Loading...
HomeMy WebLinkAboutNiederwerfer Road MORANDUM PUBLIC WORKS DEPARTMMT POLLUTION CONTROL DIVISION TO : Jules E. Page - Planning.Coordinator • FRO2i Melvin Edwards, Jr. - Sanitary Inspector DATE 28 July, 1976 SUBJECT PERMIT PLAN PREPARED FOR THEODORE L.';& LEON KAMINSKI The subject plan and accompanying test report copies of which I have attached for your records and information - cover only one (1) lot of the*Kaminski property.-,on.,the east side of. Niederwerfer Road the corner lot abutted on the north by land of the Connecticut Light and Power Company. I have just completed a review of this plan, as submitted to me by Dr. Ramesh P. Singhal, and have the following comments to offer: a. The perc rate of'twenty (20 minutes per inch is within the allowable limits -as set forth in Section 99-13-B2 01 of the Public Health Code; b. Using a scale, all separating distances appear to concur with Section Z 9-13-B20i of the Code;_ aiid ... c. As designed.;_the..._leaching..system is more.than.adequate to meet Code xequixe- ikerits; hawever, -I must insist that the trench ends be tied together as required red by, Sectiorr_.'19-'i3-B2�a.�a)�.of�the_Code. This zs.,a matter that would rioriaaily be handled in the field by the Drain Layer, however,- and presents zio problem ai this time. In short, with the addi.tion.of equalization trenches, I approve the plan as submitted. He n�s;dwards, Jx•. S^nitasy ins—c+.O Encl cc Allan S. Young - Director of Public Works Dr. Ramesh P. Singhal - file