Loading...
HomeMy WebLinkAboutDrain Layers Permit 11 Perrin Lane TOWN OF SOUTH WINDSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT 5935 Pursuant to written application, permission is ,her" by granted to .the Licensed Drai La er named here to . p,erform the work ind�Lcated belo at AqQ at premises owned by .�/yjG01'JS7 whbsj6 ddress is g' -and to Lay House PTain, ". Repair Ouse:' i4 .n, Laq Main,- Othe.r for '�'- <` ^s, f occupancy or use, with S/ ' Family Units, witfi acres. J. Type of Sewage to be connected under this permit :5 vial fA N%S WAGE I14D�TS�I,,a,I. ( ) C�r e iri%w 1� ma�'deth sa 3S Show sketch of proposed work or furnish 'two (2) copies of separate drawings. �j,.�PI; f HA REQUIREMENTS MUST BE FOI v q SPEC AL Ct�NDITIONS ' Desired Starting Date -$ 3 Estimated Time for Completion Permit to be issued to b 4, Ca $ the holder of Drain Layer's Lj sg C40-'j;T,. Permit will expire thirty (30) days after date of issuance. The und"ers %n d Drain Layer hereby agrees to all the terms and conditions set . forth in the permit and the reverse side thereof. Applicant has received Town Permit No. and/or CHD Permit No. Signed ').ice ed rain Layer The above named Drain Layer has a valid license is ued by the , State of Connecticut and has filed a satisfactory bond and insurance poli4j-YNthe name of the Town of W1&tf( ­W1%4Tsor: Bering Dept. Date Permit Fee Paid $ 3,1 O0 Check Number Connection Charge Receipt No. Dated Issued by t cr , 1 INSPECTION Date work started 9 Date completed Sufficient notification rece ve . G-Yes No Special Conditions APPROV �apor Date TOWN OF SOUTH WIN' OR SANITARY SEWER INSPECTION CHECKLIST FUN TION ° j NO YES N/A DATE INSPECTED 1. Is Permit On Job Site 2. Police Notified 3 . Safety Items In Place a. Shoring, Trench Box, adde b. Hard Hats C. Pumps 4 . Proper Material a. Pipe b. Pipe Bedding X C. Backfill —fi— d. Warning Tape e. Pipe Cap or Plug f . Cleanouts g. Fittings h. Manhole i . Cover & Frame 5 . Existing Lateral Cap Removed in Presence of Inspector 6 . Lateral probed and found to be clear 7 . Pavement Cut Properly 8 . Trench & Bedding OR 9 . Joints Properly Done 10 . Backfilling (12" Lifts ) & Compaction 11. Manhole Inverts Built 12. Subbase Material Placed 13 . Base Material Placed 14 . Blacktop (Temp) w/Proper Grades & Slopes 15 . Pressure Test 16 . Mandrel Test 17 . Installation agrees with plan 18 . As-Built plans recorded