Loading...
HomeMy WebLinkAboutDrain Layers Permit 142 Scott Drive ' TOWN OF SOUTH if WINDSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT N2597S June 25, 1993 _19 Pursuant to writt�n application, permission is hereby granted to .the Licensed Drain Layer :famed herein to _perform the work indicated ' below at 142 Scott 'Drive; So. Windscat premises owned by whose address is and to -Lay House Drain, X Repa-kr House Drain, , Lay Main, Other , for ` _____.occupancy or use, with Family Units, with acres. Type of Sewage to be connected under this permit : SANITARY SEWAGE ` INDUSTRIAL WASTES ( ), OR ( ) Connection will be made with Show sketch of proposed work or furnis .'tw (2) copies of separate drawings. OSHA REQUIREMENTS MUST BE FOLLOWED SPECIAL CONDITIONS Desired Starting Date `�/l3 Estimated Time for Completion ,'Permit to be issued to - L E_?/ C /•� the holder of Drain Layer's License No.�-'� 4a Permit will expire thirty (30); days after d`ate. of issuance. The. undersigned . Drain Layer hereby agrees : to all the terms ;and' conditions set . forth in the permit, and the `:reverse side thereof. Applicant has received Town Permit No, and or CHD.- Permit. No. Signed' L ce rysed Drain Lay The above named Drain Layer has a valid license issued by the State of f Connecticut and has filed 'a satisfactory bond and insurance policy in the name of the Town. of South Windsor: En ine g Dept. Date t Permit. Fee Paid $ D'��,C� Check umber Connection Charge Receipt No. Dated Issued by G/ INSPECTION Date work started ` Z —9 Date completed Sufficient notification recelveav --yes No ' Special Conditions + APPROVES zR Inspector Date' TOWN OF SORTS WINDSOR SANITARY SEWER INSPECTION CHECKLIST FUNCTION -. NO YES N/A DATE INSPECTED 1. Is Permit On Job Site (C)r ZB s` A pq S9 7g _ 2. Police Notified _ 3 . Safety Items In Place a. Shoring, Trench Box, Ladder b. Hard Hats _ C. Pumps �f 4 . Proper Material a. Pipe _ b. Pipe Bedding _ c. Backfill X d. Warning Tape e. Pipe Cap or Plug _ f. Cleanouts _ g. Fittings h. Manhole _ i. Cover & Frame _ 5 . Existing Lateral Cap Removed in Presence of Inspector 6 . Lateral probed and found to be clear 7 . Pavement Cut Properly _ 8 . Trench & Bedding OK _ 9 . Joints Properly Done 10 . Backfilling (12" Lifts) & Compaction 11 . Manhole Inverts Built _ 12 . Subbase Material Placed A 13 . Base Material Placed _ 14 . Blacktop (Temp) w/Proper Grades & Slopes 15 . Pressure Test _ 16 . Mandrel Test _ 17 . Installation agrees with plan _ 18 . As-Built plans recorded _