Loading...
HomeMy WebLinkAboutDrain Layers Permit 19 Porter Green r. ,sy. ,v',•7yTazwiy�w '..iwwr+FvlT+_':+.. TOWN OF SOUTH WI N DSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT 19 Pursuant to written application, permission is hereby granted to the Licensed Drain Layer named herein to perform the work indicated, at.., '/lr2.D at premises owned by whose address is a o Lay House Drain, Repair House Drain, Lay M& Other for , x,10 / occupancy or uae, Family Units ,/with ?Iel ace-a. Type of Sewage to be connected under this permit : ,SANITARY SEWAGE (1 INDUSTRIAL WASTESr ( ) . OR ( ,.) Connection will, be made with 3�R.; S salt Show sketch of proposbd work or furnish 'two (2) 'copies of separate drawings. OS A REQUIP>EM TS MUST BE FOLLOWED SPECIAL CONDhTIONS D h- SD Q h �Pf aw-6O Desired Starting Date 5--/ —9 Estimated Time for Completion Permit to be issued `to --Johy1 tq I-aV�S the holder of Drain Layer's License No. r =3p Permit will expire thirty (30) days after date of issuaitice. The undersigned Drain Layer hereby agrees to all the terms and conditions set forth in the permit and the reverse side thereof . `Applicant has received `Town Permit No. „.an:d/or CHD Permie No, Signed.; N." Li sel main Layer The above named Drain Layer has a valid license issued by the State of Connecticut and has filed a satisfactory, bond and insurance policy. in .the skr Rkme of `the Town of South Windsor : µ ; ! -94 - Engineer ng Dept. Date Permit Fee Paid $ ��' Check Number � � Connection Charge 'Receipt No. sfy Dated. Issued by INSPECTION Date work started T — Date completed Sufficient notificat on rece ve ryes No Special Conditions APP Inspector -Date SANITARY LATERAL & EXCAVATION PERMIT INSPECTION REQUEST DATE OF REQUEST: ��- /9- TIME: �-a BY: J lyl---r FOR LOCATION• -* DAY INSPEC. NEEDED 7 / �'r 9 � TIME: TYPE OF INSPECTION: ( �) SANITARY/LATERAL (PERMIT NO. ) ( � ) FOOTING DRAIN ( } EXCAVATION (PERMIT NO. ) ( ) OTHER INSPECTION REPORT DATE:_ �� !� - c`J TIME: :�a )0. 44, INSP: CONTRACTOR: WEATHER: WORK IN PROGRESS: .27/?2 AREA OF CONCERN: SPECIAL INSTRUCTIONS: