WINDSOR,CONNECTICUT 06074
(203)644-1526
RICHARO G.PATTERSON 165 SILAS DEANE HIGHWAY
JOHN M.CASEY WETHERSFIELD,CT 06109
KENNETH S.HALPERN [203]563-2634
WILLIAM E.GRACE
JOHN W.DOMBROWSKI,JR.
NANCE KRISCENSKI CASTILLO January 16, 1985
Mr. Peter DeMaille
South Windsor Town Hall
1540 Sullivan Avenue
South Windsor CT 06074
RE: Amvas Corporation
Dear Mr. DeMaille:
This letter will serve as confirmation of the meeting
scheduled for 11: 00 a.m. on Thursday, January 24,, 1985 in your
office with respect to Amvas Corporation.
In addition, another meeting has been scheduled at 9: 00 a.m.
on Wednesday, January 30, 1985 in the office of Mr. O' Neill, at
which time we will be discussing the site plan for Amvas
Corporation 's proposed facility.
Very truly yours,
UAk4ze" 0 Cf
William E. Grace
WEG:mgs
-
TABLE OF CONTENTS
1. Submittal Letter
'- 2. Land Owners and Addresses
3. Traffic Statement
4. Borings
5. Storm Drainage Computation'
ti
FUSS&O'NEILL
consulting engineers
February 12• 1985
r
Atty. William Grace
25 Oakland Road
South Windsor, CT 06074
Dear Atty. Grace:
We are pleased to submit to you the attached mat' rial pertinent to
the AMVAS Corporation's applications.
24" X 36" Plan Sheets
11 sets of 7 site plan drawings and 3 architectulial drawings
3 sets of 7 site plan drawings
8 1/2" X 11" bound reports
14 sets which include
a) The names and addresses of abutting property! owners
r b) Traffic statement
c) Soils boring logs
d) Storm drainage computations
The attached data is mean' t to supplement and su port each other
in complying with the appropriate South Windsor regulations.
Very truly yours,
•
r
•
William D. O'Neill , P.E. Kenneth J. Pud er, P.E.
WDO/ldb
r
210 MAIN STREET / MANCH ESTER. CONN. 06040 / TE EPHONE (203)646 2469
SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS*EROSION CONTROL*WATER SYSTEMS•HYDROLOGY and DRAINAGE SYSTEMS SITE PLANNING
HIGHWAYS and BRIDGES•SURVEYING•LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC•PUBLIC WORKS MANAGEMENT.HYDROGEOLOGY
AMVAS CORPORATION
SULLIVAN AVENUE
SOUIH WINDSOR, CT
LAND OWNER
Tax Map No. Property Owners iling Address
63-3 John Schweir Sons, Inc. 8 Sullivan Avenue
Sullivan Avenue uth Windsor, CT 06074
South Windsor, CT
63-7 See 63-3
ABUTTING OWNERS
Tax Map No. Property Owners TilingAddress
63-4 Gulf & Western Industries, Inc. P 0. Box 10214
405 Sullivan Avenue High Ridge Park
South Windsor, CT S arnford, Cr 06904
63-5 See 63-4
Sch
weir Road
63-6 See 63-4
Schweir Road
53-2 Sperry Wood Corporation 2 Walbridge Road
Sullivan Avenue Mst Hartford, CT 06119
South Windsor, CT
. Y
725
Lashetski Stanley & Staib 1 69 Main Street
Josephine F. Rmth Windsor, CT 06074
West Road (Rear)
South Windsor, CT
72-6 Krivickas, Albert D. 10.5 West Road
165 West Road Rmth Windsor, CT 06074
South Windsor, Cr
Stozus Helen & Setsk 1 7 Troy Road
72 7 . Y• Y
Albert J. Trustees South Windsor, CT 06074
210 West Road
_ South Windsor, CT
72 23
Industronics Inc. P O. Box 101
489 Sullivan Avenue uth Windsor, Cr 06074
-- South Windsor, CT
Tax Map No. Property Owners b iling Address
'- 72-25 Same as 72-23
72-16 Same as 72-23•
73-1 Jostal Corporation, The c o Valerie Corp.
472 Sullivan Avenue nnecticut Avenue
South Windsor, CT rwalk, CT
63-21 Schweir, John Sons Inc. 89 Sullivan Avenue
Sullivan Avenue uth Windsor, CT 06074
South Windsor, CT
63-19 Woodcock, John J. Jr. 341 Wbodcock Drive
394 Sullivan Avenue South Windsor, CT 06074
` South Windsor, CT
_ 63-20 See 63-19
45 Kennedy Road
63 p-18 Guinan P. h & 2 6 South Main Street
Jose
Katherine Gudznas rehouse Point, CT 06088
348 Sullivan Avenue
South Windsor
So , CT
63-2 J.R.D. Realty 481 Sullivan Avenue
473 Sullivan Avenue South Windsor, CT 06074
South Windsor, CT
OTHER OWNERS WITHIN 500'
Tax Map No. Property Owners iling Address
63-12 Srubas, Theodore F. 1605 Matianuck Avenue
Sullivan Avenue W ndsor, CT 06095
South Windsor, CT
63-11 See 63-12
63-10 See 63-12
Schweir Road
63-9 See 63-12
Schweir Imad
9
63-8 Econanos, Michael G. 41 Schweir lead
46 Schweir Road Rmth Windsor, CT 06074
South Windsor, CT
5210 K Company,
-F Brick Goan an Inc. 4st
O. Box 375
John Fitch Blvd. Windsor, CT 06028
South Windsor, CT
72-3 Goldszmidt, Aleksander 118 Russ Street
West Road H rtford, CT
South Windsor, CT
63-1 Same as 63-2
481 Sullivan Avenue
73-2 Same as 73-1
488 Sullivan Avenue
73-3 Same as 73-1
63-16 Cassarino, Salvatore P. & 22 Chapel Road
Linda F. uth Windsor, CT 06074
330 Sullivan Avenue
South Windsor, CT 06074
a
TRAFFIC STATEMENT
AMVAS CORPORATION
SULLIVAN AVENUE
SOUTH WINDSOR, CONNECTICUT
Proposed Building Size: 48,000 square feet
Number of Employees: 32
Maximum number for one shift: 28
Amount of Generated Traffic* :
Morning Peak Hour Eve in— (7-8 am) g Peak Hour
(4-5 pm)
32 trips/hr j2 trips/hr
Truck Traffic
4 Trips/Day
Average Daily Traffic
90 Trips/Day
Existing Traffic** :
Sullivan Avenue (west of Troy Road) :
MorningPeak Hour Eve in Peak Hour
Evening
(7-8 am) 1( 4-5 pm)
962 vehicles hr
/ 1070 vehicles/hr
Average Daily Traffic
10,r800 Vehicles/Day
Concluding Statement:
The amount of Traffic generated by the proposed evelopment should
not have a significant impact on the existing roadway network.
* These figures were generated assuming that al ' employees drive
to and from work each day and that one third of the employees
go out to lunch. Therefore these figures are conservative.
** These figures were obtained from traffic recorder counts
conducted by the Connecticut Department of Transportation in
1983.
FUSS&O'NEILL
84-420 Cunial
Schatz, Schatz, Ribicoff & Kotkin
Summary of Test Borings 1/23/85 - 1/24/85
In order to characterize the unconsolidated sedilaents at the site
a total of 9 test borings were conducted. Drilling was
accomplished by Clarence Welti and Associates us ng a
track-mounted rotary drill rig. Holes were adva ce by hollow stem
-- auger or washed with rods leaving an open hole. I Samples were
obtained by split-spoon.
Generally, the site consists of medium to very f'ne sand varying
' in thickness from 4 to 14. 5 feet underlain by th ck clay deposits.
The clay tends to be somewhat silty for the firs 5 to 15 feet and
then becomes homogeneous and very malleable. Th sand unit
appears to be well drained over much of the area', with the greatest
saturated thicknesses occurring along the easterb portions of the
site. No more than 7 feet of saturated sand wasiobserved at any
of the test boring locations.
R.S. Potterton, Jr.
-
Proposed Clay Pit
CLARENCE WELTI ASSOC.,INC. Sullivan Ave! South-Windsor
��
_ - P.O.BOX 397 BORING LOG"
GLASTONBURY, CONN.06033 CLi NT FUSS & O'NEILL
BORING NO. B-1 BORING NO.
LINE & STA. LINE & STA
OFFSET OFFSET
GR. ELEV. GR. ELEV.
BLOW01 BLOWS
A STRATUM DESCRIPTION PER B A STRATUM DESCRIPTION PER B
-` 2-3-4
sand tr.silt
bs.fine-crs.sand
Lred .clay
gr.silt with clay 6-11-11 4-5-4
layers
gr.clay
3-3-4 BOTTOMIOF BORING 51.
WATER T 4' @ 0 hrs.
1-2-3
DRILL : URSIN
2-3-3
2-2-3
2-2-3
2-3-4
40.0
red/br.ciay 2-3-3
•
1. COL. A strata depth Trio Printsn N 114
2. COL. B
3. HAMMER= 1401; FALL 30" AND - 40 to 50%
4. SAMPLER= O.D. SPLIT SPOON F-CE
E - 10 to 40%
5. GWT= GROUND WATER - 0 to 10%
CLARENCE WELTI ASSOC., INC. �� ��
Sullivan Ane.; South Windsor
P.0.80X
_ �7 BORING LOG �
GLASTONBURY, CONN.06033 CL ENT FUSS O'NEILL
BORING NO. B-2 BORING N0: B-3
LINE & STA. i LINE STA
OFFSET OFFSET
GR. ELEV. GR. ELEV.
BLOWS I
BLOWS
A STRATUM DESCRIPTION PER_fi" B A STRATUM ��DESCRIPTION PER_b_ B
br.fine-crs.sand br.fi e-crs.sand auger
red/br.fine-crs.sand •
r ome mal
gr.fine-crs.sand 7-13-19 clay layers 10-16-16
5-4-5
BOTTOW OF BORING 6.5
gr.clay WATER T 3.5' @ 0 hrs.
16.5 4-5-4
DATE: ;/22/85
DRILLER: LW IN
BOTTOM OF BORING 16. 5
WATER AT 7.5' @ 0 hr .
DATE: 1/22/85
DRILLER: URSIN
1. COL. A strata depth Trio Printers N 1127
2. COL. d
3. HAMMER= 1401; FALL 301 AN h - 40 to 509E
4. SAMPLER=_____O.D. SPLIT SPOON SO E - 10 to 40%
5. GWT= GROUND WATER E - 0 to 10%
CLARENCE WELTI ASSOC.,INC. Oj. Sullivan Ave.;South Windsor
P.0.80X 397 "'BORING ��
l.OG
GLASTONBURY, CONN. 06033 C IENT FUSS b O'NEILL
BORING NO. B-4 BORING No, B-5
LINE b STA. LINE & STA.
OFFSET OFFSET
GR. ELEV. OR. ELEV.
BLOWS BLOWS
A STRATUM DESCRIPTION PERK B A STR TUM DESCRIPTION PER 6" B
._ r r. ne-crs. 1.0 br.s ty tMsoil
• sand,some silt auger
br.fi a-crs sand,
fed/br.fine-crs. tr.s t au er
sand,tr.fine-med.
23-26-14 6.0
gr br fine-med. -
— gr.cl,ay with some sand, 12-14
ome silt
layers of fine sand
2-2-4 5-13-14
14.5
2-2-3 16.5 gr.cl y 1 - -
2
r.cia -3-2
BOTTOP OF BORING 16. 5
WATER AT 4' @ 0 hrs.
BOTTOM OF BORING 21.5 DATE: /23/85
WATER AT 8' @ 0 hrs. DRILL : URSIN
DATE: ii23/65
'— DRILLER: URSIN
E
1. COL. A strata depth Tri Printers N 1127
2. COL. d
3. HAMMER= 1401; FALL 30" A D - 40 to 50%
4. SAMPLER= O.D. SPLIT SPOON SO E - 10 to 40%
5. GWT= GROUND WATER TR CE - 0 to 1096
CLARENCE WELTI ASSOC.,INC. Sullivan Ave. ;South Windsor
- P.0.80X397 "BORING LOG"
GLASTONBURY, CONN.06033 C ENT FUSS b O'NEILL
BORING NO. B-6 BORING NO� B-7
LINE b STA. LINE b STA
OFFSET OFFSET
GR. ELEV.
GR. ELEV.
BLOWS BLOWS
A STRATUM DESCRIPTION PER-'! B A STR TUM DESCRIPTION PER 6" B
I.0 silty topsoil
r b:- fifi-e-crs.
r. ine-crs.san , auger 2.0sand 0 silt
tr.fine gravel auger
4.U ' 4.0 br•fi e-crs.sand
r r ne-me .san ,
br.fine-med.sand, 7-9-10 6.0 some silt 7-7-6
tr.silt gr.si ty c;ay
15-23-27 2-2-3
3
15.0
. 25-13-15 r.cl 3-2-3
gr.clay
3-2-2
BOTTOM OF BORING 16. 5
WATER AT 4' @ 0 hrs
BOTTOM OF BORING 21.
WATER AT 4' @ 0 hrs. DATE. /22/85
DRILL : URSIN
DRILLER: URSIN
1. COI. A strata depth Trio Printers K 1127
2. COL. d
3. HAMMER = 1401; FALL 30" AN - 40 to 50%
4. SAMPLER= O.D. SPLIT SPOON SO E - 10 to 40%
5. GWT= GROUND WATER TR E - 0 to 10%
CLARENCE WELTI ASSOC.,INC. Sullivan Ave. ;South Windsor
P.O.Box N7 "'BORING LOG"
-- GLASTONBURY, CONN.06033 CLI NT FUSS & O'NEILL
BORING NO. B-8 BORING N0. B-9
LINE & STA. LINE b STA.'
OFFSET OFFSET
GR. ELEV. GR. ELEV.
BLOWS BLOWS
A STRATUM DESCRIPTION PER_.6 1 B A STRA UM DESCRIPTION PER 6" B
I.U_. ** drk.br sit 'topsoil
br.fine--crs.sand,
tr.crs.gravej auger san , augur
• some silt
some silt 12--16-17 gr/br.silt 5-4-5
8.0
layers 2-2-22-2,2
**drk.br.fine-crs.
**br.f ne-crs.sand,
tr.fini gravel
BOTTOM OF BORING 11. 5
WATER AT It' @ 0 hrs.
BOTTOM F BORING 11. 5
DATE: 1/22/85 NO WATER @ 0 hrs.
DRILLER: URSIN
DATE: 22 85
DRILL EA: URSIN
strata depth
1. COL. A TO PrIntem N 1127
2. COL. B
3. HAMMER= 140/; FALL 30" AN _ 40 to 50%
4. SAMPLER=_O.D. SPLIT SPOON SO E - 10 to 40%
5. GWT= GROUND WATER TRA E - 0 to 10%
-
STORM DRAINAGE COMPUTATIONS
• PARKING LOT
AND
STORAGE AREA
AMVAS CORP.
SULLIVAN AVENUE
SOUTH WINDSOR, CT
FEBRUARY, 1985
FUSS & O'NEILL, INC.
210 MAIN STREET
MANCHESTER, CT 06040
r10
FUSS&O NEILL PREPARED DATE CHECKED DATE PROJECT N,
consulting engineers BY BY
SUBJECT: S 7-0 R Al D R/ /A/A GF
SHEET NO.
If M r>R p. of
tM <l fee -----
��rl<i+�y for --�`�'----- - -- -. - - -- --- ---------- ---�_ - _._--�--�-- - - -- - • ---- ---.--
13
a
1
_ 1
1
V '
i
• I
I I
- - a,
— - -- f -- ---------- ---- -- --- - - - -- -- —- �o ---- --- - -
1 I
_ r
I .
Prep. By r-�-�� I PROJECT NO.
Dat FUSS&OTNEI L
'Check By � consulting engine rs
Date ESfHEE-T NO.
f
AREA TO INLET NO TYPE
N
LOCATION l'O,,7A S-'�� gal., T OFFSET 114 "off au./�%r
Area @ Coef. • 7
1
.2 SD'X ���or>S) x %� 3 f6o =- , 66 , G� X, q = 5 9'/
AI = •S��
Gr�rgs Area @ Coef. �--
_ ZS'DX 22-K ��y3560 z JAG
/SO X?O X w33-60
AI
Area d Coef.
—1 AI =
Area @ Coef.
AI =
SUM OF AI TOTAL AI a 3 3
TIME OF CONCENTRATION rt
OVERLAND: L AH=t -7 )_ , g= %, T=_ min
-� (Seelye)
CHANNEL: L 13-0 ,0 H=( /'S , )_ , T= min
— (Kirpich)_
SUM OF T R( R(,75-1= 7/
FLOW: Q AIR
EROSION CONTROL f
Q2 = CHANNEL SHAPE _ lv �dl�P *•^'!
GRADE _
TEMPORARY LINING x a <�-
ZIP-
PERMANENT LINING =
Prep. By I PROJECT NO.
Date
Check By
FUSS&O`NEI L
Date consulting engineers
. SHEET NO.
3 of
AREA TO INLET NO 7*-' 3 TYPE C'7/1 '
LOCATION A101-44 5,G1e 1'�a " STA. OFFSET o .{/p.� �`� or /3a;l'l kl
�v I` _xoC Area @ Coef. '
X 57o = , 3 70 . 3 7D X. 9' . 3 3
Al = •3 3�'
Q-rcr5'5 Area @ Coef. Z
AI = . 0/C7
Area @ Coef.
AI =
Area Coef.
— AI =
SUM OF AI TOTAL AI 3
TIME OF CONCENTRATION
OVERLAND: L 2D ,AH=( 7 )_ g= 3s %, T= Cl � min
(Seelye)
CHANNEL: L� _ / J`O ,AH=( T= min
(Kirpich)
SUM OF T ,j R(7 )= L/. R( 2�)=
FLOW: Q - AIR
EROSION CONTROL
Q2 CHANNEL SHAPE -
GRADE = -
TEMPORARY LINING =
PERMANENT LINING =
Prep. By l�� I PROJECT NO
Date_ °��/�!S �
Fuss&0NEI L
"Check By 0
� _ - -
Date Consulting enginee.,rs
SHEET NO.
- - of
AREA TO INLET NO TYPE ofF, aQ
[_y __
LOCATION 7 e f 01-,tee'STA. OFFSET
— �a'vlss•♦--• r Area e Coef. q
x /0 8�
AI
� w s Area @ Coef. ZzSe •Z
3�O )r 3 S-O /y��a o = 2, �7/
;? s 7/x, Z = , S` Y
AI
wr' Area Coef.
yO/7'X.q— , 36 Z
AI = - 36Z
Area g Coef.
U AI =
. SUM OF AI TOTAL AI 7
TIME OF CONCENTRATION ' $.r¢t �'r7`� - /=
OVERLAND: L = .Sao ,OH=( g=,y T= min
• (Seelye)
CHANNEL: L = ,AH=( )_ , T= min
(Ki rpic h) -----
SUM OF T R( Z )_ �.5� R(2�')_ -
FLOW: Q - AIR '
EROSION CONTROL
Q2 ?.y 6 CHANNEL SHAPE = Gla 1'G,�ss )A /
GRAD: _ • �0 /
TEMPORARY LINING
PERMANENT LINING �� �r�'s,"�'ti �a•fr/`d� G,�-� q
Prep Y. B - - I PROJECT NO.
Q�Date 1/7-ilrl FUSS&O"N EI t.. gG1 q.2C)
Mir
'Check By � CO�ISI.Jltln ine rS
Date 9 e
SHEET NO.
of
AREA TO INLET NO TYPE 7' e
LOCATION EQ•ST 5;11� o� �r'V TA. OFFSET
Area e Coef. •
-1/0 xI-1e#2 s6a = . a3 � , 03 � x. �' = . G 3
AI =
Area @ Coef.ol Z
��j336o .FS5-U , oS'OX � ,oD
AI =
Area Coef.
—) AI =
Area L Coef.
AI =
SUM OF AI TOTAL AI = 0 Z
TIME OF CONCENTRATION '
OVERLAND: L = /Ol> ,AH=( )_ , g= 7 o x, T=� min
(Seelye)
CHANNEL.: L = T=' min
_. (Kirpich) use
SUM OF T R( Z )= q / R(� �)= 7
5
FLOW: Q a AIR �►�'
Q(�y� _ O
EROSION CONTROL
Q2 CHANNEL SHAPE N av
GRADE
i
TEMPORARY LINING =
—
PERXANENT LINING =
Prep. By , PROJECT NO
Date Check B �/fs FUSS&O" EI L �L� Gy�
_ Y
Date consulting engineers
SHEET NO.
6 of
AREA TO INLET NO TYPE
LOCATION CQ gT o� &`,fC'147STA. OFFSET
Area e Coef.
AI 3 y1'
Area a Coef.
AI =
Area Coef.
AI =
Area a Coef.
Al =
SUM OF AI = TOTAL AI = �3
TIME OF CONCENTRATION
OVERLAND: L = ,OH=( )_ , g= min
(Seelye)
CHANNEL: L = /06 ,AH=( min
(Kirpich)
SUM OF T = ' R(
FLOW: Q - AIR
EROSION CONTROL
Q2 CHANNEL SHAPE _ •rh-F-
GRADE
TEMPORARY LINING a A/ r+
PER'•LANENT LINING -
�. Prep. By �
PROJECT NO.
Date 2 5L �USS&®� I�.. 0
Check By Date consulting e 1ne0r
SHEET NO.
of
AREA TO INLET NO TYPE C- L C",3
� r
LOCATION 5, ` Col'�/�/� �f SvA. ./ N OFFSE �c"T Sd Sa" �`
A!//,if Area @ Coef.
13 0 560
N
AI
Area @ Coef.
Al =
Area Coef.
AI =
Area @ Coef.
AI =
SUM OF AI TOTAL AIM 3
TIME OF CONCENTRATION
OVERLAND: L = ,AH=( )_ , 9= T= min
(Seelye)
CHANNEL: L = ,d y ,0H=( ��S )_ , T= min
(Kirpich) A'
SUM OFT R{ R{ �= 7•
FLOW: Q - AIR �.
Q( _ 6 6 2. ;7 �7�5
T EROSION CONTROL
Q2 = CHANNEL SHAPE _ IVI IJ 4 '
GRADE
TEMPORARY LINING = v-0
,^ PER'-',ANENT LINING =
r ,
-- Prep. By }�-�-
Dat PROJECT NO.
Check By Fuss&of
a Date
consulting erg ne r
SHEET NO.
AREA TO INLET NO 7 _ - g of
TYPE I _
LOCATION s' O f STA.
YA�r`ea Coef.
OFFSET
6 8'3X 4(/s,.
_ AI
Area @ Coef.
'- AI =
Area @ Coef.
Al =
Area 9 Coef.
=
SUM OF AI TOTAL AI Al
TIME OF CONCENTRATION
OVERLAND: L =
(Seelye) ,�H=( )__. 8 min
CHANNEL: L =
(Kirpich) -' T min
SUM OF T R( )= y R( )= 7
FLOW: Q AIR
EROSION CONTROL
l Q2 = CHANNEL SHAPE
GRADE
TEMPORARY LINING =
• P ER-%IAN EDIT LINING =V LI. I
Prep. By
Dat PROJECT NO.
�/-3 r g 5;
Check By FUSS&OO ti I L
_.. Dat COf1SUlting engl G t"S
I SHEET NO. ,
- of I
._ AREA TO INLET NO TYPE C
LOCATION RPM
w� --/G Area @ Coef. . 2.
AI
Area @ Coef.
Al =
Area @ Coef.
` AI =
Area 8 Coef.
-- _ Al =
SUM OF Al TOTAL AI = � � /
TIME OF CONCENTRATION /VD
L
OVERLAND: �Ov
(Seelye) '�H ( ) 8= min
CHANNEL: L ,AH=( )_ , min
(Kirpich)
SUM OF T = � � R( 2 )_ ( R(���)_ G
FLOW: Q AIR
Q( _ �, p y c fs
EROSION CONTROL '
( '
Q2 �� 7� CHANNEL SHAPE
=
GRADE
TEMPORARY LINING =
PERMANENT LINING =
i
30 FUSS&OWEILL PREPARED DATE CH C ED DATE PROJECT NI
consulting engineers BY Y
SUBJECT: SHEET NO.
of
Fr 0
�73
--'- ---------- ---- - -- ---- p�� -� ---- --- -r
t r
t y,
10 'AIT
r
- /4
,000,0
r `
�4 jam_•`-'_Y-- - _�-__ '_--I- __t-- -_-- - r -. _-_} -t--+- - - --.Y-- _'-'--__-_--_1.__-
2
FUSS&O'NEILL PREPARED DATE CHECKED DATE PROJECT N(
consulting engineers , L
BY Y
SUBJECT: SHEET NO.
of
Re
-- - - - -- -- --— - -- - _ -. - - -- - - - S� - ---- i
I
s
O
_Ore.
o
d- -� — c f s z-�---- ---- - --- , - ---- - - - -
---- -- -------�----r---�-- �-----------fit-�--�- -- ------,--•-- - - •---- ----- --- --• - ,- - - --- •---• ---1 --`- •-- •- -{
I
1
i
v0
w Line Segment
Time to Inlet
w
W � \ Time in Pipe _
w `� Accumulated Time —
y ^. •� AI Entering —'
`a► N w Catch Basin
`'V Iv N —
o
N y w Sum of AI in System
`0tvCn
%1 vl ti y Rainfall Intensity-
0
in System Cn
0 � —
K
Pipe Size r
0
Q V Length of Pipe
p� o� �*► \A, Slope
•�Q � 1i e�
Average Velocity
Full Capacity
Headwater
Inlet Control
Headwater
Outlet Control
fN
, ns�� uoaS30 U3M3S M01.S -
�
��:o4 l�
_ r
FUSS&O'NEILL PREPARED DATE HE KE.D DATE PROJECT NC
,7 consulting engineers BY B
SUBJECT: ff 1-e SHEET NO.
�ro T
/3 of
ex
- ----i-- -- • v - --- - _ ty -- -
-- - — %4 O ---r --- - - -- - -- --_- y- - -
1� �/ I - 1
_ - - - -- - ---- --- -
-___- _-------- -_ - r - --- - _ - -
r Taw 0-le sio�
C �
w� 1540 SULLIVAN AVENUE • SOUTH WINDS R. C N . 06074
��dsoR•co�'� AREA CODE 203/ 44-2511
March 7 , 1985
Mr. Kenneth J. Pudeler
Fuss & O' Neill
210 Main Street
Manchester, CT 06040
d
RE: AMVAS CORPORATION
SULLIVAN AVENUE, SOUTH WINDSOR
Dear Mr. Pudeler :
I have reviewed the plans submitted for the proposed A14VAS
Corporation project on Sullivan Avenue, and I am satis ied that
the Sullivan Avenue sanitary sewer has sufficient capacity to
service this facility.
It is my understanding that the maximum total flow of anitary
wastewater will be 800 gallons per day , and there will be no
process water discharged to the sewers .
Very truly yours ,
C. F. Shaw, Superintendent
Bureau of Pollution Control
CFS: bmr
cc : W.P . C .A.
P. DeMallie, Director of Planning
R. Martel , Town Engineer
Attorney William Grace
SOUTH WINDSOR INLAND WZTIrANDS AGENCY Minutes
Monday, March 11, 1985
Pag 2
g. New Application No. 311-"Was Cc ration
Construction of industrial building and use of clay on site for manufacturing putt ry.
Property located on Sullivan Avenue.
Wm. E. Grace, Ken Pooler, and Wm. O'Neill _ present for the proposal.
Mr. Grace explained that this presentation was also gi en tothe Conservation
Commission. Mr. Grace explained that the owners are buying the a tire parc l and
wher the trees, shrubs, etc.are located by Sullivan Ave willrem In the b ginning
this manufacturer will employee approximately 32 people. ac explain d that
they will be taking the clay from the rear of the property and will be using it on
sit .
Mr. Grace explained that this proposal would be going to PZC for a Public
H aring for approval of the site plan rand also for permission for removal of th
clay PZC regulations state that if you are going to do ary r mo al you must hav
approval and this approval is only good for 2 years. Mr. ac n ted that h knew
that IWA permits were only issued for one year and: that in thi ticular applica-
tion it would need to be reviewed over- many years.
Mr. Grace explained that the amount of area to be covered in the first five years
shows that the amount of future clay expansion is good for 1001. years befor th y
would ever touch the wetlands.
Mr. Grace explained that the stockpile would be kept pure and any wat re hitting
it would not effect the pond. The stockpile would be tapped down.
Mr. Grace also explained that there would be someone on the premise at all times.
This would be for protection of the area.
Mr Grace noted that they would be removing the clay by first taking off .all of
th topsoil-and dig down to allow them to have the same continuity of the clay in
r gards to color and texture.
Mr. Pooler explained that they are using the existing pip d field farm is
crosaing to get to the rear of the parcel. He also expl ed hat the� perim her of
th hole will be bermed with the top soil that comes off of th area a�d stockpil d
up s that the store water does not come into the hole, e interior Of the pit
will b open to elevation 70 and there will be a level dr d collecting any
of th ground water that will come through the banks. Below e3e ation! 70, when
mining operations begin and they go down the water will have to be pumped out. Th
wat r will sit until they are ready t min which will be n morethan', twic a year.
At this tim they will pump it out discharging most of the cl an water' t the pond
and when they g t down t t bottom tie xc as wat r will b pumped out ont th land,
and th last 2-3 inch a will remak in th h 1 until n xt tim He xplain d that
th y ar staying out f th wetlands an much as vossibl with as li,qht_ek
trin rm m
SOUTH WINDSOR uNIAND WETLUMS AGENCY MINUTES
Monday, March 11, 1985
PAGE 3
of building the berm In the shrub area on the side the el p esenily cattails
and brush that will remain and serve as a screening for t el,m g operation in the
rear. There are some wetlands on the front portion of th pe ty and this ar a
will b disturbed only where the building will be construe dd and the (aecess driv .
Mr. Grace explained that for the mining operation th t ey would hir someon
to come in and do this work for one-two weeks and be gone. a material w uld b
stockpiled behind the building. The character of the area vo d not bis Chang d.
Th building is being designed so that it will blend in wi b t e area.; Th barns
the area will be cleaned up and remain.
Mr. Grace explained that the Connecticut Development ulth ty an� John Sham ,
EDC helped the owners in establishing their business in So th dsor. Th y have
obtain d 4Y2 million dollars for this project which does h vie trictitim tabl .
The owners presently have a business in Italy and Australi of t e same nature and
f 41 that the area of South Windsor would be suitable.
Dr. Gutkowski asked how deep would they be digging, ee answered that
they would be going down to a maximum of 50 feet and that any h ng mo�e than this
would uneconomical and would be in a limited area. He exp ain d that the b rm around
th area could be bulldozed into the hole and would parti i it.,
Dr. Gutkowaki• noted that he was concerned that this m ght b a po�ential hazard
for the area's children. Mr. Grace explained that the hol havelthe b rm around
it, someone would be on the premises 24 hours a day, and t ell tion of th proj ct.
Mr. Grace explained that they would have to come before th 1W one�year f r an
xtenaion of this permit if granted, and at that time ther Vro not be a substantial
hol but the IWA at that time could decide if it felt it n bs to install a
f nee around the hole.
Dr. Gutkowski asked if it was a small hole that was t be d than was to be
50 f t deep couldn't be covered or protected in someway.
A.H. Davies asked what the 50 ft depth time spans wo d'l,b .
i
Mr. Grace explained that the first year's depth would be feet frith a significant
p rimeter and this would not be a shaft. Mr. Grace also n tad t.h t thO hol would
contain clear water and would create a pond.
Mr Lan asked at what depth d you b gin to get wat pnolir e"l ained
a lot of th water is following the t p of the clay and th uil hiticlay at ab ut
3 feet. H also explain d that th only rat r in th hol rr4 d the rain water
b cause th y would hav a perim t r drain that Mould pick *t e and vat r, and
SOUTH WINDSOR INLAND WETLANDS AGENCY MINUTES
MONDAY, MARCH 11, 19 Q 5
I
PAGE 4
The berm on the top would keep the overland water out.
Mr. Lane noted that in the event of a heavy storm the water i I the pond could conceivably
be deep and that a fence should be placed around the area. Mr.Poo leer explain that the hole
would be side sloped.
J. Flynn asked what the to rimeter of the hole would be in 10 ye a s. Mr. ' Pooler
answered that it would be 2 acres.
J. Moran asked if once the excavation in one phase was comple ed if it would be back fillet
II
before going to the next phase. Mr. Grace answered that the town was concerned with the land evf
being able to be used again and so he feels that they would not co�np�lete y bat fill the area.
He noted that in Australia that after they completed their operati Dn of many years that the
area looked virtually unchanged.
Mr. Grace noted that there would be no objection to puttinb a �ence in now. He is un-
sure that they can fill the area within the first few years, but i regards t., long term
plans he is unsure that they can put sand into the clay they are ti g to pro ect.
The owner explained that they hove to have a safe distance f r he are: t..e� wu..id
be working in and the area that would be back filled in order to segue d against sediments
� I
running across.
T. Gutkowski asked if it would be possible to create a clean pond as they went along
with their project. Mr. O'Neill explained that both options area 4ilab e . If it becomes
an important piece of a storm water detention system then he feels that it 's st value
would be for a pond, but he feels that otherwise the best use would '',be as a detention basin.
Mr. Grace feels that filling of the hole immediately would de� troy the purpose of the
project, but filling as some point, subject to the approval of t engineering, would be
III
agreeable .
J. O'Sullivan asked what the purpose of the berm is. Mr. Grac%0 a aimd it was so
they would not have to pump anymore water than necessary and for pur+i is tion bf the water.
J. O'Sullivan asked if the t p of the berm as at elevation 82 . aoler answered yes
and it was to prevent the overland flow of water from entering the' pon . Any kxcess topsoil
I
pow" a 4
ca
e �
4f w� 1540 SULLIVAN AVENUE SOUTH WIND
�dso�.00� R� O N. 06 74
AREA CODE 203 44 25 1
March 19, 198
Mr. William E. Grace
RE: Amvas Corporation
25 Oakland Road
South Winds)r, Connecticut 06074 CERTIFIIP MAIL
Dear Sir:
At the March 19, 1985 meeting the South Windsor
approved with conditions application No. 313 for thel u nl no eeofa on Agency
an industrial building and use of clay on the site f p °nstrott ry
on property located on Sullivan Avenue, South Windso Can ectltc nt factu, tng Pottery,
T permit is based on the Plans entitled "Amvas Cor at
for Amvas Corporation, c/o William E. Grace, Esq., 2 a ion' prepared
Windsor, Connecticut, by consulting engineers bf Fu s a 1 d Road d, South
Plans are dated February 12, 1905, no revisions; 'Neill. Such
The following conditions must be adhered to h s t roug 7 of 7.
Valid: permit o be
1. The %
proposal is subject to the approval of the Town Engineer
2. The application shall indemnify and hold harm less t
ile South Windsor against any liability which might: result Tf of
the proposed operation or use.
r
3. The permit is valid for one year and if not initiated and completed withinsonel ea ire M rch 1 , 1986,
approval. 3B fr the d to of
The inland Wetlands Agency recommends that a fen
measures be taken, surrounding the excavation at e d' 3nd/or other safety
Very truly yours
John Moran, Jr., C ai
JM/se INLAND WETLM DS E C
TOWN OF SOUTH W S R °
cc: Fuss and O'Neill Engineering
A. B. Davies, Deputy Town Engineer
Jacqueline J. Smith, Town Clerk
Richard Sartor, Town Manager
Richard Ryon, Deputy Mayor
Robert F. Gilligan, Chairman PZC
Thomas D'Auria, Building Official
✓Peter DeMallie, Director of Planning
Kenneth Brill, Chairman EDC
II
�
4ti
PUNNING AND ZONING COMMISSION MARCH 19 , 1985
PUBLIC HEARING AND SPECIAL MEETING SOUTH_WINDIS R TOWN HALL
MEMBERS PRESENT: Montana, Sorosiak, Smith, Soren' o , Conde
ALTERNATES PRESENT: Hallowell (for Klenke) • Ross.. (for Gilligan) ;
Asp Lund
PUBLIC HEARINGtiC�.
1. Application of SAS o oration for a Spec'* 1 E ce ion to
Section 4. 7. 2. 8 b n Removal of Clay,_ on remises located
on the south side of Sullivan Avenue, opposile KennedyRoad,
in an I zone.
Attorney William Grace was present on behalf of t P e applicant.
He noted that the applicant just received a $4. 5' i 1 on loan, and
have an option to purchase a parcel of land of 510 acres which
will be used to build a plant to make clay. They a e here this
evening with a site plan, and also need approvals n e the Sand &
Gravel regulations for removal of the clay. They e poary and
conditional_pern it for clay removal would be for,,,,,, XIMUM of two
years. The owners are from Italy and also have a
I plant in Australia.
Mr. Grace submitted photographs of the site and Oxplained that the
building will be located several hundred feet be ind the nursery
stock which is growing on the site. He also sub t e a c lored
photograph of the various style of flower pots w c ill e
manufactured . as well as samples of the colors wi c e b ildin
r P g
could be painted, and noted that they have chose i a barn red,
but world be willing to paintit:any�cola the ContBt . s o likes.
Mr. Anthony Kunial, of Italy, said his company c s South Windsor
because under a few feet of sand, there is a goo, 1 y r of clay.
He drew a sketch- on the blackboard and explainedi t under4-6 ' of
sand, there is approximately 150 ' of clay. They s compactor
to remove the clay. A sand dike is make around e p t area
in order to stabilize the area, and they will di a t ench. There
will not be a shaft or well. A person would be 1 to walk in or
out of the pit and there will be an access ramp. pit. The
clay will be removed once or twice a year since s difficult to
work when there is rain, and they like to remove',' lay when it is
dry. They will probably do it in January or Febr a y sincethere is
usually no rain, and the snow does not affect the hey eed about
10 days in which to remove the clay. The bottom' f the pit will slope,
and a pump will be installed in case there is too much rain. From
the pit the clay goes to a stockpile next to thei a t ry. The
stockpile is 12t high. They like to mix the clay' r m the different
parts of the pit. Once it is stockpiled, it cane a e care of their
needs for three months. There is a drying system w th warm air
in case there- is too much water in the clay. The k ins op rate:
24 hours a day, seven days a week, all year long'r a d there is an
attendant on the kiln at all times. Mr. Kunialic3a d they will
employ 32 people, and will work 40 tons of clay a y ar and get 30 tons
of the product. The rest is lost in the water. Th re will be two
or three trucks a day into the site. The kiln is g s firel and
electronically controlled. He noted they do not do any ki d of
glazing_ The stockpile will be kept low, and thOt e will be no
Planning & Zoning Commission -2- 3/19/ 5
visual pollution,. and there is no air pollution., The factory
will last for 50 years, and Mr. Kunial said he alnd hisson will
be here to run it.
Bill O'Neill, of Fuss & O'Neill of Manchester, n I o ed that they
have secured approval from both the Inland Wetla4n Agency and
the Conservation Commission. The site contains15 acres and
is on the south side of Sullivan Avenue close to lenn dy load.
The soils are wet and a manmade watercourse passes th ough the site.
The present peak of traffic on Sullivan Avenue will b increased
by one-third of one percentrhy the 30 people empl y d here, and
the two or three trucks per day. They simply cro s d the wetland
area of the. site, and all the work will be in back. t i well
screened.. and well protected from view.. Storm water m nag ment
was simple because they can discharge downstream! into an xisting
watercourse.
Stephanie Fuss. of Fuss- & O'Neill, stated she isia professional
landscape architect, and she outlined the landscape plan noting
they they will use berms to block the view from ,S 1 i an
Avenue. There will be a mi$.ture of deciduous and e e green trees
and shrubs with a minimum height of 6 ' when they are lan ed.
Exposed sites will be loamed- and seeded as soonlas Oo sib e, with
the exception of the clay pit.
Mr. Grace then introduced Peter Parselli of Bloojm i l , who said
he is the tax assessor in Bloomfield and also a reil estate appraiser.
He concluded that there will be no adverse effect o property valves
in-:the-area, and the. area will be upgraded because f the setback
of the building and fact that the nursery stock Will e retained.
Mr. Grace said there will be an employee on the site 4 hours a day.
As the pit extends it will be recovered and filled i t will
take about 18 months to 'get the equipment to bui�ld 4nd get the
operation going..
Mr. DeMallie suggested they contact the Fire Marlsha.1 in view of
the kiln, and Mr. Kunial. said the only thing that c an burn would be
an electrical fire. Mr. DeMallie suggested a fenoe around the clay- pit.
Mr_ Martel, Town Engineer; reported that they had many meetings and
the applicants listened to the staff' s suggestions-', The key map
shows two barns- which no longer exist, and they s o ld be removed
from the map.
No one in the audience spoke in favor of, or in op osi ion to this
application..
Commissioner Hallowell asked if clay was the onl�_ m tlack
ria used,
and Mr. Kunial said yes. Natural gas is used for f e r.. Hallowell-
noted he has seen a similar plan in Kensington, a d, aked hat will
happen to. the scrap material. Mr. Kunial said there ill be less
than two percent scrap material and they will put it in the pit.
I
LEGEND DRAWING 002-00-84 R-3
1. Kiln Exhaust
2. Re-cycling Fan
3. Control Pyrometer
4. Gas Burners
5. Fast Cooling Fan
6. Supplemental Heat Generator
7. Kiln Door
8 . Kiln Car Storage Track
9 . Heat Direct Recovery
10. Fresh Air Supply Fan
11. Heat Indirect Recovery
12. Kiln Transfer Car
13. Kiln Car Ready to be Fired
14. Pre-kiln
15. Drier Exhaust and By-pass
16. Kiln Car Loading Platform
17. Kiln Car Unloading Platform
18. Pallestizing Unit
1 4 _ T)r i c r T, .+l l ,•-
Planning & Zoning com
mission -3-
gg
Mr.
Hallowell suggested this be referenced on the plans-
Mr. Kunial
further explained they have been in bu i�e s since 1635
and are the biggest producer of terra cotte roof i g, i theworld.
Commissoner• Conde questioned the need for a fence around the 32t•
and clarified the fact that at full operation Oe e'I w uld be
employees, plus sub-contractors who pick up them ter' al.
Mrs. Smith
determined that the hours of operation are 8 hours a days
5 days a week for the productionp- and the kiln Ito lid operate
constantly.
Mr. Asp
fund asked the size of the pit, and was t old ' t wi 1 be
about 30 , deep, and about 300 ' in diameter every fiv years.
He asked how they prevent things from getting in t#i pit that
they do not wants and Mr. Kunial said their biggest once is
sand.
'n this area,.
Mrs. Rossi pointed out that the water table is hig the s a
and Mr, Kunial sa=d_ that the water will not pent rate. ay
�her the
n opening
and when it hits clay It will keep moving facet this area is
and then it will come out• Because of the
clay, the water stays up• Mrs. Rossi said there is a brickyard
in town, and the water is- high. Mr.
Kunial said he` aware of
this,, and is, amazed that they do not have a tree h, around their
pit, because that would help co31tC01,the water.
EXCAVATION ONCE. OR -WIUE AS PRODVC:T%ON DEMANDS VROM OVTDCM
A YEAI1 S�OCKP�LE �O PR%MP.E'/ F�OXFCCD�R
- I•RoM goxFEEpE� TO
as
CLAY ►S N1%xEC ANC
01-11
FI LTERE O
GLA
STOcKptl..E �O SECONDhRY--gOxFEEOER _ -- TY-- - _ T9 JKD�R_�pC,li.P1LE - - -
VftVl BOX FEEDEPI TO "%GN-SPlLEA ROLLS •
0 WHENE CLAY MAX-TS AIM SNREADED
"' G{LEEN VNSES ARE PLAc ct)
.'•:.�'� � � ON Dill E i� Tft01.LEY S
FROM FOUR-WA.Y S0XFSF-VF-R
r -SO Ex-muocvR %.,THERE CLAY
-
_ _ Ex-�RVDED 1N�o cownN - -
VASES GO TPPROuCYN
CLAY SEC'"ONS &PIE
@-:--' I1 SHAP60 %VA-ro VP►GE�. DRY1N G c-vcLE
SHREADED LL-Ply IS FED �1 Q,Y PRESS IN DRI ER
t>%KEC-TL-Y TO FOv0.-WAY CLA`f GOLVMN %t GUT a
SOxmr6osa p
1NT0 SEcT�ONS OF ,
PP.G pE'TE0.N�NED LEN GT1i
n1 AT vR
GAS
F1N1SF1ED PRoD .T vc IS
STACKED OwcrO PALI..ETS
AHD SNRINK�WRgPPCC
ORY VASES ARE STACKED
ONTO KILN GARS
VASES ARE FIRED IN KILN
"MANUFACTURE FLOW PROCESS C14AR-T o