Loading...
HomeMy WebLinkAboutSUBDIVISION 1085 TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION The Commission will officially receive applications Application No . �G� Sr at either Special or Regular meetings provided they Received Date : ��_ �c - j were submitted to the Commission Chairperson, Secretary Action Or Public Hearing by : or agent, at least fourteen (14) days prior to the meeting at which they will be officially received. No application officially received at a Special Meeting ecei_pt No . � � �; will be acted upon at that meeting. i APPLICANT : THE HOME FARM PARTNERSHIt ADDRESS : C/O WAYNE CHRISTOPHER GERLT, P.O. 559, S. WINDSOR TELEPHONE 644-2565 OWNER OF RECORD ON LAND RECORDS : THE HOME FARM PARTNERSHIP ADDRESS : 1919 ELLINGTON ROAD, SOUTH WINDSOR, CONNECTICUT 06074 COMPLETE LOCATION OF PROPERTY: EAST SIDE OF ELLINGTON ROAD, SOUTH OF VALLEY VIEW DR. ZONE AA-3 0 AND RR NAME , ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED : WAYNE CHRISTOPHER GERLT, ESQ. 435 BUCKLAND ROAD P.O. BOX 559 SOUTH WINDSOR, CONNECTICUT 06074 T EL EP 644-2565 THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING) i ,.{ '': ° •.;. > ,,j?= 1 . Zone Change to (public hearing requ red) X 2 . Filing for Subdivision '�,• .. 3 . Filing for Open Space Subdivision (public hWa�Zr e 1#ired) 4. Filing for Resubdivision (public hearing required) eG�r7jssia� 5. Special Exception to Article (public hearing required) 6 . Site Plan of Development 7 . Removal of Sand , Gravel , Clay or Quarry Stone & Ore (public hearing required) 8 . . Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED WITH 6 SETS OF PLANS ( 7 sets if public hearing is required) BEFORE IT IS RECEIVED BY THE PLANNING & ZONING COMMISSIO . Ai I �'-- Appli a t 0 ner PLANNING AND ZONING COMMISSION TOWN OF SOUTH WINDSOR Fee Schedule and Policy 1. An application processing fee of $25 per lot ($50 minimum) is required for: Subdivisions,. resubdivisions, and open space subdivisions. 2. An application processing fee of $50 is required for: Change of Zone, Zoning Amendment, Special Exception, and Earth Removal or Land Filling Operations. 3. An application processing fee of $25 is required for Site Development Plans, except: where new buildings/additions/renovations of 2,000 s. f. or more are proposed, said fee shall be $50; said fee shall be $500 for Site Development Plans in the Designed Commercial Zone; $50 plus $5 per dwelling unit for Adult Housing ($500 minimum) . 4. An application processing fee of $10 per acre ($300 minimum) is required for a Change of Zone/General Plan of Development in the Designed Commercial Zone. 5 . An application processing fee of $100 is required for a Change of Zone/ General Plan of Development in the Multi-Family or DA-15 Residential zones; or for a Special Exception/General Plan of Development for Adult Housing. 6. An application processing fee of $50 plus $5 per dwelling unit is required for a Special Exception/Site Plan of Development in the Multi- Family or DA-15 Residential zones ($500.00 minimum). 7. Application processing fees are non-refundable after the application has been officially received by the Commission. Application processing fees may be returned prior to the application's official reception provided a letter of withdrawal, signed by the applicant , has been submitted to the Commission prior to the meeting at which said applica- tion is scheduled to be officially received. 8. Applications unaccompanied by the required application processing fee are incomplete, and as such may be returned to the applicant and removed from the Commission' s agenda. 9. Complete applications and required fees shall be submitted at least fourteen (14) calendar days prior to the Regular or Special Meeting at which it will be received. 10. Fees for a previously denied application shall not apply to any subsequent application. However, when a subdivision, resubdivision, or open space subdivision application has been denied within the preceding 12 months or approved for fewer lots than requested, and a new application for the subject tract is submitted by the same appli- cant, then the fee for the new application shall be a minimum of $50 plus $25 for each lot above and beyond the number of lots contained in the earlier application. 11. A fee of $5 per sign is required for signs to be posted by the applicant on the subject property. 12. Other Fees: Subdivision Regulations - $3.00; Zoning Regulations - $4.00; Zoning Map $1.00; fees for other documents is as determined by the Commission. 13. All checks shall be made payable to "Town of South Windsor." Adopted: 4/10/84 Revised: 12/4/84 TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION I The Commission will officially receive applications Application NO . at either Special or Regular meetings provided they Received Date : were submitted to the Commission Chairperson, Secreta ction or Public Hearing by : or agent , at least fourteen (14) days prior to the meeting at which they will be officially received. No application officially received at a Special `4eeti ece ip t No . will be acted upon at that meeting. I APPLICANT : U & R CONSTRUCTION CO. , INC. ADDRESS : 99 East Center St. , Manchester, Ct. 06040 TELEPHONE 643-9551 OWNER OF RECORD ON LAND RECORDS : U & R CONSTRUCTION CO. , INC. ADDRESS : 99 East Center St. , Manchester, Ct. 06040 COMPLETE LOCATION OF PROPERTY: Known as Rainbow Hills, approximately 600' Southwest of Sand Hill Road & Valley View Drive on the east side of Ct. Route 74 and Ellington Rd. ZONE RR & AA-30 NAME , ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED : Kenneth Peterson - Gardner & Peterson Associates 576 Old Post Road, Tolland, Conn. 06084 TELEPHONE 871-0808 THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING) 1 . Zone Change to (public hearing required) 2 . Filing for Subdivision 3 . Filing for Open Space Subdivision (public hearing required) 4 . Filing for Resubdivision (public hearing required ) 5 . Special Exception to Article (public hearing required) 6 . Site Plan of Development 7 . Removal of Sand , Gravel , Clay or Quarry Stone & Ore (public hearing required) X 8 . Other (explain in detail ) Revision to Subdivision; Lot Tine; Lot #31 - Parcel 'A' THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED WITH 6 SETS OF PLANS ( 7 sets if public hearing is requ_ir_ed) BEFORE IT IS RECEIVED BY TIL--PLANNING & ZONING COMMISSION . Applicant �� Owner /RA PLANNING AND ZONING COMMISSION TOWN OF SOUTH ,41NDSOR Fee Schedule and Policv 1. An application processing fee of $25 per lot (S50 minimum) is required for: Subdivisions,. resubdivisions , and open space subdivisions. 2. An application processing fee of S50 is required for: Change of Zone, Zoning Amendment, Special Exception, and Earth Removal or Land Filling Ooerations. 3. An application processing fee of $25 is required for Site Development Plans, except: where new buildings/additions/renovations of 2,000 s. f. or more are proposed, said fee shall be $50; said fee shall be S500 for Site Development Plans in the Designed Commercial Zone; $50 plus S5 per dwelling unit for Adult Housing ($500 minimum) . 4. An application processing fee of $10 per acre ($300 minimum) is required for a Change of Zone/General Plan of Development in the Designed Commercial Zone. 5 . An application processing fee of $100 is required for a Change of Zone/ General Plan of Development in the 'iulti-Family or OA-15 Residential zones; or for a Special Exception/General Plan of Development for adult Housing . 6 . An application processing fee of S50 plus $3 per dwelling unit is required for a Special Exception/Site P:an of Development in the Multi- Family or DA-L5 Residential zones (S500.00 :minimum). 7. Application processing fees are non-refundable after the application has been officially received by the Commission. application processing fees may be returned prior to the appLication' s official reception provided a letter of withdrawal , signed by the applicant , has been submitted to the Commission prior to the meeting at which said applica- tion is scheduled to be officially received. 8. Applications unaccompanied by the required application processing fee are incomplete, and as such may be returned to the applicant and removed from the Commission' s agenda. 9. Complete applications and required fees shall be submitted at least fourteen (14) calendar days prior to the Regular or Special '•teeting at which it will be received. 10. Fees for a previously denied application shall not apply to any subsequent application. However , when a subdivision, resubdivision, or open space subdivision application has been denied within the preceding 12 months or approved for fewer lots than requested, and a new application for the subject tract is submitted by the same appli- cant, then the fee for the new application shall be a minimum of $50 plus $25 for each Lot above and beyond the number of Lots contained in the earlier application. 11 . A fee of $5 per sign is required for signs to be posted by the applicant on the subject property. 12. Other Fees: Subdivision Regulations - $3.00; Zoning Regulations - S4 . 00; Zoning Map $1 .00 ; fees for other documents is as determined by the Commission. L3. All checks shall be made payable to "Town of South Windsor. " Adopted: 4/10/84 Revised: 12/4/84 ��pWN Sf, _au� O-P S_o_� ?d&U&Ot <� O O c 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR•CO AREA CODE 203/644-2511 July 17, 1985 Home Farm Partnership 1979 Ellington Road CERTIFIED MAIL South Windsor, CT 06074 Dear Sirs: At the July 15, 1985 meeting, the South Windsor Inland Wetlands Agency/Conservation Commission approved with conditions, Application No. 336 for the purpose of development of a conventional residential subdivision of 32 homes on property located on the east side of Ellington Road, south of Valley View Drive, South Windsor. The permit is based on the plans entitled "Rainbow Hills" prepared for Home Farm Partnership, 435 Buckland Road, South Windsor, Connecticut, by consulting engineers of Gardner & Peterson Assoc. Such plans are dated 5-31-85, being revised on June 28, 1985; sheets 1 through 12 of 12. The following conditions must be -adhered to for this permit to be valid: 1. A,$15,000. bond is required. 2. Construction activities shall be subject to the approval of the Town Engineer. 3. The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use. 4. The permit is valid for one year and shall expire July 15, 1986 if not initiated and completed within one year from the date of approval. Very truly yours, John Moran, Jr. , hairman INLAND WETLANDS AGENCY/ CONSERVATION COMMISSION cc: Wayne C. Gerlt A. B. Davies, Deputy Town Engineer �vTi�k. Jacqueline J. Smith, Town Clerk Richard J. Sartor, Town Manager Richard Ryan, Deputy Mayor ---Robert F. Gilligan , Chairman 'PZC JUL �ti 1985 Thomas D'Auria, Building Official Peter DeMallie, Director of Planning South Windsor Kenneth Brill, Chairman EDC Planning & Zoning Commission John Shemo, Coordinator EDC _ JACK W. CHRISTENSEN 710 UNION STREET MARSHFIELD, MASSACHUSETTS QZDSD July 22, 1985 ', Mr. Richard Sartor Town Manager ._. Town of South Windsor South Windsor, CT 06074 Dear Mr. Sartor: My mother, Marion Christensen, and I own property at #90-100 Oakland Road in South Windsor. We understand that adjoining property owned by Kupchunos and R wb rry may be being considered for development. Also, we believe that oth r prop rty on Oakland Road owned by Weatherall may also be under consideration for development. Drainage from all of these properties runs through ours, eventually crossing under Oakland Road. This is of considerable concern to us as the development of the Felt Road area tw my y are ago resulted in a very bad condition of flooding and erosion of our prop rty. At that time, without an adequate understanding of just how sev re the drainage problem could be, my mother sold an acre of land and c rtain "water rights" to the developer -- much to our present regret. Erosion and siltation on our land have been very severe ever since and it is not cl ar what if anything we can do about it. We would like to insure that no similar problems occur in connection with future developments adjacent to our prop rty. Could you advise me if the Town has any knowledge of pending development of adjacent properties and what requirements will be imposed to prevent future drainag " problems? Given reasonable advance notice, I will be glad to meet with appropriate officers of the Town, the developers, or otherwise to attend r 1 vant public meetings. I will appreciate any information you may be able to provide. Z17as , a)� O tensen N (P c cc. Marion Christensen w RAINBOW HILLS RESIDENTIAL SUBDIVISION CONNECTICUT ROUTE 74 (ELLINGTON ROAD) TOWN OF SOUTH WINDSOR, CONNECTICUT JULY 30, 1985 p�,1,�/ •M' IC;-,k/ ti F K13321 FUSS & O' NEILL, INC. 210 MAIN STREET MANCHESTER, CONNECTICUT �o FUSS&O'NMLL consulting engineers July 30, 1985 Mr. Ken Peterson, L. S. Gardner and Peterson Associates 576 Old Post Road _. Tolland , CT 06084 RE: Rainbow Hills Subdivision Dear Ken : We are pleased to submit eight copies of the traffic impact study for the subject project . As indicated in the report , the location of the driveway should be sufficient to handle the site generated traffic without any adverse impact on the traveling public. Should you require any additional information or have any questions , please do not hesitate to call . i Very truly yours , William D. O' Neill , P. E. Stephen F. Mitchell , P. E. WDO/SFM/sw 210 MAIN STREET / MANCHESTER, CONN. 06040 / TELEPHONE (203)646-2469 SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING HIGHWAYS and BRIDGES•SURVEYING•LANDSCAPE ARCHITECTURE 9 TRANSPORTATION and TRAFFIC 9 PUBLIC WORKS MANAGEMENT 0 HYDROGEOLOGY A. INTRODUCTION The Home Farms Partnership has proposed the subdivision of a parcel of land on the east side of Connecticut Route 74 ( Ellington Road) in the Town of South Windsor, Connecticut . As shown in Figure No. 1 , the site , which is located south of Sand Hill Road, is to be subdivided into 33 parcels for single family residential development. Fuss & O' Neill , Inc . has been retained to study the impacts of the proposed subdivision on adjacent street traffic. This report has been prepared to document the findings of that study. B. EXISTING CONDITIONS Connecticut Route 74 is a State of Connecticut facility which consists of a single lane in each direction with a total width of between 26 and 30 feet . The posted speed limit in the vicinity of the site is 30 miles per hour. Ellington Road intersects Sand Hill Road at a 4-day stop controlled intersection. The west leg of this intersection is 40 feet wide and provides a connection with Sullivan Avenue to the west. The east leg is a local street which enters a residential area. _1 _ F4Jss&o7Q�LL.mc. In order to determine the impact of the proposed development on adjacent street traffic , the intersection of Ellington Road and Sand Hill Road was counted by representatives of Fuss & O' Neill on July 24 and 25 , 1985, and information on traffic levels was gathered from the Town of South Windsor, Connecticut Transportation Study, dated June , 1982. Using this data , the count information was projected to the 1987 designation year using a 1 percent per year growth factor to account for normal growth in the area. Additional traffic generated by the adjacent "Sand Hill Road Condominiums" project ( Table No. 2) was then added so that a more accurate representation of design year traffic conditions could be presented. Figure No. 2 shows the 1987 external traffic volumes , which represent design year traffic which does not have the site as its origin or destination. The greatest traffic impact on the roadway network will occur during the a.m. peak and p.m. peak hours, the periods when "home to work" and "work to home" trips are at their highest levels. Traffic counts conducted indicate that the a.m. peak hour is 7 :00 to 8 :00 a.m. and the p.m. peak hour is 4 : 30 to 5 : 30 p.m. Therefore , these hours were subsequently analyzed. C. SITE GENERATED TRAFFIC An estimate of the amount of traffic generated by the proposed development was made using the Institute of Transportation _2_ wss80D7ei.1fvc. Engineers "Trip Generation" manual , published in 1982. This manual , which is a compilation of trip generation rates for similar facilities , gives hourly trip generation rates for entering and exiting traffic during both the a.m. peak hour and the p.m. peak hour. These hourly trip generation rates (HTGR) are given in terms of vehicles generated per dwelling unit for residential developments . When multiplied by the number of units proposed , these rates yield the number of vehicles which can be expected to enter and exit the site during the peak hours . The factors and the generation rates are summarized in Table No. 1 of this report. D. DISTRIBUTION OF SITE GENERATED TRAFFIC Regional arrival/departure distributions to and from the proposed subdivision, as shown in Figure No. 3, were derived from existing traffic patterns , and indicate a directional split of 75 percent toward the south and 25 percent toward the north. The site generated traffic was then added to the roadway system in accordance with the arrival/departure pattern with the results shown in Figure No. 4. These volumes were added to the projected traffic volumes to yield the design year combined traffic volumes shown in Figure No. 5. _3_ FUssaoWOLLmc. E. ANALYSES In discussing capacity analyses , the term level of service is used to describe the operating condition of the road or intersection. Level of service is rated on a scale from A to F, with level of service A being the best condition, and level of service F the worst. In between, level of service C is considered good for peak periods , level of service D is usually the peak hour design standard, and level of service E is the theoretical capacity of the road or intersection. Level of service F is failure , with extensive delays and jammed conditions . Capacity analysis of the " Five Corners" intersection was not conducted because the construction of the "Wapping By-Pass" between Ellington Road and Sullivan Avenue will remove site generated traffic from this intersection and a new four-leg intersection will be created. 1 . Unsignalized Intersection Capacity Analysis Capacity analyses were conducted at the unsignalized intersections of the site driveway/Route 74 and Route 74/Sand Hill Road using the methodology found in Transportation Research Circular No. 281 , "Proposed Chapters for the 1985 Highway Capacity Manual" , published by the Transportation Research Baord in 1984 . Using this _4_ wss&o?WtLAJC. methodology , individual movements approaching an intersection are analyzed based on the delay time they experience at the intersection. The results of the analysis are as follows : a. Ellington Road (Route 74 ) and Site Driveway The introduction of Site Generated Traffic will cause an increase of 25 vehicles during the a.m. peak hour and 32 vehicles during the p.m. peak hour at this intersection. During the a .m. peak hour, traffic on Route 74 will experience no delays with only 7 vehicles projected to turn left into the site during this period . Exiting traffic will experience no delays , with 19 vehicles projected to exit the site during this period. During the p.m. peak hour, a similar pattern will be experienced , with no delays felt on Route 74 and only 4 vehicles turning left into the site. Exiting the site , however, will be more difficult due to the higher volume of through traffic on the roadway at this time. The 13 exiting vehicles can expect to experience fairly long delays. b. Ellington Road ( Route 74 ) and Sand Hill Road As described in Transportation Research Circular No. 281 , the level of service provided at a four-way stop Fuss&ONOLLANC. -5- intersection is a function of number of lanes , directional split , and total approach volume. Using these criteria , intersection analyses of external traffic conditions indicate a level of service D during the a .m. peak hour and D during the p.m. peak hour. The introduction of site generated traffic will cause no change in the level of service provided at this intersection. 2. Sight Distance Considerations Route 74 is a hilly, fairly straight roadway with roadside vegetation controlled by State maintenance forces. The measured sight lines available in both directions from the proposed driveway are presented in Figure No. 6 and are adequate for the 30 mph posted speed limit. As part of the required State Highway encroachment permit process , this sight line will be reviewed by the State Department of Transportation , Division of Traffic for adequacy before any such permit is issued. F. CONCLUSIONS Based on the foregoing analyses, it is the professional opinion of Fuss & O' Neill that the introduction of traffic generated by proposed subdivision will not disrupt the continuity of traffic flow on the adjacent roadway system, and that roadway conditions will be sufficient to provide safe and efficient travel for the traffic in the area. Fuss&orNE1LL.1Nc. -6- APPENDIX A FlJSS&07113LL.IMC. D S 0r• 0 E L L I N '►w, �l s rru•. �� _ • MN M • i • Y `9 ' f roll � srh•r � i� e I � I III 4 OY..F,i •I r ♦ • wr.w• eCIEWER so l� 7 ♦ O Fib maw •.r 401 l• C d�! M C "• w• O4 • R� O POLICY ! 7 i a sou`ft +d +' .....e O•�°♦ a ,` 4°.••• FIM CO+pp� • 0, Lrc• q •/ 'fir ON j Ir.I, : ••r ^ r f .0 r f r ? ® �O SITE ►.,, Aml °•.r, FIGURE No. I FUSS&O'NIEJ MANCHESTER, CONNECTICUT SITE LOCATION • RAINBOW HILLS SOUTH WINDSOR, CONNECTICUT rRCN.No.85-382 DATE- 7-30-85 SCALE: N.T.S. APPENDIX B FUSS&07 ELL,ONC. TABLE NO. 1 RAINBOW HILLS TRIP GENERATION RATES ( 32 units ) A.M. P.M. HTGR VOL (VEH/HR) HTGR VOL (VEH/HR) ENTER 0. 21 7 0. 63 20 EXIT 0. 55 18 0. 37 12 TOTAL 0. 76 25 1. 00 32 wss&OW0LLJfYC- TABLE NO. 2 ADJACENT DEVELOPMENT TRAFFIC A.M. PEAK HOUR P.M. PEAK HOUR ENTER 4 22 EXIT 19 10 TOTAL 23 32 FUSS&CrNEILLINC. APPENDIX C FUSs. Ol E",llYC. ( UPS0-O'NEILL Dote -7U— ` _ cMILIta, c0AArCIICUI pR0JECT F': �' •+ LOCATION: Er ,r1G,7a�l L. NAME: 9A i H.60ik) H-I L S HOURLY VOLUMES VOLUMES IN PCP9 Major street: I- rlG-FD'i kL)•ON N=Q s—v 5 y .—v5 Grade P` '--i f 4� —v2—: v4 `•" v v v Date of Counts: -J zdoS �I 7,,I4 X STOP I7 9 Time Period: grc[�-�•_aP� QYIELD Approach Speed: ;m�r N - I )= PHF: minor street: Grade VOLUME ADJUSTMENTS Movement no. 2 3 4 5 7 4 Volume (vph) 14- Vol . (pcph) , see Table 10.1 =— - STEP 1 : RT From Minor Street Vq Conflicting Flow, Vc 1/2 V3+V2= 3 + vph(Vc9) Critical Gap,Tc and Potential Capacity,cp Tc '= Ssecs (Tab.10.2)cp9=L[�pcphfFig.10.3) Actual Capacity, cm cm9=c 9= Icc o Dcph STEP 2 : LT From Major Street r- v4 Conflicting Flow, Vc v3+V2.�+� -4vvh(Vc4) Critical Gap,Tc and Potential Capacity,cp Tc=S.csecs(Tab.10 .21cp4-�Ozr-ocph(Fig.10.31 8 of cp utilized and Impedance Factor (v4/cp4)xln0= e.2t P4= (Fiq.10 .51 Actual Capacity, cm cm4=c 4= r" pcph STEP 3 : LT From Minor Street -) v7 Conflicting Flow, Vc 1/2 V3+V2+V5+V4= ---� + f�+ Qi ( =55o�t, (c7) Critical Gap,Tc and Potential Capacitv,cp Tc=Lf-secs(Tab.10.2)cp7-'MOper)h(Fiq.10.3) Actual Capacity, cm cm'7=cp7xP4x `�S 41Pi pcph SHARED-LANE CAPACITY SH (v c v)+ (vv c ) if lane is shared 7 m1 9 m9 Movement no. v(pcph) cm(ocph) cS11(pcoh) cR LOS 7 15 t 9 g- IOC t 4 i ., - A-+ fl (\ ;-IL_L Dote O L { AC HILIIA. CD), NI CI I C U 7 PROJECT L4SATION: EL1_i�IC,TZ::,i-1 f?ll NAMF: R"',t-1 V-1 HOURLY VOLUMES VOLUMES IN PCPH Major street: r-UjOGTnJ AD i N I N=I-1 1—v v 5�2 5 "- 4- �- —v '—v5 Grade IIO 4 4 iG v2 4 �'� �+ v v Date of Counts. yJ?)�Y� to I/7 1 []STOP I7 Time Period: ,3- -<- 'C — YISLD Approach Speed: =c' n.4 1. N = PHF: mi((no/�r street: Grade VOLUME ADJUSTMENTS Movement no. 2 3 4 5 7 4 Volume (vph) Vol. (Pcph) , see TablE110.1 -STEP 1 : RT From Minreet (r Vq Conflicting Flow, VC 1/2 V3+V7= 8 +S�ZaSmvph(Vc9) Critical Gap,Tc and Potential Capacity,cp Tc=S ecs (Tab.10 .2)cp9-Sa21-T-)cph(Fig.10.3) Actual Capacity, c c = S c sloocph m m) 9 STEP 2 : LT From Major Street V4 Conflicting Flow, Vc V3+V2= /�c + r;?' �A5fvph(Vc4) Critical Gap,Tc and Potential Capacity,cp Tc=�•Csecs (Tab.10.21cp4-��ocPh(Fi9.10.31 % of c. utilized and Impedance Factor (v4/Cp4)x1n0= `)1 9-f P4- (Fiq.10 .5) Actual Capacity, cm Cm4=c 4=�Pcph STEP 3 : LT From Minor Street .l v7 Conflicting Flow, Vc 1/7 V3+V2+V5+V4=�+ 2+J + i_v� (c7) Critical Gap,Tc and Potential Capacitv,cp TC=(v_`5secs(Tab.10.2)cpy-3 Pcph(Fig.10.3) Actual Capacity, cm cm7=cp7xP4�3�?Ox�= Pcph SHARED-LANE CAPACITY SH v + , if lane is shared (v7 cm7) (v9 M91 Movement no. v(vcph) Cm(pcph) CS11 (pcoh) CR LOS 7 I I .c:- 9 4 c FUSS&aNEILL consulting engineers August 30, 1985 Mr. Peter DeMallie Town Planner Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 RE: Rainbow Hills Subdivision Ellington Road South Windsor, Connecticut Dear Mr. DeMallie : We are enclosing the revised Figure No. 6 from our report dated August , 1985, which reflects the latest revisions to the driveway location. As shown in the figure , the driveway has been relocated in a northerly direction in order to provide a better sight distance to the south. This revision should allow for an additional 1/2-1 second of gap time in northbound traffic. We hope that this modification will be sufficient to address your concerns . However, if you have any additional questions , please do not hesitate to call . Very tr ly you s , Ste en F. Mitchell , P. E. Director of Traffic Section SFM/jb Enclosures cc: Ken Peterson, Gardner & Peterson, w/enclosures r= S0.WINDSOR p1AN�1�G 210 MAIN STREET / MANCHESTER, CONN. 06040 ! TELEPHONE (203)646-2469 SOLID WASTE MANAGEMENT•WASTE WATER SYSTEMS•EROSION CONTROL•WATER SYSTEMS•HYDROLOGY and DRAINAGE SYSTEMS•SITE PLANNING HIGHWAYS and BRIDGES•SURVEYING 0 LANDSCAPE ARCHITECTURE•TRANSPORTATION and TRAFFIC 0 PUBLIC WORKS MANAGEMENT•HYDROGEOLOGY P, , G No,- FIGURE NO.6 MAMCMl*TMM, COMM<CTICYT EXISTING SIGHT DISTANCES RAINBOW HILLS SOUTH .W*40SOR, CONNECTICUT 'Mor.MO. 8S-3t2'sArt �-30-85 ssAit: � =4Q' . 10'0M sE.41( O JJ 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 SOe•co� AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY , SEPTEMBER 4, 1985 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION At the September 3 , 1985 meeting , the Planning and Zoning Commission voted to take the following action : 1 . Approve , with modifications, the application of The Home Farm Partnership , for a 32 lot subdivision , known as Rainbow Hills , located on the east side of Ellington Road, opposite Parkview South Condominiums , in AA-30 and RR zones . 2 . Deny the application of Vito Covensky (Coven Commerce Center) for a site plan of development for property located on the east side of Brookfield Street , north of Troy Road , GC zone . Dated at South Windsor , Connecticut this 5th day of September , 1985 . PLANNING AND ZONING COMMISSION Robert F . Gilligan , Chairman David H . Sorenson , Secretary •cow" s'N 9 ` 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074 soR•coN AREA CODE 203/644-2511 September 9, 1985 Wayne C . Gerlt , Esq . P . 0 . Box 559 South Windsor , Ct . 06074 Dear Wayne: Re: App . #1085 - The Home Farm Partnership Rainbow Hills Subdivision Please be advised that the Planning & Zoning Commission voted to approve the application of The Home Farm Partnership , for a subdivision known as Rainbow Hills , located on the east side of Ellington Road , opposite Parkview South Condominiums , in AA-30 and RR zones , as shown on plans prepared by Gardner & Peterson Associates, dated 5/31/85 , revised to 8/8/85 , subject to the follow- ing modifications: 1 . This approval is for 32 lots numbered Lot #1 through and including #32 . Lot #33 is not approved . Applicant must return to the Planning & Zoning Commission for approval of Lot #33 . 2 . The plans shall be modified to indicate the trees around Parcel A will be planted in clusters , and will contain a mixture of deciduous and coniferous trees . 3 . Concrete sidewalks, built to Town specifications, shall be installed on both sides of all interior streets . Sidewalks will not be installed along Ellington Road . 4 . Deeds for the Open Space and roadways must be submitted to this Commission prior to filing said plans . They must be approved by the Engineering Department and Town Attorney , and be in accordance with the policy for accepting deeds (attached) . The deeds will be held in escrow until completion of the subdivision and then referred to the Town Council for acceptance . 5 . Drainage for this subdivision is subject to the approval of the Town Engineer . 6 . If , for any reason, finished grading and other site work is not completed, the Town Engineer shall determine the amount of a cash bond to ensure final grading and site work. This cash bond must be submitted prior to issuance of a Certificate of Occupancy . Wayne C . Gerlt , Esq . -2- 9/9 /85 7 . All lots must be connected to the Town of South Windsor sanitary sewer system and are subject to the approval of the Water Pollution Control Authority . 8 . Water shall be supplied to this subdivision by the Connecticut Water Company . 9 . Street lighting shall be installed at intersections and on the cul-de-sac in accordance with the policy established by the Town Manager (see attached letter) . 10 . Street names and locations of fire hydrants are subject tothe approval of the Fire Marshal of the Town of South Windsor . Street names and supporting posts shall be installed by the developer in conformance with the standards of the Town of South Windsor at no expense to the Town. 11 . Prior to the building of any structure on a lot , a topographic map , drawn to a scale of 1" = 40 ' , shall be submitted for each lot in the subdivision , showing proposed contours and elevations . No building permits will be issued until the proposed contours and floor elevations have been approved by the Town Engineer . 12 . Quantity estimates must be submitted to the Town Engineer for the purpose of determining subdivision bonding , and all bonds shall be posted prior to filing the plans . The Commission voted to accept a Letter of Credit , subject to the approval of the Town Attorney . Said Letter of Credit must be renewed on a yearly basis until completion of the development . If a new Letter of Credit has not been received within 30 days before the expiration date , the Commission may , at its option, call the Letter of Credit it is holding . 13 . A drainage assessment fee in the amount of $1 , 600 shall be submitted to this Commission . 14 . A liability insurance policy shall be submitted to this Commission naming the Town of South Windsor as an insured, with a combined single limit for bodily injury and/or property damage in the amount of $1 , 000 , 000 . 15 . This approval is subject to the conditions of approval of the Inland Wetlands Agency/Conservation Commission . 16 . No building permits will be issued until all conditions of approval have been complied with , and the final plans have been filed in the Office of the Town Clerk. 17 . Prior to commencement of site work, a meeting must be held with Town staff . Wayne C . Gerlt , Esq . -3- 9/9/85 Black and white transparent mylars of the cover sheet , plus sheets #1 through and including #6 , must be submitted to this Commission to be signed and stamped. The letters of approval of this Commission , as well as the Inland Wetlands Agency/Conservation Commission, must be reproduced on the mylars and three blueprint copies must be submitted . After signing , the mylars will be filed inthe Town Clerk ' s Office . They must be filed within 90 days of the date of approval (by December 2 , 1985) . Yours very truly, PLANNING AND ZONING COMMISSION encs . Robert F . Gilligan, C airman, CC : R. Martel , Town Engineer T . D ' Auria , Building Official P . DeMallie , Planning Director E . Belleville , Assessor W. Lanning, Fire Marshal Water Pollution Control Authority Inland Wetlands/Conservation Commission t OWN SF4 � • r l� . = -7o tU12 � t7[l ? Ll/Lf 2 dl�4 J 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 /VOSOR•Co AREA CODE 203/644-2511 September 24, 1985 Mr. Kenneth Peterson Gardner & Peterson Associates Professional Engineers 576 Old Post Road Tolland, Connecticut 06084 Dear Mr. Peterson: At a regular meeting of the Water Pollution Control Authority held on September 17, 1985, the Authority voted to approve the sewer plan of Rainbow Hill - Gardner & Peterson - Map dated 5-31-85, Revised 8-8-85 . Very truly yours, / Josep_ h J�rino, Chairman TOWN OF SOUTH WINDSOR Water Pollution Control Authority JJC :pm CC : Mr. Peter DeMallie, Director of Planning Mr. Robert Gilligan, Chairman, Planning & zoning Mr. Thomas P. D 'Auria , Building Inspector Mr. Richard Martel, Town Engineer to -?rN PLO SFr' ' 1985 Fianning & th w'nd�or Zoning Commission LAW OFFICES OF WAYNE CHRISTOPHER GERLT 435 BUCKLAND ROAD P 0.BOX 559 SOUTH WINDSOR.CONN 06074 WAYNE CHRISTOPHER GERLT TELEPHONE LOUIS D. FERRE RI (203)644-2565 October 4, 1985 Messers. Richard Martel and A. Bowen Davies DEPARTMENT OF ENGINEERING Town of South Windsor 1540 Sullivan Avenue South Windsor, Connecticut 06074 Re: Rainbow Hills Subdivision Dear Rick and Bo: On behalf of the developer, I hereby notify you that CORBETT CONSTRUCTION COMPANY of Columbia, Connecticut will be the contractor installing the sanitary sewer and other subdivision improvements. Mr. David Maker of that company may be reached at 646-2248 (office) or 228-0568 (home) . Ken Petersen of GARDNER & PETERSEN can be reached at 871-0808. My number and address are shown above. Please contact me if you have any questions. Very truly yo , l� Wayne ristopher GerIt WCG: lmg �40M N S 44 T-o-11"n O-P SOUL12, `d 9 . 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 �l�Dsot•co �w AREA CODE 203/644-2511 December 4 , 1985 Wayne C. Gerlt, Esquire P.O. Box 559 South Windsor, CT 06074 RE: RAINBOW HILLS SUBDIVISION Dear Attorney Gerlt: After stressing the importance of implementation of sedimentation and erosion controls in accordance with the approved plans at the pre-job meeting; after three telephone calls and discussion with the contractor over the last three weeks; and nothing done, it would appear that compliance is not high on your list of priorities . It would also appear that it is time that we review winter time construction--either be elimination or severely restrict it. I am surprised that with the visibility of the site that you would permit this activity to continue. If you have any questions, I can be contacted at 644-2511, extension 244 . Very truly yours, c) A. Bowen Davies Deputy Town Engineer �d ABD:bmr cc : R. Martel, Town Engineer Planning & Zoning File IWA/CC File 10ON aF1 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 soR•co` AREA CODE 203/644-2511 December 41 1985 Wayne C. Gerlt, Esq. P. 0. Box 559 South Windsor, Ct. 06074 Dear Sir: Re: App. #1085 - Rainbow Hills Subdivision Please be advised that the Planning & Zoning Commission voted to grant a 90 day extension of time in which to file the final plans in the above matter. The extension is from December 2 , 1985 to March 2, 1986. Yours very truly, PLANNING & ZONING COMMISSION vg By: Robert F. Gilligan, Ch irman- - -' _ Till,T�[ y�/���N -� ���U 1 �W , . � |� � [`�j���J`^ — � umm, �x o.oxmw ,� NORTH V0x0 ����/Qm��/ | )m� , // ' � � �� ^/.N` / .^/� ( mx mmw/uICU o^oxxmoo |LL 03'03'335* x m�`'m^x� .�. .w� . . ^ . ' ^ ' |k' nn|`r/ i 2 , | VX', Wayo, C / | t , |(y'| . P .V . Box 559 South Windsor , C1' 06074 Dear Mr . Kcr | | : ' Your "Rainbow |i i | la" nu |.J i v i y i ou |` | ox , darted 5/3 | /H5 and revised 6/2H/89 , 7 /30/89 and K/H/H5 , has been r,v \ ,w,J and w, find Lhai 1530 ' �+ of 8" D . I . P . wai ,r mn / o is required in service /he 32 |oto in this subdivision . The estimated cost to install this main and 32 — ln services , main to curb is 'i'bia price rel \ecia the cont incurred if we do the excnvu/ ion necessary to install |he services . | have enclosed two ( 2 ) copies our Refundable Advance Payment Agreement for your review and signature . P \eaae return both signed copies of the agreement to this office with your advance in the amount of $82 , 123 . 56 . An csecotcJ copy of the agreement will he returned to you for your records . We have elected to ineia | \ 12" D. I . P . water main on K \ |iuXton Rood and wi \ l pay the Jificrcxcc in cost between the 8" and 12'/ main installation . Your rou/ is husn| on 8" pipe , Duo /o the fact that u portion of / hia proposed main installation in on private \`ro|`,riy , we request that you provide us with a 25 font easement in i |.» name of The Connecticut Water Company along the route of the proposed water main in "Parcel C" . '[|/is »xy,mcx / must he / ,iurx,.| to us and be approved by our attorney prior /o the start o | installation of water mains on your * i | '' . k\ inchrJ in o marked uy Lopy or your site |` | ox , on w|/ / . h | ' v, / x'| i ' : / ,J lh, | oyox \ of the water main ( or your proj.`. | and the limits of the proposed casement . | / vc also included two ( 2 ) ( opium o | our sLauJard easement form which should he ,om|` | c | n| u".| roiorxcd to us for further processing . The necessary pipe and mo / orin \ s ior this ]"\` will be placed on order as soon as the site is ready , and we receive the yigooJ agreements with your advance in the ah"v, amount . B,[urc |h i s water main i nx/ o | | " t i ox / ok,s |` | o' , , the cnaemcnL for this inuLo1iutioo as shown on your y | ooa must he approved and on [i | c in thr South Windsor 1'oxu Un | | , - LAVA V°1 I I OF C 1111FR t; I.: Itl. l 435 BUCKLANI] ROAD P O BOX SS9 SOUTH WINDSOR. CONN 06074 WAYNE CHRISTOPHER GERLT TELEPHONE KEVIN F RENNIC t03, 644-256�. 'ALSO ADMITTED IN NEW PORK January 198 Mr. Paul Longchamps, President South Windsor Bank & Trust Co. 1033 John Fitch Blvd. South Windso 06074 Re Rainbow Hills, tter of Credit #209 Dear Paul: Please be advised that on December 9th, the Planning and Zoning Ccxrurr_ission reduced the bond for this subdivision from $121,000.00 to $80,000.00. Since this letter of credit is due to expire February 7, I hereby request that you issue a renewal letter of credit, effective February 7, 1987 in the amount of $80,000.00. Even though we are in advance of that date, I do need the renewal letter of credit at least one month before the expiration of the old letter to avoid the town finding it necessary to call the bond. If you must make the new letter effective January 7, then I will live with that eventuality. If you have any questions, please don't hesitate to contact me. Thank you. Very truly yours, Wayne WCG:ekr cc: Virginia Graney Planning & Zoning Ca mission LAW OFFICES OF WAYNE CHRISTOPHER GERLT 435 BUCKLAND ROAD P 0.BOX 559 SOUTH WINDSOR.CONN 06074 WAYNE CHRISTOPHER GERLT TELEPHONE LOUIS D FERRERI (203)644-2565 January 29, 1986 Mr. Richard Sartor, Town Manager TOWN OF SOUTH WINDSOR 1540 Sullivan Avenue South Windsor, Connecticut 06074 Re: Rainbow Hills / Connecticut Water Company Basement Dear Dick: As I told you during a recent telephone conversation, one of the conditions for providing water service to the referenced subdivision is the providing of an easement through Parcel C, which was conveyed to the Town of South Windsor by U & R CONSTRUCTION COMPANY, INC. Parcel C is shown upon the enclosed utility easement plan which I have had my engineers prepare for the purpose of obtaining the easement from the Town of South Windsor. You will note that what is required is a twenty-five foot water line easement across a proposed road stub from Scott Drive. The road stub from Scott Drive which is shown as Parcel C has existed since the acceptance of the subdivision and approval thereof, which included Scott Drive. Rainbow Hills will be obtaining water service through that 25 foot easement to be provided by CWC. The easement will run in favor of the CWC. I also enclose a copy of the letter from CWC requiring the easement and a copy of the proposed easement document. Your assistance in obtaining a prompt conveyance of the easement would be deeply appreciated so that the project does not get delayed. As you know, the Planning and Zoning Commission, as a routine matter in this subdivision and in all others, required that water service be provided by CWC. If there are any questions or concerns, please contact me directly. Thank you. Very truly y , Wayn WCG: lmg �SO*N Sf4<� oslo� G U 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ���soe•coN� AREA CODE 203/644-2511 M E M O R A N D U M February 10 , 1986 TO: Richard J. Sartor, Town Manager RE: REQUEST OF CONNECTICUT WATER COMPANY FOR WATERLINE EASEMENT/RAINBOW HILLS SUBDIVISION The Engineering Department has reviewed the proposed placement of the waterline connecting Rainbow Hills to Scott Drive. A location map and draft easement document was submitted for consideration. The following comments are offered: As relates to the proposed location of the waterline and accompanying easement-- The actual location of the water main, as proposed, is not consistent with Section 2 . 4a of the South Windsor Subdivision Regulations . The line should be installed fifteen (15) feet south of , and parallel to, the northern most boundary line of "Parcel C. " The twenty-five (25) foot easement should be parallel to the above mentioned boundary line and be coincident to the line . As relates to the easement agreement-- The paragraphs of the easement have been numbered for reference to the following comments . Paragraph 2 : This paragraph deals with the control of brush and tree growth. Any control of plant growth should be done by mechanical means . The use of chemicals on Town property in a residential area by outside companies or agencies should not be encouraged or agreed to. Also , the sentence after the last semi-colon should be removed. Paragraphs 3 and 4 : Both paragraphs severely limit the Town' s right to make improvements to the parcel , including storage of materials or regrading. Any use of the parcel by the Town would require prior approval by the Connecticut Water Company. Paragraph 5 : The last sentence pertaining to ownership of lines and appurtenances should be removed. The easement is being forwarded to the Town' s attorney for review. I will do my best to expedite the review. Rob rt enault Di ector of Public Works cc : R. Martel, Town Engineer �4o,NM r `To-utn 0 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR-CO AREA CODE 203/644-2511 February 18 , 1986 Wayne C. Gerlt, Esq. P. 0. Box 559 South Windsor, Ct. 06074 Dear Wayne: Re : App. #1085 - Rainbow Hills Please be advised that the Planning & Zoning Commission voted on February llth to require a bond in the amount of $470 ,000 to ensure completion of subdivision improvements in the above matter. The Commission further voted to reduce that amount to $280, 000 in consideration of work which has been completed. The Commission also discussed the fact that construction equipment entering this site is using a driveway south of the main entrance. We question whether sightline is adequate at this driveway, and, therefore, are requesting that use of this temporary driveway for construction equipment cease. . Yours very truly, PLANN & ZONING COMMISSION vg BY 'Robert F. Gi- ligan, Ch irman f CC: R. Martel, Town Engineer P. DeMallie, Planning Director T. D'Auria, Building Official LAW OFFICES OF WAYNE CHRISTOPHER G ERLT 435 BUCKLAND ROAD P O.BOX 559 SOUTH WINDSOR,CONN 06074 WAYNE CHRISTOPHER GERLT TELEPHONE LOUIS D FERRERI (203)644.2565 March 14, 1986 Mr. Robert F. Gilligan, Chairman SOUTH WINDSOR PLANNING & ZONING CODMIESSION 1540 Sullivan Avenue South Windsor, CT 06074 Re: Rainbow Hills - reduction in $280,000. Bond Dear Chairman Gilligan: I hereby formally request that your camdssion consider a reduction in the referenced bond. We have fully completed the storm and sanitary sewers and ask that this bond be appropriately reduced. Thank you for your attention to this matter. Very truly yours, zk �., . Wayne Christopher Gerlt WCG:lmg d,, �SO•MN Sf•'` /t1LUf2 01�� ��LLUZ LUC�2L��-OJ� 9 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 ����Soe•co�'��G AREA CODE 203/644-2511 April 8 , 1986 Mr. Thomas D'Auria Chief Building Inspector South Windsor Town Hall South Windsor, Ct 06074 RE: Rainbow Hill Subdivision Building Permits and Sedimentation and Erosion Control Dear Tom: The approval of the Rainbow Hills Subdivision was granted with a number of conditions by the appropriate commissions . Over the past few weeks I have been strongly requesting that the developer attend to the sedimentation and erosion controls as indicated on his plans as approved. For all the normal reasons, these items cannot be done or won' t be done, but foundations can go in. Item 11 of the approval requires the plot plans be approved by the Town Engineer, which is the typical procedure. Item 16 indicates no building permits will be issued until all conditions of approval have been complied with. I have been delaying or denying engineering approvals in hopes that the developer would comply with what he is supposed to be doing. According to your files , there has been only one building permit approved. The developer has narrowed down my options. I doubt if any plot plans will be approved for at least 10 days . At that time we will have determined the next steps . Thank you. Very truly yours , A. B. Davies Deputy Town Engineer ABD:dlb CC: Wayne C. Gerlt, Esquire U & R Housing Corp. John M. Moran, Jr. , Chairman Inland Wetlands Agency/Conservation Commission Inland Wetlands Agency/Conservation Cf�mmission file Planning and Zoning Commission file t 0,0 sf"( C TOIV/12 V/ SOUZA G � e �L 1540 SULLIVAN AVENUE . SOUTH WINDSOR, CONN. 06074 SOR.r-ac�� AREA CODE 203/644-2511 April 23 , 1986 Wayne C. Gerlt, Esq. P. 0. Box 559 South Windsor, Ct. 06074 Dear Wayne: Re: Rainbow Hills Subdivision The Planning and Zoning Commission voted last night to reduce the amount of the bond it is requiring to ensure completion of subdivision improvements in the above matter from $280 , 000 to $225 , 000 . We are holding a Letter of Credit from the South Windsor Bank & Trust Company. Please have them forward us an amendment reducing the amount by $55 , 000 to $225, 000 . Yours very truly, PLANNING & ZONING COMMISSION A vg By: Marshall Montana, Vice-Chair n S 0'0 8 C4, Y `/o- wi? ale soil Zf Z Lild. -O'z e mac` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 sOR•CO AREA CODE 203/644-2511 May 15 , 1986 Home Farm Partnership 435 Buckland Rd. South Windsor, Ct 06074 RE: Lot #31 - Rainbow Hills Subdivision Gentlemen: It has been brought to our attention by both the proposed home buyer and Wayne Gerlt, Esquire, their concern about the watercourse as it crosses lot #31 , adjacent to Ellington Road, below the warehouse. When the area was farmed, a certain amount of repair and maintenance was done along this watercourse by your men and equipment as a matter of good farming practices and a desire to keep the area clean and neat. It always looked good. Now with a new homeowner looking at a big gulley in his back yard, they can envision major difficulties . I don't see it that way. I would hope that someone in your group would come up with a corrective proposal that would enhance the total project. It is the first one to be seen as you head northerly. I don't have a solution, but I anticipate I could support a reasonable one. As far as other support from the town, I feel safe in assuming that taxpayers would and should take a dim view of town participation in correcting a drainage system in a subdivision that is less than one year old. The plans do not call for anything, perhaps that is our fault for not recognizing such a problem before approvals . Perhaps the approval process is too quick. I would hope that you would see the need and help out the homeowner and your site. I think it would be an awfully nice gesture. If you would like to discuss this further, I can be contacted at 644-2511 extension 244 . Very truly yours , ABD:dlb A. B. Davies Deputy Town Engineer CC: Richard Martel , Town Engineer / Planning & Zoning Commission File Inland Wetlands Agency/Conservation Commission File Wayne C. Gerlt, Esquire LAW OFFICES OF WAYN E CHRIS'1['®IEDH ER G ER LT 43S BUCKLAND ROAD P O BOX 559 SOUTH WINDSOR.CONN 06074 WAYNE CHRISTOPHER GERLT TELEPHONE LOUIS D FERRERI (203)644-2565 KEVIN F RENNIE ALSO ADMITTED IN NEW YORK June 16, 1986 The Honorable Robert Gilligan, Chairman SOUTH WINDSOR PLANNING & ZONING COMMISSION 1540 Sullivan Avenue South Windsor, Connecticut 06074 Re: Rainbow Hills Subdivision, Bond Reduction; June 16, 1986 Dear Chairman Gilligan: Having completed the installation of the processed stone and the binder with curbs to be completed by June 23, 1986, I here- by request a reduction in the subdivision bond which presently stands at $225,000.00 Thank you for your attention to this request. Very trul s, Wayne C �er ot _p WCG:lmg V C 0 7 I � 1 y r J yw 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 AREA CODE 203/644-2511 R coN June 25, 1986 Wayne C. Gerlt, Esq. P. 0. Box 559 South Windsor, Ct. 06074 Dear Wayne : Re: App. #1085 - Rainbow Hills Please be advised that the Planning & Zoning Commission voted last night to reduce the amount of the bond in the above matter by $104 , 000 , from $225 , 000 to $121, 000 . Please forward us an amendment to the Letter of Credit. Yours very truly, PLANNING & ZONING COMMISSION vg By: Marshall Montana, Vice-Chairman �t0wM 8f+` 1 C r 7awn, a/,S_a� W e � wc` 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 l�pSOR-Co AREA CODE 203/644-2511 July 17, 1986 Wayne C. Gerlt CERTIFIED MAIL Attorney At Law P.O. Box 559 South Windsor, Ct 06074 RE: Permit Extension - Application #336 - Rainbow Hills Subdivision Dear Attorney Gerlt: At the July 14 , 1986 meeting of the South Windsor Inland Wetlands Agency/ Conservation Commission, the agency voted to deny a permit extension for application #336 because of noncompliance with existing plans in regards to erosion & sedimentation control measures. Letters were sent to your attention on 12/4/85, 3/14/86 , 4/7/86 , 4/8/86, and 7/11/86 stating the Town staff' s concerns about the projects erosion and sedimentation control measures that have not been brought up to com- pliance with the existing plans . You may re-apply at any time providing your new application is in compli- ance with the existing plans . We also ask to be notified in writing by your engineering firm on the project certifying that all erosion & sedi- mentation conditions of the original plans have been met, are current as of the date of re-application (i .e. through August 18 if you wish to be on the agenda for our next meeting, September 8) , and all such measures are working. If you should have any questions , please contact our department at 644-2511 Ext. 253 or Bo Davies at Ext. 244 . Very truly yours , John M. Moran, Jr. , Chad man Inland Wetlands Agency/ Conservation Commission Town of South Windsor JMM:dlb CC: A. B. Davies, Deputy Town Engineer Richard Martel, Town Engineer / Planning & Zoning Commission/ Marcia Banach, Director of Planning Thomas D'Auria, Building Official John Shemo, Economic Development Coordinator y `�� o-P South Vz�� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 f~osoa.co��' AREA CODE 203/644-2511 July 24, 1986 CERTIFIED MAIL Wayne C. Gerlt Attorney at Law P.O. Box 559 South Windsor, Ct 06074 RE: Permit Extension - Application #336, Rainbow Hills Dear Attorney Gerlt: At the July 21 , 1986 meeting, the South Windsor Inland Wetlands Agency/ Conservation Commission approved a one-year extension for the above mentioned application. The extension becomes effective July 15 , 1986 with an expiration date of July 15, 1987 . All original conditions of this permit apply. Very truly yours, / John M. Moran, J Chairman Inland Wetlands gency/ Conservation Commission Town of South Windsor DLB CC: A. B. Davies, Deputy Town Engineer Richard Martel, Town Engineer Planning & Zoning Commission J Marcia Banach, Director of Planning John Shemo, Economic Development Coordinator Thomas D'Auria, Building Official M E M O R A N D U M October 28 , 1986 TO: Mr. Thomas D'Auria, Building Inspector RE: Certificate Of Occupancy Lot 26 , 'Rainbow Hills This plan was denied for a couple of reasons . The first was for showing a 25 ' right-of-way across the easterly portion of this lot and it was not the same as the recorded plan. According to Attorney Gerlt, this does not constitute a resub- division as described in the Statutes 8-18 : 'resubdivision means a change in a map of an approved or recorded subdivision if such change (a) affects any street layout shown on such map, (b) affects any area reserved thereon for public use or (c) diminishes the size of any lot shown thereon and creates an addi- tional building lot' . The other reason was to apply the appropriate certification to the plan. When this is done, the c .o. can be issued. A. Bowen Davies Deputy Town Engineer ABD/jsv CC: Richard P. Martel, Town Engineer Marcia Banach, Director of Planning Planning & Zoning Commission File 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 f��soe•co�'� AREA CODE 203/644-2511 November 5 , 1986 Mr. John M. Moran, Jr. , Chairman Inland Wetlands Agency/Conservation Commission 1540 Sullivan Avenue South Windsor, CT 06074 RE: Application #423 U & R Construction Co. , Inc . Lot 22 , Rainbow Hills Subdivision - Review Dear Jack : In accordance with the standard review practice, enclosed are the comments as they relate to this proposal. The developers proposal for the subdivision, in 1985 , was essen- tially that the pond would remain as a viable water body and that the existing house would be altered to comply with the current standards. With the utility installation in the roadways, it appears that the springs that fed the pond have been diverted, and the water source eliminated. Now to eliminate a liability and an ugly situation, the plan indicates they propose to fill it in. The plan, as submitted, does provide a drain out of the ponding and substantial grading of the whole lot. In general, I am not opposed to what is proposed. It would be an improvement in the subdivision. Specific concerns that I have are: 1 . The house placement - which is not a IWA/CC concern. 2 . The lot does have a few mature trees . It appears the whole lot is to be graded, disregarding existing veg- etation. If the construction is to be as shown, and as per Item 1 in their grading and seeding applications, 'hll graded or disturbed areas, including slopes, shall be protected during clearing and construc- tion in accordance with the approved sediment control plan until they are permanently stabilized. " John M. Moran, Jr. November 5 , 1986 RE: U & R Construction Rainbow Hills Page 2 . At this time of the year, it does present a problem. I would hope that perhaps an on site inspection with the excavator and/or builder prior to excavation could minimize the areas dis- turbed and to be restored. If an approval were to be granted with conditions , a bond of per- haps $2 , 500 should cover the erosion and sediment control phase. Very truly yours, A. Bowen Davies Deputy Town Engineer ABD/jsv CC: U & R Construction Co. , Inc. Wayne Gerlt, Esquire Michael J. Gantick, Director of Public Works Richard P. Martel, Town Engineer / Marcia Banach, Director of Planning IWA/CC File �z _awl-t O-P Sau� V&U&at 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 l��soa•co`'� AREA CODE 203/644-2511 November 24 , 1986 U & R Construction Company , Inc . CERTIFIED MAIL 99 East Center Street Manchester , Ct 06040 RE: Application # 423 - Lot #22 , Rainbow Hills Subdivision Filling of existing pond and regrading . Gentlemen : At the November 17 , 1986 meeting , the South Windsor Inland Wetlands Agency/Conservation Commission approved with conditions application #423 , to fill existing pond and regrade land on Lot #22 , Rainbow Hills Subdivision . The following conditions must be adhered to for this permit to be valid : 1 . Plans must be modified to include erosion & sediment control measures for wintertime construction . 2 . No tree removal to fill the pond . 3 . No tree removal beyond 25 feet from the dwelling . 4 . We recommend a bond in the amount of $2 ,500 be submitted to Planning and Zoning Commission to ensure compliance with Erosion & Sediment Control Measures . 5 . Construction activities shall be subject to the approval of the Town Engineer . 6 . The application shall indemnify and hold harmless the Town of South Windsor against any liability which might result from the proposed operation or use . TO : U & R Construction Page 2 7 . The permit is valid for one year and shall expire November 17 , 1987 . Very truly yours , gn4 N---w Q" JoAk M. Moran , Jr . ,Chairm n Inland Wetlands Agency/ Conservation Commission Town of South Windsor JMM: dlb CC : A . B . Davies , Deputy Town Engineer Richard Martel , Town Engineer Marcia Banach , Director of Planning Louise Evans , Chairman , Planning and Zoning Commission Michael Gantick Director of Public Works Thomas D' Auria , Building Official John Shemo , Economic Development Coordinator Gardner & Peterson , Engineer LAW OFFICES OF 435 BUCKLAND ROAD r P 0.BOX 559 I SOUTH WINDSOR.CONN 06074 WAYNE CHRISTOPHER GERLT TELEPHONE (203)644-2565 KEVIN F RENNIE ALSO ADMITTED IN NEW YORK Decenmber 1, 1986 Mrs. Louise C. Evans Chairman Planning and Zoning Ccnudssion Town of South Windsor 1540 Sullivan Avenue South Windsor, Connecticut 06074 Re: Rainbow Hills Subdivision Dear Mrs. Evans: I hereby request a reduction in the bond for the referenced sub- division from its present limit-of $121,000.00 due to the con-pletion of curbing and sidewalks in the entire subdivision. As soon as we have a decision on this request, I will cTplete my pending application for renewal of the letter which expires February 27, 1987. The Commission's prcn pt attention to this request will be deeply appreciated. If there are any questions, please do not hesitate to contact me. Very truly s, �L? Wa Chris er Gerlt WCG:jl C cc: Mr. Richard Martel Town Engineer A l/ �40wM y r 7-own' Ole soa� ?d&U&O't C ` a 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 SOR-0) AREA CODE 203/644-2511 December 10 , 1986 Wayne C. Gerlt, Esq. P. O. Box 559 South Windsor, Ct. 06074 Dear Wayne: Re: Rainbow Hills Subdivision Please be advised that the Planning & Zoning Commission voted last night to reduce the bond in the above matter from $121, 000 to $80 , 000 . We are holding a Letter of Credit from South Windsor Bank & Trust Company which expires on February 27 , 1987 . Please forward us an amendment reducing the amount by $41, 000 , and extending the term for an additional year. Yours very truly, PLANNING & ZONING COMMISSION vg By: Louise C. Evans, Chairman r -awn' 01/ �o-td �c�� t c � .i 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 SOR-CO AREA CODE 203/644-2511 January 14 , 1987 Wayne C. Gerlt, Esquire P.O. Box 559 South Windsor, CT 06074 Dear Attorney Gerlt: Subject: Rainbow Hills - Streets It has come to my attention that on several occasions , staff members from the Engineering Division have contacted you regarding re-establishing shimming of the manholes and catch basins along the subject project. To date, nothing has been done. I trust you understand the importance of maintaining these structures in a safe condition at all times and associated liability. Plowing equipment has been damaged as a result of the lack of adequate shimming on the manholes and catch basins . I must advise you that if you do not take adequate measures to correct the above noted deficiencies by the end of Thursday, January 15 , 1987 , the Town will take measures to correct said deficiencies at your cost. It is imperative that you maintain the subject streets in a safe and passable condition. Very truly yours , Michael J. GA4,ftick Director of Public Works MJG:bmr cc: Melvin C. Stead, Jr. , Supt. of Streets Richard P. Martel , Town Engineer , Marcia Banach, Planning Director Richard J. Sartor, Town Manager 4O'NM 8E� r / 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 SOR-CO AREA CODE 203/644-2511 March 18 , 1987 Mr. Ludis Upenieks U & R Construction 99 E. Center Street Manchester, CT 06040 RE: Grading at Lots 6 & 7 , Rainbow Hills Dear Mr. Upenieks: It has come to my attention that fill material has been brought in to the rear of Lot 6 and Lot 7 on Windy Hill Drive in the Rainbow Hills Subdivision. Examination of the plot plans, used to acquire building permits, showed no regrading at the rear of these properties was to be done. The re-grading of these lots raises concern in two areas. The first is that there is exposed earth with no concern for proper soil erosion control measures. The erosion of soil has the down- stream property owners rightly concerned. The second concern is that an area has been established where slopes are steeper than they were originally. The velocities of any stormwater run-off are greater, subsequently another concern for soil erosion is raised. Temporary and permanent soil erosion control measures must be placed on the site. There must also be a resolution to the steep slopes and direction of the stormwater run-off. Please contact me so that these questions can be answered in a timely manner. Very truly yours , j �� - z Richard P. Martel Town Engineer RPM/jsv CC: Wayne Gerlt, Esquire Mr. Edward Pastula Mr. & Mrs. Nachyly Planning & Zoning Commission Tuesday, May 26, 1987 2051 Ellington Road P.O. Box 452 South Windsor, CT 06074 Louise Evans, Chairperson Planning & Zoning Commission Town of South Windsor Dear members of Planning & Zoning: About two (2) years ago, Mr. Ludis Upenieks of U. & R. developed property on the east side of my home of more than 32 years to the rear of Lots 6 and 7 on Windy Hill Drive in t1pe Rainbow Hills sect. I was promised that Ludi would carve out a swail on the west side of the Harris property, so that water and muck would not run down onto my land. Instead, tons upon tons of earth were brought in and they raised the ter- rain into a high hill. Before they did this, this particular land sloped up very gently. Now, as a result of their changing the terrain, a steep slope was left at an angle into my land and inground swimming pool. Also, raw dirt was pushed down, including rocks and stones. It was left an absolute mess. There are now, rats and snakes accumulating, along with messy poisonous plants and bramble bushes. I spoke to Ludi many times and got nowhere: I have tried to be a neat property owner and have lived in town over 65 y ars. I have never complained about anything before. Somehow this does not seem right. For your further information on this aggravating matter, I have attached her to a letter dated 3-18-87, from Tomn Engineer Richard Martel to Mr. Ludis Upenieks. Thank you for your kind attention. Sincerely, Margaret D. Nachyly Attachment: 1-Letter, dated 3-18-872 R. Martel to L. Upenieks. LAW OFFICES OF 435 BUCKLAND ROAD P O BOX 559 SOUTH WINDSOR,CONN 06074 WAYNE CHRISTOPHER GERLT /y; TELEPHONE (203)644.2565 r' July 15, 1987 , Mrs. Louise C. Evans Chairman Planning and Zoning Ccmaission Town of South Windsor 1540 Sullivan Avenue South Windsor, Connecticut 06074 Re: Rainbow Hills Subdivision - Bond Reduction Dear Mrs. Evans: I hereby request a reduction in the bond for the referenced subdivision from its present limit of $80,000.00 due to the conpletion of final paving, curbing, sidewalks and drainage. The planting of trees and setting of merestones and pins will be acccuplished as soon as possible. The Ccmission's attention to this request is a ciated. Very s, t WCG:j 1 cc: Mr. Richard Martel, Town Engineer LAW OFFICES OF WAYNE C HRISTO P]HER GERLT 435 BUCKLAND ROAD P O.BOX 559 SOUTH WINDSOR.CONN 06074 WAYNE CHRISTOPHER GERLT TELEPHONE (203)644-2565 September 16, 1987 Mrs. Louise C. Evans, Chairman j Planning & Zoning CaT fission Town of South 71indsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Rainbow Hills Subdivision - Acceptance of Streets Dear Mrs. Evans: I hereby request that the Town accept the streets and release the bond for the referenced subdivision. The final paving, curbing sidewalks and other improvements have been completed and our reque should be in order by the time you consider it. Very truly , Wayn isto er Gerlt WCG:mt cc: Mr. Richard Martel, Town Engineer s 1OwM st4 P `Qj l o ~ Tam4o��so�A ?J e P u 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 'tioSOR.Coe�� AREA CODE 203/644-2511 September 25 . 1987 Wayne C . Gerlt , Esq . P . 0 , Box 559 South Windsor , CT 06074 RE: Bond Reductions Rainbow Hills Dear Sir : Please be advised that the Planning & Zoning Commission voted on Sept 22 , 1987 to reduce the bond for Rainbow Hills from $80 , 000 to $50 , 000. We are holding a Letter of Credit from the South Windsor Bank & Trust Co. which expires on February 27 , 1988 . Kindly forward an amendment reducing the amount by $30, 000. Your prompt attention to this matter will be greatly appreciated . Very truly yours , PLANNING & ZONING COMMISSION Louis C . Evans Chairman : rt LAW OFFICES OF WAYN E CHRIS'd OPHER G ER LT 435 BUCKLAND ROAD P O.BOX 559 SOUTH WINDSOR,CONN 06074 WAYNE CHRISTOPHER GERLT TELEPHONE WAVAICH)COM{ (203)644-2565 October 7, 1987 Mrs. Louise C. Evan Chai rznan Town Planning & Zoning CaT ission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Rainbow Hills - Bonds Dear airs. Evans: Enclosed are two letter of credit extensions, one for the TPZ bond in the sum of $50,000.00 and one for the TPZ's (Conservation Commission requested) bond in the sum of $15,000.00. Since the developer's site work is substantially complete, we request a release of both bonds and acceptance of the streets at this time. By a copy of this letter we are requesting Conservation Commission tion to recommend release of their bond. Sincerely, i Wayne is h Gerlt .aCG:mt A� cc: Mr. A. Bowen Davies Mr. Kevin F. Rennie - Conservation Comtission z Q�`D 45 Nindy li11 ,rive bo ut n_ ',rir�d�ar7_`C T\\ �,dv 74 JctOoer y, 1y0( 1 Jpeniks ucut onstructlon ',c. , inc. y; I. ,'enter btreet �Iar:•3rester,, i;T -ear ..:d i our p:^.cne Gail prompts this wetter - you indica -d that i shou-Ld ce happy cecause "you .augnt he11 from ?&Z". indeed, sir, that doesn' t give me any pleasure at all. is no,: our intention to areas ;ou or have anyone else do sc. .re ±'eei that we have a iegitir.:3te problem - mainly streams of water crossing ::verjcne's bacK yard and coming .hrougn ours, suosequent.{ ?ooling Of the ?ara5e .ni once that's sufficiently ='_coded, i; then streams across the driveway and t;e sidewalk like a mini-river. This is definitely not desirac.Le, and we are par:ic;Lariy worried aCout the colder weather because these areas wiii ice over a;;� oecome not only a nuisance out a serious hazard. ono c)rociem stems from the fact, that we appear to ee "the" catcn basin, oeing ..ow spot. Ne understood tnat there was to oe a swale or. Lot ff7 �r,r. narris' cefore it Bumped onto ours, out that was not done. 4hen regrading in may we agreed :.J . .tl i 3:Jcle on our property, tnu ou4h the thir.King that :..�., .;_Id he.Lo and it did help some, cut :.ne pro Clem is st:�_ serious enough prompted us to seek re.L . The other detai-L that_ aggravates this :at�on still further is the quality of the soi- in tr:e :area, very neavy ciay does not promote good distrioution or drai:age ;we :.ad !roles auo in the _'or plan;ing trees and Lnree days after a downpour they were st,- ui of ,utside consu:ting sources indicated tnat we needej s,;rie storm drains to haraie the ;overflow. we tnen asked the lows :,ngineer, .•.r. no ;iavies, for nis irout and e oasis iily had tr.e Same recommenia.ion. et tnat coins we triea to cc:nm nica:e witr_ ycu to seek jour nelJ in the ma.ter, and .•ou: attltude casically ..:is t~a. you'd ,axe a iook at i t "when yo•.i ':a(. .ne time". jav_as says hi-- Jeoart;ment is not responsic.Le because: th-a town doesn't own _..e --ads, the Ievei,.;per at:y. 'ro,ayne . eri t does. Attorney Jerit gave nis apprcva_ noDk into .he Street storm sewers out also felt it wasn't his pro-rem, that we ...cu_ : ----.-Lk to -rcu, the builder - hence our appeal to you for help. ,t's a great -ys-.a.m 3ut there zecause it a;iowed for the prob.Lem to b•e created and now it acid-ves !ver_'cre :'rom r espo nsibility. ;;ear-y -ae .:an:luG _-mmuricate weii with you but believt .,r.e Wher. , teil you that .ne least of our intentions is to crealP any hard feeiings - we are more than appreciative of your fine skills as a builder, but we do have a problem. he fee-L that some of the respcnsibi-Lity for solving this problem lies with you. -2- 3asicaily, we want this resolved so that we too, can get on with our lives. It's almost a year that we're in this home and we'd like some respite. may we asx for a meeting with you, for Monday, Jctober ly the time at your con- venience) to see if we can find the best sciution to this problem. Thank you for your consideration of this matter. Sincerely, Hichard J. Nowak Veronica E. Nowak cc: Atty Mayne Gerlt LAW OFFICES OF WAYN E ClE-IIRISTOPHER GRRLT 435 BUCKLAND ROAD P 0.BOX 559 SOUTH WINDSOR,CONN 06074 WAYNE CHRISTOPHER GERLT TELEPHONE IMAIMOIDOOMOC (203)644-2565 October 14, 1987 Mr. A. Bowen Davies Deputy Town Engineer Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Rainbow Hills - Acceptance of Subdivision Dear Mr. Davies: As you know the developer's work in the referenced subdivision was completed on or about October 1, 1987. We hereby request a final inspection by your office of all public improvements. We have already provided deeds to the roads, drainage rights-of-way, open space and detention basin area to the Town Attorney, and you should have copies of those in your file. After you have completed your inspection, please make a recommendation for acceptance to the Planning and Zoning Commission and to the Town Manager. If there are any questions, please don't hesitate to contact us. Thank you. Veryger W eerlt WCG:mt cc: rlrs. Louis Evans, Chairperson Planning & Zoning Commission t OwN 8E7 C 7W-zW0 S � _ 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 soe•cO AREA CODE 203/644-2511 December 8 , 1987 Atty . Wayne Gerlt P . 0 . Box 559 South Windsor , CT 06074 re : B Qn.d R-e-ducri o n Rainbow Hills Dear Atty . Gerlt : At the recommendation of the Inland Wetlands Agency/Conservation Commission , the Planning and Zoning Commission voted during its November 24 , 1987 meeting to release the IWA/CC Bond on Rainbow Hills in the amount of $15 , 000. Please make arrangements to have this bond picked up at the Planning Department at your earliest convenience . Your cooperation will be greatly appreciated . Very truly yours , PLANNING AND ZONING COMMISSION Raymond F. Hallowell , Jr . Chairman cc : M. Banach , Director of Planning PZC File Engineering Department tow" se.4 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 lN�soe•co�� AREA CODE 203/644-2511 M E M O R A N D U M January 11, 1988 TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works RE: RAINBOW HILLS PERFORMANCE BOND FIELD REVIEW Please be advised that this Department has field checked the subject project and the following items require corrective action: 1. Throughout the subdivision there are numerous areas in which the grading between the edge of curb and the sidewalk is not consis- tant with the Town' s standard grading, i.e. grading is improper, area needs to be re-topsoiled and seeded (free of stones larger than 1 1/2" and miscellaneous debris) ; Lots 1, 2 , 3, 4 , 5, 6, 7, 8 , 12, 15, 16, 17, 18, 19, 20, 21, 22 , 23, 24 , 25, 26, 27, 30 . 2 . Various sections of sidewalks in front of the following lots are cracked and require replacement of sections : Lots 5, 6, 7, 15, 18 , 22 , 24, 26, 29 , R.O.W. to detention basin, Paul Kupchunos property; sidewalk spalling Lot 7 . In addition along all areas of sidewalks the expansion joints should be planed down flush with the sidewalk. 3 . Debris and concrete pieces should be removed from sidewalks along Lots 4 , 5, 7, 8, 19 , 20, 22 . 4. Sidewalk in front of Lot 17 appears to be undermined. Front yard of Lot 17 to be stabilized. 5. Driveway aprons on Lots 10, 14 , 17 , 19, 24 require repairs (ravelling/ settlement) . 6. Ponding conditions on Darlene Drive in front of Lot 23. 7 . Ponding condition on Kupchunos Drive Station 1+25± left. 8. Water gate between Lot 30/31 to be lowered to grade. 9 . Water gate Lot 22 driveway to be cut out and brought to grade. 10. Water gate Lot 10 driveway to be cut out and brought to grade. 11 . Water gates (2) along Paul Kupchunos Lot sidewalk to be relocated and sidewalk section replaced. TO: Marcia A. Banach Page 2 RE: Rainbow Hills 12 . Water gate Lot 18 and 24 to be lowered to grade. 13 . Sidewalk forms to be removed in front of Lots 12, 26. 14 . Repair/replace bituminous concrete lip curb along Lots 3, 4 , 5, 11, 12 , 15, 19 , 20, 23, 26, 27 . 15. Move cable T.V. box from in front of fire hydrant along Lot 3. Hydrant operation inhibited by present location of utility. 16. Trees planted between edge of curb and sidewalk in front of Lot 4 to be removed or relocated outside of street R.O.W. 17 . All catch basin sumps are to be cleaned free of all sand and debris. All storm drainage pipes to be flushed. (To be done under the inspection of Town) . 18 . All pipes in catch basins to be cut flush with walls. 19 . All catch basins to be repointed. Cement all spaces (CB at 7+10 right Windy Hill Road has space between CB to and first section of CB wall) . 20 . Pavement station 5+20± right Windy Hill has been scarred by heavy equipment and is to be repaired. 21 . Lot drainage between Lots 19 and 20 to be cleaned, embankment area stabilized. 22. Manhole cover in Kupchunos Drive from Lot 19 and 20 drainage to be changed to storm sewer cover. 23 . Cul-de-sac banks on Kupchunos Drive to be loamed/seeded (stabilized) . 24 . Mason sand to be removed from Kupchunos Drive cul-de-sac. 25 . 18 inch double Maple tree right side of Kupchunos Drive cul-de-sac to be removed along with dead fall within R.O.W. /Parcel "C" area. 26. All construction debris along Kupchunos Drive cul-de-sac/Parcel "C" to be removed. All curbing to be backed-up and graded per Town standards. 27 . Utilities along Lot 15 and wires exposed on Lot 29 to be secured. All utility boxes and wood post identification markers to be re- moved/secured as required. 28 . Path to the detention basin to be stabilized. Present path is erroding. 'TO: Marcia A. Banach Page 3 RE: Rainbow Hills 29 . Detention basin bottom and sides to be stabilized. All construc- tion debris, stones to be removed from basin bottom and side slopes. Basin to be "dry" basin. 30. End structure needed for drain from Lot 28 . 31. Inlets/outlets to detention basin to be riprapped with approved material. 32. Overflow struct4M CB to be cemented in place. 33. Manhole #18 near detention basin to be repaired. 34. Excess soil materials to be removed from site, area stabilized. 35. Access to detention basin to be gravelled/stabilized. 36. As-built plans are to be submitted. 37 . Subdivision to be pinned and monumented and appropriate certi- fication of same submitted. In addition to the above noted items, there remains a drainage problem affecting several lots in the subdivision. Specifically, drainage from Lot 7 drains onto Lot 6 . Water is ponding on Lot 6 northeast of the garage, then overflows along the driveway, across the sidewalk onto the road. The severity of this particular problem is such that it has the potential to cause icing problems along the driveway of Lot 6 and the sidewalk and road in front of Lot 6. A second drainage problem exists between Lots 2 and 3 and is the result of cumulative run-off from Lots 4, 5, 6 and 7. This problem has re- sulted in a continued erosive condition along Lot 2 and 3 and a subse- quent concentration of storm run-off across the sidewalk and onto Kupchunos Drive. It is imperative that the above two identified drain- age problems be rectified prior to acceptance of this subdivision by the Town. Should you have any questions regarding the above matters please contact this office. Very truly yours, 71�LleTiss � WG Michael J. Gantick, Director of Public Works MJG/jsv cc: P&Z File Engineering File r' 38 I ,k �`ti'Lt- CH lti l�� A�j/u Li..i ivY/ Z }� .�J�1�.aL 1�c�L J hl.�.�..C.la. I.(�i�1�(( � •�i�l�ti,4.c'�,t� C�-C. �.,Zt� J )E1-AI.Z -�-L•rC_ �Rr 15 ...1..i._..1::..c-�c� �.. �-`,�` �-� ' ' v L G' ( 7J" V1 (yq- 6-W i o w M d f, O � 7owt-2- 0-/e Scwm c . _ ~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ~OsoR.CO AREA CODE 203/644-2511 RICHARD J. SARTOR Town Manager April 13, 1988 Mr. and Mrs . Richard J. Nowak 45 Windy Hill Drive South Windsor, CT 06074 Dear Mr. and Mrs . Nowak: Pursuant to our meeting in my office on April 4 with Marcia Banach, Director of Planning and Michael Gantick, Director of Public Works, we will be following through on your request for r solution of drainage problems on your lot on Windy Hill Drive. Your letter has been referred to Raymond Hallowell, Chairman of the Planning and Zoning Commission, for discussion at an upcoming Planning and Zoning Commission meeting. Ms. Banach will contact you with a date and time for the meeting. I am optimistic that your drainage problems will be resolved to your satisfaction with the assistance of the Planning and Zoning Commission. Very truly yours, Richard A S rtor Town Ma ger cc: JMarcia Banach, Director of Planning Michael Gantick, Director of Public Works Raymond Hallowell, Chairman, PZC .' ' �'' � sk�/ � ^ "y *�) ~~~~ ��^ � ,� ^ ' �- �78 Sout// Cc Craig & Kathy Erickson Planning & Zon/oDwm,n�08 67 Kupchunos Dr. S. Windsor , CT 06074 April 27, 1988 Mr. Raymond Hallowell Chairman PZC South Windsor Town Hall Sullivan Ave. South Windsor , CT 06074 Dear Mr. Hallowell , Having attended the April 26th meeting of planning and zoning we are writting to you to make you aware of the drianage problems we have on lot 20 of Rainbow Hill . Enclosed is a copy of the items that need attention. Sincerely , ^ �KI /i�� �� 4L? Craig & Kathy Eri�In ' / CRAIG & KATHY ERICKSON �'^'" 67 KUPCHUNOS DRIVES L, , (LOT #20, RAINBOW HILLS) Planning & �on;n� Ccminission ITEM #1 DURING RAINSTORMS , BACK OF LOT HAS WATER FROM OTHER PROPERTIES RUNNING ACROSS IT, CAUSING SEVERE EROSION NEAR TREES , AND WHEN FLOWING , SENDS SAND INTO STORM DRAINS CONSTANTLY . ITEM #2 RIGHT SIDE OF PROPERTY HAS DRAINAGE PROBLEM THAT CAUSES SURFACE EROSION AND SENDS WATER OVER SIDEWALKS AND DRIVEWAY CAUSING A DANGEROUS ICING SITUATION WHEN COLD. ITEM #3 CURB DAMAGE IN FRONT OF LOT FROM HEAVY EQUIPMENT DURING CONSTRUCTION OF HOUSE. CURB ACTUALLY PROTRUDES OUT INTO ROADWAY . SNOW PLOWS HIT WHEN PLOWING . I WAS TOLD THE "TOWN" WILL TAKE CARE OF THIS WHEN MENTIONED TO CONTRACTOR (THIS WAS PRIOR TO FINAL SURFACE BEING PUT ON ROAD — KUPCHUNOS DRIVE) . LAW OFFICES OF WA yNH CHRIS'FOP fiEiT GERLT MAY 2 n88 435 BUCKLAND ROAD " O.BOX 559 South Windsor SOUTH WINDSOR.CONN.06074 planning & Zoning Commissi0� WAYNE CHRISTOPHER GERLT TELEPHON D}4117G(2C}C�GH� (203)644.2565 May 6, 1988 Mrs. Marcia A. Banach Director of Planning Town Planning & Zoning Commission 1540 Sullivan Avenue South Windsor, CT 06074 Re: Rainbow Hills - Release of Performance Bond Dear Mrs. Banach: In response to Mr. Gantick's Field Review I submit the following: 1. The landscapers of the individual lots raked the yards down across the walks and left some stones, etc. in the area of the road shoulders. Either U & R or my development company will ensure that this is cleared up, but we don't believe new top soil will be needed in most areas. 2. Replacement of sidewalk sections damaged during the construction of houses will be done by U & R. 3. Same as Item 1. 4. I believe this item has already been corrected by the lot owner-builder who is responsible. 5. U & R will correct this item except for Lot 17 which is the responsibility of the owner-builder and I have notified him. 6. The paving company has been notified (Roncari) . 7. Same as Item 6. 8. Connecticut Water Co. notified on April 23, 1988 after I learned their company must perform the relocation of the water gates. 9. Same as Item 8 and driveway repair by U & R. 10. Same as Item 9. Mrs. Marcia A. Banach -2- May 6, 1988 11. Same as Item 8 but sidewalk repair by developer. . 12. Same as Item 8. 13. Developer. 14. Damaged by subcontractors and to be replaced by U & R. 15. C.A.T.V. was notified on 4/25/88. 16. The owner of this lot was notified by the developer by Letter dated April 287, 1988. 17. The developer will do this at conclusion of other items. 18. Developer's contractor will do this and was notified as early as February 5, 1988. 19. Same as Item 18. 20. Damaged by subcontractors and to be repaired by U & R or developer. 21. Responsibility of U & R. 22. Same as Item 18. 23. Developer. 24. Same as Item 18. 25. This is Town owned property as has been for a number of years, but Developer will work with the Town to address this item. 26. Developer. 27. Both C.A.T.V. and C.L.& P. have been called and asked to address this item. 28. Developer. 29. Developer will remove impediment to mowing, except riprap which is needed. Y: Mrsx. Marcia A. Banach -3- May 6, 1988 30. Developer and U & R will riprap the pipe outlet. 31. The material was approved by the Town Engineer at the time of its installation by the Developer's contractor. 32. Developer's contractor will do this and was notified February 5, 1988. 33. Same as Item 32. 34. Developer. 35. Same as Item 28. 36. Developer's engineers have been requested to do this since October of 1987, and merestones are being set. 37. Same as Item 36. As to the drainage complaints of some residents, I reserve my rights since I believe I have no legal obligation. However, with all rights reserved, I have discussed changes to the Lot 6 / 7 situation and Lots 2 and 3 with Town staff and I will now contact the builder and these lot owners. I cannot assume the responsibility for eliminating the complaints, but I will attempt to ease the ground water flow in cooperation with the builder and these lot owners_ Very truly yours, Wayne Christopher Gerlt WCG:mt cc: Honorable Raymond Hallowell, Jr. , Chairman TPZ Mr. Michael Gantick, Director of Public Works LAW OFFICES OF SEP 9 1988 435 BUCKLAND ROAD South Windsor P. O BOX 559 SOUTH WINDSOR, CONN 06074 Planning & Zoning Commission WAYNE CHRISTOPHER GERLT TELEPHONE xeumxxxxxx,xxx September 7, 1988 t203j 644-2565 x�S[9c�`�CkkRXxA"kRRx Mr. Ludis Upenieks, President U & R Construction Company, Inc_ 99 East Center Street Manchester, CT 06040 Re: Rainbow Hills Dear Mr. Upenieks: Enclosed herewith you will find a letter dated August 25, 1988 addressed to me from Michael J. Gantick, the Director of the Public Works Department. Enclosed with that letter you will find a letter dated May 3, 1988 addressed to Mr. Gantick by Harold R. Cummings, Esquire, a letter dated August 19, 1988 addressed to Mrs. Marcia A. Banach from Richard and Veronica Nowak, and a letter dated August 11, 1988 addressed to Dr. Richard Nowak from Paul S. Cianci, P.E. with a sketch appended thereto. It is becoming apparent that despite repeated assurances, no action has been taken to resolve the complaints of the residents of the subdivision. I understand that you believe the drainage problem of Mr. and Mrs. Harris to have already been corrected, but their Attorney apparently believes there is still a problem, and some action on your part to resolve that matter and clear up the misunderstanding appears to be necessary. As to the complaint by Mr. and Mrs. Nowak, that is a matter which only you can resolve. In the past, you and I have also discussed the situation on Lots 1, 2 and 3 which can only be addressed by your company. It is clear that under the State Statutes, subdivision regulations and the plans which were approved for the Rainbow Hills Subdivision, the responsibility for these matters is not mine but is yours as the builder of the homes. I am not privy to all of the various agreements and arrangements between yourself and the homeowners involved, but it appears that you should take steps to satisfy Mr. Gantick that you have done everything for which you are responsible, if that is to be your position. For my part, unless these matters are resolved quickly, I will leave the matter to be resolved between the Town of South Windsor, the homeowners and yourself. Sincerely, Wayne Christopher Gerlt WCG:mt cc: Mr. Michael Gantick, Director of Public Works Mrs. Marcia Banach, Director of Planning The Honorable Raymond Hallowell, Jr., Chairman, Planning & Zoning Commission �� LAW OFFICES OF WAYNE CHRISTOPHER GERLT 435 BUCKLAND ROAD P.O. BOX 559 SOUTH WINDSOR, CONN.06074 WAYNE CHRISTOPHER GERLT TELEPHONE XX'XKXXF)tXXXXX 12031 644-2565 x?tS�RR'JCC7cTY�R7[7ca[4Cac7PA'X ` Ty'�' September 7, 1988 '�' JEr �; } 9 1J�]8 � 1J8 The Honorable Raymond J. Hallowell, Jr. SOUth W ndsL)t Chairman, Town Planning & Zoning Commissioin Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re: Letter of Credit for Rainbow Hills Subdivision Dear Mr. Hallowell: Your letter of August 23, 1988 refers to a Letter of Credit in the amount of $15,000.00 with an expiration date on October 18th of each year. Your records should reflect that that Letter of Credit was released at the meeting on November 24, 1987. Enclosed is a copy of the release letter dated December 8, 1987. I believe the only Letter of Credit in place is for $50,000.00 and expires May 16, 1989. Thank you. , r d Very trul r r` W yne Ch 's op er Gerlt WCG:int Encl.. cc: Mrs. Marcia Banach, Director of Planning Mr. Michael Gantick, Director of Public Works M E M O R A N D U M September 29, 1988 TO: Marcia A. Banach, Director of Planning FROM: Michael J. Gantick, Director of Public Works RE: INBOW HILLS PERFO E BON FIELD REVIEW UPDATE Please be advised that this Department has field checked the subject project and the following items remain outstanding. 1 . Throughout the subdivision there are numerous areas in which the grading between the edge of curb and the sidewalk is not consistent with the Town's standard grading, i .e. grading is improper, area needs to be re-topsoiled and seeded ( free of stones larger than 1 1/2" and miscellaneous debris ) ; Lots 1, 2, 3 , 4 , 5 , 6, 7, 8, 12 , 15, 16, 17 , 18, 19, 20, 21, 22, 23, 24, 25, 26, 27 , 30 . 2 . Various sections of sidewalks in front of the following lots are cracked and require replacement of sections : Lots 6 , 7 and 15 . 3 . Water gate Lot 10 driveway to be cut out and brought to grade. 4 . Move cable T.V. box from in front of fire hydrant along Lot 3 . Hydrant operation inhibited by present location of utility. 5 . Trees planted between edge of curb and sidewalk in front of Lot 4 to be removed or relocated outside of street R.O.W. 6 . All catch basin sumps are to be cleaned free of all sand and debris . All storm drainage pipes to be flushed. (To be done under the inspection of Town) . 7 . All pipes in catch basins to be cut flush with walls . 8 . All catch basins to be repointed. Cement all spaces (CB at 7+10 right Windy Hill Road has space between CB to and first section of CB wall ) . 9 . Cul-de-sac banks on Kupchunos Drive to be loamed/seeded (stabilized) . 10 . 18 inch double Maple tree right side of Kupchunos Drive cul- de-sac to be removed along with dead fall within R.O.W. /Parcel "C" area. 11 . All construction debris along Kupchunos Drive cul-de- sac/Parcel "C" to be removed. All curbing to be backed up and graded per Town standards . 12 . Path to the detention basin to be stabilized. Present path is eroding. Process stone ( fine) rolled over existing material. 13 . Detention basin bottom and sides to be stabilized. All construction debris, stones to be removed from basin bottom and side slopes . Basin to be "dry" basin. 14 . Inlets/outlets to detention basin to be riprapped with approved material . 15 . Manhole #18 near detention basin to be repaired. 16 . Excess soil materials to be removed from site, area stabilized. 17 . Access to detention basin to be gravelled/stabilized; 6" process , 4" loam and seed. 18 . As-built plans are to be submitted. 19 . Subdivision to be pinned and monumented and appropriate certification of same submitted. In addition to the above noted items, there remains a drainage problem affecting several lots in the subdivision. Specifically, drainage from Lot 7 drains onto Lot 6 . Water is ponding on Lot 6 northeast of the garage, then overflows along the driveway, across the sidewalk onto the road. The severity of this particular problem is such that it has the potential to cause icing problems along the driveway of Lot 6 and the sidewalk and road in front of Lot 6 . A second drainage problem exists between Lots 2 and 3 and is the result of cumulative run-off from Lots 4,5,6 and 7 . This problem has resulted in a continued erosive condition along Lot 2 and 3 and a subsequent concentration of storm run-off across the sidewalk and onto Kupchunos Drive. It is imperative that the above two identified drainage problems be rectified prior to acceptance of this subdivision by the Town. Should you have any questions regarding the above matters please contact this office . MJG/pmm cc: P & Z File Engineering File t 0'V 8�4 y Towi 1. O-P SV rzm W O � c .a m w� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ����soe•c0�'� AREA CODE 203/644-2511 July 18, 1989 M E M O R A N D U M TO: Marcia A. Banach, Director of Planning FROM: Jerry C. Iazzetta, Town Engineer RE: Rainbow Hills Subdivision We have estimated the cost to the proposed drainage corrections to lots 6 & 7 , and lots 1, 2 & 3 . The proposed corrections are to install a yard drain between lots 6 and 7 , between lots 2 & 3 and between lots 1 and 2, provide pipe for connection to the existing storm water system, grade and restore the lots . The estimated cost of this work is $23, 000 . JCl/jsv cc: Michael J. Gantick, Director of Public Works t 0MM a OleSaa� ?&Z� wc~ 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074 r ~osoQ•co�'� AREA CODE 203/644-2511 October 19, 1990 Edward & Emilia Sabella 603 Sandstone Drive South Windsor, CT 06074 Dear Mr. & Mrs . Sabella: RE: Letter of October 17, 1990 In response to your letter of October 17, 1990, please be advised that the developer has been instructed to regrade the open area behind the 600 grouping. The regrading is specifically aimed at providing a positive drainage slope, thereby eliminating the present high and low spots which are collecting/holding water. The regrading at a positive drainage slope will allow surface water runoff to drain from the area into the detention basin, mitigating the saturation of the soil from standing water. Your concern about the erosion of the soil was discussed during the field review of the situation. To mitigate the potential for erosion, the developer was advised to utilize proper erosion and sedimentation control measures, i.e. mulch cover, haybale and/or silt fence check dams, until the area is stabilized. Typically, stabilization of grassed slopes which collect water requires periodic reseeding/stabilization until a full stand of grass is established. Therefore, some erosion is expected, but should be corrected by the developer until the area is fully stabilized. The Town will not accept the regrading until it is satisfactorily stabilized. I trust I have answered your questions . Very truly yours, Michael J. Gaimtick, P.E. "----'-Director of Public Works MJG/jsv cc: Marcia A. Banach, Director of Planning Jerry C. Iazzetta, Town Engineer i 10 N a��< .4 To_w� aps_aa� V&Uaot m 1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074 ��tioSOR-0) AREA CODE 203/644-2511 December 2, 1991 Mr. Wayne C. Gerlt, Esquire RECEIVED 415 Buckland Road South Windsor, CT 06074 DEC 3 1991 Re: Rainbow Hills Subdivision SO. WINDSOR PLANNING DEPL Dear Mr. Gerlt: An inspection of subdivision improvements for Rainbow Hills Subdivision has shown that some repairs are necessary. As these improvements are still under a maintenance bond, we request that you make the necessary repairs prior to January 24 , 1992 . The following is a list of these required repairs : Broken Sidewalk Slabs 11 Kupchunos Drive 40, 60, 74, 80 , 92 Windy Hill Differential Sidewalk Settlement 60 Windy Hill 50 Darlene ( 2 locations) On south side of Kupchunos, approx. 150 ' from Ellington Road Miscellaneous 1 . The trench patch in the Windy Hill cul-de-sac should be repaired/replaced. 2 . The elevation of the loam should be level with the sidewalk. 3 . The sidewalk at the Kupchunos cul-de-sac should be cleared of debris . Please have your contractor obtain a street excavation permit for the work on the patch on Windy Hill, prior to starting. If you have any questions, or require additional information, please call me at 644- 2511, Ext . 245 . Very truly yours, 4" 45�zt* Je iry 6ng- nee Iaz a, P.E. To JCl/jsv cc: Michael J. Gantick, Director of Public Works Marcia A. Banach, Director of Planning Melvin C. Stead, Supt. of Street Services A. Bowen Davies, Deputy Town Engineer