,Tune 4, 1979
Thomas G. Dennis, Esquire
1708 Ellington Road
South Windsor, Connecticut 06074
Dear Attorney Dennis:
This is to notify you that the Planning and Zoning Commission voted to
approve the application of 50-Acres Ltd. for an open space subdivision
known as Wood Ponds, Section I, consisting of 20 lots on property
located 1400 feet north of Miller Road, between Nevers Road and Abby
Road, South Windsor, subject to the following conditions:
1. This approval is for lots #13, #14, #15, #16, #17, #1$, #19, #20,
#21, #22, #239 #242, #253, #263, #27, #282 #293, #6, #7, and #8, as sho-,an
on plans prepared and submitted by Luchs and Beckerman. The remainder
of the land shall be designated as follows: The land shown as open
space on the plans shall be so designated; the land shown for the
detention pond shall be so designated; the remainder of the land
shall be designated parcel "A".
2. The storm water drainage flow from this subdivision shall be directed
through the abutting Balf property (as shown on sheet #1 of 1, titled
"Detention System on Balf Property".) From the Balf property, at
the storm water outlet structure, the storm water shall be directed
to a swale (or other drainage system as agreed upon by the abutting
property owners, the Town of South Windsor Engineering Bureau and the
Planning and Zoning Commission.) The swale shall be in place from
the outlet structure to the Podunk River on property of Russo Brothers
and the subdivision known as South Ridge Estates. Easements to the
Town of South Windsor from the properties of Balf, Russo Brothers
and the subdivision known as South Ridge Estates shall be provided
for the construction of a storm drainage system. The complete drainage
.plan as designed by the Town-of South_ Windsor Engineering Bureau, (or
other drainage system as-agreed upon.by _the 'abutting property=owners;
the Town of South Windsor Engineering Bureau and the Planning and Zoning Commission) shall be operable prior to work commencing on this
subdivision.
3. A surety bond in the amount of $225,000 shall be submitted to secure
completion of all subdivision improvements in Section 1. A surety
bond in the amount of $35,000 shall be submitted to secure completion
of the detention basin and all downstream improvements on the Balf
property.
,e
Thomas G. Dennis, Esquire -2- June 4, 1979
4. The detention basin shall be owned by the applicant until all phases
of the subdivision are 100 percent completed. Th Town shall accept �y
the detention basin only after inspection and certification by the
Town Engineering Bureau that the detention basin has been built according
to the approved plans and is functioning correctly. The plans for
approval of Section I shall not be filed until the Town Council has
given preliminary approval to accept the open space land and the
detention basin, in accordance with criteria established'by the
Council on 3-28-77. A warrantee deed for the land containing the
detention basin and all the land designated open space shall be
submitted to the Town Attorney to be held in escrow by the Town of
South Windsor.
l5. All improvements to the existing detention basin and all downstream
improvements to the Balf property shall be approved by the Town
Engineering Bureau, and all details shall be shown on the plans.
All drainage pipes and outlet structures shall be reinforced concrete.
No Certificates of Occupancy shall be issued until all improvements
o the detention basin and the Balf property are completed to the
satisfaction of the Town Engineering Bureau.
r6. A drainage assessment fee in the amount of $1,000 shall be submitted.
7. A liability insurance policy shall be submitted in accordance with
t/ Section 3.2.a.10 of the Subdivision Regulations in the amounts of
$250,000 per person; $500,000 per occurrence; and $100,000 property
damage, naming the Town of South Windsor as an insured.
8. A subdivision processing fee of in the amount of $450. shall be
submitted ($25. per lot x 20 lots = $500. minus $50. submitted = $450.)
in accordance with State Statutes.
9. All utility easements shall be provided to the Town of South Windsor.
These easements shall be subject to the approval of the Town Attorney
and shall be filed, at your expense, in the Office of the Town Clerk
of the Town of South Windsor.
10. The street designated as Wood Pond Road on the plans shall be built
from Nevers Road to the intersection of the street designated as
Rustic Lane on the plans. As subsequent phases of this subdivision
are approved, Wood Pond Road shall continue through to Abby Road.
Wood Pond Road shall have a 50-foot right-of-sway and a 30-foot paved
width. The cul-de-sac streets designated on the plans as Rustic
Lane and Fox Hill Road shall be built from the intersection of
Wood Pond Road_ These two streets shall have a 50-foot right-of-way
and a 26-foot paved width.
11. Concrete sidewalks, built to Town Specifications, shall be installed
on both sides- of all streets in this subdivision, with the exception
of the open space area on the south side of Wood Pond Road. The
sidewalks shall be consistent with Section 2.5.8 of the Subdivision
Regulations providing adequate and reasonable access for the safe
and conv nient movement of physically handicapped persons.
Thomas G. Dennis, Esquire -3- June 4, 1979
12. All lots in Section I shall be conn cted to the Town of South Windsor
Sanitary Sewer System, subject to approval.of the Town of South Windsor
Sewer Commission.
rP 13. A "Sequence of Construction Events" and a Conservation Plan, as outlined
,i in Section 3.2.a.11 of the Town of South Windsor Subdivision Regulations
shall be incorporated in the plans.
14. If needed, the yard drains on lots #22 and 029 shall be approved by
the Town Engineering Bureau on the individual plot plans, in accordance
with Section 2.6.b of the Subdivision Regulations.
15. Under drains for control of ground water shall be installed in all
areas, as directed by the Town Engineer.
16. Street names and location of fire hydrants shall be subject to the
approval of the Fire Marshal of the Town of South Windsor. The location
of all fire hydrants shall be indicated on the plans. All street
name signs and supporting posts shall be installed by the developer,
in conformance with standards of the Town of South Windsor, at no
expense to the Town.
17. Street lighting shall be installed, at the developer's expense, subject
to approval by the Town Manager.
18. Water shall be supplied to all lots in Section I by The Connecticut
Water Company.
19. Improvements on the land designated open space shall not include
foot paths, and shall be limited to drainage improvements.
20. Prior to approval of subsequent phases of this subdivision, the
Commission reserves the right to require the following: (a) Additional
open space land, in accordance with Section 2.3.c of the Subdivision
Regulations; (b) Improvements to the land designated as open space;
(c) Additional drainage improvements to the land designated open
space and detention basin.
21. This approval is subject to all conditions of approval by the Town
of South Windsor Inland Wetlands Agency.
22. Prior to the building of any structure on a lot, the subdivider shall
provide a topographic map, drawn to a scale of 1 inch equals 40 feet,
for each lot in the subdivision, showing proposed contours and either
basement floor or slab floor elevation. No building permits shall be
issued until .the proposed contours and floor elevations have been
= --:.approve d -by the Town Engineer. No Certificates of Occupancy shall be
issued until lot contours and house foundation elevations have been
completed according to the Ton;n Engineer's requirements. If for any
reason, finished grading and other site work is not completed, the
Town Engineer shall determine the amount of a cash bond to insure
final grading and site work. This cash bond shall be submitted
prior to issuance of a Certificate of Occupancy.
Thomas G. Dennis, Esquire -4- June 4, 1979
23. Black and transparent subdivis ion;-plans of the plot plans (24" x 3611,
printed on polyester film) shall be submitted to the Planning and
Zoning Commission to be stamped and signed. This letter of approval
from the Planning and Zoning Commission, the letter from the Planning
and Zoning Commission approving the open space concept for this property
and the letter of approval from the Inland-Wetlands Agency shall be
reproduced on and made a part of the final plans. A black and transparent
key map, printed on polyester film, and a black and transparent
set of subdivision plans, printed on polyester film, and drawn to a
scale of 1" = 100' , shall also be submitted. A filing fee to be
determined shall be submitted prior to the final plans being filed
in the Office of the Town Clerk of the Town of South Windsor. In
addition, three paper prints of the complete subdivision plans shall
be submitted.
Very truly yours,
r.
PLANNING AND ZONING COMMISSION
By
zwj—
Robert F. Gilligan, cti g-Chairman
P.FG/src
cc: A. Young, Town Manager
D. McLaughlin, Building Inspector
R. Shattuck, Director of Public Works
J. Page, Town Engineer
B. McNamara, Assessor
W. Lanning, Fire Marshal
R. Rittenband, Town Attorney
J. Pitts, Chairman - Sewer Commission
C. E riksson, Chairman - Inland-Wetlands Agency
MEMORANDUM January 6, 1982
TO: Planning & Zoning Commission
RE: Comments For Public Hearing - Wood Ponds Open Space Subdivision Phase II
1) The k, e t p should indicate the total number of lots in the entire
subdivision.
2) The plot plan should identify the markers and monuments to be set per
Sec. 3.2.a.(2)h of the Subdivision Regulations.
3) Sheets 4 and 5, which constitute the topographic map, should indeed be
labeled "Topographic Map".
4) A conservation plan appeared to be absent from the application sub-
mission.
5) Note #6 on sheet 8 indicates the cul-de-sac is "not to be constructed
at this time". When is it to be constructed, if not now? I suggest a
bond be required now to ensure completion of thp. cul-de-sac, in the
event Woo Fon'T�o'a�c—is not extended to Abbe Road at a later date.
6) Lot dimensional requirements appear in order.
7) Lots 10 and 12 will require filling. Will they be suitable for building
development purposes given their elevation and proximity to the detention
basin?
8) If you find problems with lots 9-12, I am not averse to approving only
eight lots in this phase (1-5, 30-32), particularly in regard to my
concerns in item 9 below.
9) Open Space - For the entire subdivision, a total of 2211.,7 acres of open
space land is required under the zoning and subdivision regulations.
To date, the applicants have identified 12,.57 acres of open space, which
under our formula, qualifies for only 16 72 acres. I understand we are
holding in escrow t e ee s or is land.
To put this in historical perspective, Phase I was originally approved in
1977. Had the approval taken effect, and it did not due to the applicant's
failure to file the maps, the full 19.57 acres may have qualified as open
space, for a deficiency of approximately two acres. The application was
f resubmitted in 1979, after the effective date of the current subdivision
amendment Section 2.3c, which counts only one-half of the area of detention
i basins. Therefore, as applied to the entire subdivision proposal, the
subdivision was still deficient, but this time by 4.98 acres. This
j deficiency remains with this latest application.
i
MEMJRANDUM
Planning & Zoning Commission
January 6, 1982
Moreover, item 20 in the body of the 1979 approval letter observed the
deficiency by stating that the Commission may require additional open
space land.
As this pertains to the entire subdivision proposal, the applicant has
five options to resolve this problem: a) acquire additional land, b)
secure a zone change to lower the open space requirement, c) secure a
variance, d eliminate lots in future hases or, e) pull a rabbit out
of a at. I have conferre wit the applicants on these options..
As this pertains to the Phase II application, I am not averse to the granting
of approval for between 8 and 12 lots now (twelve have been requested). The
reason is that the lots in subsequent phases contain s, which
x eds the open space deficiencV
it any approval, however, the
at no further
applicant should be forewarne thrther lots can be approved until
the open space requirements are met.
And finally, the open space calculati ns should be shown on the plot plan.
Peter R. DeMallie
Director of Planning
PRD/ds
�o•q N SEA`
C
1540 SULLIVAN AVENUE - SOUTH WINDSOR, CONN. 06074
v
�r 'R-COS AREA CODE 203/644-2511
January Ile, 1982
Fifty Acres, Ltd. fAV-6
.es srs. "4
T). J. Henry, general =artneriu�-e,
Douglas 'd. Johnson, Trustee P&AMAL
C/o T;illiam E. trace, Esquire
25 Oakland Road
south Y�indsor, Connecticut 0607 CEi�TI.r ILJ I:AIL
Dear Sirs:
At the January 11, 1982 meeting, the South ".?indsor Inland-
`'etlands A gencir jranted a permit with conditions for Application
for -food Fonds, Phase II, a 12- '-t _residential subdi�.Tision located
viest of Abby Road and east of I4e*-ers Road, Sou'Llh '11indsor, Connecticut.
The -oermit -:as based on the set of plans entitled "'" ood Fonds,
Section II, of 0 Acres, Ltd. , " drawn by Lueek Engineering
_i,ro pert T S 5
Associates, dated 11/13/811 11/14/81 & 11/19/81; revised 12/30/81
and 1/5/82, for lots r 1, 2. 39 4 P 5; 9, 10, 11, 12; 30, 31 and 32.
The followink conditions rnus t be adhered to for this permit to
be valid:
1. The proposal is subject to the appro,ral of the
To�,.n 2in^;ineer.
lan an�� erosion and sedimentation control
2, q Conservation
plan for the 12 lots i:.ust be submitted to the Conservation
Commission for its appro-•-a?.
3. In Lots 11 and 12, the grading, fillin and tree cuttin
shall be a r�� teal decision 'oets=fee� ' ldet' and t Ze
Town ---'gin neerin , Departr..en u.
4. On all other lots there shall be no indiscri, ..inate tree
cutting.
5. The applicant shall indemnil f y and hold harmless the r2olivn
of South '!indsor against any liability which mic-ht result
from the proposed operation or use.
6. The permit is -'alid for one year and shall expire if not
Fifty Acres, Ltd.
Messrs. D. J. Henry, General Partner
Douglas 11^l. Johnson, Trustee
c/o `'illiam E. Grace, 'Esquire
25 Oakland goad
south ;"iindsor, Connecticut 0607LP
January 14, 1982
Letter of 'ermit - Application NO. 201
2
ra•;e .
exercised within that period.
Very truly yours,
Constance Eriksson, Chairman
INL'11Z 1;=ETL-UiDS A�FI*,iCY
T C);'I N C-F S O UrL H ,
CE: chin
CC: Emil 7,% Lucek, Lucek Eingineering Associates
A. D. Davies, Deputy Town Engineer
fD
Charles Enes, Town Clerk
Edv,rar,a r. Havens, ',Mayor
Richard J. a-rtor, To4in is ana;er
I.-arshall ontana, Chairperson, '�C
Da,Tidy Sorenson, PZC Liaison
Richard Ryan, Tovin Council Liaison
Thomas D'Auria, Buildin Ins?.�ec 6
/ Peter De i.71allie, Director of Plannincr
Fran'_ Salerno, Chairman, EDC
dk
S-O-U� W)1;Q4d440t
A. 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 0607 1
ORIo AREA CODE 203/644-2511
�' ��•
VV January 26, 1982
Vold
John J. Woodcock, III, Esq.
395 Buckland Road;
South Windsor, Ct. 06074
rU
Dear John: `a „
Re: 50 Acres, Ltd. - Wood Ponds Subdivision
I understand Wayne Gerlt appointed you acting Town Attorney for
anything concerning the above matter. Q
This applicant is now seeking approval for, 12 lots in Phase II. The
Town Attorney is holding in escrow a deed for approximately 19 acres
of open space land, which is adequate for Phase I and Phase II.
However, when the applicant comes in for approval of Phase III, according
to our current regulations there will not be sufficient open space.
A question was r y raised b one of the Commissioners as to whether or not
it is proper to approve Phase II, knowing that there will not be
sufficient open space for the third phase, and it was suggested that
a legal opinion be obtained.
v�
I'm enclosing a copy of the Minutes of the public hearing and also
a copy of the memo from the Planning Director, which outline the problem.
This matter will probably be decided at a work session within the next
few weeks, and we would appreciate hearing from you as soon as possible.
Yours very truly, `
PLANNING AND ZONING COMMISSION
'f
y vg B encs. rshall Montana, Chairperson
CC: P. DeMallie, Planning Director
l _
March 23, 1982
MEMORANDUM TO: Planning & Zoning Commission
FROM: J. Page, Town Engineer
RE: Meeting on March 23, 1982
Item No. 1 on Agenda - applications to be received:
hW4 a. Charbonneau & Rossi Subdivision. Okay to receive this
application. Public hearing should be held.
4 b. John Russo - Okay to receive this application. It's also
okay to approve renewing the permit.
\1 c. Admiral Moving & Storage - Site Plan - it's okay to receive
0 application.
It's also okay to approve subject to Wetlands approval.
° The applicant should be made aware that future approvals will
require more engineering work on drainage, and they should
start working as soon as possible with Engineering on
drainage for future site plans. This is very important.
Driveway to orth side of Griffin is approved by Engineering.
��3. Dr' oca 7t824 P1 asant Valley Road is approved by Engineering.
Wood Pond Subdivis
a. u - - ac sh�be at the intersection (see plans). Emil will meet
with us on the design.
b. Lots 9, 10, 11 and 12 can be approved as far as Engineering is concerned.
Commission should require a $5,000 bond for grading, subject to pipe
( � s extension.
xtension.
c. The road costs about $100,000. Applicant can do the work before plans
are filed, to reduce the bond. Sewers, drainage, top coat loam could be
finished. About $30,000 would remain. The bond you hold on Section I
5 could be used to cover that if they finish Section I.
d. Finishing the road to Abbe will cost about $100,000. You could take a
deed in escrow for Lots 41 through 46 instead of a bond to ensure the road
is firBn-i he . The Town Attorney would hold the deed in escrow.
plan
� e. Should have standard conservation p
P4 +W�::
�, .
C , T �C .
�, ,, "�w � (over)
Pa ge 2.
5. Burr Meadows. Engineering has no problem with their proposed plan
for phasing and bonding.
OLD BUSINESS
1. Reduction of bond for South Ridge. Table it again. We want to check it
out further.
Pending applications:
Engineering Dept. has no comment concerning the Bienkowski or Day Street
amendments.
vg
y 40w R 8E�(
OV
C + Tiawn, V/ S_0� •
a
v 1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
AREA CODE 203 644-2511
'1pSOR.LpC�
MarcT,h. 25, 1982
William E. Grace, Esq. V ,
^7 fv%-
25 Oakland Road
South Windsor, Ct. 06074 ..GI .
Dear Sir:
Re: App. #853 - 50 Acres, Ltd., Phase II
Please be advised that the Planning and Zoning Commission voted to amend
its approval in this matter and this letterlsupersedes the approval letter
dated March 1, 1982.
Phase II of this subdivision, which consists of 12 lots located on
Wood Pond Road, is approved, subject to the following- modifications:
1. This approval is for Lots 9, 10, 11, 12, 302 31, 323, 19 29 3, 4 and 5,
as shown on plans prepared by Lucek Engineering Assoc. , Inc. ,
entitled Proj., No. 81-72, Ref 79--169, consisting of 8 sheets.
2. The plans shall be modified as follows
a. The key map should indicate the total number of lots in the entire
subdivision.
b. The plot plan shall identify the markers and monuments to be set
in accordance with Sec. 3.2.a(2)h of the Subdivision Regulations.
c. Sheets 4 and 5 shall be labelled "topographic map."
3. Concrete sidewalks, built to Town specifications, shall be installed
on both sides of Wood Pond Road, with the exception of the open space
area on the tth side of the road. The sidewalks shall be consistent
with Section5.8 of the Subdivision Regulations providing adequate
and reasonable access for the safe and1convenient movement of physically
handicapped persons.
4. All lots shall be connected to the Town of South Windsor Sanitary Sewer
System, subject to the approval of the,Town's Sewer Commission.
5. Under drains for control of ground water shall be installed in all
areas, as dir cted by theTown Engineer
William E. Grace, Esq. -2- 3/25/82
6. Street names and location of fire hydrants shall be subject to the
approval of the Fire Marshal of the Town of South Windsor. The
location of all fire hydrants shall be indicated on the plans.
Street name signs and supporting posts shall be installed by the
developer, in conformance with standards of the Town of South Windsor,
at no expense to the Town.
7. Street lighting shall be installed at the developer's expense, subject
to approval of the Town Manager.
8. Water shall be supplied to all lots by the Connecticut Water Company.
9. This approval is subject to all conditions of the approval of the
Inland Wetlands Agency.
10. A permanent cul-de-sac must be constructed in accordance with Town
specifications and is subject to the approval of the Town Engineer.
11. Wood Pond Road, east of the proposed Meadowbrook Road, must be graded
to Abbe Road, subject to the Town Engineer's approval.
12. A liability insurance policy shall be submitted in accordance with '
Section 3.2.a.10 of the Subdivision Regulations in the amounts of
$250,000 per person; $500,000 per occurrence; and $100,000 property
damage, naming the Town of South Windsor as an insured.
13. A drainage assessment fee in the amount of $600 shall be submitted to
this Commission.
14. The following surety bonds shall be submitted to this Commission:
a. To ensure grading on all approved lots in the entire
subdivision $ 203P000
b. To ensure completion of the road and cul-de-sac, as well
as other subdivision improvements, and to ensure
that Wood Pond Road will eventually be connected
with Abbe Road $100,000
This $1001,000 bond will not be released until Wood
Pond Road has been completed and connects with Abbe Road.
15. A Deed to the Town of South Windsor for the area designated on the plans
as Lots #33 through and including 40, shall be held in escrow by the
Acting Town Attorney, John J. Woodcock, III, and is subject to his
approval, and approval of the Town Engineer. Said parcel shall be
designated as "Parcel A" and the plans shall be modified accordingly.
16. Prior to approval of Phase III of this subdivision, additional open
space areas must be provided for, and must full] comply with all
requirements of Section 5.3 of the Zoning Regulations.
10
William E. Grace, 'Esq. -3- 3/25/82
17. Any application for approval of Phase III of this subdivision must
show Wood Pond Road continuing to the east to connect with Abby Road.
18. Prior to theyg an
buildin of structure on a lot, the subdivider must
y
provide a topographic map, drawn to ascale of 1" = 40' , for each
lot in the subdivision, showing proposed contours and either a basement
floor or a slab floor elevation. No building permits shall be issued
until the proposed contours and floor elevations have been approved
by the Town Engineer. No Certificates of Occupancy shall be issued
until lot contours and house foundation elevations have been completed
according to the Town Engineer's requirements. If, for any reason,
finished grading and site work is not 'completed, the Town Engineer
shall determine the amount of a cash bond to ensure final grading
and site wor . This cash bond shall be submitted prior to issuance
of a Certifi ate of Occupancy.
19. Copies of Sheets 1 and 3, reproduced on black and white transparent poly-
ester film, modified as stated above, ,along with three paper prints
must be submitted to this Commission to be stamped and signed. This
letter, as well as the Inland Wetlands Agency approval letter, must
be reproduced on the mylars. After tUe mylars have been stamped and
signed by th Commission, they will be', returned to you for filing in the
Town Clerk's Office. These plans must be filed within 90 days of the
date of approval (by May 24, 1982) .
Yours very truly,
PLANNING AND ZONING COMMISSION
vg By:
Marshall Montana, Chairperson
CC: R. Sartor, Town Manager
J. Page, Town Engineer
T. D'Auria, Building Official
B. McNamara, Assessor
P. DeMallie, Planning Director
W. Lanning, Fire Marshal
Inland Wetlands Agency
Sewer Commission
Emil Lucek Associates
Boa N a
Ca
O V/ S-CW& �•
1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
f�osoR• 0 AREA CODE 203/644-2511
March 26, 1982
John J. Woodcock, III, Esq.
P. 0. Box 684
South Windsor, Ct,� 06074
Dear John:
Re: 50 Acres, Ltd. - Wood Ponds, Phase II
I am enclosing a copy of the modified approval letter dated March 25,
1982, for Phase ILL of the Wood Ponds subdivision, since you are acting
Town Attorney in ,this matter.
Please note item �15 which requires the applicant to deed to the Town
a certain parcel of land which will be held in escrow until the
open space requirlements in the future are met.
Would you please 'contact Bill Grace, who is the applicant's attorney,
and arrange to provide us with the Deed. After the description is
checked out by our Engineering Department, we'll return it to you
to hold in escrow.
Yours very truly,
PLANNING AND ZONING COMMISSION
vg By:
enc. Mars 11 Montana, Chairperson
CC William E. Grace, Esq.
J. Page, Town Engineer
P. DeMallie# Planning Director v
0110 si,4
60
~ (� a Sau�
•
a �
d 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
-CO AREA CODE 203/644-2511
July 28 , 1982 l .roc f"a ,� lP �/1✓�.,
William E. Gr ce , Esq .
25 Oakland Ro d `I
South Windsor Ct . 06074
Dear Bill :
Re : App . 853 - 50 Acres , Ltd.
Wood onds , Phase II
Please be adv sed that the Planning g & ZoningCommission voted
last night to amend its approval letter dated March 25 , 1982
in the above matter as -follows :
Paragraphs 14land 15 as written are hereby deleted and shall
now read as f llows :
14 . The sure y bond in the amount of $45 , 000 which this
Commissi n is holding on Phase I shall cover subdivision
improvem nts in both Phase I and Phase II , including
the dete Lion basin .
This $45 , 000 bond will not be released until Wood Pond
Road has been completed and connects with Abbe Road .
15 . An Open iSpace Deed to the Town of South Windsor for the
area designated on the plans as Lots #33 through and
including #40 , shall be held in escrow by Acting Town
Attorney',, John J . Woodcock, III, and is subject to his
approval, as well as the approval of the Town Engineer .
Said parcel shall be designated as "Parcel A" and the
plans shall be modified accordingly .
A Deed for the portion of Wood Pond Road in the proposed
Phase III of this subdivision , from Station 13+0 to 20+0
which intersects with Abbe Road , shall be held in escrow
by Acti g Town Attorney, John J . Woodcock, III , and is
subject to his approval as well as the approval of the
Town Engineer .
William E . Grace , Esq . -2- 7/28/82
All the other terms and conditions of the approval letter
dated March 25 , 1982 will remain in full force and effect .
Thi- letter , as well at the March 25th letter , must be
reproduced on the mylars before filing same .
Yours very truly ,
PLANNING AND .ZONING COMMISSION
By : -
vg Louise C . Evans , Vice-Chaff person
CC : J . Page , Town Engineer
T . D 'Auria, Building Official
P . DeMallie , Planning Director
Inland Wetlands Agency
a '
)Outn' ale S ' 71)zt�
mac", 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074
'tiosoR.co�� AREA CODE 203/644-2511
August 5, 1982
Mrs. Marshall Montana, Chairperson
Planning and Zoning Connissim
Town of South Windsor
1540 Sullivan Avenue
South Windsor, Connecticut 06074
RE: Wood Pond Estates
Dear Mrs. Montana:
In accordance uith the Planning and Zoning Cotmiission's March 25, 1982
approval as amended by the Commission on July 27, 1982, relative to the band-
ing requirements for Wood Pond Estates -Phase I and II, I have examined the
proposed warranty deeds from Douglas W. Johnson, Trustee to the Town of
South Windsor. After conferring with A. Bowen Davies of the Public Works
Department, I am sati fied with the substance and form of these two documents
and hereby advise you as to same.
If you have any questions regarding the foregoing, please advise.
Thank you for your courtesy.
qly yours6dcock, III
oan Attorney
JJW:ca
AGREEMENT
The Balf Co. , a corporation with offices in Newington, Connecticut
and Douglas W. ohnson, Trustee, of South Windsor, Connecticut, this loth day
of February, 19 3, agree as follows:
1. Th Ralf Co, will convey and sell the 7.96 acres of land shown
as "OPEN SPACE 0 BE DEEDED TO 50 ACRES LTD. 'WOOD PONTDS SUBDIVISION"' upon a
trap or plan ent tled "SAVIN WOODS Section I Concept Plan Property of The Balf
Company Nevers nd Abbe Road South Windsor, Conn. Lucek Engineering Assoc.
Inc. Seal 1" = 00' Date 2-10-83 Drawn AVH Checked EWL Sheet 2 of 5 Project
83-1" to Dougla . W. Johnson, Trustee upon expiration of the appeal period
following appro al of the Savin Woods Section I application for subdivision
approval by the South Windsor Pla It
and Zoning Commission under conditions
acceptable to The Balf Co, ,
2. T consideration f delivery of the deed shall be one
dollar and other valuable consideration.
3. T e deed shall name Douglas W. Johnson, Trustee as the Grantee
and shall be d livered to Wayne C. Gerlt, Esq. , attorney-in-fact for Mr. John-
son by power o attorney recorded in the South Windsor Land Records.
Enter d at South Windsor, Connecticut the date set forth above.
WITNESSES; DOUGLAS W. JO OA�, TRUSTEE
By g
W ne Christop r G It
ttorney-in-Fact
THE BALF COMPANY
By -
Z'2- z; i
I t s �_-R L'fR
I
C V
1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
it.0 � AREA CODE 203/644-2511
April 20 , 1983
Wood Ponds/Douglas . Johnson, Trustee
c/o 435 Buckland Road
South 'Windsor, Connecticut 06074 CERTIFIED MAIL
Gentlemen:
At the April 18, 1983 meeting, the South Wdndsor Inland--Jetlands
Agency approved with conditions Application NO. 229 for Section III
of the Open Space residential subdivision located west of Abby Road,
South Windsor, Connecticut.
The permit is based on the plans entitled "flood Ponds ,Section III ,
An Open Space Subdivision in an RR Zone , Property of Fifty Acres , Ltd. ,
1720 Ellington Road , South Windsor, Conn. , " Sheet 1 of 5, dated 11/30/81 ,
revised 7/29/82 an 1/30/83; Sheets 4 and 5 of 5 , dated 1/30/83; "Plot
Plan Sheet 2 of 5, dated 1/30/83 and "Topographic Sheet, " Sheet 3 of 5,
•
dated 1/28/83; dra n- by '.'Emil ':J . Lucek Associates.
The following conditions must be adhered to for this permit to
be valid:
1 . The Open pace is to be left in its natural state and
this is tc be so designated on the final plans filed
with the Town Clerk of South rJindsor.
2. Any rubbish and/or debris in the Open Space shall be
removed.
3. The outlet point is to be changed according to
Town Engineering direction.
4. The proposal is subject to the approval of the
Town Engineer.
5. The applicant shall indemnify and hold harmless the
Wood Ponds/Douglas �J. Johnson, Trustee
c/o 435 Buckland Road
South Windsor, Connecticut 06074
Letter of Permit - :application INTO. 229
April 20, 1983
Page 2.
Town of South Idindsor against any liability which might
result from the proposed operation or use .
6. The permit is valid for one year and shall expire if
not initiated and completed within one year from the
date of approval .
Very truly yours,
G{e,rfstance Erik on, Chairman
INLAND �vETLANDS AGENCY
TOWN OF SOUTH WINDSOR
CE :chm
CC : Emil �W . Lucek, Emil 'uu . Lucek Associates
William E . Grace, Attorney
A . B. Davies , Deputy Town Engineer
Richard J. Sartor, Town Manager
Edward F. Havens, mayor
Charles Enes, Town Clerk
Wayne C . Gerlt, Town Attorney
P%.arshall Ti1ontana, Chairperson, PZC
T mas D 'Auria, Building Official
eter De r, allie , Director of Planning
Richard Ryan, Town Council , Town Council Liaison
Peter Bortolan, Chairman, EDC
GERLT & SMITH
ATTORNEYS AT LAW
435 BUCKLAND ROAD
P. O. BOX 559
SOUTH WINDSOR,CONN. 06074
WAYNE CHRISTOPHER GERLT TELEPHONE
PAUL W.SMITH 1203)644-2565
SHARON SEROW,ASSOCIATE May 2, 1983
Mr. Peter DeMa.11ie
Town of South Wind or
1540 Sullivan Aven e
South Windsor. CT 6074
Re: Wocd Pond Est tE s, Section. III
Dear Peter:
I understand you have misplaced the original copy of the cpen space
agreement which we had provided to your office. Therefore, I am
enclosing art executed original copy of the agreement.
If you have any qu -stions, don't hesitate to tact me.
Very u y rs,
W opber Gerlt
bes
Enclosure
pow N s f,
ti
r O-P'S ?d&U&0t
V
�v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
OR•cor� AREA CODE 203/644-2511
May 25, 1983
William E. Grace, Esq.
25 Oakland Road
South Windsor, Ct. 0 074
Dear Bill:
Re: App. #904 - 50 Acres, Ltd.
Wood Ponds, Section III
Please be advised that the Planning and Zoning Commission voted
, last night to modify its approval of the above application which
was granted on May 22, 1983, by adding the following ;paragraph:
22. Beginning at the proposed intersection of Wood Pond Road
and Abbe Road the sightline to the south on Abbe Road shall
be improved by regrading and other means, subject to the
satisfaction of the Town Engineer. The plans 'shall be
modified prior to filing to show this improvement.
All other conditions of approval outlined in the letter dated
May 23, 1983 will remain in effect. This letter must be reproduced
on the plans prior to filing same.
Yours very truly,
PLANNING & ZONING COMMISSION
vg By:
Marshall Montarra, Chairperson
CC: R. Sartor, Town Manager
J. Page, Town Engineer /
P. DeMallie, Planning Director ✓
Emil Lucek Associates, Inc.
no s �
�v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
soe•co� AREA CODE 203/644-2511
May 23, 1983
William E. Grace, Esq.
25 Oakland Road
South Windsor, Ct. 06074
Dear Bill:
Re: hpp. #904 - 50 Acres, Ltd. � �,
Wood Ponds; Section`I I I Atett,
Please be advised that the Planning and Zoning Commission voted
to approve the above application for Phase III of Wood Ponds,
consisting of 20 lots in an open space subdivision in an RR zone,
as shown on plans prepared by Lucek Engineering Assoc. , Inc.
dated January 30, 1983, Proj . No. 82-74, subject to the following
modifications:
1. This approval is for Lots #33 through and including #52 as
shown on the aforementioned plans.
2. Easements for the cul-de-sac at the end of Meadowbrook, and
for drainage and sewers, as shown on the plans, shall be
submitted to this office and are subject to approval by the
Town Engineering Department and Town Attorney, prior to the
filing of the final plans.
3. The deed for the open space of 7. 96 acres must be submitted to
this office and must be approved by the Town Engineering
Department and Town Attorney, and will be held in escrow until
acceptance of the land by the Town Council.
4. Deeds for the roadways shall be submitted to this office and
are subject to approval of the Town Engineering Department and
Town Attorney. Said deeds will be held in escrow by this
Commission until the roads are accepted by the Town Council.
5. An open space improvement plan showing all open space including
the 7. 96 acres to be acquired from the Balf Company, bearing an
A-2 certification, portraying locations of merestones,
provisions for identifying open space access points and boundaries,
and landscaping improvements including land restoration where
necessary, must be submitted to this Commission for its approval.
Said plan shall be prepared after a review of the Environmental
Review Team report concerning the open space areas.
6. A conservatior plan must be submitted and is subject to approval
by the Conservation Commission.
William E. Grace, Esq. -2- 5/23/83
7. Concrete sidewalks, built to Town specifications and in
accordance with Section 2. 5.h of the Subdivision Regulations,
must be installed on the east side of Nevers Road beginning
at Wood Pond toad and extending approximately 360 feet to the
north, on the east side of Meadowbrook Road, and on both
sides of Wood Pond Road. The location of the sidewalk along
Nevers Road must be shown on the plans and is subject to the
approval of the Town Engineer.
8. Street names and location of fire hydrants are subject to approval
of the Fire Marshal of the Town of South Windsor. The location
of hydrants must be indicated on the plans. Street name
signs and sup orting posts shall be installed by the developer
in conformanc with the standards of the Town of South Windsor
and at no exp nse to the Town.
9. All lots shall be connected to the Town of South Windsor
sanitary sewer system and are subject to approval of the Water
Pollution Control Authority.
10. Water shall be supplied to this subdivision by the Connecticut
Water Company.
11. The plans shall be modified as follows:
a. The cul-d -sac at the end of Meadowbrook Road shall be shown
on the pl t plan;
b. Markers aid monuments to be set in accordance with
Section 3. 2. a (2)h of the Subdivision Regulations must be
shown;
C. The line Detween Lots #24 and #25 on the key map should be
corrected to properly shown the line between these lots;
d. The word 'Abby" shall be corrected to read "Abbe" wherever
it appear ;
e. The line etween the open space and open space access strip
near Lot 1 should be deleted;
f. The limits of Phase III must be clarified on the topographic
map and plot plan so that it is consistent with the key map.
g. All open space, including the parcel to be acquired from
Balf Company, must be shown on the plot plans.
12. A drainage assessment fee in the amount of $1, 000 shall be
submitted to this Commission prior to filing the final plans.
13. Street lighting shall be installed at the intersections and
cul-de-sac and shall be in accordance with the policy established
by the Town Manager.
14. Drainage is subject to approval of the Town Engineer.
William E. Grace, Esq. -3- 5/23/83
15. If, for any reason, finished grading and other site work is
not completed, $ie Town Engineer shall determine the amount of
a cash bond to ensure final grading and site work. This cash
bond shall be submitted prior to the issuance of a Certificate
of Occupancy.
16. A liability insurance policy shall be submitted to this
Commission naming the Town of South Windsor as an insured with
a combined single limit for bodily injury and/or property
damage in the amount of $1, 000 , 000.
17. Surety bonds, or other acceptable surety, in the following
: amounts must be submitted to this Commission prior to filing
the final plans:
a. $5, 000 to ensure completion of drainage inthe area of
the easement on the Balf property;
b. $20, 000 tD ensure that no damage will occur in open space
areas fron erosion or encroachment;
c. $70, 000 tD ensure completion of roadways, sidewalks,
sewers, and all other subdivision improvements;
d. $5 , 000 to ensure completion of grading on individual
lots.
18. No building permits will be issued until the final plans have
been filed inthe office of the Town Clerk.
19 . This approval is subject to the conditions of approval of the
Inland Wetlands Agency-,
20. Prior to the ouilding of any structure on a lot, a topographic
map, drawn to a scale of 1" - 40 ' shall be submitted for each
lot in the su division, showing proposed contours and elevations.
No building p rmits will be issued until the proposed contours
and floor elevations have been approved by the Town Engineer.
21. Black and white transparent mylars for Sheets 1 and 2, shall be
submitted to this Commission prior to August 15th, to be stamped
and signed. rhe letter of approval of this Commission as well
as the Inland Wetland Agency must be reproduced on the mylar
prior to filing same in the Town Clerk' s office.
Yours very truly,
P NNING AND ZONING COMMISSION
%14 _/7
vg By
enc. Marshall Montana, Chairperson
CC: R. Sartor, Town Manager
J. Page, Town Engineer
B. McNamara, Assessor John J. Woodcock, III , Acting Town
Attorney
W. Canning, Fire Marshal Emil Lucek Associates, Inc.
T. D'Auria, B ilding Official
Inland Wetlan s Agency
Water Polluti n Control Authorit
� a M sE4,e
CIOC r 0-le SOMM ?d&z�
e �
�v 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 06074
���osoR•co�'� AREA CODE 203/644-2511
September 22, 1983
Mr. Douglas W. Johnson
33 Murielle Drive
South Windsor, CT 06074
RE: WOOD PONDS ESTATES
Dear Mr. Johnson:
In keeping with our convexsation on the Wood Ponds site, the following items were
discussed:
1. 'Ihe on-site gravel can be used in place of the 6" min. processed gravel
subbase, assuming that there are no large stones in this layer and that it
is properly compacted and inspected prior to the installation of the
processed stone-- ackrock.
2. 'Ihe regrading of be Road, as was submitted, is acceptable. I am
assuming that you ill supply us with the appropriate slope rights for
the property on th east side of Abbe Road. It would be appropriate to
meet with the Public Works Department, police and all interested parties
prior to any excav ti-on, considering that Abbe Road is an active 'Town street.
3. the removal of the dead trees and the planting of street trees you understood.
4. The alignment of Abbe Road, I would like resolved prior to the issuance of
any building permits. This request did go out on September 6, 1983; the
timing is up to you.
5. As-built drawings, iron pins and merestones placed in accordance with
Section 4.5 of the Subdivision Regulations for the previous sections. Also,
there should be me estones Set at all angle points around the areas being
deeded to the
If you have any ques 0 , I can be contacted at 644-2511, extension 244.
Very truly yours,
PO
A. Bowen Davies
Deputy Town Engineer
cc: R. Arsenault, Director of Public Works
✓Peter DeMallie, Planning Director
Lester Braddock, sr. Engineering Inspector
Attorney Vim. Grace
Planning and Zoning Commission
_'g!/EM!fpSn"ri-.yj,7 iNfy,'•+, � yE yO". My'. 4
s}�.�=j,';'.� :,••" `)7' x,u'. .,p .=.. _r}.''e;e+ r: ..'tk,
e .1-1:+6m'? r'i+; M+•`.rtyj#' ."s .� r .:xs"Y,y ') p[-n' •r!.ke;` ',�,'_�E'..x r;2..c'..y•=r,r`.r 2".y.' ,*@,,'" r :Y 'ri'tFv .�'_^. ,. l
Eci,
,.wa. •LY i•IL'F.iYrielwp�1A "�%,l:.ti,..:14�� ,,' TM�� iwi'MMif. eJf.y.2i+i —1.�_.._.::1.aui:..+s..wt....,axr►.. -.....,or.. y ,..arw.u-..,o��+WiNi� 'f°".'
r� 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074
-AREA.CODE 20.1/644-25n
February 24, 1986
Wood Ponds/Douglas W. Johnson, Trustee
C/O Wayne Gerlt
435 Buckland Rd.
South Windsor, Ct 06074
Re: Application No. 317 - East side of Nevers Rd.
Dear Mr. Gerlt:
This is a reminder that the permit with the Inland Wetland Agency/
Conservation Commission, Application # 318 will expire on April 18, 1986.
The agency requires i letter requesting extentsion together with a fee
of $25.00. This sho ld be submitted at least 30 days prior to the
expiration date of tie permit .
If you have any questions, please call the agency office or Mr.. Davies,
Deputy Town Engineer.
Very truly yours,
.9 fohn M. Moran, Jr . , irman
Inland Wetlands Ancy/
Conservation Commission
CC: William E. Grac , . A,t.torney
Marilyn Burger, Town Clerk /
Peter DeMallie, Riree.tor of Planri14
Thomas D'Auria, Building, Official'
A. B,., Davies, Deputy, 7own Knginee�r
Robert P. Gilligan, Cha irmam, Planning & Zoning. Comm. "H
RECEIVED
FEH `'� loop
So. WINDSOR PLANNING DEPT.
'r
fi.P�y
'ji A
s e 1540 SULLIVAN AVENUE • SOUTH WINDSOR, CONN. 0607.4
��,w
soR•co AREA CODE 203/644-2511
�
April 22 , 1986
CERTIFIED MAIL
Wayne C. Gerlt
Attorney At Law
435 Buckland Rd.
P.O. Box 559
South Windsor, Ct 06074
RE: Application # 17 - Wood Pond Subdivision - East side of Nevers Rd.
Permit Extension
Dear Attorney Gerl :
At the April 14 , 1986 meeting, the South Windsor Inland Wetlands
Agency/Conservation Commission approved a one-year extension for
the above mention application.
The extension becomes effective April 18 , 1986 with an expiration
date of April 18 , 1987 .
Very truly yours,
�t c_ dff
John M. Moran, Jr. , Cha '
Inland Wetlands Agenc
Conservation Commission
Town of South Windsor
JMM:dlb
CC: A.B. Davies , Deputy Town Engineer
Robert Gilli an, Chairman, Planning & Zoning Commission
Thomas D'Aur ' a, Building Official /
Peter DeMall ' e, Director of Planning
K. Brill, Chairman, Economic Development Commission
John Shemo, Economic Development Coordinator D
•wlNpgpR P
�A��rN� p�pt�•
•
tow N F,<
)OV'At, 0-ye Soam �.
C �
U
ti 1540 SULLIVAN AVENUE . SOUTH WINDSOR. CONN. 06074
SOR•co AREA CODE 203/644-2511
September 23, 1986
Wayne Gerlt, Esquire
112 Deming Street
South Windsor, Connecticut 06074
RE: 'Town t-an j�c�Ance of Public M provemelts
waodpond Subdivision
Dear Wayne:
Before I can recamiexd acceptance of the above referenced project, the
following problems o conditions must be a-dressed.
1. Sidewalk re lacement
Replace 12 flags on Nevers Road.
Replace 2 flags in front of house #15 Woodpond.
Replace I flag west of house #39 Woodpond.
Replace I flag east of house #39 Woodpond.
Replace 2 flags in front of House #175 Woodpond.
Replace I flag west of House #166 Woodpond.
Replace I flag between house #28 & #18 Fox Hill Road.
Replace I flag at driveway House #132 Woodpond
Replace I flag in front of House #120 Woodpond.
Replace I flag east of House #20 Woodpond.
2. Storm Dr ge
Catch basin at approximate station 0+30 left, cut
pi flush to the basin wall.
Catch ba in at the northwest corner of Rockledge
and pond, cut pipes flush to the basin wall.
Catch 1 west of House #154 Woodpond needs to be
cleaned out.
3. Curb Repair
"Back-up" curbs on Nevers Road.
Curb replacement at driveway - House #24 Rustic Terrace.
Curb repair at southwest corner Woodpond & Rustic Terrace.
r Wayne Gerlt, Esquire Page 2.
RE: 'Down Acceptance of Public Improvements
woodpond Subdivision
4. Tree Plantizigs
House #1 8 Woodpond
Trees re laced House #166 Woodpond
House #4 Rockledge
House #5 Rockledge
5. Pavement
Trench patch to be repaired east of House #49 Woodpond
Pavement repair west of House #15 Woodpond
Cracks jai pavement
at approximate station 1+60
west of House #63 Woodpond
on woodpond at Rustic Lane
Note: Tliese cracks can be repaired by
cracks or infra-red techniques.
6. Miscellaneo
A Woodpond road sign be placed at the southeast corner
of Drive and Rustic Terrace. There are sane
Portland cement spoils in the greenbelt on the east
side of Rockledge Drive on the northerly extremis.
We request that all open space monuments be flagged for
easy ideptification.
men these items hav been attended to, I will be able to recommend accept-
ance and subsequent maintenance bond establishment.
Very truly yours,
Richard P. Martel, P.E. L.S.
Town Engineer
RPM/jsv
CC: Michael Gann Director of Public Works
Marcia Banach, Director of Planning ✓
Planning & Zoning Camtission file
Mel Stead, Jr. , Superintendent of Street Services
"O'MN 86q
y �� �•
o = 'Q7,�n
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
SOR•CO AREA CODE 203/644-2511
September 30, 1986
Wayne Gerlt, Esquire
112 Deming Street
South Windsor, CT 06074
RE: Town Acceptance of Public Improvements
Woo pond Subdivision
Dear Wayne:
This letter super cedes my letter of September 23 on the
corrective actions for Town acceptance of the public im-
provements for the Woodpond Subdivision.
On October 25, 19 3, the Planning & Zoning Commission reduced
phases I & II bonding to a maintenance bond thereby accepting
these two phases.
Please disregard those items in my September 23rd correspondence
that are in phases I & II.
Thank you for your cooperation in this matter.
Very truly yours,
Richard P. Martel, P8` & LS
Town Engineer
RPM/jsv