Loading...
HomeMy WebLinkAboutDrain Layers Permit 10 Linda Lane TOWN OF SOUTH WI N DSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT 19 Pursuant to written application, permission is hereby granted to the Licensed Drain Layer named herein to perform the work indicated below at , , at premises owned by r.. whose address is f, ;.. "�;. ...,s� � , and to Lay House Drain, _Repair House Drain, Lay Main, Other , for occupancy or use, with Family Units, with acres. Type of Sewage to be connected under this permit : SANITARY SEWAGE (, ) , INDUSTRIAL WASTES ( ) , OR ( ) Connection will be made with Show sketch of proposed work or furnish 'two (2) copies of separate drawings. SPECIAL CONDITIONS OSHA REQUIREMENTS MUST BE FOLLOWED Desired Starting Date Estimated Time for Completion Permit to be issued to :`j'` •., , .., the holder of Drain Layer' s License No. c.` f Permit will expire thirty (30) days after date of issuance. The undersigned Drain Layer hereby agrees to all the terms and conditions set forth in the permit and the reverse side thereof . Applicant has received Town Permit No. and/or CHD Permit No. . Signed ' Licensed Drain 1a.yer The above named Drain Layer has a valid license issued by the State of Connecticut and has filed a satisfactory bond and insurance policy in the name of the Town of South Windsor : Engineering Dept , Date Permit Fee Paid $ Check Number Connection Charge Receipt No. -,` "i ' - ` Dated Issued by INSPECTION Date work started !_- 2— ate completed �•-� -9� Sufficient notifica=ion receiv—ea : - .,Date No Special Conditions APPRO - f Inspector Date � TOWN OF SORTS WINDSOR SANITARY SEWER INSPECTION CHECKLIST FUNCTION ! NO YES N/A DATE INSPECTED 1. Is Permit On Job Site _,k ,.� -. 2 . Police Notified - 3. Safety Items In Place a. Shoring, Trench Box, Ladder b. Hard Hats C . Pumps _ 4 . Proper Material a. Pipe b. P_ipeBedding _ C . Backfill _ d. Warning Tape e. Pipe Cap or Plug — f . Cleanouts _ g. Fittings _ h. Manhole _ i . Cover & Frame _ 5 . Existing Lateral Cap Removed in Presence of Inspector 6 . Lateral probed and found to be clear 7 . Pavement Cut Properly 0 8 . Trench & Bedding OR 9 . Joints Properly Done 10 . Backfilling (12" Lifts ) & Compaction 11 . Manhole Inverts Built 12. Subbase Material Placed 13 . Base Material Placed 14 . Blacktop (Temp) w/Proper Grades & Slopes 15 . Pressure Test 16 . Mandrel Test 17 . Installation agrees with plan 18 . As-Built plans recorded