HomeMy WebLinkAboutDrain Layers Permit Miller Road MILSTONE
SOUTH WINDSOR
WATER POLLUTION
CONTROL FACILITY
1 VIBERT RD
LOG REPORT
05-04-2005
PROJECT # : MILLER/STONE
DATE : 5/4/05
OPERATOR : EW/MR
TAPE #
TAPE START:
STREET :MILLER RD
DIRECTION OF FLOW:WEST
PIPE INFORMATION
IN FRONT OF HOUSE# UP:471
IN FRONT OF HOUSE# DN:461
PIPE TYPE PVC
PIPE SIZE 8"
LENGTH MH TO MH : 183 '
DEPTH OF M.H. : 7'9"
FLOW RATE : HEAVY
WEATHER: SUNNY/CLEAR
REMARKS:
FOOTAGE: TIME OF DAY: FAULT OR COMMENTS:
7.0 Ft 10:20am START OF M.H.
140.2 Ft 10: 32am LATERAL RIGHT
177. 6 Ft 10: 35am END OF RUN AT M.H.
Page 1
MILL3
SOUTH WINDSOR
WATER POLLUTION
CONTROL FACILITY
1 VIBERT RD
LOG REPORT
05-04-2005
PROJECT # MILLERSTONE
DATE 5/4/05
OPERATOR EW/MR
TAPE #
TAPE START:
STREET :MILLER RD
DIRECTION OF FLOW:WEST
PIPE INFORMATION
IN FRONT OF HOUSE# UP:496
IN FRONT OF HOUSE# DN:480
PIPE TYPE PVC
PIPE SIZE 8"
LENGTH MH TO MH : 205'
DEPTH OF M.H. : 5'9"
FLOW RATE : MODERATE
WEATHER:000L/CLOUDY
REMARKS:
FOOTAGE: TIME OF DAY: FAULT OR COMMENTS:
7.0 Ft 2:00pm START OF M.H.
30.4 Ft 2:02pm LATERAL RIGHT
57.0 Ft 2:04pm LATERAL RIGHT
62.0 Ft 2:05pm LATERAL RIGHT
166.2 Ft 2:09pm LATERAL RIGHT
195.3 Ft 2:10pm LATERAL LEFT
204.4 Ft 2:13pm END OF RUN AT M.H.
Page 1
MILSTONI
SOUTH WINDSOR
WATER POLLUTION
CONTROL FACILITY
1 VIBERT RD
LOG REPORT
05-04-2005
PROJECT # : MILLER/STONE
DATE : 5/4/05
OPERATOR : EW/MR
TAPE #
TAPE START:
STREET :MILLER RD
DIRECTION OF FLOW:WEST
PIPE INFORMATION
IN FRONT OF HOUSE# UP471
IN FRONT OF HOUSE# DN:480
PIPE TYPE : PVC
PIPE SIZE : 8"
LENGTH MH TO MH : 150'
DEPTH OF M.H. : 7'
FLOW RATE : HEAVY
WEATHER: SUNNY/CLEAR
REMARKS:
FOOTAGE: TIME OF DAY: FAULT OR COMMENTS:
3 . 5 Ft 10: 56am START OF M.H.
25 . 3 Ft 10: 59am LATERAL RIGHT
79.6 Ft 11:03am LATERAL LEFT
84.9 Ft 11:08am END OF RUN UNABLE TO
CONTINUE DUE TO BLOCKAGE
Page 1