Loading...
HomeMy WebLinkAboutSITE PLAN PHASE III _ TOWN OF SOUTH WINDSOR PLANNING AND ZONING COMMISSION C, Th Comsissi n will fficially rec Iva applicati no pplicat On NQ,. 3t �� at either Special r Regular meetings provided they ce ived Date . '- were submitted to the C =sisal n Chairp rs n, Secret Ction or Publ ®�d ing by : or agent, at least fourteen (14) days pri r to the meeting at which they will be officially r ceiv d. No application officially received at a Special Me ti ece ip t NO. will be acted upon at that meeting. 1 APPLICANT: John G. Samsel, Jr. and Theresa G. Samsel ADDRESS : 419 Buckl nd Road, South Windsor CT 06074 TELEPHONE 644-1157 OWNER OF RECORD ON L ND RECORDS :Herman Frechette and Kenneth Jackson ADDRESS : 67 Blue idge Dry South Windsor CT 06074 COMPLETE LOCATION OF PROPERTY: 497 Buckland Road, South Windsor CT ZONE RC NAME, ADDRESS & TELE HONE NUMBER OF PERSON TO WHOM INQUIRIES SHOULD BE DIRECTED: William E. Gr ce Es 25 Oakland Road, South 'Windsor CT 06074 , TELEPHONE 644-1528 THIS APPLICATION IS OR: (CHECK ONE OF THE FOLLOWING) 1 . Zone C ange to (public hearing required) 2. Filing for Subdivision 3 . Filing for Open Space Subdivision (public hearing required) 4. Filing for Resubdivision (public hearing required) 5. Specia Exception to Article (public hearing required) XX 6 . Site P an of Development 7 . Remova of Sand , Gravel , Clay or Quarry Stone & Ore (public hearin required) 8. Other explain in detail) THIS APPLICATION MUS BE SIGNED BY THE APPLICANT AND OWNER OF THE PROPERTY AND SUBMITTED WITH 6 SETS OF PLANS (7 sets if public hearing is required) BEFORE IT IS RECEIVE BY THE PLANNING i ZONING COMMISSION. J S JR. He . F :8ette and" n Jackson ByT9PIE521 ELEgfr By race, Their Attorney William E. Grace, lo* �n¢r'�7G �n¢r' L� 1 1540 SULLIVAN AVENUE • SOUTH WINDSOR. CONN. 06074 SOR•CO / AREA CODE 203 644-2511� July 15 , 1985 William E. Grace, Esq . 25 Oakland Road South Windsor, Ct. 06074 Dear Bill : Re : App . #1095 - John G. Samsel, Jr . , Sit Plan, Terry Office Park, Phase III Please be advised hat the Planning and Zoning Commission voted on July 9th to approve the above application for a site plan of development for property located at 497 Buckland Road, as shown on the plans prepa ed by Fuss & O 'Neill , dated 5-29-85, revised to 7-8-85, RC zone subject to the following modifications: 1 . The following tems must be corrected on the plans : a. The key ma must conform to the Zoning Regulations ; b . Cross drai age and travel easements must be indicated; C . The sidewalk easement to the Town along Buckland Road must be shown; d. Iron pins ust be shown on all corners and coordinate numbers sh uld be shown for the pins ; e . The 100 ye r flood should be addressed; f . Abutting p operty owners should be shown. 2 . No building permits will be issued until the final plans have been filed in the Town Clerk ' s Office. 3 . A waiver for t ree (3) parking spaces is hereby granted in accordance with Section 8 . 4. 1 . of the Zoning Regulations . 4 . Prior to commencement of site work a meeting must be held with Town staff . 5 . This approval ' s subject to the conditions of approval of the Inland Wetland Agency/Conservation Commission. 6. The $5 ,000 boni which this Commission is holding in the event sidewalks are 7equired along Buckland Road will be held for an additional 7ear until July 15, 1986. Black and white transparent mylars, together with three paper prints , with the letters of approval of this Commission and the Inland Wetlands Agency/Conservation Commission reproduced thereon, must be submitted William E. Grace, sq . -2- 7/15/85 to this Commission to be stamped and signed. The mylars must be filed in the Town Clerk' s Office within 90 days of the date of approval (by 10/8/ 5) . Yours very truly, PLANNING & ZONING COMMISSION vg By:zt- f rk� �C- Robert F. illigan, airman CC : T . D 'Auria, Building Official / P . DeMallie , Planning Director R. Martel , T wn Engineer E. Belleville , Assessor Inland Wetlands Agency/Conservation Commission Buckland Professional Center 419 Buckland Road South Windsor, CT 06074 T lephone (203) 644.2940 July 19, 1985 Mr. Peter DeMall e Planning Director Town Hall 1540 Sullivan Avenue South Windsor, nn. 06074 D ar Nor. Della l i As per our pre c nstruction meeting on Friday, July 19, 1985, I submit to you our const ction Time Table. 1. Stripping of top soil to begin July 19, 19g5• 2. All soil conservation and soil errosion measures will be in place on or before July 19, 19g5• 3. Concrete foundation to be set July 22, 1985. 4. Drain to be completed before July 26, 1985. 5. All site work and paving to be completed before or by the 2nd week of September. 6. All site work and drainage to be installed by James and Howard Slater of South Windsor. 7. Building as approved by Planning and `Louring to be completed and occupied on or before October 1, 1985- 8. All 1 dscaping, sod and shrubs to be installed on or bedgre October 12 1985. Very truly yours., John Samsel, Jr CC: Richard Martel, Town Engineer