Loading...
HomeMy WebLinkAboutDrain Layers Permit 28 Wildlife Trail Permit No. 8086 Town of South Windsor, CT Permit Date 09/12/2006 Drain Layer Permit Expiration Date 10/12/2006 Descrip: SANLAT 60.00 CASH Applicant L8S'6 ij,on Name FOLSOM CONSTRUCTION'.: LLC AccY 3,L�$$ RIVERWALICSi7BDIV Addr. 138 RYE STREET SOUTH WINDSOR Q.T.- 060-7$ ,,... Phone No. (860)528-8j28. zK The Drain Layer assigned tlXisxkYs Iasi �zlad 1'ien3estied by the state and hereby agr.ee�'".t0 i;.:>1"':::theT`terms"and Acori'c i. 'fit "'"< ` `t. orf5. et:<::;,f_oth in the attached 'Conditions:,.' >;:::_. ..:..;.:; 3c,cardance, wYth Tasvn of South Windsor standards, all OSkIA' equir-6.6hts.t. anti tie attached-;.conditions. z Issued BY --' _- --- #-------------------- Date Inspected ----------------- I.ri'ffp_�dt' :::By TOWN OF SOUTH WINDSOR INSPECTION REPORT Permit No. 8088 Cont;rac'Eor, FOL 4.SO 1:0ONSTRUCTION LLC Location LOT8 RIVERWALK SUBDIV Ail'dre's 138.;'RYI{; STREi;.T Type Work NEW SAN LAT � ,SOUTH �INiSpOR CT 06074 c Ffhor�e ?+To (8�L1)52r8 $�28 _.. 44 J Date Insp Needed ------------ ---- bates Zns , Time Insp Needed Time Irby 0 ------------ Insp ected By j Work in Progress x ------ - -------------- ----------- - � r ] ------- 8te -------------- TOWN -OF SUU1N WINUSUH . SANITARY SEWER .* LATERAL TIELD :- LOCATION DATE OF CONSTRUCTION: BUILDING ADDRESS fig' ` Le/iQ 2ha1I STREET SUBDIVISION: :i?'ver- (,J4/!C NORTH ARROW _ i { ! _ t Al I � 4J � _. 1. e 1112 t I 1 I tft___L_j__L al CONTRACTOR (PRINT) NAME OF CONTRACTOR'S SUPERVISOR (PRINT) STREET ADDRESS SIGMA RE fr,- ;' (560r C; ( `���- DATE TOWN STATE ZIP INSPECTED TOWN DATE TELEPHONE NUMBER WHITE = TOWN PINK CONTRACTOR YELLOW.— CONSULTING ENGINEER / DEVELOPER 2c � APPLICATION FOR DRAIN LAYER PERMIT TOWN OF SOUTH WINDSOR PUBLIC WORKS DEPARTMENT TOWN HALL 1540 SULLIVAN AVENUE SOUTH WINDSOR, CT FEE $60.00 n \JJN Location of proposed work: 41e1A1x1t117k. �� �I/J-1 • - Street No. Street Name Lot #� Premises owned by: w Name of Firm: _ Phone: 124- Z Address.of Firm: -IYPE OF WORK: Lay House Drain Repair House Drain Lay Main - • Lay Lateral for Commerdal/Industrial Building of acres Connection will be made with ExisOng Water Supply: Public Water Well Proposed Start Date9 Estimated time for completion ALL WORK TO BE IN ACCORDANCE WITH•TOWN OF SOUTH WINDSOR STANDARDS ALL OSHA REQUIREMENTS AND CONDITIONS ATTACHED TO THE PERMIT Permit-is to be issued to d S the Layer's License No. a f? N C. holder of Drain Will be issued.a Only holders of P-1, P-7 or W7. licenses Permit: PERMIT WILL EXPIRE THIRTY(30) DAYS AFTER DATE OF ISSUANCE. The undersigned Drain Layer hereby agrees to all the terms -and conditions set forth in the permit and attached thereto -Town Street Excavation Permit No. thereto. Applicant has received . and/or ConnDOT Permit Na CBYD No. ZD 06? OD <--q<, Signed: Print Name: Adt- Licensed Dr ' yer Date: Standard FormA\Permits\APPLIGgTION FOR DRAIN LAYERS PERMIT.doc