Loading...
HomeMy WebLinkAboutDrain Layers Permit 21 Rockwell Court f� TOWN OF SOUTH WINDSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT 5,956 Pursuant to written application, permission is hereby granted to the Li ensed Drain Layer name d, herein to perform the work indicatg below t at premises owned y �o whose address is - Lay House Drai , Repair ouse Drain, Lay Main, Other to for occupancy use, with Family Units, ith acres. �� Type of Sewage to be connected under this permit: SANITARY SEWAGE INDUSTRIAL WASTES ( ) , OR ( Connection will be made with Show sketch of proposed work or furnish 'two (2) copies of separate drawings. OSHA REQUIREMENTS MUST BE FOLLOWED SPECIAL CONDITIONS Desired Starting Date Estimated Time for Completion Permit to be issued to the holder of Drain Layer's License No. 3Q Permit will expire thirt (30) days after date of issuance. The undersigned DrainLayer hereby agrees y to all the terms and conditions set forth in the permit and the reverse side thereof. Applicant has received Town Permit No, and/or- CHD Permit No. _.. - Signed<. 4ic 'led ain Layer The above named Drain Layer has a valid license iE ued by the .State of Connecticut and has filed a satisfactory bond and insurance policy in the, name of the Town of South Windsor: =C;V Engineering Dept. Date r� Permit Fee Paid $ Check NumberycUG� Connection Charge Receipt No. /5/ Dated -G�yf-;�'� Issued by �/7jf/�/� INSPECTION Date work started r"' 93 Date completed Sufficient notification rece ve 'yes No —'---�� Special Conditions AP P R '•- 1 Inspector Date TOWN OF SOUTH WIN OR ° SANITARY SEWER INSPECTION CHECKLIST FUNCTION 5l��!� NO YES N/A DATE INSPECTED _ � T-L)&C//Z* 1. Is Permit On Job Site �'-� 2. Police Notified 3. Safety Items In Place a. Shoring, Trench Box, Ladder f b. Hard Hats pJ _ C. Pumps 4. Proper Material a. Pipe _ b. Pipe Bedding c. Backfill d. Warning Tape e. Pipe Cap or Plug f. Cleanouts _ g. Fittings h. Manhole _ i. Cover & Frame 5 . Existing Lateral Cap Removed in Presence of Inspector 6 . Lateral probed and found to be clear _ C 7 . Pavement Cut Properly 8 . Trench & Bedding OK �p _ 9 . Joints Properly Done 10. Backfilling (12" Lifts ) & Compaction 11 . Manhole Inverts Built 12 . Subbase Material Placed 13 . Base Material Placed 14 . Blacktop (Temp) w/Proper Grades & Slopes 15 . Pressure Test 16 . Mandrel Test 17 . Installation agrees with plan 18. As-Built plans recorded