Loading...
HomeMy WebLinkAboutDrain Layers Permit 21 Shares Lane .Q .3,�...k.. ,` ' .'' 'rr.`AS. 6396 TOWN OF SOUTH WINDSOR DEPARTMENT OF PUBLIC WORKS BUREAU,OF POLLUTION CONTROL DRAIN LAYER'S PERMIT DATE: z Pursuant to written application, permission is;hereby ranted;o�the Licensed Drain Layer named herein to perform work at ��JA�o 9/., Lot# as indicated bz10 at premises ovine bd y - whose address isJr to Lay House Drain'_ ,�Repair Ho se Drain. , Lay Main OtlKerfor occupancy or use, with " acres. Type of Sewage to be connected under this permit.• SANITARY SEWAGE. 'INDUSTRIAL WASTES(1, OR{J Connecdon will be made with A# work to be in accordance with Town of South Windsor standards, al/OSHA requirements and the conditions indicated on the back of this emit. Proposed start date 7/ WEstimated time for completion / C Permit is to be issued to the holder of Drain Layer's License No. C� Only holders of P1 W9 licenses will be issued permit. Permit roil/exvire thirty (M after,Ze of issuance. The undersigned Drain Layer hereby agrees to al/ the terms and conditions set forth in the permit and the reverse side thereof. Applicant h received Town Str��tion P it No. andfor ConnDOT Permit No. _ Signed sensed Drain Layer FOR TOWN USE ONL Y Permit Fee Paid$ 7.,4�" (Check No.) f U G Y N Connection Charge $ 6 00 (Receipt No.) -41h.�J Dated 7--04+��� Insurance on File (0 ( ) Bond on File (9 ( ) This permit is hereby issued to the above mined Drain Layer who has a valid license issued by the State of Connecticut and has on file,satisfactory bond Premises subject to and insurance in the name of the Town of South Windsor. lntertown Agreement ( I (1 Record of Sewer Assessment ( I ( J Issued by Date Z "ZT9G INSPECTION Date Work Started Date CompletedZ-�-3,� Comments APPROVED: Inspector Date SANITARY LATERAL & EXCAVATION PERMIT INSPECTION REQUEST DATE OF REQUEST: -7i7 S'� TIME: BY: LOCATION: Zti?—l� FOR DAY INSPEC. NEEDED �=�� 7G TIME: TYPE OF INSPECTION: ( �) SANITARY/LATERAL (PERMIT NO.4!53�!G } ( ) FOOTING DRAIN ( ) EXCAVATION (PERMIT NO. } ( ) OTHER INSPECTION REPORT DATE: TIME: ���/ INSP: CONTRACTORS ��1/IGGe LT�G�62-r/, WEATHER: WORK IN PROGRESS: c_ AREA OF CONCERN: SPECIAL INSTRUCTIONS: