Loading...
HomeMy WebLinkAboutDrain Layers Permit 12 Jonathan Lane J OWN OF SOUTH WI N DSOR DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL DRAIN LAYER'S PERMIT 5931 19 i 9 /93. Pursuant to written application, permission is hereby granted to the 1 Licensed Drain, Layer named herein to perform the work indicated below t Z4he-- a pre e owne by L/ x Ca. , whose address ois 9� ✓,✓yr,l lYl.. �. �c� K--, and to Lay House Drain, Repaii House. Drain, Lay Main, Other , for occupancy or use, with Family Units, with acres. Type of Sewage- to be connected under this permits SANITARY SEWAGE ( � INDUSTRIAL WASTES ( ) , OR (- ) Connection will be made with Show sketch of proposed work or furnish 'two (2) copies of separate drawings. 4s her OSHA REQU f=LMUS �BFIOLLOWED SPECIAL CONDITIONS Desired Starting Date Estimated Time for Completion Permit to be issued to e uc �o the holder of Drain Layer's License No. 2opy, Permit will expire thirty (30) days after date of issuance.. The undersigned Drain Layer hereby agrees to all the terms and conditions set forth in the permit and the reverse side thereof. Applicant has received Town PermitNo. and/or CHD Permit No. i Signed License rain Layer The above named Drain Layer has a valid license issued by the State of Connecticut and has filed a satisfactory bond and insurance policy in the name of the Town of South Windsor: „ E ineering Dept. Date Permit Fee Paid $A5 Check `N ber Oooa46�1 Connection Charge Receipt No. en LIOQ 1_1 ated Issued by INSPECTION - Date work started Date completed ^^ / Sufficient notifica on rece v es No Special Conditions Inspector Date a TOWN OF SOUTH WIMSOR / S SANITARY SEWER INSPECTION CHECKLIST FUNCTION � NO YES N/A DATE INSPECTED , 1. Is Permit O(i Job Site 2. Police Notified 3. Safety Items In Place / a. Shoring, Trench Box, Ladder b. Hard Hats C. Pumps 4 . Proper Material a. Pipe b. Pipe Bedding = c . Backf ill d. Warning Tape �= -�- e. Pipe Cap or Plug f . Cleanouts g. Fittings k h. Manhole i. Cover & Frame 5. Existing Lateral Cap Removed in Presence of Inspector 6 . Lateral probed and found to be clear LS�� 7 . Pavement Cut Properly 8 . Trench & Bedding OR 9 . Joints Properly Done _ �� �s 9,3 10 . Backfilling (12" Lifts ) & Compaction 11 . Manhole Inverts Built 12 . Subbase Material Placed 13 . Base Material Placed 14 . Blacktop (Temp) w/Proper Grades & Slopes 15 . Pressure Test 16 . Mandrel Test 17 . Installation agrees with planCLy3 18. As-Built plans recorded