Loading...
HomeMy WebLinkAboutDrain Layers Permit 1437 Main Street - - -- TOWM=--=OF SOUTH=1�IND l - -- - -- -- - - --_ DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL — -- — DRAIN-LAYER'S"PERMIT . 19 Pursuant to written application, permission is hereb grant d to the Licensed Drain Layer named herein to perform the work indicated below at .7- 7 !'YI�Q 1A,1 S at premises owned by CRA► ► _ i,,,-r�l� whose address is / 3 7 �A ) S'7 and to Lay House Drain, �,. Repair House Drain, Lay Main, Other , for F /,� 1, __occupancy or use, with Family Un tY `s, with/ acres. Type of Sewage to be connected under this permit : SANITARY SEWAGE ( , INDUSTRIAL WASTES ( ) , OR ( ) Connection will be made with Show sketch of proposed work or urnish 'two (2) copies of separate drawings. C r 7-Y 4JA.-rL-, T� "3t= �~ OS RREQUIREMENTS MUST BE FOLLOWED .SPECIAL CONDITIONS Desired Starting Date r Es to Time for Completion 7 i CA Permit to be issued to It _,� the holder of Drain Layer's Licens No.. Permit will expire thirty (30) days after date of issuance. The undersigned Drain Layer hereby agrees to all the terms and conditions set forth in the permit and the reverse side thereof. Applic nt has received Town Permit No. and/or CHD Permit No. SignedA Vz-,y/X A ce seta' D Layer The above named Drain Layer has a valid l cense is ed by the State of Connecticut and has filed a satisfactory bon land insurance policy in the name of the Town of South Windsor: /reli19 ng nee "i Dept . Date Permit Fee Paid $ 43, .00 Chec N ber _ IQ54 Connection Charge Receipt No. Dated—,O,}1/q�r�.C� Issued by < 3//4 INSPECTION Date work started �' s,/ Date completed Sufficient notification receivea 's"�yes No Special Conditions APPROVED: Inspector Date SANITARY LATERAL & EXCAVATION PERMIT / � ,/ INSPECTION REQUEST DATE OF REQUEST: 3 6`�/J'1 -- TIME: ! NN BY: // idl W AS FOR LOCATION: 143 — DAY INSPEC. NEEDED 3J/� ¢ TIME: A-;rj;�: Z- jQ A—;-,-i TYPE OF INSPECTION: ( k, SANITARY/LATERAL (PERMIT NO. D ) ( ) FOOTING DRAIN ( ) EXCAVATION (PERMIT NO. ) ( ) OTHER INSPECTION REPORT DATE: 3 TIME: INSP: CONTRACTOR: GC ll � C - % WEATHER: 1L"/e-- r WORK IN PROGRESS : AREA OF CONCERN: SPECIAL INSTRUCTIONS: