Loading...
HomeMy WebLinkAboutReplace gas service Street Cut Permits 2 (3) io APPLICATION fQ TN'EEl` CAV TION PERMIT #YR _TOWN:,-6 Sq THt OR Amt. Bond,Required PUBLIC WQ�AKupPA MENT Amt. on File 4: TOWN. HALL Date of Expiratio Permit AVENUE tf �• �540 SULLIVAN Dare �`--- Ins.: on File O Yes '~ O No SOUTH INDS CT' Permit Expires /= Expiration Date Name of Firm - Yd4L lC W+ (90-S Address of Firm "Phone No, a 1"-? •..2.2.5`' Location of proposed work i3Oc,.4re~ /?A* Describe fully nature of permit requested_ 0,010co¢C E Starting date 6' • .Z 5/ " 6 — Call before you dig No. Approx. time for completion Traffic Services Control No. Show sketch of proposed work or furnish To o be flilled pA by Town of S two copies of separate drawing Pavement Cut Indicate North Prop, size of cut a 6-,!7— No. cuts Amt. of Deposit $_. by ' O Cash { ) Check # /G Cut size after Perm Patch No. Cuts -------------------------- ..5 Final Billing $ _. ,_ Amt. Due Payee $ Applicant is responsible for contacting Amt. Due Town $ the Police Dept, and C.B.Y.D. by date I agree to funish to the Town of South Windsor the amount of bond required and to reimburse the Town of South Windsor for any expenses incurred by the Town for maintenance or repair work in connection with this permit and that I am familiar with 4willa by the rules and regulations, for permits as outlined in the Town of.South Windsor's Street Cut Permit Manual, Signed: I / Gro Title:- �itJ 67 tiO �Ofivsuw D.L,I:: Dated S'-'3/ 9'6 PffoAfT SK4LL 113V ON AT ALL TIMES APPROVED: _DATE: -3/h,6 Nr GINEER FOR INSPECTOR: Date work started Date Completed Signed Date ----WHITE=_-PERMIT YELLOW - ENGINEERING PINK - ST. SERVICES GOLDENROD FINANCE