Loading...
HomeMy WebLinkAboutDrain Layers Permit 47 Shares Lane 632 TOWN OF SOUTH WINDSOR , DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT �-- DATE: Pursuant to written application, erm rion.is hereby granted to the Licensed Drain Layer named herein to perform work at Lot# W as indicated below, at Premises owl7e40y whose address is d to Lay House Drain , Repair Houefe Drain Lay Main Oth r for occupancy or use, with acres.' Type of Sewage to be connected under this permit.• SANITARY SEWAGE( , /NDUSTR/AL WASTES l J, OR f J Connection will be made with A/l work to be in accordance with Town of South Windsor standards, a//OSHA requirements and the conditions indicated:on the back of this permit. Proposed start date ' Estimated time for completion C7 . .be issued to /1/f-LA', Ct ' S the holder of Drain Zayer's License No. - Only holders of P1 -7 & W9 licenses will be issued permit. Perm/t will exyire thirty (301 days after date of issuance. The undersigned Drain Layer hereby agrees to all the terms and conditions set forth in the permit and the riewme side thereof. Applicant has a own S vat/ 'Permit No. and/or ConnDOT emit No. Signed Licensed Dr in Layer FOR TOWN USE ONLY Permit Fee Paid$ ? 5. 00 (Check No.) tf Z 7 PA 9-14-95 Y N Connection Charge $ C20o,b n (Receipt No.) Dated 9-T Insurance on File Bond on File 447 l This permit is hereby issued to die above named Drain Layer who has a valid /loense issued by the Slate of Connecticut and has on file,sedsfactory bond Premises subject to and insurance in the name of the Town of South Windsw. Intertown Agreement ( J ( l Record of Sewer Assessment Issued b Date INSPECTION Date Work Started 9' 9 5 Date Completed Z9 9-5- Comments APPROVED: 9- 15_ Inspector Date • SANITARY LATERAL & EXCAVATION PERMIT INSPECTION REQUEST DATE OF REQUEST: (4-9 S TIME: f 00 BY: Do:�V4,p/ R FOR LOCATION: VA 4 � DAY INSPEC. NEEDED 9 -r�--9S TIME: TYPE OF INSPECTION: (� ) SANITARY/LATERAL (PERMIT NO. CO 3 2 ) ( } FOOTING DRAIN ( } EXCAVATION (PERMIT NO. ) ( ) OTHER INSPECTION REPORT DATE: 9 TIME: 31, ccINSP: CONTRACTOR: WEATHER: IF WORK IN PROGRESS: Zw"gzs�m- -A&Z 44�02n a AREA OF CONCERN: SPECIAL INSTRUCTIONS: P