Loading...
HomeMy WebLinkAboutDrain Layers Permit 123 Spinners Run 4 TOWN OF SOUTH WINDSOR DEPARTMENT OF PUBLIC WORKS l 1S # Z 3 BUREAU OF POLLUTION CONTROL 2 3 DRAIN LAYER'S PERMIT N22 5970 445" 19 b Pursuant to written application . permisson is ereby granted to the Licensed Drain Layer named herein to perform the work indi ate=d . ow at/ at premises owned by - e4e whose address is and to Lay House Drain, Repair Howse Drain, Lay Main,- Other , for occupancy or use, with Family Units, with acres. Type of Sewage to be connected under this permit : SANITARY SEWAGE (V) , INDUSTRIAL WASTES ( ) , OR Connection will be made with Show sketch of proposed work or furn s two (2) copies of separate drawings. OSHA REQUIR ENTS MUST BE FOLLOWED SPECIAL CONDITIONS .Desired Starting Date Estimated Time for Completion Permit to be issued to 0 the holder of Drain Layer's License No. ) 974 Permit will expire thirty (30) days after date of issuance. The. .undersigned Drain Layer hereby agrees to all the terms and conditions set . forth _in the permit and` the` reverse side thereof. . Applicant has received Town Permit No ndfor CHD Permit No. S i&1n Licen rain Layer The above named Drain Layer has a valid lice ns issued by the State of Connecticut and has filed a satisfactory nd and nsurance `policy in the name of the Town of South Windsor s , a E gin ing Dept. Date c0 Permit Fee Paid $ ��,.� Cheer-umber. QT Connection Charge Receipt No. .kpa�..j Dated Issued by INSPECTION Date work started - Date completed 5-- 2-0.-" Sufficient notifies on r ce ve :' :: es No Special Conditions APPROV Inspector Date TOWN OF SOUTH WINDSOR SANITARY SEWER INSPECTION CHECKLIST FUNCTION NO YES N/A DATE INSPECTED 1. Is Pe t On Job Site --2�-p� L-- s 9,70 2. Police Notified A, 3. Safety Items In Place a. Shoring, Trench Box, Ladder A_ b. Hard Hats c. Pumps - 4 . Proper Material a. Pipe b. Pipe Bedding _ C. Backfill d. Warning Tape _ e. Pipe Cap or Plug _ f . Cleanouts g. Fittings h. Manhole i . Cover & Frame 5 . Existing Lateral Cap Removed in Presence of Inspector 6 . Lateral probed and found to be clear 7 . Pavement Cut Properly 8 . - . Trepch & Bedding OK / 9 . Joints Properly Done 10 . Backfilling (12" Lifts) & Compaction 11 . Manhole Inverts Built 12 . Subbase Material Placed 13 . Base Material Placed 14 . Blacktop (Temp) w/Proper Grades & Slopes 15 . Pressure Test 16 . Mandrel Test 17 . Installation agrees with plan 18 . As-Built plans recorded