Loading...
HomeMy WebLinkAboutDrain Layers Permit Rosemary Lane (2) f' J TOW OF SOUTH WI N DSOR x " t DEPARTMENT OF POLLUTION CONTROL t iSouth Windsor, Connecticut f f r DRAIN LAYER'S PERMIT '. 93 :13 tom' Pursuant to written application; permission is hereby granted to the Licensed Drain"Layer named herein to perform the work itidicated below at ..r- a on the i side " j: at premises owned byx r , whose address-is 's � M MIr4 O-WAWOU } and to Lay House Drain, Repair House Drain, Lay Main, , ,WOthe�3 , for occupancy_or use, RIM s - , with +° f s Family Units with acres. Type of Sewage be connectedunder:this permit o a : SANITARY SEWAGE, ,; F, I1 DUSTRIAL WASTE, OR t Connection:will be made with '� � 7. k Permit to be isAued:to *; the holder of Drain Laycers License No. Permit will expire on �► 19 w '► ' ''' The undersigned Drain Layer hereby agrees to all the terms and conditions set forth on the permit and the reverse side theregf. Atwlicant has rreceived Town Permit No '` and/or C H D Permit No s for street excavation, SPECIAL (CONDITIONS F : Signed h Connection,Charge Paid $ Licensed ay Air- @ (Sig) Issued by + w Tax Collector Permit Fee:•n-Paid $ INSPECTION: ' rNow INITIAL (Sig) FINAL (Sig) APPROVED (Date) (Sig-) INSPECTOR Oak Grove Acres Capped Sewer Project Report # 15 TOWN OF. SO. WINDSOR CONN . DATE 20 September19 71 erle to Rosemary ROW STREET WEATHER AM Cloudy, cool INSPECTORMelpin Edwards, Jr. WEATHER PM Same JOB STARTED FINISHED TRENCH OPEN FROM STA 0+00 (M/H 10+:62.79) TO STA 4+42 (M H 4+10) SEWER LAID FROM STA 2+91 TO STA 4+42 (M H 4+10) MANHOLE NO. STA MANHOLE NO , STA b inch Y North, South East, West, CHIMNEY (with depth) House Number STA STA STA STA STA STA STA EXTRA STONE OR PROCESSED -GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA HOUSE N06 LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO, LENGTH DEPTH STA HOUSE NO, LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH DRAWING OR SKETCH (below) 1 Foreman 1 Back Hoe 2 Operators 1 Pay Loader 2 Laborers 1 Equipment Truck. REMARKS: Clapp foreman advised this Department that this would be end of their work on the capped sewer for a time - at least until more blasting hasbeen completed. Asked that he remind his boss to advise this Department at lea$t one (1) day ahead of future work. V 10 September, 1971 Oak Grove Acres _ Capped—Sewer—Protect - - - - - - - - - - - - - Spoke with John Clapp this afternoon to get some idea of when he intended to continue laying sanitary sewer lines in this development. He seemed to think that Ravizza Brothers would probably begin blasting again on Monday, the 13th. Further, he expected that his crew would start laying additional sewer line shortly thereafter - possibly later the same day. 13 September, 1971 Oak Grove Acres _ Capped Sewer—Project— Arrived on the Berle Road site at approximately 0800 and spoke with Clapp's foreman. He had heard of no scheduled blasting for today and seemed to think that it would be some time before work on the sanitary sewer line could be continued. Oak Grove Acres - Capped Sewer Project • ReR2rt # 14 TOWN OF SO. WINDSOR CONN. DATZ7 September 1 Rosemary STREET WEATHER AM Misty, humid INSPECTOR Melvin EdKards Jr. WEATHER PM - JOB STARTED n= FINISHED 1030 TRENCH OPEN FROM STA TO STA SEWER LAID FROM STA TO STA MANHOLE NO. STA MANHOLE NO. STA b inch Y North, South East, West, CHIMNEY (with depth) House Number STA STA STA STA STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA 11+03.79 north HOUSE NO-Lot No. 9 LENGTH 40 feet DEPTH 1. itch STA HOUSE NO. LENGTH DEPTH STA HOUSE N0, LENGTH DEPTH STA HOUSE N0. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH DRAWING OR SKETCH (below) 1 Foreman 1 Back Hoe 1 Operator 1 Pay Loader 1 Mason 1 Equipment Truck 3 Laborers 1 Mason Truck REMARKS: As noted on Report #.13, dated 03 September, 1971 , trenching on this job has been temporarily halted to encountering ledge. Foreman estimated that it would be several days before operations would resume. Advised him to have his boss contact this office at leask one (1) day in advance of resumption of operations. Oak Grove Acres - Capped Sewer Project TOWN OF SO. WINDSOR CONN. DATE 03 Sept er1971 Rosemary Lane STREET WEATHER AM Cloudy INSPECTOR Melvin Edwards, Jr. WEATHER PM Overcast JOB STARTED 0730 FINISHED . 1630 east TRENCH OPEN FROM STA lo+62.79 TO STA 12+90 west SEWER LAID FROM STA 12+ •79 TO STA 12+�2 ilsi MANHOLE NO. STA MANHOLE N0. STA 6 inch Y North, South East, West, CHIMNEY (with depth) House Number STA STA STA STA STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA 11+55.79 southHOUSE NO. Lot No. 7 LENGTH 40 feet DEPTH 2% pitch STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO, LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH DRAWING OR SKETCH (below) 1 Foreman 1 Back Hoe 2 Operators 1 Pay Loader 4 Laborers 1 Equipment Truck REMARKS: Trench opened west of M/H 10+62.79 to Sta 12+90. No M/H set at Sta 12+82 dye to lack of material. Trench opened east of M/H 10+62.79 to Sta 10+20. Control lever on back hoe broken at 1400 in an attempt to break through ledge. Test holes dug along course of sewer east of Sta 10+20 revealed rising ledge. Back hoe unable to cut through. Oak Grove Acres - Capped Sewer Project • Report # 12b TOWN OF SO,, WINDSOR CONN. DATE 02 Se temberl9 Rosemary Lane STREET WEATHER AM INSPECTOR Melvin Edwards, Jr. WEATHER PM S JO•B STARTED DE FINISHED 1630 TRENCH OPEN FROM STA M/H 10+62.79 TO STA 12+20 SEWER LAID FROM STA 10+62.79 TO STA 12+00 MANHOLE NO. STA MANHOLE N0,, STA 6 inch Y North, South East, West, CHIMNEY (with depth) House Number STA 11+03.79 North Lot No. STA 11+55.79 South Lot No. 2 STA STA STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH DRAWING OR SKETCH (below) 1 Foreman 1 Back Hoe 1 Mason 1 Pay Loader 2 Operators 1 Equipment Truck 4 Laborers 1 Mason Truck REMARKS: Oak Grove Acres - Capped Sewer Project •Rnort # 1 TOWN OF SO,, WINDSOR CONN. DATE 02 Sept e119 71 erle to RosemaM ROWSTREET WEATHER AM Sunny, cool INSPECTOR Melvin Edwards, Jr. WEATHER PM JOB STARTED FINISHED TRENCH OPEN FROM STA 0+00 TO STA 3+10 SEWER LAID FROM STA 1+37.5 TO STA 2+91 MANHOLE NO. STA MANHOLE N0, STA 6 inch Y North, South East, West, CHIMNEY (with depth) House Number STA STA STA STA STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA 5+01 south HOUSE N0, Lot No. 17 LENGTH 40 feet DEPTH2% pitch STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO, LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH DRAWING OR SKETCH (below) 1 Foreman 1 Back Hoe 2 Operators 1 Pay Loader 4 Laborers 1 Equipment Truck REMARKS: Ledge encountered near Sta 3+00, contractor unable to cut through it with Back Hoe. Oak Grove Acres - Capped Sewer Project Report # 11 TOWN OF SO, WINDSOR CONN. DATE01 Septemberl9 71 ,IFerle to Rosemary ROWSTREET WEATHER AM INSPECTOR WEATHER PM Sunny, warm JOB STARTED 0730 FINISHED 1630 TRENCH OPEN FROM STA ROW 0+00 (10+62. ) TO STA 1+50 SEWER LAID FROM STA 0+00 TO STA 1+37.5 MANHOLE NO. 5 STA 10+62.79 (In Rosemary Lane) MANHOLE NO, STA 6 inch Y North, South East, West, CHIMNEY (with depth) House Number STA STA STA STA STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA 6+93 HOUSE NO. Lot No. 18 LENGTH 49 feet DEPTH 2% pitch STA 6+ 6 HOUSE NO. Lot No. 23 LENGTH 40 feet DEPTH 2.2 STA HOUSE NO. LENGTH DEPTH STA HOUSE N0. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH DRAWING OR SKETCH (below) 1 Foreman 1 Back Hoe 1 Mason 1 Pay .Loader 2 Operators 1 Mason Truck 3 Laborers - 1 Equipment Truck REMARKS: Stone very dirty Oak Grove' Acres - Capped Sewer Project Report # 10 TOWN OF SO, WINDSOR CONN. DATE 31 August 1971 Berle Road STREET WEATHER AM Clear--wa ingINSPECTOR Melvin Edwards Jr. WEATHER PM JOB STARTED FINISHED 1630 TRENCH OPEN FROM STA Backfillin -operations TO STA SEWER LAID FROM STA TO STA MANHOLE NO. STA MANHOLE N0,, STA 6 inch Y North, South East, West, CHIMNEY (with depth) House Number STA 2+20 - North Lot No. 26 STA STA STA STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA 1+12 South HOUSE NO. Lot No. 15 LENGTH 38 feet DEPTH 2% STA 2+20 North HOUSE NO. Lot No. 26 LENGTH 38 feet DEPTH 2.25% STA +81 North HOUSE NO. Lot No. 25 LENGTH 40 feet DEPTH 1.5% STA +04 North HOUSE NO. Lot No. 24 LENGTH 40 feet DEPTH 1.5% STA 2+54 South HOUSE N0. Lot No. 16 LENGTH 40 feet DEPTH 1.5% DRAWING OR SKETCH (below) Contractor Personnel: Contractor Equipment: 1 Foreman 1 Back Hoe 2 Operators 1 Pay Loader 3 Laborers 1 Equipment Truck REMARKS: Oak Grove'Acres - Capped Sewer Project Report # 9 TOWN OF SO. WINDSOR CONN. DATE 30 August 19 71 IT Berle Road STREET WEATHER AM Sunny, muggy INSPECTOR Mely_in Edwards Jr. WEATHER PM Sunny, hot JOB STARTED 0900 FINISHED 1630 TRENCH OPEN FROM STA o+go TO STA 1+ 0 SEWER LAID FROM STA TO STA MANHOLE NO. 4 STA 1+00 MANHOLE NO. STA 6 inch Y North, South East, West, CHIMNEY (with depth) House Number STA 1+09 - North Lot No. 27 STA 1+12 -- South Lot No. 15 STA t N STA STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS SNM 1+09 North HOUSE NO. Lot No. -27 LENGTH 40 feet DEPTH itch STA 2+39 North HOUSE NO. Lot No. 26 LENGTH abandoned DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE N0. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH DRAWING OR SKETCH (below) Contractor Persnnabl: Contractor Equipment: 1 Foreman 1 Back Hoe 2 Operators 1 Pay Loader 1 Mason 1 Mason Truck 3 Laborers (including mason helper) 1 Equipment Truck REMARKS: Wye Sta 2+39 abandoned in favor of Sta 2+20 due to severe ledge. Oak Grove 'Acres - Capped Sewer Project Deport # 8 TOWN OF SO. WINDSOR CONN. DATE27 August 1971 Berle Road STREET WEATHER AM Rain INSPECTOR Melvin Edwards, Jr. WEATHER PM JOB STARTED 0730 FINISHED TRENCH OPEN FROM STA 7+50 TO STA 0+90 SEWER LAID FROM STA 2+20 TO STA 1+50 MANHOLE NO. 4 STA 1+00 MANHOLE N0., STA 6 inch Y North, South East, West, CHIMNEY (with depth) House Number STA STA STA STA STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE N0, LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH DRAWING OR SKETCH (below) Contractor Personnel: Contractor Equipment: 1 Foreman 1 Back Hoe 3 Operators 1 Pay Loader 4 Laborers 1 Equipment Truck 1 Dump Truck REMARKS: Oak Grove Acres - Capped Sewer Project Report # 7 TOWN OF SO, WINDSOR CONN. DATE 26 August 19 71 JFBerle Road STREET WEATHER AM Sunny, warm INSPECTOR Melvin Edwards Jr. WEATHER PM Glear, humid JOB STARTED 0730 FINISHED 16 TRENCH OPEN FROM STA 1+70 TO STA7+ 0 & scattered to M H 10+10 SEWER LAID FROM STA M/H 4+10 TO STA 2+20 MANHOLE NO. STA 4+10 (just sump set tod MANHOLE NO, STA 6 inch Y North, South East, West, CHIMNEY (with depth) House Number STA 3+81 —North Lot No. 2 STA 2+ 4 - South STA 2+ 9 - North Lot No. P6 STA STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO, LENGTH DEPTH STA HOUSE N0. LENGTH DEPTH DRAWING OR SKETCH (below) Contractor Personnel: Contractor Equipment: 1 Foreman 1 Back Hoe i Mason 1 Pay Loader 2 Operators 1 Mason Truck 5 Laborers (including mason helper) 1 Equipment Truck REMARKS: Ravizza Brothers shooting storm sewer. John visited site in A.M., signed permit and said fee would be forthcoming. Harvey on site - must be at least two (2) feet of sand over pipe before backfilling through ledge. Cleanliness of stone very poor. Oak Grove Adres - Capped Sewer Project Report #6 TOWN OF SO, WIN DSOR CONN. DATE25 August 19 71 TIBerl2Road STREET WEATHER AM Clear, cool INSPECTOR Melvin Edwards. J WEATHER PM Breezy, warm JOB STARTED 0730 FINISHED 16 0 sca ere openings from TRENCH OPEN FROM STA 4+00 TO STA 7+ there to M H 10+10 SEWER LAID FROM STA 4+10 TO STA 7+10 MANHOLE NO. 3 STA 4+10 MANHOLE NO. STA 6 inch Y North, South East, West, CHIMNEY (with depth) House Number STA 5+01 - South Lot No. 1 STA 5+04 - North Lot No. 24 STA 6+93 - South Lot No STA 6+ 6 - North STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO, LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH DRAWING OR SKETCH (below) Contractor Personnel: Contractor EquipmentY 1 Foreman 1 Back Hoe 2 Operators 1 Pay Loader 4 Laborers 1 Equipment Truck REMARKS: Ravizza Brothers finished shooting line, began on laterals east of M/H 4+10, then to storm sewer.. Oak Grove Acres = Capped Sewer Project Report # 5 TOWN OF SO, WINDSOR CONN. DATE 24 August 1971 Berle Road STREET WEATHER AM Clear, cool to warm INSPECTOR Mel'in Ed J WEATHER PM Sunny, cool to warm JOB STARTED ?????? FINISHED ????? TRENCH OPEN FROM STA 4+00 TO STA 4+20 SEWER LAID FROM STA TO STA MANHOLE NO. 3 STA MANHOLE NO, STA 6 inch Y North, South East, West, CHIMNEY (with depth) House Number STA STA STA STA STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE N0. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH DRAWING OR SKETCH (below) Remarks: Ravizza Brothers still blasting eastwards to Abby Road Extension. Clapp began digging excavation for M/H Sta 4+10 around noon...Sump for M/H set shortly after 1330, work began on setting lazer machine. Contractor Personnel on Job: Contractor Equipment on Job: 1 Foreman 1 Digger ors 1 Pay Loader #?a orers 1 Equipment Truck Oak Grove Actes - Capped Sewer Project Re ort # 4 TOWN OF SO. WINDSOR CONN, DATE 23 August 19 71 Berle Road STREET WEATHER AM Clear,_ cool to warm INSPECTOR William Lanning & Melvin Edwards, Jr. WEATHER PM JOB STARTED ?????? FINISHED TRENCH OPEN FROM STA TO STA SEWER LAID FROM STA TO STA MANHOLE NO. STA MANHOLE N0. STA b inch Y North, South East, West, CHIMNEY (with depth) House Number STA STA STA STA STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA`: DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH DRAWING OR SKETCH (below) REMARKS: Ravizza Brothers, Ina., 28 Laurel Drive, Berlin, Conn. , blasting along line of sewer ditch - starting east of M/E Sta 4+10 and working eastward towards Abby. Rd Ext. Oak Grove Acres .- Capped Sewer Project_ „ Report #,3 TOWN OF SO, WINDSOR CONN. DATE 17 August 1971 Berle Road STREET WEATHER AM Clear, warming INSPECTOR Melvin Edwards Jr. WEATHER PM Clear3 warm JOB STARTED FINISHED TRENCH OPEN FROM STA 7+00 TO STA 10+ SEWER LAID FROM STA TO STA MANHOLE NO. STA MANHOLE NO. STA 6 inch Y North, South East, West, CHIMNEY (with depth) House Number STA STA STA STA STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA 9+92 HOUSE NO. Lot No. 21 LENGTH 4o, DEPTH 1. itch STA 8+51 HOUSE NO. Lot No. 22 LENGTH 40, DEPTH 1. itch STA 8+54 HOUSE NO. Lot No. 19 LENGTH 40' DEPTH 2.5% pitch STA 9+95 HOUSE N0, Lot No. 20 LENGTH 40' DEPTH 2.0% pitch STA HOUSE NO. LENGTH DEPTH DRAWING OR SKETCH (below) REMARKS: Contractor personnel on hand: Contractor equipment on hand: 1 foreman digger 1 mason I pay loader 3 operators 1 dump truck 1 mason's helper 1 equipment truck 3 laborers 1 mason's equipment truck See over for additional remarks. Oak Grove Acres - Capped Sewer Project Report # 2 TOWN OF SO, WINDSOR CONN. DATE 16 August 19 71 Berle Road STREET WEATHER AM Clear, cool INSPECTOR Melvin Edwards, Jr . WEATHER PM Clear, warm JOB STARTED 0700 FINISHED 1630 TRENCH OPEN FROM STA 7+00 TO STA 10+30 SEWER LAID FROM STA 7+10 TO STA 10+10 MANHOLE NO. 1 STA +10 MANHOLE NO, 2 STA 10+10 6 inch Y North, South East, West, CHIMNEY (with depth) House Number STA 8+51 - north Lot No. 22 STA 8+54 - south Lot No..1 STA 9+92 - north Lot No STA 9+95 - south Lot No. 20 STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH DRAWING OR SKETCH (below) REMARKS: Contractor personnel on hand: Contractor equipment on hand: 1 foreman 1 digger 3 operators 1 pay loader 3 laborers 1 dump truck 1 equipment truck Oak Grove Acres - Capped Sewer Project Report # 1 TOWN OF SO o WINDSOR CONN. DATE 13 August 19 71 Berle Road STREET WEATHER AM INSPECTOR Harvey W. Levack & Melvin Edwards, Jr. WEATHER PM Clear, warm JOB STARTED lAoo FINISHED 1530 TRENCH OPEN FROM STA --- TO STA ----- SEWER LAID FROM STA TO STA MANHOLE NO. STA 4+10 MANHOLE NO. 1 STA 7+10 6 inch Y North, South East, West, CHIMNEY (with depth) House Number STA STA STA STA STA STA STA EXTRA STONE OR PROCESSED GRAVEL STA TO STA. DEPTH STA TO STA DEPTH STA TO STA DEPTH BANK RUN GRAVEL STA TO STA DEPTH STA TO STA DEPTH STA TO STA DEPTH HOUSE CONNECTIONS STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH STA HOUSE NO. LENGTH DEPTH DRAWING OR SKETCH (below) REMARKS: Contractor personnel on hand: Contractor equipment on hand: contractor 1 digger 1 foreman 1 payloader 2 operators 1 euipment truck, 3 laborers See over for further remarks/