HomeMy WebLinkAboutSITE PLAN PHASE II TOWN OF SOUTH WMSOR
PLANNING AND ZONING COMMISSION
PLANNING AND ZONING CMMSSION ACTION THIS APPLICATION SHALL BE ACCEPTED BY
APPLICATION # THE PTAWpG AND ZONING COWISSION AT
RECEDED DATE. VM REGULARLY SCHEDULED XMnNG Ql THE
APPROVAL DATE: FOURTH TMSDAY OF THE MONTH. IT SHALL
REJECTED DATE:
BE SUB1rII1TED TO THE PLANNING AND
RECEIPT # ZONING COMMISSION OFFICE ONE (1) WEEK
PRIOR 70 THE FOURTH TLESDAY.
APPLICANT: John.Samsel. Jr.
ADDRESS: 419 Buck and Road, South Windsor CT 06074 TELEPHONE # 644-1157
OWNER OF RECORD ON S.W. LAND RECORDS John Samsel, Jr. and Theresa G. Samsel
ADDRESS: 419 Buck and Road, South Windsor CT 06074
COMPLDA DESCRIPTION OF LOCATION OF PROPERTY A Commercial Lot on the north
side of. Buckland Road See attached site plan map.
Z= RC
NAME, ADDRESS A 7ELEPHONE # OF PERSON TO WHOM CORRESPONDENCE AND INQUIRIES SHOULD BE
DIRECTED: William E. Grace, Esq. , 25 Oakland Road, South Windsor,
CT 06074 TELEPHONE # 644-1528
THIS APPLICATION IS R: (CHECK ONE OF THE FOLL wnX)
1. Zone Change to Zone (public bearing)
2. Filing for Subdivision
3. Filing for Open Space Subdivision (public bearing)
4. Filing for Resubdivision (public bearing)
5. Specia Exception to Article of the Zoning Regulations (public hearing)
XX 6. Site Development Plan
7. Removal of Sand, Gravel, Clay or Quarry Stone b Ore (public hearing)
8. Other explain in detail)
THIS APPLICATION musT BE SIGHED BY TEE APPLICANT AND THE OWlIER OF THE PROPERTY AND
SUBMITTED ALONG WITH THREE SETS OF PLAN BBP+ORE IT WILL Z ACG�pZED BY THE PLANNING AND
NG CON¢iISS ON
4��
A L CANTr
John Samsel, Jr John Samsel, Jr. i
Theresa G. Samsel
(over)
10,N seq
O �
e �
1540 SULLIVAN AVENUE SOUTH WINDSOR, CONN. 06074
�f`�oSOR,Co AREA CODE 203/644-2511
September 19, 1984
John G. Samsel, Jr./Theresa G. Samsel
419 Buckland Road
South indsor, Ct. 06C74 CERTIFIED MAIL
Dear Mr. and YxI s. Sams 1:
At the September 7, 1984 meeting the South Windsor Inland Wetlands Agency
approved with conditio s Application No. 291 foi the purpose of building a res-
taurant and commercial building, Terry Office P�' rk - Phase II, on Buckland Road.
The permit is based on the plans entitled 'Terry Office Park - Phase II" pre-
pared for John G. Sams el Jr.Theresa G. Samsel, by consulting engineers of Fuss
and O'Neill. Such plans are dated July 23, 198� having no revisions to date;
sheets 1 and 2.
The following conditions must be adhered to for this permit to be valid:
1. A Conservation Plan must be submitt d showing plantings and
stabilization of brook area,to be s bmitted to the Conservation Commission.
2. The proposal is subject to the approval of the Town Engineer.
3. The application shall indemnify a~n(' hold harmless the To.*n
of South Windsor against any liability which might result
from the proposed operation or use.
4. The permit is valid for one year and shall expire September
17, 1985, if not initiated and completed within one year from
date of a proval.
Very truly hours,
Constance Eriksson, Chairman
INLAND WETLANDS AGENCY
CE/se TOWN OF SOUTH WINDSOR
cc: C. Stone, Fuss and O'Neill
Jac ueling Smith Town Clerk
A. B. Davies, Deputy Totim Drigineer
Richard Sartor, own Manager
Richard Ryan, Deputy Mayor
Robert F. Gilligan, Chairman PZC
Thomas D'Auria, Building Official
RECEIVED
Peter DeMalli e, Director of Planning✓
Kenneth Brill, Chairman EDC ate i984
SO, WINDSOR PLANNING DEFT,
r �011
r-aa�
U
0-les
�v • 1540 SULLIVAN AVENUE SOUTH WINDSOR. CONN. 06074
e-co REA CODE 203/644-2511
Oct ber 12, 1984
William E. Grace, Esq.
25 Oakland Road
South Windsor , Ct . 06074 SO- WIND OR PLANNING DEPT.
Dear Bill:
Re: App . #1018 - John Samsel pea,."
Terry Office Park, Phase II
Please be advised hat the Planning and Zoning Commission voted
to approve the above application for a site plan of development
for property located on the west side of` Buckland Road, north
of Deming Street, s shown on plans prepared by Fuss & O 'Neill,
dated 7-23-84, Pro ' . No. 79-263, subject to the following
modif ications:
1 . The Federal Em rgency Management Agency must change the flood
plain map to m ve the line away from the proposed building ,
and applicant nust submit proof that this has been done to
this Commissioi prior to filing the final plan.
2 . A waiver for f urteen (14) parking spaces is hereby granted
in accordance with Section 8 . 4. 1 of the Zoning Regulations .
3. Sidewalks, bui t to Town specifications, shall be installed
on Buckland Road along the entire f ontage of Terry Office
Park, Phases I and II .
4 . This approval s subject to the approval of the Inland Wetlands
Agency, and Conservation Commission.
5. The dumpster shall be installed on concrete pad and screened
with a 6' stockade fence .
6 . Twelve (12) parking spaces shall be designated for use of
the restaurant patrons only .
7. No building pe mits will be issued until the final plans
have been filed in the Town Clerk' s Office.
i
8 . Prior to commencement, of work on th ' s site , a meeting must be
held with Town staff .
Within 90 days of he date of approval (by January 7 , 1985) � a
black and white transparent mylar of Sheet #1 , with the letters
i
i
' I
William E. Grace, sq. -2- 10/12/84
of approval of this Commission as well as the Inland Wetlands
Agency and Consery tion Commission reproduced thereon, must be
submitted to this Commission to be stamped and signed. Three
blueprint copies must also be submitted. The mylar will then
be filed in the Town Clerk' s Office.
Yours very truly,
PLANNING AND ZONING COMMISSION
A .
v g
Robert F. Gi igan, Chiirmatf-``5�
CC : R. Martel , Town Engineer
T. D 'Auria, Building Official
P. DeMallie, Planning Director
E. Belleville Assessor
Inland Wetlan s Agency/Conservation Commission
wGY 'K�,y `
Eb
Federal Emergency Management Agency
`'VashinA�tton, D.C. 20472
y
CERTIFIED MAIL IA-RA-RS (1 02a)
RETURN RECEIPT REQUESTED
Community: Town of South Windsor,
Hartford County, CT
Honorable John Mitchell Effective Date of
Mayor of the Town of South Windsor this Revision: January 2, 1985
1540 Sullivan Avenue Community Number: 090036
South Windsor, Connecticut 06074 Suffix Code: B
Dear Mayor Mitchell:
The Flood Insurance Rate Map (FIRM) and Flood Boundary and Floodway Map
(FBFM) , panel 0005 B dated May 1 , 1980, for the Town of South Windsor,
Hartford County, Connecticut, have been revised to reflect revised topographic
and hydraulic data f r Plum Gully Brook in the area of the Buckland Road
bridge. This modifi ation results in the narrowing of the Zone A3 flooding
shown on the FIRM an the 100-year flooding shown on the FBFM from the Buckland
Road bridge to a poi t approximately 400 feet downstream. Modifications to
the floodway are summarized in the configuration below:
Revised Floodway Con iguration
Distance Downstream of Existinq Total Modified Left of Channel Right of Channel
Buckland Road bridge Width Total Width Centerline* Centerline*
Downstream Face 107' 124' 8' 116'
1001- - --- 2-55'--.-- 113' _ 63' 50'
2001 2 20' 83' 451 38'
300' 190' 1351 55' 80'
400' 170' 110' 50' 60'
*Look i ng downstream
These modifications amend the currently effective FIP14 and FBFM, community
number 090036, panel 0005 B, dated may 1 , 19130, and will be incorporated into
the next physical map revision for the Town of South Windsor, Connecticut.
These modifications ave been :Wade pursuant to Section 206 of the Flood
Disaster Protection kct of 1973 ( P.L. 93--234) and are in accordance with the
`rational Flood Insurance Act of 1968, as amended (Title XIII of the Housing
and Urban Development Act of 1968, P.L. 90-4 8) 42 U.S.C. 4001-41 28, and 44
CFR Part 65.
As required by the 1 gislation, a community must adopt and enforce flood plain
management measures n order to ensure continued eligibli ty to participate in
the National Flood I surance Program. Therefore, the Town of South Windsor
must enforce these r gulations using, at a minimum, the elevations and zone
designations in the pecial flood hazard areas as shown on your community's
FIRM, including the odifications made by this letter of map revision.
These modifications re effective as of the ate of this letter. However, a
review of this dete ination and any request for changes should be made
within 30 days. Any requests for reconsider tion must be based on scientific
or technical data.
The community number and suffix code listed ove will be used for all flood
insurance policies a d renewals issued for y ur community.
A Consultation Coord' nation Officer (CCO) has been designated to assist you
with any problems yo may have concerning these modifications. The CCO will
be the primary liais n between your communit and the Federal Emergency
Management Agency. our CCO i s:
Mr. Edward Thomas Chief
FF14A, Natural & Technological. Hazards Division
J. W. M Cornack Post Office. and Courthouse Building
Room 462
Boston, Massachusetts 02109
(61 7) 2 23-2616
Any questions may be directed to your CCO.
Sincerely,
c�i�necl
Brian R. '1 az iK, Ph.D.
Chief, Risk Studies Division.
Federal Insurance Administration
Enclosures
cc: mr. Christopher Stone, Fuss and O' Nei 1
Mr. John G. Sams 1
�Mr. Richard P. `1 rtel, P.E. , L.S. , Town ngineer
•
w
16. 1540 SULLIVAN AVENUE SOUTH WINDSOR• CONN. 06074
l��soAt-co�'� AREA CODE 203/644-2511
April 19 , 1985
Mr. John Samsel
419 Buckland Roa
South Windsor, Cl:. 06074
Dear John:
Re: Amended Site Plan - Terry Office Park
Please be advised that the Planning and Zoning Commission voted
to approve an amended site plan prepared by Fuss & O'Neill,
dated 7-23-84, revised to 3-22-85, showing an additional 13
parking spaces to the rear of the building, for a total of 28
spaces.
Yours very truly,
PLANNING & ZONING COMMISSION
v g y.
Marshall Montana, Vice-Chairm-aiY
CC: P. DeMallie Planning Director
R. Martel, own Engineer
so.
WINDSOR PLANNI"O DEFT*