HomeMy WebLinkAboutSUBDIVISION 1085 TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
The Commission will officially receive applications
Application No . �G� Sr at either Special or Regular meetings provided they
Received Date : ��_ �c - j were submitted to the Commission Chairperson, Secretary
Action Or Public Hearing by : or agent, at least fourteen (14) days prior to the
meeting at which they will be officially received.
No application officially received at a Special Meeting
ecei_pt No . � � �; will be acted upon at that meeting.
i
APPLICANT : THE HOME FARM PARTNERSHIt
ADDRESS : C/O WAYNE CHRISTOPHER GERLT, P.O. 559, S. WINDSOR TELEPHONE 644-2565
OWNER OF RECORD ON LAND RECORDS : THE HOME FARM PARTNERSHIP
ADDRESS : 1919 ELLINGTON ROAD, SOUTH WINDSOR, CONNECTICUT 06074
COMPLETE LOCATION OF PROPERTY: EAST SIDE OF ELLINGTON ROAD, SOUTH OF VALLEY VIEW DR.
ZONE AA-3 0 AND RR
NAME , ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE
DIRECTED : WAYNE CHRISTOPHER GERLT, ESQ.
435 BUCKLAND ROAD P.O. BOX 559
SOUTH WINDSOR, CONNECTICUT 06074 T EL EP 644-2565
THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING) i ,.{ '': ° •.;. > ,,j?=
1 . Zone Change to (public hearing requ red)
X 2 . Filing for Subdivision
'�,• ..
3 . Filing for Open Space Subdivision (public hWa�Zr e 1#ired)
4. Filing for Resubdivision (public hearing required) eG�r7jssia�
5. Special Exception to Article (public hearing required)
6 . Site Plan of Development
7 . Removal of Sand , Gravel , Clay or Quarry Stone & Ore (public
hearing required)
8 . . Other (explain in detail)
THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY
AND SUBMITTED WITH 6 SETS OF PLANS ( 7 sets if public hearing is required)
BEFORE IT IS RECEIVED BY THE PLANNING & ZONING COMMISSIO .
Ai I �'--
Appli a t 0 ner
PLANNING AND ZONING COMMISSION
TOWN OF SOUTH WINDSOR
Fee Schedule and Policy
1. An application processing fee of $25 per lot ($50 minimum) is required
for: Subdivisions,. resubdivisions, and open space subdivisions.
2. An application processing fee of $50 is required for: Change of Zone,
Zoning Amendment, Special Exception, and Earth Removal or Land Filling
Operations.
3. An application processing fee of $25 is required for Site Development
Plans, except: where new buildings/additions/renovations of 2,000 s. f.
or more are proposed, said fee shall be $50; said fee shall be $500
for Site Development Plans in the Designed Commercial Zone; $50 plus
$5 per dwelling unit for Adult Housing ($500 minimum) .
4. An application processing fee of $10 per acre ($300 minimum) is required
for a Change of Zone/General Plan of Development in the Designed
Commercial Zone.
5 . An application processing fee of $100 is required for a Change of Zone/
General Plan of Development in the Multi-Family or DA-15 Residential zones; or
for a Special Exception/General Plan of Development for Adult Housing.
6. An application processing fee of $50 plus $5 per dwelling unit is
required for a Special Exception/Site Plan of Development in the Multi-
Family or DA-15 Residential zones ($500.00 minimum).
7. Application processing fees are non-refundable after the application
has been officially received by the Commission. Application processing
fees may be returned prior to the application's official reception
provided a letter of withdrawal, signed by the applicant , has been
submitted to the Commission prior to the meeting at which said applica-
tion is scheduled to be officially received.
8. Applications unaccompanied by the required application processing fee
are incomplete, and as such may be returned to the applicant and
removed from the Commission' s agenda.
9. Complete applications and required fees shall be submitted at least
fourteen (14) calendar days prior to the Regular or Special Meeting
at which it will be received.
10. Fees for a previously denied application shall not apply to any
subsequent application. However, when a subdivision, resubdivision,
or open space subdivision application has been denied within the
preceding 12 months or approved for fewer lots than requested, and a
new application for the subject tract is submitted by the same appli-
cant, then the fee for the new application shall be a minimum of $50
plus $25 for each lot above and beyond the number of lots contained in
the earlier application.
11. A fee of $5 per sign is required for signs to be posted by the
applicant on the subject property.
12. Other Fees: Subdivision Regulations - $3.00; Zoning Regulations - $4.00;
Zoning Map $1.00; fees for other documents is as determined by the
Commission.
13. All checks shall be made payable to "Town of South Windsor."
Adopted: 4/10/84
Revised: 12/4/84
TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
I
The Commission will officially receive applications
Application NO . at either Special or Regular meetings provided they
Received Date : were submitted to the Commission Chairperson, Secreta
ction or Public Hearing by : or agent , at least fourteen (14) days prior to the
meeting at which they will be officially received.
No application officially received at a Special `4eeti
ece ip t No . will be acted upon at that meeting.
I
APPLICANT : U & R CONSTRUCTION CO. , INC.
ADDRESS : 99 East Center St. , Manchester, Ct. 06040 TELEPHONE 643-9551
OWNER OF RECORD ON LAND RECORDS : U & R CONSTRUCTION CO. , INC.
ADDRESS : 99 East Center St. , Manchester, Ct. 06040
COMPLETE LOCATION OF PROPERTY: Known as Rainbow Hills, approximately 600' Southwest
of Sand Hill Road & Valley View Drive on the east side of Ct. Route 74 and Ellington Rd.
ZONE RR & AA-30
NAME , ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE
DIRECTED : Kenneth Peterson - Gardner & Peterson Associates
576 Old Post Road, Tolland, Conn. 06084 TELEPHONE 871-0808
THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING)
1 . Zone Change to (public hearing required)
2 . Filing for Subdivision
3 . Filing for Open Space Subdivision (public hearing required)
4 . Filing for Resubdivision (public hearing required )
5 . Special Exception to Article (public hearing required)
6 . Site Plan of Development
7 . Removal of Sand , Gravel , Clay or Quarry Stone & Ore (public
hearing required)
X 8 . Other (explain in detail ) Revision to Subdivision; Lot Tine;
Lot #31 - Parcel 'A'
THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY
AND SUBMITTED WITH 6 SETS OF PLANS ( 7 sets if public hearing is requ_ir_ed)
BEFORE IT IS RECEIVED BY TIL--PLANNING & ZONING COMMISSION .
Applicant �� Owner
/RA
PLANNING AND ZONING COMMISSION
TOWN OF SOUTH ,41NDSOR
Fee Schedule and Policv
1. An application processing fee of $25 per lot (S50 minimum) is required
for: Subdivisions,. resubdivisions , and open space subdivisions.
2. An application processing fee of S50 is required for: Change of Zone,
Zoning Amendment, Special Exception, and Earth Removal or Land Filling
Ooerations.
3. An application processing fee of $25 is required for Site Development
Plans, except: where new buildings/additions/renovations of 2,000 s. f.
or more are proposed, said fee shall be $50; said fee shall be S500
for Site Development Plans in the Designed Commercial Zone; $50 plus
S5 per dwelling unit for Adult Housing ($500 minimum) .
4. An application processing fee of $10 per acre ($300 minimum) is required
for a Change of Zone/General Plan of Development in the Designed
Commercial Zone.
5 . An application processing fee of $100 is required for a Change of Zone/
General Plan of Development in the 'iulti-Family or OA-15 Residential zones; or
for a Special Exception/General Plan of Development for adult Housing .
6 . An application processing fee of S50 plus $3 per dwelling unit is
required for a Special Exception/Site P:an of Development in the Multi-
Family or DA-L5 Residential zones (S500.00 :minimum).
7. Application processing fees are non-refundable after the application
has been officially received by the Commission. application processing
fees may be returned prior to the appLication' s official reception
provided a letter of withdrawal , signed by the applicant , has been
submitted to the Commission prior to the meeting at which said applica-
tion is scheduled to be officially received.
8. Applications unaccompanied by the required application processing fee
are incomplete, and as such may be returned to the applicant and
removed from the Commission' s agenda.
9. Complete applications and required fees shall be submitted at least
fourteen (14) calendar days prior to the Regular or Special '•teeting
at which it will be received.
10. Fees for a previously denied application shall not apply to any
subsequent application. However , when a subdivision, resubdivision,
or open space subdivision application has been denied within the
preceding 12 months or approved for fewer lots than requested, and a
new application for the subject tract is submitted by the same appli-
cant, then the fee for the new application shall be a minimum of $50
plus $25 for each Lot above and beyond the number of Lots contained in
the earlier application.
11 . A fee of $5 per sign is required for signs to be posted by the
applicant on the subject property.
12. Other Fees: Subdivision Regulations - $3.00; Zoning Regulations - S4 . 00;
Zoning Map $1 .00 ; fees for other documents is as determined by the
Commission.
L3. All checks shall be made payable to "Town of South Windsor. "
Adopted: 4/10/84
Revised: 12/4/84
��pWN Sf, _au� O-P S_o_� ?d&U&Ot
<�
O O
c
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR•CO AREA CODE 203/644-2511
July 17, 1985
Home Farm Partnership
1979 Ellington Road
CERTIFIED MAIL
South Windsor, CT 06074
Dear Sirs:
At the July 15, 1985 meeting, the South Windsor Inland Wetlands Agency/Conservation
Commission approved with conditions, Application No. 336 for the purpose of development
of a conventional residential subdivision of 32 homes on property located on the east
side of Ellington Road, south of Valley View Drive, South Windsor.
The permit is based on the plans entitled "Rainbow Hills" prepared for Home Farm
Partnership, 435 Buckland Road, South Windsor, Connecticut, by consulting engineers of
Gardner & Peterson Assoc. Such plans are dated 5-31-85, being revised on June 28, 1985;
sheets 1 through 12 of 12.
The following conditions must be -adhered to for this permit to be valid:
1. A,$15,000. bond is required.
2. Construction activities shall be subject to the approval of the Town
Engineer.
3. The application shall indemnify and hold harmless the Town of South
Windsor against any liability which might result from the proposed
operation or use.
4. The permit is valid for one year and shall expire July 15, 1986 if not
initiated and completed within one year from the date of approval.
Very truly yours,
John Moran, Jr. , hairman
INLAND WETLANDS AGENCY/
CONSERVATION COMMISSION
cc: Wayne C. Gerlt
A. B. Davies, Deputy Town Engineer �vTi�k.
Jacqueline J. Smith, Town Clerk
Richard J. Sartor, Town Manager
Richard Ryan, Deputy Mayor
---Robert F. Gilligan , Chairman 'PZC JUL �ti 1985
Thomas D'Auria, Building Official
Peter DeMallie, Director of Planning
South Windsor
Kenneth Brill, Chairman EDC Planning & Zoning Commission
John Shemo, Coordinator EDC
_ JACK W. CHRISTENSEN
710 UNION STREET
MARSHFIELD, MASSACHUSETTS QZDSD
July 22, 1985 ',
Mr. Richard Sartor
Town Manager ._.
Town of South Windsor
South Windsor, CT 06074
Dear Mr. Sartor:
My mother, Marion Christensen, and I own property at #90-100 Oakland Road in
South Windsor. We understand that adjoining property owned by Kupchunos and
R wb rry may be being considered for development. Also, we believe that oth r
prop rty on Oakland Road owned by Weatherall may also be under consideration
for development. Drainage from all of these properties runs through ours,
eventually crossing under Oakland Road.
This is of considerable concern to us as the development of the Felt Road area
tw my y are ago resulted in a very bad condition of flooding and erosion of
our prop rty. At that time, without an adequate understanding of just how
sev re the drainage problem could be, my mother sold an acre of land and
c rtain "water rights" to the developer -- much to our present regret.
Erosion and siltation on our land have been very severe ever since and it is
not cl ar what if anything we can do about it. We would like to insure that
no similar problems occur in connection with future developments adjacent to
our prop rty.
Could you advise me if the Town has any knowledge of pending development of
adjacent properties and what requirements will be imposed to prevent future
drainag " problems? Given reasonable advance notice, I will be glad to meet
with appropriate officers of the Town, the developers, or otherwise to attend
r 1 vant public meetings.
I will appreciate any information you may be able to provide.
Z17as
,
a)� O
tensen N (P
c
cc. Marion Christensen
w
RAINBOW HILLS RESIDENTIAL SUBDIVISION
CONNECTICUT ROUTE 74 (ELLINGTON ROAD)
TOWN OF SOUTH WINDSOR, CONNECTICUT
JULY 30, 1985
p�,1,�/ •M' IC;-,k/ ti F
K13321
FUSS & O' NEILL, INC.
210 MAIN STREET
MANCHESTER, CONNECTICUT
�o
FUSS&O'NMLL
consulting engineers
July 30, 1985
Mr. Ken Peterson, L. S.
Gardner and Peterson Associates
576 Old Post Road
_. Tolland , CT 06084
RE: Rainbow Hills Subdivision
Dear Ken :
We are pleased to submit eight copies of the traffic impact study
for the subject project . As indicated in the report , the location
of the driveway should be sufficient to handle the site generated
traffic without any adverse impact on the traveling public.
Should you require any additional information or have any
questions , please do not hesitate to call .
i
Very truly yours ,
William D. O' Neill , P. E. Stephen F. Mitchell , P. E.
WDO/SFM/sw
210 MAIN STREET / MANCHESTER, CONN. 06040 / TELEPHONE (203)646-2469
SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING
HIGHWAYS and BRIDGES•SURVEYING•LANDSCAPE ARCHITECTURE 9 TRANSPORTATION and TRAFFIC 9 PUBLIC WORKS MANAGEMENT 0 HYDROGEOLOGY
A. INTRODUCTION
The Home Farms Partnership has proposed the subdivision of a
parcel of land on the east side of Connecticut Route 74
( Ellington Road) in the Town of South Windsor, Connecticut .
As shown in Figure No. 1 , the site , which is located south of
Sand Hill Road, is to be subdivided into 33 parcels for single
family residential development.
Fuss & O' Neill , Inc . has been retained to study the impacts of
the proposed subdivision on adjacent street traffic. This
report has been prepared to document the findings of that
study.
B. EXISTING CONDITIONS
Connecticut Route 74 is a State of Connecticut facility which
consists of a single lane in each direction with a total width
of between 26 and 30 feet . The posted speed limit in the
vicinity of the site is 30 miles per hour.
Ellington Road intersects Sand Hill Road at a 4-day stop
controlled intersection. The west leg of this intersection is
40 feet wide and provides a connection with Sullivan Avenue to
the west. The east leg is a local street which enters a
residential area.
_1 _ F4Jss&o7Q�LL.mc.
In order to determine the impact of the proposed development
on adjacent street traffic , the intersection of Ellington Road
and Sand Hill Road was counted by representatives of Fuss &
O' Neill on July 24 and 25 , 1985, and information on traffic
levels was gathered from the Town of South Windsor,
Connecticut Transportation Study, dated June , 1982.
Using this data , the count information was projected to the
1987 designation year using a 1 percent per year growth
factor to account for normal growth in the area. Additional
traffic generated by the adjacent "Sand Hill Road
Condominiums" project ( Table No. 2) was then added so that a
more accurate representation of design year traffic conditions
could be presented. Figure No. 2 shows the 1987 external
traffic volumes , which represent design year traffic which
does not have the site as its origin or destination.
The greatest traffic impact on the roadway network will occur
during the a.m. peak and p.m. peak hours, the periods when
"home to work" and "work to home" trips are at their highest
levels. Traffic counts conducted indicate that the a.m. peak
hour is 7 :00 to 8 :00 a.m. and the p.m. peak hour is 4 : 30 to
5 : 30 p.m. Therefore , these hours were subsequently analyzed.
C. SITE GENERATED TRAFFIC
An estimate of the amount of traffic generated by the proposed
development was made using the Institute of Transportation
_2_ wss80D7ei.1fvc.
Engineers "Trip Generation" manual , published in 1982. This
manual , which is a compilation of trip generation rates for
similar facilities , gives hourly trip generation rates for
entering and exiting traffic during both the a.m. peak hour
and the p.m. peak hour. These hourly trip generation rates
(HTGR) are given in terms of vehicles generated per dwelling
unit for residential developments . When multiplied by the
number of units proposed , these rates yield the number of
vehicles which can be expected to enter and exit the site
during the peak hours . The factors and the generation rates
are summarized in Table No. 1 of this report.
D. DISTRIBUTION OF SITE GENERATED TRAFFIC
Regional arrival/departure distributions to and from the
proposed subdivision, as shown in Figure No. 3, were derived
from existing traffic patterns , and indicate a directional
split of 75 percent toward the south and 25 percent toward the
north. The site generated traffic was then added to the
roadway system in accordance with the arrival/departure
pattern with the results shown in Figure No. 4. These volumes
were added to the projected traffic volumes to yield the
design year combined traffic volumes shown in Figure No. 5.
_3_ FUssaoWOLLmc.
E. ANALYSES
In discussing capacity analyses , the term level of service is
used to describe the operating condition of the road or
intersection. Level of service is rated on a scale from A to
F, with level of service A being the best condition, and level
of service F the worst. In between, level of service C is
considered good for peak periods , level of service D is
usually the peak hour design standard, and level of service E
is the theoretical capacity of the road or intersection.
Level of service F is failure , with extensive delays and
jammed conditions .
Capacity analysis of the " Five Corners" intersection was not
conducted because the construction of the "Wapping By-Pass"
between Ellington Road and Sullivan Avenue will remove site
generated traffic from this intersection and a new four-leg
intersection will be created.
1 . Unsignalized Intersection Capacity Analysis
Capacity analyses were conducted at the unsignalized
intersections of the site driveway/Route 74 and Route
74/Sand Hill Road using the methodology found in
Transportation Research Circular No. 281 , "Proposed
Chapters for the 1985 Highway Capacity Manual" , published
by the Transportation Research Baord in 1984 . Using this
_4_ wss&o?WtLAJC.
methodology , individual movements approaching an
intersection are analyzed based on the delay time they
experience at the intersection. The results of the
analysis are as follows :
a. Ellington Road (Route 74 ) and Site Driveway
The introduction of Site Generated Traffic will cause
an increase of 25 vehicles during the a.m. peak hour
and 32 vehicles during the p.m. peak hour at this
intersection. During the a .m. peak hour, traffic on
Route 74 will experience no delays with only 7
vehicles projected to turn left into the site during
this period . Exiting traffic will experience no
delays , with 19 vehicles projected to exit the site
during this period.
During the p.m. peak hour, a similar pattern will be
experienced , with no delays felt on Route 74 and only
4 vehicles turning left into the site. Exiting the
site , however, will be more difficult due to the
higher volume of through traffic on the roadway at
this time. The 13 exiting vehicles can expect to
experience fairly long delays.
b. Ellington Road ( Route 74 ) and Sand Hill Road
As described in Transportation Research Circular No.
281 , the level of service provided at a four-way stop
Fuss&ONOLLANC.
-5-
intersection is a function of number of lanes ,
directional split , and total approach volume. Using
these criteria , intersection analyses of external
traffic conditions indicate a level of service D
during the a .m. peak hour and D during the p.m. peak
hour. The introduction of site generated traffic will
cause no change in the level of service provided at
this intersection.
2. Sight Distance Considerations
Route 74 is a hilly, fairly straight roadway with roadside
vegetation controlled by State maintenance forces. The
measured sight lines available in both directions from the
proposed driveway are presented in Figure No. 6 and are
adequate for the 30 mph posted speed limit. As part of
the required State Highway encroachment permit process ,
this sight line will be reviewed by the State Department
of Transportation , Division of Traffic for adequacy before
any such permit is issued.
F. CONCLUSIONS
Based on the foregoing analyses, it is the professional
opinion of Fuss & O' Neill that the introduction of traffic
generated by proposed subdivision will not disrupt the
continuity of traffic flow on the adjacent roadway system, and
that roadway conditions will be sufficient to provide safe and
efficient travel for the traffic in the area.
Fuss&orNE1LL.1Nc.
-6-
APPENDIX A
FlJSS&07113LL.IMC.
D S
0r•
0 E L L I N
'►w, �l s
rru•. ��
_ • MN M • i
• Y `9
' f roll
� srh•r � i�
e I �
I III 4
OY..F,i •I r ♦ •
wr.w• eCIEWER
so
l�
7 ♦ O Fib maw •.r 401 l• C d�!
M
C
"• w• O4 •
R� O
POLICY !
7
i a sou`ft +d +' .....e O•�°♦ a ,` 4°.•••
FIM CO+pp� • 0, Lrc• q
•/ 'fir ON
j Ir.I, : ••r
^ r
f
.0
r
f r ? ® �O
SITE ►.,,
Aml
°•.r, FIGURE No. I
FUSS&O'NIEJ
MANCHESTER, CONNECTICUT
SITE LOCATION
• RAINBOW HILLS
SOUTH WINDSOR, CONNECTICUT
rRCN.No.85-382 DATE- 7-30-85 SCALE: N.T.S.
APPENDIX B
FUSS&07 ELL,ONC.
TABLE NO. 1
RAINBOW HILLS
TRIP GENERATION RATES
( 32 units )
A.M. P.M.
HTGR VOL (VEH/HR) HTGR VOL (VEH/HR)
ENTER 0. 21 7 0. 63 20
EXIT 0. 55 18 0. 37 12
TOTAL 0. 76 25 1. 00 32
wss&OW0LLJfYC-
TABLE NO. 2
ADJACENT DEVELOPMENT TRAFFIC
A.M. PEAK HOUR P.M. PEAK HOUR
ENTER 4 22
EXIT 19 10
TOTAL 23 32
FUSS&CrNEILLINC.
APPENDIX C
FUSs. Ol E",llYC.
( UPS0-O'NEILL Dote -7U— ` _
cMILIta, c0AArCIICUI pR0JECT F': �' •+
LOCATION: Er ,r1G,7a�l L. NAME: 9A i H.60ik) H-I L S
HOURLY VOLUMES VOLUMES IN PCP9
Major street: I- rlG-FD'i kL)•ON
N=Q s—v 5 y .—v5
Grade P` '--i f 4� —v2—: v4
`•" v
v v
Date of Counts: -J zdoS �I 7,,I4 X STOP I7 9
Time Period: grc[�-�•_aP� QYIELD
Approach Speed: ;m�r N - I )=
PHF: minor street: Grade
VOLUME ADJUSTMENTS
Movement no. 2 3 4 5 7 4
Volume (vph) 14-
Vol . (pcph) , see Table 10.1 =— -
STEP 1 : RT From Minor Street Vq
Conflicting Flow, Vc 1/2 V3+V2= 3 + vph(Vc9)
Critical Gap,Tc and Potential Capacity,cp Tc '= Ssecs (Tab.10.2)cp9=L[�pcphfFig.10.3)
Actual Capacity, cm cm9=c 9= Icc o Dcph
STEP 2 : LT From Major Street r- v4
Conflicting Flow, Vc v3+V2.�+� -4vvh(Vc4)
Critical Gap,Tc and Potential Capacity,cp Tc=S.csecs(Tab.10 .21cp4-�Ozr-ocph(Fig.10.31
8 of cp utilized and Impedance Factor (v4/cp4)xln0= e.2t P4=
(Fiq.10 .51
Actual Capacity, cm cm4=c 4= r" pcph
STEP 3 : LT From Minor Street -) v7
Conflicting Flow, Vc 1/2 V3+V2+V5+V4= ---� + f�+ Qi ( =55o�t, (c7)
Critical Gap,Tc and Potential Capacitv,cp Tc=Lf-secs(Tab.10.2)cp7-'MOper)h(Fiq.10.3)
Actual Capacity, cm cm'7=cp7xP4x `�S 41Pi pcph
SHARED-LANE CAPACITY SH (v c v)+ (vv c ) if lane is shared
7 m1 9 m9
Movement no. v(pcph) cm(ocph) cS11(pcoh) cR LOS
7 15 t
9 g- IOC t
4 i ., - A-+
fl (\ ;-IL_L Dote
O L { AC HILIIA. CD), NI CI I C U 7 PROJECT
L4SATION: EL1_i�IC,TZ::,i-1 f?ll NAMF: R"',t-1 V-1
HOURLY VOLUMES VOLUMES IN PCPH
Major street: r-UjOGTnJ AD i N I
N=I-1 1—v v
5�2 5 "- 4- �- —v '—v5
Grade IIO 4 4 iG v2 4
�'�
�+
v v
Date of Counts. yJ?)�Y� to I/7 1 []STOP I7
Time Period: ,3- -<- 'C — YISLD
Approach Speed: =c' n.4 1. N =
PHF: mi((no/�r street: Grade
VOLUME ADJUSTMENTS
Movement no. 2 3 4 5 7 4
Volume (vph)
Vol. (Pcph) , see TablE110.1
-STEP 1 : RT From Minreet (r Vq
Conflicting Flow, VC 1/2 V3+V7= 8 +S�ZaSmvph(Vc9)
Critical Gap,Tc and Potential Capacity,cp Tc=S ecs (Tab.10 .2)cp9-Sa21-T-)cph(Fig.10.3)
Actual Capacity, c c = S c sloocph
m m) 9
STEP 2 : LT From Major Street V4
Conflicting Flow, Vc V3+V2= /�c + r;?' �A5fvph(Vc4)
Critical Gap,Tc and Potential Capacity,cp Tc=�•Csecs (Tab.10.21cp4-��ocPh(Fi9.10.31
% of c. utilized and Impedance Factor (v4/Cp4)x1n0= `)1 9-f P4-
(Fiq.10 .5)
Actual Capacity, cm Cm4=c 4=�Pcph
STEP 3 : LT From Minor Street .l v7
Conflicting Flow, Vc 1/7 V3+V2+V5+V4=�+ 2+J + i_v� (c7)
Critical Gap,Tc and Potential Capacitv,cp TC=(v_`5secs(Tab.10.2)cpy-3 Pcph(Fig.10.3)
Actual Capacity, cm cm7=cp7xP4�3�?Ox�= Pcph
SHARED-LANE CAPACITY SH v + , if lane is shared
(v7 cm7) (v9 M91
Movement no. v(vcph) Cm(pcph) CS11 (pcoh) CR LOS
7 I I .c:-
9
4
c
FUSS&aNEILL
consulting engineers
August 30, 1985
Mr. Peter DeMallie
Town Planner
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
RE: Rainbow Hills Subdivision
Ellington Road
South Windsor, Connecticut
Dear Mr. DeMallie :
We are enclosing the revised Figure No. 6 from our report dated
August , 1985, which reflects the latest revisions to the driveway
location.
As shown in the figure , the driveway has been relocated in a
northerly direction in order to provide a better sight distance to
the south. This revision should allow for an additional 1/2-1
second of gap time in northbound traffic.
We hope that this modification will be sufficient to address your
concerns . However, if you have any additional questions , please
do not hesitate to call .
Very tr ly you s ,
Ste en F. Mitchell , P. E.
Director of Traffic Section
SFM/jb
Enclosures
cc: Ken Peterson, Gardner & Peterson, w/enclosures
r=
S0.WINDSOR p1AN�1�G
210 MAIN STREET / MANCHESTER, CONN. 06040 ! TELEPHONE (203)646-2469
SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS•HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING
HIGHWAYS and BRIDGES•SURVEYING 0 LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC 0 PUBLIC WORKS MANAGEMENT•HYDROGEOLOGY
P, ,
G
No,-
FIGURE NO.6
MAMCMl*TMM, COMM<CTICYT
EXISTING SIGHT DISTANCES
RAINBOW HILLS
SOUTH .W*40SOR, CONNECTICUT
'Mor.MO. 8S-3t2'sArt �-30-85 ssAit: � =4Q' .
10'0M sE.41(
O
JJ
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
SOe•co� AREA CODE 203/644-2511
TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY , SEPTEMBER 4, 1985
LEGAL NOTICE
TOWN OF SOUTH WINDSOR
PLANNING AND ZONING COMMISSION
At the September 3 , 1985 meeting , the Planning and Zoning Commission
voted to take the following action :
1 . Approve , with modifications, the application of The Home Farm
Partnership , for a 32 lot subdivision , known as Rainbow Hills ,
located on the east side of Ellington Road, opposite Parkview
South Condominiums , in AA-30 and RR zones .
2 . Deny the application of Vito Covensky (Coven Commerce Center)
for a site plan of development for property located on the east
side of Brookfield Street , north of Troy Road , GC zone .
Dated at South Windsor , Connecticut this 5th day of September , 1985 .
PLANNING AND ZONING COMMISSION
Robert F . Gilligan , Chairman
David H . Sorenson , Secretary
•cow" s'N
9 ` 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
soR•coN AREA CODE 203/644-2511
September 9, 1985
Wayne C . Gerlt , Esq .
P . 0 . Box 559
South Windsor , Ct . 06074
Dear Wayne:
Re: App . #1085 - The Home Farm Partnership
Rainbow Hills Subdivision
Please be advised that the Planning & Zoning Commission voted to
approve the application of The Home Farm Partnership , for a
subdivision known as Rainbow Hills , located on the east side of
Ellington Road , opposite Parkview South Condominiums , in AA-30 and
RR zones , as shown on plans prepared by Gardner & Peterson
Associates, dated 5/31/85 , revised to 8/8/85 , subject to the follow-
ing modifications:
1 . This approval is for 32 lots numbered Lot #1 through and
including #32 . Lot #33 is not approved . Applicant must return
to the Planning & Zoning Commission for approval of Lot #33 .
2 . The plans shall be modified to indicate the trees around Parcel A
will be planted in clusters , and will contain a mixture of
deciduous and coniferous trees .
3 . Concrete sidewalks, built to Town specifications, shall be
installed on both sides of all interior streets . Sidewalks
will not be installed along Ellington Road .
4 . Deeds for the Open Space and roadways must be submitted to this
Commission prior to filing said plans . They must be approved
by the Engineering Department and Town Attorney , and be in
accordance with the policy for accepting deeds (attached) . The
deeds will be held in escrow until completion of the subdivision
and then referred to the Town Council for acceptance .
5 . Drainage for this subdivision is subject to the approval of the
Town Engineer .
6 . If , for any reason, finished grading and other site work is not
completed, the Town Engineer shall determine the amount of a cash
bond to ensure final grading and site work. This cash bond must be
submitted prior to issuance of a Certificate of Occupancy .
Wayne C . Gerlt , Esq . -2- 9/9 /85
7 . All lots must be connected to the Town of South Windsor sanitary
sewer system and are subject to the approval of the Water Pollution
Control Authority .
8 . Water shall be supplied to this subdivision by the Connecticut
Water Company .
9 . Street lighting shall be installed at intersections and on the
cul-de-sac in accordance with the policy established by the
Town Manager (see attached letter) .
10 . Street names and locations of fire hydrants are subject tothe
approval of the Fire Marshal of the Town of South Windsor . Street
names and supporting posts shall be installed by the developer
in conformance with the standards of the Town of South Windsor
at no expense to the Town.
11 . Prior to the building of any structure on a lot , a topographic
map , drawn to a scale of 1" = 40 ' , shall be submitted for each
lot in the subdivision , showing proposed contours and elevations .
No building permits will be issued until the proposed contours
and floor elevations have been approved by the Town Engineer .
12 . Quantity estimates must be submitted to the Town Engineer for the
purpose of determining subdivision bonding , and all bonds shall
be posted prior to filing the plans .
The Commission voted to accept a Letter of Credit , subject
to the approval of the Town Attorney . Said Letter of Credit
must be renewed on a yearly basis until completion of the
development . If a new Letter of Credit has not been received
within 30 days before the expiration date , the Commission may ,
at its option, call the Letter of Credit it is holding .
13 . A drainage assessment fee in the amount of $1 , 600 shall be submitted
to this Commission .
14 . A liability insurance policy shall be submitted to this Commission
naming the Town of South Windsor as an insured, with a combined
single limit for bodily injury and/or property damage in the
amount of $1 , 000 , 000 .
15 . This approval is subject to the conditions of approval of the
Inland Wetlands Agency/Conservation Commission .
16 . No building permits will be issued until all conditions of
approval have been complied with , and the final plans have been
filed in the Office of the Town Clerk.
17 . Prior to commencement of site work, a meeting must be held with
Town staff .
Wayne C . Gerlt , Esq . -3- 9/9/85
Black and white transparent mylars of the cover sheet , plus sheets
#1 through and including #6 , must be submitted to this Commission
to be signed and stamped. The letters of approval of this Commission ,
as well as the Inland Wetlands Agency/Conservation Commission, must
be reproduced on the mylars and three blueprint copies must be
submitted . After signing , the mylars will be filed inthe Town Clerk ' s
Office . They must be filed within 90 days of the date of approval
(by December 2 , 1985) .
Yours very truly,
PLANNING AND ZONING COMMISSION
encs . Robert F . Gilligan, C airman,
CC : R. Martel , Town Engineer
T . D ' Auria , Building Official
P . DeMallie , Planning Director
E . Belleville , Assessor
W. Lanning, Fire Marshal
Water Pollution Control Authority
Inland Wetlands/Conservation Commission
t OWN SF4
� • r l�
. = -7o tU12 � t7[l ? Ll/Lf 2 dl�4 J
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
/VOSOR•Co AREA CODE 203/644-2511
September 24, 1985
Mr. Kenneth Peterson
Gardner & Peterson Associates
Professional Engineers
576 Old Post Road
Tolland, Connecticut 06084
Dear Mr. Peterson:
At a regular meeting of the Water Pollution Control Authority
held on September 17, 1985, the Authority voted to approve
the sewer plan of Rainbow Hill - Gardner & Peterson - Map
dated 5-31-85, Revised 8-8-85 .
Very truly yours,
/ Josep_ h J�rino, Chairman
TOWN OF SOUTH WINDSOR
Water Pollution Control Authority
JJC :pm
CC : Mr. Peter DeMallie, Director of Planning
Mr. Robert Gilligan, Chairman, Planning & zoning
Mr. Thomas P. D 'Auria , Building Inspector
Mr. Richard Martel, Town Engineer
to -?rN
PLO
SFr' ' 1985
Fianning & th w'nd�or
Zoning Commission
LAW OFFICES OF
WAYNE CHRISTOPHER GERLT
435 BUCKLAND ROAD
P 0.BOX 559
SOUTH WINDSOR.CONN 06074
WAYNE CHRISTOPHER GERLT TELEPHONE
LOUIS D. FERRE RI (203)644-2565
October 4, 1985
Messers. Richard Martel and A. Bowen Davies
DEPARTMENT OF ENGINEERING
Town of South Windsor
1540 Sullivan Avenue
South Windsor, Connecticut 06074
Re: Rainbow Hills Subdivision
Dear Rick and Bo:
On behalf of the developer, I hereby notify you that CORBETT CONSTRUCTION
COMPANY of Columbia, Connecticut will be the contractor installing the
sanitary sewer and other subdivision improvements. Mr. David Maker of
that company may be reached at 646-2248 (office) or 228-0568 (home) .
Ken Petersen of GARDNER & PETERSEN can be reached at 871-0808. My number
and address are shown above.
Please contact me if you have any questions.
Very truly yo ,
l�
Wayne ristopher GerIt
WCG: lmg
�40M N S 44
T-o-11"n O-P SOUL12, `d
9 . 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
�l�Dsot•co �w AREA CODE 203/644-2511
December 4 , 1985
Wayne C. Gerlt, Esquire
P.O. Box 559
South Windsor, CT 06074
RE: RAINBOW HILLS SUBDIVISION
Dear Attorney Gerlt:
After stressing the importance of implementation of sedimentation
and erosion controls in accordance with the approved plans at the
pre-job meeting; after three telephone calls and discussion with
the contractor over the last three weeks; and nothing done, it
would appear that compliance is not high on your list of priorities .
It would also appear that it is time that we review winter time
construction--either be elimination or severely restrict it.
I am surprised that with the visibility of the site that you would
permit this activity to continue. If you have any questions, I can
be contacted at 644-2511, extension 244 .
Very truly yours,
c)
A. Bowen Davies
Deputy Town Engineer �d
ABD:bmr
cc : R. Martel, Town Engineer
Planning & Zoning File
IWA/CC File
10ON aF1
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
soR•co` AREA CODE 203/644-2511
December 41 1985
Wayne C. Gerlt, Esq.
P. 0. Box 559
South Windsor, Ct. 06074
Dear Sir:
Re: App. #1085 - Rainbow Hills Subdivision
Please be advised that the Planning & Zoning Commission voted
to grant a 90 day extension of time in which to file the final
plans in the above matter. The extension is from December 2 ,
1985 to March 2, 1986.
Yours very truly,
PLANNING & ZONING COMMISSION
vg By:
Robert F. Gilligan, Ch irman-
- -' _
Till,T�[ y�/���N -� ���U 1 �W , . � |� � [`�j���J`^ — � umm, �x o.oxmw ,� NORTH V0x0
����/Qm��/ | )m� , // ' � � �� ^/.N` / .^/� (
mx mmw/uICU o^oxxmoo |LL 03'03'335*
x m�`'m^x� .�. .w� . . ^ . ' ^ '
|k' nn|`r/ i 2 , | VX',
Wayo, C / | t , |(y'| .
P .V . Box 559
South Windsor , C1' 06074
Dear Mr . Kcr | | : '
Your "Rainbow |i i | la" nu |.J i v i y i ou |` | ox , darted 5/3 | /H5 and
revised 6/2H/89 , 7 /30/89 and K/H/H5 , has been r,v \ ,w,J and w,
find Lhai 1530 ' �+ of 8" D . I . P . wai ,r mn / o is required in
service /he 32 |oto in this subdivision .
The estimated cost to install this main and 32 — ln
services , main to curb is 'i'bia price rel \ecia
the cont incurred if we do the excnvu/ ion necessary to
install |he services .
| have enclosed two ( 2 ) copies our Refundable Advance
Payment Agreement for your review and signature . P \eaae
return both signed copies of the agreement to this office
with your advance in the amount of $82 , 123 . 56 . An csecotcJ
copy of the agreement will he returned to you for your
records .
We have elected to ineia | \ 12" D. I . P . water main on
K \ |iuXton Rood and wi \ l pay the Jificrcxcc in cost between
the 8" and 12'/ main installation . Your rou/ is husn| on 8"
pipe ,
Duo /o the fact that u portion of / hia proposed main
installation in on private \`ro|`,riy , we request that you
provide us with a 25 font easement in i |.» name of The
Connecticut Water Company along the route of the proposed
water main in "Parcel C" . '[|/is »xy,mcx / must he / ,iurx,.| to
us and be approved by our attorney prior /o the start o |
installation of water mains on your * i | '' . k\ inchrJ in o
marked uy Lopy or your site |` | ox , on w|/ / . h | ' v, / x'| i ' : / ,J lh,
| oyox \ of the water main ( or your proj.`. | and the limits of
the proposed casement . | / vc also included two ( 2 ) ( opium o |
our sLauJard easement form which should he ,om|` | c | n| u".|
roiorxcd to us for further processing .
The necessary pipe and mo / orin \ s ior this ]"\` will be
placed on order as soon as the site is ready , and we receive
the yigooJ agreements with your advance in the ah"v, amount .
B,[urc |h i s water main i nx/ o | | " t i ox / ok,s |` | o' , , the
cnaemcnL for this inuLo1iutioo as shown on your y | ooa must
he approved and on [i | c in thr South Windsor 1'oxu Un | | ,
-
LAVA V°1 I I OF
C 1111FR t; I.: Itl. l
435 BUCKLANI] ROAD
P O BOX SS9
SOUTH WINDSOR. CONN 06074
WAYNE CHRISTOPHER GERLT TELEPHONE
KEVIN F RENNIC t03, 644-256�.
'ALSO ADMITTED IN NEW PORK
January 198
Mr. Paul Longchamps, President
South Windsor Bank & Trust Co.
1033 John Fitch Blvd.
South Windso 06074
Re Rainbow Hills, tter of Credit #209
Dear Paul:
Please be advised that on December 9th, the Planning and Zoning
Ccxrurr_ission reduced the bond for this subdivision from $121,000.00 to
$80,000.00. Since this letter of credit is due to expire February 7,
I hereby request that you issue a renewal letter of credit, effective
February 7, 1987 in the amount of $80,000.00. Even though we are in
advance of that date, I do need the renewal letter of credit at least
one month before the expiration of the old letter to avoid the town
finding it necessary to call the bond. If you must make the new letter
effective January 7, then I will live with that eventuality.
If you have any questions, please don't hesitate to contact me.
Thank you.
Very truly yours,
Wayne
WCG:ekr
cc: Virginia Graney
Planning & Zoning Ca mission
LAW OFFICES OF
WAYNE CHRISTOPHER GERLT
435 BUCKLAND ROAD
P 0.BOX 559
SOUTH WINDSOR.CONN 06074
WAYNE CHRISTOPHER GERLT TELEPHONE
LOUIS D FERRERI (203)644-2565
January 29, 1986
Mr. Richard Sartor, Town Manager
TOWN OF SOUTH WINDSOR
1540 Sullivan Avenue
South Windsor, Connecticut 06074
Re: Rainbow Hills / Connecticut Water Company Basement
Dear Dick:
As I told you during a recent telephone conversation, one of the
conditions for providing water service to the referenced subdivision is
the providing of an easement through Parcel C, which was conveyed to the
Town of South Windsor by U & R CONSTRUCTION COMPANY, INC. Parcel C is
shown upon the enclosed utility easement plan which I have had my
engineers prepare for the purpose of obtaining the easement from the Town
of South Windsor. You will note that what is required is a twenty-five
foot water line easement across a proposed road stub from Scott Drive.
The road stub from Scott Drive which is shown as Parcel C has existed
since the acceptance of the subdivision and approval thereof, which
included Scott Drive.
Rainbow Hills will be obtaining water service through that 25 foot
easement to be provided by CWC. The easement will run in favor of the
CWC.
I also enclose a copy of the letter from CWC requiring the easement and a
copy of the proposed easement document. Your assistance in obtaining a
prompt conveyance of the easement would be deeply appreciated so that the
project does not get delayed. As you know, the Planning and Zoning
Commission, as a routine matter in this subdivision and in all others,
required that water service be provided by CWC.
If there are any questions or concerns, please contact me directly. Thank
you.
Very truly y ,
Wayn
WCG: lmg
�SO*N Sf4<�
oslo�
G U
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
���soe•coN� AREA CODE 203/644-2511
M E M O R A N D U M February 10 , 1986
TO: Richard J. Sartor, Town Manager
RE: REQUEST OF CONNECTICUT WATER COMPANY
FOR WATERLINE EASEMENT/RAINBOW HILLS SUBDIVISION
The Engineering Department has reviewed the proposed placement of the
waterline connecting Rainbow Hills to Scott Drive. A location map and
draft easement document was submitted for consideration.
The following comments are offered:
As relates to the proposed location of the waterline and
accompanying easement--
The actual location of the water main, as proposed, is not
consistent with Section 2 . 4a of the South Windsor Subdivision
Regulations . The line should be installed fifteen (15) feet
south of , and parallel to, the northern most boundary line of
"Parcel C. " The twenty-five (25) foot easement should be
parallel to the above mentioned boundary line and be coincident
to the line .
As relates to the easement agreement--
The paragraphs of the easement have been numbered for reference
to the following comments .
Paragraph 2 : This paragraph deals with the control of brush and
tree growth. Any control of plant growth should be done by
mechanical means . The use of chemicals on Town property in a
residential area by outside companies or agencies should not be
encouraged or agreed to. Also , the sentence after the last
semi-colon should be removed.
Paragraphs 3 and 4 : Both paragraphs severely limit the Town' s
right to make improvements to the parcel , including storage of
materials or regrading. Any use of the parcel by the Town
would require prior approval by the Connecticut Water Company.
Paragraph 5 : The last sentence pertaining to ownership of lines
and appurtenances should be removed.
The easement is being forwarded to the Town' s attorney for review.
I will do my best to expedite the review.
Rob rt enault
Di ector of Public Works
cc : R. Martel, Town Engineer
�4o,NM
r `To-utn 0
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR-CO AREA CODE 203/644-2511
February 18 , 1986
Wayne C. Gerlt, Esq.
P. 0. Box 559
South Windsor, Ct. 06074
Dear Wayne:
Re : App. #1085 - Rainbow Hills
Please be advised that the Planning & Zoning Commission voted
on February llth to require a bond in the amount of $470 ,000
to ensure completion of subdivision improvements in the above
matter. The Commission further voted to reduce that amount to
$280, 000 in consideration of work which has been completed.
The Commission also discussed the fact that construction equipment
entering this site is using a driveway south of the main entrance.
We question whether sightline is adequate at this driveway, and,
therefore, are requesting that use of this temporary driveway
for construction equipment cease.
. Yours very truly,
PLANN & ZONING COMMISSION
vg BY
'Robert F. Gi- ligan, Ch irman f
CC: R. Martel, Town Engineer
P. DeMallie, Planning Director
T. D'Auria, Building Official
LAW OFFICES OF
WAYNE CHRISTOPHER G ERLT
435 BUCKLAND ROAD
P O.BOX 559
SOUTH WINDSOR,CONN 06074
WAYNE CHRISTOPHER GERLT TELEPHONE
LOUIS D FERRERI (203)644.2565
March 14, 1986
Mr. Robert F. Gilligan, Chairman
SOUTH WINDSOR PLANNING & ZONING CODMIESSION
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Rainbow Hills - reduction in $280,000. Bond
Dear Chairman Gilligan:
I hereby formally request that your camdssion consider a
reduction in the referenced bond. We have fully completed
the storm and sanitary sewers and ask that this bond be
appropriately reduced.
Thank you for your attention to this matter.
Very truly yours, zk
�., .
Wayne Christopher Gerlt
WCG:lmg
d,,
�SO•MN Sf•'`
/t1LUf2 01�� ��LLUZ LUC�2L��-OJ�
9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
����Soe•co�'��G AREA CODE 203/644-2511
April 8 , 1986
Mr. Thomas D'Auria
Chief Building Inspector
South Windsor Town Hall
South Windsor, Ct 06074
RE: Rainbow Hill Subdivision Building Permits and Sedimentation
and Erosion Control
Dear Tom:
The approval of the Rainbow Hills Subdivision was granted with a
number of conditions by the appropriate commissions . Over the past
few weeks I have been strongly requesting that the developer attend
to the sedimentation and erosion controls as indicated on his plans
as approved. For all the normal reasons, these items cannot be done
or won' t be done, but foundations can go in. Item 11 of the approval
requires the plot plans be approved by the Town Engineer, which is the
typical procedure. Item 16 indicates no building permits will be issued
until all conditions of approval have been complied with.
I have been delaying or denying engineering approvals in hopes that
the developer would comply with what he is supposed to be doing.
According to your files , there has been only one building permit
approved. The developer has narrowed down my options. I doubt if
any plot plans will be approved for at least 10 days . At that time
we will have determined the next steps .
Thank you.
Very truly yours ,
A. B. Davies
Deputy Town Engineer
ABD:dlb
CC: Wayne C. Gerlt, Esquire
U & R Housing Corp.
John M. Moran, Jr. , Chairman
Inland Wetlands Agency/Conservation Commission
Inland Wetlands Agency/Conservation Cf�mmission file
Planning and Zoning Commission file
t 0,0 sf"(
C TOIV/12 V/ SOUZA
G �
e �L 1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. 06074
SOR.r-ac�� AREA CODE 203/644-2511
April 23 , 1986
Wayne C. Gerlt, Esq.
P. 0. Box 559
South Windsor, Ct. 06074
Dear Wayne:
Re: Rainbow Hills Subdivision
The Planning and Zoning Commission voted last night to reduce
the amount of the bond it is requiring to ensure completion of
subdivision improvements in the above matter from $280 , 000
to $225 , 000 .
We are holding a Letter of Credit from the South Windsor Bank &
Trust Company. Please have them forward us an amendment
reducing the amount by $55 , 000 to $225, 000 .
Yours very truly,
PLANNING & ZONING COMMISSION
A
vg By:
Marshall Montana, Vice-Chair n
S 0'0 8 C4,
Y
`/o- wi? ale soil Zf Z Lild. -O'z
e mac` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
sOR•CO AREA CODE 203/644-2511
May 15 , 1986
Home Farm Partnership
435 Buckland Rd.
South Windsor, Ct 06074
RE: Lot #31 - Rainbow Hills Subdivision
Gentlemen:
It has been brought to our attention by both the proposed home buyer
and Wayne Gerlt, Esquire, their concern about the watercourse as it
crosses lot #31 , adjacent to Ellington Road, below the warehouse.
When the area was farmed, a certain amount of repair and maintenance
was done along this watercourse by your men and equipment as a matter
of good farming practices and a desire to keep the area clean and neat.
It always looked good.
Now with a new homeowner looking at a big gulley in his back yard,
they can envision major difficulties . I don't see it that way. I
would hope that someone in your group would come up with a corrective
proposal that would enhance the total project. It is the first one
to be seen as you head northerly. I don't have a solution, but I
anticipate I could support a reasonable one.
As far as other support from the town, I feel safe in assuming that
taxpayers would and should take a dim view of town participation in
correcting a drainage system in a subdivision that is less than one
year old.
The plans do not call for anything, perhaps that is our fault for not
recognizing such a problem before approvals . Perhaps the approval
process is too quick.
I would hope that you would see the need and help out the homeowner
and your site. I think it would be an awfully nice gesture.
If you would like to discuss this further, I can be contacted at
644-2511 extension 244 .
Very truly yours ,
ABD:dlb A. B. Davies
Deputy Town Engineer
CC: Richard Martel , Town Engineer /
Planning & Zoning Commission File
Inland Wetlands Agency/Conservation Commission File
Wayne C. Gerlt, Esquire
LAW OFFICES OF
WAYN E CHRIS'1['®IEDH ER G ER LT
43S BUCKLAND ROAD
P O BOX 559
SOUTH WINDSOR.CONN 06074
WAYNE CHRISTOPHER GERLT TELEPHONE
LOUIS D FERRERI (203)644-2565
KEVIN F RENNIE
ALSO ADMITTED IN NEW YORK
June 16, 1986
The Honorable Robert Gilligan, Chairman
SOUTH WINDSOR PLANNING & ZONING COMMISSION
1540 Sullivan Avenue
South Windsor, Connecticut 06074
Re: Rainbow Hills Subdivision, Bond Reduction; June 16, 1986
Dear Chairman Gilligan:
Having completed the installation of the processed stone and
the binder with curbs to be completed by June 23, 1986, I here-
by request a reduction in the subdivision bond which presently
stands at $225,000.00
Thank you for your attention to this request.
Very trul s,
Wayne C �er
ot _p
WCG:lmg
V C
0
7
I � 1
y r J
yw 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
AREA CODE 203/644-2511
R coN
June 25, 1986
Wayne C. Gerlt, Esq.
P. 0. Box 559
South Windsor, Ct. 06074
Dear Wayne :
Re: App. #1085 - Rainbow Hills
Please be advised that the Planning & Zoning Commission voted
last night to reduce the amount of the bond in the above
matter by $104 , 000 , from $225 , 000 to $121, 000 . Please forward
us an amendment to the Letter of Credit.
Yours very truly,
PLANNING & ZONING COMMISSION
vg By:
Marshall Montana, Vice-Chairman
�t0wM 8f+` 1
C r 7awn, a/,S_a� W
e �
wc` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
l�pSOR-Co AREA CODE 203/644-2511
July 17, 1986
Wayne C. Gerlt CERTIFIED MAIL
Attorney At Law
P.O. Box 559
South Windsor, Ct 06074
RE: Permit Extension - Application #336 - Rainbow Hills Subdivision
Dear Attorney Gerlt:
At the July 14 , 1986 meeting of the South Windsor Inland Wetlands Agency/
Conservation Commission, the agency voted to deny a permit extension for
application #336 because of noncompliance with existing plans in regards
to erosion & sedimentation control measures.
Letters were sent to your attention on 12/4/85, 3/14/86 , 4/7/86 , 4/8/86,
and 7/11/86 stating the Town staff' s concerns about the projects erosion
and sedimentation control measures that have not been brought up to com-
pliance with the existing plans .
You may re-apply at any time providing your new application is in compli-
ance with the existing plans . We also ask to be notified in writing by
your engineering firm on the project certifying that all erosion & sedi-
mentation conditions of the original plans have been met, are current as
of the date of re-application (i .e. through August 18 if you wish to be
on the agenda for our next meeting, September 8) , and all such measures
are working.
If you should have any questions , please contact our department at
644-2511 Ext. 253 or Bo Davies at Ext. 244 .
Very truly yours ,
John M. Moran, Jr. , Chad man
Inland Wetlands Agency/
Conservation Commission
Town of South Windsor
JMM:dlb
CC: A. B. Davies, Deputy Town Engineer
Richard Martel, Town Engineer /
Planning & Zoning Commission/
Marcia Banach, Director of Planning
Thomas D'Auria, Building Official
John Shemo, Economic Development Coordinator
y `�� o-P South Vz��
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
f~osoa.co��' AREA CODE 203/644-2511
July 24, 1986
CERTIFIED MAIL
Wayne C. Gerlt
Attorney at Law
P.O. Box 559
South Windsor, Ct 06074
RE: Permit Extension - Application #336, Rainbow Hills
Dear Attorney Gerlt:
At the July 21 , 1986 meeting, the South Windsor Inland Wetlands Agency/
Conservation Commission approved a one-year extension for the above
mentioned application.
The extension becomes effective July 15 , 1986 with an expiration date
of July 15, 1987 . All original conditions of this permit apply.
Very truly yours,
/ John M. Moran, J Chairman
Inland Wetlands gency/
Conservation Commission
Town of South Windsor
DLB
CC: A. B. Davies, Deputy Town Engineer
Richard Martel, Town Engineer
Planning & Zoning Commission J
Marcia Banach, Director of Planning
John Shemo, Economic Development Coordinator
Thomas D'Auria, Building Official
M E M O R A N D U M
October 28 , 1986
TO: Mr. Thomas D'Auria, Building Inspector
RE: Certificate Of Occupancy
Lot 26 , 'Rainbow Hills
This plan was denied for a couple of reasons . The first was for
showing a 25 ' right-of-way across the easterly portion of this
lot and it was not the same as the recorded plan.
According to Attorney Gerlt, this does not constitute a resub-
division as described in the Statutes 8-18 :
'resubdivision means a change in a map of an approved
or recorded subdivision if such change (a) affects
any street layout shown on such map, (b) affects any
area reserved thereon for public use or (c) diminishes
the size of any lot shown thereon and creates an addi-
tional building lot' .
The other reason was to apply the appropriate certification to the
plan.
When this is done, the c .o. can be issued.
A. Bowen Davies
Deputy Town Engineer
ABD/jsv
CC: Richard P. Martel, Town Engineer
Marcia Banach, Director of Planning
Planning & Zoning Commission File
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
f��soe•co�'� AREA CODE 203/644-2511
November 5 , 1986
Mr. John M. Moran, Jr. , Chairman
Inland Wetlands Agency/Conservation Commission
1540 Sullivan Avenue
South Windsor, CT 06074
RE: Application #423
U & R Construction Co. , Inc .
Lot 22 , Rainbow Hills Subdivision - Review
Dear Jack :
In accordance with the standard review practice, enclosed are the
comments as they relate to this proposal.
The developers proposal for the subdivision, in 1985 , was essen-
tially that the pond would remain as a viable water body and that
the existing house would be altered to comply with the current
standards. With the utility installation in the roadways, it
appears that the springs that fed the pond have been diverted, and
the water source eliminated. Now to eliminate a liability and an
ugly situation, the plan indicates they propose to fill it in.
The plan, as submitted, does provide a drain out of the ponding
and substantial grading of the whole lot. In general, I am not
opposed to what is proposed. It would be an improvement in the
subdivision.
Specific concerns that I have are:
1 . The house placement - which is not a IWA/CC concern.
2 . The lot does have a few mature trees . It appears the
whole lot is to be graded, disregarding existing veg-
etation.
If the construction is to be as shown, and as per Item 1 in their
grading and seeding applications, 'hll graded or disturbed areas,
including slopes, shall be protected during clearing and construc-
tion in accordance with the approved sediment control plan until
they are permanently stabilized. "
John M. Moran, Jr. November 5 , 1986
RE: U & R Construction
Rainbow Hills
Page 2 .
At this time of the year, it does present a problem.
I would hope that perhaps an on site inspection with the excavator
and/or builder prior to excavation could minimize the areas dis-
turbed and to be restored.
If an approval were to be granted with conditions , a bond of per-
haps $2 , 500 should cover the erosion and sediment control phase.
Very truly yours,
A. Bowen Davies
Deputy Town Engineer
ABD/jsv
CC: U & R Construction Co. , Inc.
Wayne Gerlt, Esquire
Michael J. Gantick, Director of Public Works
Richard P. Martel, Town Engineer /
Marcia Banach, Director of Planning
IWA/CC File
�z
_awl-t O-P Sau� V&U&at
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
l��soa•co`'� AREA CODE 203/644-2511
November 24 , 1986
U & R Construction Company , Inc . CERTIFIED MAIL
99 East Center Street
Manchester , Ct 06040
RE: Application # 423 - Lot #22 , Rainbow Hills Subdivision
Filling of existing pond and regrading .
Gentlemen :
At the November 17 , 1986 meeting , the South Windsor Inland Wetlands
Agency/Conservation Commission approved with conditions application
#423 , to fill existing pond and regrade land on Lot #22 , Rainbow
Hills Subdivision .
The following conditions must be adhered to for this permit to be
valid :
1 . Plans must be modified to include erosion & sediment
control measures for wintertime construction .
2 . No tree removal to fill the pond .
3 . No tree removal beyond 25 feet from the dwelling .
4 . We recommend a bond in the amount of $2 ,500 be submitted
to Planning and Zoning Commission to ensure compliance
with Erosion & Sediment Control Measures .
5 . Construction activities shall be subject to the approval of
the Town Engineer .
6 . The application shall indemnify and hold harmless the Town
of South Windsor against any liability which might result
from the proposed operation or use .
TO : U & R Construction Page 2
7 . The permit is valid for one year and shall expire
November 17 , 1987 .
Very truly yours ,
gn4 N---w Q"
JoAk M. Moran , Jr . ,Chairm n
Inland Wetlands Agency/
Conservation Commission
Town of South Windsor
JMM: dlb
CC : A . B . Davies , Deputy Town Engineer
Richard Martel , Town Engineer
Marcia Banach , Director of Planning
Louise Evans , Chairman , Planning and Zoning Commission
Michael Gantick Director of Public Works
Thomas D' Auria , Building Official
John Shemo , Economic Development Coordinator
Gardner & Peterson , Engineer
LAW OFFICES OF
435 BUCKLAND ROAD r
P 0.BOX 559 I
SOUTH WINDSOR.CONN 06074
WAYNE CHRISTOPHER GERLT TELEPHONE
(203)644-2565
KEVIN F RENNIE
ALSO ADMITTED IN NEW YORK
Decenmber 1, 1986
Mrs. Louise C. Evans
Chairman
Planning and Zoning Ccnudssion
Town of South Windsor
1540 Sullivan Avenue
South Windsor, Connecticut 06074
Re: Rainbow Hills Subdivision
Dear Mrs. Evans:
I hereby request a reduction in the bond for the referenced sub-
division from its present limit-of $121,000.00 due to the con-pletion
of curbing and sidewalks in the entire subdivision. As soon as we have
a decision on this request, I will cTplete my pending application for
renewal of the letter which expires February 27, 1987. The Commission's
prcn pt attention to this request will be deeply appreciated. If there
are any questions, please do not hesitate to contact me.
Very truly s,
�L?
Wa Chris er Gerlt
WCG:jl
C
cc: Mr. Richard Martel
Town Engineer
A l/
�40wM
y r
7-own' Ole soa� ?d&U&O't
C `
a
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
SOR-0) AREA CODE 203/644-2511
December 10 , 1986
Wayne C. Gerlt, Esq.
P. O. Box 559
South Windsor, Ct. 06074
Dear Wayne:
Re: Rainbow Hills Subdivision
Please be advised that the Planning & Zoning Commission voted
last night to reduce the bond in the above matter from $121, 000
to $80 , 000 .
We are holding a Letter of Credit from South Windsor Bank &
Trust Company which expires on February 27 , 1987 . Please forward
us an amendment reducing the amount by $41, 000 , and extending the
term for an additional year.
Yours very truly,
PLANNING & ZONING COMMISSION
vg By:
Louise C. Evans, Chairman
r -awn' 01/ �o-td �c�� t
c �
.i
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
SOR-CO AREA CODE 203/644-2511
January 14 , 1987
Wayne C. Gerlt, Esquire
P.O. Box 559
South Windsor, CT 06074
Dear Attorney Gerlt:
Subject: Rainbow Hills - Streets
It has come to my attention that on several occasions , staff
members from the Engineering Division have contacted you
regarding re-establishing shimming of the manholes and catch
basins along the subject project. To date, nothing has been
done. I trust you understand the importance of maintaining
these structures in a safe condition at all times and associated
liability. Plowing equipment has been damaged as a result of
the lack of adequate shimming on the manholes and catch basins .
I must advise you that if you do not take adequate measures to
correct the above noted deficiencies by the end of Thursday,
January 15 , 1987 , the Town will take measures to correct said
deficiencies at your cost.
It is imperative that you maintain the subject streets in a
safe and passable condition.
Very truly yours ,
Michael J. GA4,ftick
Director of Public Works
MJG:bmr
cc: Melvin C. Stead, Jr. , Supt. of Streets
Richard P. Martel , Town Engineer
, Marcia Banach, Planning Director
Richard J. Sartor, Town Manager
4O'NM 8E�
r /
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
SOR-CO AREA CODE 203/644-2511
March 18 , 1987
Mr. Ludis Upenieks
U & R Construction
99 E. Center Street
Manchester, CT 06040
RE: Grading at Lots 6 & 7 , Rainbow Hills
Dear Mr. Upenieks:
It has come to my attention that fill material has been brought
in to the rear of Lot 6 and Lot 7 on Windy Hill Drive in the
Rainbow Hills Subdivision. Examination of the plot plans, used
to acquire building permits, showed no regrading at the rear of
these properties was to be done.
The re-grading of these lots raises concern in two areas. The
first is that there is exposed earth with no concern for proper
soil erosion control measures. The erosion of soil has the down-
stream property owners rightly concerned. The second concern is
that an area has been established where slopes are steeper than
they were originally. The velocities of any stormwater run-off
are greater, subsequently another concern for soil erosion is
raised. Temporary and permanent soil erosion control measures
must be placed on the site. There must also be a resolution to
the steep slopes and direction of the stormwater run-off.
Please contact me so that these questions can be answered in a
timely manner.
Very truly yours ,
j
�� - z
Richard P. Martel
Town Engineer
RPM/jsv
CC: Wayne Gerlt, Esquire
Mr. Edward Pastula
Mr. & Mrs. Nachyly
Planning & Zoning Commission
Tuesday, May 26, 1987
2051 Ellington Road
P.O. Box 452
South Windsor, CT 06074
Louise Evans, Chairperson
Planning & Zoning Commission
Town of South Windsor
Dear members of Planning & Zoning:
About two (2) years ago, Mr. Ludis Upenieks of U. & R. developed property
on the east side of my home of more than 32 years to the rear of Lots 6 and
7 on Windy Hill Drive in t1pe Rainbow Hills sect.
I was promised that Ludi would carve out a swail on the west side of the
Harris property, so that water and muck would not run down onto my land.
Instead, tons upon tons of earth were brought in and they raised the ter-
rain into a high hill. Before they did this, this particular land sloped
up very gently. Now, as a result of their changing the terrain, a steep
slope was left at an angle into my land and inground swimming pool. Also,
raw dirt was pushed down, including rocks and stones. It was left an
absolute mess. There are now, rats and snakes accumulating, along with
messy poisonous plants and bramble bushes.
I spoke to Ludi many times and got nowhere:
I have tried to be a neat property owner and have lived in town over 65
y ars. I have never complained about anything before. Somehow this does
not seem right.
For your further information on this aggravating matter, I have attached
her to a letter dated 3-18-87, from Tomn Engineer Richard Martel to Mr.
Ludis Upenieks.
Thank you for your kind attention.
Sincerely,
Margaret D. Nachyly
Attachment: 1-Letter, dated 3-18-872 R. Martel to L. Upenieks.
LAW OFFICES OF
435 BUCKLAND ROAD
P O BOX 559
SOUTH WINDSOR,CONN 06074
WAYNE CHRISTOPHER GERLT /y; TELEPHONE
(203)644.2565
r'
July 15, 1987 ,
Mrs. Louise C. Evans
Chairman
Planning and Zoning Ccmaission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, Connecticut 06074
Re: Rainbow Hills Subdivision - Bond Reduction
Dear Mrs. Evans:
I hereby request a reduction in the bond for the referenced subdivision
from its present limit of $80,000.00 due to the conpletion of final paving,
curbing, sidewalks and drainage. The planting of trees and setting of
merestones and pins will be acccuplished as soon as possible.
The Ccmission's attention to this request is a ciated.
Very s,
t
WCG:j 1
cc: Mr. Richard Martel, Town Engineer
LAW OFFICES OF
WAYNE C HRISTO P]HER GERLT
435 BUCKLAND ROAD
P O.BOX 559
SOUTH WINDSOR.CONN 06074
WAYNE CHRISTOPHER GERLT TELEPHONE
(203)644-2565
September 16, 1987
Mrs. Louise C. Evans, Chairman j
Planning & Zoning CaT fission
Town of South 71indsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Rainbow Hills Subdivision - Acceptance of Streets
Dear Mrs. Evans:
I hereby request that the Town accept the streets and release the bond
for the referenced subdivision. The final paving, curbing sidewalks and
other improvements have been completed and our reque should be in order
by the time you consider it.
Very truly ,
Wayn isto er Gerlt
WCG:mt
cc: Mr. Richard Martel, Town Engineer
s 1OwM st4
P `Qj l
o ~ Tam4o��so�A ?J
e P
u
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
'tioSOR.Coe�� AREA CODE 203/644-2511
September 25 . 1987
Wayne C . Gerlt , Esq .
P . 0 , Box 559
South Windsor , CT 06074
RE: Bond Reductions
Rainbow Hills
Dear Sir :
Please be advised that the Planning & Zoning Commission voted on
Sept 22 , 1987 to reduce the bond for Rainbow Hills from $80 , 000 to
$50 , 000. We are holding a Letter of Credit from the South Windsor
Bank & Trust Co. which expires on February 27 , 1988 . Kindly forward
an amendment reducing the amount by $30, 000.
Your prompt attention to this matter will be greatly appreciated .
Very truly yours ,
PLANNING & ZONING COMMISSION
Louis C . Evans
Chairman
: rt
LAW OFFICES OF
WAYN E CHRIS'd OPHER G ER LT
435 BUCKLAND ROAD
P O.BOX 559
SOUTH WINDSOR,CONN 06074
WAYNE CHRISTOPHER GERLT TELEPHONE
WAVAICH)COM{ (203)644-2565
October 7, 1987
Mrs. Louise C. Evan
Chai rznan
Town Planning & Zoning CaT ission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Rainbow Hills - Bonds
Dear airs. Evans:
Enclosed are two letter of credit extensions, one for the TPZ bond in
the sum of $50,000.00 and one for the TPZ's (Conservation Commission requested)
bond in the sum of $15,000.00.
Since the developer's site work is substantially complete, we request
a release of both bonds and acceptance of the streets at this time. By a copy
of this letter we are requesting Conservation Commission tion to recommend
release of their bond.
Sincerely,
i
Wayne is h Gerlt
.aCG:mt A�
cc: Mr. A. Bowen Davies
Mr. Kevin F. Rennie - Conservation Comtission z
Q�`D
45 Nindy li11 ,rive
bo ut n_ ',rir�d�ar7_`C T\\ �,dv 74
JctOoer y, 1y0( 1
Jpeniks
ucut onstructlon ',c. , inc.
y; I. ,'enter btreet
�Iar:•3rester,, i;T
-ear ..:d i
our p:^.cne Gail prompts this wetter - you indica -d that i shou-Ld ce happy cecause
"you .augnt he11 from ?&Z". indeed, sir, that doesn' t give me any pleasure at all.
is no,: our intention to areas ;ou or have anyone else do sc.
.re ±'eei that we have a iegitir.:3te problem - mainly streams of water crossing
::verjcne's bacK yard and coming .hrougn ours, suosequent.{ ?ooling Of the ?ara5e
.ni once that's sufficiently ='_coded, i; then streams across the driveway and
t;e sidewalk like a mini-river. This is definitely not desirac.Le, and we are
par:ic;Lariy worried aCout the colder weather because these areas wiii ice over
a;;� oecome not only a nuisance out a serious hazard.
ono c)rociem stems from the fact, that we appear to ee "the" catcn basin, oeing
..ow spot. Ne understood tnat there was to oe a swale or. Lot ff7 �r,r. narris'
cefore it Bumped onto ours, out that was not done. 4hen regrading in may we agreed
:.J . .tl i 3:Jcle on our property, tnu ou4h the thir.King that
:..�., .;_Id he.Lo and it did help some, cut :.ne pro Clem is st:�_ serious enough
prompted us to seek re.L . The other detai-L that_ aggravates this
:at�on still further is the quality of the soi- in tr:e :area, very neavy ciay
does not promote good distrioution or drai:age ;we :.ad !roles auo in the
_'or plan;ing trees and Lnree days after a downpour they were st,- ui of
,utside consu:ting sources indicated tnat we needej s,;rie storm drains to
haraie the ;overflow. we tnen asked the lows :,ngineer, .•.r. no ;iavies, for nis
irout and e oasis iily had tr.e Same recommenia.ion. et tnat coins we triea to
cc:nm nica:e witr_ ycu to seek jour nelJ in the ma.ter, and .•ou: attltude casically
..:is t~a. you'd ,axe a iook at i t "when yo•.i ':a(. .ne time".
jav_as says hi-- Jeoart;ment is not responsic.Le because: th-a town doesn't own
_..e --ads, the Ievei,.;per at:y. 'ro,ayne . eri t does. Attorney Jerit gave nis apprcva_
noDk into .he Street storm sewers out also felt it wasn't his pro-rem, that we
...cu_ : ----.-Lk to -rcu, the builder - hence our appeal to you for help. ,t's a great
-ys-.a.m 3ut there zecause it a;iowed for the prob.Lem to b•e created and now it
acid-ves !ver_'cre :'rom r espo nsibility.
;;ear-y -ae .:an:luG _-mmuricate weii with you but believt .,r.e Wher. , teil you that
.ne least of our intentions is to crealP any hard feeiings - we are more than
appreciative of your fine skills as a builder, but we do have a problem. he
fee-L that some of the respcnsibi-Lity for solving this problem lies with you.
-2-
3asicaily, we want this resolved so that we too, can get on with our lives.
It's almost a year that we're in this home and we'd like some respite. may
we asx for a meeting with you, for Monday, Jctober ly the time at your con-
venience) to see if we can find the best sciution to this problem.
Thank you for your consideration of this matter.
Sincerely,
Hichard J. Nowak
Veronica E. Nowak
cc: Atty Mayne Gerlt
LAW OFFICES OF
WAYN E ClE-IIRISTOPHER GRRLT
435 BUCKLAND ROAD
P 0.BOX 559
SOUTH WINDSOR,CONN 06074
WAYNE CHRISTOPHER GERLT TELEPHONE
IMAIMOIDOOMOC (203)644-2565
October 14, 1987
Mr. A. Bowen Davies
Deputy Town Engineer
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Rainbow Hills - Acceptance of Subdivision
Dear Mr. Davies:
As you know the developer's work in the referenced subdivision was
completed on or about October 1, 1987. We hereby request a final inspection
by your office of all public improvements. We have already provided deeds
to the roads, drainage rights-of-way, open space and detention basin area
to the Town Attorney, and you should have copies of those in your file.
After you have completed your inspection, please make a recommendation for
acceptance to the Planning and Zoning Commission and to the Town Manager.
If there are any questions, please don't hesitate to contact us.
Thank you.
Veryger
W eerlt
WCG:mt
cc: rlrs. Louis Evans,
Chairperson Planning & Zoning Commission
t OwN 8E7
C
7W-zW0 S �
_ 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
soe•cO AREA CODE 203/644-2511
December 8 , 1987
Atty . Wayne Gerlt
P . 0 . Box 559
South Windsor , CT 06074
re : B Qn.d R-e-ducri o n
Rainbow Hills
Dear Atty . Gerlt :
At the recommendation of the Inland Wetlands Agency/Conservation
Commission , the Planning and Zoning Commission voted during its November
24 , 1987 meeting to release the IWA/CC Bond on Rainbow Hills in the amount
of $15 , 000.
Please make arrangements to have this bond picked up at the Planning
Department at your earliest convenience .
Your cooperation will be greatly appreciated .
Very truly yours ,
PLANNING AND ZONING COMMISSION
Raymond F. Hallowell , Jr .
Chairman
cc : M. Banach , Director of Planning
PZC File
Engineering Department
tow" se.4
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
lN�soe•co�� AREA CODE 203/644-2511
M E M O R A N D U M
January 11, 1988
TO: Marcia A. Banach, Director of Planning
FROM: Michael J. Gantick, Director of Public Works
RE: RAINBOW HILLS
PERFORMANCE BOND FIELD REVIEW
Please be advised that this Department has field checked the subject
project and the following items require corrective action:
1. Throughout the subdivision there are numerous areas in which the
grading between the edge of curb and the sidewalk is not consis-
tant with the Town' s standard grading, i.e. grading is improper,
area needs to be re-topsoiled and seeded (free of stones larger
than 1 1/2" and miscellaneous debris) ; Lots 1, 2 , 3, 4 , 5, 6, 7,
8 , 12, 15, 16, 17, 18, 19, 20, 21, 22 , 23, 24 , 25, 26, 27, 30 .
2 . Various sections of sidewalks in front of the following lots are
cracked and require replacement of sections : Lots 5, 6, 7, 15,
18 , 22 , 24, 26, 29 , R.O.W. to detention basin, Paul Kupchunos
property; sidewalk spalling Lot 7 . In addition along all areas
of sidewalks the expansion joints should be planed down flush
with the sidewalk.
3 . Debris and concrete pieces should be removed from sidewalks along
Lots 4 , 5, 7, 8, 19 , 20, 22 .
4. Sidewalk in front of Lot 17 appears to be undermined. Front yard
of Lot 17 to be stabilized.
5. Driveway aprons on Lots 10, 14 , 17 , 19, 24 require repairs (ravelling/
settlement) .
6. Ponding conditions on Darlene Drive in front of Lot 23.
7 . Ponding condition on Kupchunos Drive Station 1+25± left.
8. Water gate between Lot 30/31 to be lowered to grade.
9 . Water gate Lot 22 driveway to be cut out and brought to grade.
10. Water gate Lot 10 driveway to be cut out and brought to grade.
11 . Water gates (2) along Paul Kupchunos Lot sidewalk to be relocated
and sidewalk section replaced.
TO: Marcia A. Banach Page 2
RE: Rainbow Hills
12 . Water gate Lot 18 and 24 to be lowered to grade.
13 . Sidewalk forms to be removed in front of Lots 12, 26.
14 . Repair/replace bituminous concrete lip curb along Lots 3, 4 , 5,
11, 12 , 15, 19 , 20, 23, 26, 27 .
15. Move cable T.V. box from in front of fire hydrant along Lot 3.
Hydrant operation inhibited by present location of utility.
16. Trees planted between edge of curb and sidewalk in front of
Lot 4 to be removed or relocated outside of street R.O.W.
17 . All catch basin sumps are to be cleaned free of all sand and
debris. All storm drainage pipes to be flushed. (To be done
under the inspection of Town) .
18 . All pipes in catch basins to be cut flush with walls.
19 . All catch basins to be repointed. Cement all spaces (CB at 7+10
right Windy Hill Road has space between CB to and first section of
CB wall) .
20 . Pavement station 5+20± right Windy Hill has been scarred by heavy
equipment and is to be repaired.
21 . Lot drainage between Lots 19 and 20 to be cleaned, embankment
area stabilized.
22. Manhole cover in Kupchunos Drive from Lot 19 and 20 drainage to
be changed to storm sewer cover.
23 . Cul-de-sac banks on Kupchunos Drive to be loamed/seeded (stabilized) .
24 . Mason sand to be removed from Kupchunos Drive cul-de-sac.
25 . 18 inch double Maple tree right side of Kupchunos Drive cul-de-sac
to be removed along with dead fall within R.O.W. /Parcel "C" area.
26. All construction debris along Kupchunos Drive cul-de-sac/Parcel "C"
to be removed. All curbing to be backed-up and graded per Town
standards.
27 . Utilities along Lot 15 and wires exposed on Lot 29 to be secured.
All utility boxes and wood post identification markers to be re-
moved/secured as required.
28 . Path to the detention basin to be stabilized. Present path is
erroding.
'TO: Marcia A. Banach Page 3
RE: Rainbow Hills
29 . Detention basin bottom and sides to be stabilized. All construc-
tion debris, stones to be removed from basin bottom and side slopes.
Basin to be "dry" basin.
30. End structure needed for drain from Lot 28 .
31. Inlets/outlets to detention basin to be riprapped with approved
material.
32. Overflow struct4M CB to be cemented in place.
33. Manhole #18 near detention basin to be repaired.
34. Excess soil materials to be removed from site, area stabilized.
35. Access to detention basin to be gravelled/stabilized.
36. As-built plans are to be submitted.
37 . Subdivision to be pinned and monumented and appropriate certi-
fication of same submitted.
In addition to the above noted items, there remains a drainage problem
affecting several lots in the subdivision. Specifically, drainage from
Lot 7 drains onto Lot 6 . Water is ponding on Lot 6 northeast of the
garage, then overflows along the driveway, across the sidewalk onto the
road. The severity of this particular problem is such that it has the
potential to cause icing problems along the driveway of Lot 6 and the
sidewalk and road in front of Lot 6.
A second drainage problem exists between Lots 2 and 3 and is the result
of cumulative run-off from Lots 4, 5, 6 and 7. This problem has re-
sulted in a continued erosive condition along Lot 2 and 3 and a subse-
quent concentration of storm run-off across the sidewalk and onto
Kupchunos Drive. It is imperative that the above two identified drain-
age problems be rectified prior to acceptance of this subdivision by
the Town.
Should you have any questions regarding the above matters please contact
this office.
Very truly yours,
71�LleTiss � WG
Michael J. Gantick,
Director of Public Works
MJG/jsv
cc: P&Z File
Engineering File
r' 38
I
,k �`ti'Lt- CH lti l�� A�j/u Li..i ivY/
Z }� .�J�1�.aL 1�c�L
J
hl.�.�..C.la. I.(�i�1�(( � •�i�l�ti,4.c'�,t� C�-C. �.,Zt�
J
)E1-AI.Z -�-L•rC_ �Rr 15 ...1..i._..1::..c-�c� �.. �-`,�` �-� ' ' v L
G'
( 7J"
V1
(yq- 6-W
i o w M d f,
O � 7owt-2- 0-/e Scwm
c .
_ ~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
~OsoR.CO AREA CODE 203/644-2511
RICHARD J. SARTOR
Town Manager
April 13, 1988
Mr. and Mrs . Richard J. Nowak
45 Windy Hill Drive
South Windsor, CT 06074
Dear Mr. and Mrs . Nowak:
Pursuant to our meeting in my office on April 4 with Marcia
Banach, Director of Planning and Michael Gantick, Director of
Public Works, we will be following through on your request for
r solution of drainage problems on your lot on Windy Hill Drive.
Your letter has been referred to Raymond Hallowell, Chairman of
the Planning and Zoning Commission, for discussion at an upcoming
Planning and Zoning Commission meeting. Ms. Banach will contact
you with a date and time for the meeting.
I am optimistic that your drainage problems will be resolved to
your satisfaction with the assistance of the Planning and Zoning
Commission.
Very truly yours,
Richard A S rtor
Town Ma ger
cc: JMarcia Banach, Director of Planning
Michael Gantick, Director of Public Works
Raymond Hallowell, Chairman, PZC
.' ' �'' � sk�/
� ^ "y *�)
~~~~ ��^ � ,� ^ '
�-
�78
Sout//
Cc
Craig & Kathy Erickson Planning & Zon/oDwm,n�08
67 Kupchunos Dr.
S. Windsor , CT 06074
April 27, 1988
Mr. Raymond Hallowell
Chairman PZC
South Windsor Town Hall
Sullivan Ave.
South Windsor , CT 06074
Dear Mr. Hallowell ,
Having attended the April 26th meeting of planning and zoning we are
writting to you to make you aware of the drianage problems we have
on lot 20 of Rainbow Hill .
Enclosed is a copy of the items that need attention.
Sincerely ,
^ �KI /i�� �� 4L?
Craig & Kathy Eri�In
' /
CRAIG & KATHY ERICKSON �'^'"
67 KUPCHUNOS DRIVES L, ,
(LOT #20, RAINBOW HILLS)
Planning & �on;n� Ccminission
ITEM #1
DURING RAINSTORMS , BACK OF LOT HAS WATER FROM OTHER PROPERTIES
RUNNING ACROSS IT, CAUSING SEVERE EROSION
NEAR TREES , AND WHEN FLOWING , SENDS SAND INTO STORM DRAINS
CONSTANTLY .
ITEM #2
RIGHT SIDE OF PROPERTY HAS DRAINAGE PROBLEM THAT CAUSES SURFACE
EROSION AND SENDS WATER OVER SIDEWALKS AND DRIVEWAY CAUSING A
DANGEROUS ICING SITUATION WHEN COLD.
ITEM #3
CURB DAMAGE IN FRONT OF LOT FROM HEAVY EQUIPMENT DURING
CONSTRUCTION OF HOUSE. CURB ACTUALLY PROTRUDES OUT INTO
ROADWAY . SNOW PLOWS HIT WHEN PLOWING .
I WAS TOLD THE "TOWN" WILL TAKE CARE OF THIS WHEN MENTIONED TO
CONTRACTOR (THIS WAS PRIOR TO FINAL SURFACE BEING PUT ON ROAD —
KUPCHUNOS DRIVE) .
LAW OFFICES OF
WA yNH CHRIS'FOP fiEiT GERLT MAY 2 n88
435 BUCKLAND ROAD
" O.BOX 559 South Windsor
SOUTH WINDSOR.CONN.06074 planning & Zoning Commissi0�
WAYNE CHRISTOPHER GERLT TELEPHON
D}4117G(2C}C�GH� (203)644.2565
May 6, 1988
Mrs. Marcia A. Banach
Director of Planning
Town Planning & Zoning Commission
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Rainbow Hills - Release of Performance Bond
Dear Mrs. Banach:
In response to Mr. Gantick's Field Review I submit the following:
1. The landscapers of the individual lots raked the yards down across the
walks and left some stones, etc. in the area of the road shoulders.
Either U & R or my development company will ensure that this is cleared
up, but we don't believe new top soil will be needed in most areas.
2. Replacement of sidewalk sections damaged during the construction of
houses will be done by U & R.
3. Same as Item 1.
4. I believe this item has already been corrected by the lot owner-builder
who is responsible.
5. U & R will correct this item except for Lot 17 which is the responsibility
of the owner-builder and I have notified him.
6. The paving company has been notified (Roncari) .
7. Same as Item 6.
8. Connecticut Water Co. notified on April 23, 1988 after I learned their
company must perform the relocation of the water gates.
9. Same as Item 8 and driveway repair by U & R.
10. Same as Item 9.
Mrs. Marcia A. Banach -2- May 6, 1988
11. Same as Item 8 but sidewalk repair by developer. .
12. Same as Item 8.
13. Developer.
14. Damaged by subcontractors and to be replaced by U & R.
15. C.A.T.V. was notified on 4/25/88.
16. The owner of this lot was notified by the developer by Letter dated
April 287, 1988.
17. The developer will do this at conclusion of other items.
18. Developer's contractor will do this and was notified as early as February
5, 1988.
19. Same as Item 18.
20. Damaged by subcontractors and to be repaired by U & R or developer.
21. Responsibility of U & R.
22. Same as Item 18.
23. Developer.
24. Same as Item 18.
25. This is Town owned property as has been for a number of years, but Developer
will work with the Town to address this item.
26. Developer.
27. Both C.A.T.V. and C.L.& P. have been called and asked to address this
item.
28. Developer.
29. Developer will remove impediment to mowing, except riprap which is needed.
Y:
Mrsx. Marcia A. Banach -3- May 6, 1988
30. Developer and U & R will riprap the pipe outlet.
31. The material was approved by the Town Engineer at the time of its installation
by the Developer's contractor.
32. Developer's contractor will do this and was notified February 5, 1988.
33. Same as Item 32.
34. Developer.
35. Same as Item 28.
36. Developer's engineers have been requested to do this since October of
1987, and merestones are being set.
37. Same as Item 36.
As to the drainage complaints of some residents, I reserve my rights
since I believe I have no legal obligation. However, with all rights reserved,
I have discussed changes to the Lot 6 / 7 situation and Lots 2 and 3 with
Town staff and I will now contact the builder and these lot owners. I cannot
assume the responsibility for eliminating the complaints, but I will attempt
to ease the ground water flow in cooperation with the builder and these lot
owners_
Very truly yours,
Wayne Christopher Gerlt
WCG:mt
cc: Honorable Raymond Hallowell, Jr. , Chairman TPZ
Mr. Michael Gantick, Director of Public Works
LAW OFFICES OF SEP 9 1988
435 BUCKLAND ROAD South Windsor
P. O BOX 559
SOUTH WINDSOR, CONN 06074 Planning & Zoning Commission
WAYNE CHRISTOPHER GERLT TELEPHONE
xeumxxxxxx,xxx September 7, 1988 t203j 644-2565
x�S[9c�`�CkkRXxA"kRRx
Mr. Ludis Upenieks, President
U & R Construction Company, Inc_
99 East Center Street
Manchester, CT 06040
Re: Rainbow Hills
Dear Mr. Upenieks:
Enclosed herewith you will find a letter dated August 25, 1988 addressed
to me from Michael J. Gantick, the Director of the Public Works Department.
Enclosed with that letter you will find a letter dated May 3, 1988 addressed
to Mr. Gantick by Harold R. Cummings, Esquire, a letter dated August 19,
1988 addressed to Mrs. Marcia A. Banach from Richard and Veronica Nowak,
and a letter dated August 11, 1988 addressed to Dr. Richard Nowak from
Paul S. Cianci, P.E. with a sketch appended thereto. It is becoming apparent
that despite repeated assurances, no action has been taken to resolve the
complaints of the residents of the subdivision.
I understand that you believe the drainage problem of Mr. and Mrs.
Harris to have already been corrected, but their Attorney apparently believes
there is still a problem, and some action on your part to resolve that
matter and clear up the misunderstanding appears to be necessary. As to
the complaint by Mr. and Mrs. Nowak, that is a matter which only you can
resolve. In the past, you and I have also discussed the situation on Lots
1, 2 and 3 which can only be addressed by your company.
It is clear that under the State Statutes, subdivision regulations
and the plans which were approved for the Rainbow Hills Subdivision, the
responsibility for these matters is not mine but is yours as the builder
of the homes. I am not privy to all of the various agreements and arrangements
between yourself and the homeowners involved, but it appears that you should
take steps to satisfy Mr. Gantick that you have done everything for which
you are responsible, if that is to be your position. For my part, unless
these matters are resolved quickly, I will leave the matter to be resolved
between the Town of South Windsor, the homeowners and yourself.
Sincerely,
Wayne Christopher Gerlt
WCG:mt
cc: Mr. Michael Gantick, Director of Public Works
Mrs. Marcia Banach, Director of Planning
The Honorable Raymond Hallowell, Jr., Chairman, Planning & Zoning Commission ��
LAW OFFICES OF
WAYNE CHRISTOPHER GERLT
435 BUCKLAND ROAD
P.O. BOX 559
SOUTH WINDSOR, CONN.06074
WAYNE CHRISTOPHER GERLT TELEPHONE
XX'XKXXF)tXXXXX 12031 644-2565
x?tS�RR'JCC7cTY�R7[7ca[4Cac7PA'X ` Ty'�'
September 7, 1988 '�' JEr �;
} 9 1J�]8 �
1J8
The Honorable Raymond J. Hallowell, Jr. SOUth W ndsL)t
Chairman, Town Planning & Zoning Commissioin Planning & Zoning Commission
Town of South Windsor
1540 Sullivan Avenue
South Windsor, CT 06074
Re: Letter of Credit for Rainbow Hills Subdivision
Dear Mr. Hallowell:
Your letter of August 23, 1988 refers to a Letter of Credit in the
amount of $15,000.00 with an expiration date on October 18th of each year.
Your records should reflect that that Letter of Credit was released at
the meeting on November 24, 1987. Enclosed is a copy of the release letter
dated December 8, 1987.
I believe the only Letter of Credit in place is for $50,000.00 and
expires May 16, 1989.
Thank you. ,
r
d
Very trul r r`
W yne Ch 's op er Gerlt
WCG:int
Encl..
cc: Mrs. Marcia Banach, Director of Planning
Mr. Michael Gantick, Director of Public Works
M E M O R A N D U M
September 29, 1988
TO: Marcia A. Banach, Director of Planning
FROM: Michael J. Gantick, Director of Public Works
RE: INBOW HILLS
PERFO E BON FIELD REVIEW UPDATE
Please be advised that this Department has field checked the
subject project and the following items remain outstanding.
1 . Throughout the subdivision there are numerous areas in which
the grading between the edge of curb and the sidewalk is not
consistent with the Town's standard grading, i .e. grading is
improper, area needs to be re-topsoiled and seeded ( free of
stones larger than 1 1/2" and miscellaneous debris ) ; Lots 1,
2, 3 , 4 , 5 , 6, 7, 8, 12 , 15, 16, 17 , 18, 19, 20, 21, 22, 23,
24, 25, 26, 27 , 30 .
2 . Various sections of sidewalks in front of the following lots
are cracked and require replacement of sections : Lots 6 , 7
and 15 .
3 . Water gate Lot 10 driveway to be cut out and brought to grade.
4 . Move cable T.V. box from in front of fire hydrant along Lot 3 .
Hydrant operation inhibited by present location of utility.
5 . Trees planted between edge of curb and sidewalk in front of
Lot 4 to be removed or relocated outside of street R.O.W.
6 . All catch basin sumps are to be cleaned free of all sand and
debris . All storm drainage pipes to be flushed. (To be done
under the inspection of Town) .
7 . All pipes in catch basins to be cut flush with walls .
8 . All catch basins to be repointed. Cement all spaces (CB at
7+10 right Windy Hill Road has space between CB to and first
section of CB wall ) .
9 . Cul-de-sac banks on Kupchunos Drive to be loamed/seeded
(stabilized) .
10 . 18 inch double Maple tree right side of Kupchunos Drive cul-
de-sac to be removed along with dead fall within R.O.W. /Parcel
"C" area.
11 . All construction debris along Kupchunos Drive cul-de-
sac/Parcel "C" to be removed. All curbing to be backed up and
graded per Town standards .
12 . Path to the detention basin to be stabilized. Present path is
eroding. Process stone ( fine) rolled over existing material.
13 . Detention basin bottom and sides to be stabilized. All
construction debris, stones to be removed from basin bottom
and side slopes . Basin to be "dry" basin.
14 . Inlets/outlets to detention basin to be riprapped with
approved material .
15 . Manhole #18 near detention basin to be repaired.
16 . Excess soil materials to be removed from site, area
stabilized.
17 . Access to detention basin to be gravelled/stabilized; 6"
process , 4" loam and seed.
18 . As-built plans are to be submitted.
19 . Subdivision to be pinned and monumented and appropriate
certification of same submitted.
In addition to the above noted items, there remains a drainage
problem affecting several lots in the subdivision. Specifically,
drainage from Lot 7 drains onto Lot 6 . Water is ponding on Lot 6
northeast of the garage, then overflows along the driveway, across
the sidewalk onto the road. The severity of this particular
problem is such that it has the potential to cause icing problems
along the driveway of Lot 6 and the sidewalk and road in front of
Lot 6 .
A second drainage problem exists between Lots 2 and 3 and is the
result of cumulative run-off from Lots 4,5,6 and 7 . This problem
has resulted in a continued erosive condition along Lot 2 and 3 and
a subsequent concentration of storm run-off across the sidewalk and
onto Kupchunos Drive. It is imperative that the above two
identified drainage problems be rectified prior to acceptance of
this subdivision by the Town.
Should you have any questions regarding the above matters please
contact this office .
MJG/pmm
cc: P & Z File
Engineering File
t 0'V 8�4
y Towi 1. O-P SV rzm W
O �
c
.a
m w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
����soe•c0�'� AREA CODE 203/644-2511
July 18, 1989
M E M O R A N D U M
TO: Marcia A. Banach, Director of Planning
FROM: Jerry C. Iazzetta, Town Engineer
RE: Rainbow Hills Subdivision
We have estimated the cost to the proposed drainage corrections
to lots 6 & 7 , and lots 1, 2 & 3 . The proposed corrections are
to install a yard drain between lots 6 and 7 , between lots 2 & 3
and between lots 1 and 2, provide pipe for connection to the
existing storm water system, grade and restore the lots . The
estimated cost of this work is $23, 000 .
JCl/jsv
cc: Michael J. Gantick, Director of Public Works
t 0MM a
OleSaa� ?&Z�
wc~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 r
~osoQ•co�'� AREA CODE 203/644-2511
October 19, 1990
Edward & Emilia Sabella
603 Sandstone Drive
South Windsor, CT 06074
Dear Mr. & Mrs . Sabella:
RE: Letter of October 17, 1990
In response to your letter of October 17, 1990, please be advised
that the developer has been instructed to regrade the open area
behind the 600 grouping. The regrading is specifically aimed at
providing a positive drainage slope, thereby eliminating the
present high and low spots which are collecting/holding water.
The regrading at a positive drainage slope will allow surface
water runoff to drain from the area into the detention basin,
mitigating the saturation of the soil from standing water.
Your concern about the erosion of the soil was discussed during
the field review of the situation. To mitigate the potential for
erosion, the developer was advised to utilize proper erosion and
sedimentation control measures, i.e. mulch cover, haybale and/or
silt fence check dams, until the area is stabilized. Typically,
stabilization of grassed slopes which collect water requires
periodic reseeding/stabilization until a full stand of grass is
established. Therefore, some erosion is expected, but should be
corrected by the developer until the area is fully stabilized.
The Town will not accept the regrading until it is satisfactorily
stabilized.
I trust I have answered your questions .
Very truly yours,
Michael J. Gaimtick, P.E.
"----'-Director of Public Works
MJG/jsv
cc: Marcia A. Banach, Director of Planning
Jerry C. Iazzetta, Town Engineer
i
10 N a��<
.4 To_w� aps_aa� V&Uaot
m 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
��tioSOR-0) AREA CODE 203/644-2511
December 2, 1991
Mr. Wayne C. Gerlt, Esquire RECEIVED
415 Buckland Road
South Windsor, CT 06074
DEC 3 1991
Re: Rainbow Hills Subdivision
SO. WINDSOR PLANNING DEPL
Dear Mr. Gerlt:
An inspection of subdivision improvements for Rainbow Hills
Subdivision has shown that some repairs are necessary. As these
improvements are still under a maintenance bond, we request that you
make the necessary repairs prior to January 24 , 1992 .
The following is a list of these required repairs :
Broken Sidewalk Slabs
11 Kupchunos Drive
40, 60, 74, 80 , 92 Windy Hill
Differential Sidewalk Settlement
60 Windy Hill
50 Darlene ( 2 locations)
On south side of Kupchunos, approx. 150 ' from Ellington Road
Miscellaneous
1 . The trench patch in the Windy Hill cul-de-sac should be
repaired/replaced.
2 . The elevation of the loam should be level with the sidewalk.
3 . The sidewalk at the Kupchunos cul-de-sac should be cleared of
debris .
Please have your contractor obtain a street excavation permit for the
work on the patch on Windy Hill, prior to starting. If you have any
questions, or require additional information, please call me at 644-
2511, Ext . 245 .
Very truly yours,
4" 45�zt*
Je iry 6ng- nee
Iaz a, P.E.
To
JCl/jsv
cc: Michael J. Gantick, Director of Public Works
Marcia A. Banach, Director of Planning
Melvin C. Stead, Supt. of Street Services
A. Bowen Davies, Deputy Town Engineer