Loading...
HomeMy WebLinkAboutDrain Layers Permit 21 Riverview Drive * TOWN OF SOUTH WINDSOR INSPECTION REPORT j i� Permit No. 7671 Cont raCt`t"r"J &"''FI S.LATER CONST CO Location 21 RIVERVIEW DR PODUNK RIDGE Address::: 7543MM..:ERC "::wAY Type Work NEW SAN LATQUTH WINDSOR CT 06074 l Phone No f$�U)52$ "5252 .. Date Insp Needed Date I &p3 Time Insp Needed _-------- — Time Itg, . J Inspected By Work in Progress --- x f -- T�` Input Date --- �—�—U u 'i r �3 Permit No. 7671 Town of South Windsor, CT Permit Date 09/22/2003 Drain Layer Permit !j Expiration Date 10/22/2003 Descrip: FEES FOR 28,36,40 70 7$ 94 95 6g,g1.t21 1`°SAME CI# .CK Applicant Location Name J & H SLATER CONST CO �1dr3 21:'RI1tERVIEW DR RODUNK RIDGE Addr. 75 COMMERCE WAY SOUTH WINDSOR CT 06074 Phone No. (860)528-5252 The Drain Layer assigned tkYis perFast teasa]id license `issued by the state and hereby agree ,.tb all the terms and condaigxi' set<:foth in the attached 'Conditions' .'All' work sha15 b i abcordnce. Wi:th.Tawn of South a17 OSHA re uirem nts aryl tie atta6he& 6q ditions. Windsor standards, Issued By =-------—--------- ; Date Inspected „ ,;.:::.. ---------------- Inspected By �,f TOWN OF SOUTH WINDSOR SANITARY SEWER LATERAL FIELD LOCATION DATE OF CONSTRUCTION: 3 BUILDING ADDRESS 1410 STREET UL ' SUBDIVISION: NORTH ARROW t__�__ j i 1 i 1 i I jl� j ! I i i � i .'... ------- Ole4 t ' ! t I � CCss : ) I t _ .- - f ! i i e I CONTRACTOR (PRINT) NAME OF CONTRACTOR'S SUPERVISOR (PRINT) STREET ADDRESS SIGNATURE (:D 4 4- 04 ATE TOWN STATE ZIP INSPECTED BY TOWN DATE TELEPHONE NUMBER WHITE - TOWN PINK - CONTRACTOR YELLOW - CONSULTING ENGINEER / DEVELOPER fl f,� E �u APPLICATION FOR DRAIN LAYER PERMIT ��, r 1 TOWN OF SOUTH WINDSOR 5 PUBLIC WORKS DEPARTMENT �� ` LA TOWN HALL � -1 i� 1540 SULLIVAN AVENUE �a *0 SOUTH WINDSOR, CT FEE $60.00 ; C� Location of proposed work:_ CLA-A &- TJR i ( V Lot # 'R W, i ` (i,�' �17 Street No. Street Name ( , l t� Premises owned by: f i rd mLtdi" Name of Firm: J Phone: Address,of Firm: M A M A le � TYPE OF WORK: Lay House Drain Repair House Drain Lay Main ; Lay Lateral for Commercial/Industrial Building of acres Connection will be made with - t Existing Water Supply: Public Water Well Proposed Start Dated-- 4 -d Estimated time for completion Aug` r`N ALL WORK TO BE IN ACCORDANCE WITH TOWN OF SOUTH WINDSOR STANDARDS, ALL OSHA REQUIREMENTS AND CONDITIONS ATTACHED TO THE PERMIT Permit is to be issued to _ i the holder of D Layer's License No. '7 ram . Only holders of P-1, P-7 or W-9 licenses will be issued a permit. PERMIT WILL EXPIRE THIRTY (30),DAYS AFTER DATE OF ISSUANCE. The undersigned Drain Layer hereby agrees to all the terms and conditions set forth in the permit a d9attached thereto. Applicant has received Town Street Excavation Permit No. and/or ConnDOT Permit No. CBYD No. 7 0 Signed: Print Name: ,,� T t Licensed Drain Layer Date: Standard Forms\Permits\APPLICATION FOR DRAIN LAYERS PERMIT.doc -