Loading...
HomeMy WebLinkAboutDrain Layers Permit 40 Pheasant Way TOWN OF SOUTH WINDSOR �? DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL Lai DRAIN LAYER'S PERMIT 5986 W 19 Pursuant to written applications permission is hereby granted to the Licensed Drain Layer ;famed herein to perform the work indicated belowat Gc� R.� a t m s e s o ne d by - , whose add ess is (' Lay House Drain„ Repai House Drain, : Lay Main, Oth r to for occupancy or use, with Family Units, ,wi h ac�- Ti�pe of Siwage- to -be connected under this permit : S`ANITARY` SEWAGE INDUSTRIAL WAST$S (.,.),, OR, ,( , Connection will be made with S 5 Pry/ Show sketch of proposed work or furnish two (2) copies of separate drawings. SPECIAL CONDITIONS OSHA REQUIREMENTS MUST BE FOLLOWED Desired Starting Date E timated Time for Completion Permit to be issued to lhp k P1 35? 5 the holder of Drain Layer' License No. Zojr '�, 0 Permit will expire thirty (30) days after date of issuance. The undersigned Drain Layer hereby agrees to all the terms and conditions set . forth in the permit and the revers-. side thereof. Applicant hasireceived Town Permit No. and/or CHD Permit No. Signed Licr ed ain Layer The above named Drain Layer has a valid licenissued by the State of Connecticut and has filed a satisfactory bon and insurance Policy in the name of the Town of South Windsor: ' E�glnee<i)4 Dept. Date Permit Fee Paid $ 7_-;_0 ) Check &L&ber /05 Connection Charge Receipt No. 4-3a& Paged Issued by_—T,-L /fJ INSPECTION Date work started Date completed 7_. 1 Sufficient notification ece ve ; 4--"yes No Special Conditions je APPROVE . nspector �.,� To " OF SOUTH 'WaiDSOR SANITARY SEfiiER INSPECTION CHLCSLIST N NO YES N/A DATE: INSPECTED 1• Is Permit On Job Site Z• Police Notified ` 3 • Safety Items In Place a. Shoring, Trench Box, Ladder b. Hard Hats c. Pumps — 4. Proper Material a. Pipe b• Pipe Bedding C. Backfill _ d• Warning Tape _ e. Pipe Cap or Plug f• Cleanouts --�_ 9• Fittings h. Manhole v i • Cover & Frame 5 . Existing Lateral Cap Removed in Presence of Inspector 6 . Lateral probed and found to be clear f 7 . Pavement Cut Properly 8 - Trench & Bedding pR 9 . Joints Properly Done 10 . Backfilling (12" Lifts) & Compaction 11. Manhole Inverts Built 12. Subbase Material Placed 13 . Base Material Placed 14 . Blacktop (Temp) w/Proper Grades & Slopes 15 . Pressure Test f 16: Mandrel Test 17. Installation agrees with plan 18 . As-Built plans recorded