HomeMy WebLinkAboutDrain Layers Permit Rosemary Lane (2) f' J TOW OF SOUTH WI N DSOR x
" t DEPARTMENT OF POLLUTION CONTROL
t iSouth Windsor, Connecticut
f f
r
DRAIN LAYER'S PERMIT '. 93
:13 tom'
Pursuant to written application; permission is hereby granted to the Licensed Drain"Layer named herein to perform
the work itidicated below at ..r- a on the
i side "
j: at premises owned byx
r , whose address-is 's � M MIr4 O-WAWOU
} and to Lay House Drain, Repair House Drain, Lay Main, , ,WOthe�3 ,
for occupancy_or use,
RIM
s - ,
with +° f s Family Units with acres.
Type of Sewage be connectedunder:this permit
o
a : SANITARY SEWAGE, ,; F, I1 DUSTRIAL WASTE, OR
t
Connection:will be made with '� �
7.
k Permit to be isAued:to *;
the holder of Drain Laycers License No. Permit will expire on �► 19
w '► ' '''
The undersigned Drain Layer hereby agrees to all the terms and conditions set forth on the permit and the reverse side
theregf. Atwlicant has rreceived Town Permit No '` and/or C H D Permit No
s for street excavation,
SPECIAL (CONDITIONS
F
: Signed
h Connection,Charge Paid $ Licensed ay
Air-
@ (Sig) Issued by
+ w
Tax Collector
Permit Fee:•n-Paid $
INSPECTION: ' rNow
INITIAL (Sig)
FINAL (Sig)
APPROVED (Date)
(Sig-)
INSPECTOR
Oak Grove Acres Capped Sewer Project
Report # 15
TOWN OF. SO. WINDSOR CONN . DATE 20 September19 71 erle to Rosemary ROW STREET
WEATHER AM Cloudy, cool INSPECTORMelpin Edwards, Jr.
WEATHER PM Same JOB STARTED FINISHED
TRENCH OPEN FROM STA 0+00 (M/H 10+:62.79) TO STA 4+42 (M H 4+10)
SEWER LAID FROM STA 2+91 TO STA 4+42 (M H 4+10)
MANHOLE NO. STA
MANHOLE NO , STA
b inch Y North, South East, West, CHIMNEY (with depth) House Number
STA
STA
STA
STA
STA
STA
STA
EXTRA STONE OR PROCESSED -GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA HOUSE N06 LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO, LENGTH DEPTH
STA HOUSE NO, LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
DRAWING OR SKETCH (below)
1 Foreman 1 Back Hoe
2 Operators 1 Pay Loader
2 Laborers 1 Equipment Truck.
REMARKS: Clapp foreman advised this Department that this would be end of their work on
the capped sewer for a time - at least until more blasting hasbeen completed. Asked that
he remind his boss to advise this Department at lea$t one (1) day ahead of future work.
V
10 September, 1971
Oak Grove Acres _ Capped—Sewer—Protect
- - - - - - - - - - - - -
Spoke with John Clapp this afternoon to get some idea of when he intended to continue
laying sanitary sewer lines in this development. He seemed to think that Ravizza Brothers
would probably begin blasting again on Monday, the 13th. Further, he expected that his
crew would start laying additional sewer line shortly thereafter - possibly later the
same day.
13 September, 1971
Oak Grove Acres _ Capped Sewer—Project—
Arrived on the Berle Road site at approximately 0800 and spoke with Clapp's foreman.
He had heard of no scheduled blasting for today and seemed to think that it would be
some time before work on the sanitary sewer line could be continued.
Oak Grove Acres - Capped Sewer Project
• ReR2rt # 14
TOWN OF SO. WINDSOR CONN. DATZ7 September 1 Rosemary STREET
WEATHER AM Misty, humid INSPECTOR Melvin EdKards Jr.
WEATHER PM - JOB STARTED n= FINISHED 1030
TRENCH OPEN FROM STA TO STA
SEWER LAID FROM STA TO STA
MANHOLE NO. STA
MANHOLE NO. STA
b inch Y North, South East, West, CHIMNEY (with depth) House Number
STA
STA
STA
STA
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA 11+03.79 north HOUSE NO-Lot No. 9 LENGTH 40 feet DEPTH 1. itch
STA HOUSE NO. LENGTH DEPTH
STA HOUSE N0, LENGTH DEPTH
STA HOUSE N0. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
DRAWING OR SKETCH (below)
1 Foreman 1 Back Hoe
1 Operator 1 Pay Loader
1 Mason 1 Equipment Truck
3 Laborers 1 Mason Truck
REMARKS: As noted on Report #.13, dated 03 September, 1971 , trenching on this job has been
temporarily halted to encountering ledge. Foreman estimated that it would be several days
before operations would resume. Advised him to have his boss contact this office at leask
one (1) day in advance of resumption of operations.
Oak Grove Acres - Capped Sewer Project
TOWN OF SO. WINDSOR CONN. DATE 03 Sept er1971 Rosemary Lane STREET
WEATHER AM Cloudy INSPECTOR Melvin Edwards, Jr.
WEATHER PM Overcast JOB STARTED 0730 FINISHED . 1630
east
TRENCH OPEN FROM STA lo+62.79 TO STA 12+90 west
SEWER LAID FROM STA 12+ •79 TO STA 12+�2 ilsi
MANHOLE NO. STA
MANHOLE N0. STA
6 inch Y North, South East, West, CHIMNEY (with depth) House Number
STA
STA
STA
STA
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA 11+55.79 southHOUSE NO. Lot No. 7 LENGTH 40 feet DEPTH 2% pitch
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO, LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
DRAWING OR SKETCH (below)
1 Foreman 1 Back Hoe
2 Operators 1 Pay Loader
4 Laborers 1 Equipment Truck
REMARKS: Trench opened west of M/H 10+62.79 to Sta 12+90. No M/H set at Sta 12+82 dye to
lack of material. Trench opened east of M/H 10+62.79 to Sta 10+20. Control lever on
back hoe broken at 1400 in an attempt to break through ledge. Test holes dug along course
of sewer east of Sta 10+20 revealed rising ledge. Back hoe unable to cut through.
Oak Grove Acres - Capped Sewer Project
• Report # 12b
TOWN OF SO,, WINDSOR CONN. DATE 02 Se temberl9 Rosemary Lane STREET
WEATHER AM INSPECTOR Melvin Edwards, Jr.
WEATHER PM S JO•B STARTED DE FINISHED 1630
TRENCH OPEN FROM STA M/H 10+62.79 TO STA 12+20
SEWER LAID FROM STA 10+62.79 TO STA 12+00
MANHOLE NO. STA
MANHOLE N0,, STA
6 inch Y North, South East, West, CHIMNEY (with depth) House Number
STA 11+03.79 North Lot No.
STA 11+55.79 South Lot No. 2
STA
STA
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
DRAWING OR SKETCH (below)
1 Foreman 1 Back Hoe
1 Mason 1 Pay Loader
2 Operators 1 Equipment Truck
4 Laborers 1 Mason Truck
REMARKS:
Oak Grove Acres - Capped Sewer Project
•Rnort # 1
TOWN OF SO,, WINDSOR CONN. DATE 02 Sept e119 71 erle to RosemaM ROWSTREET
WEATHER AM Sunny, cool INSPECTOR Melvin Edwards, Jr.
WEATHER PM JOB STARTED FINISHED
TRENCH OPEN FROM STA 0+00 TO STA 3+10
SEWER LAID FROM STA 1+37.5 TO STA 2+91
MANHOLE NO. STA
MANHOLE N0, STA
6 inch Y North, South East, West, CHIMNEY (with depth) House Number
STA
STA
STA
STA
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA 5+01 south HOUSE N0, Lot No. 17 LENGTH 40 feet DEPTH2% pitch
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO, LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
DRAWING OR SKETCH (below)
1 Foreman 1 Back Hoe
2 Operators 1 Pay Loader
4 Laborers 1 Equipment Truck
REMARKS: Ledge encountered near Sta 3+00, contractor unable to cut through it with
Back Hoe.
Oak Grove Acres - Capped Sewer Project
Report # 11
TOWN OF SO, WINDSOR CONN. DATE01 Septemberl9 71 ,IFerle to Rosemary ROWSTREET
WEATHER AM INSPECTOR
WEATHER PM Sunny, warm JOB STARTED 0730 FINISHED 1630
TRENCH OPEN FROM STA ROW 0+00 (10+62. ) TO STA 1+50
SEWER LAID FROM STA 0+00 TO STA 1+37.5
MANHOLE NO. 5 STA 10+62.79 (In Rosemary Lane)
MANHOLE NO, STA
6 inch Y North, South East, West, CHIMNEY (with depth) House Number
STA
STA
STA
STA
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA 6+93 HOUSE NO. Lot No. 18 LENGTH 49 feet DEPTH 2% pitch
STA 6+ 6 HOUSE NO. Lot No. 23 LENGTH 40 feet DEPTH 2.2
STA HOUSE NO. LENGTH DEPTH
STA HOUSE N0. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
DRAWING OR SKETCH (below)
1 Foreman 1 Back Hoe
1 Mason 1 Pay .Loader
2 Operators 1 Mason Truck
3 Laborers - 1 Equipment Truck
REMARKS: Stone very dirty
Oak Grove' Acres - Capped Sewer Project
Report # 10
TOWN OF SO, WINDSOR CONN. DATE 31 August 1971 Berle Road STREET
WEATHER AM Clear--wa ingINSPECTOR Melvin Edwards Jr.
WEATHER PM JOB STARTED FINISHED 1630
TRENCH OPEN FROM STA Backfillin -operations TO STA
SEWER LAID FROM STA TO STA
MANHOLE NO. STA
MANHOLE N0,, STA
6 inch Y North, South East, West, CHIMNEY (with depth) House Number
STA 2+20 - North Lot No. 26
STA
STA
STA
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA 1+12 South HOUSE NO. Lot No. 15 LENGTH 38 feet DEPTH 2%
STA 2+20 North HOUSE NO. Lot No. 26 LENGTH 38 feet DEPTH 2.25%
STA +81 North HOUSE NO. Lot No. 25 LENGTH 40 feet DEPTH 1.5%
STA +04 North HOUSE NO. Lot No. 24 LENGTH 40 feet DEPTH 1.5%
STA 2+54 South HOUSE N0. Lot No. 16 LENGTH 40 feet DEPTH 1.5%
DRAWING OR SKETCH (below)
Contractor Personnel: Contractor Equipment:
1 Foreman 1 Back Hoe
2 Operators 1 Pay Loader
3 Laborers 1 Equipment Truck
REMARKS:
Oak Grove'Acres - Capped Sewer Project
Report # 9
TOWN OF SO. WINDSOR CONN. DATE 30 August 19 71 IT Berle Road STREET
WEATHER AM Sunny, muggy INSPECTOR Mely_in Edwards Jr.
WEATHER PM Sunny, hot JOB STARTED 0900 FINISHED 1630
TRENCH OPEN FROM STA o+go TO STA 1+ 0
SEWER LAID FROM STA TO STA
MANHOLE NO. 4 STA 1+00
MANHOLE NO. STA
6 inch Y North, South East, West, CHIMNEY (with depth) House Number
STA 1+09 - North Lot No. 27
STA 1+12 -- South Lot No. 15
STA t N
STA
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
SNM 1+09 North HOUSE NO. Lot No. -27 LENGTH 40 feet DEPTH itch
STA 2+39 North HOUSE NO. Lot No. 26 LENGTH abandoned DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE N0. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
DRAWING OR SKETCH (below)
Contractor Persnnabl: Contractor Equipment:
1 Foreman 1 Back Hoe
2 Operators 1 Pay Loader
1 Mason 1 Mason Truck
3 Laborers (including mason helper) 1 Equipment Truck
REMARKS: Wye Sta 2+39 abandoned in favor of Sta 2+20 due to severe ledge.
Oak Grove 'Acres - Capped Sewer Project
Deport # 8
TOWN OF SO. WINDSOR CONN. DATE27 August 1971 Berle Road STREET
WEATHER AM Rain INSPECTOR Melvin Edwards, Jr.
WEATHER PM JOB STARTED 0730 FINISHED
TRENCH OPEN FROM STA 7+50 TO STA 0+90
SEWER LAID FROM STA 2+20 TO STA 1+50
MANHOLE NO. 4 STA 1+00
MANHOLE N0., STA
6 inch Y North, South East, West, CHIMNEY (with depth) House Number
STA
STA
STA
STA
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE N0, LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
DRAWING OR SKETCH (below)
Contractor Personnel: Contractor Equipment:
1 Foreman 1 Back Hoe
3 Operators 1 Pay Loader
4 Laborers 1 Equipment Truck
1 Dump Truck
REMARKS:
Oak Grove Acres - Capped Sewer Project
Report # 7
TOWN OF SO, WINDSOR CONN. DATE 26 August 19 71 JFBerle Road STREET
WEATHER AM Sunny, warm INSPECTOR Melvin Edwards Jr.
WEATHER PM Glear, humid JOB STARTED 0730 FINISHED 16
TRENCH OPEN FROM STA 1+70 TO STA7+ 0 & scattered to M H 10+10
SEWER LAID FROM STA M/H 4+10 TO STA 2+20
MANHOLE NO. STA 4+10 (just sump set tod
MANHOLE NO, STA
6 inch Y North, South East, West, CHIMNEY (with depth) House Number
STA 3+81 —North Lot No. 2
STA 2+ 4 - South
STA 2+ 9 - North Lot No. P6
STA
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO, LENGTH DEPTH
STA HOUSE N0. LENGTH DEPTH
DRAWING OR SKETCH (below)
Contractor Personnel: Contractor Equipment:
1 Foreman 1 Back Hoe
i Mason 1 Pay Loader
2 Operators 1 Mason Truck
5 Laborers (including mason helper) 1 Equipment Truck
REMARKS: Ravizza Brothers shooting storm sewer. John visited site in A.M., signed permit
and said fee would be forthcoming. Harvey on site - must be at least two (2) feet of sand
over pipe before backfilling through ledge. Cleanliness of stone very poor.
Oak Grove Adres - Capped Sewer Project
Report #6
TOWN OF SO, WIN DSOR CONN. DATE25 August 19 71 TIBerl2Road STREET
WEATHER AM Clear, cool INSPECTOR Melvin Edwards. J
WEATHER PM Breezy, warm JOB STARTED 0730 FINISHED 16 0
sca ere openings from
TRENCH OPEN FROM STA 4+00 TO STA 7+ there to M H 10+10
SEWER LAID FROM STA 4+10 TO STA 7+10
MANHOLE NO. 3 STA 4+10
MANHOLE NO. STA
6 inch Y North, South East, West, CHIMNEY (with depth) House Number
STA 5+01 - South Lot No. 1
STA 5+04 - North Lot No. 24
STA 6+93 - South Lot No
STA 6+ 6 - North
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO, LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
DRAWING OR SKETCH (below)
Contractor Personnel: Contractor EquipmentY
1 Foreman 1 Back Hoe
2 Operators 1 Pay Loader
4 Laborers 1 Equipment Truck
REMARKS: Ravizza Brothers finished shooting line, began on laterals east of M/H 4+10, then
to storm sewer..
Oak Grove Acres = Capped Sewer Project
Report # 5
TOWN OF SO, WINDSOR CONN. DATE 24 August 1971 Berle Road STREET
WEATHER AM Clear, cool to warm INSPECTOR Mel'in Ed J
WEATHER PM Sunny, cool to warm JOB STARTED ?????? FINISHED ?????
TRENCH OPEN FROM STA 4+00 TO STA 4+20
SEWER LAID FROM STA TO STA
MANHOLE NO. 3 STA
MANHOLE NO, STA
6 inch Y North, South East, West, CHIMNEY (with depth) House Number
STA
STA
STA
STA
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE N0. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
DRAWING OR SKETCH (below)
Remarks: Ravizza Brothers still blasting eastwards to Abby Road Extension. Clapp began
digging excavation for M/H Sta 4+10 around noon...Sump for M/H set shortly after 1330,
work began on setting lazer machine.
Contractor Personnel on Job: Contractor Equipment on Job:
1 Foreman 1 Digger
ors 1 Pay Loader
#?a orers 1 Equipment Truck
Oak Grove Actes - Capped Sewer Project
Re ort # 4
TOWN OF SO. WINDSOR CONN, DATE 23 August 19 71 Berle Road STREET
WEATHER AM Clear,_ cool to warm INSPECTOR William Lanning & Melvin Edwards, Jr.
WEATHER PM JOB STARTED ?????? FINISHED
TRENCH OPEN FROM STA TO STA
SEWER LAID FROM STA TO STA
MANHOLE NO. STA
MANHOLE N0. STA
b inch Y North, South East, West, CHIMNEY (with depth) House Number
STA
STA
STA
STA
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA`: DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
DRAWING OR SKETCH (below)
REMARKS: Ravizza Brothers, Ina., 28 Laurel Drive, Berlin, Conn. , blasting along line of
sewer ditch - starting east of M/E Sta 4+10 and working eastward towards Abby. Rd Ext.
Oak Grove Acres .- Capped Sewer Project_
„ Report #,3
TOWN OF SO, WINDSOR CONN. DATE 17 August 1971 Berle Road STREET
WEATHER AM Clear, warming INSPECTOR Melvin Edwards Jr.
WEATHER PM Clear3 warm JOB STARTED FINISHED
TRENCH OPEN FROM STA 7+00 TO STA 10+
SEWER LAID FROM STA TO STA
MANHOLE NO. STA
MANHOLE NO. STA
6 inch Y North, South East, West, CHIMNEY (with depth) House Number
STA
STA
STA
STA
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA 9+92 HOUSE NO. Lot No. 21 LENGTH 4o, DEPTH 1. itch
STA 8+51 HOUSE NO. Lot No. 22 LENGTH 40, DEPTH 1. itch
STA 8+54 HOUSE NO. Lot No. 19 LENGTH 40' DEPTH 2.5% pitch
STA 9+95 HOUSE N0, Lot No. 20 LENGTH 40' DEPTH 2.0% pitch
STA HOUSE NO. LENGTH DEPTH
DRAWING OR SKETCH (below)
REMARKS:
Contractor personnel on hand: Contractor equipment on hand:
1 foreman digger
1 mason I pay loader
3 operators 1 dump truck
1 mason's helper 1 equipment truck
3 laborers 1 mason's equipment truck
See over for additional remarks.
Oak Grove Acres - Capped Sewer Project
Report # 2
TOWN OF SO, WINDSOR CONN. DATE 16 August 19 71 Berle Road STREET
WEATHER AM Clear, cool INSPECTOR Melvin Edwards, Jr .
WEATHER PM Clear, warm JOB STARTED 0700 FINISHED 1630
TRENCH OPEN FROM STA 7+00 TO STA 10+30
SEWER LAID FROM STA 7+10 TO STA 10+10
MANHOLE NO. 1 STA +10
MANHOLE NO, 2 STA 10+10
6 inch Y North, South East, West, CHIMNEY (with depth) House Number
STA 8+51 - north Lot No. 22
STA 8+54 - south Lot No..1
STA 9+92 - north Lot No
STA 9+95 - south Lot No. 20
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
DRAWING OR SKETCH (below)
REMARKS:
Contractor personnel on hand: Contractor equipment on hand:
1 foreman 1 digger
3 operators 1 pay loader
3 laborers 1 dump truck
1 equipment truck
Oak Grove Acres - Capped Sewer Project
Report # 1
TOWN OF SO o WINDSOR CONN. DATE 13 August 19 71 Berle Road STREET
WEATHER AM INSPECTOR Harvey W. Levack & Melvin Edwards, Jr.
WEATHER PM Clear, warm JOB STARTED lAoo FINISHED 1530
TRENCH OPEN FROM STA --- TO STA -----
SEWER LAID FROM STA TO STA
MANHOLE NO. STA 4+10
MANHOLE NO. 1 STA 7+10
6 inch Y North, South East, West, CHIMNEY (with depth) House Number
STA
STA
STA
STA
STA
STA
STA
EXTRA STONE OR PROCESSED GRAVEL
STA TO STA. DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
BANK RUN GRAVEL
STA TO STA DEPTH
STA TO STA DEPTH
STA TO STA DEPTH
HOUSE CONNECTIONS
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
STA HOUSE NO. LENGTH DEPTH
DRAWING OR SKETCH (below)
REMARKS:
Contractor personnel on hand: Contractor equipment on hand:
contractor 1 digger
1 foreman 1 payloader
2 operators 1 euipment truck,
3 laborers
See over for further remarks/