Loading...
HomeMy WebLinkAboutDrain Layers Permit 510 Quarry Brook Dri l X TOWN OF SOUTH WINDSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL 51 O Quarrq )k­voP ULA.� , YER'S PERMIT 5955 �f Y 04,fin_ I , 19 Pursuant to1written application, permission is hereby granted to the Licensed Drain Layer named herein to perform the work indicated below at 0 at premises owned by whose address is .c z,, ir/ and to Lay House Drain, Repair House D -ain, Lay Mai , Other for occupancy or use, with Family U its, wit acres. . Type of Sewage to be connected under this permit : SANITARY SEWAGE INDUSTRIAL WASTES ( ) , OR ( ) Connection will be made with Show sketch of proposed work or furnish 'two (2) copies of separate drawings. OSHA REQUIR�MENTS MUST BE FOLLOWED SPECIAL CONDITIONS Desired Starting Date r1_ Estimated Time for Completion / Permit to be issued to the holder of Drain Layer's Licen a No. Z - Permit will expir thirty (30) days after date of issuance. The undersign d Drain Layer hereby agrees to all the terms and conditions set forth in the permit and the reverse side thereof. Applicant has received Town Permit No. and/or CHD Permit No. Signed �IA Licensed Dri n Lay r The above named Drain Layer has a valid license issued by ge State of Connecticut and has filed a satisfactory bond and insurance policy in the name of the Town of South Windsor: c� in i ring Dept. Date Permit Fee Paid $ Chekki Number (' -�.. Connection Charge Receipt No. qq Dated Issued INSPECTION Date work started Date completed j'_ -Y-9-3 Sufficient notification`re'ceive : es No Special Conditions APPROVED: 3 6a _ Inspector Date TORN OF SOUTH WIN OR gr SANITARY SEWER INSPECTION CHECKLIST • �cc��-CC - - FUNCTION P NO YES N/A DATE INSPECTED 1. Is Permit On Job Site 2 . Police Notified 3. Safety Items In Place ����� a. Shoring, Trench Box, Ladder b. Hard Hats C. Pumps 4. Proper Material a. Pipe _ b. Pipe Bedding C. Backfill _ d. Warning Tape e. Pipe Cap or Plug f. Cleanouts g. Fittings _ h. Manhole i. Cover & Frame 5 . Existing Lateral Cap Removed in Presence of Inspector 6 . Lateral probed and found to be clear 7 . Pavement Cut Properly 8 . Trench & Bedding OK 9 . Joints Properly Done 10 . Backfilling (12" Lifts) & Compaction 11. Manhole Inverts Built 12. Subbase Material Placed 13 . Base Material Placed 14. Blacktop (Temp) w/Proper Grades & Slopes 15. Pressure Test 16. Mandrel Test 17 . Installation agrees with plan 18. As-Built plans recorded