Loading...
HomeMy WebLinkAboutSITE PLAN 1210 TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION Application No. The Cession will officially receive applications Received Date: /-L_S- at its .Regular meeting on the 4th Tuesday of the Action or Public - Hearing by: month, provided it has been submitted to the CamiLssion hairrmn, Secretary or agent by 4:30 P.M. on the Receipt No. i J C1pruceding day. APPLICANT : �SpL-C772 U/W .Z/u n , ADDRESS : 118:5 -J61/11 r- / TCN c3c- y� OWNER OF RECORD ON LAND RECORDS: Ui4,<AX/7'G15-7 ElZV10E ADDRESS : E30e6CF10 ze 20 dK cT. COMPLETE LOCATION OF PROPERTY: r18 S JO HAJ r-LTC q 3 L. V O. ZONE ? (�.- NAME , ADDRESS & TELEPHONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: ���'� l�/4C LE•Cl/3 Cf�� INS J6lf.Wu lc/TG cI/D 130 W1 A.)4D ScoR- TELEPHONE ZS Z -O/ S8 THIS APPLICATION IS FOR: (CHECK ONE OF THE FOLLOWING) 1. Zone Change to (public hearing requiT,td) 2 . Filing for Subdivision fIti: 3. Filing for Open Space Subdivision (public hearing ired) 4 . Filing for Resubdivision (public hearing required)" 5 . Special Exception to Article (public hearing required) V1, 6 . Site Plan of Development 7 . Removal of Sand, Gravel , Clay or Quarry Stone & Ore (public hearing required) 8 . Other (explain in detail) THIS APPLICATION MUST BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED WITH 6 SETS OF PLANS (7 sets if public hearing is required) BEFORE IT IS RECEIVED BY THE PLANNING & ZONING COMMISSION. pplicant - '� OWTIER PLANNING AND ZONING COMMISSION TOWN OF SOUTH WINDSOR Fee Schedule and Policv 1. An application processing fee of $25 per lot ($50 minimum) is required for: Subdivisions, resubdivisions, and open space subdivisions. 2. An application processing fee of $50 is required for: Change of Zone, Zoning Amendment, Special Exception, and Earth Removal or Land Filling Operations. 3. An application processing fee of $25 is required for Site Development Plans, except: where new buildings/additions/renovations of 2,000 s. f. or more are proposed, said fee shall be $50; said fee shall be $500 for Site Development Plans in the Designed Commercial Zone; $50 plus $5 per dwelling unit for Adult Housing ($500 minimum) . 4. An application processing fee of $10 per acre ($300 minimum) is required for a Change of Zone/General Plan of Development in the Designed Commercial Zone. 5. An application processing fee of $100 is required for a Change of Zone/ General Plan of Development in the Multi-Family or DA-15 Residential zones; or for a Special Exception/General Plan of Development for Adult Housing. 6 . An application processing fee of $50 plus $5 per dwelling unit is required for a Special Exception/Site Plan of Development in the M. u1ti- Fa mily or DA-15 Residential zones ($500.00 minimum). 7. Application processing fees are non-refundable after the application has been officially received by the Commission. Application processing fees may be returned prior to the application' s official reception provided a letter of withdrawal, signed by the applicant, has been submitted to the Commission prior to the meeting at which said applica- tion is scheduled to be officially received. 8. Applications unaccompanied by the required application processing fee are incomplete, and as such may be returned to the applicant and removed from the Commission's agenda. 9. Complete applications and required fees shall be submitted at least fourteen (14) calendar days prior to the Regular or Special Meeting at which it will be received. 10. Fees for a previously denied application shall not apply to any subsequent application. However, when a subdivision, resubdivision, or open space subdivision application has been denied within the preceding 12 months or approved for fewer lots than requested, and a new application for the subject tract is submitted by the same appli- cant, then the fee for the new application shall be a minimum of $50 plus $25 for each Lot above and beyond the number of lots contained in the earlier application. 11. A fee of $5 per sign is required for signs to be posted by the applicant on the subject property. 12. Other Fees: Subdivision Regulations - $3.00; Zoning Regulations - $4.00; Zoning Map $1.00; fees for other documents is as determined by the Commission. 13. All checks shall be made payable to "Town of South Windsor." Adopted: 4/10/84 Revised: 12/4/84 t°w" sE+rA /-own- of e -CwL L(/ind 4flfL s 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 SOk cO AREA CODE 203/644-2511 TO BE PUBLISHED IN THE JOURNAL INQUIRER SATURDAY, DECEMBER 13 , 1986 LEGAL NOTICE TOWN OF SOUTH WINDSOR PLANNING & ZONING COMMISSION At the December 9 , 1986 meeting, the Planning & Zoning Commission voted to take the following action: 1. Approve, with modifications, the application of Spectrum Industries, for a site plan of development for property located at 785 John Fitch Boulevard, GC zone. 2 . Approve, with modifications, the application of Southridge Estates, Inc. for a Special Exception and Site Plan of Development for Phase III of Plum Ridge Condominiums, consisting of 36 units, located on the west side of Ellington Road between Parkview South Condominiums and the Town Hall, MF-AA zone. 3 . Deny, without prejudice, the application of Vito Covensky for a subdivision consisting of 38 lots, to be known as Coven Mountain, located on the east side of Abbe Road, and at the northerly end of Plaskel Road, as shown on plans prepared by Lucek Engineering Assoc. , Inc. , dated 1-29-86 and 8-12-86 , A-20 and A-30 zones. Dated at South Windsor, Connecticut this loth day of December, 1986 . PLANNING & ZONING COMA'IISSION Louise C. Evans, Chairman David H. Sorenson, Secretary " r Town ole south V&Uaot G = �C� 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 ftioSOR.coe� AREA CODE 203/644-2511 ,)ecenber 13, 1986 i1r . Jack r allenbach Spectrum Industries 7Z35 John Fitch Boulevard South ;lindsor, Ct . 06074 near N.r. Nallenbach: Re: App. ;1210 - Spectrum Industries, Site Plan Please be advised that the Planning & Zoning Corm.ission voted on December 9th, 1986, to approve the above application for a site plan or development for property located at 785 John Fitch Boulevard, in a GC zone, as shown on plans prepared by James SollDii , P.E. , L. S . , dated 'November 24 , 1986, subject to the following modifications: 1 . The site plan shall be amended to relocate the building as far to the east as possible; the overhead doors shall be relocated on .the westerly side of the building, and the width of the driveway cut shall be reduced . 2. No building permits will be issued until the r:ylars have been signed by the Commission, and fileu in the Office of the To::n Clerk . 3 . An as-built plan will be required prior to issuance of a certificate of occupancy per section 4.13 .10 of the Zoning Regulations. 4. Prior to comnencer:;ent of any site work, a meeting ;rust be held with Town Staff . A black and white transparent plan of the modified site plan, with the letter of approval of this Commission reproduced thereon, must be submitted to the Commission to be stariped and signed. Two blue print co?.ies must also be submitted. After the mylar has been signed, it will be returned to the applicant and must be filed in the Town Clerk ' s office within 90 days . Yours very truly, By: Z.L_�d- 't vg Louise C . ""vans, Chairn;an CC: R. Martel, Town Engineer E . Belleville, Assessor 11. Banach, Planning Director T. D'Auria, Building Official Spectrum Dec. 30, 1986 TOOLING AND GAGING•SPECIAL MACHINES•TURN-KEY TOOLING SYSTEMS•COMPUTER ASSISTED MANUFACTURING SYSTEMS Marsha Banek, Planning & Zoning Town Of South Windsor 1540 Sullivan Ave. South Windsor, CT 06074 RE: Contractor For Construction Work Please be advised that the contractor for the con- struction work at 785 John Fitch Blvd. will be : DMC Construction Co. Inc. 161 Sanrico Drive Manchester, CT 06040 Our contact is John Haugh-643-4139 Th nk you, J. M. Kallenbach SPECTRUM INDUSTRIES --- JMK/gs RE- CEIV , D EC " So WINDSDR PUNNI NG Dat 785 John Fitch Blvd. • P.O. Box 658 • South Windsor, CT 06074 • (203) 282-0158