Loading...
HomeMy WebLinkAboutBurr Meadow Condos Phase II - 7k TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION August 101 1981 PLANNING AND ZONING SION ACTION THIS APPLICATION SHALL BE ACCEPTED BY APPLICATION # THE PLANNING AND ZONING COMMISSION AT RECEI`&M DATE: - THE REGULARLY SCHEDULED MEETING ON THE APPROVAL DATE: FOURTH TUESDAY OF THE MONTH. IT SHALL REJECTED DATE: BE SUBMITTED TO THE PLANNING AND RECEIPT # ZONING COMMISSION OFFICE ONE (1) WEEK PRIOR TO THE FOURTH TUESDAY. APPLICANT: Burr Meadow Associates, a Connecticut General Partnership ADDRESS: c/o 219 Griffin Road, South Windsor, CT. 06074 TELEPHONE # 644-2333 OWNER OF RECORD ON S.W. LAND RECORDS Charles S. Burr and Anthony D. Russo Burr: 48 Meadow Large, Manchester CT. 06040 ADDRESS:FRLtizsa.: 190 Old Stafford Roads Tolland, CT. 06094 COMPLETE DESCRIPTION OF LOCATION OF PROPERTY For description of parcel, refer to Schedule attached. For abutters within 500 feet, refer to Schedule B attached. All oth i information available in General Plan and Maps which accompany. ZONE MF-A NAME,. ADDRESS & TELEPHONE # OF PERSON TO WHOM CORRESPONDENCE AND INQUIRIES SHOULD BE DIRECTED: Raymond J. Alexander, 219 Griffin Road, South Windsor, CT. 06074 TELEPHONE # 644-2333 THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING) 1. Zone Change to Zone (public hear ing) RECEIVED 2. Filing for Subdivision AUG 18 1981 3. Filing for Open Space Subdivision (public hearing)SO. WINDSOR PLANNING DEFT. 4. Filing for Resubdivision (public hearing) X 5. Special Exception to Article 4-6 of the Zoning Regulations (public hearin 6. Site Development Plan 7. Removal of Sand, Gravel, Clay or Quarry Stone & Ore (public hearing) 8. Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND THE OWNER OF THE PROPERTY AND S D ALONG WITH THREE SETS OF PLANS BEFORE IT WILL BE ACCEPTED BY THE PLANNING AND NING 0 IO P =IC OWNER Charles S. Burr Raymo J. n er /Uenneral Partner OWNER Antyny Russo (over) 1 ATTORNEY'S CERTIFICATION OF COMPLIANCE BY APPLICANT I, Kevin M. O'Brien, as attorney for the applicant, Burr Meadow Associates, aConnecticut General Partnership, hereby certify, with reference to Burr Meadow condominium proposed on the southerly side of Smith Street and the easterly side of Clark; that: A. The applicant, or his assigns, shall comply with Chapter 825 of the Connecticut General Statutes; i.e., Connecticut Condominium Act, where such development is a condominium; and for other multiple- owner developments, the applicant shall provide to prospective purchasers, a public offering statement substantially conforming to Sections 4-103 and 4-104 of the Uniform Planned Community Act, as adopted August 1980 by the National Conference of Commissioners of Uniform State Laws, and as approved by the American Bar Association; and B. The applicant, or his assigns, shall establish the multi- family residential development's community association with documents in which the covenants, conditions, and restrictions will contain language which provide the same rights to dwelling-unit owners within any multiple- owner development as are provided to cooperative and condominium-unit owners under the Condominium and Cooperative Abuse Relief Act of 1980 (15 USC 3601-3616) . Certified at Manchester, Connecticut this 14th day of August, 1981. r By /'1. Kevin M. O'Brien, Attorney-at-Law 599 Main Street Manchester, CT 06040 646-3500 TABLE OF CONTENTS SUBJECT BURR MEADOW--ZONE CHANGE/GENERAL PLAN TRAFFIC IMPACT/BURR MEADOW OBSERVATION PIT AND PERCOLATION TEST DATA OUTLINE SPECIFICATIONS ' r r —' B U R R M E A D O W ZONE CHANGE/GENERAL PLAN Zone Reg. 4.6.4.9 B.3. POLICE & FIRE Fire Marshall, William Lannin% and Police Chief, William Ryan, have reviewed the project and have concluded that the project will have no adverse impact on their respective departments. Both officials have had correspondence with Town Planner, Peter DeMallie, that will support this representation. SCHOOLS Burr Meadow, with its sixty (60) , two bedroom units and thirty eight (38) , one bedroom units, will generate a projected 18 - 24 school age children. This number of new students will have no adverse impact on the South Windsor school system which has had a declining enrollment since 1976, as noted in the 1980 annual report. South Windsor Public Schools Population YEAR EI.E- JUNIOR HIGH MENTARY HIGH SCHOOL. 'TOTAL. _ 1976-77 (actual) 2314 1282 1182 4778 1977-78(actual) 2136 1261 1209 4596 1978-79(actual) 2009 1201 1194 4404 1979-80(projected) 1723 1206 1157 4086 1979-80(actual) 1897 1128 1159 4184 FEASIBILITY OF PROPOSED IMPROVEMENTS The site, with undulating terrain from Southeast to Northwest, lends itself very nicely to regrading and landscaping due to the lack of excessive grade changes. This also allows for good building placement with no problems relating to driveway access on the proposed road layout, designed to town specifications and standards. STREETS: Of the two (2) Town roads bordering the property, improvements will, be madeto Clgrk 5treet and Smith Street, upgrading the width and drainage requirements to Town standards w�i1c'c also includes the instal ation o curbing along the site frontage. STORM WATER DRAINAGE.:- . The off-side drainage areas that presently traverse the outskirts of the site will be maintained approximately in their present locations and in some cases will be enclosed in a piped system, discharging in the same locations as at present, with no increase in discharge. The on-site storm drainage will be collected in catch basins and piped to detention basins, located on the site. Any overland run - off from adjacent areas to the Southeast, presently discharging onto the site, will also be collected in one of the detention basins. The total combined discharge from all of the detention basins on site will not exceed the existing run - off from the site. Investigation has determined that there are no locations on site that would fit into the category of a 100 year flood plain..- - � UTIbIT� IES: Water is available at Pleasant Valley Road and Clark Street. The M.D,C. is presently making a study on the size and location of the mains. Electric power is available on Clark Street. The Gas Company is planning on servicing the site via Clark Street. The .sanitary se_wers._design plan has been submitted to the Town Sewer Commission and the main discharge line will tie in at the intersection of Clark and Smith Streets. This will be a gravity system. Telephone service will be provided from Clark Street. IMPACT OF THE DEVELOPMENT ON THE CAPACITY OF MUNICIPAL AND STATE FACILITIES STREETS: The planned improvements to Smith Street and the present traffic capacity of Clark Street, as described in detail in the traffic report, indicate very Little impact on the streets. DRAINAGE: With the use of on-site detention basins, employing a zero increase in run-off, the present off-site drainage system and the downstream structures will receive no adverse impact from the project. SANI3ARY SYSTEMS: The site is located in an area that is relatively under-developed and the sanitary waste discharge will have little impact on the Town sewage system. WATER SUPPLY: The M.D.C. is presently studying the area to determine the best service system to the site with a perspective on future growth. It is anticipated that the supplying of water service to the site will have no effect on"the Town's future plans. GAS, TELEPHONE AND ELECTRIC SERVICES ARE AVAILABLE: The Utility Companies are planning to service the site and it appears there will be no adverse impact on the present capacity of these utilities. OUTD22R LIGHTING: The planned on-site outdoor lighting will be sufficiently shielded and directed so as to not present any off-site nuisance. SEDIMENTATION & EROSION CONTROL: The general plan of development has taken into consideration sedi- mentation and erosion controls to insure the existing quality of discharge from the site. SOLI WASTE DISPOSAL: The units-will have their own trash rpneptacles within their garage Are and these receptacles will be placed out for collection a rivate firm. TRAFFIC IMPACT BURR MEADOW R A. HESKETH & ASSOCIATES, INC. 101 MILLBROOK COMMON-BLOOMFIELD,CT 06002-(203)242-7755 �- April 13, 1981 Mr. Joseph Russo Palmberg & Russo 522 Cottage Grove Road Bloomfield, Connecticut 06002 RE: Burr Meadow Clark Street @ Smith Street South Windsor Our File: 8132 Dear Mr. Russo: At your request we have conducted an investigation of roadway and traffic conditions on sections of Pleasant Valley Road, Clark Street, Smith Street and other local roadways in the Town of South Windsor. We have performed the study so as to provide you and your client as well as appropriate South Windsor officials with a document to utilize as a guide in determining t al traffic generation from a land use which provides fo 99 units of multi-family housing. The report presents the results of previous studies on the range of trip generation rates at similar residential land uses as well as the results of peak period counting programs at two existing nearby facilities namely the Pleasant Valley Apartments and Cinnamon Springs. The site proposed for development is bounded on the north by Smith Street and on the west by Clark Street. The southern boundary of the property is occupied by the Cinnamon Springs Apartments and other residential properties on Pleasant Valley Road while the east boundary of the site is the agricultural traffic studies traffic engineering traffic planning land used by the Hartman Tobacco Company. Figure 1 depicts the study area and its (relationship to area roadways . Clark Street is a north-south roadway with total length of two miles extending from an intersection with Chapel Road, Burnham Street and the Manchester Industrial Road at the Manchester town line northerly past Pleasant Valley Road, Smith , Street and Deming Street to an intersection with Ellington Road (Connecticut Route 30) near the Village of Wapping. Clark Street is a two lane roadway generally 22 ' to 24 ' in width serving predominantly single family and Agricultural land uses throughout its length. The road does serve as a distributor road for traffic orininating at the Cinnamon Springs and Pleasant Valley Apartments near the Smith Street and Pleasant Valley Road intersection. The roadway is posted at 30 miles per hour which provides for safe operations for traffic on the' bituminous surface which is in generally good condition. Speed signs and signs of warning of curves are frequent along the roadway and a oainted center line provides additional safety for traffic on this typical South Windsor roadway . Stop signs control traffic on Clark Street at Chapel Road and four way stops control operations at Clark Street and - Pleasant Valley Road. Smith Street is a two-lane roadway extending approximately one mile from its intersection with Clark Street easterly to an intersection with Buckland Road. Smith Street is 18 ' to 22 ' in width with a roadway surface in fair to good condition between Park Street and Wheeler Road one half a mile to the east, a section of road which serves as the northern boundary — 2 RTE. N� t *`,t4v vS%GNES i Vq M�t�y pN T / M CH4p .� v z RO / g6 / CD 0� FIGURE 1 TVRNp�KE STUDY AREA TRAFFIC IMPACT Np BURR MEADOW �.P F. A. HESKETH & ASSOCIATES, INC. 101 Millbrook Common BLOOMFIELD, CONN. 06002 of the property proposed for development as Burr Meadow. The north Oide of this street opposite the subject site is agricultural land in a RR urban classification. To the east of Wheeler Road, Smith Street is 22 ' to 24 ' in width serving primarily single family and agricultural land uses . Smith Street is posted with a' maximum speed of 35 miles per hour. P Wheeler Road is a short stretch of road extending from Smith St. southerly to an intersection with a recently relocated section of Pleasant Vailey Road. Thereo developed properties are oped n e l fronting on Wheeler Road which is only three tenths of a mile in — g Y le th, and which has a posted speed of 25 miles per hour. Pleasaint Vallee Road from its intersection with the former Burnhalm Street,, intersection near the J.C . Penney complex northerly was recently reconstructed as a modern two-lane roadway with curbing on both sides of the roadway to a point beyond Croft St. c �g � Y Y where the roadway j on alignment with a 22 ' to � Y rejoins its original g 24 ' roadway and a painted center line . Land use along the roadway is predominantly agricultural or residential except in the vicinity of the Clark Street intersection where the Pleasant Valley and Cinnamon Spring apartments occupy the roadway frontage. The ptincipal �driveway to those two facilities are lined up nearly opposi a each other so as to form a crossroad approximately 100011east of ',the Clark Street intersection. West of Clark Street Pleasant Valley Road continues to the Ellington Road intersection and to a junction with John Fitch Boulevard and continues west to Main Street. The area of roadway between Clark Street and Ellington Road is devoted to a medium density single family units 4 except 't for the � Barrington Estates Development. Pleasant Valle _. P p y Road is postediat 30 miles per hour but frequent stop signs are P q P g in pla0e such as at Tudor Hill Road and Northview Drive in addition to the four way stop at the Clark Street intersection. During the course of our studies we conducted a series of sam leliicounts of traffic movements in the study y area. Because of thej extreme light traffic volume ' — �y g u e currently utilizing Smith Street! we deci ed that a sampling program on that roadway would not be! too effective and that estimates of peak hour and average daily traffic on this street could best be developed by a study of movements on other more heavily travelled roadways supplemented i Y Y pP by an analysis of previous traffic count data conducted in this section of South Windsor. We did, however, conduct counts of both morning a d afternoon peak period traffic movements at the following locations: Clark Street, north of Pleasant Valley Road; ^, I Clark Street, outh of Pleasant Valley Road; Pleasant Valley Road, west of Clark Street; Pleasant Valley east of Clark Street; Pleasant Valle Road east of the drive to Cinnamon Springs and Pleasant Valley Apartments . In addition, we conducted morning and afternoon eak period counts for all driveways to both — Connamon Springs and Pleasant Valley Apartments . Table I presents estimates of 1980 average daily traffic as well as the morning and afternoon peak hour traffic on roadways in the study area based Ripon ana ysis of our count data and other count data available for this area. observations o traffic in the area indicates that virtually all 5 TABLE I TRAFFIC IMPACT — BURR MEADOWS EXISTING TRAFFIC IN STUDY AREA i LOCATION AVERAGE DAILY A.M. PEAK P.M. PEAK TRAFFIC HOUR HOUR Clark St.1 south o Pleasant Malley Rd. 800 130 90 Clark St.l north of PleasantlValley Rd. 600 80 80 Smith Street east of Clark Street 100 + 10 + 10 + Pleasant �Valle_v Rd. west of Wheeler Rd. 3500 350 300 Pleasant Valley Rd. west of dark St. 2850 275 250 6 traffic consis s of passenger vehicles and small trucks . Large trucks make up a very small percentage of the traffic and school -- bussesamount o less than 10 hourly movements on any roadway durin ithe period immediate) receedin anci immediate) following g p Y P g Y g school!. The s hool bus period is coincident with the morning peak i i _ hour blot occurs earlier than the afternoon peak hour. All inter- sectioins in tha study area are provided with stop signs on at -- least jone of t e approach roadways. "All Stop" control is in effecti at the Pleasant Valley Road, Clark Street intersection. Traffic operations on all roadways in the study area, including — the "ail1 stop" intersection, operate under conditions of free flow with little or no restrictions in mobility due to the presence of other vehicles. Drivers can maintain the desired speediwith little or no delay. These operations are in a category — described by Traffic Engineers as level of Service A and B. — Appendix A reproduces a description of roadway capacities and servioe volumes including a service volume for both Pleasant Valley Road and Clark Street developed for the Town of South Winds�r in 19 8 . Computations in that document would indicate that traffic perations on both Clark Street and Pleasant Valley — Road Ore at 1 vel of Service A or B. The s�te prop sed for development by Burr Meadow Associates (Fig+ 2) occupies land at the southeast corner of Clark Street and Stith Street with a frontage of 400 ' on Clark Street and 1100 ' on Smith Street. The proposed site is contiguous to the Cinnamon T Sprinajs development for 700 ' along its southern boundary. The plann�d development would provide for 99 one and two bedroom — RTE. c P t '004001 I'll, SM/T 50 N�llv J � �A ao FV T. = w Cti4p�C v / . z RO / 86 J FIGURE 2 �v�Np�KE SITE LOCATION TRAFFIC IMPACT BURR MEADOW PN� 10\0 F. A. HESKETH & ASSOCIATES, INC. 101 Millbrook Common BLOOMFIELD, CONN. 06002 I housing units in a proposed MF-A zoning district. 'tho most reliabl means f estimating traffic that would be C'xT'Nected at i a new land use ' s a study of that which has been recorded at similariland uses . In order to gain an understandin,j of the data presented ere two definitions are useful: A TRIP is a single r one direction vehicle movement with either the origin or destination (exiting or entering) inside the study site . The AVERAGE TRIP RATE is the weighted average of the number of trips per unit such as trips per dwelling unit. These are developed by averaging rates published in various studies by summing all trips and dividing the trips sum by the sum of the independent variable (dwelling unit) to obtain a weighted average . over 270 different studies of subdivisions containing single family homes have been made and published by the Institute of Transportation Engine�rs . ThE subdivisions contained a total of more than 111,000 individual dwelling units . Subdivisions were located primarily in suburban areas throughout the United States with a finding that the average trip rate for single family homes was 10 .0 tips per day . Townhouses and garden apartments generally show lower trip i generation rates per unit than that for single family housing. The In titute of Transportation Engineers data from 113 differ�nt studies indicate an average trip rate of 6 .1 vehicle trips per unit per ("tay .. The study data indicate's that condo- miniumo produce traffic at a rate of approximately five vehicle trips per dwelling unit per day. The ratios identified would indicate approximately 600 vehicle trips per day would be 9 • anticipated fo the Burr Meadows complex. Table II shows a summar� of rates developed for different types of dwelling units s published in the latest revision of the Institute of Tra sportat on Engineers study (February 1979) . That table llustra es dramatically that single family detached i housin� units generate traffic at a rate significantly higher than tat found at apartments and about twice that found at condominium housing. The total daily traffic expected from the development proposed at Burr Meadows is approximately 600 vehicle trips per day. Recalling that a trip is a one-way moveme t then the total traffic will be approximately 300 vehicles entering -she site and a similar number departing the proper y on a typical day . Peak hour movements would be expected to range from 50 to 100 total movements . During the course of our studies , in addition t4 the count of movements on Clark Street and Pleasant Valley Road, we made counts of all novements into and out of both the Cinnamon Springs and Pleasant Valley Apartments complexes . The results of those counts indicate that both Cinnamon Springs and Pleasant Valley are generating traffic at a slightly lower rate than would be expected from application of the data developed in the Institute of Transportation Engineers study. Peak hour movements at Pleasant Valley Apartments were recorded at 69 and 65 total movements during the a.m. and p.m. peak hours respectively. At Cinnamon Springs the total a.m. movements were 51 and the total two-w y traffic during the p.m. peak was recorded as 44 . Since there are a total of 142 apartments at Pleasant Valley, the 10 06 observed peak our traffic is at the low end of the expected range . Similarly with 102 units at Cinnamon Springs we would expect peak hour movement ' n the order of 50 to 100 vehicles . It would appear then that an analysis of Burr Meadow based upon 600 daily trips and 80 peak hour trips would be appropriate and would provide a conservative o "worst case" analysis . Figures 4 through 7 present the results of the counting programs at Plecasant Valley and Cinnamon Springs apartments . While It is impossible to accurately predict the directional dis- tribut on of traffic from a new residential community, a study of directional distribution of existing residents in the same neighborhood would provide the basis for judging the destination of new residents . During the afternoon counting programs we record ad the direction l)y which each of the motorists with a destination within Cinnamon Su rings or Pleasant Valley Apartments approach the neighborhood. The results of that data is shown in Table III . Ex ressed in terms of percentage it is found that 54% of all tra fic to and from the apartments has an origin on Pleasant Valle Road east of the area, 25% on Pheasant Valley Road west of t e area, 15% from Clark Street south of the area and 6% from Clark Street north of the area. A similar dis- tribution would be anticipated for the new residents with some traffic utilizing Smith Street for access to Buckland Road and others utilizing Wheeler Road to gain access to Pleasant Valley Road. An expected distribution of traffic from Burr Meadow then is sh wn on Figure 3 . Application of the directional distribution 11 J d daily volume of 600 and the peak _ from Figure 3 o the projected y hour of 80 wou d result in additional traffic on area roadways as shown in Tables IV, V, and VI . That data indicates that the projected increased traffic is not significant on any area roadway and wi 1' not result in a diminution of the level of service available to traffic on the roadways . As part of our study we reviewed the relationship between the site and the adjacent roadways so that we may recommend a location of driveways or points of access and egress between the property and public roadways . We recommend that the major drive to the facility be placed to Smith Street at virtually any location a minimum of 2001 from the Smith Street/Clark Street intersection. - Smith Street is a level tangent roadway so that there are no sight distance considerations required in placement of the driveway . A secondary drive or a drive for emergency access purposes could be made to Clark Street if the internal pattern was such as tc discourage its movement by substantial amounts of traffic. I appreciate the opoort,nity to present our analysis of traffic operations and our findings and recommendations with respect to the development of Burr Meadows . The undersigned will be available as may be necessary to present our findings to appropriate officials in the Town of South Windsor. Very truly yours , F . A. HESKETH & ASSOC,IATES, INC. Frede ick A. Hesketh, P .E . e -- TABLE II Sunrimary of Rate Tables of the Different Types of Dwelling Units. Type of Dwelling Unit Average Weekday►Vehicle Trip Ends per Unit Average Maximulm Minimum 210 Single-Family Detached Unit 10.0 21.9 4.3 220 A artment, General 6.1 12.3 0.5 221 w-Rise Apartment 5.4 5.5 4.7 222 H igh-Rise Apartment 3.7 6.4 1.2 230 C ndominium 5.1 9.4 0.6 240 Mobile Home 5.4 6.8 2.8 250 Retirement Community 3.3 4.9 ! 2.8 270 P anned Unit Development 7.9 10.0 6.2 Source: "Trii Generation - An Informational. ReOort" Institute of Transportation Engineers, j P.O. Box 9234, Arlington, Virginia 2220�, F�bruary 1979, Page 200 13 TABLE III TRAFFIC IMPACT BURR MEADOW DIRECTIONAL DISTRIBUTION OF TRAFFIC AR4IVING AT CINNAMON SPRINGS AND PLEASANT VA�LEY DURING P.M. PEAK HOUR ORIGI (DIRECTION OF CINNAMON SPRINGS PLEASANT V�LLEY TOTAL APPROACH) Clark Street north of Pleasant Valley 4 1 5 Pleasant Va ley west of Clark Street 7 14 21 Clark Street south of Pleasant Va ley 3 9 12 Pleasant Valley east of Apartments 20 24 44 TOTAL 34 48 82 14 RTE. c r t !0jgso% v�N �E M1T Sp NG�S Fy T. Ln . ctiq pF Q . C v 2 RO / 86 / CID �QP FIGURE 3 0 v�NP�KE DIRECTIONAL DISTRIBUTION TRAFFIC IMPACT BURR MEADOW PLO F. A. HESKETH & ASSOCIATES, INC. 101 Millbrook Common BLOOMFIELD, CONN. 06002 TRAFFIC COUNT GRAPHIC SUMMARY SHEET Pleasa t Valley Road @ Cinnamon Springs Pleasant Valley Apts . April 1.0, 1981 TIME 7 :00-8:00 AM DATE'--- -- - -- ---- --- ---- — - - -- - - - - - — - --- I NI O NORTH O r U j i 9 C99 199 - 210 34 .- ---336 348 25 4 ! 87 138 26 Pleasa t Valley Rd. �r O Ln 4j O R, v T rn T rtVI •AV, JJW *Shows combined n' I movements f r m both ! driveways from Cinnamon Springs on Pleasant alley Road. - Figure 4 F A f lesk th 88 Associates 16 TRAFFIC COIF T GRAPHIC SUMMARY SH ET Cinnamon Springs @ Clark Street LOCATION- DATE: April 8, 1981 TIME :7:00-8 :00 AM NORTH -- Clark Street "- 48 5 l 47 81 32 31 33 2 N �O •� ri 00 Figure 5 F A Hes eth Assmietes TRAFFIC COUNT GRAPHIC SUMMARY SHEET LOCATION:_ Pleasant Valley Road-@ Cinnamon Sq is & Pleasant Velle AQts DATE: April) ll, 1981 TIME 4 : 30-5 : 30 PM � A M CT r. - f4 NORTH Q'' �.. to 00 , N � cd 00 0 0 U N 2 9 91 - --- 135 6 -- 265 283 3 16 34 148 11 Pleasant Valley Road N N N II � N c 4J Sa I � I � I o Ln r-4 i � roll ) f^ •V *Shows combined movements ,-A T from both driveways from a Cinnamon Springs on Pleasant Valley Road. i h A 1 it.sk .th & Associlates Figure 6 18 t TRAFFIC COUNT GRAPHIC SUMMARY SH�ET -- Cinnam n Springs at Clark Street DATE: April 1, 1981 TIME : 4 : 30-5: 30 PM NORTH ., II IIII lark Street 2 23 04 27 3 81 82 5$ 53 55 2 N d' lD Ln I i T F A Hes eth & Associates Figure 7 - 19 I I . TABLE IV TRAFFIC IMPACT BURR MEADOW — TRAFFIC AVERAGE DAILYI EXISTING LOCATION EX NG PROJECTED TOTAL ADT INCREASE TRAFFIC Clark Street north of Smith Street. 600 36 636 Clar k Street south of Pleasant Valley 800 90 890 Pleasant Valley west of Clark Street 2850 150 3000 Pleasant Valley east of Wheeler oad 3500 240 3740 Smith Street east of Wheeler Road 100 + 84 200 + II - I T T T� III 20 nl� l I i -- TABLE V TRAFFIC IMPACT BURR MEADOW MORNING PEAK HOUR TRAFFIC 7: 00 - 8: 00 AM -- LOCATION EXISTING PROJECTED TOTAL TRAFFIC INCREASE TRAFFIC Street north of Clark St 85 Smith Street 80 -' Clark Street south of 130 142 Pleasant valley 1 -- Pleasant Valley west of 295 Clark Street 275 Pleasant Valley east of Wheeler Road 350 3i2 382 Smith Street east 4f 21 Wheeler Road 10 11 r- 21 I -- TABLE VI TRAFFIC IMPACT BURR MEADOW EVENING PEAK HOUR TRAFFIC 4 : 30 - 5: 30 PM l i LOCATION EXISTING PROJECTED TOTAL TRAFFIC INCREASE TRAFFIC Clark Street north of Smith Street 80 5 85 J Clark Street south of -- Pleasant Valley 90 12 92 Pleasant Valley west of Clark Street 250 20 270 Pleasant Valley east of Wheeler Ro d 300 32 332 Smith Stre t east of 10 11 21 Wheeler Road 22 T APPENDIX A - ROADWAY CAPACITIES AND SERVICE OLU ES FROM BURNHAM STREET TRAFFIC STUDY BY: CLOSE, JENSEN & MILL R OCTOBER 1978 i - I i 7CO Roadway Yleolffdlieij and 99eiv e Wlumen � The capacity of a roadway must be given not in one al solute value, but in several values, each of which represent varying levels of congestion, unstable flow aid operating conditions. These various levels called Levels-of-Service" P 9 -- A throu h F (as defined in the Highway Research Board, HIGHWAY CAPACITY MANUAL) are giv n below: Level of Service A describes a condition of fre flow, with low volumes and high speeds. Traffic density is low, with spee s controlled by driver de- sires, speed limits, and physical roadway icondi ions. There is little or no restriction in maneuverability due to the pr sence of other vehicles, and drivers can maintain their desired speeds with little or no delay. Level of Service B is in the zone of stablle flo, , with operating speeds beginning to be restricted somewhat by traffic onditions. Drivers still have reasonable freedom to select their speed a d lane of operation. Re- ductions in speed are not unreasonable, with a ow probability of traffic flow being restricted. The lower limit (lowest speed, highest volume) of this level of service has een associated with ervice volumes used in the design of rural highways. Level of Service C is still in the zone of stab a flow, but speeds and maneuverability are more closely controlled by he higher volumes. Most of the drivers are restricted in their freedom o select their own speed, change lanes, or pass. A relatively satisfacto y operating speed is still obtained, with service volumes perhaps suitablelfor urban design practice. Level of Service D approaches unstable flow, wi h tolerable operating speeds being maintained though considerably affected by changes in operating con- ditions. Fluctuations in volume and temporary Iestrictions to flow may cause substantial drops in operating speeds. Divers have little freedom to maneuver, and comfort and convenience are to;, but conditions can be tolerated for short periods of time. Level of Service E cannot be described by', speed_alone, but represents operations at even lower operating speeds than n level D, with volumes at r-- or near the capacity of the highway. At capacity, speeds are typically one' half the speed attainable at Level-of-Se M ce Ai. Flow is unstable, and there may be stoppages of momentary duration. Level of Service F describes forced flow operation at low speeds, where volumes are below capacity. These conditions usually result from queues r of vehicles backing up from a restriction downstream. The section under �- 16 i I tudy will be serving as a storage area during parts or all of the peak our. Speeds are reduced susstantially and stopp 'ges may occur for short r long periods of time because of the downstream congestion. In the extreme, ' oth speed and volume can drop to zero. The relationship between the service volumes at vario' s levels-of-service is given in the Highway Capacity Manual as follows: -- Level-of-Service E Capacity Volume evel-of-Service D 90% Capacity evel-of-Service C 75% Capacity evel-of-Service B 50% Capacity Level-of-Service A 35% Capacity Level-of-Service F has no service volume since this rj presents unstable flow and may actually result in zero flow (stopped condition). -- The ultimate capacity of a two-lane two-way rural roal, way under ideal conditions is 2,000 vph, total both directions. Two of the factors ich affect capacity are: Lane width and lateral clearances. LA NE WIDTH Ideal conditions include 12 foot wide lanes. Narrower lanes reduce capacity according to the following table: Lane Width F' Capacity .� ((Feet) % of 12 Foot Lane Capacity 12 100 11 88 10 81 9 76 r- LATERAL CLEARANCES A clear distance to side obstruction of at least 6 f et is necessary to obtain r-- ideal conditions. Lesser lateral clearances reduce capacity as follows: Clearance From Pavement Edge to Obstruction Capo ity of Two Both Sides (Ft) 12 IFoot lanes % of Ideal 6 100 4 92 2 83 0 72 17 I II i - Applying the above factors to the ultimate capacity of 2,000 vph, using the conditions given in s�cti on 6, results in the following practical capa i ti es: Burnham Street: (2000 VPH) x (1001) x (85%) = 1700 V H Total Both Directions 12-FT Lanes 22-FT Lat. _. Clark Street: (2000 VPH) x (85%) x (72%) = 1170 VPji Total Both Directions 10-FT Lanes 0-FT Clear Pleasant Valley Road:= 2000 VPH x (100%) x (85%) _ 1700 V H Total Both Directions -- 12-FT Lanes 2 2-FT Lat. These practical capacities result in the anticipated sl rvice volumes listed bel ow: TABLE 7-A SERVICE VOLUME (TOTAL BOTH DI RECT'I!Oi4S) Burnham Pleasant Clark Level-Of-Service Street Valley Road Str et -- A 590 590 410 B 850 850 5 0 C 1270 1270 8 0 D 1530 1530 100 E 1700 1700 1110 TABLE 7-B SERVICE VOLUME (ONE DIRECTI0M Burnham Pleasant Cla k Level-Of-Service Street Valley Road Str et A 295 295 21)5 B 425 425 290 C 635 635 Oil 5 765 765 525 i — 850 850 585 18 Due �o the deteriorated condition of the roadway pavements, and the total — lack of a y sideaialk in this area, the values given in Tables 7-A and 7-B should be interpret d as absolute maximum values for each level-of-s rvice. — T T I� T- 10 T 4+ APPENDIX B TRAFFIC COUNTS PLEASANT VALLEY ROAD AT CLARK STREE r-- I ' { TRAFFIC COUNT GRAPHIC SUMMARY SHEET LOCATIO : Pleasant Valley Road @ Clark Street! DATE: April 8, 1981 TIME 7:00 - 8 :00 AM M co NORTH N Ln M r-I �D tnl 15 T 165 145 --- 242 5 -- � 26 336 13 102 79 94 2 Pleas Ant Valley Road \ N M N N 00 M T— Q� �1 b ! F A lie.keth 8 Associates APPEN ' IX B-1 TRAFFIC COU T GRAPHIC SUMMARY SH ET 4 LOCATION: Pleasant Valley Road at Clark Street April 11, 1981 4 : 30 - 5 : 30 PM DATE_-- -- - --_-- - - - - ---------- ------ - -- --- - --�-- TIME - -- --- - --- co ._ 4J a� NORTH �I 4J l0 Ln N Ln �4 r-1 i VI o rn �D N N T \ 12 99 82 99 5 247 265 9 148 123 166 T 34 Pleasant Valley Road Ln Ln H r--4 T co N l0 Lt T co T� APPEN IX B-2 F A Heskleth & Associates i I aein�ez & LAND SURVEYORS & ENGINEERS P.O. BOX 492 - BLOOMFIELD. CONNECTICUT 06002 - (�03) 24 2775 OBSERVATION PIT AND PERCOLATION TEST ATA LATE: Ito S-6 O OWNER: ��, x A�'aE� � ADDRESS -- J. 2 ss o 3ST OBSERVED Y:€�151�.es><2 RZ. m,� LOCATION OF LOT: " 2MgkDows- CLAIM �'. so 3SERVATION PIT # 1. %-)TAL DEPTH (o INCHES SOIL CHARACTERISTICS: r )P OF GROUND TO WAS s°o L WAS GROUND WAT R ENCOUNTERED: YES NO rr TO 1 rr DEPTH TO GROUNDWATER: e4-" .. 8 4 Som _ Io,4 do 5 41`'D / ".Drrw ANY SIGNS OF M TTLING: YES NO TO 3 " A Tit Ac F. F C c ay, SIj.Tr s.c�a / -- �� TO " wety� CZ DEPTH TO ?4OTTL NG: INCHES TO 4946 " C L Ay WAS LEDGE ENCOUNTERED: YES NO DEPTH TO LEDGE INCHES RELATIONSHIP BETWEEN GROUNIMTER OBSERVED AND MAXIMUM GROUNDIdATER FOR AREA: 4' Y OTHER FACTOR WHICH MIGHT INFLUENCE OPERATION OF FI D: PERCOLATION TEST: I7:PTH OF TEST INCHES LENGTH OF PRES AK: 14INIYM4 UNIT PERCOLATION RATE: MIXIINCII I AREA SUITAIEE FOR ON-SITE SEWAGE DISPOSAL AT THIS T ME: YES,NO i i LAND SURVEYORS & ENGINEERS P.O BOX 492 - BLOOMFIELD, CONNECTICUT 06002 (20 ) 242.2775 -- OBSERVATION PIT AND PERCOLATI N TE T DATA DATE: I Z'S-8 OWNER: A L E x A*b E�2, - - - ADDRESS .J. f�.S:c o TEST OBSERVED BY: ,aEsE,c, LOCATION OF LOT: ��� 9p e 5�-. S.' LZ,A.) OBSERVATION PIT # -- TOTAL D127" I 0 Z- INCHES SOIL CHARACTERISTICS: TOP OF GROEND TO 17- -s 1 r , WAS GROUND WATER ENCOUNTERED: YES NO FiN6 5.�vo/ 1 Z " TO %156 DEPTH TO GR UNDWATER: la2z" 3( " TO 7 Z_ " ANY SIGNS MOTTLING: YES -- -T Z " TO 102- " C!LA DEPTH TO MO ING: INCHES " TO f' WAS LEDGE E COUNTERED: YES NO DEPTH TO LE E: INCHES RELATIONSHIP BETWEEN GROU1494ATER OBSERVED AND 14AXIMI,7 GROUNDWATER FOR AREA: T ANY OTIAER FACTOR WHICH MIGHT INFLUENCE OPERATION OF FIELD: _ PEiiCOLATIO TEST: DEr ITH OF TEST: INCHES LENGTH OF P SOAK: _ IiINII•JIUM UNIT PERCOLATION RATE: MIN/.NCH IS AREA SUITABLE FOR ON-SITE SYdAGE DISPOSAL AT THI TIME: YES,NO i I ,�aeitz�ez 8c. �i 2�a�d LAND SURVEYORS & ENGINEERS P.O. BOX 492 - BLOOMFIELD, CONNECTICUT 06002 - Q03) 242,2775 -- OBSERVATION PIT AND PERCOLATION T SST DATA LATE: IZ-S- 80 WNER: ALExAWl>eC, Vi�-- ADDRESS .3, TZ"vsso 7 ,ST OBSERVED : IE. ICA]jsjEC 2. 1,1og LOCATION OF L : Zortm EADac•>s4 0 G.A2t:. ST. S. �LADIPJ;>501r__ C 6ERVATION PI # 3 79TAL DEPTH jopl& INCHES SOIL CHARACTERISTICS: SlAry XORAJ 7, 1P OF GROUND 0 12- "rTb Pso i` WAS GROUND WATER ENCOUNTERED: YES N 0 Z " TO 1 O " QR C�,p DEPTH TO GIROUN WATER: " TO " ANY SIGNS �OF M TTLING: YES NO " TO " DEPTH TO MIOTTL NG: INCHES " TO " WAS LEDGE ENCOUNTERED: YES NO T DEPTH TO LEDGE INCHES RELATIONSHIP BETWEEN GROUNDdATER OBSERVED AND MAXIM GROUNWATER FOR AREA: A Y OTHER FACTOR WHICH MIGHT INFLUENCE OPERATION OF FI D: P'hRCOLATION TEST: D PTH OF TEST: INCHES LENGTH OF 'PRES AK: RATE: MI I N C I�IINIMUI�i UNIT PERCOLATION I7 AREA SUITAELE FOR ON-SITE SEdAGE DISPOSAL AT THIS T ME: YES,NO i r-- l all �cicda LAND SURVEYORS & ENGINEERS P 0 BOX 492 BLOOMFIELD, CONNECTICUT 06002 F (203) 2 2-2775 OBSERVATION PIT AND PERCOLATION (TEST DATA DATE: IZ-S-ft OWNER: A1.Ex AWDGe. de. ADDRESS 'TEST OBSERVE BY:, g,, KA F p T. M, I � LOCATION OF LOT: K. MgIca C L A rt 1� T, OBSERVATION PIT '# ,TOTAL DEPTH 120 INCHES SOIL CHARACTERISTICS: it S/4 �o��►-� rOP OF GROUN TO 1Z Q,�_ WAS GROUND WA ER ENCOUNTERED: YESQ n u C.1AI/ I Z TO 3 Sow sp�p DEPTH TO IGROUI DWATER: " TO IO " MOP- s&ro t> ANY SIGNS OF OTTLING: YES ONO TO I Z " C LA DEPTH TO MO ING: INCHES " TO " WAS LEDGE ENC IINTERED: YES NO T DEPTH TO 'LEDG : INCHES RELATIONSHIP BETWEEN GROUNUdATER OBSERVED AND MAC MUM GROUNDWATER FOR AREA: NY OTHER FACTOR WHICH MIGHT- INFLUENCE OPERATION iOF F ELD: .ERCOLATION TEST: IEPTH OF TEST: INCHES LENGTH OF PRE OAK: MINIMUM UNIT PERCOLATION RATE: MIX/IN H 7 S AREA SUITABLE FOR ON-SITE SEWAGE DISPOSAL AT THIS IME: YES,NO f i II I �eilt�eZ & LAND SURVE"ORS & ENG NEERS P.O. BOX 492 • BLOOMFIELD• CONNECTICUT 06002 (203) 242-2775 1 OBSERVATION PIT AND PERCOLATION TEST DATA DATE: t 2 S•9 0 OWNER: A l.[XA N c>E CO. ADD1R'ESS S, fC�sso TEST OBSERVED BY: E. A 2: ► ► LOCATION OF LOT: " T3ue� C L*W- Srt: S, eo OBSERVATION PIT # S TOTAL DEFTH I Z 6 INCHES SOIL CHARACTERISTICS: TOP OF GROUND TO ! $ " "1"b PS o i` WAS GROUND WATER ENCOUNTERED: YES,N( T 7. " SA►�a � cam,irk. DEPTH TO GROUNDWATER:. LD6Y' C LA et.4y /l,.7lr.V '4Z " T �" S � s,4�n ANY SIGNS OF I!'IOTTLING: NO " T 3 z " C° L. DEPTH TO OTTLING: 30 INCHES " TD WAS LEDG ENCOUNTERED: YES NO DEPT�i TO EDGE: INCHES RMATION HIP BETWEEN GROUNDWATER OBSERVED AND WIMUM GROUNDWATER FOR AREA: Li ANY OTHER FACTOR WHICH MIGHT- INFLUENCE OPERATION OF FIELD: T PERCOLATION TEST: T TES • INCHES LENGTH 0 PRESOAK: DEPTH OF TEST: 1•iINIMM4 JNIT PERCOLATION RATE: � N/INCH IS AREA 3UITABLE FOR ON-SITE SEWAGE DISPOSAL AT HIS TIME: YES,NO i i `- LAND SURVEYORS & ENGINEERS I P.O. BOX 492 • BLOOMFIELD, CONNECTICUT 06002 . (203) 2 2.2775 OBSERVATION PIT AND PERCOLATION TEST DATA DATE: IZ-S- 6b OWNER: fr Lzx A N fljEjc R:. ADDRESS -'PEST OBSERVED BY: , e ,eE �E'SE LOCATION OF LOT: �� J3u�rt E,�ao�s '' C Ate srt, - OBS ERVATI ON P T # .-TOTAL DEPTH 1 I INCHES�-- I HES 30IL CHARACTE STICS• SOP ROUND F G T 0 0__� WAS GROUND WATER ENCOUNTERED: YES N " TO I " Fi n0 F. 5!A M p DEPTH TO Xi GROUNDWATER: - " TO " ANY SIGNS OF I TILING: YES NO - " TO " DEPTH TO �OTTL NG: INCHES TO " WAS LEDGE ENCO TERED: YE NO qo DEPTH TO KEDGE INCHES RELATIONSHIP BETWEEN GROUNDWATER OBSERVED AND MAXI M GROUNMATER FOR AREA: ,NY OTHER FACTOR WHICH MIGHT INFLUENCE E • OPERATION ��' FI D. .ERCOLATI ON TEST: -EPTH OF TEST: INCHES LENGTH OF ]ORES AK: 14INIMUM UNIT PERCOLATION RATE: Ml�/INCll 3 AREA SUITABLE FOR ON-SITE SEWAGE DISPOSAL AT T41S TIME: YES,NO ,��zeitt�e� & i GGd C1 LAND SURVEYORS & ENGINEERS P.O. BOX 492 - BLOOMF'IELD, CONNECTICUT 06002 - (�03) 242 2775 OBSERVATION PIT AND PERCOLATION T ST ATA LriTE: IZ-S-So WIJFsR: A)..E1CRfoDE2_ . ADDRESS 5 sT OBSERVED Y: F, s���. ►.moo LOCATION OF LOT:_10 urt2. Ac>oLlo.s C! L.piP_< ( ZERVATION Prr # 7 TOTAL DIEM 107- INCHES SilL CHARACTERISTICS: ,f SANDY TPsor`/ WAS GROUNDWAY ER ENCOUNTERED: YES ?r 0 7�P OF GROUND 0 � w+�oK���.Ay CAA tairr I s�"— 30" Sc+ uOAS f�'1ois--' 1 Z " TO 18 " ,� oLc S�gN� DEPTH TO GkUN WATER: I o r TO12 A SIGNS MOTTLING: N 0 C L Ay TO 102. Z-ie.Qc -of A YA DEPTH TO M�OT` L NG: �_ INCHES " TO It WAS LEDGE ENCO TERED: YES NO DEPTH TO LEDGE: INCHES RMATIONSHIP B TWEEN- GROUNDWATER OBSERVED AND MAXISGROUNDWATER FOR AREA: A Y OTHER FACTOR WHICH MIGHT INFLUENCE OPERATION OF FIELD: - PLRCOLATION TE T: D'7FTH OF TEST: INCHES LENGTH OF PRESOAK: ]UNI1✓,U4 UNIT PERCOLATION RATE: MI ZINCEI ^ I. AREA SUITA E FOR ON-SITE SWAGE DISPOSAL AT TH 'S TIME: YES,NO u-5ATr.e t%.�lAArS OpSS>Er�u6p AT ' W A S w a � r it I R April 13 1981 BURR MEADOW South Windsor, Connecti pt Owner: Burr Meadow Associates Architect: King-Architects South Windsor, Connecticut Avon, Connecticut OUTLINE SPECIFICATIO DIVISION 1 - GENERAL REQUIREMENTS, GENERAL CONDITIONS The General Contractor is to carry liability p' sura ce and performance bond; too abidee with a aws, codes, and ordinances; is to provide field office with telephone, heat, and fire protection. H will be using AIA General Conditions A-201 . DIVISION 2 - SITEWORK — Refer to General Plan of Development Plans an Docu ents ._ DIVISION 3 - CONCRETE Concrete strength as follows: _. Construction Element Maximum Slui no Oinimom Slum Footings 5 inches 3000 Walls (protected from weather) 4 inches 3000 Interior slab-on-grade 3 inches 3000 Exterior slab-on-grade 3 inches 4000 Concrete exposed to weather 4 inches 4000 — Structural system: Main floor, slab-on-grade,' 4 in hes concrete, with 6x6 #10/10 FWM. Slab perimeter insulation, 2 inchet rigid insulation under entire slab. DIVISION 4 - MASONRY 5 - METAL DIVISION _ S � Lintels: Steel lintels as noted on drawings. Outline Specification Burr Meadow -2- April 13, 1981 DIVISION 6 - WOOD AND PLASTICS Framing: Nos. 1 & 2 West Coast fir, spruce, 6em-f7. with F=1200 psi . Sills: 2x4; studs 2x4, 16"o.c. H aders: As noted on drawings S eathin : 3/8" plywood Roof: Trusses 24" o.c. E terior Siding: Vinyl (R factor of 0.61 ) E terior Trim: Western Red Cedar, D or bette I terior Trim: Nos. 1 & 2 grade common pine DIVISION 7 - THERMAL AND MOISTURE PROTECTION Concrete slab-on- rade, 6 mil polyethylene vapor ba rier E terior walls behind 1/2" gypsum board) , Kraft pa er with reflective foil _. face. T ermal Insulation: Exterior walls: 3-5/8" -'iberg ass batts in stud wall aid 1/2" foamboard on interior surface. Ceiling be ow roof: 9" fiberglass b tts between joists, or 9" minimum loose blo in in. R ofin : Asphalt shingles--rectangle seal tab 235# UL class C on 15# felt. S eet Metal. 16-gauge copper flashing at int rrsect on of roof and vertical s rfaces. .019" aluminum at head of doors, w ndows and vents. .024" alum- ._ i um gutters. .032" prefinished caulkings. Caulking: To be nonhardenin and nonshrinkin acr is latex. 9 � Y DIVISION 8 - DOORS, WINDOWS, AND GLASS -- Windows and Frames: Aluminum casement windows, fac ory-glazed, with 5/8" insulating glass. Glazing: Fixed glass 5/8" insulated. Siding: Vinyl clapboards. Doors and Frames: Exterior: Front doors 1-3/4" solid core, raised panel', wood, stain. Rear doors 1-3/4" solid core wood paint or jnsul ted metal . Exterior gliding doors aluminum, with 5/8" , insul ting glass. Interior: Interior doors 1-3/4" hollow co . Closet doors bi-folding, prefinished wood paint . Storage doors 1-3/4" solid core wood paint 1 -- Outline Specification Burr Meadow -3- April 13 1981 Division 8, Continued: l ._ Finish Hardware: Exterior and interior: Loc 4ets rass finish; window hardware by window manufacturer; cabinet hardware by cabinet manufacturer. Brass apartment numbers. -" W atherstri in : Windows, wool pile. Exterior do rs neoprene.P �4Thresholds, aluminum. — S reens: Prefinished aluminum frames with a mi u nu wire mesh by window w manufacturer. DIVISION 9 - FINISHES G ade material , ater al , and thickness of all interio sheal�,�hing to be as follows: 1/2" gypsum board on foil-faced vapor barrier on 0/2" Foam board (exterior walls. -- Water-resistant gypsum board in bathroom. Fire rated gypsum boards at party walls andifurnice room. 1/21' or 5/8" gypsum board--all other inter dr wa is and ceiling. Painting: Exterior I terio Wood trim--semi-transparent exterior W od--1 coat primer, 1 coat stain, 2 coats. s ri-gl ss latex Vinyl factory finish. Metal--' coat'i metal primer, one No masonry. coat se i-globs latex W Ils-- coat primer, l coat s Mi-gl ss latex Kitchen and Both--vinyl wall c vleri n Tile and Ceramic Bathroom Accessories: Material Location Floors Walls Kitchens V.A. Tile See above — Baths Sheet Vinyl .090" orlon $ee above Other areas Carpet See above Bathroom Accessories: Glass/toothbrush holder, oilet � paper holder, 2 towel bars, and 2 soap dishes in each- bathroom. Resilient Flooring: See above. 4 -- Outline Specification Burr Meadow -4- April 13, 1981 DIVISION 10 - SPECIALTIES Medicine Cabinets: Prefinished steel , 22" x 10", f ush-mounted: One per bathroom. Mail Boxes, Package Receivers: U.S. Postal Service*proved. Packaged Incinerators: None DIVISION 11 - E UIPMENT _ Refrigerators: 12 cubic feet, electric, with �,sleparilte door for freezer. K tchen Ranges: 30-inch gas, front controls, all wits. Kitchen cabinets: Wall units to be wood, with a factory finish. Base units to be wood, with a factory finiO 'T Counter top and backsplash material to be flasti laminate on particle board. Other Appliances: One each per apartment: Garbage disposer Dishwasher Clothes washer and drier DIVI ION 12 - .FURNISHINGS W ndow shades or blinds by .Owner I, I DIVISION 13 - SPECIAL CONSTRUCTION Incinerators to be job-constructed. DIVISION 14 - CONVEYING SYSTEMS None. DIVISION 15 - MECHANICAL .Plumbinq and hot water supply: Sink: SS 25"��x 21"��with mix faucet and sp ry. Lavatory: 19 x 17 vitreous china (count ). WaterCloset: Tank-type Bathtub and Shower: One piece, fiberglass, T Ilk L Outline Specification Burr Meadow -5- April 13, 1981 Division 15 Continued: � I Soil Lines: Cast Iron Waste Lines and vents: PVC or ABS Water Lines: Hard drawn copper, Type L Gas Lines: Steel Standpipes: Black steel -' Domestic Water Heatin : Individual hot water' heate s in each apartment, capacity- 60 GFM electric). Insulation: 1/2" fiberglass insulation onllWater pipes. Heatin : Hot water system, gas. Calculated pad t be determined. Room heating units o be baseboard. Temperature c htrols in ach apartment. Ventilation: Toilet and kitchen exhaust. ._ 'r i _ i Condition ng Self contained units, AC sleeves provided. AC units by Owner.^ Gas: Yes. Sanitary Sewerage to be on the municipal sewerage s stem. — DIVISION 16 - ELECTRICAL Electric Wiring: Wiring to be Romex. Each allrtme t to be individually metered, with space conduits for future load. , Site will have a motor antenna system and a smoke detector in each aO4rtme t. Electric Fixtures: Fixtures included for eaci, apar ment: Exterior street and walk lights, semi-recessed wall and ceili lig is in vestibules, 2 lights in car barn, 1 exterior light for de-_1or atio, ceiling and cabinet florescent in kitchen, 2 wall incande cent n living room, 1 flor- escent in bathroom, 1 recessed fixture in hal ' and each for stairwell . 1 florescent in laundry, 1 wall incandescent in bed oom, 1 doorbell . — Primary service will be underground, connecte�'ito p le lights and bollard lights. Charles . King, AIA I 2. Developers Permit — Burr Meadows — Raymond Alexander Mr. haw said the W. P. C. A. received a letter' fromIBurr eadows requesting the tatus of the Developer' s Permit that we di�scuss d con erning this projict. He said the developer lowered a section of gravi y line on Clark Street and put a small line along Smith S�treet� H aid they were requested by the Town to make these improvement li not onl; o handle their own project but to handle projects upstream. �r. Sh�w sai Mr. Alexander reque-sted a Developer' s Agreement which would help t reco er their costs. Discussion followed. Mr. Carino asked that this item be placed on t nex agen a for the first meeting in September and that the commis ironer revi w the Deve' oper' s Permit in the rules and regulation band ry to determine any -inadequacies that it might have and how we�,,can c ange it. MOTION TO GO INTO EXECUTIVE SESSION DIS USS PENDING CLAIMS Tabl ed. (J) ADJOURNMENT ino.1 Mr� Gilsenan seconded the Mr. Cottle made a motion to adjourn the meet in n. Motion unanimously carried. Meet ng adjourned at 9:05 P. M. - Verk Mark A.� IPetei-son, Secretary onfz, pow N r�� COY ap s - �� 1540 SULLIVAN AVENUE - SOU -I WIN SOR. ONN. 06074 �.yosQR.�o�,-- - AREA RE 2 3/644- 511 Apri� 22, I1981 jeo:Raymond ado:iws Associates J. Alexander 219 Gk'ffin Road South ?indsor, Connecticut 06074 CERTI 4AIL Dear Sir: At the April 20, 1981 meeting, the Sol,uth 1t inds r Inland 11 etlands Agency granted a permit with conditions for yoor Application No. 177, to re grade and fill a portion of the site for ulti family development, and construction of detention and pond are4spo property 'located at intersection of Smith and Clark Streets, S uth 'r�ind or, Connecticut. - on the plans dray b I Palm erg & Russo, The o„rmit is based p �� Y g entitled "General Plan of Development, " dated Aril 14, 1981; and "Inland Vietlands" , dated April 1, 1981, roviseo April 13, 1981. The following conditions must be adhered o for this permit to be valid: 1. A Conservation Plan shall be submitte ,and approved by the South Windsor Conservation Commis ionlprio to any construction. This plan shall include the sequence O f events for seeding, plantings, timing, etc. Also ero ion and sedimentation con- trol measures to be employed during construction. The proposal is subject to the a0rovca 1 of the Town Engineer. The applicant shall indemnify and hol har mess the Town of South Windsor against any liability W ich ight result from the proposed operation or use. 4. The permit is valid for one %rear and J,,hall expire if not exercised within that period. Ver trul yo s, I �L41 ND -1E AND AC►�NCY TO-:'i•; OF S U1H '11I N DSS 0R CE:c CC: age 2. vr&emo from TOWN HALL SOUTH WINDSOR, dONN. 06C 74 I ; TO peter DeMallie ATE 8/3/81 D rector of Planning S uth Windsor Town Hall S uth Windsor, Conn. 06074 L --� SUBJECT:T. Burr Meadow Condominium Project Y I have reviewed two Street names� subm' ted to m by R y Alexander for the Burr Meador Con i mn um P oject. T e names Misty Meadow Lane and Sprin Mea ow R ad are a ceptable for this project. '. NNIN ► Doi. � Sp, �'�1N�S0R p� � � • t Wil iam R. Lanning I Fix Mar_hal EAT HARTFORD, CT 061 la DATE -- / ---_-_--_—._- To Phone 644-2333 r-- -n . . _ � . i n�• , -� T 0_/?S 1540 SULLIVAN AVENUE • SOUTH WI DSOR. ONN. 06074 �tiaS0 .0 � AREA CODE 21 3/644 2511 August 6, 1981 Mr, Raymond J. Alexander 219 Griffin Road South Windsor, Connecticut r D a Alexander: e i I have received your plans of solid waste storage and -, emoval for the proposed Burr Meadow Condominium Project. i I am in agreement with your plan considerations in tha individual units are preferable to several large units for the reasons you have stated, and I fully approve of the plan considerations , Very truly ours TOWN OF SO H WI�TDSOR I Robert Dept a, anita ian RD/m cc: veeter R. DeMallie, Director of Planning Marshall Montana, Planning and Zoning Commis ion hair person ' I I i i , 1 D '=urr I~'. adow As snciat.es Ra.,jmond Ale. anger -S EP -1 9 Griffin Road mouth ' indsor, Connecticut 06074 SpR PLANNING DEPT• S0. IND Y . Marshall T,:ontana, Chairperson }'lanni g and Zoning Commission 1 r!�0 Sullivan Avenue South Windsor, Connecticut 06074 `'eptem er 25, 1981 Re : Burr Meadow Condominium, Compliance of .utu e design c onsiderations . i Dear M4s . �"ontana, Certain of ,the design considerations , as pr scri ,ed by the Elan- ning arid Zoning Regulations, cannot be logicallyidemonstr,,jteO within the context of the Site Plan/Special Exce ticn P pplicaticn documentation. This letter is to define thbse c nsiderations and indica e our awareness of, and intent to meet erexceed the stand- ards s t by them. The considerations addressed are : 4.6.4. . E. Noise Control will be depigned to m' et some of the highest standards in the , industry today. All walls , ceilings or floors contiguous to adjacent dwelling units shall have a minimum STC ati g of 45. Please note that all units have , private me ins of egress , thus no common entries ekist. 4.6.4. F. Shock Mounting requirements will be coordinated between the Building Cfficial and t e Project Fech- anical Engineer. 4.6.4. I . Handicapped Access has been conside' ed and designed into the project. Four units have een designated for handicapped modification in acc rdance with the provisions of the Connecticut Basic Ruilding Code. 4.6.4. K. Building Insulation shall meet Dr e teed the thermal. provisions of this paragraph arid th requirements of the Connecticut BaSic 'Buildipg C de. Insulation used in sound control systems may v ry from the material implied in this paragraph i.e, fiberglass batts) , however, the resulting yst m will attain the required rating. i i 4.6.4.5. C., Utilities . The proposed project is serviced br, the required operating public utilities,. A. Water is provided by ,the Mebrop�)litan District Water Bureau. 1 . The fire protection sy tem will be privately owned but maintained th FIDC on an annual fee basis paid by the owne -. This is in accordance with the Y : po icy. 2. Domestic water will be sinl.le metered at the property line. Water chares will be paid by the owner. Water service ill be provided from the domestic mainvia individual unit lines with exte for shut o fs (curb box) . B. Electricity P Y is provided b he onne t;icut LiFrht. and Power Company. Unitc will e i divi ually met:erecl . To the extent that one can cont of tuch iatter'Q , the meters will be located i mech ica ly and aestheLicall,4 pleasing locations . Ele trici wi 1 be utilized for domestic hot water, cook ng and hea ing, ventilating and air conditioning via 'heat 4.Aimpsj, C. 'telephone and cable television will be provided to the units on an individual basisland metered accordingly. 4.6.4 4. G. Prohibited parking shall be pr cri ed in the Assn- ciation Rules when they are drawn. The owner shall limit the number and size of commercial ehicles that may be parked on the site by unit owners, Very uly� yours , II I Raymo 4,.xander I i I I I I I I Burr Meadow Associates I ,"taymor d Alexander �19 Griffin Road ri South iWindlsor, Connecticut 06074 IV!s. Marshall Montana, Chairperson Planning atnd Zoning Commission 1540 ulli}van Avenue South Windsor, Connecticut 06074 September 25, 1981 j Re : urr 'Meadow Condominium, Zone Change lan � s. lite Plan` pedal Exception I Dear Ms. Montana, i With few exceptions, this project has rem 'nedjcons stant with the p an resented for the zone change. The p1 n has been refined techn cal Y to reflect the concerns of the Cormission and its staff The m)st prominent difference betwee the two lans is the unit mix. The revised mix falls within t e re ire ratios thus gomplying with the regulations. - UNIT MIX - Townhouse FT lat Loft Total 2 B 2 Br 1 Br Zone Change Plan 20 24 14 98 Special Exception/Site Plan 40 26 0 98 The miix r vision was necessitated b our inabi3ity o satisfactorily resolve tie projects external stora a requiremitnts. The revision has not significantly impacted on tiuildin e pla ' fo tpri t. We were able to reduce the total number of s f om eleven (11 ) to ten (10) . The garaging and storage remain inithe same physical relationship to the unit as in the Zone Ch nge Plan. The need for two of the free standing car barns as el ina ed b providing more ;jgarajging adjacent to the unit. These rev;Lsions led to a cleanjer, more simplified site plan. Very �truly yours. Raym d A'ilexande�r 1 i Burr Meadow Associates Raymond Alexander 219 Griffin Road Sout Winldsor, Connecticut 06074 Ms. Marshall Montana, Chairperson Planning And Zoning Commission a 1540 Sullivan Avenue Sout Windsor, Connecticut 06074 Sept mber', 259 1981 i Re : Burrl Meadow Condominium, Propo ed plwatin4schedule Dear IIMs. (Montana, We a e proposing to complete the si a plan ing in a dordance with the ,schedule below. AREA C MPLE ION TIME Road fronjtage at Clark Street prig planting and mith� Street I�-Deason 1982 Buil ing61 and 2,planting areas 13pring 1982 i Buffer area contiguous to CinnamonI. all planting Spri gs a�d Russo property eas n 1982 Buil ings'I 9 and 10, planting areas all 1982 East ern boundry buffer prig 1983 Buildings 7 and 8, planting areas Ppring 1983 I Buildings' 5 and 6, planting areas all 1983 Buil ings, 3and • Planting areas Pri g1984 Entry ar:odded, s at units completed during non.-plan ing seasons will be except during periods whe the ground is unworkablle. Y I Ver trul Y Yl ours , Raymond A exander I i lla� pw M E, 1540 SULLIVAN AVENUE SOOT IND OR. C NN. 06074 �soR•c �' �REA COE 203 644-2 11 I ' I September 30� 1981 i Ms. Melanie M. Cunningham, Pres. Cinnamon Springs Condominium Association 11 0-llt6 Pleasant Valley Road So th Windsor, Ct. 06074 Dear Ms.I Cunningham: T k u for your letter dated August 26th, ar ple se ac ept ou apologies for the delay in replying j Th s ma-}ter was discussed at length at our meet ng In-made st night and al hough we understand your concerns we do not eelt should be the re ponstbility of this Commission to hie a h olost to study th water systems that feed the pond si ce it apond located on priv4te property. However, we would encourage you to contact the boil nd Water Conservation District directly, to see vhether, .his s a matter they wish tolexplore for you. Their office is located at 340 Broad Street, Wi dsoro Ct. 06095, phone 688-4945. Mri Vern ders n is the Director. (Yours ry t uly, PIANNING AND ZONING COMMISSION i vg' By• • Ma hall Montana, Chairperson CC# J. �Page, Town Engineer / P. DeMallie Director of Planning i I, 1 I i i IVEDR C T October 5, 1981 OC Sp. IND�U PUNNING DEFT, Mrs. Marshall Montane Chairperson, Planning and Zoning Commission Town ,of South Windsor Town Hal l South Windsor, CT 06074 Re: Burr Meadow Dear Mrs. 'Montana: Mr. PeMallie, in a review of our submittal dated ogus 11 , 1981, raised some questions) regarding that submittal, and at a meeting w th h1i n today, we dis- cussed the following: 1 . Area of outside storage for units - A)though'lnot d mensi ned, the area for storage at all units not serviced by garages will be g oss area of 60 sq. fe t, dimensions 5'-0" x 12'-011• The dimensions of the' garag, s will be 1210" x 2010". 2. Unit No. 310 - East end wall will have no w it aws due t proximity of the neighboring building to meet zoning requirement re i ement of bui ding separation d is tanc . 3. The car barns shown on site plan are the same, desii n as the garages in front of the units. 4. Please note that the typical elevatlo�Iyouts s on dIrrwingl A-6 take in all thr unit types, and that the other building 1 are indicated on drawing K-2. Bu i i d,ing A that Is drawn, Dhows all cpnd I t ionls ev though they go tog th r 1 in buildings B and C. This ill gi q variety i building types d If�erent, y 9 conditions also chap a the look of builds gs because of and �s i zed. Grade 9 change of floor elevations. Should the project receive approval , ,the abo a will be of lected In the drab ings submitted for a building permit and on any t anspa encies requir d at filing of documents. if you have any questions, do not hesitate to call me. S erel Ja M. ra "- A. J �bcd cc:! Mr. � P ter DeMa i l i e, 01r. of P 1 ann i n$ Mr. , Raymond A l stand r EnwronmentwManageTmt. 0upse r89 Inc* 165 Oak Ridge / Berlin,CT 060V 20 828- 787 0 t I GROUND WA.tER ST Y I i i i BURR MEADOW PR0 CT SOUTH. WIN SOR, CT i I I � I I i submit ed b Dr. Charles Dimmick CErti0ed Professional Geologist October 9 , 198 Eriv r nm tat Evuiu tio" Iflater soua ces Land Use Impact Statements Pre-plan"irig 1 �-'- STUDY GROUND ADO�WATER Pk JECT I -- BURR ME SOUTH WINDSORY CT. f E•almber � and +sso Su ve�ors ar+d F ROCEDUF ,E` At the request O r,vest' Gat Present and rt�3 EnG inee s gloomf field Ct. EMC In+c• eadows Froze �rouect d f +.t�tTe Groundwater conditio gs on inn Cinnamon prinGs Associateon S . s youth �lir+dsor , and the adJ ee Smith Be ides r+ o -sit ir�s�ectlon� t �ro�ert on, Pleasant Valle, lied: f of l owi iG d�►c'-'Hants wer e �387469'470 A• OC_M�aPsof Nos•E,. o i I$urve�, Hartford Coy+nt9: t• : 1 Oct. , 19819 ,Meadows Associates Site Plan S1 rev se C. E#urr 30 qec. 1980, in.,=40 ft. err 'meadows Observation Pit L ratio Mal s D. �- 7ink=40 fto relat onshi between Pond at Cinnamon E. surr Meadow Plan showinG �3 Aster ' 1�r 1 Sly 1 1 �riOiGs and Exist Onsite Po +d' in the veld merit f a ,PerM neat Lake t e F. epot't, 1972, entitled De nne ticu for the eichtner Propert�v Soy.+ hfornClose� er+s ns► a �d Millers eal`t� Company, prepare IWeth',ersf ield: Ct• olati r+ Tes qat f 12/�/S0 for Burr ' on Pit and Perc d , 8 oomfieldf Ct. r G, Obse+rvatl eaciow yre�ared b� PalmberG-ar d P�'s r,di-- M r, s'te in ect,'or+ a �re�ared a con our above doc�.+ments! plus o g-weather co From he a Ground-water tab a far norm 1 d the General _ r f ow directions and maw o �! also calculated ProbabfeIjdorau is ondu tivit9 �k) for {i Lions The assumed coefficient oh el in es/ ours based on Sous rates�. + ' 1 or, site was taVyen, to the subsoil stiMates: on-�ite nspe tior+ and �revi i Service a measurements were n Ma e: s actual values Conservation r e;;perier+co. Ir+-situd 8einches/hog+r. - Hag a between an t 1' wen than the surface + 0NC USI HS• s about 6 f rid+► and about C he 0eneral water 'table i d near the si of the Po Burr Meadows 1• pond on the B f the Cinnamon Sir inGs °r' he existi6 et below the surface of al ate table is toward theiriotttie wo a of the Ge ter movement is ror�Ort�. The sloe f water Estim ted rite t a, 1.3% Gradient +/-• T is water able intersects theeetr� +eiG +borhood of �. it+ch/day• � ace ditch alonG th sou h si a of M� �faee! in the drain it Gs As cia ion ropert9 is' held The pond on the Cinnamon SPrw ter t le:! which is or+1� sliGhtl� I�,+r. � ar, artificial per wa er table. � fluctuations in the G sera ir+f +aenced b� -fl Burr Meadows pr' per 9 is alsrelation�to 3. The er:istinG Pond on the B at .east �art1el 1� b� a Perched wat r t ble r with no r the' Cinnamon -Spr-inGs s9ste.M. f I 1 i ! I i 4. Groundwater levels in the vicini w of the 6--in h Pipe running north irom the Cinnamon SprinGs roper w aF Pro-xd.Mate the flow line of the pipe. It is likely that he sr vel fill d ditch in which the Pine lies is a major control of sr and ater levels in th vi init9. In the area just port of e C nnam n SprinGs Propertu wa er Was observed enterinG the round just below the swipe: while the Pipe itself was drw. . 5. Th Planned installation of new Pipe ' 11 r iot m ke anw measurable ch nGe l in the Groundwater levels) near the inns on SprinGs Propert,�§. Ho eve# , the seasonal hiGh water levels in the iortheastern Part of the Burr Meadows Propertw maw be lows d s Gnif' cantles. 6. Rel esiOn of the existinG Pond on the Eurr eado s Proswertu into a etei`It i on basin will remove th ex i 5 i nG 1 oca Perched water to le. The detention area will iost 3 keli be rw Most of the -time. This will have no effect on the Pinnam n S rinG Property. PREPARED FOR MC S, Inc. by lie Dr. Charles . D MMic Certified Profess onal Geologist October) 9 P ISPI31 i i Fx 14 / ,C3I7- - . lv$� w �° A^` C � . • �� 1540 SULLIVAN AVENUE SOU H WIN SOR, CONN. 06074 �tioSOR. o�� AREA C DE 20!3/644-12511 i Decembe 151, 1981 , i Mr. IRaymolnd J. Alexander ' 219 I,Griftin Road N I P®00 1✓ South Windsor, Ct. 06074 Dear Sir Re: App. #835 - Burr Mead s Cond ini s l Special Exception and ite Plan Pie se be advised that the Planning and 'Zoning 3Dmmis ion voted to approve your application for a special exception and si plai of development for property ,located on the southeast corner of Smi Str et and Clark Street, consisting of 15.8 acres, as shown on plans prep red 3y Pa mberg& Russo, dated Au 'ust 15, 1981, revised to 10/2/8 and 1 4/81 consisting of 17 pages, aid on plans prepared by Design Group One, Arc itec s, dated August 1 , 1981, entitled Pro j. No. 2381 sub je�C to he following con itio s: 1. This ,,approval is for 98 multi-familyldwelli units; however, building I�perm�ts and certificates of occupanc will issued initially for 40 -7T unit located in Buildings No. 1, 2,y9 and W. is first phase shall g17a lso',include construction of all int rior r ds al d pa hways and sidewalks �1-�ANV �showo in Phase I, as well as install tion o util'ties and all recreation areas. All work shall be in accordance wit the Koning Regulations and Buil4ing Department procedures. No building permits or certificates iof occupancy ill tie issued for subsequent phases until all site impfroveme is in hase I have been icompieted and inspected by this Com 'ssion, the Town Engineer and r ; � iBuil$ing Official, for the purpose o certifying that all construction � in Phase I is in accordance with the approved site plan in all respects, inciuding the construction of the utilities,, roa4s and amenities as �required therein. 2. A re ised landscaping and buffering plan sl 11 b sub tted to the Commission for Zroval, and shall include buffering along Smith Street. The Commission reserves the right to modify the approved landscaping plan if a field inspection indicates buffering regn'reme is have not been adequately met. 3. The architectural plans shall be modified c ref ect the changes outlined in the October 5, 1981 letter from Jack M. rafj ck of Design Group One, Architects. I ' I I Raymond J. Alexander -2- 12/15/81 40 �he site plans shall be modified as follows: . 1196 parking spots must be shown in acco dance ith the revision of Sheet K2 dated December 4, 19 1; Dumpsters must be shown in accordance with th revision of Sheet K2 dated December 4, 1981; D'lump sters must be screened by Ca adian mloc s, at least four feet (4') in height, and shall be ere ted on concrite pails. d. B'us shelters for school Ochildren must e provided. ale. Exterior lighting shall be shown in the recreAtional areas. f. Iron pins and corner lot markers must be show . g. Detention basins, berms and buff r areas must be sh wn on the plot plans. h. The data block shall be amended to indicate the correct number of parking spaces and percentage of lot coverage. aM� 5. IA drainage assessment fee in the amo nt -of 9000l shallbe paid to the � (Town �of South Windsor. 6. 'All knits shall be connected to the own of outh Windsor Sanitary ,Sewer System, subject to approval by the Se� r Colmnission and Connecti- icut Department of Environmental Prot ction.l 7. IWater shall be supplied to all units by the Metro.olitan District Conu4ssion. r 8. lDraiftage shall be subject to the app oval of the own Engineer. 9. IIf, for any reason, finished grading and otier site work is not completed, Ithe town Engineer shall determine the amoun of a cash bond to ensure ' final grading and site work. This c sh bo sha be submitted prior to the issuance of a Certificate of �ccupa c i 10. ,This approval is subject to approval by they own of South Windsor Inland Wetlands Agency. j 11. 1A li bility insurance policy naming he T of South Windsor as an insu ed, and satisfactory to the T Attorney, all a submitted in the � amou is of not less than $250,000 per pers , $5 0,000 per occurrence and 100 000 property damage. bod i� y injury, $ , P P I � i i r Raymond ,7, Alexander -3- '�� 12/15/81 12. 1 Surety bonds in the following amounts shall be submit ed to the Town of South Windsor to ensure completion of all pro meet : $. For the completion of the roads and ark' g $100,000 For the completion of drains a and ads 2002000 For the completion of the sa itary sewer 60,000 4. For the completion of recrea ion fa flit' s 100,000 For the completion of plants gs and buffering 502000 i i $510,000 i 13. I Copies of sheets Kl, K2, S1, L12 L22 L3, L4 and 5, reproduced on black and white transparent polyester film, along with three paper prints, must be submitted to this C mmissi to a stamped and signed. This approval letter as we 1 as t approval letter of the Inland Wetlands Agency must be repr duced a the myla s. After the mylars have been stamped and sig d b the omission, they will be returned to you for fi ing in he ToFwn C erk's office. These plans must be filed within 90 days of the late f approval (bylMarch 8, 1982). ours very t aly, LAMING AND ZONING CONMISSION v — g BY Mars 11 MOntana, Chairperson CC: J. Page, Town Engineer T. O'Auria, Building Official B. $samara, Assessor P. OeMallie, Director of Planning Sewer Commission Inland Wetlands Agency I � gUAA 02� 'I-_-�- '31_dO BRIEN AND IGGIN ` ATTORNEYS AT, LAW 599 MAIN STREET MANCHESTER, CONN•EC ICUT 06 040 KEVIN M.O'BRIEN AREA CODE 203 JAMES M.HIGGINS,JR. 646-3500 i -� Ig-'a- G r ch 12, 19 8 2 3a I � q- . M ' . Marshall Montana, Chairperso Planning and Zoning Commission T F440 of South Windsor , J� G1 Sullivan Avenue Sh ',Windsor, Connecticut 06074' R urr Meadow Condominium D ar Ms . Montana: n accordance with your instructs ns , I enclose herewith the following: 1. Two maps showing in detail t e changes that w are requesting in the phasin of this p ojec . 2 . An attachment containin the prop sed modifi- cations in the bond. With regard to the two maps , youl ill note that they are color-coded. The color redl,indic es base I; the color ', green indicates Phase II; and the color yellow in- dicates Phase III. These maps have been r view d by both the Town Planner and the Town E ginee With regard to the modifications in t e bond, please note that there is no reduction in thetot 1 am unt, but only an adjustment to reflect the phasing f development. The proposed adjustment has also beenilevii ed y both the To-om �lanner and the Town Engineer. It is my understanding that the will be reviewing this proposal on Tuesday M ch 3 , 1 at 8 : 00 ,m. I will be present with Ray ex n er to explain the proposal and answer any que tions he orruni sion may have . i 'hank you for your attention to t his iatter. RECEIVED Vera trul yours , _ Kevin M. 0,'Eri n SO. WINDSOR PLANNING DEPT& Enclosures BONDING MODIFICATION PROPOSAL: BURR MEADOW CONDOMINIUM Phase I Phase II Phase III (Red) (Green) (Yellow) Total A. Parking and Roads 33 ,000 33 , 000 342000 100,000 B. Drainage (etc. ) 100,000 501000 50,000 2009000 C. Sewers (etc. ) _ 302000 15 ,000 15 ,000 60,000 D. Recreational (etc) 40,000 30 ,000 30,000 1002000 E. Planting and Buffering 252000 12 ,500 12,500 50,000 TOTALS 2282000 140,500 141,500 510,000 u SO-4 t 'V,44-Qt T-awf-L 0-/? 1540 SULLIVAN AVEN E SOUTH WIN DSOR, CONN. 06074 fties0 _co�� AREA DE 2 3/644 2511 rch 2 , 19 Kevin M� O'Brien, Esq. 599 Maim Street Manchester, Connecticut 06040 Dear Sir: I Re: Burr Meadow Cond iniums (App. #835 Please a advised that the Planning and Zoning "4ommission voted last night t amend its approval letter dated DecembBr 15, 1981, in the above matter, as follows: The first paragraph in item #1 will nowlread as fol ws: 1. ,This approval is for 98 multi- mily d lling uni s; however, ,building permits and certificat s of o 0 upan y wi 1 be issued initially for 32 units located 'n Buil ngs Nos. , 2 and 7. 'This first phase shall also inc ude co tru ion f all interior roads and pathways andlisidewa s sb n i Phase I, as well as installation of utiliti s and ai 1 r rest on areas. All work shall be in accordance with ZD ing legul tions and Build- ing Department procedures. Item #5 is amended to read as follows. 5. A drainage assessment fee in th amount of $ ,600 shall be paid to the Town of South Windsor. I li Item #1� is amended to read as follows: I 12. ,Surety bonds in the following a unts shall a submitted to ,the Town of South Windsor to en ure co let n of improvements in Phase I as follows: ia. For the completion of the roads and parking $ 339000 b. For the completion of drai ge and rad' g 1002000 �c. For the completion of the s nitary ewe 309000 d. For the completion of recre tion f ili 'es 502000 e. For the completion of plant ngs an buff ring 25,000 Toth $238.9000 , 4 I I Kevin M. O'Brien, Esq. -2- 3/24/82 The plans must be modified to show the phasing of this development as outlined to the Commission on March 23, 1982, and three prints of the revised plans should be submitted to the Commission. All other terms and conditions contained in the approval letter dated . December 15, 1981 will remain in full force and effect. This letter, as well as the approval letter dated December 15th, must be reproduced on the mylars before the final plans are stamped and signed by the Commission for filing. Yours very truly, PLANNING AND ZONING COMMISSION vg By: Marshall Montana, Chairperson CC: J. Page, Town Engineer P. DeMallie, Planning Director T. D'Auria, Building Official B. McNamara, Assessor Sewer Commission Inland Wetlands Agency 4 STATE OF C ONNE TIC'Cu � � 1 4 DEPARTMENT OF ENVIRONMEN L RO ECTION March 259 11982 I i I Town of South Windsor Water Pollution Control Authority Town Hall 1540 Sullivan Avenue South Windsor, Connecticut 06074 Dear Members: We have been in contact with representatives of Bu r Meadows Associates regarding their submission of an application for a perm t to discharge domestic sewage to the municipal sewerage system in the Tod of outh Windsor. A "community sewerage system" as defined in Section7-2 5 of the Connecticut Genera a,tutes is propose . The application for a permit to discharge wi be tonsidered by the Commissioner. If it is determined that the discha ge will not cause pollution, the design of the system will be review d by Department staff. If the design of the system is adequate and all n essay documentation (as specified below) has been submitted, the desi n wil be approved and constructioin authorized. This approval an autho zati n to construct is not superior to any authority vested wi h the nici alit . Sectioln 7-246(b) of the Connecticut General atut s (P -78-154) requires almunicipality to manage or ensure the a ecti a management of any communi'lty sewerage system not owned by the mu cipa ity. Before any APPROVAL required under Section 25-26 or S ction -54i of the Connecticut General Statutes is issued for a disposal acilit whic constitutes a community sewerage system not owned by a municipa ty, verified statement by a duly a',uthorized municipal official must be filed s .atinc that the munipal water pollution control authority shall manage or !nsura the effective management bf the system. A copy of any d cument ion f co tractual or other arrangements concluded between the munic' al w ter pollution control aut'hority and the owner of the community wera a system or other interested persons or municipalities shall be fil J witi saic verified statement. Such documentation shall be ac�ompani J by a certification from the legal representative of the municipal wa r po luti n control authority that said documents are legally $ufficieit. It will be the responsibility of the pplica to 'ansure that the required documents are filed. If you have, any quastion3 regarding this matter, please contact the writer (566-3245) . A'ary truly ours, i Rob rt E. 1 ore REM/WLW/lrm Director Water Comp?ianc Unit cc: Burr Meadows Associates Palmber & Russo Town of South Windsor State Office Building, Hartford, Connecticut 0115 An Equal Opportunity Employer It t4c ~ Tiawt-1 0-le S,0� • c � k c 1540 SULLIVAN AVENUE • SOUT WIN SOR, C NN. 06074 �tioso� o�� AREA C9 E 20 /644.2 11 April 13, 11982 Burr Meadow Associates c/o Raymond J. Alexander 219 Griffin Road South Windsor, Connecticut 06074 CERT IED �MAIL Dear Sir: At the April 129 1982 meeting, the South Windsor Inland Wetlands Agency granted a one-year extension for your Ap lica ion NO. 1?? for property located on Smith and Clark Streets South W ndsor, Connecticut. This extension becomes effective on April 0, 1 82 (the original expiration date of your permit) and is valid th ough April 20, 1983. Enclo',sed is your receipt for the extern ioni fee. Very truly ) our , Constance Eriks on, Chairman INLAND WET DS AGENCY TOWN OF SO x w NDSOR CE:chm CC: A. Bowen Davies, Deputy Town Engineer, Marshall Montana, Chairman, PZC Charles Enes, Town Clerk Th ma's D'Auria, Building Inspector eter De Malli e, Director of Planning'I W N S6 I A H T-awn, �soulA U C w 1540 SULLIVAN AVENUE' - SOUTH WIND OR. C NN. 06074 R•C !AREA CO E 20 644-2 11 JulyI, 28 , 1�82 Kevin M. 0 Brien, Esq . 599 Main St . Manchester , Ct . 06040 Dear Mr . O ' Brien: Rile : App . #835 - Burr Meadow Cond ini ms i Please be advised that the Planning and Zoning Commission voted last night to reduce the bond requirements from $23 , 000 to $100 , 000 wlhich will cover completion 'lof roads aI d p rking , drainage and grading, sanitary sewers , recreation facilities , and plantings and buffering . The Commission also approved acceptance of a Lejter of Credit in lieu of a surety bond, subject to appro1val ollf the Town Attorney . Before the final plans can be filed a mus hav a _letter _ _p � from the Town Attorney stating the Letter ' 0 Cr dit ' s approved , as well as th,e origin a er"o cre . `-` ite__"i `-`a o due the Town of South Windsor the sum of $1, 600 for a di ain ge assessment fee . Yours veryl, trul , PLANNING AIND ZONING COMMISSION vg By : Louise E ans Vice-Chair rson CC . P . De'Mallie , Planning Director Wayne C. Gerlt , Esq . cowC� di " c� 1Z y _ • I 1540 SULLIVAN AVENUE SOUT WIN OR. C NN. 06074 0e•C �'� AREA C E 00 /644.2 11 April 013 983 Burr Meadow ,Associates j c/o Raymond J. Alexander, General Partner P. 0. Box 53 South Windsor, Connecticut 06074 CERTIFTED 14AIL Dear Mr. Alexander: I, At the April 11, 1983 meeting, the South Wi dsor Inland Wetlands Agency approved with conditions your Application N0. 226 to regrade and fill portions of the site for development of j mult -family housing and the construction of storm water detention arias f r property lo- cated at the southeast corner of the intersqctioi of mith and Clark Street, South Windsor, Connecticut. The permit is based on the plans entitled " sitePlan, " S 1. , dated 8/15/81; revised 10/2/81, 1/22/ 2, 2/l /82 and /19/82; and "Conservation Plan, " S 6. , dated 8/15 81; revise 10/ /81 and 1/22/82; Burr Meadow ,Associates, 1665 Ellington Road, Sou h Windsor, Connecticut, drawn by Palmberg & Russo, Land Survey ors & rofissioiial Engineers. The following conditions must be adhered to for his permit to be valids 1. The Conservation Plan shall be followed. As the planting season is upon us, the disturbed areas hall be seeded and stabilized as soon as possible. 2. Filling, as stated in the application, ihall be essentially relocation of material with no nett ncr ase of quantity of soil on the site. 3. The proposal is subject to t�e app� val of the Tov'n Engineer. 4. The applicant shall indemnify and h� ld arml ss the Town of South Windsor against any 1 abi ity which might Burr Meadow Associates c/o Raymond J. Alexander, General Partner P. 0. Box 583 South Windsor, Connecticut 06074 Letter of Permit - Application NO. 226 April 13, 1983 Page 2. result from the proposed operation or use. 5. The permit is valid for one year and shall expire if not initiated and completed within one year from the date of approval. Ver truly yours, stance Erikss , Chairman INLAND WETLANDS AGENCY TOWN OF SOUTH WINDSOR CE:c hm cc: Joseph Russo, Palmberg & Russo A. B. Davies, Deputy Town Engineer Richard J. Sartor, Town Manager Edward F. Havens, Mayor Charles Enes, Town Clerk Marshall Montana, Chairperson, PZC Th as D'Auria, Building Official Peter De Mallie, Director pf Planning Richar Ryan, Town Council Liaison Peter Bortolan, Chairman, EDC BURR MEADOW ASSOCII ATES P. O. Box W South Windsor, Ct. 06074 i i May 19, 1983 Ms. Marshall Montana, Chairperson Planning & Zoning Commission Town of South Windsor j 1540 Sullivan Avenue South Windsor, Ct. 06074 j Re: Burr Me ow Condominium Phase 2 Authorization Dear Ms. Montana: Burr Meadow Associates is requesting authorization, by Your C mmiss'on, to proceed with the development and construction of Phase 2 of he ref renced condominium. Phase 1 is nearing completion and we have a feliff of t e units occupied. We are planning to close the permanent mortgages n fift percent of the first phase in mid-June. We are presently holdingnon-bin ng reservations on a number of the units in phase 2. Owing to the unusually wet weather, we are experiencing some delay in the landscaping and construction of our pool and tennis cou . W have contracted with Kashota Farms, Inc. to do our landscaping and they assu d us hat they will be able to provide the required material, if not somewhat elaye Our swimming pool has been contracted for. Although State ppro als ar pending, Aqua Pool,' has been given permission to proceed. The 'It nnis ourt i scheduled for completion within the next thirty days. We have discussed the matter of the bond for the seco pha a with the Town Engineer. We are requesting that the existing S100,00 0 security bond not be reduced for work completed in Phase 1, rather let the ond remain in force to cover the work required in Phase 2. Our experience with the first thirty-two (32) units has caused iis to rethink our unit design. We are considering a larger single level, two bedroom unit to replace a dumber our our two bedroom town house units. The empty nester market is looking 'for no stairs and more space than our smaller two edroorr unit provides. Very truly ours, Raymond J. A xantoer I r P low a �v 1540 SULLIVAN AVENUE SOUTH WINO OR, C NN. 06074 OR C AREA CO E 203 644-2 11 I I May 31, 1013 3 I Mr. Raymond J. Alexander Burr Meadow Associates P. 0. Box 583 South Windsor, Ct. 06074 Dear Sir: Re: App. #835 - Burr Meadow CoI dom' nium Phase II I Please be advised that the Planning and Zor 'ng ommi sion voted on May 24th to approve Phase II of Burr Meadow ondo iniums consisting of 32 units located in Building #8, 9 an 10, as shown on plans prepared by Palmberg & Russ ,, dated 8 15/81, revised to 12/4/82, entitled Proj . No. 23811, su ject to the following modifications: 1. The plans shall be modified to show the cor4ect size of the buildings. 2. The $100, 000 bond currently being held ) y t is Commission shall be amended to indicate that Phase II, well as Phase I, of this development is covered by said bo 3. No certificates of occupancy will be i uedifor any units in Phase II until all major recreational faCili.ties are completed subject to this Commission' s approval. , 4. The revised plans showing Phase II must be teproduced on mylars and submitted to this Commission to be tam ed and signed and filed inthe Town Clerk' s Office. This ett r of approval must be reproduced on said plans before filing same. Yours very t uly, PLANNINGr & Z NING COMMISSION vg By: Mars 1 onta a, Chairpe s CC: T. D'Auria, Building Official B. MacNamara, Assessor J. Page, Town Engineer P. DeMallie, Planning Director i 1 �O�N ,e44 ~ Tio 0-yes • C � wv 1540 SULLIVAN AVENUE - SOUTH WIND OR. C NN. 66074 ��SOR•C AREA CO CIE 203 644-2 11 June 6, 1583 Mr. Raymond J. Alexander Burr Meadow Associates P. 0. Box 583 South Windsor, Ct. 06074 Dear Sir: Re: App. #835 - Burr Meadow Condominiums Phase II Please be advised that the approval letter of this conmission dated May 31, 1983, is amended to include the following p agra h: 5. A drainage assessment fee in the amount of $a ,.600ishall be submitted to the Town of South Windsor. Yours ver truly, P NG ZO G COMMISSION vg By: _)� z" rsha Mon ana, Chairperson CC: J. Page, Town Engineer P. DeMallie, Planning Director t 4,4�4/ tOVI y ~ T-0 o-yeS )&U: e � u �v 1540 SULLIVAN AVENUE - SOUTH WIND OR. C NN. 06074 tip N� AREA COE 203 644-2 11 SOR•C I July 18 1983 Mr. Raymond J. Alexander Burr Meadow Associates P. 0. Box 583 South Windsor, Ct. 06074 Dear Mr. Alexander: At a regular meeting of the Water Pollution Control ' utho ity held on March 15, 1983, the following motion was ma : i Mr. Peterson made a motion that conceptual appr val be j given to Burr Meadows (Sketch Map dated 3 5/83) for sanitary sewer construction, subject to ne tec nical I approval of the Town Staff and that safegiardsi, recommended by the Town Staff will be tak A so that the Water Pollution Control Authorit willi be provided with a better map. Mr. Gay secon ed the motion. Motion unanimously carried. Please comply with the request of the Water Po� ution Control Authority and provide them with the map they requested. Thanki you for your cooperation in this matter. Very truly yO rs, �eggy z, ^lerk Water P llutij n Control Authority M r TOWN OF SOUTH WIND OR CC: Mr. Jules E. Page, Town Engineer . Mr, Peter De Mallie, Director of Plannin Mrs. Marshall Montana, Chairperson, Planning & 'Zonin t_ " rr C = T-Own, o-P slcw� ?'Z)". 1"14 s � w 1540 SULLIVAN AVENUE • SOUTI-1 WIND OR, C NN. 06074 SO co AREA CODE 2031/644-2 11 September' 28 , 111983 Mr . Raymond J . Alexander Burr Meadow Condominiums P . 0. Box 583 South Windsor , Ct. 06074 Dear Sir: Re: App . #835 - Burr Meadow Coil omi iums The Planning and ZoningCommission voted ast' n ' h, ig t to approve the modified plan as shown on Sheet Pi prepared by ,Palmberg & Russo, dated 8-4-83 . Please prepare a mylar with this letter epro uced thereon to be signed and filed in the Town Clerk s Office. Yours ver tru y, PLANNING AND Z NING CO !MISSION v g B y: a %s1hrd`l' Mojitana , Chairperson � r CC: P. DeMallie Planning Director V T. D 'Auria, Building Official BURR MEADOW ASSOC $ A T S P. O. Box 583 South Windsor, Ct. 06074 Nov. 23, 1983 Mr. Robert F. Gilligan, Chairperson Planning & Zoning Commission Town of South Windsor 1540 Sullivan Avenue South Windsor, Ct. 06074 Re: ow Condominium P �se 3 tho ization Dear Mr. Gilligan: Burr Meadow Associates requests that your cami sion consider this matter during the public participation portion of Your ember 29, 1983 meeting. Burr Meadow Associates is r ting ' utho ization, by your commission, to proceed with construction ,of footings and founda- tions in Phase 3 of the referenced condominium. We ' ill proceed no further than footings and foundations until the bon requirement has been met and building permits issued. We are making this request so that we can begin thelfound tion work before the winter shut-down. This will enable us t better meet our carmitments when the spring building season opens u ' . Phase 2 is nearing substantial coripletion of t a erior . We are closing on the first of the permanent mortgag in he second phase on December 2. We are presently holding non-bi ng r erva ions on a number of the units in Phase 3. We have compppll ,ted 4oth t e pool and the tennis court and the majority of the site lant ng r ired by the previous approvals. Verb t ly ours, -V Raymor � er cc / P. DeMallie R. Arsenault T. D'Auria c r T-au� � ? c a 1540 SULLIVAN AVENUE - SOUTH IM INDS R, CO N. 06074 oe•co AREA CODE 203/ 44-251 Decembex 7 , 1983 Burr Meadow Associates Mr. Raymond J. Alexander P. 0. Box 583 South Windsor, Ct. 06074 Dear Sir: Re: App. #835 - Burr Meadow Condq ini s Phase III Please be advised that the Planning and Zoning Commission voted to approve Phase III of Burr Meadow Condominium; consisting of 34 units located in Buildings #3, 4 , 5 and 6 , a6 shown on plans prepared by Palmberg & Russo, dated 8/15/81 Pr j . # 381, subject to the following modifications: 1. The amount of a bond to ensure completion of improvements will be determined at a later date. 2 . No building permits will be issued for Phas III,, until the amount of the surety bond has been dete '-minel and the bond has been submitted to this Commis on. 3. Applicant may proceed to install footings a d fo ndations in Phase III, prior to submission of the su ety ond. 4. A drainage assessment fee in the amount of $1, 70 shall be submitted to this Commission prior to the i suan a of building permits. Yours very truly, PI;ANNIN AND ZONING COMMISSION vg By: 4.t11Montana, Vice-Chair an CC: R. Martel, Town Engineer P. DeMallie, Planning Director E. Belleville, Assessor tow" sE� c L u 1540 SULLIVAN AVENUE SOUTH WIND OR, C NN. 06074 soe•c��'� AREA CODE 203 644.2 11 May 23, 198' Burr Meadow Associates P . 0 . Box 583 South Windsor , Ct . 06074 Att : Raymond J. Alexander Dear Ray : Re : App . #835 - Burr Meadow Con omi iums Phase III The Planningand Zoning Commission voted 1 l g last n, ght to permit you to modify the approved site plan for Phase , II as follows : Building #3 and #4 will now have four 2-bath ranches ; Building #5 will now have two 2-bath ranches . Please submit a modified plan on a black and wh;' te mylar , which will be stamped and signed by the Commission an filed in the Town Clerk ' s Office . Yours very trule , PLANNING AND ZONING COMMISSION Atober vg By : F. Gi 1 'gan , ChaXkman CC: P . DeMallie , Planning Director R. Martel , Town Engineer T . D ' Auria , Building Official pow N aE,4 1540 SULLIVAN AVENUE • SOUTH WINDS R, CO N. 06074 AREA CODE 203 44.25 1 soR•co� December 27 , 1985 Mr. Raymond J. Alexander R. J. Alexander, Inc . P.O. Box 654 South Windsor, CT 06074-0654 RE: BOND REDUCTION - BURR MEADOW$ Dear Ray. On December 24 , 1985 , Peter DeMallie and I petfor ed an inspection of Burr Meadows, Phase I , II , and III. Mr. DeMal lie Jnsp cted the land- scaping while my responsibility concerned the ' con truc ed facilities . Before I can recommend a reduction of the bona tola maintenance security, the following items must be addressed: 1. All dumpsters must have a Portland cement concrete pad as per the site plan. 2 . The 15" flared end pipe section to the nort�L and west of Building #7 must be supplied a channel to D tent 'on Basin #1. There is standing water in this section � due ' to the obstruction. 3 . Brush and debris must be removed around the ' stor water inlet structure located to the south of Building 42 . 4 . Approximately 65 L.F. of 4 ' wide Portland c ment concrete sidewalk must be installed on the south sid of Spring Meadow Road, just east of Misty Meadow sane This walk must include the appropriate inclines to tholexi ting pavement. 5 . An inclined concrete walkway must be instal ed o the westerly side of Misty Meadow Lane, just south of Sping �eadow Road. If you have any questions , please feel free to cal.1 me. Very truly yours , Richard P. Martel =� Town Engineer gip. �N,SOR LANNIO DEFY RPM:bmr cc : Robert Arsenault, Director of Public Works Peter DeMallie, Director of Planning �U R R M E ADOW AS a I A�rF.- P. 0. BOX 583 South Windsor, CT 016074 644-2333 06-Jun-86 Mr. Rick Martel Town Engineer Town of South Windsor 1540 Sullivan Avenue South Windsor, CT 06074 Re : Burr Meadow Bond Dear Mr . Martel . This is to inform you that the items set forth for�icorrection, in your December 27, 1985 letter have been comple ed . We trust that the matter of the bond reduction for Burr Meadow may now go to the Planning & Zoning Commission . We are available if you have any questions con erning this matter. t u1 ours) , �1e�y� �' Raymo d J. lexa�nder RJA/ iba P. O. BOX 1776 SOUTH MAIN STREET EAST GRANBY ONNE�TICUT 0602-6 March 6, 1989 Mr . Raymond Ale xander exander Burr Meadow Associates P .O. Box 583 South Windsor, CT 06074 RE : Burr Meadow S / unfield Drive Bond# K02421161 - Section I Bond# K03009907 - Section II Dear • RaY- As you can see by the attached letter, releases from the! Townof South Windsor are in fact needed to cancel referenced bo ds. Please proceed in obtaining these releases so we can finalize this matter once and for all . Sincerely, RONCARI INDUSTRIES, INC. (RDC) Lisa P. Buono Administrative Assistant Enclosure HARTFORD (203) 527-1825 EAST GRANBY (203) 653-2524 WINDSOR LOCKS (203) 623 3B1 • SPRINGFIELD 1413) 737-3503 An Equal Opportunity Employer M/FAH (Oil N S f, Ole( U1 r � • I --) �C� s 1540 SULLIVAN '%VENUE • SOUTH WIN SOR, cONN. 06074 AREA CODE 2 3/644-�511 March 13, 1989 Mr. Raymond Alexander J.F. I . Associates P.O. Box 1061 South Windsor, CT 06074 Dear Mr. Alexander: RE: Burr Meadow/Sunfield Drive Bond # K02421161 - Section I Bond # K03009907 - Section II Please be advised that the maintenance b,pnds, whiclh were being held for the above referenced project are n6 lon4er applicable. They were released as of July 28, 1988 . If you should have any further questions, please do not hesitate tol, call the Planning Department. Very Truly Yours, Raymond F. Hallowell Chairman of Planning And Zoning cc: Marcia A. Banach, Director of PLanning, PZC file