HomeMy WebLinkAboutSPECIAL EXCEPTION, SITE PLAN FOR CONDOS TOWN OF SOUTH WINDSOR l 0 z'I
PLANNING AND ZONING COMMISSION
The Commission will officially receive applications
Application No . at either Special or Regular meetings provided they
Received Date : .3 J t were submitted to the Commission Chairperson, Secretary
Action or Public Hearing by : or agent, at least fourteen (14) days prior to the
meeting at which they will be officially received.
` No application officially received at a Special Meeting
eceipt NO . r7� I will be acted upon at that meeting.
SouEhrid e Estates, Lnc . -\
APPLICANT : g
ADDRESS • 675 Oakwood Avenue, 7-est =lartf^rd, C7 OS110 TELEPHONE 5)22-41.01
OWNER OF RECORD ON LAND RECORDS : ou t icge Estates, Inc .
ADDRESS : 67,E oak,,oed Avenue, 7est 7'a_-tfn-rr!., OG11 G
COMPLETE LOCATION OF PROPERTY: Sand -fill -1oa.6 and '_llington ' oac
(see attached nan) �_`. ,?
ZONE ' -"A-"
NAME , ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE
DIRECTED : 11illiam E. Grace, Esct. 25 Oaklanc. Road, �out�� Windsor, C^_ 06074
TELEPHONE
044--132'S
THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING)
1 . Zone Change to (public hearing required)
2 . Filing for Subdivision
3 . Filing for Open Space Subdivision (public hearing required)
4 . Filing for Resubdivision (public hearing required)
5 . Special Exception to Article (public hearing required)
6 . Site Plan of Development
7 . Removal of Sand , Gravel , Clay or Quarry Stone & Ore (public
hearing required)
X 8 . Other (explain in detail) ';nec.'al 13.xcention and Site nievelonment
of Phases III , *Dnrovals for ^T''-» '_?evelonment
THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY
AND SUBMITTED WITH 6 SETS OF PLANS ( 7 sets if public hearing is required)
B 0 II I gCEIVED ggY THE PLANNING & ZONING COM�S N .
S /T���ID� ATr.3, I?dC. Xj&:G F _i,3, I�`?C.
y
J
A plicant Owner
�9i114_a.m E. �1ace, Its Atto_cnev William E. Grace, Its ?`attorney
12/84
PLANNING AND ZONING COMMISSION
TOWN OF SOUTH WINDSOR
Fee Schedule and Policv
1. An application processing fee of $25 per lot ($50 minimum) is required
for: Subdivisions,. resubdivisions, and open space subdivisions.
2. An application processing fee of $50 is required for: Change of Zone,
Zoning Amendment, Special Exception, and Earth Removal or Land Filling
Operations.
3. An application processing fee of $25 is required for Site Development
Plans, except: where new buildings/additions/renovations of 2,000 s. f.
or more are proposed, said fee shall be $50; said fee shall be $500
for Site Development Plans in the Designed Commercial Zone; $50 plus
$5 per dwelling unit for Adult Housing ($500 minimum) .
4. An application processing fee of $10 per acre ($300 minimum) is required
for a Change of Zone/General Plan of Development in the Designed
Commercial Zone.
5. An application processing fee of $100 is required for a Change of Zone/
General Plan of Development in the Multi-Family or DA-15 Residential zones; or
for a Special Exception/General Plan of Development for Adult Housing.
6. An application processing fee of $50 plus $5 per dwelling unit is
required for a Special Exception/Site Plan of Development in the Multi-
Family or DA-15 Residential zones ($500.00 minimum).
7. Application processing fees are non-refundable after the application
has been officially received by the Commission. Application processing
fees may be returned prior to the application's official reception
provided a letter of withdrawal, signed by the applicant , has been
submitted to the Commission prior to the meeting at which said applica-
tion is scheduled to be officially received.
8. Applications unaccompanied by the required application processing fee
are incomplete, and as such may be returned to the applicant and
removed from the Commission' s agenda.
9. Complete applications and required fees shall be submitted at least
fourteen (14) calendar days prior to the Regular or Special Meeting
at which it will be received.
10. Fees for a previously denied application shall not apply to any
subsequent application. However, when a subdivision, resubdivision,
or open space subdivision application has been denied within the
preceding 12 months or approved for fewer lots than requested, and a
new application for the subject tract is submitted by the same appli-
cant, then the fee for the new application shall be a minimum of $50
plus $25 for each lot above and beyond the number of lots contained in
the earlier application.
11. A fee of $5 per sign is required for signs to be posted by the
applicant on the subject property.
12. Other Fees: Subdivision Regulations - $3.00; Zoning Regulations - $4.00;
Zoning Map $1.00; fees for other documents is as determined by the
Commission.
13. All checks shall be made payable to "Town of South Windsor."
Adopted: 4/10/84
Revised: 12/4/84
PLANNING AND ZONING COMMISSION SEPTEMBER 11 , 1984
SPECIAL MEETING SOUTH WINDSOR TOWN HALL
PUBLIC HEARING AND SPECIAL MEETING -
MEMBERS PRESENT: Gilligan , Conde , Sorosiak, Sorenson , Smith , Klenke and
Montana (sitting for the Special Meeting only)
ALTERNATES PRESENT: Hallowell (sitting for Montana during Public Hearing) ,
Rossi
CALL TO ORDER
NEW BUSINESS
Mrs . Montana made a motion to go . into Executive Session to discuss
pending lcaims and litigation, -i. e . , Savin Brothers , Inc . vs . South
Windsor Planning and Zoning Commission. Mrs . Klenke seconded the
motion and it was unanimously voted in favor and so ordered .
Mrs . Klenke made a motion to authorize the Town Attorney to file , in
addition to a Petition for Certification , such other motions or documents
he deems appropriate and/or necessary to appeal the decision of the
Appellate Court in the case of Savin Brothers, Inc . vs . South Windsor
Planning and Zoning Commission. Mrs. Sorosiak seconded the motion and
it was unanimously voted in favor and so ordered.
Mrs . Klenke made a motion to recess the executive session and commence
the public hearing which was scheduled for 8 : 00 P . M. , and reconvene
the Executive Session after the public hearing. Mrs . Smith seconded
the motion and it was unanimously voted in favor and so ordered .
The Executive Session recessed at 8 : 07 P . M.
PUBLIC HEARING
1 . Application of Sand Hill Associates, for a Zone Change from RR to
MF-AA, and approval of a general Plan of Development
The secretary read the legal notice as it appeared in the newspaper ,
a copy of which is attached hereto . Mrs . Montana had disqualified
herself from sitting on this application , and the Chairman appointed
Alternate Hallowell to sit in her place .
Attorney William Grace was present on behalf of the applicant , Sand
Hill Associates , which is owned by William F. Mitchell , John J . Mitchell
and Daniel C . Guachione . They are asking for approval of an MF-AA zone
and General Plan of Development . Mr . Grace introduced William O ' Neill
of Fuss & O ' Neill , the engineers for this project , and Gregory Montana ,
the architect .
Mr . O ' Neill pointed out the site on the map and said they are proposing
102 units on 20 acres . They have secured approval from Inland Wetlands
regarding the storm water management . There will be a green corridor
between the two pieces of land . Sanitary sewers will be by gravity flow,
and water will be available . There will be a pedestrian right-of-way
between the two parcels . They are proposing a Wapping Road by-pass ,
and by the time they are ready to proceed with the fourth phase the
by-pass will be finalized .
Planning & Zoning Commission -2- 9/11/84 1
Mr . Tom Currin of Fuss 6 O 'Neill stated his qualifications as a traffic
expert and referred to his report which contained 'an analysis of both
existing' and projected traffic volumes . The traffic impact was assessed
using a density of 102 condominium units , all fully occupied . Since the
development will have more than 200 parking spaces , a State Traffic
Commission major generator permit will be required . This must be
obtained prior to issuance of a building permit by a Town .
Sight distances at the Sand Hill Road access are over 600 feet in both
directions and the pavement width is 32 feet with curbs on both sides.
Ellington Road is a two lane State roadway with a pavement width varying
from 24 to 26 feet . Sight distance is 600 feet to the north and about
175 feet to the south . Roadway modifications would have to occur to
provide adequate sight distance prior to development . Ellington Road
is currently operating at 44 percent of its capacity and would rise to
47 percent , and Sand Hill Road is operating at 33 percent and would
rise to 35 percent of its capacity with this development . The "S"
... curve on Sullivan Avenue at Sand Hill Road will be reconstructed by
._. the State . The intersection of Valley View Drive and Sand Hill Road
does work.
Referring to the Wapping by-pass road between Ellington and Sullivan
across a portion of the subject parcel which would allow the elimination
of the Ellington Road leg of the five corners intersection , Mr . Currin
said this 'is definitely an improvement and he would encourage the
Commission to pursue that .
A copy of page 11 , citing the conclusions of Mr . Currin ' s report , is
attached hereto , marked Exhibit A.
Gregory Montana , Architect and Planner for this project , proceeded as
follows : Both properties were originally mined off for the gravel ,
::. and the property on Sand Hill has a large , deep excavation which would
have to be filled . The Ellington Road piece has a high , existing ,
well-treed buffer above' the existing contours . The tree line between
Parkview South and this project have some very fine trees . They have
been concerned with the relationship of the proposed buildings as they
._, relate to Parkview South , and houses along Sand Hill and Ellington Roads .
Marketing studies have shown that a low-density , well-designed project
is a very feasible use of this property . This is more or less a continu-
ation of Parkview South. Sales of Parkview South revealed many inquiries
of why certain things hadn ' t been done , and they have taken all this
into consideration in designing the proposed project . All these units
will have individual garages with direct access to the kitchens (or units) .
They are proposing 46 units on the Ellington portion , and 56 on the Sand
Hill portion . The design philosophy has been to save as many trees
as possible . There has been discussion about relocating the swimming pool
with the tennis court , thereby causing less noise to Parkview South .
They will be about 80 ' from Parkview South at the closest point .
= : There will be two-story townhouses with optional lofts and one story
ranches . There are no second story ranches . A two-bedroom ranch has
1270 s . f . with 1� bath, full cellar , and with a cluster type arrange-
:: ment they will get a lot more light into the units . All units will have
attached garages . A 1650 s . f . ranch will have an upper story master
bedroom and loft suite The townhouses will be 1450 s . f . , with two
upstairs bedrooms and cathedral ceilings , and two different kitchen
Planning & Zoning Commission -3- 9 /11 /84
arrangments will be available . About 20 percent will be ranches with
the optional upstairs unit , and about 20 percent of the townhouses will ="
have lofts .
Density is 4 . 6 units per acre , which is the lowest density in Town .
This design has more green area than any other project in Town, and they ::•
have been sympathetic to the existing woodlands and also the facility
next to it . The landscaping plan shows development of a berm along the
new police complex .
Ceil Decker, a local real estate then reported concerning the need for
this type of housing in Town , in view of the increasing numbers of
single people and retirees . A condo can be sold for $ 70 - $80 , 000 ,
while a new single family home is -at least $110, 000 with an existing
single family home selling in the low $90 ' s . The location in South
Windsor is very desirable because of its close proximity to Hartford and
its school system. She noted the garages and basements will be a
good' selling point , as well as the fact that there are no second floor ==
ranches . Also of importance to prospective buyers is the low density =
in a rural setting.
Attorney Grace said that he received a letter from Dr . Goldman which
stated that a survey of Parkview South indicated that in the 106
units there is a total of 16 children. Six are at Orchard Hill ,
four at Timothy Edwards and six at the high school . The Board of
Education projects about 15 children in this development . They would
like an internal walkway , and a bus shelter , which have been provided .
The Fire 'Marshal did not object to the roadway . They have made
a request to the Town Manager for permission to drain into the detention
basin by the police complex . The size of it may have to change , and
this will be addressed when the site plan is brought in . The ZBA
granted a variance of 15 feet , so there is a buffer of 35 ' rather than ..
50 ' . Inland Wetlands has approved the whole development . They ..
purchased a 50 ' strip from the power company , and there may be limitations
about what they can do and possibly the power company won ' t permit
trees . Mr . Grace said they felt this land was not suitable for single
family dwellings , and the applicants are making a commitment to stay
with this project until it ' s completed just as they did with Parkview
South . The last unit was just sold in Parkview South , and they believe
this project should also develop in four stages , with a completion
date of about 4 years - the same as Parkview South .
Town Planner , Peter DeMallie , then gave the following report : :.
In his "Policy Analysis - Wapping" report , dated July 10 , 1980 , copies
of which he distributed , Mr . DeMallie said he wanted to start a :.
dialogue for establishing a growth policy for the Wapping area , and
the proposal tonight is located in that area . The final pages of this
report contained a concept plan for land use , recreation and transporta-
tion improvements . The minor road improvement at Sand Hill /Route 74
intersection has been completed. The Sullivan Avenue S curve project
has been salvaged and will go to construction in the Spring , or even
sooner . Horizontal and vertical realignment on Ellington Road above the
Town Hall in the vicinity of the southerly entrance of Sand Hill condominiums
will be required to safely accommodate traffic generated by this development .
Planning & Zoning Commission -4- 9/11/84
It is unlikely the State will do this . This area is well suited for
multi-family development , particularly for the elderly . The northerly
half of the site (Sand Hill Road part) should be developed first since
traffic improvements are necessary for the Ellington Road side .
- Sheet #10 of the plans indicate the un-named brook will be placed in
a culvert for about 390 ' , and Mr . DeMallie said he believes the
integrity of the brook as a natural watercourse should be preserved.
He said he is not adverse to relocating it to the path shown on the plan,
and he noted that the Wetlands Commission approved placing it in a pipe .
There will be substantial filling in the southwestern portion of the
Sand Hill Road site , as much as 14 feet , and slope rights will be
required from property of Norman Priest.
The detention basin for the northerly site is Town owned , and applicant
_.. must demonstrate the right to use this property . They plan to go
through the Town Manager and Town Council to secure these rights .
Unit types should be indicated on the plans . Sidewalks should be
installed on Sand HillRoad to the new Abbe Road Extension, in lieu of
concrete sidewalks on the south side of Sand Hill along this parcel ' s
frontage . The stonedust path connecting this site should be taken
into consideration since some other material might be better , and
consideration should be given to a crosswalk across Sand Hill Road to
the new Nevers Road Park . Detailed landscaping plans are not required
at this stage , but wi�.l have to address foundation plantings , buffers
on the westerly boundary complementing plantings of the police
complex , and buffers to screen the residential use from the police station.
Variances were granted along the CL & P line , and Mr . DeMallie said he
has no problem with that . He does not envision any development in the
CL & P right-of-way .
Mr . DeMallie said he basically does not oppose the zone change and
general plan for the northerly (Sand Hill) portion of the site .
Regarding the southerly (Ellington Road) part of the site , Mr . DeMallie
said the sanitary sewer line on Sheet #8 encroaches on land of Parkview
South and rights to do this will be required . If they take the alternate
route on Ellington Road, rights will be required . They will be encroaching
on property of Hills and CL & P, and rights will be required . Most
of the existing trees are in areas of new grades for buildings , and will
probably be removed. Mr . Montana interjected that the trees in the buffer
along Parkview South can be saved . Mr . DeMallie said this subject will
have to be addressed in more detail with the site plan phase . Sheet 7;6
" should have the detention basin outlined on it as well as phase lines.
Rights must be obtained to connect the stonedust sidewalk with the
existing sidewalk along Parkview South . An easement will be required
from where Parkview terminates its sidewalk to the Town property to the
south .
Regarding traffic and particularly the Wapping bypass road and Five Corners ,
-:: Mr . DeMallie referred to a xerox copy of a plan showing a bypass road
- :: between Route 30 and Route 74 , north and west of the Town Hall . The
::.. original road was proposed in the 1968 Town Plan , but going to the north
through what is now Parkview South Condominium. In 1982 Town Staff
met with DOT, and Mr . DeMallie referred to a map and two letters from
DOT . Consideration was given to make Route 74 one way northbound from
five corners , but DOT suggested consideration be given to closing it .
Planning & Zoning Commission -5- 9/11/84
It was recommended that Sullivan Avenue have an additional northbound
lane on the easterly side . CONNDOT did not seem to have problems with
the proposed bypass road but recommended it be signalized on Sullivan
Avenue , and possibly make a wider sweep through what is now proposed
to be Sand Hill Condominiums .
Mr . DeMallie said he recommends as follows : The Town should continue
pursuing resolution of the five corners traffic problem Provision
for the bypass road through the subject ' s parcel north of the Town Hall, t
and secondly , closure of the Route 74 leg of the five corners intersection
should be pursued, and Route 74 should be cul-de-sacced south of the
Town Hall entrance . Third , a northbound lane on Sullivan from five corners to the F
new bypass road should be pursued . The State should also determine
whether Route 74 will follow the bypass road, or as an alternate , Sand
Hill Road , terminating at a traffic signal on Sullivan Avenue . That
Sand Hill/Sullivan intersection will be redesigned and Sand Hill Road
may be redesignated as a State highway . If the Wapping bypass road
becomes Route 74 , a larger arc might be required by the State than if
it becomes a Town road. If Route 74 at five corners is not closed ,
the bypass road should be pursued as a Town road .
Mr . DeMallie noted that the absence of a resolution to five corners
is a Town problem, and this development does contribute to it , but only _
a small percentage . In the area of units 1 through 10 , and 31 through
36 , they could be granted approvals subject to further modifications
to accomodate the Wapping bypass road . He said the general plan
should be modified to portray a concept of a bypass road from Route 194
to 74 , centered in a 50 ' right-of-way with a 30 ' wide pavement , and
the entrance drive teed off of it . Units 1 through 4 and 31 probably
should be removed from the plans , and the bypass road either constructed
through the westerly property line of this application , or at least
graded to the westerly property line . The 50 ' right-of-way should
be deeded to the Town once this problem is resolved .
Mr . DeMallie said he doesn ' t know how they can progress to a site plan
until some of these things are pursued . He noted that it is possible
to approve and file a general plan with the understanding that that
particular area will be modified . The phasing should be modified
on the plans to reflect what was said this evening .
Mr . DeMallie concluded that he is not opposed to a change of zone for
either parcel , although his preference would be for elderly housing . j
These are very large units , with low density , and Mr . DeMallie said
the applicants did a good job .
Town Engineer Rick :Martel then proceeded to give the following report :
If the zone change is approved Sheet 7#2 should have Class D certifications .
Sheet #5 should show sanitary sewer right-of-way through the parcel , and
Sheet #6 should show the 50 ' easement around the stonedust path . The
dimension from the cul-de-sac to building #30 should be given , and the
regulations require a minimum of 65 ' . Sheet V7 should show the same 65 '
distance for building #73 . Sheet #8 shows a detention basin, and there ' s
Planning & Zoning Commission -6- 9/11/84
about a 10 ' drop fromthe street , and anyone running . off the road
would have quite a drop and perhaps berming would be the solution .
The outfall on the storm sewer at the cul-de-sac on Sheet #8 should be
addressed, as well as grading onto CL & P property will require rights .
Sheet #9 should show the location of the CL & P poles and guide wires
in relation to the walkway when the site plan is prepared . Another
right-of-way for the relocation of the sanitary sewer is required on
Sheet #9 from CL & P . Sheet #10 should correct the direction of the
storm sewers in the northeast corner of the property , as well as the
direction of the sanitary sewers . Some of the arrows are pointed in the
wrong direction.
Mr . Martel said one of his major concerns is that basically this property
has been a large borrow pit and -there ' s going to be a significant amount
of fill required . This must be addressed , as to what kind of fill , where
it is coming from and how it will be placed , and this should be done on the
site plan . Which existing tree stand will be preserved must also be
addressed.
Referring to the Wapping bypass road , Mr . Martel said if the Town takes
title , further consideration of slope rights on the north side of the
road must be considered , possibly 10-15 ' .
Speaking a b o u t the application was Judy Begley representing 1905
Ellington Road , and she - said they have three major concerns . The driveway
on the plans appear to be very close to their home and they are concerned
about the possibility of lights from cars shining into their living room.
She requested the driveway be moved north. She expressed concern that
the brook flowing through Kupchunos ' site onto the Newberry property be
preserved during construction and afterwards . Ms . Begley said traffic
on Ellington Road travels at 45 m. p . h . -or faster , and it currently takes
about 5 or 6 minutes to get out of their driveway in the morning . She
also noted that if the bypass road is built , they would be concerned again
with lights shining into their windows .
Mr . Vito Covensky of Summer Hill Road at Parkview South Condominiums
stated he is in favor of this application .
Andre Charbonneau of 604 Avery Street stated he owns a condo at Parkview
South and spoke of the need for affordable housing for younger people .
He said he is in favor of this application.
Walter Kupchunos of 392 Ellington Road said his father owns the house
opposite Parkview South . He stated that he is not quite sure of where
the drainage is going but there is a tremendous amount of run-off . He
also said if the grade of Ellington Road is changed he is wondering how
this will affect the drainage .
Steve Mewhinney of Parkview South Condominium spoke in favor and said
projects such as this will provide the opportunity for people to stay in
Town .
Chairman Gilligan then read letters from Norman Hills , who expressed
concern about an adequate buffer between his property and the applicant ' s
Planning & Zoning Commission -7- 9/11/84
property , and concern for drainage as well as a request that a chain
link fence, be erected ; from Sarah B . Hills who owns the abutting property
and requested there be a buffer and also questioning the drainage ; and
from Jill Clinton, which stated she is opposed to this application
because the present zoning is the best use of this property , because it
does not meet the zoning regulations in that it is not 15 contiguous
acres , and because of increased traffic .
Also opposed to the application was Dave Collins from Sand Hill Road who
said traffic on Sand Hill is just as bad as Ellington Road .
Commissioner Smith asked for clarification of what a major traffic
generator is , and Mr . Currin explained the procedure for obtaining
the permit .
Mrs . Sorosiak asked if the land would drain into Plum Gulley Brook,
and Mr . O 'Neill said the 10 acres on Sand Hill Road would , but will
pass through a detention basin so there will be no increase .
Mr . Conde asked who would pay for the realignment of Ellington Road if
it is done , and Mr . Currin said the developer would have to come up
with money for improvements . He also clarified that the only variance
they obtained was for the buffer . Mr . Conde also noted that
land for the Wapping bypass road should be set aside since it is in
the Plan of Development .
Mrs . Klenke clarified that sidewalks on Ellington Road would continue
to the Town Hall driveway , and will go over the brook . She asked
if they would proceed to get permission to regrade Ellington Road
now, and Mr . Grace said they would start now and hope that by the time
they are ready for Phase IV they would have approval .
Commissioner Sorenson said he has a lot of trouble with a stonedust
sidewalk connecting the two parcels , and that concrete may be better ,
and Mr . Grace said they have to go back to CL & P to see what will be
permitted , and they are not adverse to cement or whatever .
Mrs . Rossi clarified that the "right-of-way" between these two parcels
is actually owned by the applicant .
Mr . Hallowell said he would like the work in Parkview South completed ,
and Mr . Grace said there are two different entities developing Parkview
South and Sand Hill , but work will be completed at Parkview South this
Fall .
Chairman Gilligan asked if they had preliminary calculations on filling ,
and Mr . O ' Neill said they have not done computation yet , but fill will
have to be brought into the Sand Hill site , and the Ellington side will
balance better . He noted there is a possibility CL & P would allow them
to use some of the material under the CL & P lines .
Mr . Gilligan asked about drainage into the no-name brook, and Mr . O ' Neill
said the no-name brook will take drainage from each of the parcels , but
Planning & Zoning Commission -8- 9 /11/84
the net effect will be that they will provide adequate detention and
storage area so there will be no impact flow downstream, and discharge
will be at non-erodable velocities . Mr. O 'Neill said they will
protect the no-name brook' s character and there will be no erosion.
Mr . Gilligan summarized that the applicant plans to pursue Phase 3/4
on Ellington Road, recognizing that it will require extensive regrading ,
at the developer ' s expense , of Ellington Road , and also mindful and
hopeful that the proposed Wapping bypass road may come in in place of
that . Applicant is asking for approval of this application having
evidence that access to Phase 3/4 is possible, but it ' s only a matter of
how. Mr . Grace said that sums. up their position .
There being no further comments , Mrs . Klenke moved the public hearing
be adjourned and the Executive Session be reconvened . Mr . Conde seconded
the motion, and it was unanimously voted in favor and so ordered .
EXECUTIVE SESSION
The executive session reconvened at 10 : 05 P . M.
Mr . Hallowell moved the executive session be adjourned at 10 : 25 P . M. ,
seconded by Mrs - Smith and unanimously voted in favor and so ordered .
Respec fully subm ' tted ,
Vir ini S . -G an y , Recordin ecretary
APPROVED :
I
i
I
. S�•pN Sf,<
o
� n Ole S
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
S . 0 AREA CODE 203/644-2511
October 29 , 1984
William E. Grace, Esq.
25 Oakland Road
South Windsor , Ct . 06074
Dear Bill :
Re: App . #1011 - Sand Hill Associates
Zone Change and General Plan of Development
Please be advised that the Planning & Zoning Commission voted
on October 23, 1984 to approve the above application for a
zone change from RR to MF-AA on 20 . 59 acres, more or less, which
are located between Sand Hill Road and Ellington Road , south
of Parkview South Condominiums , as shown on plans prepared by
Fuss & O 'Neill , Consulting Engineers , dated 6/12/84 , Proj . No .
81-299A.
Within ninety days (by January 21 , 1985) you must submit a
zone change map (l" = 40 ' ) , with an A-2 certification , showing
the distance and bearings of all boundary lines and acreage of
the land where the zone change was granted . The map shall be
drawn in accordance with the rules and regulations of the State
Board of Registration for Professional Engineers and Land
Surveyors , and shall be stamped and signed by a Registered Land
Surveyor and submitted on black and white mylars , together with
three paper prints. After the mylar has been stamped and signed
by the Commission, it will be filed in the Town Clerk' s Office .
The effective date of the zone change is the date the mylar is
filed in the Town Clerk' s Office .
The Commission also voted to approve the General Plan of Develop-
ment as shown on plans prepared by Fuss & O ' Neill , dated
6-12-84 , consisting of 13 pages, and by Gregory Louis Montana &
Associates , consisting of 7 pages , subject to the following
modifications :
1 . Consideration must be given to the proposed by-pass road
from Ellington Road to Sullivan Avenue .
2 . Consideration must be given to exiting the entire development
onto Sand Hill Road, which may significantly reduce the
number of units in Phase IV.
William E. Grace, Esq . -2- 10/29/84
3. Setbacks from the proposed by-pass road must be 75 ' in
accordance with the Zoning Regulations.
4 . Consideration shall be given to comments made by the Town
Planning Director , Peter DeMallie, and Town Engineer , Richard
Martel , at the public hearing on September 11 , 1984 when
the Special Exception/Site Plan application is submitted .
(Minutes of 9/11/84 meeting are attached) .
Yours very truly ,
PLANNING AND ZONING COMMISSION
vg By : I_
enc . Robert F. rill7lgan, Chairman
CC : R. Martel , Town Engineer
P . DeMallie , Planning Director
E. Belleville, Assessor
Inland Wetlands Agency
�4pgM 8f,(� -
7owt-2- o-P S-q� ?4��id4:�qt
a �
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR•co AREA CODE 203/644-2511
March 11, 1985
Mr. William O'Neill
Fuss & O'Neill Consulting Engineers
210 Main Street
Manchester, Connecticut
Dear Mr. O'Neill:
At a regular meeting of the Water Pollution Control Authority
held on March 5, 1985, the Authority voted to approve the
sewer plan for Plum Ridge, Sections 1, 2, 3, and 4, Project
84-467A - Map dated 1 /4/85.
Very truly yours,
i '
j �
Joseph J. Carino, Chairman
TOWN OF SOUTH WINDSOR
Water Pollution Control Authority
JJC:pm
CC: Mr. Peter DeMallie, Director of Planning
Mr. Robert Gilligan, Chairman, Planning & Zoning
Mr. Thomas P. D'Auria, Building Inspector
Mr. Rick Martel, Town Engineer
FUSS & O' NEILL, INC.
MANCHESTER, CONNECTICUT
CONSTRUCTION COST ESTIMATE DATE PREPARED SHEET OF
PROJECT t -A R.�pv�, BASIS FOR ESTIMATE
LOCATION
SECTION
DRAWING NO. ESTIMATOR L.!-A .5 . CHECKED BY C--). 6 .1•�
ITEM ITEM UNIT N0. PER TOTAL
NO. MEAS. UNITS UNIT COST
C Y. X5 1 Boo 3 .00 15 s;=;-oo
-"o�► I�S� 35.00 109, 5�0
440'5 12.00 SZ 15940
G.Y. 1904 g.00 I5, 23Z
10 2-�- r .p l_.�. 229- 25 ;o
It
5,=o0
� —�, � 5,�.�: --ace• � � 495 �G Oo I-?-, 5~�0
4.
� � 4 �0 I � J
s40V111 aeq
H Y
sot,tA &Z&-ot
�v 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
f�OSOR-Co AREA CODE 203/644-2511
March 21, 1985
William E. Grace, Esq.
25 Oakland Road
South Windsor, Ct. 06074
Dear Bill :
Re: App. #1043 - Plum Ridge Condominiums
Special Exception and Site Plan
Please be advised that the Planning and Zoning Commission voted
on March 12, 1985 to approve the above application for a special
exception and site plan of development for Plum Ridge Condominiums ,
as shown on plans prepared by Fuss & O'Neill, dated 1/4/85 , consisting
of 16 pages, and plans prepared by Gregory Louis Montana & Associates ,
Architects, dated June 12, 1983 , subject to the following :
1. This approval is for Phases I and II of Plum Ridge Condominiums ,
consisting of 55 units on the south side of Sand Hill Road,
in an MF-AA zone. This approval includes construction of interior
roads and pathways and sidewalks, as well as installation of
utilities and recreational areas. All work shall be in accordance
with the zoning regulations and building department procedures.
Applications for approvals for subsequent phases will not
be accepted until site improvements in Phases I and II have
been completed and inspected by this Commission, the Town Engineer,
and Building Official, for the purpose of certifying that all
construction in Phases I and II are in accordance with the
approved site plan in all respects, including the construction of
the utilities, roads and amenities as required therein.
2. Prior to filing the mylars, applicant must demonstrate to the
Commission that it meets the requirements for developed recrea-
tional land as outlined in the MF-AA Zone regulations.
3. A conservation plan, subject to the Town Engineer ' s approval,
must be submitted indicating areas of earth removal and/or
excavation in Phases III and IV. These areas must be seeded,
loamed and restored in accordance with the Erosion and Sedimentation
Control Handbook, subject to the Town Engineer' s approval.
4. A plan indicating the proposed improvements to the Town-owned
detention basin must be submitted to this Commission prior to
filing the mylars.
William E. Grace, Esq. -2- 3/21/85
5 . The plans must be modified as follows :
a. Sheet No. 8 should indicate concrete sidewalks , built to
Town specifications, will be installed on the northerly side
of Sand Hill Road from Abbe Road Extension in a westerly
direction to connect with the existing sidewalks.
b. Manholes #24 , 23 , 22, 21 and 20 should indicate a 10" PVC
pipe will be installed for the sanitary sewers;
C. A manhole should be shown on the east side of Sandstone Drive,
which will extend the main down to manhole #25 to serve
units 1 through 10 and possibly 11 through 16 .
d. Services for water connections should be shown on the plans.
e. Sheets #5 and #8 should indicate a right-of-way for the storm
sewer extending from Sand Hill Road to the south.
f. During construction of Phases I and II , a temporary cul-de-sac
should be installed at the end of Sandstone Drive.
g. The key map should be corrected to show the areas of slopes
in excess of fifteen percent (15a) .
h. The plot plan should indicate that the drainage easement is
granted by the Town of South Windsor.
i. The plot plan should indicate the acreage of the site.
j . Iron pins must be shown at all property corners.
k. The pavement width should be dimensionalized on Sheet #8 .
1. The plans should indicate that grading is required on other
properties.
M. Sheet #5 should indicate the drainage easement is to Plum
Ridge Condominiums.
6 . Easements indicated on the plans must be submitted to this Commission
prior to filing the final plans, and shall be in accordance with
the procedure adopted by this Commission (copy enclosed) for filing
deeds and easements, and must be approved by the Engineering
Department and Town Attorney.
7 . Quantity estimates for bonding purposes must be submitted to the
Engineering Department, and said bond must be submitted prior to
filing the plans.
In the event the Commission votes to accept a Letter of Credit
for a one year term, in lieu of a surety bond, said Letter of
Credit must be renewed on a yearly basis until completion of the
development. If a new Letter of Credit has not been received
within thirty (30 ) days before the expiration date, the Commission
may, at its option, call the Letter of Credit it is holding.
8 . A drainage assessment fee in the amount of $2, 750 shall be submitted
to this Commission prior to filing the final plans.
9 . A liability insurance policy shall be submitted to this Commission
naming the Town of South Windsor as an insured with a combined
i
William E. Grace, Esq. -3- 3/21/85
single limit for bodily injury and/or property damage in the
amount of $1,000 , 000 .
10 . This approval is subject to the conditions of approval of the
Inland Wetlands Agency and Conservation Commission.
11. Prior to commencement of site work, a meeting must be held with
Town Staff.
12. No building permits will be issued until the final plans have
been filed in the Town Clerk' s Office.
13. Black and white transparent mylars of Sheets #2, 5 , 6 , 8 , 10 and
13 must be submitted to this Commission, together with three
complete set of the plans with the above modifications . The
letters of approval of this Commission, Inland Wetlands Agency,
and Conservation Commission must be reproduced on the mylars
prior to filing same.
Yours very truly,
PLANNING AND ZONING COMMISSION
vg By
enc. David H. Sorenson, Acting Ch irman
CC : R. Martel, Town Engineer
P. DeMallie, Planning Director
T. D'Auria , Building Official
E. Belleville, Assessor
Inland Wetlands Agency/Conservation Commission
Fuss & O 'Neill
�40,0N •!,`�
y Y T-o , o-P S-otdA ?dzndAqt
S
1540 SULLIVAN AVENUE SOUTH WIN DSOR, CONN. 06074
J~�SOR•c� AREA CODE 203/644-2511
May 29, 1985 TI
r r _
William E. Grace, Esq. Yr
25 Oakland Road
South Windsor, Ct. 06074 SO. WINUSOR DEPT.
Dear Bill:
Re: App. #1043 - Plum Ridge Condominiums
Please be advised that the Planning and Zoning Commission voted
last night to grant a 90 day extension of time in which to file
the final plans in the above matter. The extension is from
June 10, 1985 to September 8, 1985.
The Commission also voted to accept a Letter of Credit in lieu
of a surety bond, subject to the approval of the Acting Town
Attorney.
The Commission further voted to accept the plans prepared by
Fuss & O'Neill, dated 1/4/85, revised to 4/2/85, portraying the
developed recreational land, as recreational land for Phases I
and II. At the time of submission of the site plan for Phases III
and IV, the applicant must demonstrate that the recreational areas
are of sufficient size for developed recreational uses. The
Commission recommends that consideration be givento at lea t ne
,000 s or more, or use as developed
recreational lannin Phases III and IVP ases III and IV.
This letter, as well as the original approval letter, must be
reproduced on the mylars prior to filing same in the Town Clerk's
Office.
Yours very truly,
PLANNING & ZONING COMMISSION
vg By:
David H. Sorenson, Acting Ch irman
CC: Mr. William O'Neill, Fuss & O'Neill
Peter DeMallie, Planning Director
Richard Mattel, Town Engineer
t
rA
ti
1540 SULLIVAN AVENUE SOUTH WINDSOR, 4 0�IH.�0607�4
s AREA CODE 203/644-�511
7
M E M O R A N D U M
November 4 , 1986
1rn;ng CoMMIS'.
TO: Louise Evans, Chairperson, Planning & Zoning Commission
RE: Agenda Items #4 and #5 , Thursday, November 6 , 1986
Planning and Zoning Commission Special Meeting
My recommendations for the above referenced agenda items are:
Item #4 - Rosewood
1 . Sanitary sewers be made available to the Kebalo
property to the east.
2 . Further evaluation and inspection may require
improvements to the existing outlet structure to
the pond.
3 . Improvements to Clark Street will be necessary and
possibly some improvements to Smith Street.
These above items should be included in the site plan phase of
the application if the general plan is approved.
Item #5 - Plum_ Bidge--'`'�
1. A physical berm 'Ce installed along the south side
of the detention basin.
2 . Sanitary laterals be shown on the plans .
3 . ' Snow fencing be placed along appropriate borders to
insure that there is no encroachment on property of
others.
4 . Corner pins be set and shown on the plot plan.
5 . If approved, I will need quantity estimates for
bonding.
6 . Drainage computations will need to be submitted.
Louise Evans, Chairperson, Planning & Zoning
November 4 , 1986
Page 2 .
Item # 5 - Plum Ridge (Continued)
7 . The plot plan show a way to mathematically determine
where the southerly building line is .
P
r' 8 . A reasonable attempt be made to secure drainage rights
from the proposed detention basin north to the drainage
at Parkview South. If these rights canflot be gotten
that the outlet to the proposed detention basin drain
aq tie maps .
Richard P. Martel, P.E. & L. S.
Town Engineer
RPM/jsv
CC: Marcia Banach, Director of Planning
PLUM RIDGE CONDOMINIUMS
Recreation Requirements
Phase I & II Phase III Total
Required 33, 000 s. f. 21, 000 s. f. 54 , 000 s. f.
Provided 24 , 500 s. f. * 30 , 500 s. f. 55 , 000 s . f.
*Approved site plan showed 28 , 000 s . f. of recreation area
which included a 3, 500 s. f. pedestrian path under the power lines.
The area of the pedestrian path will be occupied by the principal
road and concrete sidewalk and thus has been subtracted from
Phase I and II recreation area provided.
,to am sF"(
�.
0/?S
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
soe•co` AREA CODE 203/644-2511
November 21 , 1986
William E . Grace , Esq . CERTIFIED MAIL
25 Oakland Road
South Windsor , Ct 06074
RE: Application #417 - Plum Ridge Condominium Phase III
Dear Attorney Grace:
At the November 17 , 1986 meeting , the South Windsor Inland Wetlands
Agency/conservation Commission approved with conditions Application
#417 , to construct phase III of the Plum Ridge Condominiums located
on Sandhill and Ellington Road .
The following conditions must be adhered to for this permit to be
valid :
1 . Item #3 of the Erosion & Sediment Control Measures must be
adjusted to a realistic time frame for restabilization of the
land disturbed and noted on plans .
2 . Item 1 through 10 of the Erosion & Sediment Control Measure
notes must be in place within two weeks before building
construction begins .
3 . We recommend a bond in the amount of $10 ,000 be submitted
to Planning & Zoning Commission to ensure compliance with
Erosion & Sediment Control measures .
4 . Construction activities shall be subject to the approval of
the Town Engineer .
5 . The application shall indemnify and hold harmless the Town
of South Windsor against any liability which might result
from the proposed operation or use .
r
c�
TO: William Grace , Esquire Page 2
6 . The permit is valid for one year and shall expire November
17 , 1987 .
Very truly yours ,
(�L -M
- 1A f
Joln M. Moran , Jr . , Chai man
Inland Wetlands Agency/
Conservation Commission
Town of South Windsor
JMM: dlb
CC : A . B . Davies , Deputy Town Engineer
Richard Martel , Town Engineer
Marcia Banach , Director of Planning
Louise Evans , Chairman , Planning & Zoning Commission
Michael Gantick , Director of Public Works
Thomas D' Auria, Building Official
John Shemo , Economic Development Coordinator
Fuss & O' Neill , Engineer
�S011N 8f+4 '9
-awn' 0i
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
Solt-co� AREA CODE 203/644-2511
TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, DECEMBER 13 , 1986
LEGAL NOTICE
TOWN OF SOUTH WINDSOR
PLANNING & ZONING COMMISSION
At the December 9 , 1986 meeting, the Planning & Zoning Commission
voted to take the following action:
1. Approve, with modifications, the application of Spectrum
Industries, for a site plan of development for property
located at 785 John Fitch Boulevard, GC zone.
2 . Approve, with modifications, the application of Southridge
Estates, Inc. for a Special Exception and Site Plan of
Development for Phase III of Plum Ridge Condominiums, consisting
of 36 units, located on the west side of Ellington Road between
Parkview South Condominiums and the Town Hall, MF-AA zone.
3 . Deny, without prejudice, the application of Vito Covensky for
a subdivision consisting of 38 lots, to be known as Coven
Mountain, located on the east side of Abbe Road, and at the
northerly end of Maskel Road, as shown on plans prepared
by Lucek Engineering Assoc. , Inc. , dated 1-29-86 and
8-12-86 , A-20 and A-30 zones.
Dated at South Windsor, Connecticut this loth day of December, 1986 .
PLANNING & ZONING COMMISSION
Louise C. Evans , Chairman
David H. Sorenson, Secretary
PLr
S
01PSo
9 mac` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
4.
��oSOR.00 AREA CODE 203/644-2511
April 9 , 1987
William E . Grace , Esq .
25 Oakland Road
South Windsor . CT 06074
Dear Sir :
RE: Plum Ridge I & II
The Planning and Zoning Commission is holding two Letters of Credit
drawn on the Society for Savings Bank in connection with the above
matter . The Letters of Credit are in the amount of $250 , 000 and
$20 , 000 and will expire on June 25 , 1987 .
In accordance with our policy for accepting Letters of Credit in
lieu of surety bond , we must have an amendment to the Letter
extending the term for a one year period well in advance of the
expiration date . Will you please forward us the amendment promptly .
Very truly yours ,
PLANNING & ZONING COMMISSION
By : Louise C . Evans , Chairman
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
�40w14 at'94
H = � Ole S_� L
0
G U
�r 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
c AREA CODE 203/644-2511
�~�sot• o�
June 1 , 1987
Rene Veilleux
675 Oakwood Ave
West Hartford, Ct 06110
RE: Application #354 - Plum Ridge Condo
Dear Sir:
This is a reminder that Application # 354 for permit and one year ex-
tension will expire on July 15 , 1987 .
A new application will be required if you plan to extend your project
beyond the above expiration date , along with a fee of $25 . 00 . This
should be submitted at least 30 days prior to the expiration date of
the permit. If work has been completed or will be completed by the
expiration date , we would appreciate you contacting the Inland Wetlands
Agency/Conservation Commission' s secretary, Debbie Bellizzi at 644-2511
Ext. 253 to advise her of work status .
If you have any questions , please don' t hesitate to contact Debbie or
Mr . Davies , Deputy Town Engineer .
Very truly yours ,
Kevin Rennie , Chairman
Inland Wetlands Agency/
Conservation Commission
Town of South Windsor
CC: Marcia A. Banach, Director of Planning
A. B. Davies , Deputy Town Engineer
Richard Martel, Town Engineer
Louise Evans , Chairman, PZC
.(OMN Stq
Ole S--0
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 _ �.
SOR•CO AREA CODE 203/644-2511
IQ ge
June 19, 1987 ,
Mr. Pat Gallo
675 Oakwood Avenue
West Hartford, CT. 06L10
Dear Mr. Gallo:
At a regular meeting of the Water Pollution Control Authority held
on June 16, 1987, the Authority voted to give Plum Ridge — Phase Ill —
preliminary approval to install laterals, providing all the Town
Engineering requirements as specified are met:
1. That all the laterals are paved and in the original
shelf of the manhole.
2. The stairs of a manhole do not direct a maintenance
operator into a paved lateral connection.
3. A print with the engineer's raised seal and original
signature be supplied.
Final approval will be considered at a later time.
Very truly yours,
Joseph J. rino, Chairman
TOWN OF SOUTH WINDSOR
Water Pollution Control Authority
JJC:pm
CC: Mr. Richard Martel, Town Engineer
Ms. Marcia Banach, Director of Planning
Mrs. Louise Evans, Chairperson, Planning & Zoning
Mr. Thomas D'Auria, Building Inspector
c r- Town o-P Sod W
e �
u
9 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
AREA CODE 203/644-2511
M E M O R A N D U M
September 8, 1987
TO : Louise Evans , Chairman , Planning & Zoning Commission
RE: Plum Ridge
The primary inspection at Plum Ridge was for the peripheral landscaping .
A walk-through inspection performed on Sections I and II on September 3 ,
1987 resulted in the following list of corrections/deficiencies to be
addressed :
Sidewalk repair/replacement
xl . Replace 1 flag at the westerly entrance sign .
)C2 . Replace 1 flag in front of unuit 209 .
x3 . Replace 1 flag on the principle street to the rear
of unit 410 .
4. Replace 1 flag on the principle street to the rear
of unit 210 .
-� S. Replace 3 flags at the handicapped ramp on the
principle street near unit 410.
6. Replace 1 flag in front of unit 601 .
7 . Replace 1 flag on the principle street to the rear
or unit 610 - handicapped ramp .
8 . Replace 1 flag at the entrance to the pool house .
9. Replace 3 flags in front of unit 310.
K 10 . Replace 1 flag in front of unit 301 .
11 . Replace 1 flag in front of unit 110 .
X 12 . Replace 1 flag in front of unit 107 .
Lorise Evans
Page 2 .
Curb Repair/Replacement
` 1 . Install approximately 10 linear feet at the west side
�c entrance .
K2. Replace approximately 10 linear feet opposite unit 209.
bf3 . Install around the planter in front of units 405 and 406 .
'A 4. Repair at the handicapped ramp to the rear of unit 410.
5 . Repair at the northeast corner of the parking area at
the pool .
6. Replace 45 linear feet on the principle street adjacent
to unit 501 .
'f- 7 . Replace 10 linear feet between the sidewalk and catchbasin
at unit 301 .
�- 8. Replace 10 linear feet in the parking area at unit 301 .
X9 . Replace/repair 10 linear feet at the principle street at
unit 110.
Pavement repair :
1 . At the walk at unit 404 .
Pavement depth :
Arrangements will be made with a member of the Town Hall Engineering
staff to witness and review pavement depth testing . This will be done
on all three phases at the direction of the staff representative .
Areas to be tested but not limited to are :
1 . In front of units 405 and 406 .
2 . On the driveway approach to unit 601 .
3. In front of units 605 and 606 .
4 . On the principle road east of unit 610.
Driveway repair and base rehabilitation :
1 . At the driveway entrance to unit 305 .
Regrading :
1 . West side unit 302 .
• VL �c- _r` L�
Marcia A . ' Banach
Director of Planning
Richard P . Martel
Town Engineer
CC : Southridge Estates
1
� nOPS db
�(1 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
!~osoe,c0 AREA CODE 203/644-2511
December 8, 1987
Veilleux Enterprises , Inc .
P. 0 . Box 10343
West Hartford , CT 06110
re : Bond Reduction
Plum Ridge Condominiums , First Section
Dear Mr . Veilleux :
At the recommendation of the Inland Wetlands Agency/Conservation
Commission , the Planning and Zoning Commission voted during its November
24 , 1987 meeting to release the IWA/CC Bond on Plum Ridge Condominiums ,
First Section in the amount of $20 , 000 .
Please make arrangements to have this bond picked up at the Planning
Department at your earliest convenience .
Your cooperation will be greatly appreciated .
Very truly yours ,
PLANNING AND ZONING COMMISSION
Raymond F. Hallowell , Jr .
Chairman
cc : M. Banach , Director of Planning
PZC File
Engineering Department
VEILLEUX ENTERPRISES, INC. BUILDING AND DEVELOPMENT
675 Oakwood Avenue 0 Post Office Box 10343 • West Hartford,Connecticut 06110 • Telephone(203)522-4101
R
R E C E"1--V E D
June 22, 1989 JUN 20 160o
SO. WINDSOR PLUNINO Dtpf,
Town of South Windsor
1540 Sullivan Ave.
So. Windsor, CT 06074
Attention: John McCahill
Inland/Wetlands Comm
Re: Conservation Bonds
Plumridge Phase I & II
Dear Sir:
Please consider this letter a formal request for the release
of the bonds on the above captioned subdivision. Our records
indicate a total of $r�,000 posted.
Thank you.
Sincerely,
Veilleux & Sons Builders, Inc.
OWN BE.4
y " 7wn oP S-oiam
o � ?d&U&Ot
.
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
soe•coN� AREA CODE 203/644-2511
June 23, 1989
M E M O R A N D U M
TO: Michele R. Lipe, Assistant Town Planner
FROM: A. Bowen Davies, Deputy Town Engineer 111/`/3/>
RE: PLUM RIDGE PHASE I & II - AS BUILT REVIEW
In response to your request to review the above site as-built
plans dated 12-09-86, I walked the site on 6-21-89 with the plans
in hand, as a guide.
It is my impression that the purpose of an as-built plan is to
reflect what was done in the field based on what was approved
after appropriate deliberations . The site work doesn't match the
as-built plans as submitted.
1 . The buildings are not at the elevations shown.
2 . The grading around the buildings is not as shown, by
feet.
3 . The berm west of building 6 shows it 2' above #6 finished
floor. It isn't there.
4 . The berm west of Building #5 shows it 1 ' above #5 finish
floor. It isn't there.
5 . The yard drains are not shown.
6 . The grading between Building #4 and N/F Priest is not as
shown as evident by standing water. This has no doubt
been the Condo Association concern.
7 . I did not verify the others but by Building #2, either
the buildings are not improperly located or the sanitary
sewer could be outside the easement limits . Something is
inaccurate.
8 . Finish floors and top of frame elevations appear to be on
different datum.
9 . The stockpile area north of Building #1 is inappropriate
on an as-built.
Michele R. Lipe
RE: Plum Ridge Review
June 23, 1989
10 . The storm structures at Sand Hill are incomplete.
11. The bus stop is not shown.
12. The temporary cul-de-sac does not exist.
13 . I believe that the town property line was to be
monumented.
14 . The porch stairs encroach over the building lines.
This review was from walking the perimeter. I did not review the
interior area considering a pending plan revision.
ABD/jsv
�A0,xx
y ~ 7-� ate S"0-tdA W
O �
c �
1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. 06074
�osoe•co�' AREA CODE 203/644-2511
June 29, 1989
M E M O R A N D U M
TO: Marcia A. Banach, Director of Plannin
FROM: Jerry C. Iazzetta, Town Engineer Y;1
RE: Plum Ridge Condominiums Phases I & II
We have reviewed the request for a bond reduction for Plum Ridge
Phases I & II and recommend that this bond be reduced to $70, 000 .
JCl/jsv
cc: Michael J. Gantick, Director of Public Works
40'0M Sfq(
9 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074
�QSOR•co�' AREA CODE 203/644-2511
July 17, 1989
Veilleux & Sons Builders, Inc.
675 Oakwood Ave.
P.O. Box 10343
West Hartford, CT 06110
Dear Mr. Veilleux:
re: Landscaping Plum Ridge Condominiums Phase I and II
On June 23, 1989 a landscaping inspection was done on Phases I
and II of Plum Ridge Condominiums . The following is a list of
items that remain to be addressed.
1 . dead trees along Sandstone Drive must be replaced. These
are the trees that go all the way into Phase III .
2 . dead pines, Canadian hemlocks, and other small plantings
along the Town of South Windor property must be replaced;
3 . the two maples in facing out to Sand Hill Road must be
replaced;
4 . the two maples behind building 1 must be replaced;
5 . dead foundation plantings outside of units must be replaced
(only three were noted) .
We request that the trees and plantings be replaced during the
next planting season which is September 1st through October 15th.
After such time please inform us in writing and another
inspection will be done.
If you have any questions regarding the above, please do not
hesitiate to call the Planning Department.
Very Truly Yours,
Michele R. Lipe
Assistant Planner
VEILLEUX ENTERPRISES, INC. BUILDING AND DEVELOPMENT
675 Oakwood Avenue • Post Office Box 10343 • West Hartford,Connecticut 06110 • Telephone(203)522-4101
RECEIVED
August 16 , 1989 AUG 18 1984
Sp. WINDSOR PLANNING DEPT.
Town of South Windsor
1540 Sullivan Ave
South Windsor, cT 06074
ATTN: Town Planning and Zoning
RE: Plum Ridge
Phase III
Dear Sir/Madam:
Please consider this letter a formal request for reduction of bond
on the above captioned project. My understanding is that the present
performance bond is $47 ,000 and that we could get a reduction to
maintenance level of $32 ,500 .
Sincerely�,/�
6- Vim.k
Rene Veilleux -
President, Veilleux and Son Build&rs , Inc.
' o �
e
T-o-w� ale slol� ?jzrz�
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
~oSolt.co�� AREA CODE 2031644-2511
October 20, 1989
TO: Marcia A. Banach, Director of Planning
FROM: Jerry C. Iazzetta, Town Engineer
RE: Requests for Bond Reductions
As per your September 29, 1989 transmittal we have reviewed the
requests for bond reductions attached. In response to your memo, we
met with representatives of JMJ Construction Company on October 6,
1989 to discuss in detail each of their requests. Listed below are
our recommendations:
Plum Ridge III
We recommend that the bond not be reduced at this time for the
following reasons:
1. As builts are not correct
2. The detention basin built is much smaller than designed. We
need new calculations verifying adequacy (see my June 29,
1989 letter attached)
3. Comments on June29, 1989 letter need to be addressed.
Kyle Woods Subdivision
It is recommended that the bond for Kyle Woods be reduced to a
maintenance bond.
'Cambrid(qe.Estates (JMJj)
It is recommended that the bond not be reduced at this time for
Cambridge Estates.
1. Approximately 50% of -sidewalk—still needs to be built or
replaced.-
2. Road has only binder coarse of pavement and patches need to
be repaired properly.
3. New curbs required
4 . Merestones and iron pins need to be placed.
.to -0-aw O-P S-Oam qd,��
G �
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
�►oso1,coe'`' AREA CODE 203/644-2511
June 1, 1990
Rene Veilleux
Veilleux & Sons Builders, Inc.
281 Hartford Turnpike
Vernon, CT 06066
Dear Mr. Veilleux:
re: Plum Ridge Phase I & II -'Landscaping
An inspection of the landscaping was conducted on June 1, 1990.
The following landscaping must be replaced/added to have
addressed the concerns expressed in the letter from the Planning
& Zoning Commission dated 12/4/89:
1 . Replace the following dead trees:
- one pin oak behind the mailboxes
- two trees and one pine in the pool area
- one dead tree behind unit 105-106
- two dead trees- one in front of unit 304 and one in
front of unit 307
- one dead hemlock behind unit 307
- one dead tree behind the 600's
2 . Quantities of trees and shrubs in buffer areas must reflect
what is shown on the plan; it appears that there are two
dogwood trees, one honey locust and four forsythia missing
in that area.
This work should be completed as soon as possible. After a
satisfactory inspection by the Planning Department, the
landscaping bond will be released.
Very Truly Yours,
CI
Loui--Kse C. Evans
Chairman of Planning & Zoning
Westview Office Park Condominium
_ thibodeau 1050 Sullivan Avenue
South Windsor,Connecticut 06074
management (203)6 -1571
I-K00-66666-1571
services, Inc. Fax(203)644-6710
Mailing Addres.t
P.O. Box 789
South Windsor,Connecticut 06074
August 17 , 1990
lilt J;�' rf-�=l
Chairman - Louise Evans
Planning & Zoning Commission A',JG 23 i9gC!
Town of South Windsor
1540 Sullivan Avenue ; ;th V'l n�ssor
South Windsor, CT 06074
; Commission
Re : ;' 'Plum Ridge Gondominium Association
Sandstone Drive
Dear Chairman Evans :
I spoke to Marcia Bannach last week regarding the outstanding
drainage problem which still exists in phase one at Plum
Ridge. Marcia informed me that she had requested a legal
opinion from the Town Attorney and she has not yet received a
response .
This letter is to inform you that during the heavy rain of
last week, two condominium units near this affected area were
flooded with 4 to 6 inches of water in the basements . This
is not the first time incidents of water in the basements
have occurred and the owners are now threatening litigation
against the Condominium Association.
Therefore, I am requesting the Planning and Zoning Commission
make a second request to the Town Attorney for his opinion so
that the Town may force this drainage area to be repaired or
will be allowed to call the Bond and have the area repaired.
I urgently request this matter be attended to as soon as
possible .
Thank you in advance for your anticipated cooperation.
Sincere ,
T omas J . art-in
Property Manager for
Plum Ridge Condominium Association
81790
Ole ,
Community Association Institute Better Business Bureau
t OMM 8F�
5
O � _
e
mac~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOQ,c0 AREA CODE 203/644-2511
October 15, 1990
Ms . Angela Attenello
Veilleux & Sons
281 Hartford Turnpike
Vernon, CT 06066
Dear Angela:
Re: Plum Ridge Condominiums
Thank you for meeting with Mike Gantick, Bo Davies and me
on October 9 , 1990 at Plum Ridge to discuss stormwater drainage and
detention. As we discussed, there are several low spots behind
Building 6 which need to be graded to drain into the detention basin.
This can be best accomplished by having your surveyor/engineer
determine existing grades, then regrading to eliminate low spots . As
this drainage condition has been a source of concern, please expedite
the grading so that it may be resolved prior to the approaching
winter season.
As we also discussed, you have indicated to us that the
detention basin in Phase III does not have the design capacity, and
that your engineer will be addressing this issue.
For your use, I have attached a copy of correspondence from
Town Engineer Jerry Iazzetta dated 6/29/89 and correspondence from Bo
Davies dated 6/23/83, concerning outstanding items to be addressed.
We would be happy to set up a time to meet and discuss items
remaining to be resolved so that we may reduce bonds to maintenance
levels .
We appreciate your continued cooperation.
Very truly yours ,
Marcia A. Banach
Director of Planning
MAB/pmm
cc: Michael J. Gantick, Director of Public Works
A. Bowen Davies, Deputy Town Engineer
Westview Office Park Condominium
_ thibodeau 1050 Sullivan Avenue
South Windsor,Connecticut 06074
management (203)644-1571
services, inc. Fax I(203)644-'S7 6 '
03) -6710
November 1, 1990 Mui P..00 Addy 78
P .Box 7R9
South Windsor,Connecticut 06074
Micheal Gantick
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Plum Ridge Condominium Association
Dear Mr. Gantick:
I am in receipt of a copy of your letter sent to Mr. & Mrs.
Edward Sabella on October 19, 1990. Mr. & Mrs. Sabella
brought a copy of this letter to the last Plum Ridge
Condominium Association Board of Directors meeting which was
held on October 22, 1990.
In general, the Board of Directors agrees with the content of
your letter but did have two additional concerns:
1) The Board wanted to make sure that Veilleux would
receive no reduction in his bond with the Town until
it was actually confirmed that these drainage
measures were successful.
2) The Board wanted the Town to establish a final
deadline for this work to be completed. They feel
the Spring of 1991 is a reasonable amount of time to
expect this project to be done. In fact, the Board
feels that the Town has been too lenient with the
developer in allowing him too much time accomplish
the work that the Town still has outstanding with
performance bonds.
Your comments regarding the above requests would be greatly
appreciated.
Sincerely,
o�
i
Thomas J. Martin
Property Manager for ---- -- - ;l
Plum Ridge Condominium Association it NOV I. 3 IM `i.I
11190 Tcwn ct�';..''a
f
c-,
3
�I
Better Business Bureau
Community Association Institute
1OM■ aft
s < I
P
7a- wn O-P s`0� 2v�
4 �C, 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
~ds0 fro�� AREA CODE 203/644-2511
November 30, 1990
Ms . Angela Attenello
Veilleux & Sons
281 Hartford Turnpike
Vernon, CT 06066
Dear Angela:
Re: Plum Ridge Condominium
As you will recall, on October 9, 1990, we had a site visit at Plum
Ridge to discuss stormwater drainage and detention. At that meeting
we discussed regrading of low areas behind Building 6 . We requested,
in a letter dated October 9, that the necessary regrading be
accomplished prior to the approaching winter season. To date we have
seen no action on this drainage issue.
It is imperative that this issue be resolved in the near future.
If this drainage issue is not resolved by May 1, 1991, Town staff
will recommend to the Planning and Zoning Commission that the site
bond be used to rectify the drainage.
We appreciate your expedited attention to this issue.
Very truly yours,
Marcia A. Banach
Director of Planning
MAB:gc
cc: �iniichael J. Gantick, Dir. of Public Works
Jerry C. Iazzetta, Town Engineer
Louise C. Evans, Chairman, PZC