Loading...
HomeMy WebLinkAboutDrain Layers Permit 6 Jared Court ;tomY9.. { 3 -1'+ .. .Ju TOWN Of SOUTH WI N DSOR \�•'�� DEPARTMENT OF PUBLIC WORKS BUREAU OF POLLUTION CONTROL C DRAIN LAYER'S PERMIT N 5947 Z , 19 3 Pursuant to written application, permission is hereby granted to the Licens d Drain Layer named herein to perform the work indicated below at F ]� remises owned by w ose address is s` O.�" and to Lay House Drain, RepAir0gouse Drain, Lay Main, Other ✓, for occupancy or use, with Family Units, with acres. Type of " Sewage'-fto -be connected under this permit: SANITARY SEWAGE ( , INDUSTRIAL WASTES ( ); OR ( Connection will be made with S'rjpC- Show sketch of proposed work or furnish 'two (2) copies of separate drawings. SPECIAL CONDITIONS OSHA REQUIREMENTS MUST BE FOLLOWED Desired Starting Date ],/-23 - -3 Estimated Time for Completion Permit to be issued to the holder of Drain Layer's License No. Permit will expire thirty (30) days after date of issuance. The undersigned Drain Layer hereby agrees to all the terms and conditions set . forth in the permit and the reverse side thereof. Applicant has received Town Permit No. and/or CHD' Permit No. / Signed icens D Y Layer The above named Drain Layer has a -valid icense issued by the State of Connecticut and has filed a satisfactory bond ;and insurance policy in the name of the Town of South Windsor: Eng 8 iaierin 'Dept. Date Permit Fee Paid $ p'���j Check Number Connection Charge Receipt No. l42201� Dated LA e Issued by INSPECTION q Date work started 2— l.� Date completed Sufficient notifica on ece ve : es No Special Conditions APPROVED - -Z3y9 nspector Date �bM TOWN OF SOUTH WINDSOR SANITARY SEWER INSPECTION CHECKLIST Ak4 ,57V-7 FUT;CT_I e`er q V— �, NO YES N/A DATE INSPECTED 1 Is Pernut. On�Job Site 2. Police Notifie�[" 3. Safety Items In Place a. Shoring, Trench Box, Ladder b. Hard Hats C. Pumps 4 . Proper Material a. Pipe _ b. Pipe Bedding c. Backf ill d. Warning Tape _ e. Pipe Cap or Plug f. Cleanouts g. Fittings _ h. Manhole i. Cover & Frame 5 . Existing Lateral Cap Removed in Presence of Inspector 6 . Lateral probed and found to be clear _ 7 . Pavement Cut Properly 8. Trench & Bedding OK 9 . Joints Properly Done _ 10 . Backfilling (12" Lifts) A & Compaction 11 . Manhole Inverts Built 12. Subbase Material Placed 13 . Base Material Placed 14 . Blacktop (Temp) w/Proper Grades & Slopes 15 . Pressure Test 16 . Mandrel Test 17 . Installation agrees with plan _ 18 . As-Built plans recorded